BALANCE CANTILEVER BALANCE CANTILEVER BRIDGEBRIDGE --CONSTRUCTIONCONSTRUCTION
Dr. Amorn PimanmasSirindhorn International Institute of Technology, Thammasat UniversityNorconsult Civil Engineering
Balanced Cantilever Construction
-Construction method for several bridges across the Chao Praya River
-Good for medium to long span bridge, from 60-150 m.
-No scaffolding required in the river.
Rama V Bridge: Main span = 130 m, 2 side spans each 95 m.
สภาวศิวกร
TromsoTromso Bridge, NorwayBridge, Norway80 m Span, Built in 195880 m Span, Built in 1958
RaftsundetRaftsundet Bridge, NorwayBridge, Norway298 m Span, Built in 1998298 m Span, Built in 1998
สภาวศิวกร
NangklaoNangklao Bridge, ThailandBridge, Thailand84 m Span, Built in 198384 m Span, Built in 1983
PinklaoPinklao Bridge , Thailand Bridge , Thailand 114 m Span, Built in 1971114 m Span, Built in 1971
สภาวศิวกร
Rama III Bridge , Thailand Rama III Bridge , Thailand 226 m Span, Built in 1996226 m Span, Built in 1996
Rama V Bridge , Thailand Rama V Bridge , Thailand 130 m Span, Built in 1999130 m Span, Built in 1999
สภาวศิวกร
NewNew NonthaburiNonthaburi Bridge , Thailand Bridge , Thailand 160 m Span160 m Span
NewNew NangklaoNangklao Bridge , Thailand Bridge , Thailand 229 m Span229 m Span
สภาวศิวกร
Existing Nangklao bridge
New Nangklao bridge
FREE CANTILEVER METHODFREE CANTILEVER METHODสภาวศิวกร
THE PRINCIPLE OF FREE CANTILEVERINGTHE PRINCIPLE OF FREE CANTILEVERING
PROCEDURE OF BALANCED CANTILEVERINGPROCEDURE OF BALANCED CANTILEVERING
1) ASSEMBLY OF FIRST TRAVELLER
2) FIRST TRAVELLER READY FOR CONCRETINGASSEMBLY OF SECOND TRAVELLERS
3) SECOND TRAVELLER READY FOR CONCRETING
4) STRESSING OF CABLES5) ADVANCING OF TRAVELLERS CONCRETING OF THIRD SEGMENT
FIRST TRAVELLERS READY FOR CONCRETING OF FOURTH SEGMENT1
2
3
4
5
สภาวศิวกร
TYPICAL CABLE LAYOUT
TWIN WALL TYPE PIER
CROSS CROSS -- SECTIONSECTION
สภาวศิวกร
BOXBOX--GIRDERGIRDER
Jetty Jetty
สภาวศิวกร
สภาวศิวกร
Platform Platform PrecastPrecast Element Element
สภาวศิวกร
PierheadPierhead
สภาวศิวกร
PierheadPierhead
สภาวศิวกร
11
สภาวศิวกร
Segment Segment
สภาวศิวกร
Segment Segment
สภาวศิวกร
สภาวศิวกร
Concrete BarrierConcrete Barrier
Aphetic Topping Aphetic Topping
สภาวศิวกร
CANTILEVERING ON ONE PIERCANTILEVERING ON ONE PIER
VIEW VIEW OF BRIDGE DURING OF BRIDGE DURING CANTILEVERINGCANTILEVERING
สภาวศิวกร
MID SPAN CLOUSUREMID SPAN CLOUSURE
CONNECTED AT MIDSPANCONNECTED AT MIDSPAN
สภาวศิวกร