WATERFRONT INTEGRATED RESORT COLOMBO - SRI LANKA 23th March 2015 6.4.2/1 ITEM DESCRIPTION QTY UNIT CONCRETE WORKS Reinforced Concrete A Suspended slabs, 200mm thick 1,356 B Suspended slabs, 270mm thick 453 C Suspended slabs, 300mm thk. for lift pit 3 D Suspended slabs 350mm, thk. for pool 80 E Suspended slabs 430mm, thk. for water tank 18 F Suspended slabs, 570mm thk. for pool 22 G Ramps, 200mm thick 292 H Ramps, 220mm thick 162 J Walls, 500mm thick 13 K Walls, 300mm thick 6 L Water tank walls, 300mm thick 26 M Lift pit walls, 400mm thick 6 N Beams 785 P Staircase 50 Q Core walls, 300mm thick 205 R Core walls, 600mm thick 682 BILL NO 6.4.2 - SUPER STRUCTURE +0.78 m TO +18.78 m LEVEL FOR BUILDING # 4 Reinforced poured concrete Grade 30/37 and fill in to formwork and well packed around bar reinforcements / steel sections Reinforced poured concrete Grade 40/50 and fill in to formwork and well packed around bar reinforcements / steel sections

B4 BOQ 1.5~20m - 23.03.2015

Embed Size (px)

DESCRIPTION

Boq

Citation preview

Page 1: B4 BOQ 1.5~20m - 23.03.2015

WATERFRONT INTEGRATED RESORTCOLOMBO - SRI LANKA 23th March 2015

6.4.2/1

ITEM DESCRIPTION QTY UNIT RATE

CONCRETE WORKS

Reinforced Concrete

A Suspended slabs, 200mm thick 1,356 m³

B Suspended slabs, 270mm thick 453 m³

C Suspended slabs, 300mm thk. for lift pit 3 m³

D Suspended slabs 350mm, thk. for pool 80 m³

E Suspended slabs 430mm, thk. for water tank 18 m³

F Suspended slabs, 570mm thk. for pool 22 m³

G Ramps, 200mm thick 292 m³

H Ramps, 220mm thick 162 m³

J Walls, 500mm thick 13 m³

K Walls, 300mm thick 6 m³

L Water tank walls, 300mm thick 26 m³

M Lift pit walls, 400mm thick 6 m³

N Beams 785 m³

P Staircase 50 m³

Q Core walls, 300mm thick 205 m³

R Core walls, 600mm thick 682 m³

AMOUNT (US$)

BILL NO 6.4.2 - SUPER STRUCTURE +0.78 m TO +18.78 m LEVEL FOR BUILDING # 4

Reinforced poured concrete Grade 30/37 and fill in to formwork and well packed around bar reinforcements / steel sections

Reinforced poured concrete Grade 40/50 and fill in to formwork and well packed around bar reinforcements / steel sections

Page 2: B4 BOQ 1.5~20m - 23.03.2015

WATERFRONT INTEGRATED RESORTCOLOMBO - SRI LANKA 23th March 2015

6.4.2/2

ITEM DESCRIPTION QTY UNIT RATE AMOUNT

(US$)

TO COLLECTION

CONCRETE WORKS (Cont'd)

Reinforced Concrete (Cont'd)

A Columns 815 m³

BILL NO 6.4.2 - SUPER STRUCTURE +0.78 m TO +18.78 m LEVEL FOR BUILDING # 4 (Cont'd)

Reinforced poured concrete Grade 50/60 and fill in to formwork and well packed around bar reinforcements / steel sections

Page 3: B4 BOQ 1.5~20m - 23.03.2015

WATERFRONT INTEGRATED RESORTCOLOMBO - SRI LANKA 23th March 2015

6.4.2/3

ITEM DESCRIPTION QTY UNIT RATE AMOUNT

(US$)

TO COLLECTION

CONCRETE WORKS (Cont'd)

