Avalon Road (CR 545) Preliminary Design Study

August 25, 2015

CEDS Department Office

Page 2: Avalon Road (CR 545) - ocfl.net...Avalon Road (CR 545) Preliminary Design Study August 25, 2015 CEDS Department Office. Study Location Avalon Road (C.R.545) Village H Village I Village

Study Location

Avalon Road (C.R.545)Avalon Road (C.R.545)

Page 3: Avalon Road (CR 545) - ocfl.net...Avalon Road (CR 545) Preliminary Design Study August 25, 2015 CEDS Department Office. Study Location Avalon Road (C.R.545) Village H Village I Village

Village H

VillageI

Village F

Town Center

Bridgewater

From 4,400’ South of Flamingo Crossings Boulevard, to 1,300 feet North of Intersection with Schofield Road

From 4,400’ South of Flamingo Crossings Boulevard, to 1,300 feet North of Intersection with Schofield Road

Ava

lon

Roa

d (C

R 5

45)

Seidel Road

Flamingo

Old YMCA Road

Schofield Road

429TOLL

Begin Study

End Study

OR

AN

GE

CO

UN

TYLA

KE

CO

UN

TY

Avalon Road (C.R.545)Avalon Road (C.R.545)

Page 4: Avalon Road (CR 545) - ocfl.net...Avalon Road (CR 545) Preliminary Design Study August 25, 2015 CEDS Department Office. Study Location Avalon Road (C.R.545) Village H Village I Village

Schofield Road to Old YMCA

Road, 1.00 MilesWaterleigh PD Parcel 6 Entrance to Waterleigh

PD Parcel 10 North Boundary, 0.85 Miles

– Old YMCA Road to Waterleigh PD Parcel 6

Entrance, 0.68 Miles

•Waterleigh PD Parcel 10 North Boundary to South Leg of Loop Road, 1.13 Miles

NORTH

PROJECT SEGMENTS

Avalon Road (C.R.545)Avalon Road (C.R.545)

Page 5: Avalon Road (CR 545) - ocfl.net...Avalon Road (CR 545) Preliminary Design Study August 25, 2015 CEDS Department Office. Study Location Avalon Road (C.R.545) Village H Village I Village

Project HistoryNeed for improvement Existing Conditions  Alternatives  Funding and PhasingGoals, Objectives & Policies Action Requested 

Presentation OutlinePresentation Outline

Page 6: Avalon Road (CR 545) - ocfl.net...Avalon Road (CR 545) Preliminary Design Study August 25, 2015 CEDS Department Office. Study Location Avalon Road (C.R.545) Village H Village I Village

1995 –Adopted Horizon West Sector Plan  Five Self Contained Villages Plus a Town Center 1997 –Adopted Adequate Public Facilities (APF) 2006 –Adopted Specific Area Plan (SAP) for Village “H” 2009 –Horizon West Village “H” PD 

Project HistoryProject History

Page 7: Avalon Road (CR 545) - ocfl.net...Avalon Road (CR 545) Preliminary Design Study August 25, 2015 CEDS Department Office. Study Location Avalon Road (C.R.545) Village H Village I Village

Roadway Network Agreement Approved February 2013 9 Constructing Owners         Responsible for Design, Permitting, Right‐of‐way Acquisition  and Construction Project Segments will be Phased According to Trip Allocation VHB Hired to Conduct Alignment Report  Orange County will Inspect

Project HistoryProject History

Page 8: Avalon Road (CR 545) - ocfl.net...Avalon Road (CR 545) Preliminary Design Study August 25, 2015 CEDS Department Office. Study Location Avalon Road (C.R.545) Village H Village I Village

Project HistoryNeed for improvement Existing Conditions  Alternatives  Funding and PhasingGoals, Objectives & Policies Action Requested 

Presentation OutlinePresentation Outline

Page 9: Avalon Road (CR 545) - ocfl.net...Avalon Road (CR 545) Preliminary Design Study August 25, 2015 CEDS Department Office. Study Location Avalon Road (C.R.545) Village H Village I Village

Deficiency in Future Traffic Operations and capacity Horizontal/vertical Curves Along the Road Consistency with Orange County Policies and Objectives Support the Remaining West Orange County Agriculture Industry

Need For ImprovementNeed For Improvement

Page 10: Avalon Road (CR 545) - ocfl.net...Avalon Road (CR 545) Preliminary Design Study August 25, 2015 CEDS Department Office. Study Location Avalon Road (C.R.545) Village H Village I Village

Orange County National Golf Course Newly Opened SR429 Interchange at Schofield Road Future Valencia State College Site Future Interaction with Lake County’s Wellness Way Sector Plan  & Connection to US 27

Need For ImprovementNeed For Improvement

Page 11: Avalon Road (CR 545) - ocfl.net...Avalon Road (CR 545) Preliminary Design Study August 25, 2015 CEDS Department Office. Study Location Avalon Road (C.R.545) Village H Village I Village

Project HistoryNeed for improvement Existing Conditions  Alternatives  Funding and PhasingGoals, Objectives & Policies Action Requested 

Presentation OutlinePresentation Outline

Page 12: Avalon Road (CR 545) - ocfl.net...Avalon Road (CR 545) Preliminary Design Study August 25, 2015 CEDS Department Office. Study Location Avalon Road (C.R.545) Village H Village I Village

Avalon Road Preliminary Design Study Elements

Existing Facilities Environmental Characteristics Existing Infrastructure Existing Drainage Conditions Design Criteria Alignment Analysis Preliminary Drainage Analysis Recommended Improvement

