    ERDADOC# HCCT-SDD-1120

    REVISION: 0

    AUTOMATED REPORTS GENERATIONSYSTEM FOR HIGH VOLTAGE DIVISION

    ISSUE DT:11/20/09

    SOFTWARE DESIGN DOCUMENT PAGE 1 of 49

    AHMEDABAD

    ELECTRICAL RESEARCH &DEVELOPMENT ASSOCIATION

    VADODARA, INDIA

    AUTOMATED REPORTS GENERATION SYSTEM

    FOR HIGH VOLTAGE TESTING DIVISION

    SOFTWARE DESIGN DOCUMENT

    HCCT-SDD-1120, Revision 0

    Approval Signatures

    AUTHOR: Atul Shah ____(Name) (Signature) DateApplitech Infotech

    REVIEWED BY: Shalin Patel ____(Name) (Signature) Date

    Applitech Infotech

    APPROVED BY: R. B. Desai ____(Name) (Signature) Date

    ERDA

  • 8/14/2019 Automated Reports Generation System for High Voltage Division Software Design

    2/49

    ERDADOC# HCCT-SDD-1120

    REVISION: 0

    AUTOMATED REPORTS GENERATIONSYSTEM FOR HIGH VOLTAGE DIVISION

    ISSUE DT:11/20/09

    SOFTWARE DESIGN DOCUMENT PAGE 2 of 49

    Revision Log

    Description ofRevision

    Author Revision Number RevisionDate

    Issued For Review Atul Shah 0 11/20/09

  • 8/14/2019 Automated Reports Generation System for High Voltage Division Software Design

    3/49

    ERDADOC# HCCT-SDD-1120

    REVISION: 0

    AUTOMATED REPORTS GENERATIONSYSTEM FOR HIGH VOLTAGE DIVISION

    ISSUE DT:11/20/09

    SOFTWARE DESIGN DOCUMENT PAGE 3 of 49

    Table of Contents

    1

    AHMEDABAD............................................................................................................1

    ELECTRICAL RESEARCH & DEVELOPMENT ASSOCIATION....................1

    VADODARA, INDIA..................................................................................................1

    AUTOMATED REPORTS GENERATION SYSTEM FOR HIGH VOLTAGE

    TESTING DIVISION..................................................................................................1

    SOFTWARE DESIGN DOCUMENT.......................................................................1

    HCCT-SDD-1120, Revision 0.....................................................................................1Approval Signatures...................................................................................................1

    Revision Log.................................................................................................................2

    Table of Contents........................................................................................................3

    1. Introduction ..............................................................................................................4

    2. System Overview ......................................................................................................4

    2.1 System Login Module ....................................................................................................4

    2.2 Administration Module................................................................................................. 5

    2.2.1 Customer Information............................................................................................... 5

    To modify the customer details system provides a view with the searching facility is

    shown below. On selection of any item above interface available with existing details to

    the user.................................................................................................................................... 6

    6

    2.2.2 User Information ........................................................................................................6

    To modify as well as assign the access privileges to the administrator system provides

    a view with the searching facility is shown below. On selection of any item above

    interface available with the existing details to the user........................................................ 8

    82.2.3 Parameter Value .......................................................................................................10

    2.2.4 Core Specification .....................................................................................................12

    2.2.5 Backup .......................................................................................................................14

    2.3 Report Creation Module .............................................................................................16

    2.3.1 Current Transformer Testing .................................................................................16

    2.3.2 CT-PT Testing ..........................................................................................................29

    2.3.3 Potential Transformer Testing(PT Testing) ...........................................................40

  • 8/14/2019 Automated Reports Generation System for High Voltage Division Software Design

    4/49

    ERDADOC# HCCT-SDD-1120

    REVISION: 0

    AUTOMATED REPORTS GENERATIONSYSTEM FOR HIGH VOLTAGE DIVISION

    ISSUE DT:11/20/09

    SOFTWARE DESIGN DOCUMENT PAGE 4 of 49

    1. IntroductionElectrical Research and Development Association (ERDA) is engaged in testing

    activities of various kinds of transformers. ERDA performs no of testing like High

    Voltage, Shot Circuit, Di-electrical, Meter Error Reading and others.

    To reducing the time and eliminating the errors in a report generation process,

    Applitech Infotech has developed the automated reports generation system for High

    Voltage Testing Division. To capturing a automatic data in a testing accuracy class

    system provides the online solution by integrating with excel files.

    This document describes the specifications and features of our application software.

    Also shall apply to implement the automated report generation system with in thedepartment or an organization.

    2. System Overview

    2.1 System Login ModuleThe user logs onto the computer terminal using the windows login information

    provided to the user. After logging onto the terminal, he/she will open the web

    browser and go to the login page of Automated Report Generation System.

    The user will enter the username and password information in the login window of an

    application home page. The user will only have access to screens for the systemdepending on the users access rights. Admin users will have access to all screens. A

    screen shot of the application login page is shown below:

    After successful login by the user, based on the access previllages, a Menu pageavailable to the user.

  • 8/14/2019 Automated Reports Generation System for High Voltage Division Software Design

    5/49

    ERDADOC# HCCT-SDD-1120

    REVISION: 0

    AUTOMATED REPORTS GENERATIONSYSTEM FOR HIGH VOLTAGE DIVISION

    ISSUE DT:11/20/09

    SOFTWARE DESIGN DOCUMENT PAGE 5 of 49

    2.2 Administration Module.2.2.1

    Customer Information.The interface for entering the customer information is shown below:

    The following table provides the details on each field shown on the screen above.

    Field Name Description Mandatory/Optional Values Comments

    Name Enter the unique

    Name of

    Customer

    Mandatory User defined Non Editable

    in

    Modification

    Billing Address Enter the

    address of a

    customer to print

    on invoice

    Mandatory User defined

    Communication

    Address

    Enter the

    address of acustomer to

    communicate

    Optional User defined

    Reporting

    Address

    Enter the

    address of a

    report sent to

    Optional User defined

    Email Enter the mail

    address to

    communicate

    with the

    customer

    Optional User defined

    Phone No Enter the contact

    details of a

    customer

    Optional User defined

  • 8/14/2019 Automated Reports Generation System for High Voltage Division Software Design

    6/49

    ERDADOC# HCCT-SDD-1120

    REVISION: 0

    AUTOMATED REPORTS GENERATIONSYSTEM FOR HIGH VOLTAGE DIVISION

    ISSUE DT:11/20/09

    SOFTWARE DESIGN DOCUMENT PAGE 6 of 49

    Fax Enter the Fax

    No

    Optional User defined

    To modify the customer details system provides a view with the searching facility is

    shown below. On selection of any item above interface available with existing details

    to the user.

    2.2.2 User InformationThe interface for entering the user information is shown below:

  • 8/14/2019 Automated Reports Generation System for High Voltage Division Software Design

    7/49

    ERDADOC# HCCT-SDD-1120

    REVISION: 0

    AUTOMATED REPORTS GENERATIONSYSTEM FOR HIGH VOLTAGE DIVISION

    ISSUE DT:11/20/09

    SOFTWARE DESIGN DOCUMENT PAGE 7 of 49

    The following table provides the details on each field shown on the screen above.

    Field Name Description Mandatory/Optional Values Comments

    User Name Enter the unique

    name of a user

    Mandatory User defined Not Editable

    in

    Modification

    Designation Enter the

    designation

    Mandatory User defined

    Type of User Select from the

    list

    Mandatory Select from

    Administrative,

    Normal

    For

    Administrative

    user select the

    administrative

    while for

    others selectNormal

    Login ID Enter the unique

    Login ID name

    Mandatory User defined Not Editable

    in

    Modification

    Password Enter the

    password

    Mandatory User defined Min length 6

    digit; Not

    Editable in

    Modification

    Email ID Enter the mail

    address of a user

    Mandatory User defined

    Securityquestion Select thesecurity

    question

    Mandatory Select from thelist. Values in aselection list

    available from

    parameter

    value under

    type security

    question.

