Upload
tanisha-gilliam
View
26
Download
3
Embed Size (px)
DESCRIPTION
AUTONOMOUS REGION OF FRIULI GIULIA ALPCITY PROJECT : WORK PACKAGE 7 “ Urban Environment ”. WP6 Transnational Co-ordinator Pierpaolo Suber. SUMMARY. Local planned activities of the Region FVG Key case 1 Key case 2 Key cases steps. TIMEFRAME. WP time frame as scheduled in the AF - PowerPoint PPT Presentation
Citation preview
AUTONOMOUS REGION OF FRIULI AUTONOMOUS REGION OF FRIULI GIULIAGIULIA
ALPCITY PROJECTALPCITY PROJECT : :
WORK PACKAGE 7WORK PACKAGE 7
“ “Urban EnvironmentUrban Environment” ”
WP6 Transnational Co-ordinator Pierpaolo SuberPierpaolo Suber
2.
SUMMARYSUMMARY
• Local planned activities of the Region FVG Local planned activities of the Region FVG
• Key case 1Key case 1
• Key case 2Key case 2
• Key cases steps Key cases steps
3.
TIMEFRAMETIMEFRAME
WP time frame as scheduled in the AFWP time frame as scheduled in the AF
• WP duration: 20 monthsWP duration: 20 months
• WP starting date: September 2004WP starting date: September 2004
• WP ending date: April 2006WP ending date: April 2006
4.
PLANNED ACTIVITIESPLANNED ACTIVITIES
PROJECT CONCEPT
Starting from the project idea designed to enhance theStarting from the project idea designed to enhance the
endogenousendogenous resources of alpine settlements, the resources of alpine settlements, the
Region of FVG, considering that such small Region of FVG, considering that such small
administrations have difficulties in terms of size,administrations have difficulties in terms of size,
financial capacity and professional skills, intendsfinancial capacity and professional skills, intends
financing pilot studies and planning activities. financing pilot studies and planning activities.
5.
PLANNED ACTIVITIESPLANNED ACTIVITIES
These activities foresee two different These activities foresee two different key studieskey studies::
1) guidelines for the recovery of abandoned areas in the neighbourhood of the borders with Austria and Slovenia ( involving the area of Tarvisio);
2) guidelines for obtaining the environmental certification (involving the area of Forni di Sopra),
These activities should reach at least the level of aThese activities should reach at least the level of a
“ “pre-feasibility project”, including the project financingpre-feasibility project”, including the project financing
necessary to them actually being carried outnecessary to them actually being carried out ..
6.
STEPSSTEPS
Key Study 1Key Study 1
• Preliminary analysis of the endogenous resources Preliminary analysis of the endogenous resources
and of the existing potentialities connected to the and of the existing potentialities connected to the
recovery of the abandoned areas;recovery of the abandoned areas;
• comparison of the ideas that have arisen at a local comparison of the ideas that have arisen at a local
level together with the trans-national best practices level together with the trans-national best practices
concerning similar problems;concerning similar problems;
7.
STEPSSTEPS
• definition of guidelines, planning and pre-feasibility definition of guidelines, planning and pre-feasibility
project for the recovery of dismantled areas and project for the recovery of dismantled areas and
structures.structures.
The University of Udine (Department of CivilThe University of Udine (Department of Civil
Engineering) will be appointed to carry out theEngineering) will be appointed to carry out the
guidelines and the pre-feasibility project.guidelines and the pre-feasibility project.
8.
STEPSSTEPS
Key Study 2Key Study 2
• Preliminary analysis of the endogenous resources and of the Preliminary analysis of the endogenous resources and of the
existing potentialities connected to the enhancement of the existing potentialities connected to the enhancement of the
natural landscape;natural landscape;
• definition of guidelines in order to obtain environmental definition of guidelines in order to obtain environmental
certification;certification;
• preparation and dissemination to Local Authorities of a special preparation and dissemination to Local Authorities of a special manual.manual.
9.
PRESENTATION OF RESULTSPRESENTATION OF RESULTS
• The presentation of WP7 results to the local The presentation of WP7 results to the local
authorities of the regional mountain areas will take authorities of the regional mountain areas will take
place in May 2006.place in May 2006.
• The AlpCity outputs will be disseminated during the The AlpCity outputs will be disseminated during the
Summer, after the final general international Summer, after the final general international
conference of the project scheduled in June 2006.conference of the project scheduled in June 2006.
10.
THE ENDTHE END