AWS bridging to CSWIP / CSWIP 3.2 Preparatory courses, Seminar & Examination program Organized by BIT Inspection Technology (NDT/ Welding Consultancy/ Third Party Inspection) R.Baskar, A.M.I.E ( Mech) ASNT Level 3 RT,UT,PT,MT AWS – SCWI CSWIP 3.2 Upcoming Program Course Preparatory Date Preparatory VENUE Seminar Date Exam Date Exam VENUE AWS-CWI bridging to CSWIP 3.1 12.10.09 - 13.10.09 Chennai 18.10.09 19.10.09 Trichy AWS-CWI bridging to CSWIP 3.1 28.10.09 - 29.10.09 Trichy 08.11.09 9.11.09 Chennai 04.11.09 - 05.11.09 Cochin CSWIP 3.2 06.11.09 - 11.11.09 Chennai 16.11.09 - 20.11.09 Mumbai AWS-CWI bridging to CSWIP 3.1 18.11.09 - 19.11.09 Coimbatore 13.12.09 14.12.09 Trichy 03.12.09 - 05.12.09 Chennai 08.12.09 - 09.12.09 Cochin 10.12.09 - 12.12.09 Trichy Preparatory Classes taken by R.Baskar, A.M.I.E ( Mech) ASNT Level 3 RT,UT,PT,MT AWS – SCWI CSWIP 3.2 For registration contact: Coimbatore :No:15,Shastri Street, B.R. Puram, Peelamedu Post, Coimbatore-641 004,Mobile: +91 9840800863 ( Opp to GRG School) Chennai : No. 14, 3 rd Pillaiyar koil street, Ekkattuthagal, Chennai - 600 097, Phone: +91 44 42720054,Mobile: +91 9840800863 Trichy : No. 38 / C-20, North-East Extension, 4 th Cross Street, Thillai Nagar, Trichy - 620 018, Phone: +91 431 4220312 Cochin : Edatt Buildings, 2 nd Floor, Peyoli Road, Kacherippady, Ernakulam, Cochin – 682 018, Phone: +91 484 4050247 E-mail : [email protected] , [email protected] , [email protected] Website: www.bitndtindia.com

AWS+bridging+to+CSWIP+and++CSWIP+3.2+broucher.doc

Embed Size (px)

Citation preview

Page 1: AWS+bridging+to+CSWIP+and++CSWIP+3.2+broucher.doc

AWS bridging to CSWIP / CSWIP 3.2 Preparatory courses, Seminar & Examination program

Organized by

BIT Inspection Technology (NDT/ Welding Consultancy/ Third Party Inspection)

R.Baskar, A.M.I.E ( Mech)

ASNT Level 3 RT,UT,PT,MT AWS – SCWI CSWIP 3.2

Upcoming Program

Course Preparatory Date

Preparatory VENUE

Seminar Date

Exam Date

Exam VENUE

AWS-CWI bridging to CSWIP 3.1 12.10.09 - 13.10.09 Chennai 18.10.09 19.10.09 Trichy

AWS-CWI bridging to CSWIP 3.1

28.10.09 - 29.10.09 Trichy 08.11.09 9.11.09 Chennai

04.11.09 - 05.11.09 Cochin

CSWIP 3.2 06.11.09 - 11.11.09 Chennai 16.11.09 - 20.11.09 Mumbai

AWS-CWI bridging to CSWIP 3.1

18.11.09 - 19.11.09 Coimbatore

13.12.09 14.12.09 Trichy 03.12.09 - 05.12.09 Chennai

08.12.09 - 09.12.09 Cochin

10.12.09 - 12.12.09 Trichy

Preparatory Classes taken by

R.Baskar, A.M.I.E ( Mech) ASNT Level 3 RT,UT,PT,MT AWS – SCWI CSWIP 3.2

For registration contact: Coimbatore :No:15,Shastri Street, B.R. Puram, Peelamedu Post, Coimbatore-641 004,Mobile: +91 9840800863 ( Opp to GRG School)

Chennai : No. 14, 3rd Pillaiyar koil street, Ekkattuthagal, Chennai - 600 097, Phone: +91 44 42720054,Mobile: +91 9840800863 Trichy : No. 38 / C-20, North-East Extension, 4th Cross Street, Thillai Nagar, Trichy - 620 018, Phone: +91 431 4220312 Cochin : Edatt Buildings, 2nd Floor, Peyoli Road, Kacherippady, Ernakulam, Cochin – 682 018, Phone: +91 484 4050247

E-mail : [email protected], [email protected], [email protected]

Website: www.bitndtindia.com

Page 2: AWS+bridging+to+CSWIP+and++CSWIP+3.2+broucher.doc

BIT Offers ......

Free Additional Coaching for ALL candidates Description Date Location

QA/QC activities like developing

pWPS ( proposed WPS )

WPS (welding Procedure Specification)

PQR (Procedure Qualification Record)

WQT (Welder qualification Test)

ITP (Inspection Test Plan)

Hydro-test,

Engineering Drawings ( ISO,GA and P&ID ),

Final Documentation and etc............

11.10.09 Chennai

22.10.09 - 23.10.09 Coimbatore

27.10.09 Trichy

03.11.09 Cochin

17.11.09 Coimbatore

29.11.09 - 30.11.09 Chennai

06.12.09 - 07.11.09 Cochin

27.12.09 - 28.12.09 Trichy

How to perform Welding Procedure Qualification Record ( PQR )

How to prepare Welding Procedure Specification ( WPS ) from existing qualified PQR

How to prepare Welding Procedure Specification ( WPS ) from pre - qualified PQR

How to prepare Proposed Welding Procedure Specification ( pWPS ),

Selection of consumable based on base material to be joined Selection of Joint Design Selection of welding process Welding parameters Welding technique Other essential variable, supplementary variables, non-essential variables involved in the welding

procedure qualification

How to prepare Inspection Test Plan ( ITP )

How to prepare Material, Welding & NDT log sheet

How to perform Hydro - testing ( Pressure Testing ) and necessary Test Pack (Documentation)

Final documentation ie, Manufacturing Record Book ( MRB )

How to refer Engineering Drawings

Page 3: AWS+bridging+to+CSWIP+and++CSWIP+3.2+broucher.doc

General Arrangement Drawing ( GA drawing )

Isometric Drawing

Process Instrumentation Diagram Drawing (P&ID Drawing)

Exchange Experience Through Case Studies

Page 4: AWS+bridging+to+CSWIP+and++CSWIP+3.2+broucher.doc
Page 5: AWS+bridging+to+CSWIP+and++CSWIP+3.2+broucher.doc