AVANCE PROGRAMADO PARTIDA DESCRIPCION UND METRADO PRESUPUESTO BASE PROGRAMACIÓN JULIO AGOSTO SETIEMBRE OCTUBRE NOVIEMBRE PU (S/.) PARCIAL (S/. METRADO PARCIAL METRADO PARCIAL METRADO PARCIAL METRADO PARCIAL METRADO PARCIAL 01.00.00 OBRAS PRELIMINARES 42,261.36 0 0.00 0.00 0.00 01.01.00 CARTEL DE IDENTIFICACION DE LA OBRA DE 2.40X4.80M UND 1.00 1,047.33 1,047.33 1.00 1,047.33 01.02.00 CAMPAMENTO PROVISIONAL DE OBRA M2 50.00 45.96 2,298.00 50.00 2,298.00 01.03.00 MOVILIZACION Y DESMOVILIZACION DE EQUIPO Y MAQUINARIA GLB 1.00 25,731.97 25,731.97 1.00 25,731.97 01.04.00 TRAZO NIVELACIÓN Y REPLANTEO KM 32.47 269.97 8,765.93 32.47 8,765.93 01.05.00 TRAZO Y REPLANTEO DE OBRAS DE ARTE M2 398.03 11.10 4,418.13 398.03 4,418.13 02.00.00 EXPLANACIONES 44,738.57 186531.4962 111,701.28 0.00 0.00 02.01.00 DESBROCE Y LIMPIEZA HA 9.74 82.48 803.36 9.74 803.36 02.02.00 CORTE DE MATERIAL SUELTO CON MAQUINARIA M3 23,830.50 2.91 69,346.76 7,687.26 22,369.92 16,143.24 46976.83403 02.03.00 CORTE ROCA SUELTA (PERF. Y DISP.) CON MAQUINARIA M3 22,784.25 6.31 143,768.62 3,417.64 21,565.29 19,366.61 122203.3249 02.04.00 CORTE ROCA FIJA (PERF. Y DISP.) CON MAQUINARIA M3 1,320.90 16.48 21,768.43 621.6 10243.968 699.30 11,524.46 02.05.00 CONFORMACION DE TERRAPLENES CON MATERIAL PROPIO M3 4,998.15 4.74 23,691.23 1499.445 7107.3693 3,498.71 16,583.86 02.06.00 CONFORMACION DE TERRAPLENES CON MATERIAL DE PRESTAMO M3 13,592.35 6.15 83,592.95 13,592.35 83,592.95 03.00.00 PAVIMENTOS 0.00 0 268,071.99 610,772.31 0.00 03.01.00 PERFILADO Y COMPACTADO DE SUB-RASANTE M2 136,189.37 1.30 177,046.18 62,856.63 81,713.62 73,332.74 95,332.56 03.02.00 AFIRMADO 03.02.01 EXTRACCION Y ACUMULACIÓN DE MATERIAL DE CANTERA M3 31,663.87 2.16 68,393.96 15,198.66 32,829.10 16,465.21 35,564.86 03.02.02 CLASIFICACIÓN DE MAT. DE CANTERA POR ZARANDEO M3 37,996.65 1.90 72,193.64 12,158.93 23,101.96 25,837.72 49,091.67 03.02.03 CARGUIO DE MATERIAL DE CANTERA M3 37,996.65 2.27 86,252.40 18,998.33 43,126.20 18,998.33 43,126.20 03.02.04 TRANSPORTE DE MATERIAL DE CANTERA M3 37,996.65 7.44 282,695.08 7,599.33 56,539.02 30,397.32 226,156.06 03.02.05 EXTENDIDO Y COMPACTADO DE MATERIAL DE CANATERA PARA AFIRMADO M3 37,996.65 5.06 192,263.05 6,079.46 30,762.09 31,917.19 161,500.96 04.00.00 OBRAS DE ARTE Y DRENAJE 8,661.98 111855.4424 74,873.81 61,701.43 2,604.46 04.01.00 ALCANTARILLAS 04.01.01 EXCAVACION NO CLASIFICADA PARA ESTRUCTURAS M3 551.25 23.57 12,992.96 367.50 8,661.98 183.75 4330.9875 04.01.02 RELLENO CON MATERIAL PROPIO M3 352.18 13.62 4,796.69 352.18 4796.6916 04.01.03 ELIMINACION DE MATERIAL EXCEDENTE M3 199.53 8.54 1,703.99 199.53 1,703.99 04.01.04 CONCRETO FC=175 KG/CM2 M3 162.78 341.65 55,613.79 162.78 55,613.79 04.01.05 EMBOQUILLADO EN SALIDA DE ALCANTARILLA M2 93.56 79.05 7,395.92 93.56 7,395.92 04.01.06 ENCOFRADO Y DESENCOFRADO PARA ESTRUCTURAS M2 561.28 24.80 13,919.74 561.28 13919.744 04.01.07 PINTURA EN PARAPETOS M2 69.75 19.43 1,355.24 69.75 1,355.24 04.01.08 ALCANTARILLA TMC Ø=36" M 153.09 407.69 62,413.26 153.09 62413.2621 04.01.09 ALCANTARILLA TMC Ø=24" M 102.06 258.62 26,394.76 102.06 26394.7572 04.02.00 BADENES 04.02.01 EXCAVACION NO CLASIFICADA PARA ESTRUCTURAS M3 62.13 23.57 1,464.40 62.13 1,464.40 04.02.02 ELIMINACION DE MATERIAL EXCEDENTE M3 77.66 8.54 663.22 77.66 663.22 04.02.03 CONCRETO FC=175 KG/CM2 M3 62.13 341.65 21,226.71 62.13 21,226.71 04.02.04 MAMPOSTERIA DE PIEDRA M3 5.67 192.23 1,089.94 4.25 817.46 1.42 272.49 04.02.05 EMBOQUILLADO DE PIEDRA M2 29.50 79.05 2,331.98 29.50 2,331.98 04.02.06 ENCOFRADO Y DESENCOFRADO PARA ESTRUCTURAS M2 93.15 24.80 2,310.12 93.15 2,310.12 04.03.00 CUNETAS 04.03.01 CONSTRUCCION DE CUNETAS EN MATERIAL NO CLASIFICADO M 34,940.00 1.26 44,024.40 6,988.00 8,804.88 27,952.00 35,219.52 05.00.00 SEÑALIZACION 0.00 0 0.00 0.00 7,377.03 05.01.00 SEÑALES INFORMATIVAS UND 3.00 263.01 789.03 3.00 789.03 05.02.00 POSTES KILOMETRICOS UND 33.00 182.15 6,010.95 33.00 6,010.95 05.03.00 SEÑALES PREVENTIVAS UND 3.00 192.35 577.05 3.00 577.05 UNIVERSIDAD NACIONAL DE CAJAMARCA FACULTAD DE INGENIERÍA ESCUELA ACADÉMICA PROFESIONAL DE INGENIERÍA CIVIL PROYECTO: REHABILITACIÓN PUERTO MALLETA - SAN JUAN DE CUTERVO - SANTA CRUZ DE LA SUCCHA

Avance Financiero

Embed Size (px)

DESCRIPTION

para costos y presupuestos

Citation preview

Page 1: Avance Financiero

AVANCE PROGRAMADO

PARTIDA DESCRIPCION UND METRADOPRESUPUESTO BASE

PROGRAMACIÓNJULIO AGOSTO SETIEMBRE OCTUBRE NOVIEMBRE

PU (S/.) PARCIAL (S/.) METRADO PARCIAL METRADO PARCIAL METRADO PARCIAL METRADO PARCIAL METRADO PARCIAL01.00.00 OBRAS PRELIMINARES 42,261.36 0 0.00 0.00 0.0001.01.00 CARTEL DE IDENTIFICACION DE LA OBRA DE 2.40X4.80M UND 1.00 1,047.33 1,047.33 1.00 1,047.33

01.02.00 CAMPAMENTO PROVISIONAL DE OBRA M2 50.00 45.96 2,298.00 50.00 2,298.00

01.03.00 MOVILIZACION Y DESMOVILIZACION DE EQUIPO Y MAQUINARIA GLB 1.00 25,731.97 25,731.97 1.00 25,731.97

01.04.00 TRAZO NIVELACIÓN Y REPLANTEO KM 32.47 269.97 8,765.93 32.47 8,765.93

01.05.00 TRAZO Y REPLANTEO DE OBRAS DE ARTE M2 398.03 11.10 4,418.13 398.03 4,418.13

02.00.00 EXPLANACIONES 44,738.57 186531.4962073 111,701.28 0.00 0.00

02.01.00 DESBROCE Y LIMPIEZA HA 9.74 82.48 803.36 9.74 803.36

02.02.00 CORTE DE MATERIAL SUELTO CON MAQUINARIA M3 23,830.50 2.91 69,346.76 7,687.26 22,369.92 16,143.24 46976.8340322602.03.00 CORTE ROCA SUELTA (PERF. Y DISP.) CON MAQUINARIA M3 22,784.25 6.31 143,768.62 3,417.64 21,565.29 19,366.61 122203.32487502.04.00 CORTE ROCA FIJA (PERF. Y DISP.) CON MAQUINARIA M3 1,320.90 16.48 21,768.43 621.6 10243.968 699.30 11,524.46

