9
B3385 Newgate Lane Southern Section Welcome to this event which aims to; Introduce Mildren Construction Ltd., as the County Council’s contractor who will be constructing the scheme Provide some background and an overview of the scheme Identify an outline of the work programme which will take about 12 months to complete Provide traffic and construction information Provide contacts at both Mildren Construction Ltd and Hampshire County Council This new road scheme is a new southern section for Newgate Lane that includes the construction of a 1.5km long section of single carriageway road on a new alignment to the east of the existing road and Woodcote Lane, between a point near Tanners Lane and the Peel Common Roundabout. The scheme forms the third and final phase of planned improvements to the Newgate Lane corridor, and follows on from work undertaken to the northern section of Newgate Lane and at Peel Common roundabout. The £9.5M scheme is being funded by the Solent Local Enterprise Partnership and Hampshire County Council. 1. Welcome

B3385 Newgate Lane Southern Section · scheme forms the third and final phase of planned improvements to the Newgate Lane corridor, and follows on from work undertaken to the northern

  • Upload
    others

  • View
    3

  • Download
    0

Embed Size (px)

Citation preview

Page 1: B3385 Newgate Lane Southern Section · scheme forms the third and final phase of planned improvements to the Newgate Lane corridor, and follows on from work undertaken to the northern

B3385 Newgate Lane – Southern Section

Welcome to this event which aims to;

• Introduce Mildren Construction Ltd., as the County Council’s contractor who will be constructing the scheme

• Provide some background and an overview of the scheme

• Identify an outline of the work programme which will take about 12 months to complete

• Provide traffic and construction information

• Provide contacts at both Mildren Construction Ltd and Hampshire County Council

This new road scheme is a new southern section for Newgate Lane that includes the construction of a 1.5km long section of single carriageway road

on a new alignment to the east of the existing road and Woodcote Lane, between a point near Tanners Lane and the Peel Common Roundabout. The

scheme forms the third and final phase of planned improvements to the Newgate Lane corridor, and follows on from work undertaken to the northern

section of Newgate Lane and at Peel Common roundabout.

The £9.5M scheme is being funded by the Solent Local Enterprise Partnership and Hampshire County Council.

1. Welcome

Page 2: B3385 Newgate Lane Southern Section · scheme forms the third and final phase of planned improvements to the Newgate Lane corridor, and follows on from work undertaken to the northern

B3385 Newgate Lane – Southern Section

2. Scheme Background

The work to Newgate Lane forms part of the wider ‘Improving Access to Fareham and Gosport’ – a strategy that aims to improve access and

journey time reliability on the existing arterial routes in the area to support the development of the local economy. The current package of schemes

includes those completed at Newgate Lane, the Peel Common roundabout and the A27 St Margarets roundabout, and those currently under

construction at the A27 The Avenue and at the A27 between Segensworth and Titchfield. Subject to final funding the Stubbington Bypass is planned

to come forward for a start of work on the ground in late 2019/20.

In June 2014, Hampshire County Council held a series of public exhibitions across the Fareham and Gosport Districts. Feedback from the public

identified positive levels of support with 81% supporting the planned improvements to Newgate Lane.

Solent Local Enterprise Partnership

With a population of more than 1.3 million and over 50,000 businesses, the Solent area is an internationally-

recognised key economic hub anchored around the Isle of Wight, the two cities of Portsmouth and

Southampton, the M27 corridor and the Solent waterway.

The Solent LEP is a locally-owned partnership between businesses and local authorities and plays a central

role in determining local economic priorities and undertaking activities to drive economic growth and creation

of local jobs.

The Solent Local Growth Deal is focussed on three key priority areas as identified in the LEP's Strategic

Economic Plan: enabling flagship sites for housing and employment; enhancing transport connectivity across

the area; growing the skills base and supporting business growth.

Page 3: B3385 Newgate Lane Southern Section · scheme forms the third and final phase of planned improvements to the Newgate Lane corridor, and follows on from work undertaken to the northern

B3385 Newgate Lane – Southern Section

Two lanes from Rowner Road

around the Peel Common roundabout

to the new road then merge to one lane

Two lane exit from Peel Common roundabout

to Broom Way then merge to one lane

Link road junction with

widened right turn lane to access the existing Newgate Lane

7.3m wide single carriageway on smoother

alignment with few side roads and accesses to impede flow The new southbound approach to Peel Common

roundabout has one lane to Stubbington and Broom Way

one lane to Broom Way and Rowner Road

one lane to Rowner Road

3. Scheme Features - Capacity

Page 4: B3385 Newgate Lane Southern Section · scheme forms the third and final phase of planned improvements to the Newgate Lane corridor, and follows on from work undertaken to the northern