    Your Answer Enter the answer

    for selected

    security

    question

    Mandatory User defined

    Status For valid user

    select Activewhile for not

    valid select

    Inactive

    Optional Select from the

    List

    Default it

    stores Active

  • 8/14/2019 Automated Reports Generation System for High Voltage Division Software Design

    8/49

  • 8/14/2019 Automated Reports Generation System for High Voltage Division Software Design

    9/49

    ERDADOC# HCCT-SDD-1120

    REVISION: 0

    AUTOMATED REPORTS GENERATIONSYSTEM FOR HIGH VOLTAGE DIVISION

    ISSUE DT:11/20/09

    SOFTWARE DESIGN DOCUMENT PAGE 9 of 49

    User can change his/her password by logged into the account by default password. On

    click of Change Password following screen is available to the user.

    In case of forgot password, system provides the forgot password option to user while

    logged in. On click of forgot password following interface avaialble to the user anduser has to submit the correct answer of a security question. If answer is correct,

    system generates a new password and auto mail to users mail ID with the password

    information.

  • 8/14/2019 Automated Reports Generation System for High Voltage Division Software Design

    10/49

    ERDADOC# HCCT-SDD-1120

    REVISION: 0

    AUTOMATED REPORTS GENERATIONSYSTEM FOR HIGH VOLTAGE DIVISION

    ISSUE DT:11/20/09

    SOFTWARE DESIGN DOCUMENT PAGE 10 of 49

    2.2.3 Parameter ValueSystem provides the number of default parameter types to the user for configuring therequired values. At the time of transactions selection of these values available to user

    according to the parameter. Default list of a Parameters type is given below.

    No Type Description Remarks

    01 Class Under the type user can able to create the different

    class values.

    02 Ratio CT Under the type user can able to create the different

    ratio related to Current Transformer Testing.

    03 Security Question Under the type user can able to create the different

    security questions for users security.04 Burden % Only system administrator can able to create the

    different values for Burden %.

    05 Current Rated % Only system administrator can able to create the

    different values for Current Rated %.

    06 Connected to gather to

    earth

    Under the type user can able to create the different

    values related to power frequency dry withstand test

    on primary winding.

    07 NSV Under the type user can able to create the different

    NSV values along with IL and HSV.

    08 Enable Capture Default value is Y. For manual entries in a Testing

    accuracy class modify and set the value to N09 Ratio CTPT Under the type user can able to create the different

    ratio related to CTPT and Potential Transformer

    Testing.

    10 Phase Pattern Under the type user can able to create the different

    Phase Pattern used in CTPT report for secondary

    winding terminals.

    11 Current Report Start According to the requirement user can set the start

    date of a year to control the duplication into report

    no.

    12 Previous Report Start According to the requirement and allow to backdate

    entries user can set the start date of a previous year to

    control the duplication into report no.

    13 Frequency Voltage % Under the type user can able to create different

    frequency Voltage % according to the requirement in

    dry withstand test on secondary winding and on

    primary winding.

  • 8/14/2019 Automated Reports Generation System for High Voltage Division Software Design

    11/49

    ERDADOC# HCCT-SDD-1120

    REVISION: 0

    AUTOMATED REPORTS GENERATIONSYSTEM FOR HIGH VOLTAGE DIVISION

    ISSUE DT:11/20/09

    SOFTWARE DESIGN DOCUMENT PAGE 11 of 49

    A screen shot of the parameter value screen is shown below:

    The following table provides the details on each field shown on the screen above.

    Field Name Description Mandatory/Optional Values CommentsParameter

    Type

    Select the

    parameter

    type.

    Mandatory From the

    Parameter

    Type Master

    Non editable

    in

    modification

    Parameter

    Value

    Enter the

    unique value

    with in a type

    Mandatory User defined Non editable

    in

    modification

    Status Select Active

    for valid

    while

    Inactive for

    not valid

    Mandatory Select from

    the list

    To change the status of a parameter value following view available to the user. On

    click of any item interface with the values available to the user.

  • 8/14/2019 Automated Reports Generation System for High Voltage Division Software Design

    12/49

    ERDADOC# HCCT-SDD-1120

    REVISION: 0

    AUTOMATED REPORTS GENERATIONSYSTEM FOR HIGH VOLTAGE DIVISION

    ISSUE DT:11/20/09

    SOFTWARE DESIGN DOCUMENT PAGE 12 of 49

    2.2.4 Core Specification

    One or more cores are available on Current transformer and Voltage transformer

    available with the specific values of a current or a voltage. Per CT, CTPT and PT

    testing, according to the requirement user need to configure the core specification ifnot exist into a standard list of core specification. User can able to configure the core

    specification of a Current transformer under CT Type wile for CTPT & PT type

    CTPT available to the user. The interface for entering the core specification is shown

    below:

  • 8/14/2019 Automated Reports Generation System for High Voltage Division Software Design

    13/49

    ERDADOC# HCCT-SDD-1120

    REVISION: 0

    AUTOMATED REPORTS GENERATIONSYSTEM FOR HIGH VOLTAGE DIVISION

    ISSUE DT:11/20/09

    SOFTWARE DESIGN DOCUMENT PAGE 13 of 49

    The following table provides the details on each field shown on the screen above.

    Field Name Description Mandatory/Optional Values Comments

    Unit Type Select the Unit type from

    the list

    Mandatory Select CT

    for

    Current

    Transfor

    mer

    while

    CTPT for

    CTPT

    testing as

    well asPT

    Testing

    Non editable

    in

    modification

    Core Sr No. Enter the Sr. No of a unit Mandatory Non editable

    in

    modification

    Core Enter the standard

    current applied to a core

    Mandatory Non editable

    in

    modification

    Burden(VA) Enter the standard

    burden applied to the unit

    Mandatory Non editable

    in

    modification

    Limit Class Select from the list Mandatory From The

    Paramete

    r Value

    Master

    under the

    type

    Class

    Non editable

    in

    modification

    ISF/ALF Enter the standard value

    of ISF

    Optional Non editable

    in

    modificationCore

    Specification

    (Core No-

    Core(A)/Bur

    den/Class)

    System generates auto Auto From the

    available

    values

    Non editable

    in

    modification

    Status Select Active for valid

    while InActive for not

    valid

    Mandatory Select

    from the

    list

  • 8/14/2019 Automated Reports Generation System for High Voltage Division Software Design

    14/49

    ERDADOC# HCCT-SDD-1120

    REVISION: 0

    AUTOMATED REPORTS GENERATIONSYSTEM FOR HIGH VOLTAGE DIVISION

    ISSUE DT:11/20/09

    SOFTWARE DESIGN DOCUMENT PAGE 14 of 49

    To change the status of a core specification following view available to the user. On

    click of any item interface with the values available to the user.

    2.2.5 BackupSystem provides the Backup option to administrator for taking a backup of a data. To

    get the successful backup administrator has to ensure that none of user logged into the

    system i.e. system should in exclusive mode.

  • 8/14/2019 Automated Reports Generation System for High Voltage Division Software Design

    15/49

    ERDADOC# HCCT-SDD-1120

    REVISION: 0

    AUTOMATED REPORTS GENERATIONSYSTEM FOR HIGH VOLTAGE DIVISION

    ISSUE DT:11/20/09

    SOFTWARE DESIGN DOCUMENT PAGE 15 of 49

    On completion of a backup user will get the following screen.

