87
1 Automatic control (of wind turbines and wind farms in the power system) - WIND TURBINE CONTROLS - WIND FARM CONTROL - POWER SYSTEM INTEGRATION MARE WINT Opening Lectures NTNU, 4. September 2013 Kjetil Uhlen NTNU

Automatic control - CESOS - NTNUAutomatic control (of wind turbines and wind farms in the power system) - WIND TURBINE CONTROLS ... Schematic of Vestas V80- 2MW . 10 How they look

  • Upload
    others

  • View
    1

  • Download
    0

Embed Size (px)

Citation preview

Page 1: Automatic control - CESOS - NTNUAutomatic control (of wind turbines and wind farms in the power system) - WIND TURBINE CONTROLS ... Schematic of Vestas V80- 2MW . 10 How they look

1

Automatic control

(of wind turbines and wind farms in the power system)

- WIND TURBINE CONTROLS - WIND FARM CONTROL - POWER SYSTEM INTEGRATION

MARE WINT Opening Lectures NTNU, 4. September 2013

Kjetil Uhlen NTNU

Page 2: Automatic control - CESOS - NTNUAutomatic control (of wind turbines and wind farms in the power system) - WIND TURBINE CONTROLS ... Schematic of Vestas V80- 2MW . 10 How they look

2

Overview TECHNOLOGY

Review on relevant wind turbine technologies and configurations (energy conversion principles)

CONTROL

Overview of various control systems and the purpose of those: Power control (speed and torque) Voltage control (and reactive power compensation) Other controls

SYSTEM INTEGRATION

Relevant issues on network integration and system operation System requirements and grid codes

Page 3: Automatic control - CESOS - NTNUAutomatic control (of wind turbines and wind farms in the power system) - WIND TURBINE CONTROLS ... Schematic of Vestas V80- 2MW . 10 How they look

3

Overview TECHNOLOGY

Review on relevant wind turbine technologies and configurations (energy conversion principles)

CONTROL

Overview of various control systems and the purpose of those: Power control (speed and torque) Voltage control (and reactive power compensation) Other controls

SYSTEM INTEGRATION

Relevant issues on network integration and system operation System requirements and grid codes

Page 4: Automatic control - CESOS - NTNUAutomatic control (of wind turbines and wind farms in the power system) - WIND TURBINE CONTROLS ... Schematic of Vestas V80- 2MW . 10 How they look

4

Technology – Wind turbines/power plants

Horizontal axis (three-bladed) wind turbines for electric power generation Electro-mechanical configurations Automatic controls

Foto: Hydro

Page 5: Automatic control - CESOS - NTNUAutomatic control (of wind turbines and wind farms in the power system) - WIND TURBINE CONTROLS ... Schematic of Vestas V80- 2MW . 10 How they look

5

Wind turbine power conversion

Type BVariable slip

Type CDoubly-fed IG

Gear box IG

Control system

Gear box IG

Control system

Gear box

Control system

Gear box

Control system

Type DFull converter (IG/PM/SG)

Gear box G

Control system ~~

Gear box DFIG

Controlsystem ~~

Gear box DFIG

Controlsystem ~~~~

Type AFixed speed

Page 6: Automatic control - CESOS - NTNUAutomatic control (of wind turbines and wind farms in the power system) - WIND TURBINE CONTROLS ... Schematic of Vestas V80- 2MW . 10 How they look

6

Relevant electro-mechanical configurations 1. Induction (asynchronous) generator + Passive control

(”stall-control”) 2. Induction (asynchronous) generator + Rotor angle control

(”pitch-control” or ”active stall”) 3. Induction (asynchronous) generator with variable slip +

Rotor angle control (”opti-slip”) 4. Doubly-fed induction generator (DFIG) + Rotor angle

control (”opti-speed”) 5. Induction generator with frequency converter + Rotor

angle control 6. Synchronous generator with frequency converter + Rotor

angle control

Page 7: Automatic control - CESOS - NTNUAutomatic control (of wind turbines and wind farms in the power system) - WIND TURBINE CONTROLS ... Schematic of Vestas V80- 2MW . 10 How they look

7

Gear-box

Pmvw

Pel

ωPowergridfn

β = const.

AGx

Gear-boxGear-box

Pmvw

Pel

ωPowergridfn

β = const.

AGxx

Gear-box

Pmvw

Pel

ωPowergridfn

β

AGx

Gear-boxGear-box

Pmvw

Pel

ωPowergridfn

β

AGx

Gear-box

vwPowergridfn

β

AG

R

ω fn (1 + s)x

Gear-boxGear-box

vwPowergridfn

β

AG

R

ω fn (1 + s)ω fn (1 + s)xx

Powergrid

fn

Gear-box

f1

vw

β

AG

ω f1

Powergrid

fn

Gear-boxGear-box

f1

vw

β

vw

β

AG

ω f1 ω f1

f1

vw

β

Powergrid

fn

ω f1

uf

f1

vw

β

Powergrid

fn

ω f1 ω f1

uf

1)

2)

3)

4)

5)

6)

Power grid

fn

Gear-box

vw

β

DFIG

ω fn- fr fr

Power grid

fn

Gear-boxGear-box

vw

β

vw

β

DFIG

ω fn- fr ω fn- fr frfr

Page 8: Automatic control - CESOS - NTNUAutomatic control (of wind turbines and wind farms in the power system) - WIND TURBINE CONTROLS ... Schematic of Vestas V80- 2MW . 10 How they look