B3385 Newgate Lane – Southern Section

40 mph speed limit along new road

Landscape planting including

about 200 trees and 8,500 shrubs to

form hedges to screen the road

and acoustic fences

2m high ball netting on 3m acoustic fence

adjacent to sports pitches at Brookers Field

Sports pitch layout at HMS Collingwood

revised and refurbished

Sports pitches at Brookers Field retained

Controlled surface water drainage

with swales and balancing ponds

Acoustic fences to west side 1m to 3m high on 1m high earth bund

3m high acoustic fence to east side

from Brookers Lane north to farm access

No street lighting to central

section of new road

4. Scheme Features - Environmental

Page 5: B3385 Newgate Lane Southern Section · scheme forms the third and final phase of planned improvements to the Newgate Lane corridor, and follows on from work undertaken to the northern

B3385 Newgate Lane – Southern Section

Road closed at Peel Common roundabout

(except pedestrians and cyclists)

30 mph speed limit proposed Street lighting retained

Road closed near Tanners Lane

(except pedestrians and cyclists) Vehicular access to the existing Newgate Lane via link road

and T junction with wide right turn lane

Minor repairs will be made to the

existing road and footway once traffic is removed

5. Scheme Features – Existing Newgate Lane

Page 6: B3385 Newgate Lane Southern Section · scheme forms the third and final phase of planned improvements to the Newgate Lane corridor, and follows on from work undertaken to the northern

B3385 Newgate Lane – Southern Section

Pedestrian and cycle access

to/from Peel Common roundabout Pedestrian and cycle access to/from the

off-road facilities near HMS Collingwood

Without through traffic the existing road will become a signposted on-road

cycle route between Peel Common roundabout and HMS Collingwood

The existing bus service 21/21A will use the new road The surface of Woodcote Lane will be improved to provide

pedestrian access to the bus stops on the new road

The unmade section of Brookers Lane will be

improved to form a pedestrian and cycle link

New bus shelters and pedestrian islands will be provided

on the new road near Woodcote Lane and Tudor Lodge

New bus shelters will be

provided on Gosport Road

6. Scheme Features – Pedestrians, Cycles and Buses

Signal controlled crossing across new

road at Peel Common roundabout

Page 7: B3385 Newgate Lane Southern Section · scheme forms the third and final phase of planned improvements to the Newgate Lane corridor, and follows on from work undertaken to the northern

B3385 Newgate Lane – Southern Section

Start of Main Works

Set Up Site Compound and Secure Site

Temporary Acoustic Fencing, West Side

Earthworks

Drainage

Acoustic Fencing

Kerbing

Surfacing

Connections to Peel Common Roundabout and Newgate

Lane

Install and Commission Traffic Signals

Open New Road to Traffic

Woodcote Lane Surfacing

Newgate Lane Repairs

Landscape Planting

Planting Winter 2017/18 Planting Winter 2018/19

Main Works Completed

7. Programme

Work is starting in July 2017 for about 12 months.

Page 8: B3385 Newgate Lane Southern Section · scheme forms the third and final phase of planned improvements to the Newgate Lane corridor, and follows on from work undertaken to the northern

B3385 Newgate Lane – Southern Section

Construction traffic is restricted to the A27, A32 and Newgate

Lane. Construction traffic is not allowed to use Woodcote Lane

except to provide the works on Woodcote Lane.

Access to the site is provided at three locations:

• north end, where the new road connects to Newgate Lane

• where the new link roads connect to Newgate Lane

• Peel Common roundabout.

The contractor will have a site compound on the east side of

Newgate Lane south of the MoD playing fields.

The contractors normal working times will be between 8am and

6pm Mon – Fri, and 8am – 1 pm on Saturdays, however some

night works will also be required (8pm – 6am).

Traffic disruption is expected to be low, however where lane

closures are required the work will be done at night.

Lane closures will be required on the Broom Way approach to the

Peel Common roundabout and when the new road is connected

to the existing roads. Temporary road closures and/or temporary

traffic signals will be required, but such restrictions will be

publicised in advance.

Work is planned on the unmade section of Brookers Lane so it will

be necessary to close this pedestrian route from time to time.

Such closures will be kept to a minimum and signed in advance.

HCC will be working with Mildren Construction to minimise noise,

vibration and dust during the works. Some temporary acoustic

fencing will be provided in the vicinity of Woodcote Lane pending

the construction of the permanent acoustic fencing here.

New road

Access routes for construction traffic

Routes unavailable to construction traffic

8. Traffic and Construction Information

Page 9: B3385 Newgate Lane Southern Section · scheme forms the third and final phase of planned improvements to the Newgate Lane corridor, and follows on from work undertaken to the northern

B3385 Newgate Lane – Southern Section

9. Contacts

Mildren Construction Ltd will take a lead role in communicating their activities as the scheme progresses.

Their Communications Officer is the first point of contact;

Phone: 01329 842087 & 07795 328268

E-mail: [email protected]

Hampshire County Council can be contacted by;

Phone: 0330 555 1375 (Contact Centre)

Email: [email protected]

Post to: Strategic Transport, Hampshire County Council, The Castle, Winchester SO23 8UD

These contacts are available online at the scheme webpage, where updates about the scheme and changes to traffic management will also appear;

https://www.hants.gov.uk/transport/transportschemes