  • 8/14/2019 Automated Reports Generation System for High Voltage Division Software Design

    16/49

    ERDADOC# HCCT-SDD-1120

    REVISION: 0

    AUTOMATED REPORTS GENERATIONSYSTEM FOR HIGH VOLTAGE DIVISION

    ISSUE DT:11/20/09

    SOFTWARE DESIGN DOCUMENT PAGE 16 of 49

    2.3 Report Creation Module2.3.1 Current Transformer Testing

    A screen shot of the parameter value screen is shown below:

    The following table provides the details on each field shown on the screen above.

    HEADER INFORMATION

    Field Name Description Mandatory/Opt

    ional

    Values Comments

    Name Select thecustomer

    name

    Mandatory From theCustomer

    information

    Address System

    display

    automatically

    Auto From the

    Customer

    Information

    Not Editable

    in Add/Modify

    Customer Ref Date Enter the

    customer

    reference

    date

    Mandatory User defined Date format:

    DD.MM.YYY

    Y

    Customer Ref No Enter the

    customerreference No

    Mandatory User defined Duplication

    controls onCustomer Ref

  • 8/14/2019 Automated Reports Generation System for High Voltage Division Software Design

    17/49

    ERDADOC# HCCT-SDD-1120

    REVISION: 0

    AUTOMATED REPORTS GENERATIONSYSTEM FOR HIGH VOLTAGE DIVISION

    ISSUE DT:11/20/09

    SOFTWARE DESIGN DOCUMENT PAGE 17 of 49

    Date and

    Customer Ref

    NoSHS Date Enter the

    SHS Date

    Optional User defined Date format:

    DD.MM.YYY

    Y

    SHS No Enter the

    SHS No

    Optional User defined If SHS date

    and SHS No

    available then

    system check

    the duplication

    on SHS Date

    and SHS No

    Gate Inward Date Enter theGate Inward

    Date

    Optional User Defined Date format:DD.MM.YYY

    Y

    Gate Inward No Enter the

    Gate Inward

    No

    Optional User defined If GI date and

    GI No

    available then

    system check

    the duplication

    on GI Date

    and GI No

    Work Order Date Enter the

    Work Order

    Date

    Optional User defined Date format:

    DD.MM.YYY

    Y

    Work Order No Enter the

    Work order

    no

    Optional User defined If WO date

    and WO No

    available then

    system check

    the duplication

    on WO Date

    and WO No.

    Also if WO

    detailsavailable then

    only user can

    able to select

    the test details.

    Date of Sample

    Receipt

    Enter the

    Date of

    Sample

    receipt

    Optional User defined Date format:

    DD.MM.YYY

    Y

    Date of Testing Enter the

    date of

    testing

    Optional User defined Date format:

    DD.MM.YYY

    YTest Report Date Enter the Optional User defined Date format:

  • 8/14/2019 Automated Reports Generation System for High Voltage Division Software Design

    18/49

    ERDADOC# HCCT-SDD-1120

    REVISION: 0

    AUTOMATED REPORTS GENERATIONSYSTEM FOR HIGH VOLTAGE DIVISION

    ISSUE DT:11/20/09

    SOFTWARE DESIGN DOCUMENT PAGE 18 of 49

    Test Report

    Date

    DD.MM.YYY

    Y

    Test Report No Enter theTest report

    No

    Optional User defined If TR date andTR No

    available then

    system check

    the duplication

    on TR Date

    and TR No.

    Also system

    not allows the

    report entry if

    TR dates less

    than parametervalue previous

    report starts

    date.

    Tested By Select from

    the list

    Optional From User

    Master

    Checked By Select User

    from List

    Optional From User

    Master

    Value assign

    from Report

    approval by

    authorized

    user.

    MFD.BY Enter the

    name of

    client

    Optional User defined

    No of Core Enter the no

    of core

    required

    Mandatory User defined Numerical

    value are only

    allow

    Ratio Select the

    ratio from

    the list

    Mandatory From Parameter

    value Master

    under the type

    Ratio

    User can able

    to select

    multiple Ratio

    Core Specification Select theCore

    Specification

    from the list

    Mandatory From Corespecification

    under the Unit

    Type CT

    Systemautomatically

    check the No

    of Core is

    equal to select

    the Core

    Specification

    NSV Select the

    NSV

    Mandatory From Parameter

    Value Master

    under the unit

    type CT

    I.L Systemautomatically

    Auto From Parameter Value Master

  • 8/14/2019 Automated Reports Generation System for High Voltage Division Software Design

    19/49

    ERDADOC# HCCT-SDD-1120

    REVISION: 0

    AUTOMATED REPORTS GENERATIONSYSTEM FOR HIGH VOLTAGE DIVISION

    ISSUE DT:11/20/09

    SOFTWARE DESIGN DOCUMENT PAGE 19 of 49

    display the

    value

    HSV Systemautomatically

    display the

    value

    Auto From Parameter Value Master

    S.T Current(kA) Enter the

    value of

    Standard

    Transformer

    Current

    Optional User defined

    Frequency Enter the

    frequency of

    the currenttransformer

    testing

    Mandatory User defined

    v.k(min) Enter the v.k

    for the

    current

    transformer

    Optional User defined

    IEX(min)@VK Enter the

    IEX in

    minute and

    VK value

    Optional User defined

    RCT(max)@75C Enter the

    RCT Value

    Optional User defined

    INS.Class Enter the

    Insulation

    Class Value

    for the

    Current

    Transformer

    Testing

    Optional User defined

    Model Enter the

    Model Name

    Optional User defined

    Sr. No Enter the

    Serial No of

    the Sample

    Mandatory User defined

    Type Enter the

    Type of

    Sample

    Mandatory User defined

    Drawing No Enter the

    Drawing No

    of Sample

    Optional User defined

    ERDA

    Identification No

    Enter the

    ERDAIdentification

    Mandatory User defined

  • 8/14/2019 Automated Reports Generation System for High Voltage Division Software Design

    20/49

    ERDADOC# HCCT-SDD-1120

    REVISION: 0

    AUTOMATED REPORTS GENERATIONSYSTEM FOR HIGH VOLTAGE DIVISION

    ISSUE DT:11/20/09

    SOFTWARE DESIGN DOCUMENT PAGE 20 of 49

    No

    Remark Enter the

    remarks ifany

    Optional User defined

    Test Details Select the

    required test

    to be perform

    on the

    Current

    Transformer

    Optional From Test

    Detail Master

    under type CT

    Work order

    date and Work

    order no must

    be entered

    Result Select the

    result on

    completion

    of allselected tests

    Optional 1. Confirm

    2. Not

    confirm

    3. Resultas per

    Remarks

    4. Under

    Testing

    While adding

    new test result

    will be 4

    defaults.Section will be

    shown to the

    user if all tests

    data are

    available into

    the system.

    Remark For result as

    per remarks

    selected,

    Enter the

    Test Result if

    any

    Optional User defined Section will be

    shown to the

    user if all tests

    data are

    available into

    the system.

    Note Please enter

    the general

    notes if any

    Optional User defined Section will be

    shown to the

    user if all tests

    data are

    available into

    the system.

  • 8/14/2019 Automated Reports Generation System for High Voltage Division Software Design

    21/49

    ERDADOC# HCCT-SDD-1120

    REVISION: 0

    AUTOMATED REPORTS GENERATIONSYSTEM FOR HIGH VOLTAGE DIVISION

    ISSUE DT:11/20/09

    SOFTWARE DESIGN DOCUMENT PAGE 21 of 49

    TEST DETAILS

    TEST NAME: TERMINAL MARKING AND POLARITY.

