AWARDED HYDROELECTRICPOWER PROJECTS as of March 31, 2016 ISLAND / GRID REGION PROVINCE CITY / MUNICIPALITY PROJECT NAME COMPANY NAME STATUS POTENTIAL CAPACITY (MW) INSTALLED CAPACITY (MW) LUZON CAR Benguet Kibungan Kibungan Hydropower Corporation Compliant With: -Work Program - Posting of performance bond Non-Compliant With: RESHERR 1,000.00 Bakun & Mankayan Mankayan 1 Hydroelectric Power Project HEDCOR, Inc. Compliant With: Work Program Non-Compliant With: - Posting of performance bond - RESHERR 12.70 Bokod & Kabayan Kabayan 3 Hydroelectric Power Project Hedcor Benguet, Inc. Compliant With: Posting of performance bond Non-Compliant With: - Work Program - RESHERR 14.30 Buguias Man-asok Hydroelectric Power Project Benguet Electric Cooperative, Inc. Compliant With: -Work Plan - RESHERR -Posting of performance bond 3.00 Buguias & Kabayan Kabayan 1 Hedcor Benguet, Inc. Compliant With: -Work Program Non-Compliant With: - Posting of performance bond -RESHERR 20.00 Itogon San Roque Upper East Pump Storage Strategic Power Development Corp. Compliant With: -Work Program - Posting of performance bond - RESHERR 600.00 San Roque West Pump Storage Strategic Power Development Corp. Compliant With: -Work Program - Posting of performance bond - RESHERR Non-Compliant With: RESHERR 400.00 Kabayan Eddet Adaoay 2 Hydroelectric Power Project United Hydro Power Builders Non-Compliant With: - Work Program - Posting of performance bond - RESHERR 1.80

Awarded Hydropower Projects as of 31 March 2016

  • Upload
    lamdiep

  • View
    218

  • Download
    2

Embed Size (px)

Citation preview

Page 1: Awarded Hydropower Projects as of 31 March 2016

AWARDED HYDROELECTRICPOWER PROJECTS as of March 31, 2016

ISLAND /

GRID REGION PROVINCE

CITY /

MUNICIPALITYPROJECT NAME COMPANY NAME STATUS

POTENTIAL

CAPACITY

(MW)

INSTALLED

CAPACITY

(MW)

LUZON CAR Benguet Kibungan Kibungan Hydropower Corporation

Compliant With:

-Work Program -

Posting of performance bond

Non-Compliant With:

RESHERR

1,000.00

Bakun &

MankayanMankayan 1 Hydroelectric Power Project HEDCOR, Inc.

Compliant With:

Work Program

Non-Compliant With:

- Posting of performance bond

- RESHERR

12.70

Bokod &

KabayanKabayan 3 Hydroelectric Power Project Hedcor Benguet, Inc.

Compliant With:

Posting of performance bond

Non-Compliant With:

- Work Program

- RESHERR

14.30

Buguias Man-asok Hydroelectric Power Project Benguet Electric Cooperative, Inc.

Compliant With:

-Work Plan

- RESHERR

-Posting of performance bond

3.00

Buguias &

KabayanKabayan 1 Hedcor Benguet, Inc.

Compliant With:

-Work Program

Non-Compliant With:

- Posting of performance bond

-RESHERR

20.00

Itogon San Roque Upper East Pump Storage Strategic Power Development Corp.

Compliant With:

-Work Program

- Posting of performance bond

- RESHERR

600.00

San Roque West Pump Storage Strategic Power Development Corp.

Compliant With:

-Work Program

- Posting of performance bond

- RESHERR Non-Compliant With:

RESHERR

400.00

Kabayan Eddet Adaoay 2 Hydroelectric Power

ProjectUnited Hydro Power Builders

Non-Compliant With:

- Work Program

- Posting of performance bond

- RESHERR

1.80

Page 2: Awarded Hydropower Projects as of 31 March 2016

AWARDED HYDROELECTRICPOWER PROJECTS as of March 31, 2016

ISLAND /

GRID REGION PROVINCE

CITY /

MUNICIPALITYPROJECT NAME COMPANY NAME STATUS

POTENTIAL

CAPACITY

(MW)

INSTALLED

CAPACITY

(MW)

LUZON CAR Benguet Kabayan Eddet Adaoay 1 Hydroelectric Power

ProjectUnited Hydro Power Builders

Non-Compliant With:

- Work Program

- Posting of performance bond

- RESHERR

1.00

Kabayan Natalang B Hydroelectric Power Project Hedcor Cordillera, Inc.

Compliant With:

-Work Plan

Non-Compliant With:

-Posting of performance bond

-RESHERR

38.00

Kapangan &

Kibungan Kapangan Hydroelectric Power Project

Cordillera Hydro Electric Power

Corporation

Compliant With:

- Posting of performance bond Non-

Compliant With:

RESHERR

-Work Plan

60.00

La Trinidad Bineng 1-2B Combination HEDCOR, Inc.

Compliant With:

-Work Program -

Posting of performance bond

Non-Compliant With:

RESHERR

16.50

Sabangan Sabangan Hydroelectric Power Project Hedcor Sabangan, Inc.

Compliant With:

Work Plan

Non-Compliant With:

RESHERR

14.00

Tabaan Sur, Tuba Abdao Hydroelectric Power Project AV Garcia Power Systems Corp.

Compliant With:

-Work Plan

-RESHERR

Non-Compliant With:

Posting of performance bond

2.00

Tuba Kanggas Hydroelectric Power Project Goldlink Global Energy Corporation

Compliant With:

-Work Program

-RESHERR

Non-Compliant With:

- Posting of performance bond

3.00

Tadiangan Hydroelectric Power Project Goldlink Global Energy Corporation

Compliant With:

-Work Program

-RESHERR

Non-Compliant With:

- Posting of performance bond

4.70

Page 3: Awarded Hydropower Projects as of 31 March 2016

AWARDED HYDROELECTRICPOWER PROJECTS as of March 31, 2016

ISLAND /

GRID REGION PROVINCE

CITY /

MUNICIPALITYPROJECT NAME COMPANY NAME STATUS

POTENTIAL

CAPACITY

(MW)

INSTALLED

CAPACITY

(MW)

LUZON CAR Benguet Tuba Irisan 1 Hydroelectric Power Plant HEDCOR, Inc.

Compliant With:

Work Plan

Non-Compliant With:

RESHERR

3.80

Tublay Tublay 1 Hydroelectric Power Project AT Dinum Company

Compliant With:

- Posting of performance bond Non-

Compliant With:

- RESHERR

-Work Program

0.90

Tublay 2 AT Dinum Company

Compliant With:

-Work Program

Non-Compliant With:

- Posting of performance bond

-RESHERR

6.00

Ifugao Alfonso ListaMaris Main Canals 2 Hydroelectric Power

ProjectSN Aboitiz Power - Magat

Compliant With:

Work Program

Non-Compliant With:

- Posting of performance bond

- RESHERR

1.75

Asipulo &

KianganLikud Hydroelectric Power Project Provincial Government of Ifugao

Compliant With:

Work Plan

Non-Compliant With:

RESHERR

0.82

Kiangan Asin Hydroelectric Power Project Kiangan Mini Hydro Corporation

Compliant With:

- Work Program

- RESHERR

Non-Compliant With:

- Posting of performance bond

4.00

Ibulao 1 Hydroelectric Power Project Kiangan Mini Hydro Corporation

Compliant With:

-RESHERR

Non-Compliant With:

- Work Program

- Posting of performance bond

6.00

Ibulao 2 Hydroelectric Power Project Enerhighlands Corporation

Compliant With:

-Work Program

- RESHERR

Non-Compliant With:

- Posting of performance bond

8.80

Page 4: Awarded Hydropower Projects as of 31 March 2016

AWARDED HYDROELECTRICPOWER PROJECTS as of March 31, 2016

ISLAND /

GRID REGION PROVINCE

CITY /

MUNICIPALITYPROJECT NAME COMPANY NAME STATUS

POTENTIAL

CAPACITY

(MW)

INSTALLED

CAPACITY

(MW)

LUZON CAR Ifugao Kiangan Hungduan Hydroelectric Power Project Kiangan Mini Hydro Corporation

Compliant With:

-RESHERR

- Work Program

Non-Compliant With:

- Posting of performance bond

4.00

Kiangan Ambangal Hydroelectric Power Plant Provincial Government of Ifugao

Compliant With:

Work Plan

Non-Compliant With:

RESHERR

0.20

Lagawe Ibulao Hydroelectric Power Project Hydrocore, Inc.

Compliant With:

- RESHERR

Non-Compliant With:

- Work Plan

- Posting of performance bond

4.50

Lamut Lamut Hydroelectric Power Project Enerhighlands Corporation

Compliant With:

- Posting of performance bond

- RESHERR

- Work Program

9.00

Tinoc Tinoc 1 Hydroelectric Power Project Quadriver Energy Corporation

Compliant With:

-RESHERR

Non-Compliant With:

- Work Plan

4.10

Tinoc 2 Hydroelectric Power Project Quadriver Energy Corporation

Compliant With:

-RESHERR

Non-Compliant With:

- Work Plan

6.50

Tinoc 3 Hydroelectric Power Project Quadriver Energy Corporation

Compliant With:

-RESHERR

Non-Compliant With:

- Work Plan

5.00

Tinoc 4 Hydroelectric Power Project Philnew Hydro Power Corp

Non-Compliant With:

- Work Plan

- Posting of performance bond

- RESHERR

6.00

Tinoc 5 Hydroelectric Power Project (Lower

Luhong)Philnewriver Power Corp.

Compliant With:

Work Plan

Non-Compliant With:

- Posting of performance bond

- RESHERR

6.90

Page 5: Awarded Hydropower Projects as of 31 March 2016

AWARDED HYDROELECTRICPOWER PROJECTS as of March 31, 2016

ISLAND /

GRID REGION PROVINCE

CITY /

MUNICIPALITYPROJECT NAME COMPANY NAME STATUS

POTENTIAL

CAPACITY

(MW)

INSTALLED

CAPACITY

(MW)

LUZON CAR Ifugao Tinoc Tinoc 6 Hydroelectric Power Project

(Wangwang) Philnewriver Power Corp.

Compliant With:

Work Plan

Non-Compliant With:

- Posting of performance bond

- RESHERR

8.00

Kalinga Chico Hydroelectric Power ProjectSan Lorenzo Ruiz Piat Energy and Water,

Inc.

Non-Compliant With:

- Work Program

- Posting of performance bond

- RESHERR

150.00

Balbalan Biyao Hydroelectric Power Project Biyao Hydro Power Corporation

Compliant With:

-Work Plan

- Posting of peformance bond

- RESHERR

0.80

Tabuk Bulanao Hydroelectric Power Project DPJ Engineers and Consultants Non-Compliant With:

RESHERR1.00

Chico River Hydroelectric Power ProjectSan Lorenzo Ruiz Builders & Developers

Group, Inc.

Non-Compliant With:

- Work Program

- Posting of performance bond

- RESHERR

45.00

Tinglayan Tinglayan Hydroelectric Power Project Pan Pacific Renewable Power Philippine

Corp.

