AWARDED HYDROELECTRICPOWER PROJECTS as of March 31, 2016
ISLAND /
GRID REGION PROVINCE
CITY /
MUNICIPALITYPROJECT NAME COMPANY NAME STATUS
POTENTIAL
CAPACITY
(MW)
INSTALLED
CAPACITY
(MW)
LUZON CAR Benguet Kibungan Kibungan Hydropower Corporation
Compliant With:
-Work Program -
Posting of performance bond
Non-Compliant With:
RESHERR
1,000.00
Bakun &
MankayanMankayan 1 Hydroelectric Power Project HEDCOR, Inc.
Compliant With:
Work Program
Non-Compliant With:
- Posting of performance bond
- RESHERR
12.70
Bokod &
KabayanKabayan 3 Hydroelectric Power Project Hedcor Benguet, Inc.
Compliant With:
Posting of performance bond
Non-Compliant With:
- Work Program
- RESHERR
14.30
Buguias Man-asok Hydroelectric Power Project Benguet Electric Cooperative, Inc.
Compliant With:
-Work Plan
- RESHERR
-Posting of performance bond
3.00
Buguias &
KabayanKabayan 1 Hedcor Benguet, Inc.
Compliant With:
-Work Program
Non-Compliant With:
- Posting of performance bond
-RESHERR
20.00
Itogon San Roque Upper East Pump Storage Strategic Power Development Corp.
Compliant With:
-Work Program
- Posting of performance bond
- RESHERR
600.00
San Roque West Pump Storage Strategic Power Development Corp.
Compliant With:
-Work Program
- Posting of performance bond
- RESHERR Non-Compliant With:
RESHERR
400.00
Kabayan Eddet Adaoay 2 Hydroelectric Power
ProjectUnited Hydro Power Builders
Non-Compliant With:
- Work Program
- Posting of performance bond
- RESHERR
1.80
AWARDED HYDROELECTRICPOWER PROJECTS as of March 31, 2016
ISLAND /
GRID REGION PROVINCE
CITY /
MUNICIPALITYPROJECT NAME COMPANY NAME STATUS
POTENTIAL
CAPACITY
(MW)
INSTALLED
CAPACITY
(MW)
LUZON CAR Benguet Kabayan Eddet Adaoay 1 Hydroelectric Power
ProjectUnited Hydro Power Builders
Non-Compliant With:
- Work Program
- Posting of performance bond
- RESHERR
1.00
Kabayan Natalang B Hydroelectric Power Project Hedcor Cordillera, Inc.
Compliant With:
-Work Plan
Non-Compliant With:
-Posting of performance bond
-RESHERR
38.00
Kapangan &
Kibungan Kapangan Hydroelectric Power Project
Cordillera Hydro Electric Power
Corporation
Compliant With:
- Posting of performance bond Non-
Compliant With:
RESHERR
-Work Plan
60.00
La Trinidad Bineng 1-2B Combination HEDCOR, Inc.
Compliant With:
-Work Program -
Posting of performance bond
Non-Compliant With:
RESHERR
16.50
Sabangan Sabangan Hydroelectric Power Project Hedcor Sabangan, Inc.
Compliant With:
Work Plan
Non-Compliant With:
RESHERR
14.00
Tabaan Sur, Tuba Abdao Hydroelectric Power Project AV Garcia Power Systems Corp.
Compliant With:
-Work Plan
-RESHERR
Non-Compliant With:
Posting of performance bond
2.00
Tuba Kanggas Hydroelectric Power Project Goldlink Global Energy Corporation
Compliant With:
-Work Program
-RESHERR
Non-Compliant With:
- Posting of performance bond
3.00
Tadiangan Hydroelectric Power Project Goldlink Global Energy Corporation
Compliant With:
-Work Program
-RESHERR
Non-Compliant With:
- Posting of performance bond
4.70
AWARDED HYDROELECTRICPOWER PROJECTS as of March 31, 2016
ISLAND /
GRID REGION PROVINCE
CITY /
MUNICIPALITYPROJECT NAME COMPANY NAME STATUS
POTENTIAL
CAPACITY
(MW)
INSTALLED
CAPACITY
(MW)
LUZON CAR Benguet Tuba Irisan 1 Hydroelectric Power Plant HEDCOR, Inc.
Compliant With:
Work Plan
Non-Compliant With:
RESHERR
3.80
Tublay Tublay 1 Hydroelectric Power Project AT Dinum Company
Compliant With:
- Posting of performance bond Non-
Compliant With:
- RESHERR
-Work Program
0.90
Tublay 2 AT Dinum Company
Compliant With:
-Work Program
Non-Compliant With:
- Posting of performance bond
-RESHERR
6.00
Ifugao Alfonso ListaMaris Main Canals 2 Hydroelectric Power
ProjectSN Aboitiz Power - Magat
Compliant With:
Work Program
Non-Compliant With:
- Posting of performance bond
- RESHERR
1.75
Asipulo &
KianganLikud Hydroelectric Power Project Provincial Government of Ifugao
Compliant With:
Work Plan
Non-Compliant With:
RESHERR
0.82
Kiangan Asin Hydroelectric Power Project Kiangan Mini Hydro Corporation
Compliant With:
- Work Program
- RESHERR
Non-Compliant With:
- Posting of performance bond
4.00
Ibulao 1 Hydroelectric Power Project Kiangan Mini Hydro Corporation
Compliant With:
-RESHERR
Non-Compliant With:
- Work Program
- Posting of performance bond
6.00
Ibulao 2 Hydroelectric Power Project Enerhighlands Corporation
Compliant With:
-Work Program
- RESHERR
Non-Compliant With:
- Posting of performance bond
8.80
AWARDED HYDROELECTRICPOWER PROJECTS as of March 31, 2016
ISLAND /
GRID REGION PROVINCE
CITY /
MUNICIPALITYPROJECT NAME COMPANY NAME STATUS
POTENTIAL
CAPACITY
(MW)
INSTALLED
CAPACITY
(MW)
LUZON CAR Ifugao Kiangan Hungduan Hydroelectric Power Project Kiangan Mini Hydro Corporation
Compliant With:
-RESHERR
- Work Program
Non-Compliant With:
- Posting of performance bond
4.00
Kiangan Ambangal Hydroelectric Power Plant Provincial Government of Ifugao
Compliant With:
Work Plan
Non-Compliant With:
RESHERR
0.20
Lagawe Ibulao Hydroelectric Power Project Hydrocore, Inc.
Compliant With:
- RESHERR
Non-Compliant With:
- Work Plan
- Posting of performance bond
4.50
Lamut Lamut Hydroelectric Power Project Enerhighlands Corporation
Compliant With:
- Posting of performance bond
- RESHERR
- Work Program
9.00
Tinoc Tinoc 1 Hydroelectric Power Project Quadriver Energy Corporation
Compliant With:
-RESHERR
Non-Compliant With:
- Work Plan
4.10
Tinoc 2 Hydroelectric Power Project Quadriver Energy Corporation
Compliant With:
-RESHERR
Non-Compliant With:
- Work Plan
6.50
Tinoc 3 Hydroelectric Power Project Quadriver Energy Corporation
Compliant With:
-RESHERR
Non-Compliant With:
- Work Plan
5.00
Tinoc 4 Hydroelectric Power Project Philnew Hydro Power Corp
Non-Compliant With:
- Work Plan
- Posting of performance bond
- RESHERR
6.00
Tinoc 5 Hydroelectric Power Project (Lower
Luhong)Philnewriver Power Corp.
Compliant With:
Work Plan
Non-Compliant With:
- Posting of performance bond
- RESHERR
6.90
AWARDED HYDROELECTRICPOWER PROJECTS as of March 31, 2016
ISLAND /
GRID REGION PROVINCE
CITY /
MUNICIPALITYPROJECT NAME COMPANY NAME STATUS
POTENTIAL
CAPACITY
(MW)
INSTALLED
CAPACITY
(MW)
LUZON CAR Ifugao Tinoc Tinoc 6 Hydroelectric Power Project
(Wangwang) Philnewriver Power Corp.
Compliant With:
Work Plan
Non-Compliant With:
- Posting of performance bond
- RESHERR
8.00
Kalinga Chico Hydroelectric Power ProjectSan Lorenzo Ruiz Piat Energy and Water,
Inc.
Non-Compliant With:
- Work Program
- Posting of performance bond
- RESHERR
150.00
Balbalan Biyao Hydroelectric Power Project Biyao Hydro Power Corporation
Compliant With:
-Work Plan
- Posting of peformance bond
- RESHERR
0.80
Tabuk Bulanao Hydroelectric Power Project DPJ Engineers and Consultants Non-Compliant With:
RESHERR1.00
Chico River Hydroelectric Power ProjectSan Lorenzo Ruiz Builders & Developers
Group, Inc.
Non-Compliant With:
- Work Program
- Posting of performance bond
- RESHERR
45.00
Tinglayan Tinglayan Hydroelectric Power Project Pan Pacific Renewable Power Philippine
Corp.
Compliant With:
- Work Program
- RESHERR
Non-Compliant With:
- Posting of performance bond
4.32
Apayao KabugaoApayao-Abulog Hydroelectric Power
Project
Pan Pacific Renewable Power Philippine
Corp.
Compliant With:
- Work Program
- RESHERR
Non-Compliant With:
- Posting of performance bond
150.00
Mountain
ProvinceBauko Enodey-Abit 1 Hydroelectric Power Project Kadipo Bauko Hydropower Corp.
Non-Compliant With:
- Work Program
- Posting of performance bond
- RESHERR
2.00
Enodey-Abit 2 Hydroelectric Power Project Kadipo Bauko Hydropower Corp.
Non-Compliant With:
- Work Program
- Posting of performance bond
- RESHERR
1.20
AWARDED HYDROELECTRICPOWER PROJECTS as of March 31, 2016
ISLAND /
GRID REGION PROVINCE
CITY /
MUNICIPALITYPROJECT NAME COMPANY NAME STATUS
POTENTIAL
CAPACITY
(MW)
INSTALLED
CAPACITY
(MW)
LUZON CARMountain
ProvinceBauko Enodey-Abit 3 Hydroelectric Power Project Kadipo Bauko Hydropower Corp.
Non-Compliant With:
- Work Program
- Posting of performance bond
- RESHERR
2.00
Ampassit Hydroelectric Power Project Kadipo Bauko Hydro Power Corp.
Non-Compliant With:
- Work Program
- Posting of performance bond
- RESHERR
1.20
Enodey 1A Hydroelectric Power Project Kadipo Bauko Hydro Power Corp.