Reinforcement

In suspended slabs including ramps,pool & water tank slabs, diameter

A 6mm 6,687 kg

B 8 mm 26,956 kg

C 10 mm 74,687 kg

D 12 mm 53,519 kg

E 16 mm 56,228 kg

F 20 mm 28,919 kg

G 25 mm 29,898 kg

H 32 mm 2,774 kg

In suspended slabs for lift pit, diameter

J 12 mm 354 kg

In walls, diameter

K 10 mm 914 kg

In water tank walls, diameter

L 10 mm 205 kg

M 12 mm 395 kg

BILL NO 6.4.2 - SUPER STRUCTURE +0.78 m TO +18.78 m LEVEL FOR BUILDING # 4 (Cont'd)

High yield deformed bar reinforcement and mild steel stirrups to BS 4449 including bends, hooks, tying wire distance blocks and ordinary spacers (Laps and designed chairs included in quantities)

Page 4: B4 BOQ 1.5~20m - 23.03.2015

WATERFRONT INTEGRATED RESORTCOLOMBO - SRI LANKA 23th March 2015

6.4.2/4

ITEM DESCRIPTION QTY UNIT RATE AMOUNT

(US$)

TO COLLECTION

CONCRETE WORKS (Cont'd)

Reinforcement (Cont'd)

In lift pit walls, diameter

A 10 mm 157 kg

B 12 mm 208 kg

In core walls, diameter

C 8 mm 3,582 kg

D 10 mm 5,180 kg

E 12 mm 128 kg

F 16 mm 37,563 kg

G 20 mm 29,620 kg

H 32 mm 134,676 kg

In columns, diameter

J 8 mm 3,597 kg

K 10 mm 7,741 kg

L 12 mm 1,774 kg

M 16 mm 10,353 kg

N 20 mm 32,673 kg

P 25 mm 30,139 kg

Q 32 mm 49,588 kg

BILL NO 6.4.2 - SUPER STRUCTURE +0.78 m TO +18.78 m LEVEL FOR BUILDING # 4 (Cont'd)

Page 5: B4 BOQ 1.5~20m - 23.03.2015

WATERFRONT INTEGRATED RESORTCOLOMBO - SRI LANKA 23th March 2015

6.4.2/5

ITEM DESCRIPTION QTY UNIT RATE AMOUNT

(US$)

TO COLLECTION

CONCRETE WORKS (Cont'd)

Reinforcement (Cont'd)

In beams, diameter

A 8 mm 16,763 kg

B 10 mm 3,119 kg

C 12 mm 19,859 kg

D 16 mm 37,230 kg

E 20 mm 24,371 kg

F 25 mm 18,546 kg

In staircases, diameter

G 6 mm 124 kg

H 8 mm 1,228 kg

I 10 mm 1,915 kg

J 12 mm 1,024 kg

K 16 mm 1,164 kg

BILL NO 6.4.2 - SUPER STRUCTURE +0.78 m TO +18.78 m LEVEL FOR BUILDING # 4 (Cont'd)

Page 6: B4 BOQ 1.5~20m - 23.03.2015

WATERFRONT INTEGRATED RESORTCOLOMBO - SRI LANKA 23th March 2015

6.4.2/6

ITEM DESCRIPTION QTY UNIT RATE AMOUNT

(US$)

TO COLLECTION

CONCRETE WORKS (Cont'd)

Formwork

Basic finish

A Sides and soffits of suspended slabs 9,072

B Sides and soffits of suspended slabs for lift pit 11

C Sides and soffits of suspended slabs for pool 298

D Sides and soffits of ramps 2,297

E Sides of walls 91

F Sides of water tank walls 41

G Sides of lift pit walls 19

H Sides of core walls 3,461

J Sides and soffits of beams 1,235

K Sides of columns 3,862

L Sides and soffits of staircases 359

BILL NO 6.4.2 - SUPER STRUCTURE +0.78 m TO +18.78 m LEVEL FOR BUILDING # 4 (Cont'd)

m2

m2

m2

m2

m2

m2

m2

m2

m2

m2

m2

Page 7: B4 BOQ 1.5~20m - 23.03.2015

WATERFRONT INTEGRATED RESORTCOLOMBO - SRI LANKA 23th March 2015

6.4.2/7

ITEM DESCRIPTION QTY UNIT RATE AMOUNT

(US$)