    The user interface for the Terminal Marking and Polarity Test is shown below.

    The following table provides the details on each field shown on the screen above.

    Field Name Description Mandatory/Optiona

    l

    Values Comments

    Primary Winding

    Terminals

    Enter the

    value of the

    primary

    winding

    value for theSample

    Mandatory User

    defined

    Secondary

    Winding

    Terminals

    System

    generates

    default

    details

    based on

    the no of

    core and

    Ratio

    selected

    Mandatory User

    defined

    User can

    change if

    any

    Terminal markingand polarity found

    Select theTerminal

    Mandatory 1.O.K 2.Not O.k.

  • 8/14/2019 Automated Reports Generation System for High Voltage Division Software Design

    22/49

    ERDADOC# HCCT-SDD-1120

    REVISION: 0

    AUTOMATED REPORTS GENERATIONSYSTEM FOR HIGH VOLTAGE DIVISION

    ISSUE DT:11/20/09

    SOFTWARE DESIGN DOCUMENT PAGE 22 of 49

    marking and

    Polarity

    found value

    TEST NAME: DETERMINATION OF ERRORS ACCORDING TO THE

    REQUIREMENTS OF APPROPRIATE ACCURACY CLASS.

    The user interface for the testing Accuracy Test is shown below. To capturing a

    automatic data in a testing accuracy class click on capture button, Applitech Infotech

    has provided the online solution by integrating with excel files. To enter the manual

    entry user has to set the Capture from parameter value from Y to N.

    The following table provides the details on each field shown on the screen above.

    Field Name Description Mandatory/Optional Values Comments

    Ratio Select the

    Ratio from

    the list

    Mandatory From

    Header

    Details

    CoreSpecification Select theCore Mandatory FromHeader

  • 8/14/2019 Automated Reports Generation System for High Voltage Division Software Design

    23/49

    ERDADOC# HCCT-SDD-1120

    REVISION: 0

    AUTOMATED REPORTS GENERATIONSYSTEM FOR HIGH VOLTAGE DIVISION

    ISSUE DT:11/20/09

    SOFTWARE DESIGN DOCUMENT PAGE 23 of 49

    Specification

    from the list

    Details

    Burden (%) Select theBurden (%)

    Mandatory FromParameter

    Value under

    type Burden

    (%)

    Current Rated

    (%)

    Select the

    Current Rated

    (%)

    Mandatory From

    Parameter

    Value under

    type

    Current

    Rated (%)

    Phase AngleError(Min)

    Enter thePhase Angle

    Error

    Mandatory User Define

    Ratio Error

    (%)

    Enter the

    Ratio Error

    (%)

    Mandatory User Define

    Accuracy

    Class

    Enter the

    Accuracy

    Class

    Mandatory User Define System Check

    All Row are

    unique on

    Ratio, Core

    Specification,

    Applied

    Burden and

    Current Rated

    %

    TEST NAME: POWER FREQUENCY DRY WITHSTAND TEST ON

    PRIMARY WINDING.

    The user interface for the primary winding Test is shown below.

  • 8/14/2019 Automated Reports Generation System for High Voltage Division Software Design

    24/49

    ERDADOC# HCCT-SDD-1120

    REVISION: 0

    AUTOMATED REPORTS GENERATIONSYSTEM FOR HIGH VOLTAGE DIVISION

    ISSUE DT:11/20/09

    SOFTWARE DESIGN DOCUMENT PAGE 24 of 49

    Field Name Description Mandatory/Optio

    nal

    Values Comment

    Power

    Frequency

    Voltage(kv)

    System

    generates

    default details

    based on the no

    HSV entered.

    Also select the

    power

    frequency

    voltage % from

    list available

    Mandatory Frequency

    voltage % from

    parameter value

    master under the

    type Frequency

    Voltage.

    ConnectedTo Earth

    Select one ormore value

    from the list

    Mandatory FromParameterValue

    under the tyoe

    Connected to

    earth

    Duration Enter the

    Duration and

    select Minute or

    Second from the

    list

    Mandatory User Defined

    TEST NAME: POWER FREQUENCY DRY WITHSTAND TEST ON

    SECONDARY WINDING.

    The interface for Power frequency dry withstand test on secondary winding test is

    shown below.

  • 8/14/2019 Automated Reports Generation System for High Voltage Division Software Design

    25/49

    ERDADOC# HCCT-SDD-1120

    REVISION: 0

    AUTOMATED REPORTS GENERATIONSYSTEM FOR HIGH VOLTAGE DIVISION

    ISSUE DT:11/20/09

    SOFTWARE DESIGN DOCUMENT PAGE 25 of 49

    Field Name Description Mandatory/Option

    al

    Values Comment

    PowerFrequency

    Voltage(KV)

    Enter the PowerFrequency

    Voltage(KV) and

    select power

    frequency

    voltage %

    Mandatory User Defined

    Defaultvalue 3

    Secondary

    winding

    terminals

    System

    automatic

    generate

    secondary

    winding terminal

    values based onthe No of Core

    and Ratio

    Selected in to the

    Header details

    Mandatory User defined

    CT Result Enter the CT

    result

    Mandatory User

    Defined

    Default No

    disruptive

    and

    withstood

    TEST NAME: OVER VOLTAGE INTER- TURN TEST.

    The interface for Over voltage inter turn test on secondary winding test is shown

    below.

  • 8/14/2019 Automated Reports Generation System for High Voltage Division Software Design

    26/49

    ERDADOC# HCCT-SDD-1120

    REVISION: 0

    AUTOMATED REPORTS GENERATIONSYSTEM FOR HIGH VOLTAGE DIVISION

    ISSUE DT:11/20/09

    SOFTWARE DESIGN DOCUMENT PAGE 26 of 49

    Field Name Description Mandatory/Optional Values Comment

    SecondaryWinding

    Terminal

    Select fromthe list, also

    select % value

    Mandatory System autogenerates

    the list

    value based

    on the No of

    Core Header

    details

    % valuefrom the

    Parameter

    Master.

    Rated

    Secondary

    Current(amp)

    Enter the

    Rated

    Secondary

    Current(amp)

    Mandatory User Define

    CT Result Enter the CTResult

    Mandatory User Define

    Duration Enter the

    value of

    Duration

    Mandatory User Define Select

    Minute or

    Second from

    the list

    TEST NAME: INSTRUMENT SECURITY FACTOR TEST.

    The interface of Instrument Security Factor Test is shown below.

  • 8/14/2019 Automated Reports Generation System for High Voltage Division Software Design

    27/49

    ERDADOC# HCCT-SDD-1120

    REVISION: 0

    AUTOMATED REPORTS GENERATIONSYSTEM FOR HIGH VOLTAGE DIVISION

    ISSUE DT:11/20/09

    SOFTWARE DESIGN DOCUMENT PAGE 27 of 49

    Field Name Description Mandatory/Optional Values Comment

    Ratio Select from

    the list

    Mandatory List value

    based onthe Ratio

    selected in

    Header

    Details

    System

    Check onlyOne Ratio

    enter the

    value

    Core

    Specification

    Select from

    the list

    Mandatory List values

    based on

    the Selected

    core with

    the

    specified

    ISFavailable on

    Header

    Details

    Core(A) System

    Automatic

    display from

    the selected

    core

    Auto User

    defined

    Excitation

    Current

    System

    Automatic

    generated

    based on

    formula

    Auto User

    defined

    Formula:

    Cold

    Resistance

    (mOhms)

    Enter the Cold

    Resistance

    Mandatory User Define

    Ambient

    Temperature

    Enter the

    Ambient

    Temperature

    Mandatory User Define

    Voltage

    Measured

    Enter the

    VoltageMeasured

    Mandatory User Define

    SLV System Auto

    Generate SLV

    value based

    on fix

    Formula

    Auto Read only Formula:

    Therefore ISF System Auto

    Generate

    Therefore ISF

    value based

    on fixFormula

    Auto Read only Formula:

  • 8/14/2019 Automated Reports Generation System for High Voltage Division Software Design

    28/49

    ERDADOC# HCCT-SDD-1120

    REVISION: 0

    AUTOMATED REPORTS GENERATIONSYSTEM FOR HIGH VOLTAGE DIVISION

    ISSUE DT:11/20/09

    SOFTWARE DESIGN DOCUMENT PAGE 28 of 49

    TEST NAME: MEASUREMENT OF PARTIAL DISCHARGE.