Non-Compliant With:
- Work Program
- Posting of performance bond
- RESHERR
1.80
Besao Besao 1 Hydroelectric Power ProjectBIMAKA Renewable Energy Development
Corporation (BREDCO)
Compliant With:
- Work Program
- Posting of performance bond
Non-Compliant With:
RESHERR
4.50
Besao 2 Hydroelectric Power ProjectBIMAKA Renewable Energy Development
Corporation (BREDCO)
Compliant With:
- Work Program
- Posting of performance bond
Non-Compliant With:
RESHERR
7.00
Besao 3 Hydroelectric Power ProjectBIMAKA Renewable Energy Development
Corporation (BREDCO)
Compliant With:
- Work Program
- Posting of performance bond
Non-Compliant With:
RESHERR
4.00
Besao 1A Hydroelectric Power ProjectBIMAKA Renewable Energy Development
Corporation (BREDCO)
Compliant With:
- Work Program
- Posting of performance bond
Non-Compliant With:
RESHERR
2.60
Besao 1B Hydroelectric Power ProjectBIMAKA Renewable Energy Development
Corporation (BREDCO)
Compliant With:
- Work Program
- Posting of performance bond
Non-Compliant With:
RESHERR
1.70
AWARDED HYDROELECTRICPOWER PROJECTS as of March 31, 2016
ISLAND /
GRID REGION PROVINCE
CITY /
MUNICIPALITYPROJECT NAME COMPANY NAME STATUS
POTENTIAL
CAPACITY
(MW)
INSTALLED
CAPACITY
(MW)
LUZON CARMountain
ProvinceBesao Besao 2A Hydroelectric Power Project
BIMAKA Renewable Energy Development
Corporation (BREDCO)
Compliant With:
- Work Program
- Posting of performance bond
Non-Compliant With:
RESHERR
1.10
Bontoc Talubin Hydroelectric Power ProjectMountain Province Electric Cooperative,
Inc.
Compliant With:
-Work Program
- Posting of performance bond Non-
Compliant With:
- RESHERR
5.40
Mabungao Mabungao Hydroelectric Power ProjectSoutheast Asia Renewable Power
Corporation
Non-Compliant With:
- Work Program
- Posting of performance bond
- RESHERR
5.70
Malecom Malecom Hydroelectric Power ProjectSoutheast Asia Renewable Power
Corporation
Non-Compliant With:
- Work Program
- Posting of performance bond
- RESHERR
0.80
Malig Malig Hydroelectric Power ProjectSoutheast Asia Renewable Power
Corporation
Non-Compliant With:
- Work Program
- Posting of performance bond
- RESHERR
1.10
Natonin Lower Siffu Hydroelectric Power Project Asiapac Green Renewable Energy
Corporation
Compliant With:
Work Program
Non-Compliant With:
- Posting of performance bond
- RESHERR
8.00
Upper Siffu Hydroelectric Power Project Asiapac Green Renewable Energy
Corporation
Compliant With:
Work Program
Non-Compliant With:
- Posting of performance bond
- RESHERR
8.00
Pantor Hydroelectric Power ProjectSoutheast Asia Renewable Power
Corporation
Non-Compliant With:
- Work Program
- Posting of performance bond
- RESHERR
1.20
AWARDED HYDROELECTRICPOWER PROJECTS as of March 31, 2016
ISLAND /
GRID REGION PROVINCE
CITY /
MUNICIPALITYPROJECT NAME COMPANY NAME STATUS
POTENTIAL
CAPACITY
(MW)
INSTALLED
CAPACITY
(MW)
LUZON CARMountain
ProvinceTadian Dicapan Hydroelectric Power Project
Asiapac Green Renewable Energy
Corporation
Compliant With:
Work Program
Non-Compliant With:
- Posting of performance bond
- RESHERR
3.00
Abra Lagayan Tineg Hydroelectric Power Project Sta. Clara Power Corp.
Non-Compliant With:
- Work Program
- Posting of performance bond
- RESHERR
16.00
Manabo Three Rivers Hydroelectric Power Project Sta. Clara Power Corp.
Non-Compliant With:
- Work Program
- Posting of performance bond
- RESHERR
10.00
Tubo Amtuagan Hydroelectric Power Project Sta. Clara Power Corp.
Non-Compliant With:
- Work Program
- Posting of performance bond
- RESHERR
8.50
Gayaman (Tubo) Hydroelectric Power
ProjectSta. Clara Power Corp.
Non-Compliant With:
- Work Program
- Posting of performance bond
- RESHERR
8.50
Benguet &
Ilocos Sur
Bakun &
CervantesMankayan 2 Hydroelectric Power Project HEDCOR, Inc.
Compliant With:
Work Program
Non-Compliant With:
- Posting of performance bond
- RESHERR
20.30
Mt. Province Bauko Boga Hydroelectric Power Project Kadipo Bauko Hydro Power Corp.
Compliant With:
-Work Program -
Posting of performance bond
Non-Compliant With:
RESHERR
1.00
Upper Chico Kadipo Bauko Hydro Power Corp.
Compliant With:
-Work Program -
Posting of performance bond
Non-Compliant With:
RESHERR
2.10
AWARDED HYDROELECTRICPOWER PROJECTS as of March 31, 2016
ISLAND /
GRID REGION PROVINCE
CITY /
MUNICIPALITYPROJECT NAME COMPANY NAME STATUS
POTENTIAL
CAPACITY
(MW)
INSTALLED
CAPACITY
(MW)
LUZON CAR Mt. Province Bauko Lower Chico Kadipo Bauko Hydro Power Corp.
Compliant With:
-Work Program -
Posting of performance bond
Non-Compliant With:
RESHERR
3.40
I Ilocos Sur Alilem Alilem Hydroelectric Power Project Philnewriver Power Corp.
Compliant With:
Work Plan
Non-Compliant With:
- Posting of performance bond
- RESHERR
16.20
Bakun AC Hydroelectric Power Plant Luzon Hydro Corporation
Compliant With:
Work Plan
Non-Compliant With:
RESHERR
70.00
Quirino Quirino Hydroelectric Power Project Philnewriver Power Corp.
Compliant With:
Work Plan
Non-Compliant With:
- Posting of performance bond
- RESHERR
11.50
San Emilio Matibuey Hydroelectric Power Project Sta. Clara Power Corp.
Non-Compliant With:
- Work Program
- Posting of performance bond
- RESHERR
6.50
Sugpon Danac Hydroelectric Power Project Philnewriver Power Corp.
Compliant With:
Work Plan
Non-Compliant With:
- Posting of performance bond
- RESHERR
3.00
La Union Bagulin Baroro 1 Hydroelectric Power ProjectTeam (Philippines) Renewable Energy
Corporation
Non-Compliant With:
- Work Program
- Posting of performance bond
- RESHERR
1.00
Baroro 2 Hydroelectric Power ProjectTeam (Philippines) Renewable Energy
Corporation
Non-Compliant With:
- Work Program
- Posting of performance bond
- RESHERR
3.00
Baroro 3 Hydroelectric Power ProjectTeam (Philippines) Renewable Energy
Corporation
Non-Compliant With:
- Work Program
- Posting of performance bond
- RESHERR
1.50
AWARDED HYDROELECTRICPOWER PROJECTS as of March 31, 2016
ISLAND /
GRID REGION PROVINCE
CITY /
MUNICIPALITYPROJECT NAME COMPANY NAME STATUS
POTENTIAL
CAPACITY
(MW)
INSTALLED
CAPACITY
(MW)
LUZON I La Union Bagulin Bagulin I Hydroelectric Power ProjectGreen Indigenous Environment
Development Corporation
Non-Compliant With:
- Work Program
- Posting of performance bond
- RESHERR
9.00
Naguilian Naguilian Hydroelectric Power Project Naguilian Mini-Hydro Electric Corporation
Non-Compliant With:
- Work Program
- Posting of performance bond
- RESHERR
6.10
Tubao Tubao Hydroelectric Power Project Tubao Mini-Hydro Electric Corporation
Compliant With:
Work Plan
Non-Compliant With:
- Posting of performance bond
1.50
II Cagayan Gonzaga Baua 1 Hydroelectric Power Project Pan Pacific Renewable Power Philippine
Corp.
Compliant With:
- Work Program
- RESHERR
Non-Compliant With:
- Posting of performance bond
4.44
Peñablanca Pinacanauan River Hydroelectric Power
ProjectSunwest Water & Electric Company, Inc.
Non-Compliant With:
-Work Plan
-Posting of performance bond
-RESHERR
6.00
Isabela /
QuirinoSan Augustin Dibuluan Hydroelectric Power Project Greenpower Resources Corporation
Compliant With:
- Work Plan
- Posting of performance bond
Non-Compliant With:
RESHERR
5.50
Isabela Balasig Balasig 2 Hydroelectric Power Project Greenpower Resources Corporation
Compliant With:
-Posting of performance bond
-Work Program
Non-Compliant With:
- RESHERR
7.00
Cabagan Balasig 1 Hydroelectric Power Project Greenpower Resources Corporation
Compliant With:
-Posting of performance bond
-Work Program
Non-Compliant With:
- RESHERR
9.00
Balasig 3 Hydroelectric Power Project Greenpower Resources Corporation
Compliant With:
-Posting of performance bond
-Work Program
Non-Compliant With:
- RESHERR
7.00
AWARDED HYDROELECTRICPOWER PROJECTS as of March 31, 2016
ISLAND /
GRID REGION PROVINCE
CITY /
MUNICIPALITYPROJECT NAME COMPANY NAME STATUS
POTENTIAL
CAPACITY
(MW)
INSTALLED
CAPACITY
(MW)
LUZON II Isabela Cordon Magat F Hydroelectric Power Project PhilCarbon Inc.