Compliant With:

- Work Program

- RESHERR

Non-Compliant With:

- Posting of performance bond

4.32

Apayao KabugaoApayao-Abulog Hydroelectric Power

Project

Pan Pacific Renewable Power Philippine

Corp.

Compliant With:

- Work Program

- RESHERR

Non-Compliant With:

- Posting of performance bond

150.00

Mountain

ProvinceBauko Enodey-Abit 1 Hydroelectric Power Project Kadipo Bauko Hydropower Corp.

Non-Compliant With:

- Work Program

- Posting of performance bond

- RESHERR

2.00

Enodey-Abit 2 Hydroelectric Power Project Kadipo Bauko Hydropower Corp.

Non-Compliant With:

- Work Program

- Posting of performance bond

- RESHERR

1.20

Page 6: Awarded Hydropower Projects as of 31 March 2016

AWARDED HYDROELECTRICPOWER PROJECTS as of March 31, 2016

ISLAND /

GRID REGION PROVINCE

CITY /

MUNICIPALITYPROJECT NAME COMPANY NAME STATUS

POTENTIAL

CAPACITY

(MW)

INSTALLED

CAPACITY

(MW)

LUZON CARMountain

ProvinceBauko Enodey-Abit 3 Hydroelectric Power Project Kadipo Bauko Hydropower Corp.

Non-Compliant With:

- Work Program

- Posting of performance bond

- RESHERR

2.00

Ampassit Hydroelectric Power Project Kadipo Bauko Hydro Power Corp.

Non-Compliant With:

- Work Program

- Posting of performance bond

- RESHERR

1.20

Enodey 1A Hydroelectric Power Project Kadipo Bauko Hydro Power Corp.

Non-Compliant With:

- Work Program

- Posting of performance bond

- RESHERR

1.80

Besao Besao 1 Hydroelectric Power ProjectBIMAKA Renewable Energy Development

Corporation (BREDCO)

Compliant With:

- Work Program

- Posting of performance bond

Non-Compliant With:

RESHERR

4.50

Besao 2 Hydroelectric Power ProjectBIMAKA Renewable Energy Development

Corporation (BREDCO)

Compliant With:

- Work Program

- Posting of performance bond

Non-Compliant With:

RESHERR

7.00

Besao 3 Hydroelectric Power ProjectBIMAKA Renewable Energy Development

Corporation (BREDCO)

Compliant With:

- Work Program

- Posting of performance bond

Non-Compliant With:

RESHERR

4.00

Besao 1A Hydroelectric Power ProjectBIMAKA Renewable Energy Development

Corporation (BREDCO)

Compliant With:

- Work Program

- Posting of performance bond

Non-Compliant With:

RESHERR

2.60

Besao 1B Hydroelectric Power ProjectBIMAKA Renewable Energy Development

Corporation (BREDCO)

Compliant With:

- Work Program

- Posting of performance bond

Non-Compliant With:

RESHERR

1.70

Page 7: Awarded Hydropower Projects as of 31 March 2016

AWARDED HYDROELECTRICPOWER PROJECTS as of March 31, 2016

ISLAND /

GRID REGION PROVINCE

CITY /

MUNICIPALITYPROJECT NAME COMPANY NAME STATUS

POTENTIAL

CAPACITY

(MW)

INSTALLED

CAPACITY

(MW)

LUZON CARMountain

ProvinceBesao Besao 2A Hydroelectric Power Project

BIMAKA Renewable Energy Development

Corporation (BREDCO)

Compliant With:

- Work Program

- Posting of performance bond

Non-Compliant With:

RESHERR

1.10

Bontoc Talubin Hydroelectric Power ProjectMountain Province Electric Cooperative,

Inc.

Compliant With:

-Work Program

- Posting of performance bond Non-

Compliant With:

- RESHERR

5.40

Mabungao Mabungao Hydroelectric Power ProjectSoutheast Asia Renewable Power

Corporation

Non-Compliant With:

- Work Program

- Posting of performance bond

- RESHERR

5.70

Malecom Malecom Hydroelectric Power ProjectSoutheast Asia Renewable Power

Corporation

Non-Compliant With:

- Work Program

- Posting of performance bond

- RESHERR

0.80

Malig Malig Hydroelectric Power ProjectSoutheast Asia Renewable Power

Corporation

Non-Compliant With:

- Work Program

- Posting of performance bond

- RESHERR

1.10

Natonin Lower Siffu Hydroelectric Power Project Asiapac Green Renewable Energy

Corporation

Compliant With:

Work Program

Non-Compliant With:

- Posting of performance bond

- RESHERR

8.00

Upper Siffu Hydroelectric Power Project Asiapac Green Renewable Energy

Corporation

Compliant With:

Work Program

Non-Compliant With:

- Posting of performance bond

- RESHERR

8.00

Pantor Hydroelectric Power ProjectSoutheast Asia Renewable Power

Corporation

Non-Compliant With:

- Work Program

- Posting of performance bond

- RESHERR

1.20

Page 8: Awarded Hydropower Projects as of 31 March 2016

AWARDED HYDROELECTRICPOWER PROJECTS as of March 31, 2016

ISLAND /

GRID REGION PROVINCE

CITY /

MUNICIPALITYPROJECT NAME COMPANY NAME STATUS

POTENTIAL

CAPACITY

(MW)

INSTALLED

CAPACITY

(MW)

LUZON CARMountain

ProvinceTadian Dicapan Hydroelectric Power Project

Asiapac Green Renewable Energy

Corporation

Compliant With:

Work Program

Non-Compliant With:

- Posting of performance bond

- RESHERR

3.00

Abra Lagayan Tineg Hydroelectric Power Project Sta. Clara Power Corp.

Non-Compliant With:

- Work Program

- Posting of performance bond

- RESHERR

16.00

Manabo Three Rivers Hydroelectric Power Project Sta. Clara Power Corp.

Non-Compliant With:

- Work Program

- Posting of performance bond

- RESHERR

10.00

Tubo Amtuagan Hydroelectric Power Project Sta. Clara Power Corp.

Non-Compliant With:

- Work Program

- Posting of performance bond

- RESHERR

8.50

Gayaman (Tubo) Hydroelectric Power

ProjectSta. Clara Power Corp.

Non-Compliant With:

- Work Program

- Posting of performance bond

- RESHERR

8.50

Benguet &

Ilocos Sur

Bakun &

CervantesMankayan 2 Hydroelectric Power Project HEDCOR, Inc.

Compliant With:

Work Program

Non-Compliant With:

- Posting of performance bond

- RESHERR

20.30

Mt. Province Bauko Boga Hydroelectric Power Project Kadipo Bauko Hydro Power Corp.

Compliant With:

-Work Program -

Posting of performance bond

Non-Compliant With:

RESHERR

1.00

Upper Chico Kadipo Bauko Hydro Power Corp.

Compliant With:

-Work Program -

Posting of performance bond

Non-Compliant With:

RESHERR

2.10

Page 9: Awarded Hydropower Projects as of 31 March 2016

AWARDED HYDROELECTRICPOWER PROJECTS as of March 31, 2016

ISLAND /

GRID REGION PROVINCE

CITY /

MUNICIPALITYPROJECT NAME COMPANY NAME STATUS

POTENTIAL

CAPACITY

(MW)

INSTALLED

CAPACITY

(MW)

LUZON CAR Mt. Province Bauko Lower Chico Kadipo Bauko Hydro Power Corp.

Compliant With:

-Work Program -

Posting of performance bond

Non-Compliant With:

RESHERR

3.40

I Ilocos Sur Alilem Alilem Hydroelectric Power Project Philnewriver Power Corp.

Compliant With:

Work Plan

Non-Compliant With:

- Posting of performance bond

- RESHERR

16.20

Bakun AC Hydroelectric Power Plant Luzon Hydro Corporation

Compliant With:

Work Plan

Non-Compliant With:

RESHERR

70.00

Quirino Quirino Hydroelectric Power Project Philnewriver Power Corp.

Compliant With:

Work Plan

Non-Compliant With:

- Posting of performance bond

- RESHERR

11.50

San Emilio Matibuey Hydroelectric Power Project Sta. Clara Power Corp.

Non-Compliant With:

- Work Program

- Posting of performance bond

- RESHERR

6.50

Sugpon Danac Hydroelectric Power Project Philnewriver Power Corp.

Compliant With:

Work Plan

Non-Compliant With:

- Posting of performance bond

- RESHERR

3.00

La Union Bagulin Baroro 1 Hydroelectric Power ProjectTeam (Philippines) Renewable Energy

Corporation

Non-Compliant With:

- Work Program

- Posting of performance bond

- RESHERR

1.00

Baroro 2 Hydroelectric Power ProjectTeam (Philippines) Renewable Energy

Corporation

Non-Compliant With:

- Work Program

- Posting of performance bond

- RESHERR

3.00

Baroro 3 Hydroelectric Power ProjectTeam (Philippines) Renewable Energy

Corporation

Non-Compliant With:

- Work Program

- Posting of performance bond

- RESHERR

1.50

Page 10: Awarded Hydropower Projects as of 31 March 2016

AWARDED HYDROELECTRICPOWER PROJECTS as of March 31, 2016

ISLAND /

GRID REGION PROVINCE

CITY /

MUNICIPALITYPROJECT NAME COMPANY NAME STATUS

POTENTIAL

CAPACITY

(MW)

INSTALLED

CAPACITY

(MW)

LUZON I La Union Bagulin Bagulin I Hydroelectric Power ProjectGreen Indigenous Environment

Development Corporation

Non-Compliant With:

- Work Program

- Posting of performance bond

- RESHERR

9.00

Naguilian Naguilian Hydroelectric Power Project Naguilian Mini-Hydro Electric Corporation

Non-Compliant With:

- Work Program

- Posting of performance bond

- RESHERR

6.10

Tubao Tubao Hydroelectric Power Project Tubao Mini-Hydro Electric Corporation

Compliant With:

Work Plan

Non-Compliant With:

- Posting of performance bond

1.50

II Cagayan Gonzaga Baua 1 Hydroelectric Power Project Pan Pacific Renewable Power Philippine

Corp.

Compliant With:

- Work Program

- RESHERR

Non-Compliant With:

- Posting of performance bond

4.44

Peñablanca Pinacanauan River Hydroelectric Power

ProjectSunwest Water & Electric Company, Inc.

Non-Compliant With:

-Work Plan

-Posting of performance bond

-RESHERR

6.00

Isabela /

QuirinoSan Augustin Dibuluan Hydroelectric Power Project Greenpower Resources Corporation

Compliant With:

- Work Plan

- Posting of performance bond

Non-Compliant With:

RESHERR

5.50

Isabela Balasig Balasig 2 Hydroelectric Power Project Greenpower Resources Corporation

Compliant With:

-Posting of performance bond

-Work Program

Non-Compliant With:

- RESHERR

7.00

Cabagan Balasig 1 Hydroelectric Power Project Greenpower Resources Corporation

Compliant With:

-Posting of performance bond

-Work Program

Non-Compliant With:

- RESHERR

9.00

Balasig 3 Hydroelectric Power Project Greenpower Resources Corporation

Compliant With:

-Posting of performance bond

-Work Program

Non-Compliant With:

- RESHERR

7.00

Page 11: Awarded Hydropower Projects as of 31 March 2016

AWARDED HYDROELECTRICPOWER PROJECTS as of March 31, 2016

ISLAND /

GRID REGION PROVINCE

CITY /

MUNICIPALITYPROJECT NAME COMPANY NAME STATUS

POTENTIAL

CAPACITY

(MW)

INSTALLED

CAPACITY

(MW)

LUZON II Isabela Cordon Magat F Hydroelectric Power Project PhilCarbon Inc.

