1) Member (Power Systems), CEA, New Delhi
2) Director (OM), Ministry of Power, New Delhi
3) Director (Operations), POWERGRID, Gurgaon
4) Member Secretary NRPC/ERPC/WRPC/SRPC/NERPC
5) GM NRLDC/ERLDC/WRLDC/SRLDC
6) AGM NERLDC
7) Secretary, CERC, New Delhi
1
Automated Defence Plans for secure operation of the Grids
1.0 A 12-point resolution was adopted in the meeting taken by
Secretary (Power) on 6th August 2012 with Chief Secretaries of
Northern Region states. One of the points (No. 11) was that
‘POSOCO would evolve a contingency load shedding protocol,
especially when non frequency related load shedding is required.’
2.0 A draft template of the same has been prepared considering
various scenarios when the system could be under stress. There
could be ten different scenarios outlined below.
i. Overdrawals: All constituents shall normally maintain their
withdrawal from the Grid strictly as per schedule. In the event
of any deviation of actual withdrawal from schedule greater
than a set amount when the system frequency is falling below
50 Hz, pre-identified radial load/feeders constituting in different
identified Groups shall be automatically disconnected on
rotational basis by the command automatically generated from
the Programmable Logic Controller (PLC) based Expert System
located at SLDCs/RLDCs.
ii. Over-injection/Under-drawal: Power generating stations shall
normally maintain their injection into the Grid strictly as per
schedule. In case of state utilities the under-drawal is also not
desirable as it could lead to problems in other parts of the grid.
Manual generation reduction through secondary control may be
resorted to in Stage-I followed by an automatic signal sent from
the PLC based Expert System installed at SLDCs/RLDCs to the
power stations within the state which can be used for
automatically reducing the generation.
2
iii. Under-voltage: For maintaining system voltage above the
minimum limits specified as per IEGC, Automatic Under Voltage
Load Shedding scheme (AUVLS) shall be effected. Bus voltage of
400 kV and 220 kV nodes shall be monitored for this purpose.
The UVLS shall be a multi-stage scheme and would trip the
designated group of loads in case voltage falls below 200
kV/380 kV at the node.
iv. Line loading crossing set limits: Whenever a trunk line loading
crosses normal operating limits endangering system security,
designated loads shall be disconnected by operation of System
Protection Schemes (SPS). In Stage-I Manual disconnection shall
be resorted to by the SLDCs/RLDCs. In Stage-II automatic load
disconnection shall be affected through PLC based Expert
System.
v. Power flows exceeding Total Transfer Capability (TTC):
Automatic load disconnection shall be effected in case inter-
area flows exceed TTC limits by greater than 100 MW. Based on
measurements obtained at RLDCs SCADA automatic load
shedding or generation reduction shall be effected.
vi. Loss of generation exceeding 1000 MW or loss of high capacity
transmission corridor: In case of sudden loss of generation in
excess of 1000 MW or loss of high capacity transmission
corridor, automatic control action to be initiated through
System Protection Schemes (SPS).
vii. Angular separation: In case of angular separation between any
two identified set of nodes exceeding the cut off value (based
on system studies with data obtained from PMUs/WAMS),
automatic load disconnection of Groups on rotational basis
would be automatically generated from the PLC based Expert
System located at NLDC/RLDCs.
3
viii. Flat frequency Under Frequency Relays (UFRs): Four stages of
Automatic UFR load relief as decided in respective RPC forum
with Stage-I set at 49 Hz, Stage-II set at 48.8 Hz, Stage-III set at
48.6 Hz and Stage-IV set at 48.4 Hz.
ix. RATE OF change of frequency or df/dt relays: In case of sudden
major loss of generation or isolation of part or full regional
system especially if such grid/system is importing power from
adjacent systems the rate of change of frequency protection
system shall automatically disconnect pre-identified feeders in
its control area.
x. Islanding schemes: Automatic islanding schemes at 47.9 Hz or
below through UFRs to isolate power stations with matching
loads and dynamic reactive reservesas finalized in respective
RPC forums.
A draft template for every state in each region is enclosed in the
Annexures. The template covers the ten different scenarios
mentioned above.
Exhibit 1: Automated Defence Plan for Northern Region
Exhibit 2: Automated Defence Plan for Eastern Region
Exhibit 3: Automated Defence Plan for Western Region
Exhibit 4: Automated Defence Plan for Southern Region
Exhibit 5: Automated Defence Plan for North Eastern Region
These can be finalized in consultation with the states and
generating companies at RPC level. The ultimate objective of the
entire exercise is to have a self-healing mechanism in the grid.
