Ballard Conveyance Design Contract Info Session Richard Fernandez Ship Canal Water Quality Project Project Manager Eset Alemu Ship Canal Water Quality Project Project Engineer Katia Garcia Environmental Justice and Service Equity WMBE Manager November 2, 2018 1

Ballard Conveyance Design Contract Info Session · Ballard Conveyance Project DIVERSION LOCATION GRAVITY FLOW TEPS. Ballard Conveyance Project CONVEYANCE SYSTEM CHARACTERISTICS •

  • Upload
    others

  • View
    3

  • Download
    0

Embed Size (px)

Citation preview

Page 1: Ballard Conveyance Design Contract Info Session · Ballard Conveyance Project DIVERSION LOCATION GRAVITY FLOW TEPS. Ballard Conveyance Project CONVEYANCE SYSTEM CHARACTERISTICS •

Ballard Conveyance Design Contract Info Session

Richard FernandezShip Canal Water Quality ProjectProject Manager

Eset AlemuShip Canal Water Quality ProjectProject Engineer

Katia GarciaEnvironmental Justice and Service EquityWMBE Manager

November 2, 2018

1

Page 2: Ballard Conveyance Design Contract Info Session · Ballard Conveyance Project DIVERSION LOCATION GRAVITY FLOW TEPS. Ballard Conveyance Project CONVEYANCE SYSTEM CHARACTERISTICS •

Agenda• Welcome• Ship Canal Water Quality Project Overview• WMBE Inclusion• Ballard Conveyance Overview• Key Project Risks• Design Contract Tasks• Questions• Networking

2

Page 3: Ballard Conveyance Design Contract Info Session · Ballard Conveyance Project DIVERSION LOCATION GRAVITY FLOW TEPS. Ballard Conveyance Project CONVEYANCE SYSTEM CHARACTERISTICS •

Questions1. What interests you about the

Ship Canal Water Quality Project and Ballard Conveyance?

2. What do you hope to get from and give to the project?

Page 4: Ballard Conveyance Design Contract Info Session · Ballard Conveyance Project DIVERSION LOCATION GRAVITY FLOW TEPS. Ballard Conveyance Project CONVEYANCE SYSTEM CHARACTERISTICS •

Ship Canal Water Quality Project Overview

Page 5: Ballard Conveyance Design Contract Info Session · Ballard Conveyance Project DIVERSION LOCATION GRAVITY FLOW TEPS. Ballard Conveyance Project CONVEYANCE SYSTEM CHARACTERISTICS •

Ship Canal Water Quality

Program

5

Keeps over 80 million gallons of combined

sewage overflow out of the Ship Canal, Salmon

Bay, and Lake Union each year

Page 6: Ballard Conveyance Design Contract Info Session · Ballard Conveyance Project DIVERSION LOCATION GRAVITY FLOW TEPS. Ballard Conveyance Project CONVEYANCE SYSTEM CHARACTERISTICS •

SCWQP Locations

6

Page 7: Ballard Conveyance Design Contract Info Session · Ballard Conveyance Project DIVERSION LOCATION GRAVITY FLOW TEPS. Ballard Conveyance Project CONVEYANCE SYSTEM CHARACTERISTICS •

Facility Plan

Ballard Early Work

Storage Tunnel

Pump Station

Ballard Conveyance

Wallingford Conveyance

Street Restoration

Small Works Projects

Program Management

2015 2016 2017 2018 2019 2020 2021 2022 2023 2024 2025

7

Planning and Management Options Analysis Design Construction

SCWQP Schedule

Page 8: Ballard Conveyance Design Contract Info Session · Ballard Conveyance Project DIVERSION LOCATION GRAVITY FLOW TEPS. Ballard Conveyance Project CONVEYANCE SYSTEM CHARACTERISTICS •

Consent Decree Milestones

8

Deadline DescriptionMarch 31, 2020 Draft Plans and 

SpecificationsDecember 31, 2020 Final Plans and 

SpecificationsDecember 31, 2024 Construction Complete

December 31, 2025 Operational

Page 9: Ballard Conveyance Design Contract Info Session · Ballard Conveyance Project DIVERSION LOCATION GRAVITY FLOW TEPS. Ballard Conveyance Project CONVEYANCE SYSTEM CHARACTERISTICS •

SCWQP Costs Total Ship Canal Project Cost = $570M at 70% confidence

Project is within the Adopted Budget and approved by Council

Ballard Conveyance Project is within the $570M

Page 10: Ballard Conveyance Design Contract Info Session · Ballard Conveyance Project DIVERSION LOCATION GRAVITY FLOW TEPS. Ballard Conveyance Project CONVEYANCE SYSTEM CHARACTERISTICS •