8

Electro-mechanical configurations of major wind turbine manufacturers Vestas (DK)

Originally referred to as “Opti-slip” and “Opti-speed” NTE: Vikna og Hundhammerfjellet

SIEMENS (DK) Traditional AG/active stall (recently with frequency converter) Statkraft: Smøla (150 MW), Hitra (55 MW) and Kjøllefjord

Enercon (DE) Multi-pole synchronous generator, direct drive TE: Valsneset and Bessakerfjellet

Nordex (DE) DFIG Havøygavlen: 16 x 2.5 MW

GE wind (USA) DFIG and frequency converter

Page 9: Automatic control - CESOS - NTNUAutomatic control (of wind turbines and wind farms in the power system) - WIND TURBINE CONTROLS ... Schematic of Vestas V80- 2MW . 10 How they look

9

How they look..

Schematic of Siemens 2.3 MW Her mangler det et bilde av en ”konvensjonell” vindturbingenerator

Schematic of Vestas V80-2MW

Page 10: Automatic control - CESOS - NTNUAutomatic control (of wind turbines and wind farms in the power system) - WIND TURBINE CONTROLS ... Schematic of Vestas V80- 2MW . 10 How they look

10

How they look..

Stator in Enercon’s 4.5 MW

Her mangler det et bilde av en ”konvensjonell” vindturbingenerator

Schematic of Enercon 2 MW

Page 11: Automatic control - CESOS - NTNUAutomatic control (of wind turbines and wind farms in the power system) - WIND TURBINE CONTROLS ... Schematic of Vestas V80- 2MW . 10 How they look

11

Overview TECHNOLOGY

Review on relevant wind turbine technologies and configurations (energy conversion principles)

CONTROL

Overview of various control systems and the purpose of those: Power control (speed and torque) Voltage control (and reactive power compensation) Other controls

SYSTEM INTEGRATION

Relevant issues on network integration and system operation System requirements and grid codes

Page 12: Automatic control - CESOS - NTNUAutomatic control (of wind turbines and wind farms in the power system) - WIND TURBINE CONTROLS ... Schematic of Vestas V80- 2MW . 10 How they look

12

What is special about wind power?

The wind power plant lacks a controllable ”energy storage” on the input Generation planning becomes more difficult

Grid G Energy input: -Fuel -Reservoir

Active power Frequency

Voltage

Reactive power

Grid

vw G Energi input:

-Wind

Active power Frequency

Voltage

Reactive power

Page 13: Automatic control - CESOS - NTNUAutomatic control (of wind turbines and wind farms in the power system) - WIND TURBINE CONTROLS ... Schematic of Vestas V80- 2MW . 10 How they look

13

What is special about wind power?

More degrees of freedom with power electronics and variable speed operation

Grid G Energy input: -Fuel -Reservoir

Active power Frequency

Voltage

Reactive power

Grid

vw G Energi input:

-Wind

Active power

Speed Torque

Voltage Reactive power

Page 14: Automatic control - CESOS - NTNUAutomatic control (of wind turbines and wind farms in the power system) - WIND TURBINE CONTROLS ... Schematic of Vestas V80- 2MW . 10 How they look

14

Three main control objectives

Optimization of power output and energy yield To track the optimal power setpoint.

Minimize mechanical load and wear Active damping of (mechanical) resonant modes.

Contribute to power system control Power-frequency and voltage control

Page 15: Automatic control - CESOS - NTNUAutomatic control (of wind turbines and wind farms in the power system) - WIND TURBINE CONTROLS ... Schematic of Vestas V80- 2MW . 10 How they look

Wind turbine controls Control objectives (more specifically):

Optimization of power output and energy yield Power output limitation Minimization of power fluctuations and mechanical

loads, due to: Rapid variations in windspeed (and waves) Structural modes, 3P-variations, etc. (hydrodynamic forces) (Disturbances from the grid)

Maintain voltage quality requirements Damping of fast power variations (impacting grid voltage). Reduce voltage flicker Reactive power support / voltage control

(optionally) active power-frequency control support

Page 16: Automatic control - CESOS - NTNUAutomatic control (of wind turbines and wind farms in the power system) - WIND TURBINE CONTROLS ... Schematic of Vestas V80- 2MW . 10 How they look

16

Other control and monitoring functions Protections and breaking systems

Start and stop functions

Operational control and monitoring (communication

with control centre)

Mostly relevant in autonomous systems or weak grids: Frequency control Energy storage

Page 17: Automatic control - CESOS - NTNUAutomatic control (of wind turbines and wind farms in the power system) - WIND TURBINE CONTROLS ... Schematic of Vestas V80- 2MW . 10 How they look

Other controls / protections

Start/stop procedures (normal) Grid synchronization and breakers ”Soft starter”

(Start)/stop procedures (emergency) Protection: Overspeed, low voltage (fault ride through) Safety: brakes and breaking system (mechanical, fail safe

pitch control, braking resistor / dump load, electrical breakers)

“Storm” control

Yaw control

Page 18: Automatic control - CESOS - NTNUAutomatic control (of wind turbines and wind farms in the power system) - WIND TURBINE CONTROLS ... Schematic of Vestas V80- 2MW . 10 How they look

