  • AVEVA’s Construction Management Solution Jen Rizzo July 22, 2013 Business Development Manager

  • Copyright © 2013 AVEVA Solutions Limited and its subsidiaries. All rights reserved.

    What’s the problem ?

  • Copyright © 2013 AVEVA Solutions Limited and its subsidiaries. All rights reserved.

    Efficiency – Reach a defined goal with minimum resource allocation /

    consumption

    What’s the problem ?

    Source: Enhanced Work Packaging: Design through Workface Execution (Construction Industry Institute), July 2011

    33%

    44% 23%

    Craftsman’s Work Day

    Tool Time

    Idle

    Travelling/gatheringmaterial

  • Copyright © 2013 AVEVA Solutions Limited and its subsidiaries. All rights reserved.

    If you want to know where to go you need to know where you are

    Predictability – Where are we? How are we doing? Will we make it?

    What’s the problem ?

  • Copyright © 2013 AVEVA Solutions Limited and its subsidiaries. All rights reserved.

    Properly Implemented Work Packaging and Workface Planning

    Early Project Planning that integrates Work Packaging with – Engineering – Procurement – Construction – Project Controls

    How can that challenge be solved?

    Source: Enhanced Work Packaging: Design through Workface Execution (Construction Industry Institute), July 2011

  • Copyright © 2013 AVEVA Solutions Limited and its subsidiaries. All rights reserved.

    How can that challenge be solved?

    the work and work the plan

  • Copyright © 2013 AVEVA Solutions Limited and its subsidiaries. All rights reserved.

    How it can be solved

    Source: COAA & CII

  • Copyright © 2013 AVEVA Solutions Limited and its subsidiaries. All rights reserved.

    How does AVEVA address this? Vertical Planning

    – Rough Cut Planning on the top • Create and schedule Construction Work Packages

    – Workface Planning below Rough Cut Planning • Create Installation Work Packages • IWPs shall stay in within he constraints defined during rough cut

    planning (time & budget)

    – Execution Layer on the bottom • Provide a task list to the Forman • Check constraints • Execute work • Gather actual data and let the system roll-up

  • Copyright © 2013 AVEVA Solutions Limited and its subsidiaries. All rights reserved.

    How does AVEVA address this? 4D / 5D Planning

    – Link the schedule with the 3D model – Simulate construction sequence to verify correct planning – Integrate with materials management

    • Materials are purchased and delivered to support construction

    – Communication of tasks is improved at the workface • “a picture is worth a thousand words”

    – Predictability gets increased Visualisation

    – Visualise material availability – Visualise status by colour-coding objects in 3D model

  • Copyright © 2013 AVEVA Solutions Limited and its subsidiaries. All rights reserved.

    Vertical Planning

    Project Planning

    Workface Planning

    Execution & Control

    Rough Cut

    Planning

    Detail Planning

    Release

    Execution

    Feedback

    Roll-up

    Reconcile

  • Copyright © 2013 AVEVA Solutions Limited and its subsidiaries. All rights reserved.

    Vertical Planning: Loop in the Loop

    Rough Cut

    Planning

    Detail Planning

    Release

    Execution

    Feedback

    Roll-up

    Reconcile

    Reconcile

    Construction Work Package

    IWP

    IWP IWP

    IWP

  • Copyright © 2013 AVEVA Solutions Limited and its subsidiaries. All rights reserved.

    Application AVI

  • Copyright © 2013 AVEVA Solutions Limited and its subsidiaries. All rights reserved.

    Work Package Building (Kitting)

    Show a 3D Model in Planning Assign objects from model to work package

    Step1: Select item in the model or from a list

    Step2: Assign to Work Pack

  • Copyright © 2013 AVEVA Solutions Limited and its subsidiaries. All rights reserved.

    Timeline Simulation

    Assign objects from a 3D Model to Work Packages – Can be done on all levels (CWPs, IWPs and jobs)

    Timeline Simulation – Run through the schedule and simulate construction – Verify correct construction sequence – Change sequence of work packages in schedule if required

  • Copyright © 2013 AVEVA Solutions Limited and its subsidiaries. All rights reserved.

    Run a Timeline Simulation

    Simulate construction sequence over time

    Timeline running through he schedule

    Adjust speed to daily, weekly monthly

  • Copyright © 2013 AVEVA Solutions Limited and its subsidiaries. All rights reserved.

    Visualisation

  • Copyright © 2013 AVEVA Solutions Limited and its subsidiaries. All rights reserved.

    Visualisation Resource Load

    – Man power, machinery Material status

    – To support the execution of work on-site – Visualise material availability, i.e. give a warning if material

    won’t be available on time

    Project Status – Colour code objects in a 3D Model depending on their

    status – Status of object gets derived from underlying work

    package status

    Project Performance

  • Copyright © 2013 AVEVA Solutions Limited and its subsidiaries. All rights reserved.

    Resource Load

  • Copyright © 2013 AVEVA Solutions Limited and its subsidiaries. All rights reserved.

    Material Status

    Red dot indicates shortage of material

    Detailed list of material for a work package

    Precise list of missing items

  • Copyright © 2013 AVEVA Solutions Limited and its subsidiaries. All rights reserved.

    Project Status

  • Copyright © 2013 AVEVA Solutions Limited and its subsidiaries. All rights reserved.

    Project Performance

  • Copyright © 2013 AVEVA Solutions Limited and its subsidiaries. All rights reserved.

    Summarised we’ve come pretty close to this:

    Someone tells me how to put

    it together…

    …and where it has to be

    installed …

    AND I CAN RELY ON

    THIS! … and I have

    everything I need to do it

  • Copyright © 2013 AVEVA Solutions Limited and its subsidiaries. All rights reserved.

    What do we get?

    Communication of tasks is improved at the Workface Predictability gets increased Constraints such as craft availability, material,

    scaffolding and drawings are better managed Engineering is able to support the construction

    sequence and schedule Vendor-supplied equipment remains on schedule Materials are purchased and delivered to support

    construction

    AVEVA’s Construction Management Solution��Jen Rizzo�July 22, 2013�Business Development ManagerWhat’s the problem ?What’s the problem ?What’s the problem ?How can that challenge be solved?How can that challenge be solved?How it can be solvedHow does AVEVA address this?How does AVEVA address this?Vertical PlanningVertical Planning: Loop in the LoopApplication AVIWork Package Building (Kitting)Timeline SimulationRun a Timeline SimulationVisualisationVisualisationResource LoadMaterial StatusProject StatusProject PerformanceSummarised we’ve come pretty close to this:What do we get?