3.0 While the Exhibits enclosed have been mainly prepared at RLDC
level, it is suggested that a uniform methodology is adopted for
feeder selection, grouping etc. so that maximum flexibility is
4
available during implementation of the scheme. A suggested
outline could be as under:
3.1 Identify the maximum requirement of load in each state, say A,
that needs to be shed. A suggested figure is 60% of the peak load.
If the state’s peak load is 10000 MW then ‘A’ would be 6000 MW.
3.2 Divide ‘A’ MW into 100 MW groups so that we get approximately
A/100 groups. In this example we would get sixty (60) groups
numbered as Group 1, Group 2 and so on up to Group 60.
3.3 The groups should be geographically spread throughout the state
and not confined to a particular zone or pocket.
3.4 For each group or a set of groups, the nearest geographically
connected 220 kV or 400 kV node would be identified/listed. For
instance Node 1 might contain Groups 1 to 3, Node 2 might
contain Groups 4 to 6 and so on. The groups 1 to 3 should be
geographically and electrically adjacent to each other.
3.5 All state owned coal fired and gas power generating stations above
250 MW would also be identified for automatic generation
regulation actions. For instance in the example taken we could
have ten (10) such power stations from say Station A to Station J.
4.0 Typical automatic load shedding matrix:
For the ten identified schemes at S no. 2 above, the groups could
be selected from these sixty (60) and the typical automatic load-
shedding matrix could be as tabulated below considering the need
5
for rotational load shedding and the assumption that generally not
more than two contingencies would arise simultaneously.
S
no
Logic Control Action
1 Overdrawal > 12% of schedule
or 150 MW
(PLC based scheme at LDCs)
On day 1, Group 1 load is shed in the first instance of violation
followed by Group 2 in the second instance and so on say upto
Group 5 if there are five (5) violations
On day 2, Group 6 would be shed for the first violation followed
by Group 7 and so on. After Group 60, Group 1 would start.
2 Under-drawals > 12% of
schedule or 150 MW
(PLC based scheme at LDCs)
On day 1, signal would be sent to Power station ‘A’ in the first
instance followed by station ‘B’ in the second instance and so
on say upto Power station ‘C’ if there are three (3) violations.
On day 2, signal would be sent to the Power station ‘D’ in the
first instance and so on.
3 Voltage <200 kV for more than
5 minutes
(Local or PLC installed at the
nodes identified)
Under Voltage Load Shedding (UVLS) Relays would be installed
at each of the twenty nodes. In case of UV at node 1 shed load
in Group 1 and if the UV persists, shed Group 2 and so on.
4 ICT/line loading crossing limits
(Local or PLC installed at select
locations).
Choose appropriate Groups from 1 to 60 for each set of
ICTs/lines.
5 Flows crossing TTC and
overdrawal
(PLC based scheme at RLDCs)
Choose Group 1 in state 1, Group 1 in state 2 and so on for the
first instance violation followed by Group 2 in state 1, Group 2
in state 2 and so on Day 1.
On Day 2 move to the group following day 1 for the respective
states.
6 Loss of generation > 1000 MW.
(PLC based scheme installed at
power station end)
Choose appropriate ten (10) groups adjacent to the power
station. Further the PLC can also be used to secure the power
station in case of depletion of the network emanating from the
power station.
6
S
no
Logic Control Action
7 Angular difference
(PLC based scheme at RLDC
level)
Choose appropriate two groups for each state located
downstream of the angle pair.
8 Under-Frequency Relays
UFR1: 49.0 Hz
UFR2: 48.8 Hz
UFR3: 48.6 Hz
UFR4: 48.4 Hz
20% of identified loads for shedding………….12 Groups
20% of identified loads”””””””””””……………12 Groups
30% of identified loads………………………………18 Groups
30% of identified loads………………………………18 Groups
9 Df/dt relays
49.9 Hz with 0.1 Hz/sec slope
49.9 Hz with 0.2 Hz/sec slope
Overlap with UFR3 above
Overlap with UFR4 above
10 Islanding at 47.9 Hz
Power station specific schemes to be formulated.