(Additional) Wind farm controls

Control of power output from wind farm. Setpoint control within the available power

range (for congestion management and balancing purposes)

Power optimization

Frequency and voltage control Control functionality enabling wind farms to

contribute with primary active and reactive reserves

Page 19: Automatic control - CESOS - NTNUAutomatic control (of wind turbines and wind farms in the power system) - WIND TURBINE CONTROLS ... Schematic of Vestas V80- 2MW . 10 How they look

19

Development trends Increasing demand on controllability:

To reduce mechanical loads

Lighter components Cost reduction (cost/kWh)

To optimize wind turbine design and performance Cost reduction (cost/kWh)

To ensure voltage quality Eliminate local grid constraints

Increasing focus on system requirements (as specified in grid codes)

Wind farms are treated more and more as conventional power plants Must be able to offer system services (contribute to system frequency and voltage

control) Improve system stability and maintain system security

Page 20: Automatic control - CESOS - NTNUAutomatic control (of wind turbines and wind farms in the power system) - WIND TURBINE CONTROLS ... Schematic of Vestas V80- 2MW . 10 How they look

Floating turbines

Trend towards very large turbines

Low frequency tower oscillations Damping (stability) relies on control system

20

Page 21: Automatic control - CESOS - NTNUAutomatic control (of wind turbines and wind farms in the power system) - WIND TURBINE CONTROLS ... Schematic of Vestas V80- 2MW . 10 How they look

Summary control objectives

Load Mitigation

Power Quality

Electrical disturbances

(FRT)

Frequency control

(Primary)

Frequency control

(Secondary)

Voltage/ Reactive

power Control

Active Power

Forecast

Time

Impact

System wide

Local

Wind Turbine Level

Wind Farm Level

Power System Level

...........ms..............seconds ................ minutes ............hours..........

Wakes & Turbulence

Ref. Olimpo Anaya-Lara

Page 22: Automatic control - CESOS - NTNUAutomatic control (of wind turbines and wind farms in the power system) - WIND TURBINE CONTROLS ... Schematic of Vestas V80- 2MW . 10 How they look

22

Power and energy from wind

312 windwind p air rotorP C A vρ=

Turbine power:

www.windpower.org

1

2

3vv

=

Betz-Lanchester: Maximum efficiency for an ideal rotor: Cpmax= 0.59 if

Max efficiency for three-bladed wind turbines today is around Cpmax=0.5.

Max efficiency depends on rotor design and the number of blades in the rotor

Page 23: Automatic control - CESOS - NTNUAutomatic control (of wind turbines and wind farms in the power system) - WIND TURBINE CONTROLS ... Schematic of Vestas V80- 2MW . 10 How they look

23

0.00

0.05

0.10

0.15

0.20

0.25

0.30

0.35

0.40

0.45

0.50

0 5 10 15 20Tip-speed ratio

Cp

-101510

"Pitch"-vinkel[grader]

Virkningsgradskurver, Cp (λ ,β )

Page 24: Automatic control - CESOS - NTNUAutomatic control (of wind turbines and wind farms in the power system) - WIND TURBINE CONTROLS ... Schematic of Vestas V80- 2MW . 10 How they look

24

Wind turbine controls Power control Possibilities depend on configuration (turbine and

power conversion system) Main principles for power control:

(Passive stall) Pitch control Variable speed

Through frequency converter Through induction generator and variable slip

Yaw control

Page 25: Automatic control - CESOS - NTNUAutomatic control (of wind turbines and wind farms in the power system) - WIND TURBINE CONTROLS ... Schematic of Vestas V80- 2MW . 10 How they look

25

Turbine power: PW = ½ Cp(λ ,β )ρ A vw

3 ,”Tip speed ratio” λ = ω r / vw - Speed - Pitch - Yaw

Gear- box Nett

PW vw

Pel

ω f1 f2

β

Page 26: Automatic control - CESOS - NTNUAutomatic control (of wind turbines and wind farms in the power system) - WIND TURBINE CONTROLS ... Schematic of Vestas V80- 2MW . 10 How they look

26

Power control “Pitch” versus “stall” and speed control

Power is a function of torque and speed: P = T · ω Turbine speed is determined by grid frequency, gear ratio and slip of

induction generator. ”STALL”: Passive torque regulation, determined by the turbine’s

aerodynamic properties. ”PITCH”: Active torque control through pitching of rotor blades

(applied for both optimization and power output limitation)

Gear- box

PW vw

Pel

ω Nett fn

β

AG

Page 27: Automatic control - CESOS - NTNUAutomatic control (of wind turbines and wind farms in the power system) - WIND TURBINE CONTROLS ... Schematic of Vestas V80- 2MW . 10 How they look

27

Induction motor Torque versus speed curves

TEL

ngen

Motor

Generator

ngen ≈ fn(1-s)

Page 28: Automatic control - CESOS - NTNUAutomatic control (of wind turbines and wind farms in the power system) - WIND TURBINE CONTROLS ... Schematic of Vestas V80- 2MW . 10 How they look

28

Power versus windspeed curves

0

20

40

60

80

100

120

0 5 10 15 20 25 30Wind speed (m/s)