    The interface of Partial Discharge Measurement is shown below.

    Field Name Description Mandatory/Optional Values Comment

    Pre-Stress

    Voltage(Um)

    Enter the Pre-

    Stress

    Voltage(Um)

    Mandatory User

    Define

    System

    automatically

    display

    default value

    Duration(Sec) Enter the

    Duration

    with sign

    Mandatory User

    Define

    System

    automatically

    display

    default value

    Reduce

    Voltage(Um)

    Enter the

    Reduce

    Voltage

    Mandatory User

    Define

    System

    automatically

    display

    default value

    Duration

    Maintained(Min)

    Enter the

    Duration

    Maintained

    with sign

    Mandatory User

    Define

    System

    automatically

    display

    default value

    Magnitude

    Voltage(pC)

    Enter the

    MagnitudeVoltage

    Mandatory User

    Define

    System

    automaticallydisplay

  • 8/14/2019 Automated Reports Generation System for High Voltage Division Software Design

    29/49

    ERDADOC# HCCT-SDD-1120

    REVISION: 0

    AUTOMATED REPORTS GENERATIONSYSTEM FOR HIGH VOLTAGE DIVISION

    ISSUE DT:11/20/09

    SOFTWARE DESIGN DOCUMENT PAGE 29 of 49

    default value

    Limit Of Pd

    Quantity(pC)

    Enter the

    Limit if PDQuantity

    Mandatory User

    Define

    System

    automaticallydisplay

    default value

    2.3.2 CT-PT Testing

    A screen shot of the CT-PT screen is shown below:

    The following table provides the details on each field shown on the screen above.

  • 8/14/2019 Automated Reports Generation System for High Voltage Division Software Design

    30/49

    ERDADOC# HCCT-SDD-1120

    REVISION: 0

    AUTOMATED REPORTS GENERATIONSYSTEM FOR HIGH VOLTAGE DIVISION

    ISSUE DT:11/20/09

    SOFTWARE DESIGN DOCUMENT PAGE 30 of 49

    HEADER INFORMATION

    Field Name Description Mandatory/O

    ptional

    Values Comments

    Name Select the

    customer name

    Mandatory From the

    Customer

    information

    Address System display

    automatically

    Auto From the

    Customer

    Information

    Not Editable

    in Add/Modify

    Customer Ref Date Enter the

    customer

    reference date

    Mandatory User defined Date format:DD.MM.YYYY

    Customer Ref No Enter the

    customer

    reference No

    Mandatory User defined Duplication

    controls on

    Customer Ref

    Date and

    Customer Ref

    No

    SHS Date Enter the SHS

    Date

    Optional User defined Date format:DD.MM.YYYY

    SHS No Enter the SHS

    No

    Optional User defined If SHS date

    and SHS Noavailable then

    system check

    the duplication

    on SHS Date

    and SHS No

    Gate Inward Date Enter the Gate

    Inward Date

    Optional User Defined Date format:

    DD.MM.YYY

    Y

    Gate Inward No Enter the Gate

    Inward No

    Optional User defined If GI date and

    GI No

    available thensystem check

    the duplication

    on GI Date

    and GI No

    Work Order Date Enter the Work

    Order Date

    Optional User defined Date format:

    DD.MM.YYY

    Y

    Work Order No Enter the Work

    order no

    Optional User defined If WO date

    and WO No

    available then

    system checkthe duplication

  • 8/14/2019 Automated Reports Generation System for High Voltage Division Software Design

    31/49

    ERDADOC# HCCT-SDD-1120

    REVISION: 0

    AUTOMATED REPORTS GENERATIONSYSTEM FOR HIGH VOLTAGE DIVISION

    ISSUE DT:11/20/09

    SOFTWARE DESIGN DOCUMENT PAGE 31 of 49

    on WO Date

    and WO No.

    Also if WOdetails

    available then

    only user can

    able to select

    the test details.

    Date of Sample

    Receipt

    Enter the Date

    of Sample

    receipt

    Optional User defined Date format:

    DD.MM.YYY

    Y

    Date of Testing Enter the date

    of testing

    Optional User defined Date format:

    DD.MM.YYY

    YTest Report Date Enter the Test

    Report Date

    Optional User defined Date format:

    DD.MM.YYY

    Y

    Test Report No Enter the Test

    report No

    Optional User defined If TR date and

    TR No

    available then

    system check

    the duplication

    on TR Date

    and TR No.

    Also system

    not allows the

    report entry if

    TR dates less

    than parameter

    value previous

    report starts

    date.

    Tested By Select from the

    list

    Optional From User

    Master

    Created User

    Show Here.

    Checked By Select User from List

    Optional From User Master

    Value assignfrom Report

    approval by

    authorized

    user.

    Sample Name Enter the

    Sample Name

    Optional User defined

    MFD.BY Enter the name

    of client

    Optional User defined

    No of Core Enter the no of

    core required

    Mandatory User defined Numerical

    value are only

    allowRatio CT Select the ratio Mandatory From Parameter User can able

  • 8/14/2019 Automated Reports Generation System for High Voltage Division Software Design

    32/49

    ERDADOC# HCCT-SDD-1120

    REVISION: 0

    AUTOMATED REPORTS GENERATIONSYSTEM FOR HIGH VOLTAGE DIVISION

    ISSUE DT:11/20/09

    SOFTWARE DESIGN DOCUMENT PAGE 32 of 49

    from the list value Master

    under the type

    Ratio and Unittype CT

    to select

    multiple Ratio

    Ratio PT Select the ratio

    from the list

    Mandatory From Parameter

    value Master

    under the type

    Ratio and Unit

    type CTPT

    User can able

    to select

    multiple Ratio

    Core Specification Select the Core

    Specification

    from the list

    Mandatory From Core

    specification

    under the Unit

    Type CTPT

    System

    automatically

    check the No

    of Core is

    equal to selectthe Core

    Specification

    No. Of CTS/PTS Enter the

    number of CTS

    and PTS

    Optional User defined

    Phase Select the

    Phase

    Optional From Parameter

    Value Master

    under the unit

    type Phase

    System

    automatically

    generate the

    phase no

    depends on

    selection of

    phase

    Conn Enter the

    Connection

    value for the

    PT

    Optional User defined

    NSV Select the NSV

    from the list

    Mandatory From Parameter

    Value Master

    under the unit

    type CTPT

    I.L Systemautomatically

    display the

    value

    Auto From Parameter Value Master

    Systemautomatically

    generate Value

    here But

    Editable Field.

    H.S.V System

    automatically

    display the

    value

    Auto From Parameter

    Value Master

    System

    automatically

    generate Value

    here But

    Editable Field.