Compliant With:
-Posting of performance bond
Non-Compliant With:
- Work Program
- RESHERR
0.60
Dinapigue Ilaguen 2 Hydroelectric Power Project Isabela Power Corporation
Compliant With:
- Work Plan
- Posting of performance bondNon-
Compliant With:
RESHERR
14.00
Echague Ilaguen 3 Hydroelectric Power Project Isabela Power Corporation
Compliant With:
- Work Program
- Posting of performance bond
Non-Compliant With:
RESHERR
11.00
Ilaguen 4 Hydroelectric Power Project Isabela Power Corporation
Compliant With:
- Work Program
- Posting of performance bond
Non-Compliant With:
RESHERR
10.00
Ilagan, Ilagan Hydroelectric Power ProjectTrans-Asia Oil and Energy Development
Corp,
Compliant With:
Work Program
Non-Compliant With:
- Posting of performance bond
- RESHERR
10.00
RamonMaris Main Canals 1 Hydroelectric Power
ProjectSN Aboitiz Power - Magat
Compliant With:
Work Program
Non-Compliant With:
- Posting of performance bond
- RESHERR
6.00
Magat A Hydroelectric Power Project I-Magat Renewable Energy Corporation
Compliant With:
-Work Plan
Non-Compliant With:
- Posting of performance bond
-RESHERR
1.30
Magat B Hydroelectric Power Project I-Magat Renewable Energy Corporation
Compliant With:
ongoing study and permitting
Non-Compliant With:
-Work Program
- Posting of performance bond
- RESHERR
1.00
AWARDED HYDROELECTRICPOWER PROJECTS as of March 31, 2016
ISLAND /
GRID REGION PROVINCE
CITY /
MUNICIPALITYPROJECT NAME COMPANY NAME STATUS
POTENTIAL
CAPACITY
(MW)
INSTALLED
CAPACITY
(MW)
LUZON II IsabelaSan Augustin /
MadellaDabubu Hydroelectric Power Project Greenpower Resources Corporation
Compliant With:
- Work Program
- Posting of performance bond
Non-Compliant With:
RESHERR
4.50
San Mariano Disabungan Hydroelectric Power Project Greenpower Resources Corporation
Compliant With:
- Work Plan
- Posting of performance bond
Non-Compliant With:
RESHERR
5.50
San Mariano &
San GuillermoIlaguen Hydroelectric Power Project Isabela Power Corp.
Compliant With:
Work Plan
Non-Compliant With:
- Posting of performance bond
- RESHERR
19.00
San Mateo Lateral B National Irrigation Administration
Compliant With:
Work Plan
Non-Compliant With:
RESHERR
0.05
San Pablo San Pablo Greenpower Resources Corporation
Compliant With:
-Work Program -
Posting of performance bond
Non-Compliant With:
RESHERR
8.00
Tumauini Tumauini Hydroelectric Power Project
(Lower Cascade)Quadriver Energy Corporation
Compliant With:
-RESHERR
Non-Compliant With:
- Work Plan
- Posting of performance bond
7.80
Tumauini Hydroelectric Power Project
(Upper Cascade)Philnew Hydro Power Corp
Non-Compliant With:
- Work Plan
- Posting of performance bond
- RESHERR
14.00
Nueva VizcayaAlfonso
CastañedaMangayngay Hydroelectric Power Project United Hydro Power Builders
Non-Compliant With:
- Work Program
- Posting of performance bond
- RESHERR
1.60
AWARDED HYDROELECTRICPOWER PROJECTS as of March 31, 2016
ISLAND /
GRID REGION PROVINCE
CITY /
MUNICIPALITYPROJECT NAME COMPANY NAME STATUS
POTENTIAL
CAPACITY
(MW)
INSTALLED
CAPACITY
(MW)
LUZON II Nueva VizcayaAlfonso
CastañedaDenip Hydroelectric Power Project JRV Renewable Energy Corporation
Compliant With:
Work Program
Non-Compliant With:
- Posting of performance bond
- RESHERR
2.30
Alfonzo Abaca Hydroelectric Power Project JRV Renewable Energy Corporation
Non-Compliant With:
- Work Program
- Posting of performance bond
- RESHERR
3.20
Ambaguio Matuno 1 Hydroelectric Power Project Smith Bell Mini-Hydro Corp.
Compliant With:
Work Program
Non-Compliant With:
- Posting of performance bond
- RESHERR
7.40
Bambang Matuno 2 Hydroelectric Power Project Smith Bell Mini-Hydro Corp.
Compliant With:
Work Program
Non-Compliant With:
- Posting of performance bond
- RESHERR
7.90
Matuno Hydroelectric Power Project Epower Technologies Corp.
Compliant With:
-Work Plan
-RESHERR
Non-Compliant With:
-Posting of performance bond
8.00
Dupax del Norte
and Alfonzo
Castañeda
Casignan Hydroelectric Power Project JRV Renewable Energy Corporation
Compliant With:
Work Program
Non-Compliant With:
- Posting of performance bond
- RESHERR
5.00
Kasibu Didipio 1 Hydroelectric Power Project AT Dinum Company
Compliant With:
- Work Program
- Posting of performance bond
Non-Compliant With:
RESHERR
2.50
Didipio 2 Hydroelectric Power Project Alimit Hydro Corp.
Compliant With:
- Work Program
- Posting of performance bond
Non-Compliant With:
RESHERR
6.60
AWARDED HYDROELECTRICPOWER PROJECTS as of March 31, 2016
ISLAND /
GRID REGION PROVINCE
CITY /
MUNICIPALITYPROJECT NAME COMPANY NAME STATUS
POTENTIAL
CAPACITY
(MW)
INSTALLED
CAPACITY
(MW)
LUZON II Nueva Vizcaya Kasibu Namanaan Hydroelectric Power Project AT Dinum Company
Compliant With:
-Work Program -
Posting of performance bond
Non-Compliant With:
RESHERR
0.60
Edralin Hydroelectric Power Project AT Dinum Company
Compliant With:
-Work Program -
Posting of performance bond
Non-Compliant With:
RESHERR
1.20
Solano Commonal-Uddiawan Hydroelectric Power
PlantSmith Bell Mini-Hydro Corp.
Non-Compliant With:
RESHERR1.80
Quirino Aglipay Addalam Hydroelectric Power Project Quirino Power Energy Corporation
Non-Compliant With:
- Work Program
- Posting of performance bond
- RESHERR
3.60
Cabbaroguis Addalam Hydroelectric Power Project Quirino Resources Development Corp.
Compliant With:
- Work Program
- Posting of performance bond
Non-Compliant With:
RESHERR
26.00
Nagtipunan Geblem 1 Hydroelectric Power Project Gawagan Hydro Power Corp.
Non-Compliant With:
- Work Program
- Posting of performance bond
- RESHERR
0.70
Gawagan 1 Hydroelectric Power Project Gawagan Hydro Power Corp.
Non-Compliant With:
- Work Program
- Posting of performance bond
- RESHERR
4.30
Gawagan 2 Hydroelectric Power Project Gawagan Hydro Power Corp.
Non-Compliant With:
- Work Program
- Posting of performance bond
- RESHERR
2.60
Dakgan 1 Hydroelectric Power Project Asiapacific Renewables Corporation
Compliant With:
-Work Program -
Posting of performance bond
Non-Compliant With:
RESHERR
9.00
AWARDED HYDROELECTRICPOWER PROJECTS as of March 31, 2016
ISLAND /
GRID REGION PROVINCE
CITY /
MUNICIPALITYPROJECT NAME COMPANY NAME STATUS
POTENTIAL
CAPACITY
(MW)
INSTALLED
CAPACITY
(MW)
LUZON II Quirino Nagtipunan Dakgan 2 Hydroelectric Power Project Asiapacific Renewables Corporation
Compliant With:
-Work Program -
Posting of performance bond
Non-Compliant With:
RESHERR
12.00
III Aurora Dinalungan Talaytay Hydroelectric Power ProjectPTC Energy, Inc. (Aurora Energy
Corporation)
Compliant With:
Posting of performance bond
Non-Compliant With:
- Work Program
- RESHERR
1.45
Dingalan Davildavilan Hydroelectric Power Project PTC Energy, Inc.
Compliant With:
- Work Plan
Non-Compliant With:
- Posting of performance bond
- RESHERR
1.00
San Luis Diteki Hydroelectric Power ProjectPTC Energy, Inc. (Aurora Energy
Corporation)
Compliant With:
Posting of performance bond
Non-Compliant With:
- Work Program
- RESHERR
1.67
Nueva Ecija Bongabon Calaanan Hydroelectric Power Project Hydrokinetic Corp.
Compliant With:
- Work Program
- Posting of performance bond
Non-Compliant With:
RESHERR
2.00
Gabaldon Dupinga Hydroelectric Power Project Constellation Energy Corporation
Compliant With:
Work PlanNon-Compliant With:
-Posting of performance bond
-RESHERR
3.00
General Tinio Rio Chico Hydroelectric Power Project LGU of Gen. Tinio
Non-Compliant With:
- Work Program
- Posting of performance bond
- RESHERR
2.00
General Tiño Balintingon Hydroelectric Power Project First Gen Luzon Power Corporation
Non-Compliant With:
- Work Program
- Posting of performance bond
- RESHERR
30.00
AWARDED HYDROELECTRICPOWER PROJECTS as of March 31, 2016
ISLAND /
GRID REGION PROVINCE
CITY /
MUNICIPALITYPROJECT NAME COMPANY NAME STATUS
POTENTIAL
CAPACITY
(MW)
INSTALLED
CAPACITY
(MW)
LUZON III Nueva Ecija PantabanganPantabangan (Pump Storage)Hydroelectric
Power ProjectFirst Gen Prime Energy Corporation
Compliant With:
Work Program
Non-Compliant With:
-Posting of performance bond
- RESHERR
300.00
Diaman Hydroelectric Power Project United Hydro Power Builders
Non-Compliant With:
- Work Program
- Posting of performance bond
- RESHERR
1.80
Rizal PRISMC Hydroelectric Power Project PNOC-Renewables Corporation operating 1.00
San Jose SDC Hydroelectric Power Project PNOC-Renewables Corporation
Compliant With:
-RESHERR
Non-Compliant With:
- Work Program
- Posting of performance bond
0.50
Bataan Mariveles Mariveles Hydroelectric Power ProjectSoutheast Asia Renewable Power
Corporation
Compliant With:
Work Program
Non-Compliant With:
- Posting of performance bond
- RESHERR
1.10
Tarlac Mayantoc Camiling 1 Hydroelectric Power Project Northgreen Energy Corporation
Compliant With:
-Work Program -
Posting of performance bond
Non-Compliant With:
RESHERR
5.40
Camiling River 3 Hydroelectric Power
ProjectNorthgreen Energy Corporation
Compliant With:
Posting of performance bond
Non-Compliant With:
- Work Program
- RESHERR
3.40
Zambales Masinloc Coto 1 Hydroelectric Power Project Coto Hydro Corp.
Compliant With:
Work Program
Non-Compliant With:
- Posting of performance bond
- RESHERR
6.50
AWARDED HYDROELECTRICPOWER PROJECTS as of March 31, 2016
ISLAND /
GRID REGION PROVINCE
CITY /
MUNICIPALITYPROJECT NAME COMPANY NAME STATUS
POTENTIAL
CAPACITY
(MW)
INSTALLED
CAPACITY
(MW)
LUZON III ZambalesSouth Lauis &
MabininalCoto 2 Hydroelectric Power Project Coto Hydro Corp.
