pdcsummit.org STUDYING THE PAST TO BUILD A BETTER FUTURE LESSONS FROM A POST-OCCUPANCY EVALUATION PDC SUMMIT 2016

Ballinger & CCH talk at ASHE_PDC2016_As Delivered Final

Embed Size (px)

Citation preview

Page 1: Ballinger & CCH talk at ASHE_PDC2016_As Delivered Final

pdcsummit.org

STUDYING THE PAST TO BUILD A BETTER FUTURELESSONS FROM A POST-OCCUPANCY EVALUATION

PDC SUMMIT 2016

Page 2: Ballinger & CCH talk at ASHE_PDC2016_As Delivered Final

STUDYING THE PAST TO BUILD A BETTER FUTURELESSONS FROM A POST-OCCUPANCY EVALUATION

PDC SUMMIT 2016

Page 3: Ballinger & CCH talk at ASHE_PDC2016_As Delivered Final

PRESENTERS:

Louis Meilink, Jr., AIA, ACHA, ACHE PrincipalBallinger

Cathy Weidman, MPA, BSN, RN, CNML Director of Medical Surgical ServicesThe Chester County Hospital

Christina Grimes, AIA, LEED AP BD+C, EDAC Senior Associate, Healthcare Planner Ballinger

Debbie Phillips, AIA, ACHA, EDACSenior Healthcare PlannerBallinger

pdcsummit.org

Page 4: Ballinger & CCH talk at ASHE_PDC2016_As Delivered Final

IDENTIFY DESIGN CONCEPTS THAT PROVIDE THE MOST IMPACT ON HCAHPS SCORES, EITHER BECAUSE OF PATIENT SATISFACTION OR THROUGH BETTER STAFF PERFORMANCE.

CALCULATE THE COST SAVINGS FROM DIFFERENT DESIGN INTERVENTIONS AND ASSESS FIRST COSTS (CONSTRUCTION) AGAINST LONGER TERM (OPERATIONAL) COSTS.

COMPARE STAFF RESPONSES FROM POE AGAINST THE INITIAL GOALS AND EXPECTATIONS FOR THE PROJECT.

LIST WHICH DESIGN INTERVENTIONS PERFORMED WELL ENOUGH TO MERIT REPETITION IN UPCOMING BUILDING CONSTRUCTION.

pdcsummit.org

TO PARTICIPATE IN POLL:

TEXT TO 22333 and TYPE BALLINGER2016THEN TEXT A, B, C, OR D TO RESPOND TO QUESTIONS

Page 5: Ballinger & CCH talk at ASHE_PDC2016_As Delivered Final

PHILADELPHIA

NEW YORK

WEST CHESTER, PA

CHESTER COUNTY HOSPITALPENN MEDICINE HEALTH SYSTEM

Page 6: Ballinger & CCH talk at ASHE_PDC2016_As Delivered Final

463,000 SFEXISTING CAMPUS

36.26 ACRES

242 BEDS

108,000 GSFLASKO TOWER

$40MCONSTRUCTION

COST

$63MPROJECT COST

Page 7: Ballinger & CCH talk at ASHE_PDC2016_As Delivered Final

Clinical Administrative

Page 8: Ballinger & CCH talk at ASHE_PDC2016_As Delivered Final
Page 9: Ballinger & CCH talk at ASHE_PDC2016_As Delivered Final
Page 10: Ballinger & CCH talk at ASHE_PDC2016_As Delivered Final
Page 11: Ballinger & CCH talk at ASHE_PDC2016_As Delivered Final
Page 12: Ballinger & CCH talk at ASHE_PDC2016_As Delivered Final
Page 13: Ballinger & CCH talk at ASHE_PDC2016_As Delivered Final

PROJECT TIMELINES

Page 15: Ballinger & CCH talk at ASHE_PDC2016_As Delivered Final
Page 16: Ballinger & CCH talk at ASHE_PDC2016_As Delivered Final

