AWARDED SOLAR PROJECTS as of 30 JUNE 2020 . ISLAND / GRID REGION PROVINCE CITY / MUNICIPALITY PROJECT NAME COMPANY NAME STAGE OF CONTRACT POTENTIAL CAPACITY (MW) INSTALLED CAPACITY (MW) LUZON I Pangasinan Anda 1 MWp Anda Solar Power Project Pangasinan I Electric Cooperative, Inc. Pre-Development Stage 0.00 Bolinao 5 MWp Bolinao Solar PV Power Plant EEI Power Corporation Pre-Development Stage 5.00 Bugallon & San Carlos City Bugallon Solar Power Project Phinma Energy Corporation Pre-Development Stage 1.03 Labrador Labrador Solar Power Project IJG1 Philippines Inc. Development Stage 5.00 Labrador, Mabini and Infanta 90 MW Cayanga- Bugallon SPP PV Sinag Power Inc. Pre-Development Stage 90.00 Mapandan and Santa Barbara Sta. Barbara Solar Power Project OneManaoag Solar Corporation (Formerly SunAsia Energy Inc.) Development Stage 10.14 Rosales Rosales Solar Power Project C Squared Prime Commodities Corporation Pre-Development Stage 0.00 San Manuel San Manuel 2 Solar Power Project Pilipinas Einstein Energy Corp. Pre-Development Stage 70.00 San Manuel 1 Solar Power Project Pilipinas Newton Energy Corp. Pre-Development Stage 70.00 Sison and Binalonan Binalonan Solar Power Project PV Sinag Power Inc. Pre-Development Stage 50.00 Ilocos Norte Burgos Burgos Solar Power Project Phase I Energy Development Corporation Commercial Operation 4.10 Burgos Solar Power Project Phase 2 Energy Development Corporation Commercial Operation 2.66 Bangui Solar Power Project NorthWind Power Development Corporation Pre-Development Stage 2.50 Currimao Currimao Solar Power Project. Nuevo Solar Energy Corp. Pre-Development Stage 50.00 Currimao Solar Power Project.. Mirae Asia Energy Corporation Commercial Operation 20.00

AWARDED SOLAR PROJECTS as of 30 JUNE 2020 - EVOSS

  • Upload
    others

  • View
    2

  • Download
    0

Embed Size (px)

Citation preview

AWARDED SOLAR PROJECTS as of 30 JUNE 2020.

ISLAND /

GRID REGION PROVINCE CITY / MUNICIPALITY PROJECT NAME COMPANY NAME STAGE OF CONTRACT

POTENTIAL

CAPACITY (MW)

INSTALLED

CAPACITY (MW)

LUZON I Pangasinan Anda 1 MWp Anda Solar Power Project Pangasinan I Electric Cooperative, Inc. Pre-Development Stage 0.00

Bolinao 5 MWp Bolinao Solar PV Power Plant EEI Power Corporation Pre-Development Stage 5.00

Bugallon & San Carlos City Bugallon Solar Power Project Phinma Energy Corporation Pre-Development Stage 1.03

Labrador Labrador Solar Power Project IJG1 Philippines Inc. Development Stage 5.00

Labrador, Mabini and

Infanta90 MW Cayanga- Bugallon SPP PV Sinag Power Inc. Pre-Development Stage 90.00

Mapandan and Santa

Barbara Sta. Barbara Solar Power Project

OneManaoag Solar Corporation (Formerly

SunAsia Energy Inc.)Development Stage 10.14

Rosales Rosales Solar Power Project C Squared Prime Commodities Corporation Pre-Development Stage 0.00

San Manuel San Manuel 2 Solar Power Project Pilipinas Einstein Energy Corp. Pre-Development Stage 70.00

San Manuel 1 Solar Power Project Pilipinas Newton Energy Corp. Pre-Development Stage 70.00

Sison and Binalonan Binalonan Solar Power Project PV Sinag Power Inc. Pre-Development Stage 50.00

Ilocos Norte Burgos Burgos Solar Power Project Phase I Energy Development Corporation Commercial Operation 4.10

Burgos Solar Power Project Phase 2 Energy Development Corporation Commercial Operation 2.66

Bangui Solar Power Project NorthWind Power Development

Corporation Pre-Development Stage 2.50

Currimao Currimao Solar Power Project. Nuevo Solar Energy Corp. Pre-Development Stage 50.00

Currimao Solar Power Project.. Mirae Asia Energy Corporation Commercial Operation 20.00

.

ISLAND /

GRID REGION PROVINCE CITY / MUNICIPALITY PROJECT NAME COMPANY NAME STAGE OF CONTRACT

POTENTIAL

CAPACITY (MW)

INSTALLED

CAPACITY (MW)

LUZON I Ilocos Norte Currimao Currimao Solar Power Project… Ilocos Norte Electric Cooperative, Inc. Pre-Development Stage 0.00

Paoay Ilocos Norte Phase I Solar Power Project Del Sol Energy Primera, Inc. Pre-Development Stage 40.00

Ilocos Norte Phase II Solar Power Project Del Sol Energy Primera, Inc. Pre-Development Stage 40.00

Paoay II Solar Power Project Del Sol Energy Segunda, Inc. Pre-Development Stage 40.00

Paoay III Solar Power Project Del Sol Energy Tercera, Inc. Pre-Development Stage 40.00

Pasuquin, Burgos Ilocos Norte Solar Power Project Energy Logics Philippines, Inc. Development Stage 100.00

Sarrat Sarrat Solar Power Project Bosung Solartec, Inc. Commercial Operation 1.00

Bulacan San Ildefonso Bulacan 2 Solar Power Project Cleantech Global Renewables, Inc. Development Stage 22.00

Ilocos Sur Magsingal Magsingal Solar Power Project Neoenergy Corporation Pre-Development Stage 100.00

Narvacan Sulvec Solar Power Project Neoenergy Corporation Pre-Development Stage 20.00

Santa Santa Solar Power Project Satrap Power Corporation Development Stage 20.00

III Bataan Hermosa Hermosa Solar Power Project Solana Solar Alpha Inc. Development Stage 24.00

Hermosa Solar Power Project. YH Green Energy Incorporated Commercial Operation 14.50

Mariveles Bataan Solar Power Project Next Generation Power Technology Corp. Commercial Operation 18.00

Morong Morong Solar Power Project SPARC Solar Powered Agri-Rural

Communities CorporationCommercial Operation 5.02

Orani Bataan Solar Power Project BWST, Inc. Pre-Development Stage 150.00

.