Compliant With:
Work Program
Non-Compliant With:
- Posting of performance bond
- RESHERR
2.80
Nueva Ecija /
Aurora
Gabaldon / San
LuisLingod River United Hydro Power Builders
Compliant With:
-Work Program
Non-Compliant With:
- Posting of performance bond
-RESHERR
2.50
IV-ALaguna /
Quezon
Pangil / Real &
MaubanSiniloan Hydroelectric Power Project Sierra Madre Water Corporation
Compliant With:
Work Program
Non-Compliant With:
- Posting of performance bond
- RESHERR
35.00
Quezon General Nakar Umiray 1 Laguna Hydroenergy Corporation
Compliant With:
-Work Program
Non-Compliant With:
- Posting of performance bond
6.00
Lucban Maapon Hydroelectric Power Project Renesons Energy Corporation
Compliant With:
- Work Program
- Posting of performance bond -
RESHERR
2.60
Maddela Dabubu 2 Greenpower Resources Corporation
Compliant With:
-Posting of performance bond
-Work Plan
Non-Compliant With:
4.30
Mauban Calmenue Hydroelectric Power Project Sta. Clara Power Corp.
Non-Compliant With:
- Work Program
- Posting of performance bond
- RESHERR
2.00
(Laguio) Laginbayan Malaki 2 Hydroelectric
Power ProjectEnervantage Supplier's Co., Inc.
Compliant With:
- Work Program
- Posting of performance bond
Non-Compliant With:
3.10
Mauban Hydroelectric Power Project Aurora All Asia Energy Corporation
Non-Compliant With:
-Work Program
- Posting of performance bond
- RESHERR
10.00
AWARDED HYDROELECTRICPOWER PROJECTS as of March 31, 2016
ISLAND /
GRID REGION PROVINCE
CITY /
MUNICIPALITYPROJECT NAME COMPANY NAME STATUS
POTENTIAL
CAPACITY
(MW)
INSTALLED
CAPACITY
(MW)
LUZON IV-A Quezon Real Kinanliman Hydroelectric Power Project Municipality of Real, Quezon
Non-Compliant With:
- Work Program
- Posting of performance bond
- RESHERR
1.60
Labayat River (Upper Cascade)
Hydroelectric Power Project
Repower Energy Development
Corporation
Compliant With:
- Work Program
- Posting of performance bond
Non-Compliant With:
RESHERR
3.00
Piapi River Hydroelectric Power ProjectRepower Energy Development
Corporation
Compliant With:
- Work Program
- Posting of performance bond
Non-Compliant With:
RESHERR
3.30
Labayat River (Lower Cascade)
Hydroelectric Power Project
Repower Energy Development
Corporation
Compliant With:
- Work Program
- Posting of performance bond
Non-Compliant With:
RESHERR
2.80
Tignoan River (Upper Cascade)
Hydroelectric Power Project
Repower Energy Development
Corporation
Compliant With:
- Work Program
- Posting of performance bond
Non-Compliant With:
RESHERR
3.50
Tibag Hydroelectric Power ProjectRepower Energy Development
Corporation
Compliant With:
- Work Program
- Posting of performance bond
Non-Compliant With:
RESHERR
5.00
Tignoan Hydroelectric Power Project Aurora All Asia Energy Corporation
Compliant With:
Work Program
Non-Compliant With:
- Posting of performance bond
- RESHERR
20.00
Lalawinan Hydroelectric Power ProjectRepower Energy Development
Corporation
Compliant With:
- Work Program
- Posting of performance bond
Non-Compliant With:
RESHERR
3.00
AWARDED HYDROELECTRICPOWER PROJECTS as of March 31, 2016
ISLAND /
GRID REGION PROVINCE
CITY /
MUNICIPALITYPROJECT NAME COMPANY NAME STATUS
POTENTIAL
CAPACITY
(MW)
INSTALLED
CAPACITY
(MW)
LUZON IV-A Rizal Laguio (Laginbayan) Malaki 1 Hydroelectric
Power ProjectEnervantage Supplier's Co., Inc.
Compliant With:
-Work Program -
Posting of performance bond
Non-Compliant With:
RESHERR
1.60
Pililia, Pililia Pumped Storage Hydroelectric
Power Project
Trans-Asia Oil and Energy Development
Corp,
Compliant With:
Work Program
Non-Compliant With:
- Posting of performance bond
- RESHERR
300.00
RodriguezWawa Pumped Storage 1 Hydroelectric
Power ProjectOlympia Violago Water & Power, Inc
Compliant With:
- Work Program
- Posting of performance bondNon-
Compliant With:
- RESHERR
500.00
Wawa Pumped Storage 3 Hydroelectric
Power ProjectOlympia Violago Water & Power, Inc
Non-Compliant With:
- Work Program
- Posting of performance bond
- RESHERR
50.00
Wawa Pumped Storage 2 Hydroelectric
Power ProjectOlympia Violago Water & Power, Inc
Non-Compliant With:
- Work Program
- Posting of performance bond
- RESHERR
100.00
Laguna Majayjay Majayjay Hydroelectric Power Project Majayjay Hydropower Company, Inc.
Compliant With:
-Work Plan
- Posting of performance bond
Non-Compliant With:
RESHERR
3.00
Balanac (Middle)Repower Energy Development
Corporation
Compliant With:
-Work Program
Non-Compliant With:
- Posting of performance bond
-RESHERR
5.00
CaviteIndang and
MaragondonIndang Hydroelectric Power Project Energywise Corporation
Compliant With:
-RESHERR
Non-Compliant With:
- Work Program
- Posting of performance bond
1.50
AWARDED HYDROELECTRICPOWER PROJECTS as of March 31, 2016
ISLAND /
GRID REGION PROVINCE
CITY /
MUNICIPALITYPROJECT NAME COMPANY NAME STATUS
POTENTIAL
CAPACITY
(MW)
INSTALLED
CAPACITY
(MW)
LUZON IV-BOriental
MindoroBaco San Ignacio Hydroelectric Power Project
Alpaparay Resort & Development
Corporation
Non-Compliant With:
- Work Program
- Posting of performance bond
- RESHERR
0.50
Baco Dulangan Hydroelectric Power Project PNOC - Renewables Corp.
Compliant With:
-RESHERR
Non-Compliant With:
-Posting of performance bond
-Work Program
8.25
Linao-Cawayan (Lower Cascade)
Hydroelectric Power Plant
Oriental Mindoro Electric Cooperative,
Inc.
Compliant With:
-Work Plan
-RESHERR
2.10
Linao-Cawayan (Upper Cascade)
Hydroelectric Power Project
Oriental Mindoro Electric Cooperative,
Inc.
Compliant With:
-Work Plan
-RESHERR
2.10
Bansud Bansud Hydroelectric Power Project Sunwest Water and Electric Co., Inc.
Compliant With:
-Work Program
- Posting of performance bond
Non-Compliant With:
-RESHERR
1.50
Naujan Catuiran (Upper Cascade) Hydroelectric
Power Project Philnew Hydro Power Corp
Compliant With:
Work Program
Non-Compliant With:
-Posting of performance bond
- RESHERR
8.00
Catuiran Hydroelectric Power Project Catuiran Hydro Power Corp.
Compliant With:
- Work Plan
- Posting of performance bond
- RESHERR
8.00
Mag-asawang Tubig B Hydroelectric Power
ProjectPhilippine Hybrid Energy Systems, Inc.
Non-Compliant With:
- Work Program
- Posting of performance bond
- RESHERR
1.00
San Teodoro Inabasan Hydroelectric Power Project Ormin Power, Inc
Compliant With:
Work Plan
Non-Compliant With:
- Posting of performance bond
- RESHERR
10.00
AWARDED HYDROELECTRICPOWER PROJECTS as of March 31, 2016
ISLAND /
GRID REGION PROVINCE
CITY /
MUNICIPALITYPROJECT NAME COMPANY NAME STATUS
POTENTIAL
CAPACITY
(MW)
INSTALLED
CAPACITY
(MW)
LUZON IV-BOriental
MindoroSan Teodoro
Linao Cawayan Hydroelectric Power
Project (Phase 2 - tail -end)Mindoro Grid Corporation
Compliant With:
- Work Program
- Posting of performance bond
Non-Compliant With:
RESHERR
1.00
Alag Tributary 1 Hydroelectric Power
ProjectConstellation Energy Corporation
Non-Compliant With:
- Work Program
- Posting of performance bond
- RESHERR
2.80
Alag Tributary 2 Hydroelectric Power
ProjectConstellation Energy Corporation
Non-Compliant With:
- Work Program
- Posting of performance bond
- RESHERR
2.80
San Teodoro &
Puerto Gallera
Inabasan Phase II Hydroelectric Power
ProjectOrmin Power, Inc.
Compliant With:
-Work Program -
Posting of performance bond
Non-Compliant With:
RESHERR
10.00
Palawan BatarazaMarangas River Hydroelectric Power
ProjectAQA Global Power Inc.
Non-Compliant With:
- Work Program
- Posting of performance bond
- RESHERR
12.00
Brooke's Point Sologon River Hydroelectric Power Project AQA Global Power Inc.
Non-Compliant With:
- Work Program
- Posting of performance bond
- RESHERR
12.00
BusuangaBusuanga River 1 Hydroelectric Power
ProjectAQA Global Power Inc.
Non-Compliant With:
- Work Program
- Posting of performance bond
- RESHERR
8.00
El NidoBulalakao-1 North River Hydroelectric
Power ProjectAlternergy Viento Partners Corporation
Non-Compliant With:
- Work Program
- Posting of performance bond
- RESHERR
0.34
Bulalakao-2 South River Hydroelectric
Power ProjectAlternergy Viento Partners Corporation
Non-Compliant With:
- Work Program
- Posting of performance bond
- RESHERR
0.44
AWARDED HYDROELECTRICPOWER PROJECTS as of March 31, 2016
ISLAND /
GRID REGION PROVINCE
CITY /
MUNICIPALITYPROJECT NAME COMPANY NAME STATUS
POTENTIAL
CAPACITY
(MW)
INSTALLED
CAPACITY
(MW)
LUZON IV-B Palawan NarraBato-Bato (Kaliwa) Hydroelectric Power
ProjectAQA Global Power Inc.
Non-Compliant With:
- Work Program
- Posting of performance bond
- RESHERR
12.00
Estrella River Hydroelectric Power Project AQA Global Power Inc.