TO COLLECTION

CONCRETE WORKSCOLLECTION

Page 6.4.2/1

Page 6.4.2/2

Page 6.4.2/3

Page 6.4.2/4

Page 6.4.2/5

Page 6.4.2/6

BILL NO 6.4.2 - SUPER STRUCTURE +0.78 m TO +18.78 m LEVEL FOR BUILDING # 4 (Cont'd)

Page 8: B4 BOQ 1.5~20m - 23.03.2015

WATERFRONT INTEGRATED RESORTCOLOMBO - SRI LANKA 23th March 2015

6.4.2/8

ITEM DESCRIPTION QTY UNIT RATE AMOUNT

(US$)

TOTAL OF CONCRETE WORKS TO SUMMARY

Page 9: B4 BOQ 1.5~20m - 23.03.2015

WATERFRONT INTEGRATED RESORTCOLOMBO - SRI LANKA 23

th

March 2015 .

6.4.2/8

ITEM DESCRIPTION QTY UNIT RATE

SUMMARY PAGE NO.

CONCRETE WORKS 6.4.2/7

AMOUNT (US$)

BILL NO 6.4.2 - SUPER STRUCTURE +0.78 m TO +18.78 m LEVEL FOR BUILDING # 4

Page 10: B4 BOQ 1.5~20m - 23.03.2015

WATERFRONT INTEGRATED RESORTCOLOMBO - SRI LANKA 23

th

March 2015 .

6.4.2/9

ITEM DESCRIPTION QTY UNIT RATE AMOUNT

(US$)

BILL NO 6.4.2 - SUPER STRUCTURE +0.78 m TO +18.78 m LEVEL FOR BUILDING # 4 CARRIED TO GENERAL SUMMARY

Page 11: B4 BOQ 1.5~20m - 23.03.2015

WATERFRONT INTEGRATED RESORTCOLOMBO - SRI LANKA 23th March 2015

6.4.4/1

ITEM DESCRIPTION QTY UNIT RATE

METAL WORKS

Structural steel work

H beam for composite columns

A HD 400 x 187 2,374 kg

B HD 400 x 287 18,594 kg

C HD 400 x 347 5,001 kg

D HD 400 x 421 7,107 kg

E HD 400 x 509 19,294 kg

F HD 400 x 592 8,531 kg

G HD 400 x 677 5,715 kg

H HD 400 x 744 60,005 kg

J HD 400 x 900 15,193 kg

K HD 400 x 1086 91,028 kg

AMOUNT (US$)

BILL NO 6.4.4 - SUPER STRUCTURE +0.78 m TO +18.78 m LEVEL FOR BUILDING # 4

Page 12: B4 BOQ 1.5~20m - 23.03.2015

WATERFRONT INTEGRATED RESORTCOLOMBO - SRI LANKA 23th March 2015

6.4.4/2

ITEM DESCRIPTION QTY UNIT RATE AMOUNT

(US$)

TOTAL OF METAL WORKS TO SUMMARY

Page 13: B4 BOQ 1.5~20m - 23.03.2015

WATERFRONT INTEGRATED RESORTCOLOMBO - SRI LANKA 23

th

March 2015 .

6.4.2/2

ITEM DESCRIPTION QTY UNIT RATE

SUMMARY PAGE NO.

METAL WORKS 6.4.4/1

AMOUNT (US$)

BILL NO 6.4.4 - SUPER STRUCTURE +0.78 m TO +18.78 m LEVEL FOR BUILDING # 4

Page 14: B4 BOQ 1.5~20m - 23.03.2015

WATERFRONT INTEGRATED RESORTCOLOMBO - SRI LANKA 23

th

March 2015 .

6.4.2/3

ITEM DESCRIPTION QTY UNIT RATE AMOUNT

(US$)

BILL NO 6.4.4 - SUPER STRUCTURE +0.78 m TO +18.78 m LEVEL FOR BUILDING # 4 CARRIED TO GENERAL SUMMARY