    Rated V Enter the Rated

    Voltage for theSample

    Optional User defined

  • 8/14/2019 Automated Reports Generation System for High Voltage Division Software Design

    33/49

    ERDADOC# HCCT-SDD-1120

    REVISION: 0

    AUTOMATED REPORTS GENERATIONSYSTEM FOR HIGH VOLTAGE DIVISION

    ISSUE DT:11/20/09

    SOFTWARE DESIGN DOCUMENT PAGE 33 of 49

    S.T Current Enter the value

    of Standard

    CTPT

    Optional User defined

    V.F Enter the value

    of Standard

    CTPT

    Optional User defined

    Frequency Enter the

    frequency of

    the CTPT

    testing

    Mandatory User defined

    Insulation. Class Enter the

    Insulation

    Class Value for

    the CTPTTesting

    Optional User defined

    Sr. No Enter the Serial

    No of the

    Sample

    Mandatory User defined

    Type Enter the Type

    of Sample

    Mandatory User defined

    Drawing No Enter the

    Drawing No of

    Sample

    Optional User defined

    ERDAIdentification No Enter theERDA

    Identification

    No

    Mandatory User defined

    Remark Enter the

    remarks if any

    Optional User defined

    Test Details Select the

    required test to

    be perform on

    the CTPT

    Optional From Test

    Detail Master

    under type CT

    PT

    Work order

    date and Work

    order no must

    be entered

    Result Select the

    result oncompletion of

    all selected

    tests

    Optional 1. Confirm

    2. Notconfirm

    3. Result

    as per

    Remarks

    4. Under

    Testing

    While adding

    new test resultwill be 4

    defaults.

    Section will be

    shown to the

    user if all tests

    data are

    available into

    the system.

    Remark For result as

    per remarks

    selected, Enterthe Test Result

    Optional User defined Section will be

    shown to the

    user if all testsdata are

  • 8/14/2019 Automated Reports Generation System for High Voltage Division Software Design

    34/49

    ERDADOC# HCCT-SDD-1120

    REVISION: 0

    AUTOMATED REPORTS GENERATIONSYSTEM FOR HIGH VOLTAGE DIVISION

    ISSUE DT:11/20/09

    SOFTWARE DESIGN DOCUMENT PAGE 34 of 49

    if any available into

    the system.

    Note Please enter the general

    notes if any

    Optional User defined Section will beshown to the

    user if all tests

    data are

    available into

    the system.

    TEST DETAILS

    TEST NAME: VERIFICATION OF TERMINAL MARKING AND

    POLARITY.

    The user interface for the Terminal Marking & Polarity Test CTPT is shown below.

    The following table provides the details on each field shown on the screen above.

    Field Name Description Mandatory/Optional Values Comments

    Primary Winding

    Terminals CT

    Enter the

    Value of the

    Primary

    Winding CT

    Value for

    the Sample

    Mandatory Auto/

    User

    defined

    System auto

    generate

    value based

    on Phase,

    No of Core

    and Core

    Specificatio

    nPrimary Winding Enter the Mandatory Auto/ System auto

  • 8/14/2019 Automated Reports Generation System for High Voltage Division Software Design

    35/49

    ERDADOC# HCCT-SDD-1120

    REVISION: 0

    AUTOMATED REPORTS GENERATIONSYSTEM FOR HIGH VOLTAGE DIVISION

    ISSUE DT:11/20/09

    SOFTWARE DESIGN DOCUMENT PAGE 35 of 49

    Terminals PT Value of the

    Primary

    Winding PTValue for

    the Sample

    User

    defined

    generate

    value based

    on Phase, No of Core

    and Core

    Specificatio

    n

    Secondary

    Winding

    Terminals CT

    Enter the

    Value of the

    Secondary

    Winding CT

    Value for

    the Sample

    Mandatory Auto/

    User

    defined

    System

    Automatic

    generate

    based on

    the no of

    core and

    Ratioselected in

    the header

    details

    Secondary

    Winding

    Terminals PT

    Enter the

    Value of the

    Secondary

    Winding PT

    Value for

    the Sample

    Mandatory User

    defined

    System

    Automatic

    generate

    based on

    the no of

    core and

    Ratio

    selected in

    the header

    details

    Terminal marking

    and polarity found

    Select the

    Terminal

    marking and

    Polarity

    found value

    from the list

    Optional 1.O.K

    2.Not O.k.

    Value Select

    From The

    List.

    TEST NAME: DETERMINATION OF ERROS ACCORDING TO THEREQUIREMENT OF THE APPROPRIATE ACCURACY CLASS.

  • 8/14/2019 Automated Reports Generation System for High Voltage Division Software Design

    36/49

    ERDADOC# HCCT-SDD-1120

    REVISION: 0

    AUTOMATED REPORTS GENERATIONSYSTEM FOR HIGH VOLTAGE DIVISION

    ISSUE DT:11/20/09

    SOFTWARE DESIGN DOCUMENT PAGE 36 of 49

    The user interface for the testing Accuracy Test is shown below. To capturing

    a automatic data in a testing accuracy class system, Applitech Infotech has providedthe online solution by integrating with excel files. To enter the manual entry user has

    to set the Capture from parameter value from Enable Capture Y Or N.

    Enable Capture Y = automatic data in a testing accuracy class system.

    Enable Capture N= User defined.

    The following table provides the details on each field shown on the screen above.

    Field Name Description Mandatory/Optional Values Comments

    Phase Select thePhase From

    the list

    Mandatory FromHeader

    Details

    System Autogenerate

    based on

    header details

    Ratio Select the

    Ratio from the

    list

    Mandatory From

    Header

    Details

    Core

    Specification

    Select the

    Core

    Specification

    from the list

    Mandatory From

    Header

    Details

    Burden (%) Select the

    Burden (%)

    Mandatory From

    Parameter

    Value under

    type Burden

    (%)

    Current

    Rated (%)

    Select the

    Current Rated

    (%)

    Mandatory From

    Parameter

    Value under

    type Current

    Rated (%)

    Phase AngleError(Min)

    Enter thePhase Angle

    Mandatory User Define

  • 8/14/2019 Automated Reports Generation System for High Voltage Division Software Design

    37/49

    ERDADOC# HCCT-SDD-1120

    REVISION: 0

    AUTOMATED REPORTS GENERATIONSYSTEM FOR HIGH VOLTAGE DIVISION

    ISSUE DT:11/20/09

    SOFTWARE DESIGN DOCUMENT PAGE 37 of 49

    Error

    Ratio Error

    (%)

    Enter the

    Ratio Error(%)

    Mandatory User Define

    Accuracy

    Class

    Enter the

    Accuracy

    Class

    Mandatory User Define System Check

    All Row are

    unique on

    Ratio, Core

    Specification,

    Applied

    Burden and

    Current Rated

    %

    TEST NAME: INSTRUMENT SECURITY FACTORTEST ON CTS.

    The user interface for Instrument Security FactorTest CTPT shown below:

    The following table provides the details on each field shown on the screen above.