ISLAND /

GRID REGION PROVINCE CITY / MUNICIPALITY PROJECT NAME COMPANY NAME STAGE OF CONTRACT

POTENTIAL

CAPACITY (MW)

INSTALLED

CAPACITY (MW)

LUZON III Zambales Botolan Botolan Solar Power Project Solar Power Utilities Generator Corporation Development Stage 39.27

Iba and Palauig Iba-Palauig Solar Power ProjectSolar Philippines Commercial Rooftop

Projects, Inc. Pre-Development Stage 1,200.00

Iba-Palauig Iba-Palauig 2 Solar Power ProjectSolar Philippines Commercial Rooftop

Projects, Inc. Pre-Development Stage 1,200.00

Palauig Solar Power Project. Shizen Inc. Pre-Development Stage 50.00

Palauig Palauig Solar Power Project Gigasol3, Inc. Operating Contract 0.00

Bato (formerly applied as Bulawen) Solar

Power Project Solar Power Utilities Generator Corporation Pre-Development Stage 35.50

Palauig Solar Power Project.SPARC Solar Powered Agri-Rural

Communities CorporationCommercial Operation 5.02

San Marcelino San Marcelino Solar Power Project Santa Cruz Solar Energy, Inc. Newly awarded 0.00

Bulacan PlaridelBulihan Industrial Park Solar Rooftop

ProjectET Energy Island, Corp. Pre-Development Stage 0.31

San Ildefonso Bulacan 3 Solar Power ProjectBulacan Solar Energy Corp. (formerly

Cleantech Global Renewables, Inc.) Commercial Operation 15.00

55-MW San Ildefonso Solar Power ProjectTeam (Philippines) Renewable Energy

CorporationPre-Development Stage 37.77

San Jose del Monte San Jose del Monte Solar Power Project Manresa Power Corporation Pre-Development Stage 80.00

San Miguel San Miguel Solar Power Project Powersource First Bulacan Solar Inc. Development Stage 80.91

San Rafael San Rafael Solar Power Project SPARC Solar Powered Agri-Rural

Communities CorporationCommercial Operation 3.82

Casalat Solar Power Project CMP Green Energy Corp. Pre-Development Stage 40.00

Nueva Ecija Cabanatuan City Cabanatuan Solar Power Project First Cabanatuan Renewable Ventures, Inc. Commercial Operation 10.26

.

ISLAND /

GRID REGION PROVINCE CITY / MUNICIPALITY PROJECT NAME COMPANY NAME STAGE OF CONTRACT

POTENTIAL

CAPACITY (MW)

INSTALLED

CAPACITY (MW)

LUZON III Nueva Ecija Munoz City and San JoseCentral Luzon State University Rooftop

Solar Power ProjectPI Energy, Inc. Pre-Development Stage 0.98

Patnanungan 5MW Patnanungan Solar Power Project Masé Power Corporation Pre-Development Stage 5.00

Peñaranda and General

TinioPeñaranda Solar Power Project ET Energy Island, Corp. Newly awarded 1.00

Santa Rosa and

Cabanatuan City

Santa Rosa Nueva Ecija 3 Solar Power

Project

Solar Philippines Commercial Rooftop

Projects, Inc.Pre-Development Stage 0.00

Santa Rosa and

PeñarandaSta Rosa Nueva Ecija 1 Solar Power Project

Solar Philippines Commercial Rooftop

Projects, Inc.Pre-Development Stage 100.00

Santa Rosa, Peñaranda

and San Leonardo

Santa Rosa Nueva Ecija 2 Solar Power

ProjectSolar Philippines Nueva Ecija Corporation Pre-Development Stage 1,200.00

Bataan Mariveles Bataan Solar Power Project Bataan Solar Energy Inc. Development Stage 20.00

Morong -HermosaBataan Solar Power Project Phase I, II, and

IIIJobin-Sqm Inc. Commercial Operation 100.00 32.34

Pampanga Angeles City Clark International Airport Solar Power

ProjectRuei Hsiang Solar (Philippines) Corp. Pre-Development Stage 10.00

Marquee Mall Solar Rooftop Project Urbasolar Philippines Corporation Pre-Development Stage 0.00

Apalit Apalit Solar Power Project Doña Isabel Power Corporation Pre-Development Stage 0.00

Clark Freeport Zone Clark Solar Power Project Energence Renewable Energy Corporation Pre-Development Stage 35.00

Clark Special Economic

ZoneClark Solar Power Project

Enfinity Philippines Renewable Resources

Inc. Commercial Operation 22.33

Clark Solar Power Project Phase 2Enfinity Philippines Renewable Resources

Fifth, Inc. Pre-Development Stage

Mabalacat Raslag III Solar PV Power Project Raslag Corp. Pre-Development Stage 17.49

Mabalacat City CityMall Dau Solar Power Project Solar Pacific Citysun Corporation Commercial Operation 0.24

.