02.05.00 CONFORMACION DE TERRAPLENES CON MATERIAL PROPIO M3 4,998.15 4.74 23,691.23 1499.445 7107.3693 3,498.71 16,583.86

02.06.00 CONFORMACION DE TERRAPLENES CON MATERIAL DE PRESTAMO M3 13,592.35 6.15 83,592.95 13,592.35 83,592.95

03.00.00 PAVIMENTOS 0.00 0 268,071.99 610,772.31 0.00

03.01.00 PERFILADO Y COMPACTADO DE SUB-RASANTE M2 136,189.37 1.30 177,046.18 62,856.63 81,713.62 73,332.74 95,332.56

03.02.00 AFIRMADO

03.02.01 EXTRACCION Y ACUMULACIÓN DE MATERIAL DE CANTERA M3 31,663.87 2.16 68,393.96 15,198.66 32,829.10 16,465.21 35,564.86

03.02.02 CLASIFICACIÓN DE MAT. DE CANTERA POR ZARANDEO M3 37,996.65 1.90 72,193.64 12,158.93 23,101.96 25,837.72 49,091.67

03.02.03 CARGUIO DE MATERIAL DE CANTERA M3 37,996.65 2.27 86,252.40 18,998.33 43,126.20 18,998.33 43,126.20

03.02.04 TRANSPORTE DE MATERIAL DE CANTERA M3 37,996.65 7.44 282,695.08 7,599.33 56,539.02 30,397.32 226,156.06

03.02.05 EXTENDIDO Y COMPACTADO DE MATERIAL DE CANATERA PARA AFIRMADO M3 37,996.65 5.06 192,263.05 6,079.46 30,762.09 31,917.19 161,500.96

04.00.00 OBRAS DE ARTE Y DRENAJE 8,661.98 111855.4424 74,873.81 61,701.43 2,604.46

04.01.00 ALCANTARILLAS

04.01.01 EXCAVACION NO CLASIFICADA PARA ESTRUCTURAS M3 551.25 23.57 12,992.96 367.50 8,661.98 183.75 4330.987504.01.02 RELLENO CON MATERIAL PROPIO M3 352.18 13.62 4,796.69 352.18 4796.691604.01.03 ELIMINACION DE MATERIAL EXCEDENTE M3 199.53 8.54 1,703.99 199.53 1,703.99

04.01.04 CONCRETO FC=175 KG/CM2 M3 162.78 341.65 55,613.79 162.78 55,613.79

04.01.05 EMBOQUILLADO EN SALIDA DE ALCANTARILLA M2 93.56 79.05 7,395.92 93.56 7,395.92

04.01.06 ENCOFRADO Y DESENCOFRADO PARA ESTRUCTURAS M2 561.28 24.80 13,919.74 561.28 13919.74404.01.07 PINTURA EN PARAPETOS M2 69.75 19.43 1,355.24 69.75 1,355.24

04.01.08 ALCANTARILLA TMC Ø=36" M 153.09 407.69 62,413.26 153.09 62413.262104.01.09 ALCANTARILLA TMC Ø=24" M 102.06 258.62 26,394.76 102.06 26394.757204.02.00 BADENES

04.02.01 EXCAVACION NO CLASIFICADA PARA ESTRUCTURAS M3 62.13 23.57 1,464.40 62.13 1,464.40

04.02.02 ELIMINACION DE MATERIAL EXCEDENTE M3 77.66 8.54 663.22 77.66 663.22

04.02.03 CONCRETO FC=175 KG/CM2 M3 62.13 341.65 21,226.71 62.13 21,226.71

04.02.04 MAMPOSTERIA DE PIEDRA M3 5.67 192.23 1,089.94 4.25 817.46 1.42 272.49

04.02.05 EMBOQUILLADO DE PIEDRA M2 29.50 79.05 2,331.98 29.50 2,331.98

04.02.06 ENCOFRADO Y DESENCOFRADO PARA ESTRUCTURAS M2 93.15 24.80 2,310.12 93.15 2,310.12

04.03.00 CUNETAS

04.03.01 CONSTRUCCION DE CUNETAS EN MATERIAL NO CLASIFICADO M 34,940.00 1.26 44,024.40 6,988.00 8,804.88 27,952.00 35,219.52

05.00.00 SEÑALIZACION 0.00 0 0.00 0.00 7,377.03

05.01.00 SEÑALES INFORMATIVAS UND 3.00 263.01 789.03 3.00 789.03

05.02.00 POSTES KILOMETRICOS UND 33.00 182.15 6,010.95 33.00 6,010.95

05.03.00 SEÑALES PREVENTIVAS UND 3.00 192.35 577.05 3.00 577.05

06.00.00 IMPACTO AMBIENTAL 0.00 0 0.00 0.00 8,006.56

06.01.00 RESTAURACION DE CANTERAS M2 1,600.00 0.56 896.00 1,600.00 896.00

06.02.00 RESTAURACION DEL PATIO DE MAQUINAS Y CAMPAMENTO M2 870.00 0.48 417.60 870.00 417.60

06.03.00 ACONDICIONAMIENTO DE DEPOSITO DE MATERIALES EXCEDENTES M2 350.00 1.74 609.00 350.00 609.00

06.04.00 REVEGETACION HA 1.50 4,055.97 6,083.96 1.50 6,083.96

UNIVERSIDAD NACIONAL DE CAJAMARCA FACULTAD DE INGENIERÍAESCUELA ACADÉMICA PROFESIONAL DE INGENIERÍA CIVILPROYECTO: REHABILITACIÓN PUERTO MALLETA - SAN JUAN DE CUTERVO - SANTA CRUZ DE LA SUCCHA

Page 2: Avance Financiero

AVANCE PROGRAMADO

PARTIDA DESCRIPCION UND METRADOPRESUPUESTO BASE

PROGRAMACIÓNJULIO AGOSTO SETIEMBRE OCTUBRE NOVIEMBRE

PU (S/.) PARCIAL (S/.) METRADO PARCIAL METRADO PARCIAL METRADO PARCIAL METRADO PARCIAL METRADO PARCIAL

UNIVERSIDAD NACIONAL DE CAJAMARCA FACULTAD DE INGENIERÍAESCUELA ACADÉMICA PROFESIONAL DE INGENIERÍA CIVILPROYECTO: REHABILITACIÓN PUERTO MALLETA - SAN JUAN DE CUTERVO - SANTA CRUZ DE LA SUCCHA

07 FLETE TERRESTRE 0.00 0 0.00 0.00 8,800.00

07.01 FLETE TERRESTRE GLB 1.00 8,800.00 8,800.00 1.00 8,800.00

COSTO DIRECTO 1,547,957.71 95,661.90 298,386.94 454,647.08 672,473.74 26,788.05GASTOS GENERALES FIJOS (1.5 %) 23,219.37 1,434.93 4,475.80 6,819.71 10,087.11 401.82GASTOS GENERALES VARIABLES (10.5 %) 162,535.56 10,044.50 31,330.63 47,737.94 70,609.74 2,812.74UTILIDAD ( 7 %) 108,357.04 6,696.33 20,887.09 31,825.30 47,073.16 1,875.16SUB TOTAL 1,842,069.67 113,837.66 355,080.46 541,030.02 800,243.75 31,877.77IGV (19 %) 349,993.24 21,629.16 67,465.29 102,795.70 152,046.31 6,056.78PRESUPUESTO REFERENCIAL 2,192,062.91 135,466.82 422,545.74 643,825.73 952,290.07 37,934.55