WMBE Inclusion

Page 11: Ballard Conveyance Design Contract Info Session · Ballard Conveyance Project DIVERSION LOCATION GRAVITY FLOW TEPS. Ballard Conveyance Project CONVEYANCE SYSTEM CHARACTERISTICS •

WMBE Inclusion• Race & Social Justice Initiative and Contracting Equity

• Tools & Opportunities:• WMBE Inclusion Plan• Online Business Directory• Outreach Events

• Reporting & Accountability:• B2GNow• Prompt Payment

Page 12: Ballard Conveyance Design Contract Info Session · Ballard Conveyance Project DIVERSION LOCATION GRAVITY FLOW TEPS. Ballard Conveyance Project CONVEYANCE SYSTEM CHARACTERISTICS •

WMBE Consultant Inclusion Plan• Aspirational WMBE Goals

• Core Work vs. Non-core Work

• Past Performance

• Inclusion Strategies • Partnering• Mentoring

Page 13: Ballard Conveyance Design Contract Info Session · Ballard Conveyance Project DIVERSION LOCATION GRAVITY FLOW TEPS. Ballard Conveyance Project CONVEYANCE SYSTEM CHARACTERISTICS •

WMBE Consultant Inclusion Plan

• Aspirational Goals• Core Work vs. Non-core Work• Partnering/Inclusion Strategies• Mentoring

Page 14: Ballard Conveyance Design Contract Info Session · Ballard Conveyance Project DIVERSION LOCATION GRAVITY FLOW TEPS. Ballard Conveyance Project CONVEYANCE SYSTEM CHARACTERISTICS •

Ballard Conveyance Overview

Page 15: Ballard Conveyance Design Contract Info Session · Ballard Conveyance Project DIVERSION LOCATION GRAVITY FLOW TEPS. Ballard Conveyance Project CONVEYANCE SYSTEM CHARACTERISTICS •

Ballard Conveyance Project

CONVEYANCE SYSTEMS FOR• BASIN 152 • BASIN 150/151

Page 16: Ballard Conveyance Design Contract Info Session · Ballard Conveyance Project DIVERSION LOCATION GRAVITY FLOW TEPS. Ballard Conveyance Project CONVEYANCE SYSTEM CHARACTERISTICS •

Ballard Conveyance Project

DIVERSION LOCATION 

GRAVITY FLOW

TEPS

Page 17: Ballard Conveyance Design Contract Info Session · Ballard Conveyance Project DIVERSION LOCATION GRAVITY FLOW TEPS. Ballard Conveyance Project CONVEYANCE SYSTEM CHARACTERISTICS •

Ballard Conveyance Project

CONVEYANCE SYSTEM CHARACTERISTICS 

• Peak Flows – 130MGD• Structures

o Diversion structure o Gate Vault o Maintenance Holes 

• Trenchless pipe installation

Page 18: Ballard Conveyance Design Contract Info Session · Ballard Conveyance Project DIVERSION LOCATION GRAVITY FLOW TEPS. Ballard Conveyance Project CONVEYANCE SYSTEM CHARACTERISTICS •

Ballard Conveyance Project

UPSTREAM END • Residential (NW 56th St + 28th Ave NW)

Page 19: Ballard Conveyance Design Contract Info Session · Ballard Conveyance Project DIVERSION LOCATION GRAVITY FLOW TEPS. Ballard Conveyance Project CONVEYANCE SYSTEM CHARACTERISTICS •

19

Ballard Conveyance Project

PROJECT AREA• Residential (NW 56th St)

Page 20: Ballard Conveyance Design Contract Info Session · Ballard Conveyance Project DIVERSION LOCATION GRAVITY FLOW TEPS. Ballard Conveyance Project CONVEYANCE SYSTEM CHARACTERISTICS •

PROJECT AREA• Commercial / High Traffic zone (24th Ave NW) 

Ballard Conveyance Project

Page 21: Ballard Conveyance Design Contract Info Session · Ballard Conveyance Project DIVERSION LOCATION GRAVITY FLOW TEPS. Ballard Conveyance Project CONVEYANCE SYSTEM CHARACTERISTICS •

Ballard Conveyance Project

Page 22: Ballard Conveyance Design Contract Info Session · Ballard Conveyance Project DIVERSION LOCATION GRAVITY FLOW TEPS. Ballard Conveyance Project CONVEYANCE SYSTEM CHARACTERISTICS •

Ballard Conveyance Project

Page 23: Ballard Conveyance Design Contract Info Session · Ballard Conveyance Project DIVERSION LOCATION GRAVITY FLOW TEPS. Ballard Conveyance Project CONVEYANCE SYSTEM CHARACTERISTICS •