ISLAND /

GRID REGION PROVINCE CITY / MUNICIPALITY PROJECT NAME COMPANY NAME STAGE OF CONTRACT

POTENTIAL

CAPACITY (MW)

INSTALLED

CAPACITY (MW)

LUZON III Pampanga Mexico Pampanga Solar Power Project Phase I Raslag Corp. Commercial Operation 10.00

Pampanga Solar Power Project Phase II Raslag Corp. Commercial Operation 13.14

Mexico, Arayat Arayat Solar Power Project Citicore Renewable Energy Corp. Pre-Development Stage

Tarlac Capas Capas Solar Power Project Sindicatum C-Solar Power Inc. Pre-Development Stage 0.64

Tarlac Solar Power Project Greenergy Solutions Inc. Pre-Development Stage 50.00

Concepcion Sta. Rosa Solar Power Project Terasu Energy Inc. Pre-Development Stage 0.00

Concepcion Concepcion 1 Solar Power Project Solar Philippines Tarlac Corporation Commercial Operation 115.00 100.61

Concepcion and Tarlac

CityConcepcion Tarlac 2 Solar Power Project

Solar Philippines Commercial Rooftop

Projects, Inc. Pre-Development Stage 100.00

Tarlac City Tarlac Solar Power Project Phase I PetroSolar Corporation Commercial Operation 50.07

Armenia Solar Power Project nv vogt Philippines Solar Energy Three, Inc. Commercial Operation 8.84

Tarlac Solar Power Project nv vogt Philippines Solar Energy Three, Inc. Pre-Development Stage 55.00

Tarlac Solar Power Project Phase II PetroSolar Corporation Development Stage 20.00

Tarlac City & Victoria Dalayap Solar Power Project nv vogt Philippines Solar Energy Four, Inc. Commercial Operation 7.48

Tarlac City and La Paz Tarlac Solar Power ProjectSolar Philippines Commercial Rooftop

Projects, Inc. Pre-Development Stage 150.00

Tarlac City and San Jose Armenia Solar Power Project AP Renewables Energy Corp. Pre-Development Stage 39.00

Nueva Ecija Bongabon Bongabon Solar Power Project Greentech Solar Energy Inc. Pre-Development Stage 18.75

.

ISLAND /

GRID REGION PROVINCE CITY / MUNICIPALITY PROJECT NAME COMPANY NAME STAGE OF CONTRACT

POTENTIAL

CAPACITY (MW)

INSTALLED

CAPACITY (MW)

LUZON III Nueva Ecija Cabanatuan City and Laur Cabanatuan Solar Power Project Greentech Solar Energy Inc. Development Stage 6.25

General Tinio Gen. Tinio Solar Power Project Sunlite Energy Helio-Site 1 Inc. Pre-Development Stage 0.00

Muñoz and Lupao Talugtug Solar Power Project Greenergy Solutions Inc. Pre-Development Stage 125.00

Rizal and Pantabangan Pantabangan Solar Power Project Firmgreen Phils. Inc. Pre-Development Stage 100.00

San Jose City San Jose Solar Power Project V-Mars Solar Energy Corporation Development Stage 10.00

San Jose City and Lupao San Jose Solar Power Project SJC SolarPower Corporation Development Stage 10.00

Tarlac Tarlac City, Concepcion &

CapasTarlac Solar Power Project Firmgreen Phils. Inc. Pre-Development Stage 50.00

Bulacan San Ildefonso San Ildefonso Solar Power ProjectSolar Philippines Commercial Rooftop

Projects, Inc. Pre-Development Stage 140.00

San Miguel San Miguel Bulacan Solar Power Project Neoenergy Corporation Pre-Development Stage 100.00

San Rafael San Rafael 1 Solar Power ProjectSolar Philippines Commercial Rooftop

Projects, Inc. Pre-Development Stage 140.00

IV-A Laguna Alaminos Alaminos Solar Power Project Solarace1 Energy Corp. Pre-Development Stage 0.00

Bay , Laguna Laguna Lake-Bay Solar Power Project 2 Barracuda Energy Corp. Pre-Development Stage 0.00

Binan Central Mall Biñan Solar Power ProjectSolar Philippines Commercial Rooftop

Projects, Inc.Commercial Operation 0.70

Biñan Laguna Technopark Solar Power Project ET Energy Island, Corp. Newly awarded 1.00

Calamba Laguna Solar Power ProjectTransnational Renewable Energy

Corporation Pre-Development Stage 0.21

Calamba City , Laguna Laguna Lake-Calamba Solar Power Project 4 Barracuda Energy Corp. Pre-Development Stage 0.00

.

ISLAND /

GRID REGION PROVINCE CITY / MUNICIPALITY PROJECT NAME COMPANY NAME STAGE OF CONTRACT

POTENTIAL

CAPACITY (MW)

INSTALLED

CAPACITY (MW)

LUZON IV-A Laguna Los Baños Laguna Solar Power Project MSPECTRUM, INC. Pre-Development Stage 0.81

Los Baños , LagunaLaguna Lake-Los Baños Solar Power

Project5 Barracuda Energy Corp. Pre-Development Stage 0.00

Luisiana Luisiana Solar Power Project Solar Power Utilities Generator Corporation Pre-Development Stage 30.00

Lumban and Cavinti NKS Solar One Floating Power Project NKS Solar One Inc. Pre-Development Stage 190.00

Lumban, Laguna Laguna Lake-Lumban Solar Power Project 6 Barracuda Energy Corp. Pre-Development Stage 0.00

Santa Rosa City , Laguna Laguna Lake-Balibago Solar Power Project 1 Barracuda Energy Corp. Pre-Development Stage 0.00

Sta. Rosa CW Home Depot Solar Power Project CW Marketing & Development Corporation Commercial Operation 1.68

Quezon Cabatang, Taiong, Quezon Cabatang Tiaong Solar Power ProjectSolar Philippines Commercial Rooftop

Projects, Inc.Pre-Development Stage 0.00

Candelaria Candelaria Solar Power Project Solar Power Utilities Generator Corporation Pre-Development Stage 50.00

Jomalig Jomalig Solar Power Project Masé Power Corporation Pre-Development Stage 5.00

Lucena Lucena I Solar Power Project Sun Premier Pagbilao Philippine Corporation Pre-Development Stage 10.00

Mauban Cagbalete Island Microgrid SPP Manila Electric Company Pre-Development Stage 0.12

Pagbilao Ikirin Solar Power Project Sun Premier Pagbilao Philippine Corporation Pre-Development Stage 10.00

Tayabas, Quezon Tayabas Solar Power ProjectSolar Philippines Commercial Rooftop

Projects, Inc.Pre-Development Stage 0.00

Rizal Antipolo and Tanay Antipolo Rooftop Solar Power Project ET Energy Island, Corp. Pre-Development Stage 1.00

Baras Pinugay Solar Power Project H&WB Asia Pacific (Pte Ltd) Corporation Pre-Development Stage 50.00

.

