Upload
raluca-axante
View
226
Download
3
Tags:
Embed Size (px)
DESCRIPTION
Â
Citation preview
axante raluca-elenaportfoliourban planner
#10, M. Cioranu St., Bl70B, apt.7, Bucharest, 050751e-mail: [email protected]: +40 722 599 145
education
2007 - 2011 Bachelor of Architectural Studies Spiru Haret University of Architecture, BucharestDiploma unit: Ice rink FloreascaQualification: Accredited Architect
1998 - 2004 Bachelor of Urban Planning Ion Mincu University of Architecture and Urban Studies, BucharestDiploma unit: Urban reintegration of historical city center of BotosaniQualification: Accredited Urban Planner
03/2002-07/2002 - Aristotle University, Thessaloniki, GreeceErasmus exchange program
planning and employment experience
08/2004 - 03/2005, Alpha Studio, Bucharest, Romania junior urban plannerurban planning design under the supervision of a senior architect
03/2005 - currently, Alpha Studio, Bucharest, Romania senior urban plannerdesigning and managing urban planning projects, zonning projects, new urban developments design, city infrastructure design
03/2005 - currently, East Wind Arhitect, Bucharest, Romania senior urban plannerdesigning and managing urban planning projects, zonning projects, new urban developments design, city infrastructure design
memberships
RUR - Romanian Planning AssociationOAR - Association of Romanian Architects
languages
computer and IT skills
Computer literacy (MS-Office programs, internet, email)Visual graphic programs (CorelDraw, AutoCAD, Sketchup)
axante raluca-elena
Listening Reading Spoken interaction Spoken production
Understanding Speaking Writing
English
French
German(*)Common European Framework of Reference for Languages
Proficient userC2 C1Proficient user Proficient user Proficient user Proficient userC2 C2 C2
Independent user
Basic user
B1
A2
B1
A2Basic user
Independent user
Basic user
Independent user
Basic user
Basic user
Basic user
B2
A2
B1
A2
A2
A1
Independent user
Willbrook platinum business & convention center
Dragomiresti Industrial Park
Esplanada
Bucuresti-Ploiesti 1A
Ford old warehouse rehabilitation
Sintofarm residential development
Valenii de Munte-landscape study-general urbanistic plan-design code
Baia Mare-landscape study-public spaces study-general urbanistic plan
Bucharest nord ring road
Magurele developments
landscape designSf. Gheorghe square
architectureIce rink Floreasca
Varvsstaden design project
urban planning
competitionsBucharest General Urban Plan
urban planningWillbrook platinum business & convention center
Dragomiresti Industrial Park
Esplanada
Bucuresti-Ploiesti 1A
Ford old warehouse rehabilitation
Sintofarm residential development
Valenii de Munte-landscape study-general urbanistic plan-design code
Baia Mare-landscape study-public spaces study-general urbanistic plan
Bucharest nord ring road
Magurele developments
Varvsstaden design project
raluca axante | portfolio
willbrook platinum business & convention center
Project type: zonning plan
Location: #172-178 Bucuresti-Ploiesti Rd., Bucharest
2004Designed:
29072.11sqmTotal area:
Details:
There were a few planning restrictions imposed by the presence of a small forest, that requires its own protection area
and the vicinity with a national road which imposes some traffic regulations. Thus, the office building is withdrawn from
the street alignment by 75 m.
Here are the urbanistic parameters for the site:
POT = 35% (maximum land use percentage)
CUT = 2.5 (maximum land use coefficient)
H max = 1U+GF+5F (maximum height)
5_TH FLOOR
4_TH FLOOR
3_RD FLOOR
2_ND FLOOR
1_ST FLOOR
GROUNDFLOOR
willbrook platinum business & convention center
raluca axante | portfolio
raluca axante | portfolio
dragomiresti industrial park
Project type: zoning plan, master plan
Dragomiresti, RomaniaLocation:
2005Designed:
67.5 haTotal area:
Details:
A zoning plan for an area of ~67.5ha, featuring an industrial park. The inner road is the back bone of the master plan. This road allows access
to each warehouse. Also utilities were provided from independent sources: a power plant of 10MW, a water treatment station, a gas pressure
reduction station, 4 wells of ~100m depth.
raluca axante | portfolio
esplanada master plan
Project type: master plan, urban concept
Location: Unirii Bvd, Bucharest
2006Designed:
2.7haTotal area:
Details:
Unirii Bvd. was built during the communist era as an over imposed symmetric composition axe developed in front of the House of Parliament A
totalitarian urban intervention like this one, developed on such a scale has resulted in big conflicts with the previous urban tissue. The historic frame
was denied totally, ie behind the main buildings guarding the boulevard are numerous conflict areas, where low rise buildings are visually and
physically aggressed by the new buildings. This can be divided into few segments defined by the main elements that generate the axis.