VALUE OF THE TEMPLATE

L3: ORTHO

L4: TELEMETRY

GW: ORTHO

L2: OB

Page 17: Ballinger & CCH talk at ASHE_PDC2016_As Delivered Final

LASKO TOWER

GW: ORTHO

L2: OB

L3: ORTHO

WEST BUILDING

2

G1

3

L4: TELEMETRY4

13,295 UNIT SF20 BEDS210 SF / ROOMBUILT 1962, RENOVATED 19981 CENTRAL NURSE STATION

23,300 UNIT SF24 BEDS320 SF / ROOMBUILT 20132 SMALL NURSE STATIONS (L2)2 CENTRAL NURSE STATIONS (L3 + L4)12 DECENTRALIZED STATIONS (ALL)

Page 18: Ballinger & CCH talk at ASHE_PDC2016_As Delivered Final

5 KEY DESIGN DECISIONS

• TEMPLATE DESIGN FOR M/S, IMU AND ICU CAPABLE WITH RENOVATION• DECENTRALIZED CARE STATIONS BETWEEN EVERY 2 ROOMS• ALL PRIVATE ROOMS – MIRRORED IDENTICAL CARE GIVING• OUTBOARD TOILETS• PATIENT / FAMILY AMENITIES IN ROOM

Page 19: Ballinger & CCH talk at ASHE_PDC2016_As Delivered Final

SURVEY OF PATIENTS

SURVEY OF STAFF

ONSITE OBSERVATION

ONSITE INTERVIEWS WITH STAFF

DATA COLLECTION METHODS

Page 20: Ballinger & CCH talk at ASHE_PDC2016_As Delivered Final

STAFF PATIENTS

RESPONDENT DEMOGRAPHICS

Page 21: Ballinger & CCH talk at ASHE_PDC2016_As Delivered Final
Page 22: Ballinger & CCH talk at ASHE_PDC2016_As Delivered Final
Page 23: Ballinger & CCH talk at ASHE_PDC2016_As Delivered Final

STAFF PATIENTSL4 L3 L2 GW

OVERALL SATISFACTION

Page 24: Ballinger & CCH talk at ASHE_PDC2016_As Delivered Final

PATIENT SATISFACTION

Page 25: Ballinger & CCH talk at ASHE_PDC2016_As Delivered Final

ICONIC SUCCESS

STAFF PATIENTS

LASKO AVERAGE GW

$$

Page 26: Ballinger & CCH talk at ASHE_PDC2016_As Delivered Final

$$

Page 27: Ballinger & CCH talk at ASHE_PDC2016_As Delivered Final

320 SFTYPICAL LASKO

210 SFGROUND WEST

$$$

Page 28: Ballinger & CCH talk at ASHE_PDC2016_As Delivered Final

$$$

PATIENT SAFETY

Page 29: Ballinger & CCH talk at ASHE_PDC2016_As Delivered Final

PATIENT SAFETY

Page 30: Ballinger & CCH talk at ASHE_PDC2016_As Delivered Final
Page 31: Ballinger & CCH talk at ASHE_PDC2016_As Delivered Final
Page 32: Ballinger & CCH talk at ASHE_PDC2016_As Delivered Final
Page 33: Ballinger & CCH talk at ASHE_PDC2016_As Delivered Final
Page 34: Ballinger & CCH talk at ASHE_PDC2016_As Delivered Final

$$

30 CENTRAL SEATS 24 CENTRAL SEATS 12 CENTRAL SEATS

Page 35: Ballinger & CCH talk at ASHE_PDC2016_As Delivered Final

$$

30 CENTRAL SEATS 24 CENTRAL SEATS 12 CENTRAL SEATS

Page 36: Ballinger & CCH talk at ASHE_PDC2016_As Delivered Final
Page 37: Ballinger & CCH talk at ASHE_PDC2016_As Delivered Final

