Upload
reagan-luna
View
17
Download
1
Embed Size (px)
DESCRIPTION
Baggs lesson plans 05/12/2010 -05172010. Substitute Plans Wednesday Thursday Friday Monday. Wednesday: 05/12/10. Scholastic Arts (Folk or Medieval) Answer questions “Quiz on Thursday) (Turn in today –Name/Date/Period Do 2 processes in your Design Snectics Packet - PowerPoint PPT Presentation
Citation preview
Baggs lesson plans05/12/2010 -05172010
Substitute Plans
Wednesday
Thursday
Friday
Monday
Wednesday: 05/12/10
Scholastic Arts (Folk or Medieval) Answer questions “Quiz on Thursday) (Turn in today –Name/Date/Period
Do 2 processes in your Design Snectics PacketPaint your papier mache animals (2 coats
minimum in the style of your artist)Clean UpNo netbook use = Referral for use today!No Bathroom or leaving the room so go before the
bell
Thursday, 05/13/10ID check
• Scholastic Art Quiz (turn in today – verifies your attendance)
• Do 2 more processes in Design Synectics (you should be at # 8 by the end of the period or you will have homework)
• Paint (2 coats minimum on papier mache in the stryle of your artist (last day due tomorrow)
• Clean up• Review Safety Procedures
Friday 05/14/10
• Progress Report Deadline
• Turn in packet (after you finish up to #10 Today)
• Papier- mache Animal due
• Computer Graphic Animal explained –Bring Charged Netbook Monday
Monday, May 17,2010
• Copy, paste a picture of an inimal into word• Obtain a drawing tool bar (view-toolbars-drawing)• Click on Photo in word (right click-format picture-layout, text behind, ok)• Click to the side of photo• Click autoshapes – liines- scribble• Begin to draw contour line drawing over your photo (trace)• To group line; click on line, hold CTRL, click on other line, right click – grouping – group• Drag photo of original animal to bottom right• Autoshape – stars banner pick a banner – stretch at top right corner• Click on textbos – stretch on banner – type: name, date, period• Drop in p:drive/ or print in library/ turn in by end of day• Should have the following layout
Pic drawn
Orig pic
NameDate
Period