Compliant With:

-Posting of performance bond

Non-Compliant With:

- Work Program

- RESHERR

0.60

Dinapigue Ilaguen 2 Hydroelectric Power Project Isabela Power Corporation

Compliant With:

- Work Plan

- Posting of performance bondNon-

Compliant With:

RESHERR

14.00

Echague Ilaguen 3 Hydroelectric Power Project Isabela Power Corporation

Compliant With:

- Work Program

- Posting of performance bond

Non-Compliant With:

RESHERR

11.00

Ilaguen 4 Hydroelectric Power Project Isabela Power Corporation

Compliant With:

- Work Program

- Posting of performance bond

Non-Compliant With:

RESHERR

10.00

Ilagan, Ilagan Hydroelectric Power ProjectTrans-Asia Oil and Energy Development

Corp,

Compliant With:

Work Program

Non-Compliant With:

- Posting of performance bond

- RESHERR

10.00

RamonMaris Main Canals 1 Hydroelectric Power

ProjectSN Aboitiz Power - Magat

Compliant With:

Work Program

Non-Compliant With:

- Posting of performance bond

- RESHERR

6.00

Magat A Hydroelectric Power Project I-Magat Renewable Energy Corporation

Compliant With:

-Work Plan

Non-Compliant With:

- Posting of performance bond

-RESHERR

1.30

Magat B Hydroelectric Power Project I-Magat Renewable Energy Corporation

Compliant With:

ongoing study and permitting

Non-Compliant With:

-Work Program

- Posting of performance bond

- RESHERR

1.00

Page 12: Awarded Hydropower Projects as of 31 March 2016

AWARDED HYDROELECTRICPOWER PROJECTS as of March 31, 2016

ISLAND /

GRID REGION PROVINCE

CITY /

MUNICIPALITYPROJECT NAME COMPANY NAME STATUS

POTENTIAL

CAPACITY

(MW)

INSTALLED

CAPACITY

(MW)

LUZON II IsabelaSan Augustin /

MadellaDabubu Hydroelectric Power Project Greenpower Resources Corporation

Compliant With:

- Work Program

- Posting of performance bond

Non-Compliant With:

RESHERR

4.50

San Mariano Disabungan Hydroelectric Power Project Greenpower Resources Corporation

Compliant With:

- Work Plan

- Posting of performance bond

Non-Compliant With:

RESHERR

5.50

San Mariano &

San GuillermoIlaguen Hydroelectric Power Project Isabela Power Corp.

Compliant With:

Work Plan

Non-Compliant With:

- Posting of performance bond

- RESHERR

19.00

San Mateo Lateral B National Irrigation Administration

Compliant With:

Work Plan

Non-Compliant With:

RESHERR

0.05

San Pablo San Pablo Greenpower Resources Corporation

Compliant With:

-Work Program -

Posting of performance bond

Non-Compliant With:

RESHERR

8.00

Tumauini Tumauini Hydroelectric Power Project

(Lower Cascade)Quadriver Energy Corporation

Compliant With:

-RESHERR

Non-Compliant With:

- Work Plan

- Posting of performance bond

7.80

Tumauini Hydroelectric Power Project

(Upper Cascade)Philnew Hydro Power Corp

Non-Compliant With:

- Work Plan

- Posting of performance bond

- RESHERR

14.00

Nueva VizcayaAlfonso

CastañedaMangayngay Hydroelectric Power Project United Hydro Power Builders

Non-Compliant With:

- Work Program

- Posting of performance bond

- RESHERR

1.60

Page 13: Awarded Hydropower Projects as of 31 March 2016

AWARDED HYDROELECTRICPOWER PROJECTS as of March 31, 2016

ISLAND /

GRID REGION PROVINCE

CITY /

MUNICIPALITYPROJECT NAME COMPANY NAME STATUS

POTENTIAL

CAPACITY

(MW)

INSTALLED

CAPACITY

(MW)

LUZON II Nueva VizcayaAlfonso

CastañedaDenip Hydroelectric Power Project JRV Renewable Energy Corporation

Compliant With:

Work Program

Non-Compliant With:

- Posting of performance bond

- RESHERR

2.30

Alfonzo Abaca Hydroelectric Power Project JRV Renewable Energy Corporation

Non-Compliant With:

- Work Program

- Posting of performance bond

- RESHERR

3.20

Ambaguio Matuno 1 Hydroelectric Power Project Smith Bell Mini-Hydro Corp.

Compliant With:

Work Program

Non-Compliant With:

- Posting of performance bond

- RESHERR

7.40

Bambang Matuno 2 Hydroelectric Power Project Smith Bell Mini-Hydro Corp.

Compliant With:

Work Program

Non-Compliant With:

- Posting of performance bond

- RESHERR

7.90

Matuno Hydroelectric Power Project Epower Technologies Corp.

Compliant With:

-Work Plan

-RESHERR

Non-Compliant With:

-Posting of performance bond

8.00

Dupax del Norte

and Alfonzo

Castañeda

Casignan Hydroelectric Power Project JRV Renewable Energy Corporation

Compliant With:

Work Program

Non-Compliant With:

- Posting of performance bond

- RESHERR

5.00

Kasibu Didipio 1 Hydroelectric Power Project AT Dinum Company

Compliant With:

- Work Program

- Posting of performance bond

Non-Compliant With:

RESHERR

2.50

Didipio 2 Hydroelectric Power Project Alimit Hydro Corp.

Compliant With:

- Work Program

- Posting of performance bond

Non-Compliant With:

RESHERR

6.60

Page 14: Awarded Hydropower Projects as of 31 March 2016

AWARDED HYDROELECTRICPOWER PROJECTS as of March 31, 2016

ISLAND /

GRID REGION PROVINCE

CITY /

MUNICIPALITYPROJECT NAME COMPANY NAME STATUS

POTENTIAL

CAPACITY

(MW)

INSTALLED

CAPACITY

(MW)

LUZON II Nueva Vizcaya Kasibu Namanaan Hydroelectric Power Project AT Dinum Company

Compliant With:

-Work Program -

Posting of performance bond

Non-Compliant With:

RESHERR

0.60

Edralin Hydroelectric Power Project AT Dinum Company

Compliant With:

-Work Program -

Posting of performance bond

Non-Compliant With:

RESHERR

1.20

Solano Commonal-Uddiawan Hydroelectric Power

PlantSmith Bell Mini-Hydro Corp.

Non-Compliant With:

RESHERR1.80

Quirino Aglipay Addalam Hydroelectric Power Project Quirino Power Energy Corporation

Non-Compliant With:

- Work Program

- Posting of performance bond

- RESHERR

3.60

Cabbaroguis Addalam Hydroelectric Power Project Quirino Resources Development Corp.

Compliant With:

- Work Program

- Posting of performance bond

Non-Compliant With:

RESHERR

26.00

Nagtipunan Geblem 1 Hydroelectric Power Project Gawagan Hydro Power Corp.

Non-Compliant With:

- Work Program

- Posting of performance bond

- RESHERR

0.70

Gawagan 1 Hydroelectric Power Project Gawagan Hydro Power Corp.

Non-Compliant With:

- Work Program

- Posting of performance bond

- RESHERR

4.30

Gawagan 2 Hydroelectric Power Project Gawagan Hydro Power Corp.

Non-Compliant With:

- Work Program

- Posting of performance bond

- RESHERR

2.60

Dakgan 1 Hydroelectric Power Project Asiapacific Renewables Corporation

Compliant With:

-Work Program -

Posting of performance bond

Non-Compliant With:

RESHERR

9.00

Page 15: Awarded Hydropower Projects as of 31 March 2016

AWARDED HYDROELECTRICPOWER PROJECTS as of March 31, 2016

ISLAND /

GRID REGION PROVINCE

CITY /

MUNICIPALITYPROJECT NAME COMPANY NAME STATUS

POTENTIAL

CAPACITY

(MW)

INSTALLED

CAPACITY

(MW)

LUZON II Quirino Nagtipunan Dakgan 2 Hydroelectric Power Project Asiapacific Renewables Corporation

Compliant With:

-Work Program -

Posting of performance bond

Non-Compliant With:

RESHERR

12.00

III Aurora Dinalungan Talaytay Hydroelectric Power ProjectPTC Energy, Inc. (Aurora Energy

Corporation)

Compliant With:

Posting of performance bond

Non-Compliant With:

- Work Program

- RESHERR

1.45

Dingalan Davildavilan Hydroelectric Power Project PTC Energy, Inc.

Compliant With:

- Work Plan

Non-Compliant With:

- Posting of performance bond

- RESHERR

1.00

San Luis Diteki Hydroelectric Power ProjectPTC Energy, Inc. (Aurora Energy

Corporation)

Compliant With:

Posting of performance bond

Non-Compliant With:

- Work Program

- RESHERR

1.67

Nueva Ecija Bongabon Calaanan Hydroelectric Power Project Hydrokinetic Corp.

Compliant With:

- Work Program

- Posting of performance bond

Non-Compliant With:

RESHERR

2.00

Gabaldon Dupinga Hydroelectric Power Project Constellation Energy Corporation

Compliant With:

Work PlanNon-Compliant With:

-Posting of performance bond

-RESHERR

3.00

General Tinio Rio Chico Hydroelectric Power Project LGU of Gen. Tinio

Non-Compliant With:

- Work Program

- Posting of performance bond

- RESHERR

2.00

General Tiño Balintingon Hydroelectric Power Project First Gen Luzon Power Corporation

Non-Compliant With:

- Work Program

- Posting of performance bond

- RESHERR

30.00

Page 16: Awarded Hydropower Projects as of 31 March 2016

AWARDED HYDROELECTRICPOWER PROJECTS as of March 31, 2016

ISLAND /

GRID REGION PROVINCE

CITY /

MUNICIPALITYPROJECT NAME COMPANY NAME STATUS

POTENTIAL

CAPACITY

(MW)

INSTALLED

CAPACITY

(MW)

LUZON III Nueva Ecija PantabanganPantabangan (Pump Storage)Hydroelectric

Power ProjectFirst Gen Prime Energy Corporation

Compliant With:

Work Program

Non-Compliant With:

-Posting of performance bond

- RESHERR

300.00

Diaman Hydroelectric Power Project United Hydro Power Builders

Non-Compliant With:

- Work Program

- Posting of performance bond

- RESHERR

1.80

Rizal PRISMC Hydroelectric Power Project PNOC-Renewables Corporation operating 1.00

San Jose SDC Hydroelectric Power Project PNOC-Renewables Corporation

Compliant With:

-RESHERR

Non-Compliant With:

- Work Program

- Posting of performance bond

0.50

Bataan Mariveles Mariveles Hydroelectric Power ProjectSoutheast Asia Renewable Power

Corporation

Compliant With:

Work Program

Non-Compliant With:

- Posting of performance bond

- RESHERR

1.10

Tarlac Mayantoc Camiling 1 Hydroelectric Power Project Northgreen Energy Corporation

Compliant With:

-Work Program -

Posting of performance bond

Non-Compliant With:

RESHERR

5.40

Camiling River 3 Hydroelectric Power

ProjectNorthgreen Energy Corporation

Compliant With:

Posting of performance bond

Non-Compliant With:

- Work Program

- RESHERR

3.40

Zambales Masinloc Coto 1 Hydroelectric Power Project Coto Hydro Corp.