Page 3: Avance Financiero

VALORIZACION CONTRACTUAL Nº01Del 01 de Julio al 31 Julio

PARTIDA DESCRIPCION UND METRADOPRESUPUESTO BASE

AVANCESALDOS

ANTERIOR ACTUAL ACUMULADOPU (S/.) PARCIAL (S/.) METRADO PARCIAL METRADO PARCIAL METRADO PARCIAL % METRADO PARCIAL %

01.00.00 OBRAS PRELIMINARES 29,395.37 29,395.37 12,865.9901.01.00 CARTEL DE IDENTIFICACION DE LA OBRA DE 2.40X4.80M UND 1.00 1,047.33 1,047.33 1.00 1,047.33 1.00 1,047.33 100.00%01.02.00 CAMPAMENTO PROVISIONAL DE OBRA M2 50.00 45.96 2,298.00 50.00 2,298.00 50.00 2,298.00 100.00%01.03.00 MOVILIZACION Y DESMOVILIZACION DE EQUIPO Y MAQUINARIA GLB 1.00 25,731.97 25,731.97 0.50 12,865.99 0.50 12,865.99 50.00% 0.50 12,865.99 50.00%01.04.00 TRAZO NIVELACIÓN Y REPLANTEO KM 32.47 269.97 8,765.93 32.47 8,765.93 32.47 8,765.93 100.00%01.05.00 TRAZO Y REPLANTEO DE OBRAS DE ARTE M2 398.03 11.10 4,418.13 398.03 4,418.13 398.03 4,418.13 100.00%02.00.00 EXPLANACIONES 47,829.97 47,829.97 166,088.7602.01.00 DESBROCE Y LIMPIEZA HA 9.74 82.48 803.36 8.14 671.39 8.14 671.39 83.57% 1.60 131.97 16.43%02.02.00 CORTE DE MATERIAL SUELTO CON MAQUINARIA M3 23,830.50 2.91 69,346.76 7,087.14 20,623.58 7,087.14 20,623.58 29.74% 16,743.36 48,723.18 70.26%02.03.00 CORTE ROCA SUELTA (PERF. Y DISP.) CON MAQUINARIA M3 22,784.25 6.31 143,768.62 4,205.23 26,535.00 4,205.23 26,535.00 18.46% 18,579.02 117,233.62 81.54%02.04.00 CORTE ROCA FIJA (PERF. Y DISP.) CON MAQUINARIA M3 1,320.90 16.48 21,768.43

02.05.00 CONFORMACION DE TERRAPLENES CON MATERIAL PROPIO M3 4,998.15 4.74 23,691.23

02.06.00 CONFORMACION DE TERRAPLENES CON MATERIAL DE PRESTAMO M3 13,592.35 6.15 83,592.95

03.00.00 PAVIMENTOS 0.00 0.00 0.00

03.01.00 PERFILADO Y COMPACTADO DE SUB-RASANTE M2 136,189.37 1.30 177,046.18

03.02.00 AFIRMADO

03.02.01 EXTRACCION Y ACUMULACIÓN DE MATERIAL DE CANTERA M3 31,663.87 2.16 68,393.96

03.02.02 CLASIFICACIÓN DE MAT. DE CANTERA POR ZARANDEO M3 37,996.65 1.90 72,193.64

03.02.03 CARGUIO DE MATERIAL DE CANTERA M3 37,996.65 2.27 86,252.40

03.02.04 TRANSPORTE DE MATERIAL DE CANTERA M3 37,996.65 7.44 282,695.08

03.02.05 EXTENDIDO Y COMPACTADO DE MATERIAL DE CANATERA PARA AFIRMADO M3 37,996.65 5.06 192,263.05

04.00.00 OBRAS DE ARTE Y DRENAJE 9,444.73 9,444.73 3,548.23

04.01.00 ALCANTARILLAS

04.01.01 EXCAVACION NO CLASIFICADA PARA ESTRUCTURAS M3 551.25 23.57 12,992.96 400.71 9,444.73 400.71 9,444.73 72.69% 150.54 3,548.23 27.31%04.01.02 RELLENO CON MATERIAL PROPIO M3 352.18 13.62 4,796.69

04.01.03 ELIMINACION DE MATERIAL EXCEDENTE M3 199.53 8.54 1,703.99

04.01.04 CONCRETO FC=175 KG/CM2 M3 162.78 341.65 55,613.79

04.01.05 EMBOQUILLADO EN SALIDA DE ALCANTARILLA M2 93.56 79.05 7,395.92

04.01.06 ENCOFRADO Y DESENCOFRADO PARA ESTRUCTURAS M2 561.28 24.80 13,919.74

04.01.07 PINTURA EN PARAPETOS M2 69.75 19.43 1,355.24

04.01.08 ALCANTARILLA TMC Ø=36" M 153.09 407.69 62,413.26

04.01.09 ALCANTARILLA TMC Ø=24" M 102.06 258.62 26,394.76

04.02.00 BADENES

04.02.01 EXCAVACION NO CLASIFICADA PARA ESTRUCTURAS M3 62.13 23.57 1,464.40

04.02.02 ELIMINACION DE MATERIAL EXCEDENTE M3 77.66 8.54 663.22

04.02.03 CONCRETO FC=175 KG/CM2 M3 62.13 341.65 21,226.71

04.02.04 MAMPOSTERIA DE PIEDRA M3 5.67 192.23 1,089.94

04.02.05 EMBOQUILLADO DE PIEDRA M2 29.50 79.05 2,331.98

04.02.06 ENCOFRADO Y DESENCOFRADO PARA ESTRUCTURAS M2 93.15 24.80 2,310.12

04.03.00 CUNETAS

04.03.01 CONSTRUCCION DE CUNETAS EN MATERIAL NO CLASIFICADO M 34,940.00 1.26 44,024.40

05.00.00 SEÑALIZACION 0.00 0.00 0.00

05.01.00 SEÑALES INFORMATIVAS UND 3.00 263.01 789.03

05.02.00 POSTES KILOMETRICOS UND 33.00 182.15 6,010.95

05.03.00 SEÑALES PREVENTIVAS UND 3.00 192.35 577.05

06.00.00 IMPACTO AMBIENTAL 0.00 0.00 0.00

UNIVERSIDAD NACIONAL DE CAJAMARCA FACULTAD DE INGENIERÍAESCUELA ACADÉMICA PROFESIONAL DE INGENIERÍA CIVILPROYECTO: REHABILITACIÓN PUERTO MALLETA - SAN JUAN DE CUTERVO - SANTA CRUZ DE LA SUCCHA

Page 4: Avance Financiero

VALORIZACION CONTRACTUAL Nº01Del 01 de Julio al 31 Julio

PARTIDA DESCRIPCION UND METRADOPRESUPUESTO BASE

AVANCESALDOS

ANTERIOR ACTUAL ACUMULADOPU (S/.) PARCIAL (S/.) METRADO PARCIAL METRADO PARCIAL METRADO PARCIAL % METRADO PARCIAL %

UNIVERSIDAD NACIONAL DE CAJAMARCA FACULTAD DE INGENIERÍAESCUELA ACADÉMICA PROFESIONAL DE INGENIERÍA CIVILPROYECTO: REHABILITACIÓN PUERTO MALLETA - SAN JUAN DE CUTERVO - SANTA CRUZ DE LA SUCCHA

06.01.00 RESTAURACION DE CANTERAS M2 1,600.00 0.56 896.00

06.02.00 RESTAURACION DEL PATIO DE MAQUINAS Y CAMPAMENTO M2 870.00 0.48 417.60

06.03.00 ACONDICIONAMIENTO DE DEPOSITO DE MATERIALES EXCEDENTES M2 350.00 1.74 609.00

06.04.00 REVEGETACION HA 1.50 4,055.97 6,083.96

07 FLETE TERRESTRE 0.00 0.00 0.00

07.01 FLETE TERRESTRE GLB 1.00 8,800.00 8,800.00

COSTO DIRECTO 1,547,957.71 86,670.07 86,670.07 182,502.97GASTOS GENERALES FIJOS (1.5 %) 23,219.37 1,300.05 1,300.05 2,737.54GASTOS GENERALES VARIABLES (10.5 %) 162,535.56 9,100.36 9,100.36 19,162.81UTILIDAD ( 7 %) 108,357.04 6,066.91 6,066.91 12,775.21SUB TOTAL 1,842,069.67 103,137.39 103,137.39 217,178.54IGV (19 %) 349,993.24 19,596.10 19,596.10 41,263.92PRESUPUESTO REFERENCIAL 2,192,062.91 122,733.49 122,733.49 258,442.46