ISLAND /

GRID REGION PROVINCE CITY / MUNICIPALITY PROJECT NAME COMPANY NAME STAGE OF CONTRACT

POTENTIAL

CAPACITY (MW)

INSTALLED

CAPACITY (MW)

LUZON IV-A Rizal Baras, Morong and Tanay Laguna Lake 3 Solar Power Project Winnergy Holdings Corp. Pre-Development Stage

Binangonan Talim Floating Solar Phase 1 Power Project Island Wind Energy Corp. Pre-Development Stage 120.00

Binangonan and Cardona Talim Floating Solar Phase 2 Power Project Island Wind Energy Corp. Pre-Development Stage 120.00

Binangonan and Cardona

and Laguna de Bay

Laguna de Bay Area 2E Solar Power Project

aka Cardona Floating Solar Power ProjectSolar Philippines South Luzon Corporation Pre-Development Stage 0.00

Laguna de Bay Rizal Solar Floating Project AC Subic Solar, Inc. Pre-Development Stage 0.00

Laguna de Bay and Pililla Pililla Solar Power Project AC Laguna Solar, Inc. Pre-Development Stage 0.00

Pililia Laguna Lake 4 Solar Power Project Winnergy Holdings Corp. Pre-Development Stage

Pililla Tanay Solar Power Project Green Atom Renewable Energy Corporation Pre-Development Stage 12.00

Pililla Solar Power Project Green Atom Renewable Energy Corporation Pre-Development Stage 100.00

Laguna Bay 2 Solar Power Project Pangasinan UPC Asia Corporation Pre-Development Stage 0.00

Pililla Solar Floating Project Laguna Central Renewables Inc. Pre-Development Stage 0.00

Pililla Solar Power Project. Metro Solar Power Solutions, Inc. Pre-Development Stage 65.00

Batangas Balayan Batangas Solar Power Project EarthEnergy Corp. Pre-Development Stage 30.00

Balayan and Calaca Balayan Solar Power ProjectSolar Philippines Commercial Rooftop

Projects, Inc. Pre-Development Stage 600.00

Batangas City 50 MW Mabacong Solar Power Project Lumin Solar Energy Inc. Pre-Development Stage 50.00

Calatagan Calatagan Solar Power Project Solar Philippines Calatagan Corporation Commercial Operation 63.30

.

ISLAND /

GRID REGION PROVINCE CITY / MUNICIPALITY PROJECT NAME COMPANY NAME STAGE OF CONTRACT

POTENTIAL

CAPACITY (MW)

INSTALLED

CAPACITY (MW)

LUZON IV-A Batangas Lian Lian Solar Power Project Absolut Distillers, Inc. Commercial Operation 2.04

Lipa City and Santo Tomas Lumbang Solar Power Project SBR Clean Energy Corp. Pre-Development Stage 50.00

Lumbangan, TuyLumbangan Ground Mounted Solar Power

ProjectCiticore Renewable Energy Corp. Pre-Development Stage 125.00

Malvar Malvar Solar Power Project Majestics Energy Corporation Pre-Development Stage 3.00

Nasugbu and Tuy Nasugbu Solar Power Project Roxas Green Energy Corporation Pre-Development Stage 30.00

Padre Garcia Padre Garcia Solar Power Project Solar Philippines Batangas Corporation Pre-Development Stage 0.00

Tanauan City Tanauan Solar Rooftop Project ET Energy Island, Corp. Pre-Development Stage 1.00

Tanauan Batangas 3 Solar Power Project Solar Philippines Tanauan Corporation Pre-Development Stage 0.00

Taysan Mataas na Lupa Solar Power Project ET Energy Island, Corp. Newly awarded 1.00

Tuy Tuy Batangas 4 Solar Power Project Greencore Power Solutions 2, Inc. Pre-Development Stage 62.50

Tuy Batangas 3 Solar Power Project Verdecore Power Solutions, Inc. Pre-Development Stage 62.50

Rizal Baras Baras Solar Power Project Green Atom Renewable Energy Corporation Pre-Development Stage 3.00

Baras, Morong and Tanay Baras 1 Solar Power Project Winnergy Holdings Corp. Pre-Development Stage 0.00

Rodriguez Macabud Solar Power Project ATN Philippines Solar Energy Group, Inc. Development Stage 30.00

CaviteGeneral Trias,

Dasmariñas, SilangSilang Solar Power Project PTC Energy, Inc. Pre-Development Stage 0.00

Imus Anabu II Solar Power Project ET Energy Island, Corp. Pre-Development Stage 1.00

.

ISLAND /

GRID REGION PROVINCE CITY / MUNICIPALITY PROJECT NAME COMPANY NAME STAGE OF CONTRACT

POTENTIAL

CAPACITY (MW)

INSTALLED

CAPACITY (MW)

LUZON IV-A Cavite Indang Indang Solar Power Project Solarite Power Inc. Pre-Development Stage 4.75

Maragondon Maragondon 3 Solar Power Project Solar Philippines Tanauan Corporation Pre-Development Stage 140.00

Pantihan II Solar Power Project ET Energy Island, Corp. Newly awarded 1.00

Maragondon and General

Emilio AguinaldoMaragondon 1 Solar Power Project Solar Philippines Tanauan Corporation Pre-Development Stage 0.00

Naic and Tanza Sabang Solar Power Project G.A. Philkor Multi Energy Corp. Development Stage 50.00

Maragondon-Naic-Tanza 2 Solar Power

Project

Solar Philippines Commercial Rooftop

Projects, Inc. Pre-Development Stage 200.00

Naic, Maragondon and

Indang Maragondon-Naic 1 Solar Power Project

Solar Philippines Commercial Rooftop

Projects, Inc. Pre-Development Stage 100.00

Noveleta, Rosario,

General Trias, and TanzaCavite Solar Power Project

Enfinity Philippines Renewable Resources

Second, Inc. Development Stage 3.00

Rosario and General Trias Cavite Economic Zone Solar Power Project Majestics Energy Corporation Commercial Operation 41.30

Batangas Lipa City and Padre Garcia Bawi Solar Power Project Phinma Energy Corporation Pre-Development Stage 45.00

Sto. Tomas FPIP Batangas Solar Power Project First Gen Visayas Energy Inc. Terminated with finality 0.00

(blank)Laguna de Bay and

Muntinlupa CityLaguna Bay 1 Solar Power Project Pangasinan UPC Asia Corporation Pre-Development Stage 0.00

Laguna and

BatangasCalamba and Tanauan Calamba - Tanauan Solar Power Project

Solar Philippines Tanauan Corporation

(formerly Solar Philippines Commercial

Rooftop Projects, Inc.)