Compliant With:

Work Program

Non-Compliant With:

- Posting of performance bond

- RESHERR

6.50

Page 17: Awarded Hydropower Projects as of 31 March 2016

AWARDED HYDROELECTRICPOWER PROJECTS as of March 31, 2016

ISLAND /

GRID REGION PROVINCE

CITY /

MUNICIPALITYPROJECT NAME COMPANY NAME STATUS

POTENTIAL

CAPACITY

(MW)

INSTALLED

CAPACITY

(MW)

LUZON III ZambalesSouth Lauis &

MabininalCoto 2 Hydroelectric Power Project Coto Hydro Corp.

Compliant With:

Work Program

Non-Compliant With:

- Posting of performance bond

- RESHERR

2.80

Nueva Ecija /

Aurora

Gabaldon / San

LuisLingod River United Hydro Power Builders

Compliant With:

-Work Program

Non-Compliant With:

- Posting of performance bond

-RESHERR

2.50

IV-ALaguna /

Quezon

Pangil / Real &

MaubanSiniloan Hydroelectric Power Project Sierra Madre Water Corporation

Compliant With:

Work Program

Non-Compliant With:

- Posting of performance bond

- RESHERR

35.00

Quezon General Nakar Umiray 1 Laguna Hydroenergy Corporation

Compliant With:

-Work Program

Non-Compliant With:

- Posting of performance bond

6.00

Lucban Maapon Hydroelectric Power Project Renesons Energy Corporation

Compliant With:

- Work Program

- Posting of performance bond -

RESHERR

2.60

Maddela Dabubu 2 Greenpower Resources Corporation

Compliant With:

-Posting of performance bond

-Work Plan

Non-Compliant With:

4.30

Mauban Calmenue Hydroelectric Power Project Sta. Clara Power Corp.

Non-Compliant With:

- Work Program

- Posting of performance bond

- RESHERR

2.00

(Laguio) Laginbayan Malaki 2 Hydroelectric

Power ProjectEnervantage Supplier's Co., Inc.

Compliant With:

- Work Program

- Posting of performance bond

Non-Compliant With:

3.10

Mauban Hydroelectric Power Project Aurora All Asia Energy Corporation

Non-Compliant With:

-Work Program

- Posting of performance bond

- RESHERR

10.00

Page 18: Awarded Hydropower Projects as of 31 March 2016

AWARDED HYDROELECTRICPOWER PROJECTS as of March 31, 2016

ISLAND /

GRID REGION PROVINCE

CITY /

MUNICIPALITYPROJECT NAME COMPANY NAME STATUS

POTENTIAL

CAPACITY

(MW)

INSTALLED

CAPACITY

(MW)

LUZON IV-A Quezon Real Kinanliman Hydroelectric Power Project Municipality of Real, Quezon

Non-Compliant With:

- Work Program

- Posting of performance bond

- RESHERR

1.60

Labayat River (Upper Cascade)

Hydroelectric Power Project

Repower Energy Development

Corporation

Compliant With:

- Work Program

- Posting of performance bond

Non-Compliant With:

RESHERR

3.00

Piapi River Hydroelectric Power ProjectRepower Energy Development

Corporation

Compliant With:

- Work Program

- Posting of performance bond

Non-Compliant With:

RESHERR

3.30

Labayat River (Lower Cascade)

Hydroelectric Power Project

Repower Energy Development

Corporation

Compliant With:

- Work Program

- Posting of performance bond

Non-Compliant With:

RESHERR

2.80

Tignoan River (Upper Cascade)

Hydroelectric Power Project

Repower Energy Development

Corporation

Compliant With:

- Work Program

- Posting of performance bond

Non-Compliant With:

RESHERR

3.50

Tibag Hydroelectric Power ProjectRepower Energy Development

Corporation

Compliant With:

- Work Program

- Posting of performance bond

Non-Compliant With:

RESHERR

5.00

Tignoan Hydroelectric Power Project Aurora All Asia Energy Corporation

Compliant With:

Work Program

Non-Compliant With:

- Posting of performance bond

- RESHERR

20.00

Lalawinan Hydroelectric Power ProjectRepower Energy Development

Corporation

Compliant With:

- Work Program

- Posting of performance bond

Non-Compliant With:

RESHERR

3.00

Page 19: Awarded Hydropower Projects as of 31 March 2016

AWARDED HYDROELECTRICPOWER PROJECTS as of March 31, 2016

ISLAND /

GRID REGION PROVINCE

CITY /

MUNICIPALITYPROJECT NAME COMPANY NAME STATUS

POTENTIAL

CAPACITY

(MW)

INSTALLED

CAPACITY

(MW)

LUZON IV-A Rizal Laguio (Laginbayan) Malaki 1 Hydroelectric

Power ProjectEnervantage Supplier's Co., Inc.

Compliant With:

-Work Program -

Posting of performance bond

Non-Compliant With:

RESHERR

1.60

Pililia, Pililia Pumped Storage Hydroelectric

Power Project

Trans-Asia Oil and Energy Development

Corp,

Compliant With:

Work Program

Non-Compliant With:

- Posting of performance bond

- RESHERR

300.00

RodriguezWawa Pumped Storage 1 Hydroelectric

Power ProjectOlympia Violago Water & Power, Inc

Compliant With:

- Work Program

- Posting of performance bondNon-

Compliant With:

- RESHERR

500.00

Wawa Pumped Storage 3 Hydroelectric

Power ProjectOlympia Violago Water & Power, Inc

Non-Compliant With:

- Work Program

- Posting of performance bond

- RESHERR

50.00

Wawa Pumped Storage 2 Hydroelectric

Power ProjectOlympia Violago Water & Power, Inc

Non-Compliant With:

- Work Program

- Posting of performance bond

- RESHERR

100.00

Laguna Majayjay Majayjay Hydroelectric Power Project Majayjay Hydropower Company, Inc.

Compliant With:

-Work Plan

- Posting of performance bond

Non-Compliant With:

RESHERR

3.00

Balanac (Middle)Repower Energy Development

Corporation

Compliant With:

-Work Program

Non-Compliant With:

- Posting of performance bond

-RESHERR

5.00

CaviteIndang and

MaragondonIndang Hydroelectric Power Project Energywise Corporation

Compliant With:

-RESHERR

Non-Compliant With:

- Work Program

- Posting of performance bond

1.50

Page 20: Awarded Hydropower Projects as of 31 March 2016

AWARDED HYDROELECTRICPOWER PROJECTS as of March 31, 2016

ISLAND /

GRID REGION PROVINCE

CITY /

MUNICIPALITYPROJECT NAME COMPANY NAME STATUS

POTENTIAL

CAPACITY

(MW)

INSTALLED

CAPACITY

(MW)

LUZON IV-BOriental

MindoroBaco San Ignacio Hydroelectric Power Project

Alpaparay Resort & Development

Corporation

Non-Compliant With:

- Work Program

- Posting of performance bond

- RESHERR

0.50

Baco Dulangan Hydroelectric Power Project PNOC - Renewables Corp.

Compliant With:

-RESHERR

Non-Compliant With:

-Posting of performance bond

-Work Program

8.25

Linao-Cawayan (Lower Cascade)

Hydroelectric Power Plant

Oriental Mindoro Electric Cooperative,

Inc.

Compliant With:

-Work Plan

-RESHERR

2.10

Linao-Cawayan (Upper Cascade)

Hydroelectric Power Project

Oriental Mindoro Electric Cooperative,

Inc.

Compliant With:

-Work Plan

-RESHERR

2.10

Bansud Bansud Hydroelectric Power Project Sunwest Water and Electric Co., Inc.

Compliant With:

-Work Program

- Posting of performance bond

Non-Compliant With:

-RESHERR

1.50

Naujan Catuiran (Upper Cascade) Hydroelectric

Power Project Philnew Hydro Power Corp

Compliant With:

Work Program

Non-Compliant With:

-Posting of performance bond

- RESHERR

8.00

Catuiran Hydroelectric Power Project Catuiran Hydro Power Corp.

Compliant With:

- Work Plan

- Posting of performance bond

- RESHERR

8.00

Mag-asawang Tubig B Hydroelectric Power

ProjectPhilippine Hybrid Energy Systems, Inc.

Non-Compliant With:

- Work Program

- Posting of performance bond

- RESHERR

1.00

San Teodoro Inabasan Hydroelectric Power Project Ormin Power, Inc

Compliant With:

Work Plan

Non-Compliant With:

- Posting of performance bond

- RESHERR

10.00

Page 21: Awarded Hydropower Projects as of 31 March 2016

AWARDED HYDROELECTRICPOWER PROJECTS as of March 31, 2016

ISLAND /

GRID REGION PROVINCE

CITY /

MUNICIPALITYPROJECT NAME COMPANY NAME STATUS

POTENTIAL

CAPACITY

(MW)

INSTALLED

CAPACITY

(MW)

LUZON IV-BOriental

MindoroSan Teodoro

Linao Cawayan Hydroelectric Power

Project (Phase 2 - tail -end)Mindoro Grid Corporation

Compliant With:

- Work Program

- Posting of performance bond

Non-Compliant With:

RESHERR

1.00

Alag Tributary 1 Hydroelectric Power

ProjectConstellation Energy Corporation

Non-Compliant With:

- Work Program

- Posting of performance bond

- RESHERR

2.80

Alag Tributary 2 Hydroelectric Power

ProjectConstellation Energy Corporation

Non-Compliant With:

- Work Program

- Posting of performance bond

- RESHERR

2.80

San Teodoro &

Puerto Gallera

Inabasan Phase II Hydroelectric Power

ProjectOrmin Power, Inc.

Compliant With:

-Work Program -

Posting of performance bond

Non-Compliant With:

RESHERR

10.00

Palawan BatarazaMarangas River Hydroelectric Power

ProjectAQA Global Power Inc.

Non-Compliant With:

- Work Program

- Posting of performance bond

- RESHERR

12.00

Brooke's Point Sologon River Hydroelectric Power Project AQA Global Power Inc.

Non-Compliant With:

- Work Program

- Posting of performance bond

- RESHERR

12.00

BusuangaBusuanga River 1 Hydroelectric Power

ProjectAQA Global Power Inc.