AVANCE % 5.60% 5.60% 11.79%

TOTAL PROGRAMADO 2,192,062.91 135,466.82 135,466.82 2,056,596.09

PORCENTAJE DE AVANCE PROGRAMADO 100.00% 6.18% 6.18%

PORCENTAJE DE AVANCE Vs. PROGRAMADO 90.60% 90.60%

Page 5: Avance Financiero

VALORIZACION CONTRACTUAL Nº 02Del 01 de Agosto al 31 Agosto

PARTIDA DESCRIPCION UND METRADOPRESUPUESTO BASE

AVANCESALDOS

ANTERIOR ACTUAL ACUMULADOPU (S/.) PARCIAL (S/.) METRADO PARCIAL METRADO PARCIAL METRADO PARCIAL % METRADO PARCIAL %

01.00.00 OBRAS PRELIMINARES 29,395.37 12,865.99 42,261.36 0.0001.01.00 CARTEL DE IDENTIFICACION DE LA OBRA DE 2.40X4.80M UND 1.00 1,047.33 1,047.33 1.00 1047.33 1.00 1,047.33 100.00%01.02.00 CAMPAMENTO PROVISIONAL DE OBRA M2 50.00 45.96 2,298.00 50.00 2298 50.00 2,298.00 100.00%01.03.00 MOVILIZACION Y DESMOVILIZACION DE EQUIPO Y MAQUINARIA GLB 1.00 25,731.97 25,731.97 0.50 12865.985 0.50 12,865.99 1.00 25,731.97 100.00%01.04.00 TRAZO NIVELACIÓN Y REPLANTEO KM 32.47 269.97 8,765.93 32.47 8765.9259 32.47 8,765.93 100.00%01.05.00 TRAZO Y REPLANTEO DE OBRAS DE ARTE M2 398.03 11.10 4,418.13 398.03 4,418.13 398.03 4,418.13 100.00%02.00.00 EXPLANACIONES 47,829.97 180,607.12 228,437.09 30,941.3002.01.00 DESBROCE Y LIMPIEZA HA 9.74 82.48 803.36 8.14 671.3872 1.60 131.97 9.74 803.36 100.00%02.02.00 CORTE DE MATERIAL SUELTO CON MAQUINARIA M3 23,830.50 2.91 69,346.76 7087.14 20623.5774 16,743.36 48,723.18 23,830.50 69,346.76 100.00%02.03.00 CORTE ROCA SUELTA (PERF. Y DISP.) CON MAQUINARIA M3 22,784.25 6.31 143,768.62 4205.23 26535.0013 18,579.02 117,233.62 22,784.25 143,768.62 100.00%02.04.00 CORTE ROCA FIJA (PERF. Y DISP.) CON MAQUINARIA M3 1,320.90 16.48 21,768.43 521.60 8,595.97 521.60 8,595.97 39.49% 799.30 13,172.4602.05.00 CONFORMACION DE TERRAPLENES CON MATERIAL PROPIO M3 4,998.15 4.74 23,691.23 1,249.45 5,922.39 1,249.45 5,922.39 25.00% 3,748.70 17,768.8402.06.00 CONFORMACION DE TERRAPLENES CON MATERIAL DE PRESTAMO M3 13,592.35 6.15 83,592.95

03.00.00 PAVIMENTOS 0.00 0.00 0.00 0.00

03.01.00 PERFILADO Y COMPACTADO DE SUB-RASANTE M2 136,189.37 1.30 177,046.18

03.02.00 AFIRMADO

03.02.01 EXTRACCION Y ACUMULACIÓN DE MATERIAL DE CANTERA M3 31,663.87 2.16 68,393.96

03.02.02 CLASIFICACIÓN DE MAT. DE CANTERA POR ZARANDEO M3 37,996.65 1.90 72,193.64

03.02.03 CARGUIO DE MATERIAL DE CANTERA M3 37,996.65 2.27 86,252.40

03.02.04 TRANSPORTE DE MATERIAL DE CANTERA M3 37,996.65 7.44 282,695.08

03.02.05 EXTENDIDO Y COMPACTADO DE MATERIAL DE CANATERA PARA AFIRMADO M3 37,996.65 5.06 192,263.05

04.00.00 OBRAS DE ARTE Y DRENAJE 9,444.73 111,072.68 120,517.42 0.00

04.01.00 ALCANTARILLAS

04.01.01 EXCAVACION NO CLASIFICADA PARA ESTRUCTURAS M3 551.25 23.57 12,992.96 400.71 9444.7347 150.54 3,548.23 551.25 12,992.96 100.00%04.01.02 RELLENO CON MATERIAL PROPIO M3 352.18 13.62 4,796.69 352.18 4,796.69 352.18 4,796.69 100.00%04.01.03 ELIMINACION DE MATERIAL EXCEDENTE M3 199.53 8.54 1,703.99

04.01.04 CONCRETO FC=175 KG/CM2 M3 162.78 341.65 55,613.79

04.01.05 EMBOQUILLADO EN SALIDA DE ALCANTARILLA M2 93.56 79.05 7,395.92

04.01.06 ENCOFRADO Y DESENCOFRADO PARA ESTRUCTURAS M2 561.28 24.80 13,919.74 561.28 13,919.74 561.28 13,919.74 100.00%04.01.07 PINTURA EN PARAPETOS M2 69.75 19.43 1,355.24

04.01.08 ALCANTARILLA TMC Ø=36" M 153.09 407.69 62,413.26 153.09 62,413.26 153.09 62,413.26 100.00%04.01.09 ALCANTARILLA TMC Ø=24" M 102.06 258.62 26,394.76 102.06 26,394.76 102.06 26,394.76 100.00%04.02.00 BADENES

04.02.01 EXCAVACION NO CLASIFICADA PARA ESTRUCTURAS M3 62.13 23.57 1,464.40

04.02.02 ELIMINACION DE MATERIAL EXCEDENTE M3 77.66 8.54 663.22

04.02.03 CONCRETO FC=175 KG/CM2 M3 62.13 341.65 21,226.71

04.02.04 MAMPOSTERIA DE PIEDRA M3 5.67 192.23 1,089.94

04.02.05 EMBOQUILLADO DE PIEDRA M2 29.50 79.05 2,331.98

04.02.06 ENCOFRADO Y DESENCOFRADO PARA ESTRUCTURAS M2 93.15 24.80 2,310.12

04.03.00 CUNETAS

04.03.01 CONSTRUCCION DE CUNETAS EN MATERIAL NO CLASIFICADO M 34,940.00 1.26 44,024.40

05.00.00 SEÑALIZACION 0.00 0.00 0.00 0.00

05.01.00 SEÑALES INFORMATIVAS UND 3.00 263.01 789.03

05.02.00 POSTES KILOMETRICOS UND 33.00 182.15 6,010.95

05.03.00 SEÑALES PREVENTIVAS UND 3.00 192.35 577.05

06.00.00 IMPACTO AMBIENTAL 0.00 0.00 0.00 0.00

UNIVERSIDAD NACIONAL DE CAJAMARCA FACULTAD DE INGENIERÍAESCUELA ACADÉMICA PROFESIONAL DE INGENIERÍA CIVILPROYECTO: REHABILITACIÓN PUERTO MALLETA - SAN JUAN DE CUTERVO - SANTA CRUZ DE LA SUCCHA

Page 6: Avance Financiero

VALORIZACION CONTRACTUAL Nº 02Del 01 de Agosto al 31 Agosto

PARTIDA DESCRIPCION UND METRADOPRESUPUESTO BASE

AVANCESALDOS

ANTERIOR ACTUAL ACUMULADOPU (S/.) PARCIAL (S/.) METRADO PARCIAL METRADO PARCIAL METRADO PARCIAL % METRADO PARCIAL %

UNIVERSIDAD NACIONAL DE CAJAMARCA FACULTAD DE INGENIERÍAESCUELA ACADÉMICA PROFESIONAL DE INGENIERÍA CIVILPROYECTO: REHABILITACIÓN PUERTO MALLETA - SAN JUAN DE CUTERVO - SANTA CRUZ DE LA SUCCHA

06.01.00 RESTAURACION DE CANTERAS M2 1,600.00 0.56 896.00

06.02.00 RESTAURACION DEL PATIO DE MAQUINAS Y CAMPAMENTO M2 870.00 0.48 417.60

06.03.00 ACONDICIONAMIENTO DE DEPOSITO DE MATERIALES EXCEDENTES M2 350.00 1.74 609.00

06.04.00 REVEGETACION HA 1.50 4,055.97 6,083.96

07 FLETE TERRESTRE 0.00 0.00 0.00 0.00

07.01 FLETE TERRESTRE GLB 1.00 8,800.00 8,800.00

COSTO DIRECTO 1,547,957.71 86,670.07 304,545.79 391,215.87 30,941.30GASTOS GENERALES FIJOS (1.5 %) 23,219.37 1,300.05 4,568.19 5,868.24 464.12GASTOS GENERALES VARIABLES (10.5 %) 162,535.56 9,100.36 31,977.31 41,077.67 3,248.84UTILIDAD ( 7 %) 108,357.04 6,066.91 21,318.21 27,385.11 2,165.89SUB TOTAL 1,842,069.67 103,137.39 362,409.49 465,546.88 36,820.15IGV (19 %) 349,993.24 19,596.10 68,857.80 88,453.91 6,995.83PRESUPUESTO REFERENCIAL 2,192,062.91 122,733.49 431,267.29 554,000.79 43,815.98