Existing ConditionsExisting ConditionsExisting ConditionsExisting Conditions

Page 13: Avalon Road (CR 545) - ocfl.net...Avalon Road (CR 545) Preliminary Design Study August 25, 2015 CEDS Department Office. Study Location Avalon Road (C.R.545) Village H Village I Village

Village Land Uses

Rural Estate Open Space Wetlands & Water Bodies Village Home District Garden Home District Estate Home District Apartment District Village Center

Existing ConditionsExisting Conditions

Page 14: Avalon Road (CR 545) - ocfl.net...Avalon Road (CR 545) Preliminary Design Study August 25, 2015 CEDS Department Office. Study Location Avalon Road (C.R.545) Village H Village I Village

Project HistoryNeed for improvement Existing Conditions  Alternatives  Funding and PhasingGoals, Objectives & Policies Action Requested 

Presentation OutlinePresentation Outline

Page 15: Avalon Road (CR 545) - ocfl.net...Avalon Road (CR 545) Preliminary Design Study August 25, 2015 CEDS Department Office. Study Location Avalon Road (C.R.545) Village H Village I Village

Centerline Alignment−Western & Eastern Right-of-Way Expansion− (Major Impacts – Utilities & Wetlands)

Segment 4−East Alignment Alternative−West Alignment Alternative−Minimize Springhill Alignment Alternative −Avoid RCID Alignment Alternative

Preferred Alignment−Segments 1, 2 & 3: Western Right-of-Way Expansion−Segment 4: East-West-East Right-of-Way Expansion

AlternativesAlternatives

Page 16: Avalon Road (CR 545) - ocfl.net...Avalon Road (CR 545) Preliminary Design Study August 25, 2015 CEDS Department Office. Study Location Avalon Road (C.R.545) Village H Village I Village

Pond Locations NORTH

AlternativesAlternatives

Page 17: Avalon Road (CR 545) - ocfl.net...Avalon Road (CR 545) Preliminary Design Study August 25, 2015 CEDS Department Office. Study Location Avalon Road (C.R.545) Village H Village I Village

NORTH

Pond Locations

AlternativesAlternatives

Page 18: Avalon Road (CR 545) - ocfl.net...Avalon Road (CR 545) Preliminary Design Study August 25, 2015 CEDS Department Office. Study Location Avalon Road (C.R.545) Village H Village I Village

Recommended Typical Section

AlternativesAlternatives

Page 19: Avalon Road (CR 545) - ocfl.net...Avalon Road (CR 545) Preliminary Design Study August 25, 2015 CEDS Department Office. Study Location Avalon Road (C.R.545) Village H Village I Village

Cost of All Alternatives

AlternativesAlternatives

Page 20: Avalon Road (CR 545) - ocfl.net...Avalon Road (CR 545) Preliminary Design Study August 25, 2015 CEDS Department Office. Study Location Avalon Road (C.R.545) Village H Village I Village

Public Involvement

AlternativesAlternatives

Community Meeting−April 22, 2015

LPA Hearing− June 17, 2015

BCC Hearing−August 25, 2015

Page 21: Avalon Road (CR 545) - ocfl.net...Avalon Road (CR 545) Preliminary Design Study August 25, 2015 CEDS Department Office. Study Location Avalon Road (C.R.545) Village H Village I Village

Project HistoryNeed for improvement Existing Conditions  Alternatives  Funding and PhasingGoals, Objectives & Policies Action Requested 

Presentation OutlinePresentation Outline

Page 22: Avalon Road (CR 545) - ocfl.net...Avalon Road (CR 545) Preliminary Design Study August 25, 2015 CEDS Department Office. Study Location Avalon Road (C.R.545) Village H Village I Village

Alignment Study is First Step Final Design will Take 1 Year ‐May 2016 Construction Will Begin Shortly After Most Likely Order will be Segment 3,2,4,1 Construction Schedule is Market Driven

Funding and PhasingFunding and Phasing

Page 23: Avalon Road (CR 545) - ocfl.net...Avalon Road (CR 545) Preliminary Design Study August 25, 2015 CEDS Department Office. Study Location Avalon Road (C.R.545) Village H Village I Village

Project HistoryNeed for improvement Existing Conditions  Alternatives  Funding and PhasingGoals, Objectives & Policies Action Requested 

Presentation OutlinePresentation Outline

Page 24: Avalon Road (CR 545) - ocfl.net...Avalon Road (CR 545) Preliminary Design Study August 25, 2015 CEDS Department Office. Study Location Avalon Road (C.R.545) Village H Village I Village

Goal T1: A safe, convenient, efficient and financially feasible multimodal system which minimizes environmental impacts

Obj. T2.1: The County will continue to ensure minimum level of service standards on County roads

Goals, Objectives & PoliciesGoals, Objectives & Policies

Page 25: Avalon Road (CR 545) - ocfl.net...Avalon Road (CR 545) Preliminary Design Study August 25, 2015 CEDS Department Office. Study Location Avalon Road (C.R.545) Village H Village I Village

Project HistoryNeed for improvement Existing Conditions  Alternatives  Funding and PhasingGoals, Objectives & Policies Action Requested 

Presentation OutlinePresentation Outline

Page 26: Avalon Road (CR 545) - ocfl.net...Avalon Road (CR 545) Preliminary Design Study August 25, 2015 CEDS Department Office. Study Location Avalon Road (C.R.545) Village H Village I Village

Approve the Findings of the Avalon Road/CR 545 Preliminary Design Study

Find it Consistent with the Comprehensive Plan Goals,    Objectives and Policies

Action RequestedAction Requested