Non-Compliant With:

- Work Program

- Posting of performance bond

- RESHERR

8.00

El NidoBulalakao-1 North River Hydroelectric

Power ProjectAlternergy Viento Partners Corporation

Non-Compliant With:

- Work Program

- Posting of performance bond

- RESHERR

0.34

Bulalakao-2 South River Hydroelectric

Power ProjectAlternergy Viento Partners Corporation

Non-Compliant With:

- Work Program

- Posting of performance bond

- RESHERR

0.44

Page 22: Awarded Hydropower Projects as of 31 March 2016

AWARDED HYDROELECTRICPOWER PROJECTS as of March 31, 2016

ISLAND /

GRID REGION PROVINCE

CITY /

MUNICIPALITYPROJECT NAME COMPANY NAME STATUS

POTENTIAL

CAPACITY

(MW)

INSTALLED

CAPACITY

(MW)

LUZON IV-B Palawan NarraBato-Bato (Kaliwa) Hydroelectric Power

ProjectAQA Global Power Inc.

Non-Compliant With:

- Work Program

- Posting of performance bond

- RESHERR

12.00

Estrella River Hydroelectric Power Project AQA Global Power Inc.

Non-Compliant With:

- Work Program

- Posting of performance bond

- RESHERR

8.00

Malasgao (Kaliwa) Hydroelectric Power

ProjectAQA Global Power Inc.

Non-Compliant With:

- Work Program

- Posting of performance bond

- RESHERR

10.00

Narra Batang-Batang Hydroelectric Power Project Langongan Power Corporation

Non-Compliant With:

- Work Plan

- Posting of performance bond

- RESHERR

3.50

Puerto Princesa Langogan Hydroelectric Power Project Langongan Power Corporation

Compliant With:

-Work Plan

Non-Compliant With:

- Posting of performance bond

- RESHERR

6.80

Puerto Princesa

CityInaguan River Hydroelectric Power Project AQA Global Power Inc.

Non-Compliant With:

- Work Program

- Posting of performance bond

- RESHERR

12.00

Rizal Culasian River Hydroelectric Power Project AQA Global Power Inc.

Non-Compliant With:

- Work Program

- Posting of performance bond

- RESHERR

10.00

Romblon Romblon Cantingas Hydroelectric Power Plant Romblon Electric Cooperative, Inc.

Compliant With:

Work Plan

Non-Compliant With:

RESHERR

0.90

Quezon General Nakar Kanan B-1 Hydroelectric Power Project Energy World Kanan River, Inc.

Compliant With:

-Work Program

- Posting of performance bond

Non-Compliant With:

-RESHERR

150.00

Page 23: Awarded Hydropower Projects as of 31 March 2016

AWARDED HYDROELECTRICPOWER PROJECTS as of March 31, 2016

ISLAND /

GRID REGION PROVINCE

CITY /

MUNICIPALITYPROJECT NAME COMPANY NAME STATUS

POTENTIAL

CAPACITY

(MW)

INSTALLED

CAPACITY

(MW)

LUZON IV-B Laguna MajayjayUpper Botocan River Hydroelectric Power

ProjectAurora All Asia Energy Corporation

Compliant With:

-Work Program

Non-Compliant With:

- Posting of performance bond

-RESHERR

8.64

V Camarines Sur Buhi Barit 2 Hydroelectric Power Project People's Energy Services Inc.

Compliant With:

-Work Program

- Posting of performance bond Non-

Compliant With:

- RESHERR

0.60

Barit 1 Hydroelectric Power Plant People's Energy Services Inc.

Compliant With:

Work Plan

Non-Compliant With:

RESHERR

1.80

Buhi Barit (Irrigation Discharge) Hydroelectric

Power ProjectNASCENT Technologies Corp.

Non-Compliant With:

-Work Plan

-Posting of performance bond

-RESHERR

0.40

Goa & Tigaon, Ranggas Hydroelectric Power Project Clean and Green Energy Solutions, Inc.

Compliant With:

Work Plan

Non-Compliant With:

- Posting of performance bond

- RESHERR

1.50

Catanduanes Caramoran Hitoma 1 Hydroelectric Power Plant Sunwest Water & Electric Company, Inc.

Compliant With:

-Work Plan

-RESHERR Non-Compliant With:

1.50

San Miguel Kapipian Hydroelectric Power Project Sunwest Water & Electric Company, Inc.

Compliant With:

- Work Plan

- Posting of performance bond

Non-Compliant With:

-RESHERR

2.40

Solong Hydroelectric Power Plant Sunwest Water & Electric Company, Inc.

Compliant With:

-Work Plan

-RESHERR

2.10

Page 24: Awarded Hydropower Projects as of 31 March 2016

AWARDED HYDROELECTRICPOWER PROJECTS as of March 31, 2016

ISLAND /

GRID REGION PROVINCE

CITY /

MUNICIPALITYPROJECT NAME COMPANY NAME STATUS

POTENTIAL

CAPACITY

(MW)

INSTALLED

CAPACITY

(MW)

LUZON VCamarines

NorteMercedes Colasi Hydroelectric Power Project

Colasi Mini Hydro Electric Power Plant

Corporation

Compliant With:

Work Plan

Non-Compliant With:

- Posting of performance bond

- RESHERR

0.96

Sorsogon Upper Cawayan 1 Hydroelectric Power

Plant

Sunwest Water and Electric Co., Inc. -

Sorsogon II Electric Cooperative, Inc.

(SUWECO-SORECO II)

Compliant With:

Work Plan

Non-Compliant With:

RESHERR

0.60

Sorsogon Cawayan 2 Hydroelectric Power Project Sunwest Water and Electric Co., Inc.

Compliant With:

- Work Program

- Posting of performance bond

Non-Compliant With:

-RESHERR

0.99

LUZON Sum 4,799.65 106.065

VISAYAS VI Aklan Libacao Main Aklan River Hydroelectric Power

ProjectSunwest Water & Electric Company, Inc.

Non-Compliant With:

-Work Plan

-Posting of performance bond

-RESHERR

15.00

Madalag Timbaban Hydroelectric Power ProjectOriental Energy and Power Generation

Corporation

Compliant With:

-Posting of performance bond

-Work Plan

Non-Compliant With:

-RESHERR

18.00

NabaoyAklan Pumped-Storage Hydroelectric

Power ProjectStrategic Power Development Corp.

Compliant With:

-Work Program

- RESHERRNon-Compliant With:

Posting of Performance Bond

200.00

Antique Bugasong Villasiga 2 Hydroelectric Power Project Sunwest Water and Electric Co., Inc.

Non-Compliant With:

- Work Program

- Posting of performance bond

- RESHERR

9.40

Bugasong Villasiga Hydroelectric Power Project Sunwest Water & Electric Company, Inc. 2

Compliant With:

-RESHERR

Non-Compliant With:

-Work Plan

-Posting of performance bond

8.00

Page 25: Awarded Hydropower Projects as of 31 March 2016

AWARDED HYDROELECTRICPOWER PROJECTS as of March 31, 2016

ISLAND /

GRID REGION PROVINCE

CITY /

MUNICIPALITYPROJECT NAME COMPANY NAME STATUS

POTENTIAL

CAPACITY

(MW)

INSTALLED

CAPACITY

(MW)

VISAYAS VI Antique San RemegioManinila (Lower Cascade) Hydroelectric

Power ProjectCentury Peak Energy Corporation

Non-Compliant With:

-Work Plan

-Posting of performance bond

-RESHERR

4.50

Maninila (Upper Cascade) Hydroelectric

Power ProjectCentury Peak Energy Corporation

Non-Compliant With:

-Work Plan

-Posting of performance bond

-RESHERR

3.10

Sibalom (Upper Cascade) Hydroelectric

Power ProjectCentury Peak Energy Corporation

Non-Compliant With:

-Work Plan

-Posting of performance bond

-RESHERR

4.20

Sibalom (Middle Cascade) Hydroelectric

Power ProjectCentury Peak Energy Corporation

Non-Compliant With:

-Work Plan

-Posting of performance bond

-RESHERR

4.00

Sibalom (Lower Cascade) Hydroelectric

Power ProjectCentury Peak Energy Corporation

Non-Compliant With:

-Work Plan

-Posting of performance bond

-RESHERR

3.30

Sebaste Caro-an Hydroelectric Power Project Antique Electric Cooperative, Inc.

Compliant With:

-Work Plan

- Posting of performance bond

Non-Compliant With:

-RESHERR

0.84

Ipayo Hydroelectric Power Project Antique Electric Cooperative, Inc.

Compliant With:

-Work Plan

- Posting of performance bond

Non-Compliant With:

-RESHERR

1.30

Iloilo Igbaras Igbulo (Bais) Hydroelectric Power Project Century Peak Energy Corporation

Compliant With:

Work Plan

Non-Compliant With:

-Posting of performance bond

- RESHERR

5.10

Page 26: Awarded Hydropower Projects as of 31 March 2016

AWARDED HYDROELECTRICPOWER PROJECTS as of March 31, 2016

ISLAND /

GRID REGION PROVINCE

CITY /

MUNICIPALITYPROJECT NAME COMPANY NAME STATUS

POTENTIAL

CAPACITY

(MW)

INSTALLED

CAPACITY

(MW)

VISAYAS VINegros

OccidentalBago & Murcia Bago 4 Hydroelectric Power Project Alsons Energy Development Corporation

Compliant With:

Work Program

Non-Compliant With:

- Posting of performance bond -

RESHERR

11.00

Don Salvador

BenedictoBago 2 Hydroelectric Power Project Alsons Energy Development Corporation

Compliant With:

- Work Program

- Posting of performance bond

Non-Compliant With:

RESHERR

10.00

Kabankalan Hilabangan (Upper Cascade) Hydroelectric

Power ProjectCentury Peak Energy Corporation

Non-Compliant With:

-Work Plan

-Posting of performance bond

-RESHERR

4.80

Hilabangan (Lower Cascade) Hydroelectric

Power ProjectCentury Peak Energy Corporation

Non-Compliant With:

-Work Plan

-Posting of performance bond

-RESHERR

3.00

SagayLower Himogaan Hydroelectric Power

Project LGU of Sagay

Compliant With:

Work Plan

Non-Compliant With:

- Posting of performance bond

- RESHERR

4.00

San Carlos City Bago 1 Hydroelectric Power Project Alsons Energy Development Corporation

Compliant With:

- Work Program

- Posting of performance bond

Non-Compliant With:

RESHERR

4.00

Initihan Hydroelectric Power Project Bago River Hydro Power Corporation

Compliant With:

Work Program

Non-Compliant With:

- Posting of performance bond

- RESHERR

3.00

Bago-Prosperidad 2 Hydroelectric Power

ProjectBago River Hydro Power Corporation

Compliant With:

Work Program

Non-Compliant With:

- Posting of performance bond

- RESHERR

2.00

Page 27: Awarded Hydropower Projects as of 31 March 2016

AWARDED HYDROELECTRICPOWER PROJECTS as of March 31, 2016

ISLAND /

GRID REGION PROVINCE

CITY /

MUNICIPALITYPROJECT NAME COMPANY NAME STATUS

POTENTIAL

CAPACITY

(MW)

INSTALLED

CAPACITY

(MW)

VISAYAS VINegros

OccidentalSilay Malugo Hydroelectric Power Project Vivant-Malogo Hydropower, Inc.