AVANCE % 5.60% 19.67% 25.27% 2.00%

TOTAL PROGRAMADO 2,192,062.91 135,466.82 422,545.74 558,012.56 1,634,050.35

PORCENTAJE DE AVANCE PROGRAMADO 100.00% 6.18% 19.28% 25.46%

PORCENTAJE DE AVANCE Vs. PROGRAMADO 90.60% 102.06% 99.28%

Page 7: Avance Financiero

VALORIZACION CONTRACTUAL Nº 03Del 01 de Setiembre al 30 Setiembre

PARTIDA DESCRIPCION UND METRADOPRESUPUESTO BASE

AVANCESALDOS

ANTERIOR ACTUAL ACUMULADOPU (S/.) PARCIAL (S/.) METRADO PARCIAL METRADO PARCIAL METRADO PARCIAL % METRADO PARCIAL %

01.00.00 OBRAS PRELIMINARES 42,261.36 0.00 42,261.36 0.0001.01.00 CARTEL DE IDENTIFICACION DE LA OBRA DE 2.40X4.80M UND 1.00 1,047.33 1,047.33 1.00 1,047.33 1.00 1,047.33 100.00%01.02.00 CAMPAMENTO PROVISIONAL DE OBRA M2 50.00 45.96 2,298.00 50.00 2,298.00 50.00 2,298.00 100.00%01.03.00 MOVILIZACION Y DESMOVILIZACION DE EQUIPO Y MAQUINARIA GLB 1.00 25,731.97 25,731.97 1.00 25,731.97 1.00 25,731.97 100.00%01.04.00 TRAZO NIVELACIÓN Y REPLANTEO KM 32.47 269.97 8,765.93 32.47 8,765.93 32.47 8,765.93 100.00%01.05.00 TRAZO Y REPLANTEO DE OBRAS DE ARTE M2 398.03 11.10 4,418.13 398.03 4,418.13 398.03 4,418.13 100.00%02.00.00 EXPLANACIONES 228,437.09 114,534.25 342,971.34 0.0002.01.00 DESBROCE Y LIMPIEZA HA 9.74 82.48 803.36 9.74 803.36 9.74 803.36 100.00%02.02.00 CORTE DE MATERIAL SUELTO CON MAQUINARIA M3 23,830.50 2.91 69,346.76 23,830.50 69,346.76 23,830.50 69,346.76 100.00%02.03.00 CORTE ROCA SUELTA (PERF. Y DISP.) CON MAQUINARIA M3 22,784.25 6.31 143,768.62 22,784.25 143,768.62 22,784.25 143,768.62 100.00%02.04.00 CORTE ROCA FIJA (PERF. Y DISP.) CON MAQUINARIA M3 1,320.90 16.48 21,768.43 521.60 8,595.97 799.30 13,172.46 1,320.90 21,768.43 100.00%02.05.00 CONFORMACION DE TERRAPLENES CON MATERIAL PROPIO M3 4,998.15 4.74 23,691.23 1,249.45 5,922.39 3,748.70 17,768.84 4,998.15 23,691.23 100.00%02.06.00 CONFORMACION DE TERRAPLENES CON MATERIAL DE PRESTAMO M3 13,592.35 6.15 83,592.95 13,592.35 83,592.95 13,592.35 83,592.95 100.00%03.00.00 PAVIMENTOS 0.00 323,161.99 323,161.99 555,682.31

03.01.00 PERFILADO Y COMPACTADO DE SUB-RASANTE M2 136,189.37 1.30 177,046.18 72,856.63 94,713.62 72,856.63 94,713.62 53.50% 63,332.74 82,332.56 46.50%03.02.00 AFIRMADO

03.02.01 EXTRACCION Y ACUMULACIÓN DE MATERIAL DE CANTERA M3 31,663.87 2.16 68,393.96 18,198.66 39,309.10 18,198.66 39,309.10 57.47% 13,465.21 29,084.86 42.53%03.02.02 CLASIFICACIÓN DE MAT. DE CANTERA POR ZARANDEO M3 37,996.65 1.90 72,193.64 14,158.93 26,901.96 14,158.93 26,901.96 37.26% 23,837.72 45,291.67 62.74%03.02.03 CARGUIO DE MATERIAL DE CANTERA M3 37,996.65 2.27 86,252.40 21,998.33 49,936.20 21,998.33 49,936.20 57.90% 15,998.33 36,316.20 42.10%03.02.04 TRANSPORTE DE MATERIAL DE CANTERA M3 37,996.65 7.44 282,695.08 9,599.33 71,419.02 9,599.33 71,419.02 25.26% 28,397.32 211,276.06 74.74%03.02.05 EXTENDIDO Y COMPACTADO DE MATERIAL DE CANATERA PARA AFIRMADO M3 37,996.65 5.06 192,263.05 8,079.46 40,882.09 8,079.46 40,882.09 21.26% 29,917.19 151,380.96 78.74%04.00.00 OBRAS DE ARTE Y DRENAJE 120,517.42 74,873.81 195,391.23 35,219.52

04.01.00 ALCANTARILLAS

04.01.01 EXCAVACION NO CLASIFICADA PARA ESTRUCTURAS M3 551.25 23.57 12,992.96 551.25 12,992.96 551.25 12,992.96 100.00%04.01.02 RELLENO CON MATERIAL PROPIO M3 352.18 13.62 4,796.69 352.18 4,796.69 352.18 4,796.69 100.00%04.01.03 ELIMINACION DE MATERIAL EXCEDENTE M3 199.53 8.54 1,703.99 199.53 1,703.99 199.53 1,703.99 100.00%04.01.04 CONCRETO FC=175 KG/CM2 M3 162.78 341.65 55,613.79 162.78 55,613.79 162.78 55,613.79 100.00%04.01.05 EMBOQUILLADO EN SALIDA DE ALCANTARILLA M2 93.56 79.05 7,395.92 93.56 7,395.92 93.56 7,395.92 100.00%04.01.06 ENCOFRADO Y DESENCOFRADO PARA ESTRUCTURAS M2 561.28 24.80 13,919.74 561.28 13,919.74 561.28 13,919.74 100.00%04.01.07 PINTURA EN PARAPETOS M2 69.75 19.43 1,355.24 69.75 1,355.24 69.75 1,355.24 100.00%04.01.08 ALCANTARILLA TMC Ø=36" M 153.09 407.69 62,413.26 153.09 62,413.26 153.09 62,413.26 100.00%04.01.09 ALCANTARILLA TMC Ø=24" M 102.06 258.62 26,394.76 102.06 26,394.76 102.06 26,394.76 100.00%04.02.00 BADENES

04.02.01 EXCAVACION NO CLASIFICADA PARA ESTRUCTURAS M3 62.13 23.57 1,464.40

04.02.02 ELIMINACION DE MATERIAL EXCEDENTE M3 77.66 8.54 663.22

04.02.03 CONCRETO FC=175 KG/CM2 M3 62.13 341.65 21,226.71

04.02.04 MAMPOSTERIA DE PIEDRA M3 5.67 192.23 1,089.94

04.02.05 EMBOQUILLADO DE PIEDRA M2 29.50 79.05 2,331.98

04.02.06 ENCOFRADO Y DESENCOFRADO PARA ESTRUCTURAS M2 93.15 24.80 2,310.12

04.03.00 CUNETAS

04.03.01 CONSTRUCCION DE CUNETAS EN MATERIAL NO CLASIFICADO M 34,940.00 1.26 44,024.40 6,988.00 8,804.88 6,988.00 8,804.88 20.00% 27,952.00 35,219.52 80.00%05.00.00 SEÑALIZACION 0.00 0.00 0.00 0.00

05.01.00 SEÑALES INFORMATIVAS UND 3.00 263.01 789.03

05.02.00 POSTES KILOMETRICOS UND 33.00 182.15 6,010.95

05.03.00 SEÑALES PREVENTIVAS UND 3.00 192.35 577.05

06.00.00 IMPACTO AMBIENTAL 0.00 0.00 0.00 0.00

06.01.00 RESTAURACION DE CANTERAS M2 1,600.00 0.56 896.00

UNIVERSIDAD NACIONAL DE CAJAMARCA FACULTAD DE INGENIERÍAESCUELA ACADÉMICA PROFESIONAL DE INGENIERÍA CIVILPROYECTO: REHABILITACIÓN PUERTO MALLETA - SAN JUAN DE CUTERVO - SANTA CRUZ DE LA SUCCHA

Page 8: Avance Financiero

VALORIZACION CONTRACTUAL Nº 03Del 01 de Setiembre al 30 Setiembre

PARTIDA DESCRIPCION UND METRADOPRESUPUESTO BASE

AVANCESALDOS

ANTERIOR ACTUAL ACUMULADOPU (S/.) PARCIAL (S/.) METRADO PARCIAL METRADO PARCIAL METRADO PARCIAL % METRADO PARCIAL %

UNIVERSIDAD NACIONAL DE CAJAMARCA FACULTAD DE INGENIERÍAESCUELA ACADÉMICA PROFESIONAL DE INGENIERÍA CIVILPROYECTO: REHABILITACIÓN PUERTO MALLETA - SAN JUAN DE CUTERVO - SANTA CRUZ DE LA SUCCHA