Non-Compliant With:
- Work Program
- Posting of performance bond
- RESHERR
8.00
Malasgao (Kaliwa) Hydroelectric Power
ProjectAQA Global Power Inc.
Non-Compliant With:
- Work Program
- Posting of performance bond
- RESHERR
10.00
Narra Batang-Batang Hydroelectric Power Project Langongan Power Corporation
Non-Compliant With:
- Work Plan
- Posting of performance bond
- RESHERR
3.50
Puerto Princesa Langogan Hydroelectric Power Project Langongan Power Corporation
Compliant With:
-Work Plan
Non-Compliant With:
- Posting of performance bond
- RESHERR
6.80
Puerto Princesa
CityInaguan River Hydroelectric Power Project AQA Global Power Inc.
Non-Compliant With:
- Work Program
- Posting of performance bond
- RESHERR
12.00
Rizal Culasian River Hydroelectric Power Project AQA Global Power Inc.
Non-Compliant With:
- Work Program
- Posting of performance bond
- RESHERR
10.00
Romblon Romblon Cantingas Hydroelectric Power Plant Romblon Electric Cooperative, Inc.
Compliant With:
Work Plan
Non-Compliant With:
RESHERR
0.90
Quezon General Nakar Kanan B-1 Hydroelectric Power Project Energy World Kanan River, Inc.
Compliant With:
-Work Program
- Posting of performance bond
Non-Compliant With:
-RESHERR
150.00
AWARDED HYDROELECTRICPOWER PROJECTS as of March 31, 2016
ISLAND /
GRID REGION PROVINCE
CITY /
MUNICIPALITYPROJECT NAME COMPANY NAME STATUS
POTENTIAL
CAPACITY
(MW)
INSTALLED
CAPACITY
(MW)
LUZON IV-B Laguna MajayjayUpper Botocan River Hydroelectric Power
ProjectAurora All Asia Energy Corporation
Compliant With:
-Work Program
Non-Compliant With:
- Posting of performance bond
-RESHERR
8.64
V Camarines Sur Buhi Barit 2 Hydroelectric Power Project People's Energy Services Inc.
Compliant With:
-Work Program
- Posting of performance bond Non-
Compliant With:
- RESHERR
0.60
Barit 1 Hydroelectric Power Plant People's Energy Services Inc.
Compliant With:
Work Plan
Non-Compliant With:
RESHERR
1.80
Buhi Barit (Irrigation Discharge) Hydroelectric
Power ProjectNASCENT Technologies Corp.
Non-Compliant With:
-Work Plan
-Posting of performance bond
-RESHERR
0.40
Goa & Tigaon, Ranggas Hydroelectric Power Project Clean and Green Energy Solutions, Inc.
Compliant With:
Work Plan
Non-Compliant With:
- Posting of performance bond
- RESHERR
1.50
Catanduanes Caramoran Hitoma 1 Hydroelectric Power Plant Sunwest Water & Electric Company, Inc.
Compliant With:
-Work Plan
-RESHERR Non-Compliant With:
1.50
San Miguel Kapipian Hydroelectric Power Project Sunwest Water & Electric Company, Inc.
Compliant With:
- Work Plan
- Posting of performance bond
Non-Compliant With:
-RESHERR
2.40
Solong Hydroelectric Power Plant Sunwest Water & Electric Company, Inc.
Compliant With:
-Work Plan
-RESHERR
2.10
AWARDED HYDROELECTRICPOWER PROJECTS as of March 31, 2016
ISLAND /
GRID REGION PROVINCE
CITY /
MUNICIPALITYPROJECT NAME COMPANY NAME STATUS
POTENTIAL
CAPACITY
(MW)
INSTALLED
CAPACITY
(MW)
LUZON VCamarines
NorteMercedes Colasi Hydroelectric Power Project
Colasi Mini Hydro Electric Power Plant
Corporation
Compliant With:
Work Plan
Non-Compliant With:
- Posting of performance bond
- RESHERR
0.96
Sorsogon Upper Cawayan 1 Hydroelectric Power
Plant
Sunwest Water and Electric Co., Inc. -
Sorsogon II Electric Cooperative, Inc.
(SUWECO-SORECO II)
Compliant With:
Work Plan
Non-Compliant With:
RESHERR
0.60
Sorsogon Cawayan 2 Hydroelectric Power Project Sunwest Water and Electric Co., Inc.
Compliant With:
- Work Program
- Posting of performance bond
Non-Compliant With:
-RESHERR
0.99
LUZON Sum 4,799.65 106.065
VISAYAS VI Aklan Libacao Main Aklan River Hydroelectric Power
ProjectSunwest Water & Electric Company, Inc.
Non-Compliant With:
-Work Plan
-Posting of performance bond
-RESHERR
15.00
Madalag Timbaban Hydroelectric Power ProjectOriental Energy and Power Generation
Corporation
Compliant With:
-Posting of performance bond
-Work Plan
Non-Compliant With:
-RESHERR
18.00
NabaoyAklan Pumped-Storage Hydroelectric
Power ProjectStrategic Power Development Corp.
Compliant With:
-Work Program
- RESHERRNon-Compliant With:
Posting of Performance Bond
200.00
Antique Bugasong Villasiga 2 Hydroelectric Power Project Sunwest Water and Electric Co., Inc.
Non-Compliant With:
- Work Program
- Posting of performance bond
- RESHERR
9.40
Bugasong Villasiga Hydroelectric Power Project Sunwest Water & Electric Company, Inc. 2
Compliant With:
-RESHERR
Non-Compliant With:
-Work Plan
-Posting of performance bond
8.00
AWARDED HYDROELECTRICPOWER PROJECTS as of March 31, 2016
ISLAND /
GRID REGION PROVINCE
CITY /
MUNICIPALITYPROJECT NAME COMPANY NAME STATUS
POTENTIAL
CAPACITY
(MW)
INSTALLED
CAPACITY
(MW)
VISAYAS VI Antique San RemegioManinila (Lower Cascade) Hydroelectric
Power ProjectCentury Peak Energy Corporation
Non-Compliant With:
-Work Plan
-Posting of performance bond
-RESHERR
4.50
Maninila (Upper Cascade) Hydroelectric
Power ProjectCentury Peak Energy Corporation
Non-Compliant With:
-Work Plan
-Posting of performance bond
-RESHERR
3.10
Sibalom (Upper Cascade) Hydroelectric
Power ProjectCentury Peak Energy Corporation
Non-Compliant With:
-Work Plan
-Posting of performance bond
-RESHERR
4.20
Sibalom (Middle Cascade) Hydroelectric
Power ProjectCentury Peak Energy Corporation
Non-Compliant With:
-Work Plan
-Posting of performance bond
-RESHERR
4.00
Sibalom (Lower Cascade) Hydroelectric
Power ProjectCentury Peak Energy Corporation
Non-Compliant With:
-Work Plan
-Posting of performance bond
-RESHERR
3.30
Sebaste Caro-an Hydroelectric Power Project Antique Electric Cooperative, Inc.
Compliant With:
-Work Plan
- Posting of performance bond
Non-Compliant With:
-RESHERR
0.84
Ipayo Hydroelectric Power Project Antique Electric Cooperative, Inc.
Compliant With:
-Work Plan
- Posting of performance bond
Non-Compliant With:
-RESHERR
1.30
Iloilo Igbaras Igbulo (Bais) Hydroelectric Power Project Century Peak Energy Corporation
Compliant With:
Work Plan
Non-Compliant With:
-Posting of performance bond
- RESHERR
5.10
AWARDED HYDROELECTRICPOWER PROJECTS as of March 31, 2016
ISLAND /
GRID REGION PROVINCE
CITY /
MUNICIPALITYPROJECT NAME COMPANY NAME STATUS
POTENTIAL
CAPACITY
(MW)
INSTALLED
CAPACITY
(MW)
VISAYAS VINegros
OccidentalBago & Murcia Bago 4 Hydroelectric Power Project Alsons Energy Development Corporation
Compliant With:
Work Program
Non-Compliant With:
- Posting of performance bond -
RESHERR
11.00
Don Salvador
BenedictoBago 2 Hydroelectric Power Project Alsons Energy Development Corporation
Compliant With:
- Work Program
- Posting of performance bond
Non-Compliant With:
RESHERR
10.00
Kabankalan Hilabangan (Upper Cascade) Hydroelectric
Power ProjectCentury Peak Energy Corporation
Non-Compliant With:
-Work Plan
-Posting of performance bond
-RESHERR
4.80
Hilabangan (Lower Cascade) Hydroelectric
Power ProjectCentury Peak Energy Corporation
Non-Compliant With:
-Work Plan
-Posting of performance bond
-RESHERR
3.00
SagayLower Himogaan Hydroelectric Power
Project LGU of Sagay
Compliant With:
Work Plan
Non-Compliant With:
- Posting of performance bond
- RESHERR
4.00
San Carlos City Bago 1 Hydroelectric Power Project Alsons Energy Development Corporation
Compliant With:
- Work Program
- Posting of performance bond
Non-Compliant With:
RESHERR
4.00
Initihan Hydroelectric Power Project Bago River Hydro Power Corporation
Compliant With:
Work Program
Non-Compliant With:
- Posting of performance bond
- RESHERR
3.00
Bago-Prosperidad 2 Hydroelectric Power
ProjectBago River Hydro Power Corporation
Compliant With:
Work Program
Non-Compliant With:
- Posting of performance bond
- RESHERR
2.00
AWARDED HYDROELECTRICPOWER PROJECTS as of March 31, 2016
ISLAND /
GRID REGION PROVINCE
CITY /
MUNICIPALITYPROJECT NAME COMPANY NAME STATUS
POTENTIAL
CAPACITY
(MW)
INSTALLED
CAPACITY
(MW)
VISAYAS VINegros
OccidentalSilay Malugo Hydroelectric Power Project Vivant-Malogo Hydropower, Inc.
Non-Compliant With:
- Work Plan
- Posting of performance bond
- RESHERR
6.00
Silay & E. B
Magalona
Malogo Phase 3 Hydroelectric Power
ProjectVivant-Malogo Hydropower, Inc.
Compliant With:
-Posting of performance bond
-Work Program
Non-Compliant With:
- RESHERR
2.00
Victorias & CadizMalogo Phase 2 Hydroelectric Power
ProjectVivant-Malogo Hydropower, Inc.