1
INDEX
Page no
EXHIBIT 1- AUTOMATED DEFENCE PLAN FOR NORTHERN REGION…..…………………..…………………………5
Annex 1.1- Automated defence plan summary for secure operation of grids…….Punjab System…….……….6
Annex 1.2- Automated defence plan summary for secure operation of grids…… Haryana System………….08
Annex 1.3- Automated defence plan summary for secure operation of grids…….Rajasthan System……….11
Annex 1.4- Automated defence plan summary for secure operation of grids…….Delhi System……………….14
Annex 1.5- Automated defence plan summary for secure operation of grids……Uttarpradesh System…..16
Annex 1.6- Automated defence plan summary for secure operation of grids…….Uttarakhand System…..19
Annex 1.7- Automated defence plan summary for secure operation of grids…….J&K System…………………21
Annex 1.8- Automated defence plan summary for secure operation of grids…….HP System………………….23
Annex 1.9- Automated defence plan summary for secure operation of grids…….Chandigarh System…….25
Annex I.A- Punjab -Feeders list for Remote tripping…………………………….…………………………….…………………27
Annex I.B- Punjab- List of power stations for generation regulation……………….…………………………….………28
Annex I.C- Punjab –Nodes identified for Under Voltage Load Shedding………….…………………………….………29
Annex I.D- Punjab –Feeders selected for ICT/ line loading crossing normal operating limits………….……..30
Annex I.E- Punjab – Feeders selected for loss of generation >1000MW/
High capacity corridor…………………………………………………………………………………………….31
Annex I.F- Punjab –Power stations selected for Islanding at 47.9Hz……………..………….…………………………..31
Annex II.A- Haryana -Feeders list for Remote tripping…………………………….…………………………….………………32
Annex II.B- Haryana List of power stations for generation regulation……………….…………………………….…….33
Annex II.C- Haryana –Nodes identified for Under Voltage Load Shedding………….…………………………….……34
Annex II.D- Haryana – Feeders selected for ICT/ line loading crossing normal operating limits……………..35
Annex II.E- Haryana – Feeders selected for loss of generation >1000MW/
High capacity corridor…………………………………………………………………………………………………………..36
Annex II.F- Haryana –Power stations selected for Islanding at 47.9Hz……………..………….………………………..37
Annex III.A- Rajasthan -Feeders list for Remote tripping…………………………….…………………………….…………..38
Annex III.B- Rajasthan - List of power stations for generation regulation……………….……………………………..40
Annex III.C- Rajasthan –Nodes identified for Under Voltage Load Shedding………….………………………………41
Annex III.D- Rajasthan – Feeders selected for ICT/ line loading crossing normal operating limits………….42
Annex III.E- Rajasthan – Feeders selected for loss of generation >1000MW/
High capacity corridor………………………………………………………………………………………………………..43
Annex III.F- Rajasthan –Power stations selected for Islanding at 47.9Hz……………..………….……………………44
2
Annex IV.A- Delhi -Feeders list for Remote tripping…………………………….…………………………….………………..45
Annex IV.B- Delhi List of power stations for generation regulation……………….…………………………….………46
Annex IV C- Delhi –Nodes identified for Under Voltage Load Shedding………….…………………………….……..47
Annex IV.D- Delhi – Feeders selected for ICT/ line loading crossing normal operating limits………….……48
Annex IV.E- Delhi – Feeders selected for loss of generation >1000MW/
High capacity corridor……………………………………………………………………………………………………….48
Annex IV.F- Delhi –Power stations selected for Islanding at 47.9Hz……………..………….………………………….48
Annex V.A- Uttarpradesh -Feeders list for Remote tripping…………………………….………………………………….49
Annex V.B- Uttarpradesh List of power stations for generation regulation……………….………………………..51
Annex V C- Uttarpradesh –Nodes identified for Under Voltage Load Shedding………….……………………….52
Annex V.D- Uttarpradesh – Feeders selected for ICT/ line loading crossing normal operating limits…..53
Annex V.E- Uttarpradesh – Feeders selected for loss of generation >1000MW/
High capacity corridor……………………………………………………………………………………………………….54
Annex V.F- Uttarpradesh –Power stations selected for Islanding at 47.9Hz……………..………….……………..55
Annex VI.A- Uttarakhand -Feeders list for Remote tripping…………………………….…………………………….……56
Annex VI.B- Uttarakhand List of power stations for generation regulation……………….………………………..56