Non-Compliant With:

- Work Plan

- Posting of performance bond

- RESHERR

6.00

Silay & E. B

Magalona

Malogo Phase 3 Hydroelectric Power

ProjectVivant-Malogo Hydropower, Inc.

Compliant With:

-Posting of performance bond

-Work Program

Non-Compliant With:

- RESHERR

2.00

Victorias & CadizMalogo Phase 2 Hydroelectric Power

ProjectVivant-Malogo Hydropower, Inc.

Compliant With:

-Posting of performance bond

-Work Program

Non-Compliant With:

- RESHERR

5.00

VII Bohol Danao Cantakoy Hydroelectric Power Project Quadriver Energy Corporation

Compliant With:

-RESHERR

Non-Compliant With:

- Work Plan

- Posting of performance bond

8.00

Loboc Loboc Hydroelectric Power Plant Sta. Clara Power Corporation

Compliant With:

-Work Plan

Non-Compliant With:

-RESHERR

1.20

Sevilla Sevilla Hydroelectric Power Plant BOHECO 1 Sevilla Mini Hydro Corp. Non-Compliant With:

RESHERR2.50

Cebu AlegriaKawasan Waterfalls Hydroelectric Power

ProjectT.A.G Mineral Resources, Inc.

Compliant With:

-Work Program -

Posting of performance bond

Non-Compliant With:

RESHERR

0.50

Argao Argao Hydroelectric Power Project Universal Hydrotechnologies, Inc.

Non-Compliant With:

- Work Program

- Posting of performance bond

- RESHERR

0.80

Badian Basak II Hydroelectric Power Project Rapids Innoenergy, Inc.

Non-Compliant With:

- Work Plan

- Posting of performance bond

- RESHERR

0.50

Page 28: Awarded Hydropower Projects as of 31 March 2016

AWARDED HYDROELECTRICPOWER PROJECTS as of March 31, 2016

ISLAND /

GRID REGION PROVINCE

CITY /

MUNICIPALITYPROJECT NAME COMPANY NAME STATUS

POTENTIAL

CAPACITY

(MW)

INSTALLED

CAPACITY

(MW)

VISAYAS VIINegros

OrientalAmlan Amlan Hydroelectric Power Plant Amlan Hydroelectric Power Corporation

Compliant With:

-Work Plan

- Posting of performance bond

Non-Compliant With:

RESHERR

0.80

Amlan Amlan (Plant A) Hydroelectric Power

ProjectNatural Power Sources Intergration,Inc.

Non-Compliant With:

- Work Plan

- Posting of performance bond

- RESHERR

3.20

Amlan (Plant B) Hydroelectric Power

ProjectNatural Power Sources Intergration,Inc.

Non-Compliant With:

- Work Plan

- Posting of performance bond

- RESHERR

1.50

Amlan (Plant C) Hydroelectric Power

ProjectNatural Power Sources Intergration,Inc.

Non-Compliant With:

- Work Plan

- Posting of performance bond

- RESHERR

0.80

La LibertadPacuan -Guinobaan Hydroelectric Power

ProjectPNOC - Renewables Corp.

Compliant With:

-RESHERR

Non-Compliant With:

-Posting of performance bond

-Work Program

33.00

Siaton Canaway 1 Hydroelectric Power Project Orbysy Holdings, Inc.

Compliant With:

Work Program

- RESHERR

Non-Compliant With:

- Posting of performance bond

1.60

Canaway 2 Hydroelectric Power Project Orbysy Holdings, Inc.

Compliant With:

Work Program

Non-Compliant With:

- Posting of performance bond

- RESHERR

1.40

Siquijor Lazi Senona Hydroelectric Power Project AQA Global Power Inc.

Compliant With:

-Work Program -

Posting of performance bond

Non-Compliant With:

RESHERR

3.20

Page 29: Awarded Hydropower Projects as of 31 March 2016

AWARDED HYDROELECTRICPOWER PROJECTS as of March 31, 2016

ISLAND /

GRID REGION PROVINCE

CITY /

MUNICIPALITYPROJECT NAME COMPANY NAME STATUS

POTENTIAL

CAPACITY

(MW)

INSTALLED

CAPACITY

(MW)

VISAYAS VII Siquijor Lazi Gabangan Hydroelectric Power Project AQA Global Power Inc.

Compliant With:

-Work Program -

Posting of performance bond

Non-Compliant With:

RESHERR

4.14

VIII Eastern Samar LawaanPumped Storage Bolusao Hydroelectric

Power Project

San Lorenzo Ruiz Samar Energy and

Water, Inc.

Compliant With:

Work Program

Non-Compliant With:

- Posting of performance bond

- RESHERR

300.00

Run-of-River Bolusao Hydroelectric Power

Project

San Lorenzo Ruiz Samar Energy and

Water, Inc.

Compliant With:

Work Program

Non-Compliant With:

- Posting of performance bond

- RESHERR

12.00

Maslog Upper Maslog Iraya Energy Corporation

Compliant With:

-Work Program

Non-Compliant With:

- Posting of performance bond

-RESHERR

9.00

Leyte Inopacan Caminto River Hydroelectric Power Project Leyte IV Electric Cooperative, Inc.

Non-Compliant With:

- Work Program

- Posting of performance bond

- RESHERR

0.50

Jaro & PastranaBinaha-an River Hydroelectric Power

Project

Engineering & Development Corporation

of the Philippines

Compliant With:

-RESHERR

Non-Compliant With:

- Work Program

- Posting of performance bond

2.20

Kananga Bao Hydroelectric Power ProjectLeyte V Electric Cooperative, Inc (LEYECO

V)

Compliant With:

Posting of performance bond

Non-Compliant With:

- Work Program

- RESHERR

1.50

MatalomDumagocdoc River Hydroelectric Power

ProjectLeyte IV Electric Cooperative, Inc.

Non-Compliant With:

- Work Program

- Posting of performance bond

- RESHERR

0.60

Page 30: Awarded Hydropower Projects as of 31 March 2016

AWARDED HYDROELECTRICPOWER PROJECTS as of March 31, 2016

ISLAND /

GRID REGION PROVINCE

CITY /

MUNICIPALITYPROJECT NAME COMPANY NAME STATUS

POTENTIAL

CAPACITY

(MW)

INSTALLED

CAPACITY

(MW)

VISAYAS VIII Western

SamarCalbiga Calbiga Hydroelectric Power Project Meadowland Developers, Inc.

Non-Compliant With:

- Work Program

- Posting of performance bond

- RESHERR

15.00

VISAYAS Sum 730.98 4.50

MINDANAO IXZamboanga

del SurBayog Bayog Hydroelectric Power Project Global Sibagat Hydro Power Corp.

Compliant With:

-Posting of performance bond -

RESHERR

Non-Compliant With:

- Work Program

6.00

Dumingag &

MidsalipSindangan 4 Hydroelectric Power Project Alsons Energy Development Corporation

Non-Compliant With:

- Work Program

- Posting of performance bond

- RESHERR

8.00

Zamboanga CityPasonanca (Upstream) Hydroelectric

Power ProjectPhilCarbon Inc.

Non-Compliant With:

- Work Plan

- Posting of performance bond

- RESHERR

1.00

Pasonanca Hydroelectric Power Project PhilCarbon Inc.

Non-Compliant With:

- Work Plan

- Posting of performance bond

- RESHERR

0.05

Saaz Hydroelectric Power Project Meadowland Developers, Inc.

Non-Compliant With:

- Work Program

- Performance bond

- RESHERR

1.00

Zamboanga

del NorteLeon Postigo Polandoc Hydroelectric Power Project Euro Hydro Power (Asia) Holdings, Inc.

Compliant With:

Work Program

Non-Compliant With:

- Posting of performance bond

- RESHERR

2.00

MutiaDapitan River (Middle) Hydroelectric

Power ProjectEuro Hydro Power (Asia) Holdings, Inc.

Compliant With:

Posting of performance bond

Non-Compliant With:

- Work Program

- RESHERR

3.60

Page 31: Awarded Hydropower Projects as of 31 March 2016

AWARDED HYDROELECTRICPOWER PROJECTS as of March 31, 2016

ISLAND /

GRID REGION PROVINCE

CITY /

MUNICIPALITYPROJECT NAME COMPANY NAME STATUS

POTENTIAL

CAPACITY

(MW)

INSTALLED

CAPACITY

(MW)

MINDANAO IXZamboanga

del NorteMutia

Dapitan River (Upper) Hydroelectric Power

ProjectEuro Hydro Power (Asia) Holdings, Inc.

Compliant With:

Posting of performance bond

Non-Compliant With:

- Work Program

- RESHERR

3.60

Zamboanga

City Alimpaya Everhydro Corporation

Compliant With:

-Work Program -

Posting of performance bond

Non-Compliant With:

RESHERR

0.50

Patalon Hydroelectric Power Project Everhydro Corporation

Compliant With:

-Work Program -

Posting of performance bond

Non-Compliant With:

RESHERR

0.50

Tagpangi Hydroelectric Power Project Everhydro Corporation

Compliant With:

-Work Program -

Posting of performance bond

Non-Compliant With:

RESHERR

0.50

Ayala Hydroelectric Power Project Everhydro Corporation

Compliant With:

-Work Program -

Posting of performance bond

Non-Compliant With:

RESHERR

1.00

X Bukidnon Katipunan River Hydroelectric Power

Project

Repower Energy Development

Corporation

Compliant With:

- Work Program

- Posting of performance bond

Non-Compliant With:

RESHERR

2.10

Pulanai River Hydroelectric Power ProjectRepower Energy Development

Corporation

Compliant With:

- Work Program

- Posting of performance bond

Non-Compliant With:

RESHERR

10.60

Page 32: Awarded Hydropower Projects as of 31 March 2016

AWARDED HYDROELECTRICPOWER PROJECTS as of March 31, 2016

ISLAND /

GRID REGION PROVINCE

CITY /

MUNICIPALITYPROJECT NAME COMPANY NAME STATUS

POTENTIAL

CAPACITY

(MW)

INSTALLED

CAPACITY

(MW)

MINDANAO X Bukidnon Baungon Tumalaong Hydroelectric Power Project FGEN Tumalaong Hydro Corp.

Compliant With:

-Posting of performance bond

Non-Compliant With:

-Work Plan

-RESHERR

9.00

Baungon and

LibonaBubunawan Hydroelectric Power Project FGEN Bubunawan Hydro Corporation

Compliant With:

-Posting of performance bond

Non-Compliant With:

-Work Plan

-RESHERR

23.00

Baungon and

LibonanBubunawan Hydroelectric Power Plant Bubunawan Power Company, Inc.

Compliant With:

Work Plan

Non-Compliant With:

RESHERR

7.00

Dancagan Kitaotao 1 Hedcor Bukidnon, Inc.

Compliant With:

-Work Program -

Posting of performance bond

Non-Compliant With:

RESHERR

35.00

Impasugong Panoon Hydroelectric Power Plant Gerphil Renewable Energy, Inc.