Pow

er (%

)

Pitch controlled

Stall regulated

Page 29: Automatic control - CESOS - NTNUAutomatic control (of wind turbines and wind farms in the power system) - WIND TURBINE CONTROLS ... Schematic of Vestas V80- 2MW . 10 How they look

29

Power control “Pitch” versus “stall” and speed control

Source: Lubosny

www.windpower.org

Page 30: Automatic control - CESOS - NTNUAutomatic control (of wind turbines and wind farms in the power system) - WIND TURBINE CONTROLS ... Schematic of Vestas V80- 2MW . 10 How they look

30

Conventional pitch control (rated @ 1500 kW)

-15

-10

-5

0

5

10

15

20

25

0 5 10 15 20 25

Windspeed [m/s]

Pitc

h an

gle

[deg

rees

]

3000 kW2500 kW2000 kW1500 kW1000 kW 500 kW 0 kW

Power limitationOptimisation

Page 31: Automatic control - CESOS - NTNUAutomatic control (of wind turbines and wind farms in the power system) - WIND TURBINE CONTROLS ... Schematic of Vestas V80- 2MW . 10 How they look

31

Active stall control

-15

-10

-5

0

5

10

15

20

25

0 5 10 15 20 25

Windspeed [m/s]

Pitc

h an

gle

[deg

rees

]

3000 kW2500 kW2000 kW1500 kW1000 kW 500 kW 0 kW

Power limitationOptimisation

Page 32: Automatic control - CESOS - NTNUAutomatic control (of wind turbines and wind farms in the power system) - WIND TURBINE CONTROLS ... Schematic of Vestas V80- 2MW . 10 How they look

32

0

500

1000

1500

2000

2500

0 5 10 15 20 25

Windspeed [m/s]

Pow

er [k

W]

-101271025

"Pitch"-vinkel[grader]

-1

0 1

2

7 10 25 16 Pitch controlled Active stall control

Page 33: Automatic control - CESOS - NTNUAutomatic control (of wind turbines and wind farms in the power system) - WIND TURBINE CONTROLS ... Schematic of Vestas V80- 2MW . 10 How they look

33

10-2 10-1 100 10110-6

10-4

10-2

100

102

104

106

Frequency (Hz)

PSD

(kW

2 /Hz)

((m

/s)2 /H

z)PowerWind speed

Power spectral density from measurements

Page 34: Automatic control - CESOS - NTNUAutomatic control (of wind turbines and wind farms in the power system) - WIND TURBINE CONTROLS ... Schematic of Vestas V80- 2MW . 10 How they look

34

Power control Variable speed operation There are limitations to pitch control with regard to

actuator speed (bandwidth) and performance. Additional achievements by variable speed control:

Further optimization of efficiency (one more degree of freedom). Energy of rotor inertia can be exploited (short-term energy

storage). Enables faster and more precise control.

Implementation of variable speed control is possible by using: Induction generator with variable slip Doubly-fed induction generator (DFIG) Full-scale frequency converter (independent of generator type)

Page 35: Automatic control - CESOS - NTNUAutomatic control (of wind turbines and wind farms in the power system) - WIND TURBINE CONTROLS ... Schematic of Vestas V80- 2MW . 10 How they look

35

Optimization by variable speed control

[Ref: Heier]

Page 36: Automatic control - CESOS - NTNUAutomatic control (of wind turbines and wind farms in the power system) - WIND TURBINE CONTROLS ... Schematic of Vestas V80- 2MW . 10 How they look

Optimization by variable speed control Control regions

3max ,

3

1( )2wind p opt windP v C Av

K

ρ

ω

=

=

Page 37: Automatic control - CESOS - NTNUAutomatic control (of wind turbines and wind farms in the power system) - WIND TURBINE CONTROLS ... Schematic of Vestas V80- 2MW . 10 How they look

37

Induction generator with variable slip

Gear- box

vw

Grid fn

β

AG

R

ω fn (1 - s)

Grid

fn

Gir- box

vw

β

DFIG

ω fn- fr fr

Doubly-fed induction generator (DFIG) (with frequency converter controlling rotor voltage)

Page 38: Automatic control - CESOS - NTNUAutomatic control (of wind turbines and wind farms in the power system) - WIND TURBINE CONTROLS ... Schematic of Vestas V80- 2MW . 10 How they look

38

Induction motor Torque versus speed curves

TEL

ngen

Page 39: Automatic control - CESOS - NTNUAutomatic control (of wind turbines and wind farms in the power system) - WIND TURBINE CONTROLS ... Schematic of Vestas V80- 2MW . 10 How they look

39

Power balance of a DFIG

Super-synchronous speed:

Sub-synchronous speed:

DFIG

AC-DC-AC

Pmek Pel

DFIG

AC-DC-AC

Pmek Pel

Pr

Ps

Ps

Pr

Pr s = (ωr- ωN)/ωN

Page 40: Automatic control - CESOS - NTNUAutomatic control (of wind turbines and wind farms in the power system) - WIND TURBINE CONTROLS ... Schematic of Vestas V80- 2MW . 10 How they look

40

Frequency converter at part load

Full frequency converter

f1

vw

β

Grid

fn

ω f1

Grid

fn

Gear- box

f1

vw

β

AG

ω f1(1-s)