Annex VI C- Uttarakhand –Nodes identified for Under Voltage Load Shedding………….………………………..57
Annex VI.D- Uttarakhand Feeders selected for ICT/ line loading crossing normal operating limits………57
Annex VI.E- Uttarakhand – Feeders selected for loss of generation >1000MW/
High capacity corridor………………………………………………………………………………………………………58
Annex VI.F- Uttarakhand –Power stations selected for Islanding at 47.9Hz……………..………….……………..58
Annex VII.A- Jammu & Kashmir -Feeders list for Remote tripping…………………………….…………………………59
Annex VII.B- Jammu & Kashmir List of power stations for generation regulation……………….……………….60
Annex VII C- Jammu & Kashmir –Nodes identified for Under Voltage Load Shedding………….………………60
Annex VII.D- J & K– Feeders selected for ICT/ line loading crossing normal operating limits……………….61
Annex VII.E- Jammu & Kashmir – Feeders selected for loss of generation >1000MW/
High capacity corridor…………………………………………………………………………………………………….62
Annex VII.F- Jammu & Kashmir –Power stations selected for Islanding at 47.9Hz……………..………….…….62
Annex VIII.A- Himachal Pradesh -Feeders list for Remote tripping…………………………….………………………..63
Annex VIII.B- Himachal Pradesh List of power stations for generation regulation……………….………………63
Annex VIII C- Himachal Pradesh –Nodes identified for Under Voltage Load Shedding………….……………..64
Annex VIII.D- HP – Feeders selected for ICT/ line loading crossing normal operating limits ………….……64
Annex VIII.E- Himachal Pradesh – Feeders selected for loss of generation >1000MW/
High capacity corridor…………………………………………………………………………………………………….65
Annex VIII.F- Himachal Pradesh –Power stations selected for Islanding at 47.9Hz……………..………….…..65
Annex IX.A- Chandigarh -Feeders list for Remote tripping…………………………….…………………………….……..66
Annex IX.B- Chandigarh List of power stations for generation regulation……………….………………………….66
3
Annex IX C- Chandigarh –Nodes identified for Under Voltage Load Shedding………….…………………………66
Annex IX.D- Chandigarh – Feeders selected for ICT/ line loading crossing normal operating limits ……67
Annex IX.E- Chandigarh –Feeders selected for loss of generation >1000MW/
High capacity corridor……………………………………………………………………………………………………..67
Annex IX.F- Chandigarh –Power stations selected for Islanding at 47.9Hz……………..………….……………….67
Annex X.A- Regional Level- Feeders selected in case of loss of generation >1000MW /loss of
high capacity corridor………………….………………………………………………………………………………...68
Annex XI- UFR & df/dt setting…………………….………………………………………………………………………………………69
EXHIBIT 2- AUTOMATED DEFENCE PLAN FOR EASTERN REGION…………………………………………71
Annex 2.1- Automated defence plan summary for secure operation of grids…….Bihar System………….72
Annex 2.2- Automated defence plan summary for secure operation of grids…… DVC System…………….73
Annex 2.3- Automated defence plan summary for secure operation of grids…….Jharkhand System……74
Annex 2.4- Automated defence plan summary for secure operation of grids……Odisha System………….75
Annex 2.5- Automated defence plan summary for secure operation of grids……Sikkim System..…….…..76
Annex 2.6- Automated defence plan summary for secure operation of grids…….West Bengal System…77
Annex-2.A- Feeders list for Voltage crossing the limits…………………….………………………………………………….78
Annex-2.B- Key line/ICT loading crossing limits…………………….………………………………………………………………80
Annex-2.C-Action plan for TTC violation…………………….…………………………………………………………………………81 Annex- 2.D-Action Plan for Loss of Generation / High capacity corridor…………………….…………………………82 Annex 2.E-Existing UFR & df/dt setting…………………….…………………………………………………………………………..84
Annex 2.F-Islanding Schemes…………………….………………………………………………………………………………………….87
EXHIBIT 3- AUTOMATED DEFENCE PLAN FOR WESTERN REGION…………………………………………90
Annex 3.1- Automated defence plan summary for secure operation of grids……Gujarat System………….91
Annex 3.2- Automated defence plan summary for secure operation of grids……Chattisgarh System……93
Annex 3.3- Automated defence plan summary for secure operation of grids…….Maharastra System…..95
Annex 3.4- Automated defence plan summary for secure operation of grids-Madhyapradesh System…97
Annex 3.A- Regional Level- List of ISGS for generation regulation & line loading crossing
normal operating limits …….……………………………………………………………………………………………….99