Pre-Development Stage 100.00

Calamba and Tanauan

CityCalamba-Tanauan 2 Solar Power Project

Solar Philippines Commercial Rooftop

Projects, Inc.Pre-Development Stage 0.00

Maragondon, Cavite Maragondon Maragondon 2 Solar Power Project Solar Philippines Tanauan Corporation Pre-Development Stage 140.00

Laguna Laguna de Bay Laguna Lake Solar Floating Project NORTESOLIII INC. Pre-Development Stage 0.00

.

ISLAND /

GRID REGION PROVINCE CITY / MUNICIPALITY PROJECT NAME COMPANY NAME STAGE OF CONTRACT

POTENTIAL

CAPACITY (MW)

INSTALLED

CAPACITY (MW)

LUZON IV-A Laguna Santa Maria Pililla Solar Power Project.. TotalPower, Inc. Pre-Development Stage 0.00

IV-B Palawan Bataraza Rio Tuba Solar Power Project Powersource Philippines Inc. Pre-Development Stage 0.00

CoronYH Busuanga Solar-Diesel Hybrid Power

PlantYH Green Energy Incorporated Pre-Development Stage 19.50

Culion Culion Solar Power Project Culna Renewable Energy Corp Pre-Development Stage 2.80

El Nido Island El Nido Solar Power Project SolarPacific Energy Corporation Pre-Development Stage 3.00

TPI El NidoSolar Power Project TotalPower, Inc. Pre-Development Stage 0.00

Linapacan Linapacan Solar Power Project Culna Renewable Energy Corp Pre-Development Stage 0.33

Puerto Princesa Palawan Solar Power Project Phil. Solar Farm-Palawan, Inc. Pre-Development Stage 10.00

Palawan Solar Power Project, Sabang Renewable Energy Corp. Development Stage 1.45

Puerto Princesa City Puerto Princesa Solar Power Project PetroGreen Energy Corporation Pre-Development Stage 10.00

Puerto Princesa City and

AborlanPalawan Solar Power Project.

Solar Philippines Renewable Energy

Projects, Inc.Pre-Development Stage 0.00

Puerto Princesa City,

PalawanPuerto Princesa Solar Power Project

Solar Philippines Commercial Rooftop

Projects, Inc.Pre-Development Stage 0.00

Roxas and San Vicente Palawan Solar Power Project Global Clean Hybrid Energy Corp. Pre-Development Stage 0.00

San Vicente San Vicente Solar PV Project New Belvia Renewables, Inc. Pre-Development Stage 0.00

Kemdeng Solar Power Project New Belvia Renewables, Inc. Newly awarded 0.00

Villa Libertad, El Nido,

PalawanEl Nido Solar Power Project

Solar Philippines Commercial Rooftop

Projects, Inc.Pre-Development Stage 0.00

.

ISLAND /

GRID REGION PROVINCE CITY / MUNICIPALITY PROJECT NAME COMPANY NAME STAGE OF CONTRACT

POTENTIAL

CAPACITY (MW)

INSTALLED

CAPACITY (MW)

LUZON IV-B Batangas San Juan , Batangas San Juan Solar Power Project Scion Sustainable Power Corp. Pre-Development Stage 40.00

Oriental Mindoro Gloria, Oriental Mindoro Mindoro Island Solar Power Project First Cleanergy Corporation Pre-Development Stage

Romblon Odiongan Tumingad Island Solar Power Project

Suweco Tablas Energy Corporation

(formerly Sunwest Water and Electric

Company, Inc.)

Development Stage 7.50

Romblon Cobrador Solar Power ProjectCantingas Mini-Hydro Power (CHPC)

Corporation Pre-Development Stage 0.00

Occidental Mindoro San JoseRizal Occidental Mindoro Hybrid Power

Production Systems ProjectOne Renewable Energy Enterprise, Inc. Pre-Development Stage 52.00

V Camarines Sur Calabanga Calabanga Solar Power Project Calabanga Renewable Energy (CARE), Inc. Development Stage 50.00

Del Gallego Del Gallego Solar Power Project Sun Premier Sud Philippine Corporation Pre-Development Stage 0.00

Garchitorena Quinalasag Solar Power Project FP Island Energy Corporation Pre-Development Stage 0.00

Haponan Haponan Solar Power Project FP Island Energy Corporation Pre-Development Stage

Lahuy Lahuy Solar Power Project FP Island Energy Corporation Pre-Development Stage 0.25

Pili and Naga City Naga Solar Power Project Solar Philippines South Luzon Corporation Pre-Development Stage

Catanduanes Caramoran Catanduanes Solar Power Project Local Government Unit of Caramoran Pre-Development Stage 1.00

NCR Metro Manila Quezon City SM North Solar Power ProjectSolar Philippines Commercial Rooftop

Projects, Inc.Commercial Operation 1.47

Metro Manila Pasay City SM Mall of Asia Solar Power Project Solar Philippines Commercial Rooftop

Projects, Inc. Commercial Operation 2.69

Quezon City Balintawak Solar Power Project Solkraft Power Ph Corp. Pre-Development Stage 0.31

Quezon City La Mesa Solar Power Project AC La Mesa Solar, Inc. Pre-Development Stage 0.00

.