(1 )first segment defined by the House of Parliament and Unirii Square . This axis is enhaced only by the high buildings with no other connexion to
the urban frame
(2 )Unirii square as a main jonction of the esplanade bvd. to the main Bucharest north -south axis
(3) this segment was intended similar to the frist described segment, but never got to have its guarding buldings finished. Other massiv volumes
part of the large scale totalitarian urban composition were never completed. This is also the case of this project location.
(4) This ending segment seemes to be the most integrated functionally. Compositionally speaking it is an axis end, opposing the massiv volume of
the House of Parliament on a distance of almost 3 km.
Located very close to the centre of Bucharest the Esplanade site is an important real estate development oportunity. A new reglementation plan
was necessary to translate the investor's development tendancies into the site.
raluca axante | portfolio
esplanada master plan
Project evolution:
The project started as a trigger public-private investment in
a central area and it was intended yo develop in a major city
area reintegration. There were three phases of the project, one of
them involving a concept by Helmut Jahn GmbH.
The development of the project design was stopped by the begging
of world economic crisis, thus the area is still waiting for an urban
solution.
raluca axante | portfolio
esplanada master plan
raluca axante | portfolio
Bucharest-Ploiesti 1A
Project type:
Location:
Designed:
Total area:
Details:
zoning plan
Bucharest, Romania
2007
0.3 ha
A zoning plan for an area of ~3200sqm, featuring a class A office building. The site is located on the main entrance road to the capital city.
The vicinity hosts other representative office buildings.
raluca axante | portfolio
ford old warehouse rehabilitation
Project type:
Location:
Designed: 2007
Total area:
Details:
zoning plan / rehabilitation plan
+159 Floreasca St., Bucharest
2.7ha
Some of the well preserved examples of industrial architecture
in Romania - the F O R D industry warehouse is now included
in a rehabilitation project. It is an opportunity for the developer
to rehabilitate this building and reintegrate it into the city circuit.
Three different land uses will be integrated into the new
buildings: residential, retailing and offices.
The completion of such a project, consisting of a historical
building restoration would place this development among the
few to be elaborated in Bucharest, in the well appreciated trend
of old industrial areas conversion process.
The 2.7 ha area is located in the interference of three strong
land uses areas, which makes it well suited for a mixture of
those uses.
The northern area of the city has always been subject to real
estate pressure; the demand for new buildings still defies the
economic crisis mildly. The historical building is emphasized by
the creation of public spaces that make
a gradual passing from built areas to green areas;
The residential buildings are located near the park, so that the
inhabitants will benefit from the view to the park;
The tall office building will become land mark for the area, just
as a campanile tower to the historical building.
raluca axante | portfolio
ford old warehouse rehabilitation
Offices, commercial galleries and other
services are located on Floreaca Av.
emphasising its commercial status.
The minimum 30% green space required by
the Regional Environmental Protection
Agency is provided on the site.
The pedestrian flows are gradually
distributed towards the park via the public
square and other space cells in between the
buildings on site.
land use green area flows
raluca axante | portfolio
ford old warehouse rehabilitation
raluca axante | portfolio
sintofarm residential development
Project type: master plan, urban concept developed by AS&P GmbH
Location: 22-25 Ziduri intre Vii, Bucharest
2011Designed:
88298 sqmTotal area:
Details:
The basic planning principles for the urban design concept were as follows:
- According to the overall town-planning strategy for the district, the location and quality of the site, as well as the
prevailing market requirements, the property will be developed as a middle-class housing area. Depending on the future
population of the site, it is quite likely that a smaller share of social services (kindergarden, small medical facilities) and a
small number of shops and restaurants will support the residential area.
- One of the mail design features is the open interior garden and a central plaza, shelltering off the traffic and creating an
introvert neighbourhood.