Compliant With:
-Posting of performance bond
-Work Program
Non-Compliant With:
- RESHERR
5.00
VII Bohol Danao Cantakoy Hydroelectric Power Project Quadriver Energy Corporation
Compliant With:
-RESHERR
Non-Compliant With:
- Work Plan
- Posting of performance bond
8.00
Loboc Loboc Hydroelectric Power Plant Sta. Clara Power Corporation
Compliant With:
-Work Plan
Non-Compliant With:
-RESHERR
1.20
Sevilla Sevilla Hydroelectric Power Plant BOHECO 1 Sevilla Mini Hydro Corp. Non-Compliant With:
RESHERR2.50
Cebu AlegriaKawasan Waterfalls Hydroelectric Power
ProjectT.A.G Mineral Resources, Inc.
Compliant With:
-Work Program -
Posting of performance bond
Non-Compliant With:
RESHERR
0.50
Argao Argao Hydroelectric Power Project Universal Hydrotechnologies, Inc.
Non-Compliant With:
- Work Program
- Posting of performance bond
- RESHERR
0.80
Badian Basak II Hydroelectric Power Project Rapids Innoenergy, Inc.
Non-Compliant With:
- Work Plan
- Posting of performance bond
- RESHERR
0.50
AWARDED HYDROELECTRICPOWER PROJECTS as of March 31, 2016
ISLAND /
GRID REGION PROVINCE
CITY /
MUNICIPALITYPROJECT NAME COMPANY NAME STATUS
POTENTIAL
CAPACITY
(MW)
INSTALLED
CAPACITY
(MW)
VISAYAS VIINegros
OrientalAmlan Amlan Hydroelectric Power Plant Amlan Hydroelectric Power Corporation
Compliant With:
-Work Plan
- Posting of performance bond
Non-Compliant With:
RESHERR
0.80
Amlan Amlan (Plant A) Hydroelectric Power
ProjectNatural Power Sources Intergration,Inc.
Non-Compliant With:
- Work Plan
- Posting of performance bond
- RESHERR
3.20
Amlan (Plant B) Hydroelectric Power
ProjectNatural Power Sources Intergration,Inc.
Non-Compliant With:
- Work Plan
- Posting of performance bond
- RESHERR
1.50
Amlan (Plant C) Hydroelectric Power
ProjectNatural Power Sources Intergration,Inc.
Non-Compliant With:
- Work Plan
- Posting of performance bond
- RESHERR
0.80
La LibertadPacuan -Guinobaan Hydroelectric Power
ProjectPNOC - Renewables Corp.
Compliant With:
-RESHERR
Non-Compliant With:
-Posting of performance bond
-Work Program
33.00
Siaton Canaway 1 Hydroelectric Power Project Orbysy Holdings, Inc.
Compliant With:
Work Program
- RESHERR
Non-Compliant With:
- Posting of performance bond
1.60
Canaway 2 Hydroelectric Power Project Orbysy Holdings, Inc.
Compliant With:
Work Program
Non-Compliant With:
- Posting of performance bond
- RESHERR
1.40
Siquijor Lazi Senona Hydroelectric Power Project AQA Global Power Inc.
Compliant With:
-Work Program -
Posting of performance bond
Non-Compliant With:
RESHERR
3.20
AWARDED HYDROELECTRICPOWER PROJECTS as of March 31, 2016
ISLAND /
GRID REGION PROVINCE
CITY /
MUNICIPALITYPROJECT NAME COMPANY NAME STATUS
POTENTIAL
CAPACITY
(MW)
INSTALLED
CAPACITY
(MW)
VISAYAS VII Siquijor Lazi Gabangan Hydroelectric Power Project AQA Global Power Inc.
Compliant With:
-Work Program -
Posting of performance bond
Non-Compliant With:
RESHERR
4.14
VIII Eastern Samar LawaanPumped Storage Bolusao Hydroelectric
Power Project
San Lorenzo Ruiz Samar Energy and
Water, Inc.
Compliant With:
Work Program
Non-Compliant With:
- Posting of performance bond
- RESHERR
300.00
Run-of-River Bolusao Hydroelectric Power
Project
San Lorenzo Ruiz Samar Energy and
Water, Inc.
Compliant With:
Work Program
Non-Compliant With:
- Posting of performance bond
- RESHERR
12.00
Maslog Upper Maslog Iraya Energy Corporation
Compliant With:
-Work Program
Non-Compliant With:
- Posting of performance bond
-RESHERR
9.00
Leyte Inopacan Caminto River Hydroelectric Power Project Leyte IV Electric Cooperative, Inc.
Non-Compliant With:
- Work Program
- Posting of performance bond
- RESHERR
0.50
Jaro & PastranaBinaha-an River Hydroelectric Power
Project
Engineering & Development Corporation
of the Philippines
Compliant With:
-RESHERR
Non-Compliant With:
- Work Program
- Posting of performance bond
2.20
Kananga Bao Hydroelectric Power ProjectLeyte V Electric Cooperative, Inc (LEYECO
V)
Compliant With:
Posting of performance bond
Non-Compliant With:
- Work Program
- RESHERR
1.50
MatalomDumagocdoc River Hydroelectric Power
ProjectLeyte IV Electric Cooperative, Inc.
Non-Compliant With:
- Work Program
- Posting of performance bond
- RESHERR
0.60
AWARDED HYDROELECTRICPOWER PROJECTS as of March 31, 2016
ISLAND /
GRID REGION PROVINCE
CITY /
MUNICIPALITYPROJECT NAME COMPANY NAME STATUS
POTENTIAL
CAPACITY
(MW)
INSTALLED
CAPACITY
(MW)
VISAYAS VIII Western
SamarCalbiga Calbiga Hydroelectric Power Project Meadowland Developers, Inc.
Non-Compliant With:
- Work Program
- Posting of performance bond
- RESHERR
15.00
VISAYAS Sum 730.98 4.50
MINDANAO IXZamboanga
del SurBayog Bayog Hydroelectric Power Project Global Sibagat Hydro Power Corp.
Compliant With:
-Posting of performance bond -
RESHERR
Non-Compliant With:
- Work Program
6.00
Dumingag &
MidsalipSindangan 4 Hydroelectric Power Project Alsons Energy Development Corporation
Non-Compliant With:
- Work Program
- Posting of performance bond
- RESHERR
8.00
Zamboanga CityPasonanca (Upstream) Hydroelectric
Power ProjectPhilCarbon Inc.
Non-Compliant With:
- Work Plan
- Posting of performance bond
- RESHERR
1.00
Pasonanca Hydroelectric Power Project PhilCarbon Inc.
Non-Compliant With:
- Work Plan
- Posting of performance bond
- RESHERR
0.05
Saaz Hydroelectric Power Project Meadowland Developers, Inc.
Non-Compliant With:
- Work Program
- Performance bond
- RESHERR
1.00
Zamboanga
del NorteLeon Postigo Polandoc Hydroelectric Power Project Euro Hydro Power (Asia) Holdings, Inc.
Compliant With:
Work Program
Non-Compliant With:
- Posting of performance bond
- RESHERR
2.00
MutiaDapitan River (Middle) Hydroelectric
Power ProjectEuro Hydro Power (Asia) Holdings, Inc.
Compliant With:
Posting of performance bond
Non-Compliant With:
- Work Program
- RESHERR
3.60
AWARDED HYDROELECTRICPOWER PROJECTS as of March 31, 2016
ISLAND /
GRID REGION PROVINCE
CITY /
MUNICIPALITYPROJECT NAME COMPANY NAME STATUS
POTENTIAL
CAPACITY
(MW)
INSTALLED
CAPACITY
(MW)
MINDANAO IXZamboanga
del NorteMutia
Dapitan River (Upper) Hydroelectric Power
ProjectEuro Hydro Power (Asia) Holdings, Inc.
Compliant With:
Posting of performance bond
Non-Compliant With:
- Work Program
- RESHERR
3.60
Zamboanga
City Alimpaya Everhydro Corporation
Compliant With:
-Work Program -
Posting of performance bond
Non-Compliant With:
RESHERR
0.50
Patalon Hydroelectric Power Project Everhydro Corporation
Compliant With:
-Work Program -
Posting of performance bond
Non-Compliant With:
RESHERR
0.50
Tagpangi Hydroelectric Power Project Everhydro Corporation
Compliant With:
-Work Program -
Posting of performance bond
Non-Compliant With:
RESHERR
0.50
Ayala Hydroelectric Power Project Everhydro Corporation
Compliant With:
-Work Program -
Posting of performance bond
Non-Compliant With:
RESHERR
1.00
X Bukidnon Katipunan River Hydroelectric Power
Project
Repower Energy Development
Corporation
Compliant With:
- Work Program
- Posting of performance bond
Non-Compliant With:
RESHERR
2.10
Pulanai River Hydroelectric Power ProjectRepower Energy Development
Corporation
Compliant With:
- Work Program
- Posting of performance bond
Non-Compliant With:
RESHERR
10.60
AWARDED HYDROELECTRICPOWER PROJECTS as of March 31, 2016
ISLAND /
GRID REGION PROVINCE
CITY /
MUNICIPALITYPROJECT NAME COMPANY NAME STATUS
POTENTIAL
CAPACITY
(MW)
INSTALLED
CAPACITY
(MW)
MINDANAO X Bukidnon Baungon Tumalaong Hydroelectric Power Project FGEN Tumalaong Hydro Corp.
Compliant With:
-Posting of performance bond
Non-Compliant With:
-Work Plan
-RESHERR
9.00
Baungon and
LibonaBubunawan Hydroelectric Power Project FGEN Bubunawan Hydro Corporation
Compliant With:
-Posting of performance bond
Non-Compliant With:
-Work Plan
-RESHERR
23.00
Baungon and
LibonanBubunawan Hydroelectric Power Plant Bubunawan Power Company, Inc.
Compliant With:
Work Plan
Non-Compliant With:
RESHERR
7.00
Dancagan Kitaotao 1 Hedcor Bukidnon, Inc.
Compliant With:
-Work Program -
Posting of performance bond
Non-Compliant With:
RESHERR
35.00
Impasugong Panoon Hydroelectric Power Plant Gerphil Renewable Energy, Inc.
Compliant With:
Work Plan
Non-Compliant With:
RESHERR
0.22
Gakaon Hydroelectric Power Project LGU of Impasugong
Non-Compliant With:
- Work Program
- Posting of performance bond
- RESHERR
2.23
Atugan 1 River Hydroelectric Power Project Gerphil Renewable Energy, Inc.
Compliant With:
-Work Program
Non-Compliant With:
- Posting of performance bond
-RESHERR
2.40
Atugan 4 Gerphil Renewable Energy, Inc.