Compliant With:

Work Plan

Non-Compliant With:

RESHERR

0.22

Gakaon Hydroelectric Power Project LGU of Impasugong

Non-Compliant With:

- Work Program

- Posting of performance bond

- RESHERR

2.23

Atugan 1 River Hydroelectric Power Project Gerphil Renewable Energy, Inc.

Compliant With:

-Work Program

Non-Compliant With:

- Posting of performance bond

-RESHERR

2.40

Atugan 4 Gerphil Renewable Energy, Inc.

Compliant With:

-Work Program

Non-Compliant With:

- Posting of performance bond

-RESHERR

3.50

Page 33: Awarded Hydropower Projects as of 31 March 2016

AWARDED HYDROELECTRICPOWER PROJECTS as of March 31, 2016

ISLAND /

GRID REGION PROVINCE

CITY /

MUNICIPALITYPROJECT NAME COMPANY NAME STATUS

POTENTIAL

CAPACITY

(MW)

INSTALLED

CAPACITY

(MW)

MINDANAO X BukidnonImpasugong and

SumilaoTagoloan Hydroelectric Power Project FGEN Tagoloan Hydro Corporation

Compliant With:

-Posting of performance bond

Non-Compliant With:

-Work Plan

-RESHERR

39.00

Kalilangan &

Wao

Maladugao River (Lower Cascade)

Hydroelectric Power Project

Bukidnon Maladugao Hydro Power

Corporation

Compliant With:

- Work Plan

- Posting of performance bond

Non-Compliant With:

RESHERR

10.00

Libona Umalag 1 Hydroelectric Power Project Meadowland Developers, Inc.

Compliant With:

Posting of performance bond

Non-Compliant With:

- Work Program

- RESHERR

1.80

Malaybalay Sawaga Hydroelectric Power Project Euro Hydro Power (Asia) Holdings, Inc.

Compliant With:

Work Program

Non-Compliant With:

- Posting of performance bond

- RESHERR

1.20

Repower Energy Development

Corporation

Compliant With:

- Work Program

- Posting of performance bond

Non-Compliant With:

RESHERR

2.00

Middle Canayan Hydroelectric Power

ProjectSta. Clara Power Corp.

Non-Compliant With:

- Work Program

- Posting of performance bond

- RESHERR

3.00

Malitbog Malitbog Hydroelectric Power Project Philnewriver Power Corp.

Compliant With:

Work Plan

Non-Compliant With:

-RESHERR

-Posting of PB

3.40

Page 34: Awarded Hydropower Projects as of 31 March 2016

AWARDED HYDROELECTRICPOWER PROJECTS as of March 31, 2016

ISLAND /

GRID REGION PROVINCE

CITY /

MUNICIPALITYPROJECT NAME COMPANY NAME STATUS

POTENTIAL

CAPACITY

(MW)

INSTALLED

CAPACITY

(MW)

MINDANAO X Bukidnon Malitbog Silo-o Hydroelectric Power Project Philnewriver Power Corp.

Compliant With:

Work Plan

Non-Compliant With:

- Posting of performance bond

- RESHERR

4.50

Manolo Culaman Hydroelectric Power ProjectOriental Energy and Power Generation

Corporation

Compliant With:

- RESHERR

Non-Compliant With:

-Work Plan

- Posting of performance bond

10.00

Manolo Fortich Agusan River Hydroelectric Power Plant FG Bukidnon Power Corp.

Compliant With:

-Work Plan

-RESHERR

1.60

Mangima Hydroelectric Power Project Philnewriver Power Corp.

Compliant With:

Work Plan

Non-Compliant With:

- Posting of performance bond

- RESHERR

10.00

Maramag Maramag Hydroelectric Power Project Maramag Mini-Hydro Corporation

Compliant With:

Work Program

Non-Compliant With:

- Posting of performance bond

- RESHERR

2.00

Pulangui IVRepower Energy Development

Corporation

Compliant With:

-Work Program -

Posting of performance bond

Non-Compliant With:

RESHERR

10.00

SantiagoManolo Fortich 1 Hydroelectric Power

ProjectHedcor Bukidnon, Inc.

Compliant With:

-Work Plan

- Posting of performance bond

Non-Compliant With:

- RESHERR

43.40

Manolo Fortich 2 Hydroelectric Power

ProjectHedcor Bukidnon, Inc.

Compliant With:

-Work Plan

- Posting of performance bond

Non-Compliant With:

- RESHERR

25.40

Page 35: Awarded Hydropower Projects as of 31 March 2016

AWARDED HYDROELECTRICPOWER PROJECTS as of March 31, 2016

ISLAND /

GRID REGION PROVINCE

CITY /

MUNICIPALITYPROJECT NAME COMPANY NAME STATUS

POTENTIAL

CAPACITY

(MW)

INSTALLED

CAPACITY

(MW)

MINDANAO X Bukidnon Valencia Manupali Hydroelectric Power Project Matic Hydropower Corporation

Compliant With:

Work Plan

Non-Compliant With:

-Posting of performance bond

- RESHERR

9.00

Upper Manupali Hydroelectric Power

Project Bukidnon II Electric Cooperative, Inc.

Compliant With:

- Work Program

- Posting of performance bond

Non-Compliant With:

RESHERR

2.00

WaoMaladugao River (Upper Cascade)

Hydroelectric Power Project

UHPC Bukidnon Hydro Power I

Corporation

Compliant With:

- Work Plan

- Posting of performance bond

Non-Compliant With:

RESHERR

5.50

Cagayan de

Oro Claveria Mat-i 1 Hydroelectric Power Project Philnew Hydro Power Corp

Non-Compliant With:

- Work Plan

- Posting of performance bond

- RESHERR

4.85

Misamis

OccidentalCalamba Langaran Hydroelectric Power Project Kaltimex Langaran Hydro Inc.

Compliant With:

Work Program

Non-Compliant With:

- Posting of performance bond

- RESHERR

3.64

Clarin Clarin Hydroelectric Power Project Philnew Hydro Power Corp

Non-Compliant With:

- Work Plan

- Posting of performance bond

- RESHERR

6.20

Misamis

Oriental

Cagayan de Oro

CityLimbatangon Hydroelectric Power Project Turbines Resource & Development Corp.

Non-Compliant With:

- Work Plan

- Posting of performance bond

- RESHERR

9.00

Mat-i 2 Hydroelectric Power Project Philnewriver Power Corp.

Compliant With:

Work Plan

Non-Compliant With:

- Posting of performance bond

- RESHERR

1.60

Page 36: Awarded Hydropower Projects as of 31 March 2016

AWARDED HYDROELECTRICPOWER PROJECTS as of March 31, 2016

ISLAND /

GRID REGION PROVINCE

CITY /

MUNICIPALITYPROJECT NAME COMPANY NAME STATUS

POTENTIAL

CAPACITY

(MW)

INSTALLED

CAPACITY

(MW)

MINDANAO XMisamis

Oriental

Cagayan de Oro

CityMat-i 3 Hydroelectric Power Project Philnewriver Power Corp.

Compliant With:

Work Plan

Non-Compliant With:

- Posting of performance bond

- RESHERR

3.25

Umalag 2 Hydroelectric Power Project Meadowland Developers, Inc.

Compliant With:

Posting of performance bond

Non-Compliant With:

- Work Program

- RESHERR

2.50

Claveria Cabulig Hydroelectric Power Plant Mindanao Energy Systems, Inc. Non-Compliant With:

RESHERR8.00

Jasaan Lower Cabulig Hydroelectric Power Project Mindanao Energy Systems, Inc.

Non-Compliant With:

- Work Program

- Posting of performance bond

- RESHERR

10.00

Odiongan,

Gingoog City

Odiongan River A Mini-Hydroelectric

Power ProjectJE Hydropower Ventures, Inc.

Non-Compliant With:

- Work Program

- Posting of performance bond

- RESHERR

0.25

Lanao del

NorteBacolod Liangan Liangan Power Corp. (blank) 11.90

Iligan City Bayug Hydroelectric Power Project Euro Hydro Power (Asia) Holdings, Inc.

Compliant With:

Work Program

Non-Compliant With:

- Posting of performance bond

- RESHERR

1.00

Lower Bayug Hydroelectric Power Project Euro Hydro Power (Asia) Holdings, Inc.

Compliant With:

Posting of performance bond

Non-Compliant With:

- Work Program

- RESHERR

4.00

Upper Bayug Hydroelectric Power Project Euro Hydro Power (Asia) Holdings, Inc.

Compliant With:

Posting of performance bond

Non-Compliant With:

- Work Program

- RESHERR

3.30

Page 37: Awarded Hydropower Projects as of 31 March 2016

AWARDED HYDROELECTRICPOWER PROJECTS as of March 31, 2016

ISLAND /

GRID REGION PROVINCE

CITY /

MUNICIPALITYPROJECT NAME COMPANY NAME STATUS

POTENTIAL

CAPACITY

(MW)

INSTALLED

CAPACITY

(MW)

MINDANAO XLanao del

NorteIligan City

Bulanog-Batang Hydroelectric Power

ProjectBukidnon Hydro Energy Corporation

Compliant With:

-Work Program -

Posting of performance bond

Non-Compliant With:

RESHERR

150.00

Agus VIII Modular Hydroelectric Power

ProjectFu-Tai Philippines, Inc.

Compliant With:

-Work Program -

Posting of performance bond -

RESHERR

12.00

Kolambogan Titunod Hydroelectric Power Project Euro Hydro Power (Asia) Holdings, Inc.

Compliant With:

Work Program

Non-Compliant With:

- Posting of performance bond

- RESHERR

1.00

X/ARMM

Lanao del

Norte/Lanao

del Sur

Pantar &

Baloi/SaguiaranAgus III Maranao Energy Corp.

Compliant With:

-Work Program -

Posting of performance bond

Non-Compliant With:

RESHERR

225.00

XI Davao del Sur Davao City Tamugan Hydroelectric Power Project HEDCOR, Inc.

Non-Compliant With:

- Work Program

- Posting of performance bond

- RESHERR

11.50

Digos City Ruparan Hydroelectric Power Project Davao de Sur Electric Cooperative, Inc.

Compliant With:

Work Program

Non-Compliant With:

- Posting of performance bond

- RESHERR

5.00

Malita Malita Hydroelectric Power Project LGU of Malita, Davao del Sur

Compliant With:

Work Program

Non-Compliant With:

-Posting of performance bond

- RESHERR

2.50

Sta. Cruz Tudaya 2 Hydroelectric Power Plant Hedcor Tudaya, Inc.

Compliant With:

Work Plan

Non-Compliant With:

RESHERR

7.00

Page 38: Awarded Hydropower Projects as of 31 March 2016

AWARDED HYDROELECTRICPOWER PROJECTS as of March 31, 2016

ISLAND /

GRID REGION PROVINCE

CITY /

MUNICIPALITYPROJECT NAME COMPANY NAME STATUS

POTENTIAL

CAPACITY

(MW)

INSTALLED

CAPACITY

(MW)

MINDANAO XI Davao del Sur Sta. Cruz Tudaya 1 Hydroelectric Power Plant Hedcor Sibulan, Inc .