- The tall buildings are concentrated on the perimeter, grouped around the central garden to landmark the area.
- The entire road system consists of a ring road at the property boundary, leaving the interior area traffic free.
- The backbone of the urban development is the main road -Str. Ziduri intre Vii; at the intersection of this road with the
central plaza the public functions are located.
raluca axante | portfolio
sintofarm residential development
raluca axante | portfolio
valenii de munte
Project type: landscape study
town of Valenii de Munte, RomaniaLocation:
2011Designed:
21.59 kmTotal area:
Details:
Valenii de Munte is a little town of about 13000 inhabitants in the
south part of Romania. A landscape study for the town was done
in order to establish the town landscape typology. Different criteria
were applied based on natural factors, social, economic, cultural
and perception factors. The town was divided into landscape
territorial units. After establishing the category of the landscape,
the final objective of the study was to enounce a few conclusions
and directions for the new General Urbanistic Plan of the town.
2
raluca axante | portfolio
Project type: general urbanistic plan
town of Valenii de Munte, RomaniaLocation:
2011, on goingDesigned:
21.59 kmTotal area:
Details:
Among the problems the town is facing this project has to find a solution for a ring road to eliminate the heavy traffic from the center of the town
and to restructure the central area of the town.
valenii de munte
2
raluca axante | portfolio
valenii de munte
Project type: design code
town of Valenii de Munte, RomaniaLocation:
2011Designed:
21.59 kmTotal area:
Details:
The target of this project is to set a design code for residential areas of the town of Valenii de Munte.
The distinctive character of a country fair town, developed in a pre-balcan area will be preserved by construction rules imposed
on elements such as windows, roofs, facades, fences, land use regulations, volumes.
2
raluca axante | portfolio
baia mare
Project type: landscape study
town of Baia Mare, RomaniaLocation:
2011Designed:
233.3 km Total area:
Details:
Baia Mare is a big town in the north part of Romania, the capital
of the Maramures county. The town is a traditional mining centre
ever since Middle Ages. The beautiful landscape with high hills on
north of the crossing Sasar river and a plain on the souther bank
of the river was seriously affected by the industrialized era, when
big factories with high chimneys were built all over the town.
Going green is a difficult process and a challenge to preserve and
restore a traditional landscape.
2
raluca axante | portfolio
baia mareProject type: landscape study
raluca axante | portfolio
baia mare
Project type: General Urbanistic Plan
town of Baia Mare, RomaniaLocation:
2011, on goingDesigned:
233.3 kmTotal area:
Details:
Baia Mare, a town of about 115 000 inhabitants, has an old mining tradition, that raises major environmental problems due to gold and other metal
extraction and processing. This is only one of the many challenges for the new General Urbanistic Plan.
2
raluca axante | portfolio
baia mare
Project type: public spaces study
town of Baia Mare, RomaniaLocation:
2011Designed:
233.3 kmTotal area:
Details:
The objective of the project is to identify and make an inventory of all existing public spaces from the town of Baia Mare: squares, parks,
pedestrian streets, etc as well as potential new public spaces developments. The analysis was made on each town district.
2
raluca axante | portfolio
baia mareProject type: public spaces study
raluca axante | portfolio
Bucharest north ring road
Project type: infrastructure planning
Bucharest, RomaniaLocation:
2011, on goingDesigned:
282 haTotal area:
Details:
The development of city infrastructure system of roads and railways is a key element to the relief of traffic congestion in central area. A future
north ring road of Bucharest of about 10km long was designed. The project was partitioned in 7 study areas.
The new ring road has 3 lanes per direction and a back bone of urban train rails. The existing train rails are to be converted into urban train
rails with two stations along the way.