Page 41: Automatic control - CESOS - NTNUAutomatic control (of wind turbines and wind farms in the power system) - WIND TURBINE CONTROLS ... Schematic of Vestas V80- 2MW . 10 How they look

41

Wind turbine controls Voltage control

Possibilities depend on configuration (power conversion system and grid connection)

Main principles for voltage control: Synchronous generator with AVR (not widely used in WTs) Switched capacitor banks (Mechanically or thyristor based) Using power electronics (converter based)

(Internally) as part of the wind turbine’s power conversion system

(Externally) as separate solutions within the wind farm transformer station (point of common connection)

Page 42: Automatic control - CESOS - NTNUAutomatic control (of wind turbines and wind farms in the power system) - WIND TURBINE CONTROLS ... Schematic of Vestas V80- 2MW . 10 How they look

42

Synchronous generator with AVR (not a common solution)

Gear- box

vw

ω Grid Un SG

AVR

Gear- box

vw

ω Grid Un AG

Induction generator with switched capacitor banks (conventional solution)

x x

Page 43: Automatic control - CESOS - NTNUAutomatic control (of wind turbines and wind farms in the power system) - WIND TURBINE CONTROLS ... Schematic of Vestas V80- 2MW . 10 How they look

43

Full frequency converter

Converter based compensator (Statcom) Uset

vw Grid

Un

Grid Un

Gear- box

Uset

vw AG

Page 44: Automatic control - CESOS - NTNUAutomatic control (of wind turbines and wind farms in the power system) - WIND TURBINE CONTROLS ... Schematic of Vestas V80- 2MW . 10 How they look

44

Voltage control at point of common connection (using an SVC)

Gear- box

vw

ω Grid

Un AG

x x

Gear- box

vw

ω AG

SVC

: :

Page 45: Automatic control - CESOS - NTNUAutomatic control (of wind turbines and wind farms in the power system) - WIND TURBINE CONTROLS ... Schematic of Vestas V80- 2MW . 10 How they look

45

Voltage control at point of common connection (using Statcom)

Gear- box

vw

ω Grid

Un AG

Gear- box

vw

ω AG

: :

STATCOM

Xt

Page 46: Automatic control - CESOS - NTNUAutomatic control (of wind turbines and wind farms in the power system) - WIND TURBINE CONTROLS ... Schematic of Vestas V80- 2MW . 10 How they look

46

Control structures

Control objectives Choice of measurement signals Choice of control variables (actuators) Controller implementations – Choice of:

Control loops Control structures and tuning

Page 47: Automatic control - CESOS - NTNUAutomatic control (of wind turbines and wind farms in the power system) - WIND TURBINE CONTROLS ... Schematic of Vestas V80- 2MW . 10 How they look

47

Control structures for active and reactive power

Converter controls for variable speed turbines

Pitch control

Page 48: Automatic control - CESOS - NTNUAutomatic control (of wind turbines and wind farms in the power system) - WIND TURBINE CONTROLS ... Schematic of Vestas V80- 2MW . 10 How they look

General control structure (for active power)

fG

vw

β

fn

ω fG

Network

Pel

ω

Pref ω

ωmax Pitch controller

Power/torque controller

-

- Max power tracking

τG

ω

ω Pref

Page 49: Automatic control - CESOS - NTNUAutomatic control (of wind turbines and wind farms in the power system) - WIND TURBINE CONTROLS ... Schematic of Vestas V80- 2MW . 10 How they look

Max power tracking (for active power)

vw

fG

β

fn

ω fG

Network

Pel

ω

Pref

ωmax Pitch controller

Power/torque controller

-

- τG

ω

ω

Max power tracking

ω

Pref

ω

Page 50: Automatic control - CESOS - NTNUAutomatic control (of wind turbines and wind farms in the power system) - WIND TURBINE CONTROLS ... Schematic of Vestas V80- 2MW . 10 How they look

50

Rotor powerConverter

Grid

Gear

Inductionmachine

Transformer

PrimaryController

SecondaryController

Example: Overall control structure for DFIG (active and reactive power)

Pset

Uset

Un

Uset

fset αset Qset

Pel Udc

ω

α

vwind

Speed Power

Page 51: Automatic control - CESOS - NTNUAutomatic control (of wind turbines and wind farms in the power system) - WIND TURBINE CONTROLS ... Schematic of Vestas V80- 2MW . 10 How they look

51

Controllers and control loops in a DFIG-model

ir

vs

ac / dc dc / ac

C1 C2 Rotor position and

speed

Coordinate Transformation

Control of grid side converter

PWM PWM

Inverse Coordinate

Transformation

θr

Tsp

+

refqri

qri

qrv

Torque to current

transformation (K’)

PI Controller

dri

+

drv

PI Controller

Magnitude and angle of voltage

vector

Slip-frequency estimation

θs

V

vdc

Voltage or power factor

control Vref refdri

Page 52: Automatic control - CESOS - NTNUAutomatic control (of wind turbines and wind farms in the power system) - WIND TURBINE CONTROLS ... Schematic of Vestas V80- 2MW . 10 How they look

Control challenges Development trends Lighter turbines and offshore turbines:

More flexible constructions More dependent on control systems

for reduction of structural loads for stabilisation

Wind power impact on power system increasingly important Wind farms must contribute to power system frequency and

voltage control Must be able to ride through faults and provide support

during disturbances

Page 53: Automatic control - CESOS - NTNUAutomatic control (of wind turbines and wind farms in the power system) - WIND TURBINE CONTROLS ... Schematic of Vestas V80- 2MW . 10 How they look

Offshore floating turbines: Stabilisation of tower movements Drag forces:

Page 54: Automatic control - CESOS - NTNUAutomatic control (of wind turbines and wind farms in the power system) - WIND TURBINE CONTROLS ... Schematic of Vestas V80- 2MW . 10 How they look

Stabilisation of tower movements

fG

vw

β

fn

ω fG

Network

Pel

ω

Pref ω

ωmax Pitch controller

Power/torque controller

-

- Max power tracking

τG

ω

ω Pref

Additional measurements of position/speed/acceleration

?

Page 55: Automatic control - CESOS - NTNUAutomatic control (of wind turbines and wind farms in the power system) - WIND TURBINE CONTROLS ... Schematic of Vestas V80- 2MW . 10 How they look

55

Control structures for active active and reactive power

Breakingresistor

~

~=

=

Generator sideconverter

Generator

Grid sideconverter

DC link

AC gridShaft

Turbine

PIω βref

-ωmax

-

Ratelimit

Anglelimitτpitch

β

Gainscheduling

Pitch actuator

MId MId MIq MIq

β

Page 56: Automatic control - CESOS - NTNUAutomatic control (of wind turbines and wind farms in the power system) - WIND TURBINE CONTROLS ... Schematic of Vestas V80- 2MW . 10 How they look

56

...with active tower stabilisation

Breakingresistor

~

~=

=

Generator sideconverter

Generator

Grid sideconverter

DC link

AC gridShaft

Turbine

PIω βref

-ωmax

-

Ratelimit

Anglelimitτpitch

β

Gainscheduling

Pitch actuator

MId MId MIq MIq

β

ω BPPSSTSt α

Page 57: Automatic control - CESOS - NTNUAutomatic control (of wind turbines and wind farms in the power system) - WIND TURBINE CONTROLS ... Schematic of Vestas V80- 2MW . 10 How they look

Stabilisation and load reduction

fG

vw

β

fn

ω fG

Network

Pel

ω

Pref ω

ωmax Pitch controller

Power/torque controller

-

- Max power tracking

τG

ω

ω Pref

(Both high and low frequency dynamics) Additional measurements

Page 58: Automatic control - CESOS - NTNUAutomatic control (of wind turbines and wind farms in the power system) - WIND TURBINE CONTROLS ... Schematic of Vestas V80- 2MW . 10 How they look

58

Normal converter controls

f(ω) PIω Popt

PMId-

Converter interface & control

LP

id-

PI

PIMIq-

Converter interface & control

iq-

PI

Q

Qref

U

QU

Voltage droop

Speed / Active power

Voltage / Reactive power

Page 59: Automatic control - CESOS - NTNUAutomatic control (of wind turbines and wind farms in the power system) - WIND TURBINE CONTROLS ... Schematic of Vestas V80- 2MW . 10 How they look

59

Possibilities for active damping

PIMId-

Converter interface & control

id-

PI

UDC

UDCref

ω

-

BPPSS

Indirectly through modulation of DC

voltage

f(ω) PIω Popt

PMId-

Converter interface & control

LP

id-

PI

BPPSS

Through modulation of power control

Page 60: Automatic control - CESOS - NTNUAutomatic control (of wind turbines and wind farms in the power system) - WIND TURBINE CONTROLS ... Schematic of Vestas V80- 2MW . 10 How they look

Independent pitch control

fG

vw

β1

fn

ω fG

Network

Pel

ω

Pref ω

ωmax Pitch controller

Power/torque controller

-

- Max power tracking

τG

ω

ω Pref

β3 β2

Additional measurements

Page 61: Automatic control - CESOS - NTNUAutomatic control (of wind turbines and wind farms in the power system) - WIND TURBINE CONTROLS ... Schematic of Vestas V80- 2MW . 10 How they look

Independent pitch control Reduction of loads

f [Hz] Source: Bossanyi

1p. collective(dependent) pitch

Independent pitch + different control realisations

Page 62: Automatic control - CESOS - NTNUAutomatic control (of wind turbines and wind farms in the power system) - WIND TURBINE CONTROLS ... Schematic of Vestas V80- 2MW . 10 How they look

Fault ride through and power system support

fG

vw

β

fn

ω fG

Network

Pel

ω

Pref ω

ωmax Pitch controller

Power/torque/voltage controller

-

- Max power tracking

τG

ω

ω Pref

Additional measurements

U,f id,set

Page 63: Automatic control - CESOS - NTNUAutomatic control (of wind turbines and wind farms in the power system) - WIND TURBINE CONTROLS ... Schematic of Vestas V80- 2MW . 10 How they look

Power optimization Wakes and turbulence

( )1 1

max ( ) max ( )n turb n turb

i ii i

P t P t= =

>

∑ ∑Question:

Picture: © Vattenfall, Horns Rev 1 owned by Vattenfall. Photographer Christian Steiness

Page 64: Automatic control - CESOS - NTNUAutomatic control (of wind turbines and wind farms in the power system) - WIND TURBINE CONTROLS ... Schematic of Vestas V80- 2MW . 10 How they look

Fault ride through..