Compliant With:
-Work Program
Non-Compliant With:
- Posting of performance bond
-RESHERR
3.50
AWARDED HYDROELECTRICPOWER PROJECTS as of March 31, 2016
ISLAND /
GRID REGION PROVINCE
CITY /
MUNICIPALITYPROJECT NAME COMPANY NAME STATUS
POTENTIAL
CAPACITY
(MW)
INSTALLED
CAPACITY
(MW)
MINDANAO X BukidnonImpasugong and
SumilaoTagoloan Hydroelectric Power Project FGEN Tagoloan Hydro Corporation
Compliant With:
-Posting of performance bond
Non-Compliant With:
-Work Plan
-RESHERR
39.00
Kalilangan &
Wao
Maladugao River (Lower Cascade)
Hydroelectric Power Project
Bukidnon Maladugao Hydro Power
Corporation
Compliant With:
- Work Plan
- Posting of performance bond
Non-Compliant With:
RESHERR
10.00
Libona Umalag 1 Hydroelectric Power Project Meadowland Developers, Inc.
Compliant With:
Posting of performance bond
Non-Compliant With:
- Work Program
- RESHERR
1.80
Malaybalay Sawaga Hydroelectric Power Project Euro Hydro Power (Asia) Holdings, Inc.
Compliant With:
Work Program
Non-Compliant With:
- Posting of performance bond
- RESHERR
1.20
Repower Energy Development
Corporation
Compliant With:
- Work Program
- Posting of performance bond
Non-Compliant With:
RESHERR
2.00
Middle Canayan Hydroelectric Power
ProjectSta. Clara Power Corp.
Non-Compliant With:
- Work Program
- Posting of performance bond
- RESHERR
3.00
Malitbog Malitbog Hydroelectric Power Project Philnewriver Power Corp.
Compliant With:
Work Plan
Non-Compliant With:
-RESHERR
-Posting of PB
3.40
AWARDED HYDROELECTRICPOWER PROJECTS as of March 31, 2016
ISLAND /
GRID REGION PROVINCE
CITY /
MUNICIPALITYPROJECT NAME COMPANY NAME STATUS
POTENTIAL
CAPACITY
(MW)
INSTALLED
CAPACITY
(MW)
MINDANAO X Bukidnon Malitbog Silo-o Hydroelectric Power Project Philnewriver Power Corp.
Compliant With:
Work Plan
Non-Compliant With:
- Posting of performance bond
- RESHERR
4.50
Manolo Culaman Hydroelectric Power ProjectOriental Energy and Power Generation
Corporation
Compliant With:
- RESHERR
Non-Compliant With:
-Work Plan
- Posting of performance bond
10.00
Manolo Fortich Agusan River Hydroelectric Power Plant FG Bukidnon Power Corp.
Compliant With:
-Work Plan
-RESHERR
1.60
Mangima Hydroelectric Power Project Philnewriver Power Corp.
Compliant With:
Work Plan
Non-Compliant With:
- Posting of performance bond
- RESHERR
10.00
Maramag Maramag Hydroelectric Power Project Maramag Mini-Hydro Corporation
Compliant With:
Work Program
Non-Compliant With:
- Posting of performance bond
- RESHERR
2.00
Pulangui IVRepower Energy Development
Corporation
Compliant With:
-Work Program -
Posting of performance bond
Non-Compliant With:
RESHERR
10.00
SantiagoManolo Fortich 1 Hydroelectric Power
ProjectHedcor Bukidnon, Inc.
Compliant With:
-Work Plan
- Posting of performance bond
Non-Compliant With:
- RESHERR
43.40
Manolo Fortich 2 Hydroelectric Power
ProjectHedcor Bukidnon, Inc.
Compliant With:
-Work Plan
- Posting of performance bond
Non-Compliant With:
- RESHERR
25.40
AWARDED HYDROELECTRICPOWER PROJECTS as of March 31, 2016
ISLAND /
GRID REGION PROVINCE
CITY /
MUNICIPALITYPROJECT NAME COMPANY NAME STATUS
POTENTIAL
CAPACITY
(MW)
INSTALLED
CAPACITY
(MW)
MINDANAO X Bukidnon Valencia Manupali Hydroelectric Power Project Matic Hydropower Corporation
Compliant With:
Work Plan
Non-Compliant With:
-Posting of performance bond
- RESHERR
9.00
Upper Manupali Hydroelectric Power
Project Bukidnon II Electric Cooperative, Inc.
Compliant With:
- Work Program
- Posting of performance bond
Non-Compliant With:
RESHERR
2.00
WaoMaladugao River (Upper Cascade)
Hydroelectric Power Project
UHPC Bukidnon Hydro Power I
Corporation
Compliant With:
- Work Plan
- Posting of performance bond
Non-Compliant With:
RESHERR
5.50
Cagayan de
Oro Claveria Mat-i 1 Hydroelectric Power Project Philnew Hydro Power Corp
Non-Compliant With:
- Work Plan
- Posting of performance bond
- RESHERR
4.85
Misamis
OccidentalCalamba Langaran Hydroelectric Power Project Kaltimex Langaran Hydro Inc.
Compliant With:
Work Program
Non-Compliant With:
- Posting of performance bond
- RESHERR
3.64
Clarin Clarin Hydroelectric Power Project Philnew Hydro Power Corp
Non-Compliant With:
- Work Plan
- Posting of performance bond
- RESHERR
6.20
Misamis
Oriental
Cagayan de Oro
CityLimbatangon Hydroelectric Power Project Turbines Resource & Development Corp.
Non-Compliant With:
- Work Plan
- Posting of performance bond
- RESHERR
9.00
Mat-i 2 Hydroelectric Power Project Philnewriver Power Corp.
Compliant With:
Work Plan
Non-Compliant With:
- Posting of performance bond
- RESHERR
1.60
AWARDED HYDROELECTRICPOWER PROJECTS as of March 31, 2016
ISLAND /
GRID REGION PROVINCE
CITY /
MUNICIPALITYPROJECT NAME COMPANY NAME STATUS
POTENTIAL
CAPACITY
(MW)
INSTALLED
CAPACITY
(MW)
MINDANAO XMisamis
Oriental
Cagayan de Oro
CityMat-i 3 Hydroelectric Power Project Philnewriver Power Corp.
Compliant With:
Work Plan
Non-Compliant With:
- Posting of performance bond
- RESHERR
3.25
Umalag 2 Hydroelectric Power Project Meadowland Developers, Inc.
Compliant With:
Posting of performance bond
Non-Compliant With:
- Work Program
- RESHERR
2.50
Claveria Cabulig Hydroelectric Power Plant Mindanao Energy Systems, Inc. Non-Compliant With:
RESHERR8.00
Jasaan Lower Cabulig Hydroelectric Power Project Mindanao Energy Systems, Inc.
Non-Compliant With:
- Work Program
- Posting of performance bond
- RESHERR
10.00
Odiongan,
Gingoog City
Odiongan River A Mini-Hydroelectric
Power ProjectJE Hydropower Ventures, Inc.
Non-Compliant With:
- Work Program
- Posting of performance bond
- RESHERR
0.25
Lanao del
NorteBacolod Liangan Liangan Power Corp. (blank) 11.90
Iligan City Bayug Hydroelectric Power Project Euro Hydro Power (Asia) Holdings, Inc.
Compliant With:
Work Program
Non-Compliant With:
- Posting of performance bond
- RESHERR
1.00
Lower Bayug Hydroelectric Power Project Euro Hydro Power (Asia) Holdings, Inc.
Compliant With:
Posting of performance bond
Non-Compliant With:
- Work Program
- RESHERR
4.00
Upper Bayug Hydroelectric Power Project Euro Hydro Power (Asia) Holdings, Inc.
Compliant With:
Posting of performance bond
Non-Compliant With:
- Work Program
- RESHERR
3.30
AWARDED HYDROELECTRICPOWER PROJECTS as of March 31, 2016
ISLAND /
GRID REGION PROVINCE
CITY /
MUNICIPALITYPROJECT NAME COMPANY NAME STATUS
POTENTIAL
CAPACITY
(MW)
INSTALLED
CAPACITY
(MW)
MINDANAO XLanao del
NorteIligan City
Bulanog-Batang Hydroelectric Power
ProjectBukidnon Hydro Energy Corporation
Compliant With:
-Work Program -
Posting of performance bond
Non-Compliant With:
RESHERR
150.00
Agus VIII Modular Hydroelectric Power
ProjectFu-Tai Philippines, Inc.
Compliant With:
-Work Program -
Posting of performance bond -
RESHERR
12.00
Kolambogan Titunod Hydroelectric Power Project Euro Hydro Power (Asia) Holdings, Inc.
Compliant With:
Work Program
Non-Compliant With:
- Posting of performance bond
- RESHERR
1.00
X/ARMM
Lanao del
Norte/Lanao
del Sur
Pantar &
Baloi/SaguiaranAgus III Maranao Energy Corp.
Compliant With:
-Work Program -
Posting of performance bond
Non-Compliant With:
RESHERR
225.00
XI Davao del Sur Davao City Tamugan Hydroelectric Power Project HEDCOR, Inc.
Non-Compliant With:
- Work Program
- Posting of performance bond
- RESHERR
11.50
Digos City Ruparan Hydroelectric Power Project Davao de Sur Electric Cooperative, Inc.
Compliant With:
Work Program
Non-Compliant With:
- Posting of performance bond
- RESHERR
5.00
Malita Malita Hydroelectric Power Project LGU of Malita, Davao del Sur
Compliant With:
Work Program
Non-Compliant With:
-Posting of performance bond
- RESHERR
2.50
Sta. Cruz Tudaya 2 Hydroelectric Power Plant Hedcor Tudaya, Inc.
Compliant With:
Work Plan
Non-Compliant With:
RESHERR
7.00
AWARDED HYDROELECTRICPOWER PROJECTS as of March 31, 2016
ISLAND /
GRID REGION PROVINCE
CITY /
MUNICIPALITYPROJECT NAME COMPANY NAME STATUS
POTENTIAL
CAPACITY
(MW)
INSTALLED
CAPACITY
(MW)
MINDANAO XI Davao del Sur Sta. Cruz Tudaya 1 Hydroelectric Power Plant Hedcor Sibulan, Inc .
Compliant With:
Work Plan
Non-Compliant With:
RESHERR
6.60
Compostela
ValleyMaco Upper Maco Hydroelectric Power Project Sta. Clara Power Corp.
Non-Compliant With:
- Work Program
- Posting of performance bond
- RESHERR
4.00
Mt. Leonard Hydroelectric Power Project Sta. Clara Power Corp.