Designing the new project was also a good opportunity to reorganize the road system in the surrounding area and implement bicycle circuits
connected with the green zones.
raluca axante | portfolio
Bucharest north ring road
raluca axante | portfolio
Bucharest north ring road
raluca axante | portfolio
magurele high-tech cluster
accesibility
Project type: master plan
Magurele, RomaniaLocation:
2012Designed:
~168 haTotal area:
Details:
A master plan for an area of ~168ha, featuring a high-tech cluster. Located on the south-west of Bucharest the proposed high-tech cluster
has to be integrated into the infrastructure network consisting of railroads, subway lines, connection to the city and the neareast airport. A new
generation laser is to be built in this area for medical purposes and other types of research.
urban area
railroads
road [DC]
road [DJ]
national road [DN]DN4
highway [A]A 2
DJ401
DC201
ring road 2 [proposal]
ring road 1 [existing]
traffic airlines
administration boundary
rural areapp
subway lines
subway lines (proposal)
railway station
subway station
DJ401
DJ401DC83
DC128DC121
DJ601
DJ602
DJ401
DJ401
DJ401
DJ101
DJ101
DC77
DJ602
DJ602
DJ601A
DC18
DJ101A
Dj100
Dj100
Dj100
DJ101
Dj101C
DJ101
Dj101C
Dj101B
Dj101B
Dj101CDj101C
Dj100
Dj200
Dj200B
Dj200B
Dj200
Dj200
Dj200
Dj200
Dj300
Dj300
Dj300
DJ401A
Dj100
Dj200B
A3
A3
A3
DN5
DN4
DN3
DN6
DN5
DN6 DN4
DN3
DN2
DN2
DN1
DN1
DN1
DN1
DN7
A 1
A 2
A 2
A 2
A 1
DN7
DN1A
DN1A
DN7
DN3
DN2
DN2
DN4
DN6
A 2
DN1A
DN5
h.Sintesti
St. Vidra
St.Jilava
St.Berceni
H.Popesti-Leordeni
St.Cernica
St.Chitila
St.Pantelimon
St.ConstantinDavid
St.PasareaH.Cozieni
St.Branesti
H.Sabarul
St.Domnestiide Sus
St.Sabareni
St.Buftea
St.MogosoaiaSt.Otopeni
St.Balotesti
St.Caciulati
St.Moara Vlasiei
St.Greci
H.Snagov Plaja
H.Snagov Sat
H.Scrovistea
St.Virteju
H.Peris
St. C.F.
Măgurele
raluca axante | portfolio
magurele high-tech cluster
raluca axante | portfolio
magurele new investments
Project type: master plan
Magurele, RomaniaLocation:
2012Designed:
~120 haTotal area:
Details:
A master plan was created for an area of ~120ha, in order to support all the services necessary to support ~1000 science people who will be
located in Magurele for the new generation laser research. There will be three different areas connected by the interior longitudinal road -
services, residential and public investments.
raluca axante | portfolio
varvsstaden design project
Project type:
Location:
Designed:
Total area:
Details:
design project
Malmo, Sweden
2013
~18.5 ha
In this project WATER has been the main driven force of the design, from an esthetic point of view to technical aspects, preparing for
possible floods as well as saving water. Different ways of experiencing water have been envisioned, water as an element that brings people
together.
There are different water features along the water edge and inland, visible or invisible: water amphitheater, inner harbor bath, restaurant on the
water, fishing and promenade decks, water plaza, bridges and different other connections over the channel (sound pipes to transfer the
sound across the other side of the canal in a playful way), an open workshop for ship building as a remembrance of the former Kockums
shipyard, a bio diverse area with aquatic flora and fauna, an exhibition pavilion dedicated to water in connection to an underwater observatory.
A former dry dock has been reopened for promenade and houses specialized in living by the water.
raluca axante | portfolio
varvsstaden design project
landscape designSf. Gheorghe square
raluca axante | portfolio
St. Gheorghe square park
Project type:
Location:
Designed:
Total area:
Details:
landscaping design
Bucharest, Romania
2004
2ha
A landscape design for a square park located
at the heart of the historical center of
Bucharest. The approach was very neutral
and non aggressive considering the fact that
an old orthodox church of Saint. Gheorghe is
located in this square as well as a monument
that indicates KM 0 - the geometrical center of
the city.
The light system emphasizes the old
monument as well as other anthropic and
natural elements.
competitions
raluca axante | portfolio
bucharest
Project type: general urban plan
Bucharest, RomaniaLocation:
2012Competition:
228 kmTotal area:
Details:
The competition was set for the new general urban plan of the Romanian capital city - Bucharest. Five distinctive ideas for the future city character
had to be developed after different layers of analysis. The concept presented in the competition was the result of an assiduous team work . A
workshop was held in September 2012 with the participation of the reunited international team.
2
architectureIce rink Floreasca