Source: ABB

Page 65: Automatic control - CESOS - NTNUAutomatic control (of wind turbines and wind farms in the power system) - WIND TURBINE CONTROLS ... Schematic of Vestas V80- 2MW . 10 How they look

65

Overview TECHNOLOGY

Review on relevant wind turbine technologies and configurations (energy conversion principles)

CONTROL

Overview of various control systems and the purpose of those: Power control (speed and torque) Voltage control (and reactive power compensation) Other controls

SYSTEM INTEGRATION

Relevant issues on network integration and system operation System requirements and grid codes

Page 66: Automatic control - CESOS - NTNUAutomatic control (of wind turbines and wind farms in the power system) - WIND TURBINE CONTROLS ... Schematic of Vestas V80- 2MW . 10 How they look

66

Large-scale wind power integration

SYSTEM REQUIREMENTS

Kjetil Uhlen NTNU

Problem areas and need of system requirements (”grid codes”) for grid

integration of large wind farms.

Page 67: Automatic control - CESOS - NTNUAutomatic control (of wind turbines and wind farms in the power system) - WIND TURBINE CONTROLS ... Schematic of Vestas V80- 2MW . 10 How they look

67

Content Problem areas in system operation

General overview (of system problems and control requirements)

System requirements (and examples illustrating relevant system problems)

Offshore grids

Page 68: Automatic control - CESOS - NTNUAutomatic control (of wind turbines and wind farms in the power system) - WIND TURBINE CONTROLS ... Schematic of Vestas V80- 2MW . 10 How they look

68

System operation – problem areas

Power balance (frequency control) Power system security (contingencies, congestions) Thermal limitations (Lines, cables, transformers,..) Voltage stability Stability (electro-mechanical)

Transient stability Damping (power oscillations)

Voltage quality Requirements on equipment

Control requirements Protection, limits on tolerance

etc.

Page 69: Automatic control - CESOS - NTNUAutomatic control (of wind turbines and wind farms in the power system) - WIND TURBINE CONTROLS ... Schematic of Vestas V80- 2MW . 10 How they look

69

System requirements - Motivation

That wind power plants will (or should) face similar requirements as conventional power plants regarding controllability and ability to provide relevant system services

Two key questions: What are the system performance requirements (technical issue)? Which system services should be provided by wind farms

(economic issue)?

Page 70: Automatic control - CESOS - NTNUAutomatic control (of wind turbines and wind farms in the power system) - WIND TURBINE CONTROLS ... Schematic of Vestas V80- 2MW . 10 How they look

70

”Grid codes” The aim is to ensure system control properties that are essential for

the reliability of supply, security in operation and power quality in the short end long term. General laws, regulations and agreements apply (”Entso-E Grid Codes”)

Specific grid codes for large scale wind power are being established in

Germany, Denmark, UK, Ireland, Spain, Sweden, .. Norway..

Process to harmonise in Europe through Entso-E

Page 71: Automatic control - CESOS - NTNUAutomatic control (of wind turbines and wind farms in the power system) - WIND TURBINE CONTROLS ... Schematic of Vestas V80- 2MW . 10 How they look

71

Grid codes for wind power .. Power control

Ability to control power output Frequency control (primary reserves) Start and stop, limits on power gradients,..

Frequency and voltage deviations Frequency and voltage limits where wind farms shall operate and when they shall stop

Reactive power and Voltage control Reactive compensation Control Requirements (Mvar-control, cosΦ-control, Voltage control, etc.) Voltage quality (Voltage variations, dips, flicker, harmonics, etc.)

Response to grid faults Stability requirements (transient) (Various types of faults)

Protection of the wind farm against grid faults Responsibility Tolerance.

Communication (between wind farm and grid operator, ..) Responsibility for providing information, operational data, etc.

Requirements regarding documentation, analysis, testing, etc.

Page 72: Automatic control - CESOS - NTNUAutomatic control (of wind turbines and wind farms in the power system) - WIND TURBINE CONTROLS ... Schematic of Vestas V80- 2MW . 10 How they look

Fault Ride Thourgh (FRT) requirements German FRT Grid Code requirements (BDEW) for MV

U/U c

t [ms]

100%

70%

45%

15%

0 150 700 1500 3000

Not disconnect

Disconnect

Examples of LVRT requirements

Page 73: Automatic control - CESOS - NTNUAutomatic control (of wind turbines and wind farms in the power system) - WIND TURBINE CONTROLS ... Schematic of Vestas V80- 2MW . 10 How they look

Fault Ride Thourgh (FRT) requirements

U/U c

t [ms]

100%

70%

45%

15%

0 150 700 1500 3000

Not disconnect

Disconnect

Examples of LVRT requirements

German FRT Grid Code requirements (BDEW) for MV Norwegian grid code (FIKS) for HV (> 220 kV)

1000

25%

Page 74: Automatic control - CESOS - NTNUAutomatic control (of wind turbines and wind farms in the power system) - WIND TURBINE CONTROLS ... Schematic of Vestas V80- 2MW . 10 How they look

Fault Ride Thourgh (FRT) requirements

U/U c

t [ms]