06.02.00 RESTAURACION DEL PATIO DE MAQUINAS Y CAMPAMENTO M2 870.00 0.48 417.60

06.03.00 ACONDICIONAMIENTO DE DEPOSITO DE MATERIALES EXCEDENTES M2 350.00 1.74 609.00

06.04.00 REVEGETACION HA 1.50 4,055.97 6,083.96

07 FLETE TERRESTRE 0.00 0.00 0.00 0.00

07.01 FLETE TERRESTRE GLB 1.00 8,800.00 8,800.00

COSTO DIRECTO 1,547,957.71 391,215.87 512,570.05 903,785.92 590,901.83GASTOS GENERALES FIJOS (1.5 %) 23,219.37 5,868.24 7,688.55 13,556.79 8,863.53GASTOS GENERALES VARIABLES (10.5 %) 162,535.56 41,077.67 53,819.86 94,897.52 62,044.69UTILIDAD ( 7 %) 108,357.04 27,385.11 35,879.90 63,265.01 41,363.13SUB TOTAL 1,842,069.67 465,546.88 609,958.36 1,075,505.24 703,173.18IGV (19 %) 349,993.24 88,453.91 115,892.09 204,346.00 133,602.90PRESUPUESTO REFERENCIAL 2,192,062.91 554,000.79 725,850.45 1,279,851.24 836,776.08

AVANCE % 25.27% 33.11% 58.39% 38.17%

TOTAL PROGRAMADO 2,192,062.91 558,012.56 643,825.73 1,201,838.29 990,224.62

PORCENTAJE DE AVANCE PROGRAMADO 100.00% 25.46% 29.37% 54.83%

PORCENTAJE DE AVANCE Vs. PROGRAMADO 99.28% 112.74% 106.49%

Page 9: Avance Financiero

VALORIZACION CONTRACTUAL Nº 04Del 01 de Octubre al 31 Octubre

PARTIDA DESCRIPCION UND METRADOPRESUPUESTO BASE

AVANCESALDOS

ANTERIOR ACTUAL ACUMULADOPU (S/.) PARCIAL (S/.) METRADO PARCIAL METRADO PARCIAL METRADO PARCIAL % METRADO PARCIAL %

01.00.00 OBRAS PRELIMINARES 42,261.36 0.00 42,261.36 0.0001.01.00 CARTEL DE IDENTIFICACION DE LA OBRA DE 2.40X4.80M UND 1.00 1,047.33 1,047.33 1.00 1,047.33 1.00 1,047.33 100.00%01.02.00 CAMPAMENTO PROVISIONAL DE OBRA M2 50.00 45.96 2,298.00 50.00 2,298.00 50.00 2,298.00 100.00%01.03.00 MOVILIZACION Y DESMOVILIZACION DE EQUIPO Y MAQUINARIA GLB 1.00 25,731.97 25,731.97 1.00 25,731.97 1.00 25,731.97 100.00%01.04.00 TRAZO NIVELACIÓN Y REPLANTEO KM 32.47 269.97 8,765.93 32.47 8,765.93 32.47 8,765.93 100.00%01.05.00 TRAZO Y REPLANTEO DE OBRAS DE ARTE M2 398.03 11.10 4,418.13 398.03 4,418.13 398.03 4,418.13 100.00%02.00.00 EXPLANACIONES 342,971.34 0.00 342,971.34 0.0002.01.00 DESBROCE Y LIMPIEZA HA 9.74 82.48 803.36 9.74 803.36 9.74 803.36 100.00%02.02.00 CORTE DE MATERIAL SUELTO CON MAQUINARIA M3 23,830.50 2.91 69,346.76 23,830.50 69,346.76 23,830.50 69,346.76 100.00%02.03.00 CORTE ROCA SUELTA (PERF. Y DISP.) CON MAQUINARIA M3 22,784.25 6.31 143,768.62 22,784.25 143,768.62 22,784.25 143,768.62 100.00%02.04.00 CORTE ROCA FIJA (PERF. Y DISP.) CON MAQUINARIA M3 1,320.90 16.48 21,768.43 1,320.90 21,768.43 1,320.90 21,768.43 100.00%02.05.00 CONFORMACION DE TERRAPLENES CON MATERIAL PROPIO M3 4,998.15 4.74 23,691.23 4,998.15 23,691.23 4,998.15 23,691.23 100.00%02.06.00 CONFORMACION DE TERRAPLENES CON MATERIAL DE PRESTAMO M3 13,592.35 6.15 83,592.95 13592.35 83,592.95 13,592.35 83,592.95 100.00%03.00.00 PAVIMENTOS 323,161.99 555,682.31 878,844.30 0.00

03.01.00 PERFILADO Y COMPACTADO DE SUB-RASANTE M2 136,189.37 1.30 177,046.18 72856.6323077 94,713.62 63,332.74 82,332.56 136,189.37 177,046.18 100.00%03.02.00 AFIRMADO

03.02.01 EXTRACCION Y ACUMULACIÓN DE MATERIAL DE CANTERA M3 31,663.87 2.16 68,393.96 18198.6576 39,309.10 13,465.21 29,084.86 31,663.87 68,393.96 100.00%03.02.02 CLASIFICACIÓN DE MAT. DE CANTERA POR ZARANDEO M3 37,996.65 1.90 72,193.64 14158.928 26,901.96 23,837.72 45,291.67 37,996.65 72,193.64 100.00%03.02.03 CARGUIO DE MATERIAL DE CANTERA M3 37,996.65 2.27 86,252.40 21998.325 49,936.20 15,998.33 36,316.20 37,996.65 86,252.40 100.00%03.02.04 TRANSPORTE DE MATERIAL DE CANTERA M3 37,996.65 7.44 282,695.08 9599.33 71,419.02 28,397.32 211,276.06 37,996.65 282,695.08 100.00%03.02.05 EXTENDIDO Y COMPACTADO DE MATERIAL DE CANATERA PARA AFIRMADO M3 37,996.65 5.06 192,263.05 8,079.46 40,882.09 29,917.19 151,380.96 37,996.65 192,263.05 100.00%04.00.00 OBRAS DE ARTE Y DRENAJE 195,391.23 61,220.38 256,611.61 753.54

04.01.00 ALCANTARILLAS

04.01.01 EXCAVACION NO CLASIFICADA PARA ESTRUCTURAS M3 551.25 23.57 12,992.96 551.25 12,992.96 551.25 12,992.96 100.00%04.01.02 RELLENO CON MATERIAL PROPIO M3 352.18 13.62 4,796.69 352.18 4,796.69 352.18 4,796.69 100.00%04.01.03 ELIMINACION DE MATERIAL EXCEDENTE M3 199.53 8.54 1,703.99 199.53 1,703.99 199.53 1,703.99 100.00%04.01.04 CONCRETO FC=175 KG/CM2 M3 162.78 341.65 55,613.79 162.78 55,613.79 162.78 55,613.79 100.00%04.01.05 EMBOQUILLADO EN SALIDA DE ALCANTARILLA M2 93.56 79.05 7,395.92 93.56 7,395.92 93.56 7,395.92 100.00%04.01.06 ENCOFRADO Y DESENCOFRADO PARA ESTRUCTURAS M2 561.28 24.80 13,919.74 561.28 13,919.74 561.28 13,919.74 100.00%04.01.07 PINTURA EN PARAPETOS M2 69.75 19.43 1,355.24 69.75 1,355.24 69.75 1,355.24 100.00%04.01.08 ALCANTARILLA TMC Ø=36" M 153.09 407.69 62,413.26 153.09 62,413.26 153.09 62,413.26 100.00%04.01.09 ALCANTARILLA TMC Ø=24" M 102.06 258.62 26,394.76 102.06 26,394.76 102.06 26,394.76 100.00%04.02.00 BADENES

04.02.01 EXCAVACION NO CLASIFICADA PARA ESTRUCTURAS M3 62.13 23.57 1,464.40 62.13 1,464.40 62.13 1,464.40 100.00%04.02.02 ELIMINACION DE MATERIAL EXCEDENTE M3 77.66 8.54 663.22 77.66 663.22 77.66 663.22 100.00%04.02.03 CONCRETO FC=175 KG/CM2 M3 62.13 341.65 21,226.71 62.13 21,226.71 62.13 21,226.71 100.00%04.02.04 MAMPOSTERIA DE PIEDRA M3 5.67 192.23 1,089.94 1.75 336.40 1.75 336.40 30.86% 3.92 753.54 69.14%04.02.05 EMBOQUILLADO DE PIEDRA M2 29.50 79.05 2,331.98

04.02.06 ENCOFRADO Y DESENCOFRADO PARA ESTRUCTURAS M2 93.15 24.80 2,310.12 93.15 2,310.12 93.15 2,310.12 100.00%04.03.00 CUNETAS

