AWWA PRESENTATIONPoseidon Water:

Carlsbad Case Study

October 22nd, 2014

© POSEIDON WATER 2014 2

Agenda

I. Introduction

II. Market Demand - Seawater Desalination

III. Poseidon Water

IV. Public Private Partnerships

V. Case Study: Carlsbad

© POSEIDON WATER 2014 3

Introduction

Graham Beatty

Poseidon Water - Director of Finance and Project Management

Assistant Manager for Huntington Beach Desalination Project

10 years of Commercial Real Estate and Development Experience

Source: Global Water Intelligence

© POSEIDON WATER 2014 4

DEMAND FOR SEAWATER DESALINATION

© POSEIDON WATER 2014 5

Problem - Strained Water Supply

Stressed: Drought,

Environmental Concerns,

Federal Pumping

Restrictions, Oversubscription

Source: Municipal Water District of Orange County, March 2012 and Poseidon Water

© POSEIDON WATER 2014 6

Why Desalination?

San Diego County imports approximately 85% of

its water supply

Current water supply dependent upon rainfall and

snowpack

Desalination a reliable, drought-proof, clean and

safe source of water

Limited incremental land needs

Competitive with other locally available water

supply options

Desalination Offers a Reliable SolutionPoseidon’s Value Proposition

© POSEIDON WATER 2014 7

Reduced Cost of SWRO

0

10

20

30

40

50

1970 1980 1990 2000 CarlsbadDesalination

(2012)

Ele

ctr

icit

y

Co

nsu

mp

tio

n (

kW

h

per

1,0

00 g

allo

ns)

Desalination Energy Improvements

$-

$1.00

$2.00

$3.00

$4.00

$5.00

$6.00

$7.00

0 20 40 60 80 100 120 140

Co

st

of

Wate

r $ / 1

,000

gallo

ns

Capacity (MGD)

-20% Trend Line +20%

Scale Economies of Desalination Plants

© POSEIDON WATER 2014 8

OVERVIEW OF POSEIDON

© POSEIDON WATER 2014 9

Senior management team has collectively developed, financed and

constructed over $10 BILLION IN INFRASTRUCTURE PROJECTS

Secured total financing of $1.3 BILLION ACROSS 9 WATER

PROJECTS since inception

Seawater desalination offers a reliable,

drought-proof, additional source for water

Poseidon’s TECHNOLOGY-NEUTRAL DEVELOPMENT approach

enables tailored, industry-leading and cost-optimized solutions

Poseidon FIRST MOVER and only company with established brand,

large-scale desalination track record in the U.S. and experience

developing sites in California, Florida and Texas

FOUNDED IN 1995 to develop water infrastructure projects through a

public-private partnership approach

CONFIDENTIAL

Poseidon WaterA Unique Opportunity to Develop Water Infrastructure

9

Holds multiple US PATENTS for SWRO desalination system co-

located with power generation

© POSEIDON WATER 2014 10

PUBLIC PRIVATE PARTNERSHIPS

© POSEIDON WATER 2014 11

Public - Private PartnershipsRisk Allocation

Construction

Permitting

Interest Rate

Regulation

Technology

Market

Demand

Plant

Performance

Electricity

Rates

Water Purchase

Agreement

Closing

Change in

Regulation

PUBLIC UTILITY

Electricity

Consumption

© POSEIDON WATER 2014 12

Typical Terms of a Water Purchase Agreement

Term 30 years

Quantity Sized to meet Buyer’s demand and guaranteed with take-or-pay agreement

Quality Will meet Buyer’s requirements

Delivery Point Delivered to the Buyer at a point set by mutual agreement

Delivery Schedule The agreement will have guaranteed milestones for water delivery

Price

Project-specific, but typical agreement to include:

I. Capital Charge

II. Fixed and Variable Operating Charge

III. Fixed and Variable Electricity Charge

– Water Price dependent on plant location, size of the facility, delivery points,

additional water distribution infrastructure required and energy and labor prices

among other factors

– Any subsidy, grant or other will typically be to the benefit of the Buyer

Reliability Poseidon will guarantee the facility’s reliability to a mutually agreed basis

© POSEIDON WATER 2014 13

Capital

Charge

Electricity

Charge

Operating

Charge

Fixed & Variable Electricity Charge

is Driven by:

Power Consumption

Cost of Power

Terms of Poseidon’s O&M

Agreement with Contractor

The Electricity Charge will

vary with electricity prices

Capital Charge is Driven by:

Poseidon’s Capital Budget

Bond Issuance

Equity Return/ Developer

Fee

Development period costs

Capital Charge is fixed at a

pre-established escalation

rate

Fixed & Variable Operating

Charge is Driven by:

Terms of Poseidon’s O&M

Agreement with Contractor

Other operating expenses

Operating Charge is indexed to CPI

Cross Section of Water Price

© POSEIDON WATER 2014 14

CASE STUDY – CARLSBAD DESALINATION

© POSEIDON WATER 2014 15

Carlsbad Desalination Project

© POSEIDON WATER 2014 16

Carlsbad Desalination Project

Outfall

Mouth of

Lagoon

© POSEIDON WATER 2014 17

Carlsbad Water Flow Diagram

© POSEIDON WATER 2014 18

Project Capacity: 54 MGD

Water Purchase Agreement: 30-year take-if-delivered

contract for water, minimum purchase of 48,000 AF, option up

to 56,000 AF with San Diego County Water Authority

Poseidon to Construct:

– 54 MGD desalination plant located on the site of the

Encina Power Station

– 10 mile 54-inch diameter conveyance pipeline to connect

to existing aqueduct pipeline

Water Authority to Construct:

– Relining of 5.5 mile reach of aqueduct pipeline

– Water Treatment Plant improvements to accommodate

desalinated water flows

Project Summary

Poseidon:

Permit, Design and Build the Desalination Plant

Permit, Design and Build the Product Water Pipeline

Own, Operate and Maintain the Desalination Plant

Supply Product Water

San Diego County Water Authority:

“Take or Pay” for Product Water (minimum commitment

of 48,000 AF/Yr)

Timely construction of water treatment plant

improvements and pipeline rehabilitation

Receive Product Water

Own, operate and maintain the Product Water Pipeline,

the water treatment plant Improvements and pipeline

Key Responsibilities

Site AerialOverhead Rendering

Carlsbad Desalination PlantProject Overview

© POSEIDON WATER 2014 19

Third Party EquityShareholder

Agreement

Project Debt

Facilities

O&M ProviderEngineering, Procurement

and Construction

Water Utility

Water Purchase

Agreement

Loan

Agreement

O&M Service

Agreement

EPC

Agreement

Carlsbad Desalination PlantSuccess Deploying PPP Approach

Carlsbad Desalination was developed through a public private partnership between the

San Diego County Water Authority and Poseidon Water

Energy

Provider

Project Management

© POSEIDON WATER 2014 20

Financing Overview:

Project Equity: 18%

Debt:

– 82% funded through split tranche bonds issuance via

the California Pollution Control Financing Authority

(CPCFA)

Plant Bonds issued as Tax-Exempt Private Activity Bonds

with Poseidon as the sponsor

– Subject to Alternative Minimum Tax (AMT)

Pipeline Bonds issued as Tax-Exempt Governmental

Purpose Bonds with the Water Authority as the sponsor

– Not subject to the AMT, but issued with a 5 year early

call option

– Water Authority exempt from repayment obligations if

Poseidon does not perform

33 year financing

Interest Rates:

– Plant Bonds: 4.8%

– Pipeline Bonds: 4.4%

Bonds obtained two investment grade ratings

– Moody’s Baa3, Fitch BBB-

Key Financial Metrics:

Project Capacity: 54 MGD

Total Capital: $922m

– Debt: $755m

– Equity: $167m

Equity Plant Bonds Pipeline Bonds

Cash Equity Contribution

18%

New Debt Issuance

82%

Plant Bonds59%

PipelineBonds

23%

Carlsbad Desalination PlantFinancial Overview

1. Based on equity funding date, not closing date.

© POSEIDON WATER 2014 21

Plant Construction: 65% Complete

© POSEIDON WATER 2014 22

Plant Construction

© POSEIDON WATER 2014 23

Pipeline Construction: 80% Complete

© POSEIDON WATER 2014 24

Carlsbad Project Impact

• Construction impact of $350 million to local economy and

an estimated 2,500 jobs in desalination, engineering,

construction and other services industries

• The project will have 36 full-time employees, support 500

direct, indirect and induced jobs, and contribute $50 million

in estimated annual spending to the county's economy

• Carlsbad Desalination Project will provided locally

controlled, drought proof water supply for 7% of San Diego

County’s water supply

© POSEIDON WATER 2014 25

QUESTIONS?

© POSEIDON WATER 2014 26

ADDITIONAL SLIDES

© POSEIDON WATER 2014 27

Carlsbad Plant Layout

Plant

SchematicAny chlorine remaining in the filter can

damage the RO membranes. To protect

the RO system, filter effluent will be de-

chlorinated using sodium bisulfate prior

to treatment.

Desalinated water requires

chemical conditioning prior to

delivery to increase hardness

and reduce corrosion

potential. Chlorine is also

added to meet the California

Department of Public Health

quality standards for potable

water disinfection and to

control biological growth in

the transmission pipeline.

The pretreatment system

removes the organic

compounds in the seawater via

gravity filtration.

Step 1 Step 2

Step 3

Step 4

The RO treatment system will

separate the pretreated and

conditioned intake seawater in

two streams: desalinated water,

and concentrated seawater.

Step 6

Step 5

The product water pump

station pressurizes the

water for delivery to

SDCWA.

The finished water

(product water) is held in a

3.4 MG storage tank prior

to delivery to SDCWA.

© POSEIDON WATER 2014 28

Tampa Bay Desalination,

Florida

Water Treatment,

Mexico & BrazilCranston Wastewater

Treatment,

Rhode Island

Largest seawater reverse

osmosis desalination plant

currently operating in the

United States

Poseidon was the original

developer and investor

Size: 25 MGD

Developed, managed and

financed five water reuse

plants for PEMEX,

Mexico’s national oil

company, and preferred

investment in Sanepar, a

Brazilian water utility (7.9m

customers)

Size: 50 MGD (Mexico)

First large-scale

wastewater treatment

privatization / upgrade in

the United States

Provided upfront payment

and funded capital

improvements in exchange

for 25-year lease

Size: 25 MGD

Projects Realized to DateDemonstrated Expertise Developing Water Infrastructure Projects

MGD = Million Gallons per Day

© POSEIDON WATER 2014 29

Carlsbad

Desalination

Huntington Beach

DesalinationTexas & Florida

Pipeline

54 MGD seawater reverse

osmosis desalination plant

co-located with Encina

power plant. Will be the

largest and most energy-

efficient seawater

desalination plant in the

Western Hemisphere.

Construction began

12/2012

Proposed 54 MGD

seawater desalination

facility co-located with AES

Power

Project is currently in late-

stage development and

awaiting final permit from

California Coastal

Commission

Numerous project

opportunities are in

evaluation assessment and

pursuit stage in Texas &

Florida

Framework agreements

already in place in FL with

local power companies to

develop Seawater reverse

osmosis desalination

projects at eligible sites

Projects Under Construction and DevelopmentDemonstrated Expertise Developing Water Infrastructure Projects

MGD = Million Gallons per Day

© POSEIDON WATER 2014 30

Seawater Desalination Process