2
AWARD-WINNING ROOF PROJECT FOR HOSPITAL IN BELFAST Icopal’s products have provided a truly multi- system solution to the waterproofing and insulation needs at Ulster Hospital’s new Inpatient Ward and Acute Services Block in Belfast. NEW GENERIC WARD AND FACILITIES BLOCK ULSTER HOSPITAL DUNDONALD, Co. DOWN, NORTHERN IRELAND CLIENT: SOUTH EASTERN HEALTH & SOCIAL CARE TRUST ARCHITECT: KENNEDY FITZGERALD ARCHITECTS LLP MAIN CONTRACTOR: GRAHAM-BAM HEALTHCARE PARTNERSHIP CONTRACTOR: TANDRAGEE ROOFING COMPANY COMPLETION: 2016 0161 865 4444 FAX: 0161 866 2616 E: [email protected] W: www.icopal.co.uk BARTON DOCK ROAD, STRETFORD, MANCHESTER, M32 0YL (47) Ln2 L5241: P342 CI/SfB August 2016 Uniclass 1 LIQUID APPLIED ROOF SYTEMS

AWARD-WINNING ROOF PROJECT FOR HOSPITAL IN .../media/IcopalUK/Download/case-studies/...Parabit Duo Hotmelt waterproofing before the areas were completed with hard landscaping. This

  • Upload
    others

  • View
    1

  • Download
    0

Embed Size (px)

Citation preview

Page 1: AWARD-WINNING ROOF PROJECT FOR HOSPITAL IN .../media/IcopalUK/Download/case-studies/...Parabit Duo Hotmelt waterproofing before the areas were completed with hard landscaping. This

AWARD-WINNING

ROOF PROJECT

FOR HOSPITAL IN

BELFAST

Icopal’s products have

provided a truly multi-

system solution to

the waterproofing and

insulation needs at Ulster

Hospital’s new Inpatient

Ward and Acute Services

Block in Belfast.

NEW GENERIC WARD AND FACILITIES BLOCK

ULSTER HOSPITAL

DUNDONALD, Co. DOWN, NORTHERN IRELAND

CLIENT: SOUTH EASTERN HEALTH & SOCIAL CARE TRUST

ARCHITECT: KENNEDY FITZGERALD ARCHITECTS LLP

MAIN CONTRACTOR: GRAHAM-BAM HEALTHCARE PARTNERSHIP

CONTRACTOR: TANDRAGEE ROOFING COMPANY

COMPLETION: 2016

0161 865 4444FAX: 0161 866 2616 E: [email protected] W: www.icopal.co.uk

BARTON DOCK ROAD, STRETFORD, MANCHESTER, M32 0YL

(47) Ln2

L5241: P342

CI/SfB August 2016

Uniclass

1

LIQ

UID

AP

PL

IED

RO

OF

SY

TE

MS

Page 2: AWARD-WINNING ROOF PROJECT FOR HOSPITAL IN .../media/IcopalUK/Download/case-studies/...Parabit Duo Hotmelt waterproofing before the areas were completed with hard landscaping. This

“We were very happy to work with

Icopal’s products on this project as

the ease of application and quality of

product helped us stay on schedule.”

David Laverty of,

Tandragee Roofing

0161 865 4444FAX: 0161 866 2616 E: [email protected] W: www.icopal.co.uk

BARTON DOCK ROAD, STRETFORD, MANCHESTER, M32 0YLICS

10

78

PARABIT DUO Hot Melt Waterproofing System is a hot applied tough and very flexible

monolithic waterproofing membrane system manufactured from a special blend of

bitumen, synthetic rubbers, polymers and other additives which, when combined

with a spun-bond polyester fabric and high performance elastomeric membrane, is

ideal for use in protected/inverted roofs, plaza decks and green roof installations.

Quick to apply and cure, it provides a continuous system without seams, the

waterproofing adheres tenaciously to the entire surface of the roof deck to eliminate

water migration and moisture build-up on the surface of the substrate.

When Ulster Hospital announced its

Phase B Redevelopment Programme,

main contractors GRAHAM-Bam

Healthcare Partnership (GBHP)

appointed Tandragee Roofing to

complete the waterproofing and

insulation of roofs and podium decks

using Icopal waterproofing products.

The Icopal’s products used resulted in

a truly multi-system solution to the

buildings’ waterproofing and insulation

needs.

The Ulster Hospital Phase B

Redevelopment will provide a new

Inpatient Ward Block and a new Acute

Services Block. GBHP sought roofing

systems proven to withstand the test

of time, supported by comprehensive

long-term guarantees. Due to the

building schedule, those systems also

needed to be installed quickly.

Tandragee Roofing carried out works

on two large podium decks and multiple

balcony and terrace areas. To ensure

the insulation met building regulations,

Icopal’s Thermazone Hydroshield IVR

insulation system, incorporating

Icopal Monarperm water reducing

membrane, was used on top of the

Parabit Duo Hotmelt waterproofing

before the areas were completed with

hard landscaping. This presented a

highly durable, thermally efficient, long

term solution for these areas, matching

highest technical performance with

pleasing aesthetics.

Speed of application was critical in

allowing works to commence internally

and the Icopal Parabit Duo Hotmelt

waterproofing membrane was key

to maximising installer productivity.

This is because the membrane can be

applied in low temperatures as well

as requiring less time to be installed,

keeping projects on schedule all year

round.

The extensive upper roof areas

were completed using an Anderson

reinforced bitumen waterproofing

system incorporating Thermaweld

capsheet for maximum security and

in-use performance. Offering ‘groove

MULTI-SYSTEM SOLUTION

technology’, the application process is

30% faster than traditional torch-on

membranes and results in a secure

bond and resistance to wind uplift.

David Laverty of Tandragee Roofing

commented on the project, saying, “We

knew we had a tight timeline, and the

podium decks were actually within the

core of the internal building structure

so there were also access issues we

had to work with. We had multiple

areas to waterproof and we were also

responsible for all the hard landscaping

works that followed. We were very

happy to work with Icopal’s products on

this project as the ease of application

and product quality helped us stay on

schedule.”

PRODUCT BENEFITS

LIQ

UID

AP

PL

IED

RO

OF

SY

TE

MS