04.03.01 CONSTRUCCION DE CUNETAS EN MATERIAL NO CLASIFICADO M 34,940.00 1.26 44,024.40 6,988.00 8,804.88 27,952.00 35,219.52 34,940.00 44,024.40 100.00%05.00.00 SEÑALIZACION 0.00 0.00 0.00 0.00

05.01.00 SEÑALES INFORMATIVAS UND 3.00 263.01 789.03

05.02.00 POSTES KILOMETRICOS UND 33.00 182.15 6,010.95

05.03.00 SEÑALES PREVENTIVAS UND 3.00 192.35 577.05

06.00.00 IMPACTO AMBIENTAL 0.00 0.00 0.00 0.00

UNIVERSIDAD NACIONAL DE CAJAMARCA FACULTAD DE INGENIERÍAESCUELA ACADÉMICA PROFESIONAL DE INGENIERÍA CIVILPROYECTO: REHABILITACIÓN PUERTO MALLETA - SAN JUAN DE CUTERVO - SANTA CRUZ DE LA SUCCHA

Page 10: Avance Financiero

VALORIZACION CONTRACTUAL Nº 04Del 01 de Octubre al 31 Octubre

PARTIDA DESCRIPCION UND METRADOPRESUPUESTO BASE

AVANCESALDOS

ANTERIOR ACTUAL ACUMULADOPU (S/.) PARCIAL (S/.) METRADO PARCIAL METRADO PARCIAL METRADO PARCIAL % METRADO PARCIAL %

UNIVERSIDAD NACIONAL DE CAJAMARCA FACULTAD DE INGENIERÍAESCUELA ACADÉMICA PROFESIONAL DE INGENIERÍA CIVILPROYECTO: REHABILITACIÓN PUERTO MALLETA - SAN JUAN DE CUTERVO - SANTA CRUZ DE LA SUCCHA

06.01.00 RESTAURACION DE CANTERAS M2 1,600.00 0.56 896.00

06.02.00 RESTAURACION DEL PATIO DE MAQUINAS Y CAMPAMENTO M2 870.00 0.48 417.60

06.03.00 ACONDICIONAMIENTO DE DEPOSITO DE MATERIALES EXCEDENTES M2 350.00 1.74 609.00

06.04.00 REVEGETACION HA 1.50 4,055.97 6,083.96

07 FLETE TERRESTRE 0.00 0.00 0.00 0.00

07.01 FLETE TERRESTRE GLB 1.00 8,800.00 8,800.00

COSTO DIRECTO 1,547,957.71 903,785.92 616,902.69 1,520,688.61 753.54GASTOS GENERALES FIJOS (1.5 %) 23,219.37 13,556.79 9,253.54 22,810.33 11.30GASTOS GENERALES VARIABLES (10.5 %) 162,535.56 94,897.52 64,774.78 159,672.30 79.12UTILIDAD ( 7 %) 108,357.04 63,265.01 43,183.19 106,448.20 52.75SUB TOTAL 1,842,069.67 1,075,505.24 734,114.20 1,809,619.44 896.71IGV (19 %) 349,993.24 204,346.00 139,481.70 343,827.69 170.38PRESUPUESTO REFERENCIAL 2,192,062.91 1,279,851.24 873,595.89 2,153,447.14 1,067.09

AVANCE % 58.39% 39.85% 98.24% 0.05%

TOTAL PROGRAMADO 2,192,062.91 1,201,838.29 952,290.07 2,154,128.36 37,934.55

PORCENTAJE DE AVANCE PROGRAMADO 100.00% 54.83% 43.44% 98.27%

PORCENTAJE DE AVANCE Vs. PROGRAMADO 106.49% 91.74% 99.97%

Page 11: Avance Financiero

VALORIZACION CONTRACTUAL Nº 05Del 01 de Noviembre al 28 de Noviembre

PARTIDA DESCRIPCION UND METRADOPRESUPUESTO BASE

AVANCESALDOS

ANTERIOR ACTUAL ACUMULADOPU (S/.) PARCIAL (S/.) METRADO PARCIAL METRADO PARCIAL METRADO PARCIAL % METRADO PARCIAL %

01.00.00 OBRAS PRELIMINARES 42,261.36 0.00 42,261.36 0.0001.01.00 CARTEL DE IDENTIFICACION DE LA OBRA DE 2.40X4.80M UND 1.00 1,047.33 1,047.33 1.00 1,047.33 1.00 1,047.33 100.00%01.02.00 CAMPAMENTO PROVISIONAL DE OBRA M2 50.00 45.96 2,298.00 50.00 2,298.00 50.00 2,298.00 100.00%01.03.00 MOVILIZACION Y DESMOVILIZACION DE EQUIPO Y MAQUINARIA GLB 1.00 25,731.97 25,731.97 1.00 25,731.97 1.00 25,731.97 100.00%01.04.00 TRAZO NIVELACIÓN Y REPLANTEO KM 32.47 269.97 8,765.93 32.47 8,765.93 32.47 8,765.93 100.00%01.05.00 TRAZO Y REPLANTEO DE OBRAS DE ARTE M2 398.03 11.10 4,418.13 398.03 4,418.13 398.03 4,418.13 100.00%02.00.00 EXPLANACIONES 342,971.34 0.00 342,971.34 0.0002.01.00 DESBROCE Y LIMPIEZA HA 9.74 82.48 803.36 9.74 803.36 9.74 803.36 100.00%02.02.00 CORTE DE MATERIAL SUELTO CON MAQUINARIA M3 23,830.50 2.91 69,346.76 23,830.50 69,346.76 23,830.50 69,346.76 100.00%02.03.00 CORTE ROCA SUELTA (PERF. Y DISP.) CON MAQUINARIA M3 22,784.25 6.31 143,768.62 22,784.25 143,768.62 22,784.25 143,768.62 100.00%02.04.00 CORTE ROCA FIJA (PERF. Y DISP.) CON MAQUINARIA M3 1,320.90 16.48 21,768.43 1,320.90 21,768.43 1,320.90 21,768.43 100.00%02.05.00 CONFORMACION DE TERRAPLENES CON MATERIAL PROPIO M3 4,998.15 4.74 23,691.23 4,998.15 23,691.23 4,998.15 23,691.23 100.00%02.06.00 CONFORMACION DE TERRAPLENES CON MATERIAL DE PRESTAMO M3 13,592.35 6.15 83,592.95 13592.35 83,592.95 13,592.35 83,592.95 100.00%03.00.00 PAVIMENTOS 878,844.30 0.00 878,844.30 0.00

03.01.00 PERFILADO Y COMPACTADO DE SUB-RASANTE M2 136,189.37 1.30 177,046.18 136189.37 177,046.18 136,189.37 177,046.18 100.00%03.02.00 AFIRMADO

03.02.01 EXTRACCION Y ACUMULACIÓN DE MATERIAL DE CANTERA M3 31,663.87 2.16 68,393.96 31663.87 68,393.96 31,663.87 68,393.96 100.00%03.02.02 CLASIFICACIÓN DE MAT. DE CANTERA POR ZARANDEO M3 37,996.65 1.90 72,193.64 37996.65 72,193.64 37,996.65 72,193.64 100.00%03.02.03 CARGUIO DE MATERIAL DE CANTERA M3 37,996.65 2.27 86,252.40 37996.65 86,252.40 37,996.65 86,252.40 100.00%03.02.04 TRANSPORTE DE MATERIAL DE CANTERA M3 37,996.65 7.44 282,695.08 37996.65 282,695.08 37,996.65 282,695.08 100.00%03.02.05 EXTENDIDO Y COMPACTADO DE MATERIAL DE CANATERA PARA AFIRMADO M3 37,996.65 5.06 192,263.05 37,996.65 192,263.05 37,996.65 192,263.05 100.00%04.00.00 OBRAS DE ARTE Y DRENAJE 256,611.61 3,085.52 259,697.13 0.00

04.01.00 ALCANTARILLAS

04.01.01 EXCAVACION NO CLASIFICADA PARA ESTRUCTURAS M3 551.25 23.57 12,992.96 551.25 12,992.96 551.25 12,992.96 100.00%04.01.02 RELLENO CON MATERIAL PROPIO M3 352.18 13.62 4,796.69 352.18 4,796.69 352.18 4,796.69 100.00%04.01.03 ELIMINACION DE MATERIAL EXCEDENTE M3 199.53 8.54 1,703.99 199.53 1,703.99 199.53 1,703.99 100.00%04.01.04 CONCRETO FC=175 KG/CM2 M3 162.78 341.65 55,613.79 162.78 55,613.79 162.78 55,613.79 100.00%04.01.05 EMBOQUILLADO EN SALIDA DE ALCANTARILLA M2 93.56 79.05 7,395.92 93.56 7,395.92 93.56 7,395.92 100.00%04.01.06 ENCOFRADO Y DESENCOFRADO PARA ESTRUCTURAS M2 561.28 24.80 13,919.74 561.28 13,919.74 561.28 13,919.74 100.00%04.01.07 PINTURA EN PARAPETOS M2 69.75 19.43 1,355.24 69.75 1,355.24 69.75 1,355.24 100.00%04.01.08 ALCANTARILLA TMC Ø=36" M 153.09 407.69 62,413.26 153.09 62,413.26 153.09 62,413.26 100.00%04.01.09 ALCANTARILLA TMC Ø=24" M 102.06 258.62 26,394.76 102.06 26,394.76 102.06 26,394.76 100.00%04.02.00 BADENES

