14
Airport Airside Panel Madrid 21-22 May 2002 AVIATION OPERATIONAL MEASURES FOR FUEL AND EMISSIONS REDUCTION WORKSHOP AIRPORT INFRASTRUCTURE Arturo Benito Director Fleet Planning & Environment-IBERIA

AVIATION OPERATIONAL MEASURES FOR FUEL AND EMISSIONS REDUCTION WORKSHOP AIRPORT INFRASTRUCTURE

  • Upload
    abra

  • View
    41

  • Download
    2

Embed Size (px)

DESCRIPTION

AVIATION OPERATIONAL MEASURES FOR FUEL AND EMISSIONS REDUCTION WORKSHOP AIRPORT INFRASTRUCTURE Arturo Benito Director Fleet Planning & Environment-IBERIA. ISSUES. Minimum energy airside design ATC co-ordination Reduction of APU / GSE use APU replacement. - PowerPoint PPT Presentation

Citation preview

Page 1: AVIATION OPERATIONAL MEASURES FOR FUEL AND EMISSIONS REDUCTION WORKSHOP AIRPORT INFRASTRUCTURE

Airport Airside Panel Madrid 21-22 May 2002

AVIATION OPERATIONAL MEASURES FOR FUEL AND EMISSIONS REDUCTION

WORKSHOP

AIRPORT INFRASTRUCTURE

Arturo BenitoDirector Fleet Planning & Environment-IBERIA

Page 2: AVIATION OPERATIONAL MEASURES FOR FUEL AND EMISSIONS REDUCTION WORKSHOP AIRPORT INFRASTRUCTURE

Airport Airside Panel Madrid 21-22 May 2002

ISSUES

Minimum energy airside design

ATC co-ordination

Reduction of APU / GSE use

APU replacement

Page 3: AVIATION OPERATIONAL MEASURES FOR FUEL AND EMISSIONS REDUCTION WORKSHOP AIRPORT INFRASTRUCTURE

Airport Airside Panel Madrid 21-22 May 2002

MINIMUM ENERGY AIRSIDE DESIGN

TargetMinimise taxi time to save fuel

and emissions.

For Iberia:

1 minute of taxi per flight=

3,000 tons of fuel per year

Page 4: AVIATION OPERATIONAL MEASURES FOR FUEL AND EMISSIONS REDUCTION WORKSHOP AIRPORT INFRASTRUCTURE

Airport Airside Panel Madrid 21-22 May 2002

MINIMUM ENERGY AIRSIDE DESIGN

StrategyParking positions/terminals

close to taxiways

Minimise taxiways length

Avoid taxi braking when

possible

Page 5: AVIATION OPERATIONAL MEASURES FOR FUEL AND EMISSIONS REDUCTION WORKSHOP AIRPORT INFRASTRUCTURE

Airport Airside Panel Madrid 21-22 May 2002

ATC CO-ORDINATION Target

Minimise time between engine

starting and beginning of taxi

Close co-ordination between:

airport (ground movement)

ATC (arrival/departure planning)

Page 6: AVIATION OPERATIONAL MEASURES FOR FUEL AND EMISSIONS REDUCTION WORKSHOP AIRPORT INFRASTRUCTURE

Airport Airside Panel Madrid 21-22 May 2002

ATC CO-ORDINATION LEONARDO Project

It will integrate existing management tools at CDG and MAD airports under real operating conditions

The partners are Aeroport de Paris (France), SICTA (Italy), NLR (Holland), AENA, Iberia, Indra, Ineco, Isdefe (Spain)

Page 7: AVIATION OPERATIONAL MEASURES FOR FUEL AND EMISSIONS REDUCTION WORKSHOP AIRPORT INFRASTRUCTURE

Airport Airside Panel Madrid 21-22 May 2002

COMMERCIAL AIRCRAFT TURN-AROUND

Typical turnaround: 0.5-3.0 hours

Operations: deplane/unload

cleaning

refuelling

technical checks

Most of these tasks require energy supply by APU/GSE

repairs

catering

enplane/loading

pre-flight checks

Page 8: AVIATION OPERATIONAL MEASURES FOR FUEL AND EMISSIONS REDUCTION WORKSHOP AIRPORT INFRASTRUCTURE

Airport Airside Panel Madrid 21-22 May 2002

REPLACING APU/GSESystems

FunctionsElectricity

Air conditioning

Engine starting

Water supply truck

Replacements50/60-400 Hz

converters

Pre-conditioned air

Compressed air supplier

Water from general network

Page 9: AVIATION OPERATIONAL MEASURES FOR FUEL AND EMISSIONS REDUCTION WORKSHOP AIRPORT INFRASTRUCTURE

Airport Airside Panel Madrid 21-22 May 2002

REPLACING APU/GSESavings

HC CO NOx PM10CO2

(Tons)

150 seater (MR)

0.02 0.46 1.05 0.02 0.413

250 seater (LR)

0.05 0.24 4.55 0.07 1.547

Iberia 2001 operations

6,060 93,350 415,490 7,070 43,186

Typical APU emissions per turnaround (kg.)

Page 10: AVIATION OPERATIONAL MEASURES FOR FUEL AND EMISSIONS REDUCTION WORKSHOP AIRPORT INFRASTRUCTURE

Airport Airside Panel Madrid 21-22 May 2002

REPLACE STANDARD APU BY FUEL CELL

ProsEnergy efficiency improvement

by a factor of 2-3 times

Nearly elimination of pollutant emissions

Production of water for potential on-board use

Page 11: AVIATION OPERATIONAL MEASURES FOR FUEL AND EMISSIONS REDUCTION WORKSHOP AIRPORT INFRASTRUCTURE

Airport Airside Panel Madrid 21-22 May 2002

REPLACE STANDARD APU BY FUEL CELL

ConsHigher weight (compensated by

water generation)

Higher price (probably will become less than APU’s in the future)

Jet fuel sulphur content is challenging

Slower start

Page 12: AVIATION OPERATIONAL MEASURES FOR FUEL AND EMISSIONS REDUCTION WORKSHOP AIRPORT INFRASTRUCTURE

Airport Airside Panel Madrid 21-22 May 2002

FUEL CELL ARCHITECTURE

Fuel Cell StacksDCAC

Integrated Fuel Processor

ExhaustCabin

Air

SystemController

Comp.

Battery

Turb.Jet

FuelWater

Separator

Water

Page 13: AVIATION OPERATIONAL MEASURES FOR FUEL AND EMISSIONS REDUCTION WORKSHOP AIRPORT INFRASTRUCTURE

Airport Airside Panel Madrid 21-22 May 2002

FUEL CELL TIMINGAutomotive manufacturers doing

active researchBoeing: a light aircraft demonstrator

powered by fuel cells (2003-2005)NASA/Boeing program: fuel cell APU

demonstrator (2006-2008)Power density may increase in next

10-15 years to enable APU production

Page 14: AVIATION OPERATIONAL MEASURES FOR FUEL AND EMISSIONS REDUCTION WORKSHOP AIRPORT INFRASTRUCTURE

Airport Airside Panel Madrid 21-22 May 2002

AVIATION OPERATIONAL MEASURES FOR FUEL AND EMISSIONS REDUCTION

WORKSHOP

Thank you !