ISLAND /

GRID REGION PROVINCE CITY / MUNICIPALITY PROJECT NAME COMPANY NAME STAGE OF CONTRACT

POTENTIAL

CAPACITY (MW)

INSTALLED

CAPACITY (MW)

LUZON NCR Metro Manila Valenzuela City Valenzuela Solar Power Project Valenzuela Solar Energy Inc. Commercial Operation 8.50

TaguigLaguna de Bay and Taguig

CityTaguig Floating Solar Power Project NortesolIV, Inc. Pre-Development Stage

II Cagayan Aparri Aparri Solar Power Project GreEnergy Power Systems Philippines, Inc. Pre-Development Stage 105.00

Lal-lo and Gattaran Lal-lo Hybrid Solar Power ProjectNatures Renewable Energy Dev't.

(NAREDCO) Corporation Pre-Development Stage 100.00

Tuguegarao City SM City Tuguegarao Solar Power ProjectSolar Philippines Commercial Rooftop

Projects, Inc.Pre-Development Stage 0.00

Isabela Cauayan, Alica,

AngadananCagayan Valley Solar PV Project GRM Cagayan Valley, Inc. Pre-Development Stage 0.00

Cordon Cordon Solar Power Project Greenergy Solutions Inc. Pre-Development Stage 50.00

Gamu Gamu 2 SPP PV Sinag Power Inc. Pre-Development Stage 70.00

Gamu and Naguilian Gamu Solar Power Project Pilipinas Faraday Energy Corp. Pre-Development Stage 100.00

Ilagan Isabela Solar Power Project Living Projects 4 People Philippines Inc. Pre-Development Stage 100.00

Ilagan City Ilagan City Solar Power Project Greenergy Solutions Inc. Pre-Development Stage 100.00

Ramon & Santiago Ramon Solar Power Project AAESUN Corporation Development Stage 5.00

Reina Mercedes and Luna Isabela Solar Power Project Daebo Green Pacific Inc. Development Stage 18.00

San Pablo San Pablo Solar Power Project Solar Valley Energy Solutions Inc. Pre-Development Stage 130.00

San Pablo and Cabagan Limbauan Solar Power Project BKS Green Energy Corp. Pre-Development Stage 25.00

Sta. Maria Sta. Maria Solar Power Project East Coast FAS Renewable Energy and

Industrial Corporation Pre-Development Stage 30.00

.

ISLAND /

GRID REGION PROVINCE CITY / MUNICIPALITY PROJECT NAME COMPANY NAME STAGE OF CONTRACT

POTENTIAL

CAPACITY (MW)

INSTALLED

CAPACITY (MW)

LUZON II Isabela Sta. Maria Sta. Maria Solar Power Project.. Greenergy Solutions Inc. Pre-Development Stage 100.00

Isabela and Cagayan Santa Maria & Enrile Maria Lourdes Green Solar Power Project East Coast Asia Power Development

CorporationPre-Development Stage 0.00

NCR and

III

Metro Manila and

Bulacan

Valenzuela City and

ObandoEcopark Isla Solar Power Project Ecopark Energy of Valenzuela Corp. Development Stage 4.70

Valenzuela City and

Obando-MeycauayanEcopark Tagalag Solar Power Project Ecopark Energy of Valenzuela Corp. Development Stage 16.00

CAR Ifugao Lagawe and Kiangan First Ifugao Solar Power Project Alfalfa Construction Pre-Development Stage 0.60

Benguet Tuba BENECO - 1MW Tabaan Sur SPP Benguet Electric Cooperative Inc. Pre-Development Stage 1.00

II and CAR Isabela and KalingaSanta Maria-Cabagan and

Rizal Pasto Di Apolonio Solar Power Project

East Coast Asia Power Development

CorporationPre-Development Stage 0.00

(blank) Tarlac Capas, Tarlac Tarlac Solar Power Project Sunray Power Inc. Pre-Development Stage 100.00

NCR and

IV-ALaguna , Manila

Muntinlupa ,San

Pedro,Laguna de BaySan Pedro Floating Solar Power Project Nortesol Incorporated Pre-Development Stage 250.00

Cavite, Metro

ManilaBacoor City and Las Piñas Pamplona Solar Power Project ET Energy Island, Corp. Pre-Development Stage 1.00

LUZON Sum 10,534.86 466.10

VISAYAS VI Aklan Banga Banga Solar Power Project Gemini Energy Corporation Pre-Development Stage 10.00

Kalibo Kalibo Solar Power Project Solar Pacific Citysun Corporation Commercial Operation 0.22

Iloilo Miag-ao Miag-ao Solar Power Project Cosmo Solar Energy, Inc. Commercial Operation 5.67

Oton Vistamall Iloilo Solar Power Project Kratos Res, Inc. Pre-Development Stage 0.66

Negros Occidental Bacolod City CityMall Mandalagan Solar Power Project Solar Pacific Citysun Corporation Commercial Operation 0.63

.

ISLAND /

GRID REGION PROVINCE CITY / MUNICIPALITY PROJECT NAME COMPANY NAME STAGE OF CONTRACT

POTENTIAL

CAPACITY (MW)

INSTALLED

CAPACITY (MW)

VISAYAS VI Negros Occidental Bacolod CityCityMall Goldenfields Solar Rooftop

ProjectSolar Pacific Citysun Corporation Pre-Development Stage 0.18

Bacolod City Bacolod City Solar Power Project II Negros PH Solar Inc. Development Stage 200.00

Vista Alegre Solar Power Project Amatera Renewable Energy Corporation Pre-Development Stage 50.00

Bais City Bais Solar Power Project (SACASOL IV) Monte Solar Energy Inc. Commercial Operation 18.00

Cadiz City Cadiz Solar Power ProjectHelios Solar Energy Corp. (formerly Phil-

Power Solar Energy Corp.)Commercial Operation 132.50

Cadiz City Cadiz City Solar Power Project Puente Al Sol Inc. Pre-Development Stage 70.00

Cadiz Solar Rooftop Project Solar Pacific Citysun Corporation Pre-Development Stage

Himamaylan Nabali-an Solar Power Project Greencane Sugarfields Corporation Pre-Development Stage 60.00

Kabankalan City Kabankalan Solar Power Project Solar Pacific Citysun Corporation Commercial Operation 1.00

Hilamonan Solar Power Project Greencane Sugarfields Corporation Pre-Development Stage 60.00

La Carlota City Islasol Solar Power Project (ISLASOL II) Negros Island Solar Power Inc. Commercial Operation 32.00

La Carlota City La Carlota Solar Power Project Megawatt Clean Energy, Inc. Pre-Development Stage 50.00

Manapla and Cadiz Manapla Solar Power Project (ISLASOL III) Negros Island Solar Power Inc. Commercial Operation 48.00

San Carlos CitySan Carlos Solar Power Project Phase I-A

and I-B (SACASOL I-A&I-B)San Carlos Solar Energy Inc. Commercial Operation 22.00

San Carlos Solar Power Project Phase I-C

and I-D (SACASOL I-C&I-D)San Carlos Solar Energy Inc. Commercial Operation 23.00

San Carlos Solar Rooftop Project Solar Pacific Citysun Corporation Pre-Development Stage 0.12

.