100%

70%

45%

15%

0 150 700 1500 3000

Disconnect

Examples of LVRT requirements

Not disconnect

German FRT Grid Code requirements (BDEW) for MV Norwegian grid code (FIKS) for HV ( >= 220 kV) Norwegian grid code (FIKS) for MV/HV (< 220 kV)

400 1000

Page 75: Automatic control - CESOS - NTNUAutomatic control (of wind turbines and wind farms in the power system) - WIND TURBINE CONTROLS ... Schematic of Vestas V80- 2MW . 10 How they look

75

Example illustrating problems related to congestion management and balancing control (frequency control) Frequency control reserves Congestion management Balancing services Reserves

Power capacity related problems

Example is from 8. January 2005

More than 1700 MW wind power discionnects due to severe storm in Southern Scandinavia

http://www.eltra.dk/composite-15751.htm

Page 76: Automatic control - CESOS - NTNUAutomatic control (of wind turbines and wind farms in the power system) - WIND TURBINE CONTROLS ... Schematic of Vestas V80- 2MW . 10 How they look

76

Western Denmark (Eltra)

Key counts of the power system of Eltra for the year 2003 (Source: Eltra)

MW GWh Central power plants 3,516 16,161 Decentralised CHP units 1,567 6,839 Decentralised wind turbines 2,374 4,363 Offshore wind farm Horns Rev A 160 Consumption 21,043 Maximum load 3,780 Minimum load 1,246 Capacity export to UCTE 1,200 Capacity import from UCTE 800 Capacity export to Nordel 1,560 Capacity import from Nordel 1,610

Page 77: Automatic control - CESOS - NTNUAutomatic control (of wind turbines and wind farms in the power system) - WIND TURBINE CONTROLS ... Schematic of Vestas V80- 2MW . 10 How they look

77

Elspot areas and transmission capacities

NO1

DK1

SE

NO2 FI

To Germany

DK2

950 MW 1000 MW

800 MW 1200 MW

Page 78: Automatic control - CESOS - NTNUAutomatic control (of wind turbines and wind farms in the power system) - WIND TURBINE CONTROLS ... Schematic of Vestas V80- 2MW . 10 How they look

78

8 January 2005

-1000

-750

-500

-250

0

250

500

750

1000

1250

1500

1750

2000

1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 16 17 18 19 20 21 22 23 24

Hour

MW

h/h

Exchange DK1 -> NO1Balancing power (NO1)Windpower DK1

Source: ELTRA / NORDPOOL

Page 79: Automatic control - CESOS - NTNUAutomatic control (of wind turbines and wind farms in the power system) - WIND TURBINE CONTROLS ... Schematic of Vestas V80- 2MW . 10 How they look

79

Power and frequency control

Primary frequency control and primary reserves Relevant in systems with very large scale wind integration In parts of the grid where wind power is the dominating

Power control (secondary control)

Important for congestion management and to avoid too strong or too fast power variations

Page 80: Automatic control - CESOS - NTNUAutomatic control (of wind turbines and wind farms in the power system) - WIND TURBINE CONTROLS ... Schematic of Vestas V80- 2MW . 10 How they look

80

Power-frequency control Frequency droop and primary reserves

50.0

49.9

49.5

HZ

MW

R = 100 MW/Hz

Pa

10 MW min 15 MW

Pn

FR DR

R = 2Pn/δ δ = 6 % Pn = 300 MW

Page 81: Automatic control - CESOS - NTNUAutomatic control (of wind turbines and wind farms in the power system) - WIND TURBINE CONTROLS ... Schematic of Vestas V80- 2MW . 10 How they look

81

Wind farm power control (active and reactive power reserves)

Time

Pow

er

Set-point power

Available power

Frequency

Pow

er

droop

Voltage

Rea

ctiv

e po

wer

droop

Time

Reserve power

Available power

Pow

er

Page 82: Automatic control - CESOS - NTNUAutomatic control (of wind turbines and wind farms in the power system) - WIND TURBINE CONTROLS ... Schematic of Vestas V80- 2MW . 10 How they look

Main challenges in operation and control

Primary control: Less primary reserves if new generation provide less

frequency response Secondary control: More need for secondary reserves with more variable

generation Tertiary control: Benefits with larger control areas and exchange of

reserves.

New possibilities with an offshore Multi-terminal HVDC grid!

Page 86: Automatic control - CESOS - NTNUAutomatic control (of wind turbines and wind farms in the power system) - WIND TURBINE CONTROLS ... Schematic of Vestas V80- 2MW . 10 How they look

Offshore Multi-terminal HVDC

MTDC has the potential to fully integrate power markets between asynchronous areas.

Can be operated in a similar manner as ac grids.

With the dc voltage droop control, no need of fast communication between converter terminals.

Primary reserves can be traded between asynchronous areas (with frequency droop on the converter)

Page 87: Automatic control - CESOS - NTNUAutomatic control (of wind turbines and wind farms in the power system) - WIND TURBINE CONTROLS ... Schematic of Vestas V80- 2MW . 10 How they look

87

Summary

Basic wind power technology: Power versus windspeed Pitch control Impact of variable speed operation

Turbine- and generator technologies 6 different power conversion configurations

Control systems Power, torque and speed control Voltage control

Grid connection and system operation issues Problem areas, grid codes and network analysis