Non-Compliant With:
- Work Program
- Posting of performance bond
- RESHERR
2.00
Tagum R Hydroelectric Power Project Sta. Clara Power Corp.
Non-Compliant With:
- Work Program
- Posting of performance bond
- RESHERR
4.00
Hijo R. I Hydroelectric Power Project Sta. Clara Power Corp.
Non-Compliant With:
- Work Program
- Posting of performance bond
- RESHERR
3.00
Hijo R. II Hydroelectric Power Project Sta. Clara Power Corp.
Non-Compliant With:
- Work Program
- Posting of performance bond
- RESHERR
3.00
New Bataan New Bataan Hydroelectric Power Project Euro Hydro Power (Asia) Holdings, Inc.
Compliant With:
Work Plan
Non-Compliant With:
- Posting of performance bond
- RESHERR
2.40
Davao
OrientalBaganga Baganga River Hydroelectric Power Project Global Sibagat Hydro Power Corp.
Compliant With:
-Posting of performance bond -
RESHERR
Non-Compliant With:
- Work Program
11.00
AWARDED HYDROELECTRICPOWER PROJECTS as of March 31, 2016
ISLAND /
GRID REGION PROVINCE
CITY /
MUNICIPALITYPROJECT NAME COMPANY NAME STATUS
POTENTIAL
CAPACITY
(MW)
INSTALLED
CAPACITY
(MW)
MINDANAO XIDavao
OrientalBaganga Cateel River Hydroelectric Power Project Global Sibagat Hydro Power Corp.
Compliant With:
-Posting of performance bond -
RESHERR
Non-Compliant With:
- Work Program
16.00
Caraga Osmeña Hydroelectric Power Project LGS Renewable Energies Corporation
Non-Compliant With:
- Work Program
- Posting of performance bond
- RESHERR
2.00
Manorigao Hydroelectric Power Project LGS Renewable Energies Corporation
Non-Compliant With:
- Work Program
- Posting of performance bond
- RESHERR
17.00
Lupon Sumlog 2 Hydroelectric Power Project Alsons Energy Development Corporation
Non-Compliant With:
- Work Program
- Posting of performance bond
- RESHERR
15.00
Sumlog 1 Hydroelectric Power Project Alsons Energy Development Corporation
Non-Compliant With:
- Work Program
- Posting of performance bond
- RESHERR
8.00
Manay Casauman Hydroelectric Power Project Global Sibagat Hydro Power Corp.
Compliant With:
- RESHERRNon-Compliant With:
- Work Program
- Posting of performance bond
34.00
Davao del Sur Davao City Davao Hydroelectric Power ProjectSan Lorenzo Ruiz Olympia Energy and
Water, Inc.
Non-Compliant With:
- Work Program
- Posting of performance bond
- RESHERR
140.00
XIINorth
CotabatoAlamada Alamada Hydroelectric Power Project Euro Hydro Power (Asia) Holdings, Inc.
Compliant With:
Work Program
Non-Compliant With:
- Posting of performance bond
- RESHERR
1.00
AWARDED HYDROELECTRICPOWER PROJECTS as of March 31, 2016
ISLAND /
GRID REGION PROVINCE
CITY /
MUNICIPALITYPROJECT NAME COMPANY NAME STATUS
POTENTIAL
CAPACITY
(MW)
INSTALLED
CAPACITY
(MW)
MINDANAO XIINorth
CotabatoMagpet Magpet 1 Hydroelectric Power Project Universal Hydrotechnologies, Inc.
Compliant With:
Work Program
Non-Compliant With:
- Posting of performance bond
- RESHERR
9.80
Magpet 2 Hydroelectric Power Project Universal Hydrotechnologies, Inc.
Compliant With:
Work Program
Non-Compliant With:
- Posting of performance bond
- RESHERR
1.30
Makilala Makilala-1 Hydroelectric Power Project Universal Hydrotechnologies, Inc.
Non-Compliant With:
- Work Program
- Posting of performance bond
- RESHERR
2.00
Sultan
KudaratIsulan Kabulnan 2 Hydroelectric Power Project Philnewriver Power Corp.
Compliant With:
Work Program
Non-Compliant With:
- Posting of performance bond
- RESHERR
110.00
Sarangani Maasim Siguil 1 Hydroelectric Power Project Alsons Energy Development Corporation
Compliant With:
Work Program
Non-Compliant With:
-Posting of performance bond
- RESHERR
8.70
Siguil 2 Hydroelectric Power Project Alsons Energy Development Corporation
Compliant With:
Work Program
Non-Compliant With:
-Posting of performance bond
- RESHERR
3.20
Siguil 3 Hydroelectric Power Project Alsons Energy Development Corporation
Compliant With:
Work Program
Non-Compliant With:
-Posting of performance bond
- RESHERR
4.80
Maitum Kalaong 3 Hydroelectric Power Project Alsons Energy Development Corporation
Non-Compliant With:
- Work Program
- Posting of performance bond
- RESHERR
4.00
AWARDED HYDROELECTRICPOWER PROJECTS as of March 31, 2016
ISLAND /
GRID REGION PROVINCE
CITY /
MUNICIPALITYPROJECT NAME COMPANY NAME STATUS
POTENTIAL
CAPACITY
(MW)
INSTALLED
CAPACITY
(MW)
MINDANAO XII Saranggani Maitum Kalaong 1 Hydroelectric Power Project Alsons Energy Development Corporation
Compliant With:
- Work Program
- Posting of performance bond
Non-Compliant With:
RESHERR
12.00
Kalaong 2 Hydroelectric Power Project Alsons Energy Development Corporation
Compliant With:
- Work Program
- Posting of performance bond
Non-Compliant With:
RESHERR
6.00
South
Cotabato
Koronadal &
TampakanMarbel 1 Euro Hydro Power (Asia) Holdings, Inc.
Compliant With:
-Work Plan
Non-Compliant With:
- Posting of performance bond
-RESHERR
0.50
Lake SebuLanon (Lam-alu) Hydroelectric Power
ProjectEuro Hydro Power (Asia) Holdings, Inc.
Compliant With:
Work Plan
Non-Compliant With:
- Posting of performance bond
- RESHERR
9.00
Sebu, Takbo Hydroelectric Power Project South Cotabato I Electric Cooperative, Inc.
Non-Compliant With:
- Work Program
- Posting of performance bond
- RESHERR
15.00
XIIIAgusan del
NorteButuan Taguibo 1 Hydroelectric Power Project Equi-Parco Construction Co.
Compliant With:
Work Program
Non-Compliant With:
- Posting of performance bond
- RESHERR
2.00
Taguibo 2 Hydroelectric Power Project Equi-Parco Construction Co.
Compliant With:
Work Program
Non-Compliant With:
- Posting of performance bond
- RESHERR
2.00
AWARDED HYDROELECTRICPOWER PROJECTS as of March 31, 2016
ISLAND /
GRID REGION PROVINCE
CITY /
MUNICIPALITYPROJECT NAME COMPANY NAME STATUS
POTENTIAL
CAPACITY
(MW)
INSTALLED
CAPACITY
(MW)
MINDANAO XIIIAgusan del
NorteButuan City Bugsukan Hydroelectric Power Project Global Sibagat Hydro Power Corp.
Compliant With:
-Posting of performance bond -
RESHERR
Non-Compliant With:
- Work Program
5.00
Cabadbaran Cabadbaran Hydroelectric Power Project FGEN Cabadbaran Hydro Corporation
Compliant With:
-Posting of performance bond
Non-Compliant With:
-Work Plan
-RESHERR
9.75
Jabonga Lake Mainit Hydroelectric Power Project Agusan Power Corporation
Compliant With:
- Work Plan
- RESHERRNon-Compliant With:
- Posting of performance bond
25.00
Jabonga Puyo Hydroelectric Power Project FGEN Puyo Hydro Corporation
Compliant With:
-Work Plan
-Posting of performance bond
Non-Compliant With:
-RESHERR
30.00
Santiago Asiga Hydroelectric Power Project Asiga Green Energy Corporation
Compliant With:
Work Plan
Non-Compliant With:
- Posting of performance bond
- RESHERR
8.00
Surigao del
SurCantilan
Lower Carac-an Hydroelectric Power
ProjectMeadowland Developers, Inc.
Non-Compliant With:
- Work Program
- Posting of performance bond
- RESHERR
5.00
Madrid Carac-an Hydroelectric Power Project Hydro Link Projects Corporation
Non-Compliant With:
- Work Program
- Posting of performance bond
- RESHERR
25.00
Agusan Del
SurSibagat Wawa 1 Hydroelectric Power Project Equi-Parco Construction Co.
Non-Compliant With:
- Work Program
- Posting of performance bond
- RESHERR
7.70
AWARDED HYDROELECTRICPOWER PROJECTS as of March 31, 2016
ISLAND /
GRID REGION PROVINCE
CITY /
MUNICIPALITYPROJECT NAME COMPANY NAME STATUS
POTENTIAL
CAPACITY
(MW)
INSTALLED
CAPACITY
(MW)
MINDANAO XIIIAgusan Del
SurSibagat Wawa 2 Hydroelectric Power Project Equi-Parco Construction Co.
Non-Compliant With:
- Work Program
- Posting of performance bond
- RESHERR
7.00
Wawa 3 Hydroelectric Power Project Equi-Parco Construction Co.
Non-Compliant With:
- Work Program
- Posting of performance bond
- RESHERR
5.60
Managong Hydroelectric Power Project Global Sibagat Hydropower Corporation
Compliant With:
-Posting of performance bond
-RESHERR
-Work Program
6.00
Wawa Hydroelectric Power Project Global Sibagat Hydropower Corporation
Compliant With:
-Posting of performance bond
-RESHERR
Non-Compliant With:
- Work Program
13.00
ARMM Lanao del SurMalabang &
TubaranMaitling River Hydroelectric Power Project AQA Global Power Inc.
Non-Compliant With:
- Work Program
- Posting of performance bond
- RESHERR
50.00
Baras River Hydroelectric Power Project AQA Global Power Inc.
Non-Compliant With:
- Work Program
- Posting of performance bond
- RESHERR
30.00
Matadi River Hydroelectric Power Project AQA Global Power Inc.
Non-Compliant With:
- Work Program
- Posting of performance bond
- RESHERR
27.00
Lake Dapao Hydroelectric Power Project AQA Global Power Inc.
Non-Compliant With:
- Work Program
- Posting of performance bond
- RESHERR
50.00
MINDANAO Sum 1,522.52 30.92
Grand Total 7,053.15 141.49