ISLAND /

GRID REGION PROVINCE CITY / MUNICIPALITY PROJECT NAME COMPANY NAME STAGE OF CONTRACT

POTENTIAL

CAPACITY (MW)

INSTALLED

CAPACITY (MW)

VISAYAS VI Negros Occidental San Carlos City SACASUN Solar Power Project San Carlos Sun Power Inc. Commercial Operation 58.98

San Enrique San Enrique Solar Rooftop Project Solar Pacific Citysun Corporation Pre-Development Stage 0.60

Silay City Silay Solar Power ProjectSilay Solar Power, Inc. (formerly Megawatt

Clean Energy, Inc.) Commercial Operation 25.01

Victorias City Victorias Solar Power Project Solar Pacific Citysun Corporation Commercial Operation 0.64

Victorias Solar Power Project..VictoriaSolar Energy Corp. (formerly

SunAsia Energy Inc.)Development Stage 30.63

Aklan Malay Boracay Solar Power Project Solar Pacific Citysun Corporation Commercial Operation 0.30

Capiz Roxas City Roxas City Mall Solar Rooftop ProjectSolar Philippines Commercial Rooftop

Projects, Inc. Pre-Development Stage 0.59

Iloilo Iloilo City Gaisano Iloilo Solar Rooftop ProjectEDC Siklab Power Corporation (Formerly:

EDC Bago Solar Power Corporation)Commercial Operation 1.03

Tigbauan Tigbauan Solar Power Project Solexar Energy International, Inc. Development Stage 34.30

Guimaras San Lorenzo San Lorenzo Solar Power Project Phinma Renewable Energy Corporation Pre-Development Stage 0.00

VII Cebu Aloguinsan Cebu Solar Power Project Solarex Energy Corporation Pre-Development Stage

Bogo Bogo III Solar Power Project Sun Premier Bogo Philippine Corporation Pre-Development Stage 15.00

Bogo V Solar Power Project Sun Premier Bogo Philippine Corporation Pre-Development Stage 16.70

Consolacion Consolacion Solar Power Project Solar Pacific Citysun Corporation Pre-Development Stage 0.30

DaanBantayan Daanbantayan Solar Power Project Ceko Solar Farm Systems Corporation Pre-Development Stage 25.00

Lapu-LapuFCO International, Inc. Solar Rooftop

ProjectET Energy Island, Corp. Pre-Development Stage 1.00

.

ISLAND /

GRID REGION PROVINCE CITY / MUNICIPALITY PROJECT NAME COMPANY NAME STAGE OF CONTRACT

POTENTIAL

CAPACITY (MW)

INSTALLED

CAPACITY (MW)

VISAYAS VII Cebu Mandaue City Mandaue City Solar Rooftop Project ET Energy Island, Corp. Pre-Development Stage 0.62

Mandaue Solar Power Project ET Energy Island, Corp. Development Stage 1.50

Toledo Toledo Solar Power Project First Toledo Solar Energy Corp. (formerly

SunAsia Energy Inc.) Commercial Operation 60.00

Negros Oriental Dumaguete City Dumaguete Solar Power Project Solar Pacific Citysun Corporation Commercial Operation 0.24

Cebu Medellin Medellin Solar Power ProjectSolar Philippines Commercial Rooftop

Projects, Inc. Pre-Development Stage 100.00

VIII Leyte Kananga and Ormoc Kananga-Ormoc Solar Power Project Solar Philippines Visayas Corporation Pre-Development Stage 300.00

Ormoc Ormoc Solar Power ProjectFirst Solar Energy Corp. (Formerly First

Soleq Energy Corp.) Commercial Operation 30.00

Leyte Solar Power Project II Phil. Solar Farm-Leyte, Inc. Pre-Development Stage 30.00

San Isidro and Calubian San Isidro Solar Power Project TotalPower, Inc. Pre-Development Stage 151.00

San Miguel San Miguel Solar Power Project Sunpalo Solar Energy Inc. Pre-Development Stage 100.00

Tacloban, Santa Fe and

Palo Palo Solar Power Project Sulu Electric Power and Light (Phils.), Inc. Commercial Operation 49.81

Biliran Biliran Biliran Solar Power Project E & P Green Energy, Inc. Development Stage 25.00

Samar Calbayog City 1MW SAMELCO I - Calbayog SPP Samar I Electric Cooperative, Inc. Pre-Development Stage 1.00

Paranas 1MW SAMELCO II - Paranas SPP Samar II Electric Cooperative, Inc. Pre-Development Stage 0.00

VISAYAS

Sum1,334.20 509.03

MINDANAO IXZamboanga del

NorteLa Libertad and Dapitan Zamboanga del Norte Solar Power Project Astronergy Development Dipolog Inc. Pre-Development Stage 5.00

.

ISLAND /

GRID REGION PROVINCE CITY / MUNICIPALITY PROJECT NAME COMPANY NAME STAGE OF CONTRACT

POTENTIAL

CAPACITY (MW)

INSTALLED

CAPACITY (MW)

MINDANAO IX Zamboanga Zamboanga City Zambo Ecozone Solar Power Project Ecoglobal Inc. Pre-Development Stage 30.00

Zaboanga Peninsula Pagadian City Pagadian Solar Power Project Astronergy Development Pagadian inc. Pre-Development Stage 10.00

XI Davao del Sur Digos City Digos Solar Power Project

Alterpower Digos Solar, Inc. (formerly:

Enfinity Philippines Renewable Resources

Fourth, Inc.)