    Field Name Description Mandatory/Optional Values CommentRatio Select from

    the list

    Mandatory List value

    based on

    the Ratio

    selected in

    Header

    Details

    System

    Check only

    One Ratio

    enter the

    value

    Core

    Specification

    Select from

    the list

    Mandatory List values

    based on

    the Selected

    core with

    thespecified

  • 8/14/2019 Automated Reports Generation System for High Voltage Division Software Design

    38/49

    ERDADOC# HCCT-SDD-1120

    REVISION: 0

    AUTOMATED REPORTS GENERATIONSYSTEM FOR HIGH VOLTAGE DIVISION

    ISSUE DT:11/20/09

    SOFTWARE DESIGN DOCUMENT PAGE 38 of 49

    ISF

    available on

    HeaderDetails

    Core(A) System

    Automatic

    display from

    the selected

    core

    Auto Read only

    Excitation

    Current

    System

    Automatic

    generated

    based on

    formula

    Auto Auto /User

    defined

    Formula:

    Cold

    Resistance

    (mOhms)

    Enter the Cold

    Resistance

    Mandatory User Define

    Ambient

    Temperature

    Enter the

    Ambient

    Temperature

    Mandatory User Define

    Voltage

    Measured

    Enter the

    Voltage

    Measured

    Mandatory User Define

    SLV System AutoGenerate SLV

    value based

    on fix

    Formula

    Auto Read only Formula:

    Therefore ISF System Auto

    Generate

    Therefore ISF

    value based

    on fix

    Formula

    Auto Read only Formula:

  • 8/14/2019 Automated Reports Generation System for High Voltage Division Software Design

    39/49

    ERDADOC# HCCT-SDD-1120

    REVISION: 0

    AUTOMATED REPORTS GENERATIONSYSTEM FOR HIGH VOLTAGE DIVISION

    ISSUE DT:11/20/09

    SOFTWARE DESIGN DOCUMENT PAGE 39 of 49

    TEST NAME: VISUAL EXAMINATION OF HOT DIP GALVANIZING.

    The user interface for Visual examination of hot dip galvanizingshown below:

    The following table provides the details on each field shown on the screen above.

    Field Name Description Mandatory/Optional Values Comment

    Requirement Enter the

    Requirement

    for the

    Sample

    Optional User defined

    Observation Enter the

    Observation

    for theSample

    Optional User defined

  • 8/14/2019 Automated Reports Generation System for High Voltage Division Software Design

    40/49

    ERDADOC# HCCT-SDD-1120

    REVISION: 0

    AUTOMATED REPORTS GENERATIONSYSTEM FOR HIGH VOLTAGE DIVISION

    ISSUE DT:11/20/09

    SOFTWARE DESIGN DOCUMENT PAGE 40 of 49

    2.3.3 Potential Transformer Testing(PT Testing)A screen shot of the PT Testing screen is shown below:

    The following table provides the details on each field shown on the screen above.

    HEADER INFORMATION

    Field Name Description Mandatory/Opt

    ional

    Values Comments

    Name Select the

    customer

    name

    Mandatory From the

    Customer

    information

    Address System

    display

    automatically

    Auto From the

    Customer

    Information

    Not Editable

    in Add/Modify

  • 8/14/2019 Automated Reports Generation System for High Voltage Division Software Design

    41/49

    ERDADOC# HCCT-SDD-1120

    REVISION: 0

    AUTOMATED REPORTS GENERATIONSYSTEM FOR HIGH VOLTAGE DIVISION

    ISSUE DT:11/20/09

    SOFTWARE DESIGN DOCUMENT PAGE 41 of 49

    Customer Ref Date Enter the

    customer

    referencedate

    Mandatory User defined Date format:

    DD.MM.YYY

    Y

    Customer Ref No Enter the

    customer

    reference No

    Mandatory User defined Duplication

    controls on

    Customer Ref

    Date and

    Customer Ref

    No

    SHS Date Enter the

    SHS Date

    Optional User defined Date format:

    DD.MM.YYY

    Y

    SHS No Enter theSHS No

    Optional User defined If SHS dateand SHS No

    available then

    system check

    the duplication

    on SHS Date

    and SHS No

    Gate Inward Date Enter the

    Gate Inward

    Date

    Optional User Defined Date format:

    DD.MM.YYY

    Y

    Gate Inward No Enter the

    Gate Inward

    No

    Optional User defined If GI date and

    GI No

    available then

    system check

    the duplication

    on GI Date

    and GI No

    Work Order Date Enter the

    Work Order

    Date

    Optional User defined Date format:

    DD.MM.YYY

    Y

    Work Order No Enter the

    Work orderno

    Optional User defined If WO date

    and WO Noavailable then

    system check

    the duplication

    on WO Date

    and WO No.

    Also if WO

    details

    available then

    only user can

    able to select

    the test details.

  • 8/14/2019 Automated Reports Generation System for High Voltage Division Software Design

    42/49

    ERDADOC# HCCT-SDD-1120

    REVISION: 0

    AUTOMATED REPORTS GENERATIONSYSTEM FOR HIGH VOLTAGE DIVISION

    ISSUE DT:11/20/09

    SOFTWARE DESIGN DOCUMENT PAGE 42 of 49

    Date of Sample

    Receipt

    Enter the

    Date of

    Samplereceipt

    Optional User defined Date format:

    DD.MM.YYY

    Y

    Date of Testing Enter the

    date of

    testing

    Optional User defined Date format:

    DD.MM.YYY

    Y

    Test Report Date Enter the

    Test Report

    Date

    Optional User defined Date format:

    DD.MM.YYY

    Y

    Test Report No Enter the

    Test report

    No

    Optional User defined If TR date and

    TR No

    available then

    system checkthe duplication

    on TR Date

    and TR No.

    Also system

    not allows the

    report entry if

    TR dates less

    than parameter

    value previous

    report starts

    date.

    Tested By Select from

    the list

    Optional From User

    Master

    Checked By Select User

    from List

    Optional From User

    Master

    Value assign

    from Report

    approval by

    authorized

    user.

    MFD.BY Enter the

    name of

    client

    Optional User defined

    No of Core Enter the no

    of core

    required

    Mandatory User defined Numerical

    value are only

    allow

    Ratio Select the

    ratio from

    the list

    Mandatory From Parameter

    value Master

    under the type

    Ratio

    User can able

    to select

    multiple Ratio

    Core Specification Select the

    Core

    Specification

    from the list

    Mandatory From Core

    specification

    under the Unit

    Type PT

    System

    automatically

    check the No

    of Core isequal to select

  • 8/14/2019 Automated Reports Generation System for High Voltage Division Software Design

    43/49

    ERDADOC# HCCT-SDD-1120

    REVISION: 0

    AUTOMATED REPORTS GENERATIONSYSTEM FOR HIGH VOLTAGE DIVISION

    ISSUE DT:11/20/09

    SOFTWARE DESIGN DOCUMENT PAGE 43 of 49

    the Core

    Specification

    NSV Select the NSV from

    the list

    Mandatory From Parameter Value Master

    under the unit

    type PT

    I.L System

    automatically

    display the

    value

    Auto From Parameter

    Value Master

    System

    automatically

    generate Value

    here But

    Editable Field.

    H.S.V System

    automatically

    display thevalue

    Auto From Parameter

    Value Master

    System

    automatically

    generate Valuehere But

    Editable Field.