04.02.01 EXCAVACION NO CLASIFICADA PARA ESTRUCTURAS M3 62.13 23.57 1,464.40 62.13 1,464.40 62.13 1,464.40 100.00%04.02.02 ELIMINACION DE MATERIAL EXCEDENTE M3 77.66 8.54 663.22 77.66 663.22 77.66 663.22 100.00%04.02.03 CONCRETO FC=175 KG/CM2 M3 62.13 341.65 21,226.71 62.13 21,226.71 62.13 21,226.71 100.00%04.02.04 MAMPOSTERIA DE PIEDRA M3 5.67 192.23 1,089.94 1.75 336.40 3.92 753.54 5.67 1,089.94 100.00% 1.75 0.00 30.86%04.02.05 EMBOQUILLADO DE PIEDRA M2 29.50 79.05 2,331.98 29.50 2,331.98 29.50 2,331.98 100.00%04.02.06 ENCOFRADO Y DESENCOFRADO PARA ESTRUCTURAS M2 93.15 24.80 2,310.12 93.15 2,310.12 93.15 2,310.12 100.00%04.03.00 CUNETAS

04.03.01 CONSTRUCCION DE CUNETAS EN MATERIAL NO CLASIFICADO M 34,940.00 1.26 44,024.40 34,940.00 44,024.40 34,940.00 44,024.40 100.00%05.00.00 SEÑALIZACION 0.00 7,377.03 7,377.03 0.00

05.01.00 SEÑALES INFORMATIVAS UND 3.00 263.01 789.03 3.00 789.03 3.00 789.03 100.00% 0.00 0.0005.02.00 POSTES KILOMETRICOS UND 33.00 182.15 6,010.95 33.00 6,010.95 33.00 6,010.95 100.00% 0.00 0.0005.03.00 SEÑALES PREVENTIVAS UND 3.00 192.35 577.05 3.00 577.05 3.00 577.05 100.00% 0.00 0.0006.00.00 IMPACTO AMBIENTAL 0.00 8,006.56 8,006.56 0.00

UNIVERSIDAD NACIONAL DE CAJAMARCA FACULTAD DE INGENIERÍAESCUELA ACADÉMICA PROFESIONAL DE INGENIERÍA CIVILPROYECTO: REHABILITACIÓN PUERTO MALLETA - SAN JUAN DE CUTERVO - SANTA CRUZ DE LA SUCCHA

Page 12: Avance Financiero

VALORIZACION CONTRACTUAL Nº 05Del 01 de Noviembre al 28 de Noviembre

PARTIDA DESCRIPCION UND METRADOPRESUPUESTO BASE

AVANCESALDOS

ANTERIOR ACTUAL ACUMULADOPU (S/.) PARCIAL (S/.) METRADO PARCIAL METRADO PARCIAL METRADO PARCIAL % METRADO PARCIAL %

UNIVERSIDAD NACIONAL DE CAJAMARCA FACULTAD DE INGENIERÍAESCUELA ACADÉMICA PROFESIONAL DE INGENIERÍA CIVILPROYECTO: REHABILITACIÓN PUERTO MALLETA - SAN JUAN DE CUTERVO - SANTA CRUZ DE LA SUCCHA

06.01.00 RESTAURACION DE CANTERAS M2 1,600.00 0.56 896.00 1,600.00 896.00 1,600.00 896.00 100.00% 0.00 0.0006.02.00 RESTAURACION DEL PATIO DE MAQUINAS Y CAMPAMENTO M2 870.00 0.48 417.60 870.00 417.60 870.00 417.60 100.00% 0.00 0.0006.03.00 ACONDICIONAMIENTO DE DEPOSITO DE MATERIALES EXCEDENTES M2 350.00 1.74 609.00 350.00 609.00 350.00 609.00 100.00% 0.00 0.0006.04.00 REVEGETACION HA 1.50 4,055.97 6,083.96 1.50 6,083.96 1.50 6,083.96 100.00% 0.00 0.00

07 FLETE TERRESTRE 0.00 8,800.00 8,800.00 0.00

07.01 FLETE TERRESTRE GLB 1.00 8,800.00 8,800.00 1.00 8,800.00 1.00 8,800.00 100.00% 0.00 0.00COSTO DIRECTO 1,547,957.71 1,520,688.61 27,269.10 1,547,957.71 0.00GASTOS GENERALES FIJOS (1.5 %) 23,219.37 22,810.33 409.04 23,219.37 0.00GASTOS GENERALES VARIABLES (10.5 %) 162,535.56 159,672.30 2,863.26 162,535.56 0.00UTILIDAD ( 7 %) 108,357.04 106,448.20 1,908.84 108,357.04 0.00SUB TOTAL 1,842,069.67 1,809,619.44 32,450.23 1,842,069.67 0.00IGV (19 %) 349,993.24 343,827.69 6,165.54 349,993.24 0.00PRESUPUESTO REFERENCIAL 2,192,062.91 2,153,447.14 38,615.77 2,192,062.91 0.00

AVANCE % 98.24% 1.76% 100.00% 0.00%

TOTAL PROGRAMADO 2,192,062.91 2,154,128.36 37,934.55 2,192,062.91 0.00

PORCENTAJE DE AVANCE PROGRAMADO 100.00% 98.27% 1.73% 100.00%

PORCENTAJE DE AVANCE Vs. PROGRAMADO 99.97% 101.80% 100.00%

Page 13: Avance Financiero

MONTOS VALORIZADOS

MONTOS VALORIZADOS PROGRAMADOS MONTOS VALORIZADOS EJECUTADOS

MONTOS (Inc/ IGV) PORCENTAJES MONTOS (Inc/ IGV)MES PARCIAL ACUMUL. PARCIAL ACUMUL. MES PARCIAL ACUMUL.

S/. S/. % % S/. S/.1-Jul-08 0 0 0 0 1-Jul-08 0.00 0

1-Aug-08 135,466.82 135,466.82 6.18% 6.18% 1-Aug-08 122,733.49 122,733.491-Sep-08 422,545.74 558,012.56 19.28% 25.46% 1-Sep-08 431,267.29 554,000.791-Oct-08 643,825.73 1,201,838.29 29.37% 54.83% 1-Oct-08 725,850.45 1,279,851.241-Nov-08 952,290.07 2,154,128.36 43.44% 98.27% 1-Nov-08 873,595.89 2,153,447.14

28-Nov-08 37,934.55 2,192,062.91 1.73% 100.00% 28-Nov-08 38,615.77 2,192,062.91TOTAL 2,192,062.91 100.00% TOTAL 2,192,062.91

UNIVERSIDAD NACIONAL DE CAJAMARCA FACULTAD DE INGENIERÍAESCUELA ACADÉMICA PROFESIONAL DE INGENIERÍA CIVILPROYECTO: REHABILITACIÓN PUERTO MALLETA - SAN JUAN DE CUTERVO - SANTA CRUZ DE LA SUCCHA

Page 14: Avance Financiero

MONTOS VALORIZADOS

MONTOS VALORIZADOS EJECUTADOS

PORCENTAJESPARCIAL ACUMUL.

% %0 0

5.60% 5.60%19.67% 25.27%33.11% 58.39%39.85% 98.24%

1.76% 100.00%100.00%

UNIVERSIDAD NACIONAL DE CAJAMARCA

Page 15: Avance Financiero

01-Jul-08 01-Aug-08 01-Sep-08 01-Oct-08 01-Nov-08 01-Dec-080%

10%

20%

30%

40%

50%

60%

70%

80%

90%

100%

0

6.18%

25.46%

54.83%

98.27%

GRAFICO DEL PORCENTAJE DE AVANCE PROGRAMADO

PROGRAMADO

PLAZO DE EJECUCION (MESES)

AV

AN

CE

ME

NS

UA

L A

CU

MU

LA

DO

(%

)

Page 16: Avance Financiero

01-Jul-08 01-Aug-08 01-Sep-08 01-Oct-08 01-Nov-08 01-Dec-080%

10%

20%

30%

40%

50%

60%

70%

80%

90%

100%

0

6.18%

25.46%

54.83%

98.27%

05.60%

25.27%

58.39%

98.24%