23

Key Project Risks1. Constructability at

NW 56th and 24th

Ave NW2. Meeting consent

decree milestones3. Unplanned

interventions4. Subsurface

conditions5. Utility

Coordination

Page 24: Ballard Conveyance Design Contract Info Session · Ballard Conveyance Project DIVERSION LOCATION GRAVITY FLOW TEPS. Ballard Conveyance Project CONVEYANCE SYSTEM CHARACTERISTICS •

Ballard Conveyance Schedule

1. 03/31/20 Submit Draft Plans and Specs (90%) to Ecology2. 12/31/20 Submit Final Plans and Specs (100%) to Ecology3. 09/2022 Storage Tunnel Demob from West Shaft Site4. 04/2024 Construction Complete

2018 2019 2020 2021 2022 2023 2024

Ship Canal Water Quality Project Construction

DesignPhase

Construction Phase

1 2 3 4

Page 25: Ballard Conveyance Design Contract Info Session · Ballard Conveyance Project DIVERSION LOCATION GRAVITY FLOW TEPS. Ballard Conveyance Project CONVEYANCE SYSTEM CHARACTERISTICS •

Design & Engineering Services Contract

Page 26: Ballard Conveyance Design Contract Info Session · Ballard Conveyance Project DIVERSION LOCATION GRAVITY FLOW TEPS. Ballard Conveyance Project CONVEYANCE SYSTEM CHARACTERISTICS •

• Project Management and Quality Control

• Geotechnical Investigation, Reports, and TMs

• Basis of Design• Value Engineering Study

Participation• 30, 60, 90, 100% Design

Submittals• Construction Cost

Estimates

• Final Contract Documents (revised 100% deliverables for bidding purposes)

• Operations and Maintenance Plan

• Bid Support• Permit Support• Public Outreach

Support• Engineering Services

During Construction (Planned Amendment)

26

Major Deliverables

Page 27: Ballard Conveyance Design Contract Info Session · Ballard Conveyance Project DIVERSION LOCATION GRAVITY FLOW TEPS. Ballard Conveyance Project CONVEYANCE SYSTEM CHARACTERISTICS •

Task 1: Project Management

• Develop a Project Management Plan

• Develop a Quality Management Plan

• Prepare Monthly Progress Reports

• Communications with SPU• Track and control schedule

and budget• Manage the Consulting

Team

27

Page 28: Ballard Conveyance Design Contract Info Session · Ballard Conveyance Project DIVERSION LOCATION GRAVITY FLOW TEPS. Ballard Conveyance Project CONVEYANCE SYSTEM CHARACTERISTICS •

Pre-Design Tasks

Task 2: Review Background Information and Existing Site ConditionsTask 3: Geotechnical Investigation and Reports

• Site Exploration Plan• Geotechnical Investigation• Geotechnical Data Report,

Interpretive Technical Memoranda, and Baseline Report

Task 4: Initial Basis of Design

28

Page 29: Ballard Conveyance Design Contract Info Session · Ballard Conveyance Project DIVERSION LOCATION GRAVITY FLOW TEPS. Ballard Conveyance Project CONVEYANCE SYSTEM CHARACTERISTICS •

Design Tasks1

Task 5: 30% DesignTask 6: Value EngineeringTask 7: 60% DesignTask 8: 90% Design2

Task 9: 100% Design3

Task 10: Final Contract DocumentsTask 16: Physical Modeling1 - All design tasks to conform to SPU’s Design Standards and Guidelines available at https://www.seattle.gov/util/Engineering/DSG/

2 - Submit to Ecology Draft Plans and Specifications by 3/31/2020

3 – Submit to Ecology Final Plans and Specifications by 12/31/2020 29

Page 30: Ballard Conveyance Design Contract Info Session · Ballard Conveyance Project DIVERSION LOCATION GRAVITY FLOW TEPS. Ballard Conveyance Project CONVEYANCE SYSTEM CHARACTERISTICS •

Support Tasks

Task 11: Bid SupportTask 12: Permit SupportTask 13: Public Outreach SupportTask 15: Utility CoordinationTask 17: Wallingford Conveyance Deign Support

30

Page 31: Ballard Conveyance Design Contract Info Session · Ballard Conveyance Project DIVERSION LOCATION GRAVITY FLOW TEPS. Ballard Conveyance Project CONVEYANCE SYSTEM CHARACTERISTICS •

Operations and Maintenance

Task 14: O&M Plan• O&M Workshop• Rolled into SCWQP O&M

Manual

31

Page 32: Ballard Conveyance Design Contract Info Session · Ballard Conveyance Project DIVERSION LOCATION GRAVITY FLOW TEPS. Ballard Conveyance Project CONVEYANCE SYSTEM CHARACTERISTICS •

Procurement Schedule

Task DateRFP Release/Advertisement 11/19/2018

Deadline for Questions 12/6/2018

Sealed Proposals Due to SPU 12/18/2018

Announcement of Selected Proposal

1/30/2019

Anticipated Contract Execution 4/12/2019