    S.T Current(kA) Enter the

    value of

    Standard

    Transformer

    Current

    Optional User defined

    Frequency (Hz) Enter the

    frequency of

    the current

    transformer

    testing

    Mandatory User defined

    V.K(min) Enter the v.k

    for the

    current

    transformer

    Optional User defined

    IEX(min)@VK Enter the

    IEX in

    minute and

    VK value

    Optional User defined

    RCT(max)@75C Enter theRCT Value

    Optional User defined

    INS.Class Enter the

    Insulation

    Class Value

    for the

    Current

    Transformer

    Testing

    Optional User defined

    Model Enter the

    Model Name

    Optional User defined

    Sr. No Enter theSerial No of

    Mandatory User defined

  • 8/14/2019 Automated Reports Generation System for High Voltage Division Software Design

    44/49

    ERDADOC# HCCT-SDD-1120

    REVISION: 0

    AUTOMATED REPORTS GENERATIONSYSTEM FOR HIGH VOLTAGE DIVISION

    ISSUE DT:11/20/09

    SOFTWARE DESIGN DOCUMENT PAGE 44 of 49

    the Sample

    Type Enter the

    Type of Sample

    Mandatory User defined

    C/O Enter the

    Carry off

    value for the

    sample

    Optional User defined

    Drawing No Enter the

    Drawing No

    of Sample

    Optional User defined

    ERDA

    Identification No

    Enter the

    ERDA

    IdentificationNo

    Mandatory User defined

    Remark Enter the

    remarks if

    any

    Optional User defined

    Test Details Select the

    required test

    to be perform

    on the

    Current

    Transformer

    Optional From Test

    Detail Master

    under type PT

    Work order

    date and Work

    order no must

    be entered

    Result Select the

    result on

    completion

    of all

    selected tests

    Optional 1. Confirm

    2. Not

    confirm

    3. Result

    as per

    Remarks

    4. Under

    Testing

    While adding

    new test result

    will be 4

    defaults.

    Section will be

    shown to the

    user if all tests

    data are

    available into

    the system.

    Remark For result as per remarks

    selected,

    Enter the

    Test Result if

    any

    Optional User defined Section will beshown to the

    user if all tests

    data are

    available into

    the system.

    Witness By Please enter

    the general

    notes if any

    Optional User defined Section will be

    shown to the

    user if all tests

    data are

    available into

    the system.

  • 8/14/2019 Automated Reports Generation System for High Voltage Division Software Design

    45/49

    ERDADOC# HCCT-SDD-1120

    REVISION: 0

    AUTOMATED REPORTS GENERATIONSYSTEM FOR HIGH VOLTAGE DIVISION

    ISSUE DT:11/20/09

    SOFTWARE DESIGN DOCUMENT PAGE 45 of 49

    TEST DETAILS

    TEST NAME: VERIFICATION TERMINAL MARKING AND POLARITY.

    The user interface for the Terminal Marking & Polarity Test is shown below:

    Field Name Description Mandatory/Optiona

    l

    Values Comments

    Primary Winding

    Terminals

    Enter the

    value of the

    primary

    winding

    value for the

    Sample

    Mandatory User

    defined

    SecondaryWinding

    Terminals

    Systemgenerates

    default

    details

    based on

    the no of

    core and

    Ratio

    selected

    Mandatory User defined

    User canchange if

    any

    Terminal marking

    and polarity found

    Select the

    Terminal

    marking andPolarity

    Mandatory 1.O.K

    2.Not O.k.

  • 8/14/2019 Automated Reports Generation System for High Voltage Division Software Design

    46/49

    ERDADOC# HCCT-SDD-1120

    REVISION: 0

    AUTOMATED REPORTS GENERATIONSYSTEM FOR HIGH VOLTAGE DIVISION

    ISSUE DT:11/20/09

    SOFTWARE DESIGN DOCUMENT PAGE 46 of 49

    found value

    TEST NAME: DETERMINATION OF ERROS ACCORDING TO THE

    REQUIREMENT OF THE APPROPRIATE ACCURACY CLASS.

    The user interface for the testing Accuracy Test is shown below. To capturing

    a automatic data in a testing accuracy class system, Applitech Infotech has provided

    the online solution by integrating with excel files. To enter the manual entry user has

    to set the Capture from parameter value from Enable Capture Y Or N.

    Enable Capture Y = automatic data in a testing accuracy class system.

    Enable Capture N= User defined.

    The following table provides the details on each field shown on the screen above.

    Field Name Description Mandatory/Optional Values Comments

    Ratio Select the

    Ratio from

    the list

    Mandatory From

    Header

    Details

    Core

    Specification

    Select the

    Core

    Specification

    from the list

    Mandatory From

    Header

    Details

    Burden (%) Select the

    Burden (%)

    Mandatory From

    ParameterValue under

  • 8/14/2019 Automated Reports Generation System for High Voltage Division Software Design

    47/49

    ERDADOC# HCCT-SDD-1120

    REVISION: 0

    AUTOMATED REPORTS GENERATIONSYSTEM FOR HIGH VOLTAGE DIVISION

    ISSUE DT:11/20/09

    SOFTWARE DESIGN DOCUMENT PAGE 47 of 49

    type Burden

    (%)

    Current Rated(%)

    Select theCurrent Rated

    (%)

    Mandatory FromParameter

    Value under

    type

    Current

    Rated (%)

    Phase Angle

    Error(Min)

    Enter the

    Phase Angle

    Error

    Mandatory User Define

    Ratio Error

    (%)

    Enter the

    Ratio Error

    (%)

    Mandatory User Define

    Accuracy

    Class

    Enter the

    Accuracy

    Class

    Mandatory User Define System Check

    All Row are

    unique on

    Ratio, Core

    Specification,

    Applied

    Burden and

    Current Rated

    %

    TEST NAME: POWER FREQUENCY DRY WITHSTAND TEST ONSECONDRAY WINDING.

    The user interface for the secondary winding Test is shown below:

    The following table provides the details on each field shown on the screen above.

    Field Name Description Mandatory/Option Values Comment

  • 8/14/2019 Automated Reports Generation System for High Voltage Division Software Design

    48/49

    ERDADOC# HCCT-SDD-1120

    REVISION: 0

    AUTOMATED REPORTS GENERATIONSYSTEM FOR HIGH VOLTAGE DIVISION

    ISSUE DT:11/20/09

    SOFTWARE DESIGN DOCUMENT PAGE 48 of 49

    al

    Power

    FrequencyVoltage(KV)

    Enter the Power

    FrequencyVoltage(KV) and

    select power

    frequency

    voltage %

    Mandatory User

    Defined

    Default

    value 3

    Secondary

    winding

    terminals

    System

    automatic

    generate

    secondary

    winding terminal

    values based on

    the No of Coreand Ratio

    Selected in to the

    Header details

    Mandatory User defined

    CT Result Enter the CT

    result

    Mandatory User

    Defined

    Default No

    disruptive

    and

    withstood

    TEST NAME: MEASUREMENT OF PARTIAL DISCHARGE.

    The interface of Partial Discharge Measurement is shown below:

  • 8/14/2019 Automated Reports Generation System for High Voltage Division Software Design

    49/49

    ERDADOC# HCCT-SDD-1120

    REVISION: 0

    AUTOMATED REPORTS GENERATIONSYSTEM FOR HIGH VOLTAGE DIVISION

    ISSUE DT:11/20/09

    SOFTWARE DESIGN DOCUMENT PAGE 49 of 49

    Field Name Description Mandatory/Optional Values Comment

    Pre-Stress

    Voltage(Um)

    Enter the Pre-

    StressVoltage(Um)

    Mandatory User

    Define

    System

    automaticallydisplay

    default value

    Duration(Sec) Enter the

    Duration

    with sign

    Mandatory User

    Define

    System

    automatically

    display

    default value

    Reduce

    Voltage(Um)

    Enter the

    Reduce

    Voltage

    Mandatory User

    Define

    System

    automatically

    display

    default value

    DurationMaintained(Min)

    Enter theDuration

    Maintained

    with sign

    Mandatory User Define

    Systemautomatically

    display

    default value

    Magnitude

    Voltage(pC)

    Enter the

    Magnitude

    Voltage

    Mandatory User

    Define

    System

    automatically

    display

    default value

    Limit Of Pd

    Quantity(pC)

    Enter the

    Limit if PD

    Quantity

    Mandatory User

    Define

    System

    automatically

    displaydefault value