$$

30 CENTRAL SEATS 24 CENTRAL SEATS 12 CENTRAL SEATS

ADEQUATE LOCATIONS FOR CHARTING

L3: ORTHOL4: TELEMETRY L2: OB

Page 38: Ballinger & CCH talk at ASHE_PDC2016_As Delivered Final

$TRAVEL DISTANCE BETWEEN STAFF WORK AREAS

L3: ORTHOL4: TELEMETRY L2: OB

Page 39: Ballinger & CCH talk at ASHE_PDC2016_As Delivered Final

$VISIBILITY BETWEEN STAFF WORK AREAS

L3: ORTHOL4: TELEMETRY L2: OB

Page 40: Ballinger & CCH talk at ASHE_PDC2016_As Delivered Final

$$TRAVEL DISTANCE BETWEEN STAFF WORK & PATIENT CARE AREAS

L3: ORTHOL4: TELEMETRY L2: OB

Page 41: Ballinger & CCH talk at ASHE_PDC2016_As Delivered Final

$$VISIBILITY BETWEEN STAFF WORK & PATIENT CARE AREAS

L3: ORTHOL4: TELEMETRY L2: OB

Page 42: Ballinger & CCH talk at ASHE_PDC2016_As Delivered Final

$PROXIMITY OF SUPPLIES TO THE PATIENT ROOMS

L3: ORTHOL4: TELEMETRY L2: OB

Page 43: Ballinger & CCH talk at ASHE_PDC2016_As Delivered Final

L4: TELEMETRY

PROXIMITY INDEX BETWEEN STAFF WORK AREAS

CENTRAL STATION

L4: TELEMETRY

DECENTRALIZED STATION

Page 44: Ballinger & CCH talk at ASHE_PDC2016_As Delivered Final

L2: OBL2: OB

CENTRAL STATION DECENTRALIZED STATION

PROXIMITY INDEX BETWEEN STAFF WORK AREAS

Page 45: Ballinger & CCH talk at ASHE_PDC2016_As Delivered Final

L4: TELEMETRY L2: OB

PROXIMITY INDEX

Page 46: Ballinger & CCH talk at ASHE_PDC2016_As Delivered Final
Page 47: Ballinger & CCH talk at ASHE_PDC2016_As Delivered Final

MATERIAL COST/BENEFITFIRST COST OPS COST MAINT. ACOUST. SAFETY

$$$ $ + EPOXY FLOORING

$$ $$ TILE

$ $$$ VCT

$$ $ + SHEET VINYL

$ $$ PLASTIC LAMINATE

$$ $ SOLID SURFACE

$$ - ACOUSTIC TILE

$$$ - + ACOUSTIC TILE - ENHANCED

Page 48: Ballinger & CCH talk at ASHE_PDC2016_As Delivered Final

OVERALL COST/BENEFITFIRST COST OPS COST MAINT. ACOUST. SAFETY

$ $$$ - PAINT

$$ $$$ + FLOORING

$$ $$ + CASEWORK

$$$ $ + + LAYOUT: PRIVATE ROOMS

$ $ + + LAYOUT: DECENTRALIZED STATION

$ $ + + LAYOUT: SUPPLY LOCATIONS

$$ $ LAYOUT: FAMILY AMENITIES

$$$ $ + BUILDING EXTERIOR

Page 49: Ballinger & CCH talk at ASHE_PDC2016_As Delivered Final

WHAT WOULD WE CHANGE?• DIFFERENT CONFIGURATION OF MAIN NURSING STATION• VERIFY TRAVEL DISTANCES FOR FREQUENTLY FETCHED ITEMS

WHAT REPEATS IN NEXT PROJECT?• LARGE WINDOWS• +/- 320 SF FOR SINGLE PATIENT ROOM & BATHROOM• DECENTRALIZED STATIONS IMPROVED WORKFLOW• MATERIAL : SOLID SURFACE, RESIN FLOOR

Page 50: Ballinger & CCH talk at ASHE_PDC2016_As Delivered Final

STUDYING THE PAST TO BUILD A BETTER FUTURELESSONS FROM A POST-OCCUPANCY EVALUATION

PDC SUMMIT 2016