Commercial Operation 28.59

Davao del Norte Tagum City Tagum Solar Power Projct Solar Pacific Citysun Corporation Commercial Operation 0.84

Davao Oriental Mati City Davao Oriental Solar Power ProjectSun Option for Livelihood Alternative

Resources Inc. Pre-Development Stage 48.00

 Davao del Sur Tugbok District Davao Solar Power Project Maverick Solar Parks Corporation Pre-Development Stage 10.00

Davao del Sur Hagonoy Hagonoy Solar Power Project Enfinity Philippines Renewable Resources

Sixth, Inc.Pre-Development Stage 0.00

XII South Cotabato General Santos Gen. Santos Solar Power Project Centro Solar Energy II, Inc. Pre-Development Stage 0.00

General Santos Solar Power ProjectSolar Philippines Commercial Rooftop

Projects, Inc.Pre-Development Stage 300.00

General Santos City Santos Solar Power Project Astronergy Development GenSan Inc. Commercial Operation 24.96

GenSan Solar Power Project Phase I Del Sol Energy CGS, Inc. Development Stage 48.00

GenSan Solar Power Project Phase II Del Sol Energy CGS, Inc. Development Stage 48.00

General Santos City Mabuhay Solar Power Project (Phase I) Embrace Nature Power1 Corporation Pre-Development Stage 44.00

Conel Solar Power Project (Phase II) Embrace Nature Power1 Corporation Pre-Development Stage 16.00

Surallah Centrala Solar Power Project nv vogt Philippines Solar Energy One, Inc. Commercial Operation 6.23

Tantangan, South

CoatbatoTantangan Solar Power Project NVVP SE FIVE, Inc. Pre-Development Stage 65.00

.

ISLAND /

GRID REGION PROVINCE CITY / MUNICIPALITY PROJECT NAME COMPANY NAME STAGE OF CONTRACT

POTENTIAL

CAPACITY (MW)

INSTALLED

CAPACITY (MW)

MINDANAO XII Sarangani Alabel Alabel Solar Power Project SolarPacific Energy Corporation Pre-Development Stage 15.00

Sarangani Alabel Alabel Solar Power Project El Elyon Power Plant Phils. Inc. Pre-Development Stage 160.00

TPI Sarangani Solar Power Project TotalPower, Inc. Pre-Development Stage 80.00

Maasim Maasim Hybrid Solar Power Project Natures Renewable Energy Dev't.

(NAREDCO) Corporation Pre-Development Stage 100.00

Sultan Kudarat Tacurong City 1.212-MWp SUKELCO Solar Power Plant Sultan Kudarat Electric Cooperative, Inc. Pre-Development Stage 0.00

General Santos - SOCOTECO II - Apopong SPP South Cotabato II Electric Cooperative Pre-Development Stage 0.00

XIII Agusan del Norte Butuan City Butuan City 1 Solar Power ProjectEnfinity Philippines Renewable Resources

Third, Inc.Pre-Development Stage 10.00

Agusan del Sur San Francisco San Francisco Solar Power Project GPower Inc. Pre-Development Stage 10.00

ARMM Lanao del SurTagoloan II, Saguiaran &

Marawi City ICOM Solar Power Project

Local Government Unit of the Islamic City of

Marawi Pre-Development Stage 5.00

Maguindanao Datu Odin Sinsuat Datu Odin Sinsuat Solar Power Project Greenlight Solar Farms Tapian Corporation Pre-Development Stage 50.00

Sultan Kudarat Maguindanao Solar Power ProjectSalamat Mindanao Light & Power

Corporation Pre-Development Stage 20.00

X Misamis Oriental Villanueva Kirahon Solar Power Project Kirahon Solar Energy Corporation Commercial Operation 12.50

Bukidnon Kibawe Kibawe Solar Power Project Asian Greenenergy Corp. Commercial Operation 10.49

Manolo Fortich Manolo Fortich Solar Power Project Pilipinas Crosthwait Energy Corp. Pre-Development Stage 60.00

Maramag Maramag Solar Power Project Enerhiya Solaris Holdings Corporation Pre-Development Stage 1.50

Sumilao Bukidnon Solar Power Project SunAsia Energy Inc. Development Stage 2.00

.

ISLAND /

GRID REGION PROVINCE CITY / MUNICIPALITY PROJECT NAME COMPANY NAME STAGE OF CONTRACT

POTENTIAL

CAPACITY (MW)

INSTALLED

CAPACITY (MW)

MINDANAO X Misamis Oriental Balingasag Misamis Oriental Solar Power Project Astronergy Development Mindanao, Inc. Pre-Development Stage 0.00

Claveria Claveria Solar Power Project The Ark Green Dynamic Resources Corp. Pre-Development Stage 61.10

Gingoog City Gingoog City Solar Power Project Misamisestedelsol Inc. Pre-Development Stage 10.00

Laguindingan Laguindingan Solar Power Project Centro Solar Energy Inc. Pre-Development Stage 40.00

Opol Opol Solar Power Project Electra Ecoenergy Corp. Pre-Development Stage 25.00

Tagoloan Tagoloan Solar Power Project

Solar Philippines Tagoloan Corporation

(formerly Solar Philippines Commercial

Rooftop Projects, Inc.)

Pre-Development Stage 45.00

Talisayan Talisayan Solar Power Project One Renewable Energy Enterprise, Inc. Pre-Development Stage 0.00

Villanueva Hayes Solar Power Project Hayes Solar Energy Corporation Pre-Development Stage 20.00

CamiguinGuinsiliban, Mahinog,

SagayCamiguin Solar Power Project Camigreen Inc. Pre-Development Stage 5.00

ARMM &

X

Lanao del Sur and

Lanao del Norte

Saguiaran and Piagao -

Pantao RagatSaguiaran Solar Power Project

Local Government Unit of Saguiaran-Lanao

del SurPre-Development Stage 5.00

MINDANAO Sum 1,348.60 83.61