Compliant With:

Work Plan

Non-Compliant With:

RESHERR

6.60

Compostela

ValleyMaco Upper Maco Hydroelectric Power Project Sta. Clara Power Corp.

Non-Compliant With:

- Work Program

- Posting of performance bond

- RESHERR

4.00

Mt. Leonard Hydroelectric Power Project Sta. Clara Power Corp.

Non-Compliant With:

- Work Program

- Posting of performance bond

- RESHERR

2.00

Tagum R Hydroelectric Power Project Sta. Clara Power Corp.

Non-Compliant With:

- Work Program

- Posting of performance bond

- RESHERR

4.00

Hijo R. I Hydroelectric Power Project Sta. Clara Power Corp.

Non-Compliant With:

- Work Program

- Posting of performance bond

- RESHERR

3.00

Hijo R. II Hydroelectric Power Project Sta. Clara Power Corp.

Non-Compliant With:

- Work Program

- Posting of performance bond

- RESHERR

3.00

New Bataan New Bataan Hydroelectric Power Project Euro Hydro Power (Asia) Holdings, Inc.

Compliant With:

Work Plan

Non-Compliant With:

- Posting of performance bond

- RESHERR

2.40

Davao

OrientalBaganga Baganga River Hydroelectric Power Project Global Sibagat Hydro Power Corp.

Compliant With:

-Posting of performance bond -

RESHERR

Non-Compliant With:

- Work Program

11.00

Page 39: Awarded Hydropower Projects as of 31 March 2016

AWARDED HYDROELECTRICPOWER PROJECTS as of March 31, 2016

ISLAND /

GRID REGION PROVINCE

CITY /

MUNICIPALITYPROJECT NAME COMPANY NAME STATUS

POTENTIAL

CAPACITY

(MW)

INSTALLED

CAPACITY

(MW)

MINDANAO XIDavao

OrientalBaganga Cateel River Hydroelectric Power Project Global Sibagat Hydro Power Corp.

Compliant With:

-Posting of performance bond -

RESHERR

Non-Compliant With:

- Work Program

16.00

Caraga Osmeña Hydroelectric Power Project LGS Renewable Energies Corporation

Non-Compliant With:

- Work Program

- Posting of performance bond

- RESHERR

2.00

Manorigao Hydroelectric Power Project LGS Renewable Energies Corporation

Non-Compliant With:

- Work Program

- Posting of performance bond

- RESHERR

17.00

Lupon Sumlog 2 Hydroelectric Power Project Alsons Energy Development Corporation

Non-Compliant With:

- Work Program

- Posting of performance bond

- RESHERR

15.00

Sumlog 1 Hydroelectric Power Project Alsons Energy Development Corporation

Non-Compliant With:

- Work Program

- Posting of performance bond

- RESHERR

8.00

Manay Casauman Hydroelectric Power Project Global Sibagat Hydro Power Corp.

Compliant With:

- RESHERRNon-Compliant With:

- Work Program

- Posting of performance bond

34.00

Davao del Sur Davao City Davao Hydroelectric Power ProjectSan Lorenzo Ruiz Olympia Energy and

Water, Inc.

Non-Compliant With:

- Work Program

- Posting of performance bond

- RESHERR

140.00

XIINorth

CotabatoAlamada Alamada Hydroelectric Power Project Euro Hydro Power (Asia) Holdings, Inc.

Compliant With:

Work Program

Non-Compliant With:

- Posting of performance bond

- RESHERR

1.00

Page 40: Awarded Hydropower Projects as of 31 March 2016

AWARDED HYDROELECTRICPOWER PROJECTS as of March 31, 2016

ISLAND /

GRID REGION PROVINCE

CITY /

MUNICIPALITYPROJECT NAME COMPANY NAME STATUS

POTENTIAL

CAPACITY

(MW)

INSTALLED

CAPACITY

(MW)

MINDANAO XIINorth

CotabatoMagpet Magpet 1 Hydroelectric Power Project Universal Hydrotechnologies, Inc.

Compliant With:

Work Program

Non-Compliant With:

- Posting of performance bond

- RESHERR

9.80

Magpet 2 Hydroelectric Power Project Universal Hydrotechnologies, Inc.

Compliant With:

Work Program

Non-Compliant With:

- Posting of performance bond

- RESHERR

1.30

Makilala Makilala-1 Hydroelectric Power Project Universal Hydrotechnologies, Inc.

Non-Compliant With:

- Work Program

- Posting of performance bond

- RESHERR

2.00

Sultan

KudaratIsulan Kabulnan 2 Hydroelectric Power Project Philnewriver Power Corp.

Compliant With:

Work Program

Non-Compliant With:

- Posting of performance bond

- RESHERR

110.00

Sarangani Maasim Siguil 1 Hydroelectric Power Project Alsons Energy Development Corporation

Compliant With:

Work Program

Non-Compliant With:

-Posting of performance bond

- RESHERR

8.70

Siguil 2 Hydroelectric Power Project Alsons Energy Development Corporation

Compliant With:

Work Program

Non-Compliant With:

-Posting of performance bond

- RESHERR

3.20

Siguil 3 Hydroelectric Power Project Alsons Energy Development Corporation

Compliant With:

Work Program

Non-Compliant With:

-Posting of performance bond

- RESHERR

4.80

Maitum Kalaong 3 Hydroelectric Power Project Alsons Energy Development Corporation

Non-Compliant With:

- Work Program

- Posting of performance bond

- RESHERR

4.00

Page 41: Awarded Hydropower Projects as of 31 March 2016

AWARDED HYDROELECTRICPOWER PROJECTS as of March 31, 2016

ISLAND /

GRID REGION PROVINCE

CITY /

MUNICIPALITYPROJECT NAME COMPANY NAME STATUS

POTENTIAL

CAPACITY

(MW)

INSTALLED

CAPACITY

(MW)

MINDANAO XII Saranggani Maitum Kalaong 1 Hydroelectric Power Project Alsons Energy Development Corporation

Compliant With:

- Work Program

- Posting of performance bond

Non-Compliant With:

RESHERR

12.00

Kalaong 2 Hydroelectric Power Project Alsons Energy Development Corporation

Compliant With:

- Work Program

- Posting of performance bond

Non-Compliant With:

RESHERR

6.00

South

Cotabato

Koronadal &

TampakanMarbel 1 Euro Hydro Power (Asia) Holdings, Inc.

Compliant With:

-Work Plan

Non-Compliant With:

- Posting of performance bond

-RESHERR

0.50

Lake SebuLanon (Lam-alu) Hydroelectric Power

ProjectEuro Hydro Power (Asia) Holdings, Inc.

Compliant With:

Work Plan

Non-Compliant With:

- Posting of performance bond

- RESHERR

9.00

Sebu, Takbo Hydroelectric Power Project South Cotabato I Electric Cooperative, Inc.

Non-Compliant With:

- Work Program

- Posting of performance bond

- RESHERR

15.00

XIIIAgusan del

NorteButuan Taguibo 1 Hydroelectric Power Project Equi-Parco Construction Co.

Compliant With:

Work Program

Non-Compliant With:

- Posting of performance bond

- RESHERR

2.00

Taguibo 2 Hydroelectric Power Project Equi-Parco Construction Co.

Compliant With:

Work Program

Non-Compliant With:

- Posting of performance bond

- RESHERR

2.00

Page 42: Awarded Hydropower Projects as of 31 March 2016

AWARDED HYDROELECTRICPOWER PROJECTS as of March 31, 2016

ISLAND /

GRID REGION PROVINCE

CITY /

MUNICIPALITYPROJECT NAME COMPANY NAME STATUS

POTENTIAL

CAPACITY

(MW)

INSTALLED

CAPACITY

(MW)

MINDANAO XIIIAgusan del

NorteButuan City Bugsukan Hydroelectric Power Project Global Sibagat Hydro Power Corp.

Compliant With:

-Posting of performance bond -

RESHERR

Non-Compliant With:

- Work Program

5.00

Cabadbaran Cabadbaran Hydroelectric Power Project FGEN Cabadbaran Hydro Corporation

Compliant With:

-Posting of performance bond

Non-Compliant With:

-Work Plan

-RESHERR

9.75

Jabonga Lake Mainit Hydroelectric Power Project Agusan Power Corporation

Compliant With:

- Work Plan

- RESHERRNon-Compliant With:

- Posting of performance bond

25.00

Jabonga Puyo Hydroelectric Power Project FGEN Puyo Hydro Corporation

Compliant With:

-Work Plan

-Posting of performance bond

Non-Compliant With:

-RESHERR

30.00

Santiago Asiga Hydroelectric Power Project Asiga Green Energy Corporation

Compliant With:

Work Plan

Non-Compliant With:

- Posting of performance bond

- RESHERR

8.00

Surigao del

SurCantilan

Lower Carac-an Hydroelectric Power

ProjectMeadowland Developers, Inc.

Non-Compliant With:

- Work Program

- Posting of performance bond

- RESHERR

5.00

Madrid Carac-an Hydroelectric Power Project Hydro Link Projects Corporation

Non-Compliant With:

- Work Program

- Posting of performance bond

- RESHERR

25.00

Agusan Del

SurSibagat Wawa 1 Hydroelectric Power Project Equi-Parco Construction Co.

Non-Compliant With:

- Work Program

- Posting of performance bond

- RESHERR

7.70

Page 43: Awarded Hydropower Projects as of 31 March 2016

AWARDED HYDROELECTRICPOWER PROJECTS as of March 31, 2016

ISLAND /

GRID REGION PROVINCE

CITY /

MUNICIPALITYPROJECT NAME COMPANY NAME STATUS

POTENTIAL

CAPACITY

(MW)

INSTALLED

CAPACITY

(MW)

MINDANAO XIIIAgusan Del

SurSibagat Wawa 2 Hydroelectric Power Project Equi-Parco Construction Co.

Non-Compliant With:

- Work Program

- Posting of performance bond

- RESHERR

7.00

Wawa 3 Hydroelectric Power Project Equi-Parco Construction Co.

Non-Compliant With:

- Work Program

- Posting of performance bond

- RESHERR

5.60

Managong Hydroelectric Power Project Global Sibagat Hydropower Corporation

Compliant With:

-Posting of performance bond

-RESHERR

-Work Program

6.00

Wawa Hydroelectric Power Project Global Sibagat Hydropower Corporation

Compliant With:

-Posting of performance bond

-RESHERR

Non-Compliant With:

- Work Program

13.00

ARMM Lanao del SurMalabang &

TubaranMaitling River Hydroelectric Power Project AQA Global Power Inc.

Non-Compliant With:

- Work Program

- Posting of performance bond

- RESHERR

50.00

Baras River Hydroelectric Power Project AQA Global Power Inc.

Non-Compliant With:

- Work Program

- Posting of performance bond

- RESHERR

30.00

Matadi River Hydroelectric Power Project AQA Global Power Inc.

Non-Compliant With:

- Work Program

- Posting of performance bond

- RESHERR

27.00

Lake Dapao Hydroelectric Power Project AQA Global Power Inc.

Non-Compliant With:

- Work Program

- Posting of performance bond

- RESHERR

50.00

MINDANAO Sum 1,522.52 30.92

Grand Total 7,053.15 141.49