4
Annex-3.B-Western Region Islanding Schemes …………………….……………………………………………………………100
Annex-3.C- GUJARAT Load Shed Scheme …………………….………………………………………………………………………101
Annex-3.D - Chattisgarh Load Shed Scheme …………………….………………………………………………………………….111 Annex-3.E - Maharastra Load Shed Scheme …………………….………………………………………………………………….115
Annex-3.F- Madhyapradesh Load Shed Scheme …………………….……………………………………………………………135
EXHIBIT 4- AUTOMATED DEFENCE PLAN FOR SOUTHERN REGION…………………………...............138 Annex 4.1-Automated defence plan summary for secure operation of grids-Andhra Pradesh System….139
Annex 4.2- Automated defence plan summary for secure operation of grids…Karnataka System………..141
Annex4.3- Automated defence plan summary for secure operation of grids…Kerala System……………….143
Annex 4.4- Automated defence plan summary for secure operation of grids…Pondycherry System…….145
Annex 4.5- Automated defence plan summary for secure operation of grids…Tamilnadu System..……..146
Annex 4.A- Feeders list for Remote tripping…………….………………………………………………………………………….148
Annex-4.B-Key Line/ICT loading crossing normal operating limits………………………………………………………..151
Annex-4.C- Annexure -B. Loss of Generation / High capacity corridor…………………….……………………………152
Annex 4.D-Angular difference exceeding cut off value …………………….………………………………………………….154
Annex 4.E- UFR & df/dt setting……………………………………………………………………………………………………………155
EXHIBIT 5- AUTOMATED DEFENCE PLAN FOR NORTH EASTERN REGION……………………………..172
Annex 5.1- Automated defence plan summary for secure operation of grids-Arunachal Pradesh………..173
Annex 5.2- Automated defence plan summary for secure operation of grids…… Assam System………….175
Annex 5.3- Automated defence plan summary for secure operation of grids……Manipur System……….177
Annex 5.4- Automated defence plan summary for secure operation of grids…….Meghalaya System…..179
Annex 5.5- Automated Haryana defence plan for secure operation of grids……Mizoram System..………182
Annex 5.6- Automated defence plan summary for secure operation of grids……Nagaland System………184
Annex 5.7- Automated defence plan summary for secure operation of grids…….Tripura System…………186
Annex 5.A- -Intra Regional - Line Loading crossing the normal operating limits, TTC violation, Loss of
Gen/High capacity corridor……………………………………………………………………………………………….188
Annex 5.B-NER-Islanding Schemes..…….……………………………………………………………………………………………….193
5
EXHIBIT 1
AUTOMATED DEFENCE PLAN FOR NORTHERN REGION
6
Annex 1.1-Automated defence plan summary for secure operation of grids…….Punjab System
S No Logic Control Action Manual or Automatic Measurements as input for control action (Local / Wide
Area)
Control Action (Local / Wide Area)
Remarks
NO
RTH
ERN
REG
ION
-PU
NJA
B
1
∆ P > 150 MW ∆ P = Actual-Schd and freq < 50 Hz
Shed load in Punjab in identified seven groups A, B, C,D,E,F &G each group constituting 150 MW or 12% of schedule .Rotation logic and sequence to be programmed at SLDC and RLDC PLCs
Stage 1 : Manual Stage 2 : Automatic (From SLDC PLC after 15 minutes) Stage 3 : Backup (from NRLDC PLC after 20 minutes)
Wide Area : Schedules & Drawal from SCADA system at LDCs
Wide Area: signal sent from LDC to (~34 x 220 kV sub-stations in 7 groups, each group would have ~3-5 x 220 kV sub-stations and ~3-5 x 132/66 kV feeders would be identified at each substn. (Feeder list is enclosed in Annex-I.A)
Group A: Bahadurgarh, Rajpura, Nabha,Rajla,Patran all 220 kV sub-stations Group B: Barnala,Pakhowal,Amloh,Sunam all 220 kV sub-stations Group C: Moga, Ferozpur, Baghapurana,Botiawala, Sadiq all 220 kV sub-stations Group D: Muktsar, LehraMohabbat all 220 kV sub-stations Group E: Verpal, patti,, Butari, WadalaGranthian all 220 kV sub-stations Group F: Nakodar, Kartarpur,Goraya, Jamsher,JallandharBBMb, RehanaJattan all 220 kV sub-stations Group G: Laltokalan,Ropar,Kohara,Kharar,Ferozpur Road, Humbran,Jagraon,132kV Doraha all 220 kV sub-stations
2
∆ P < -150 MW and freq > 50 Hz ∆ P = Actual-Schd
Send signal to designated power stations A, B, C,D,E,F &G . Rotation logic and sequence to be programmed at SLDC and NRLDC PLC
Stage 1 : Manual Stage 2 : Automatic (From SLDC PLC 15 minutes) Stage 3 : Backup (from NRLDC PLC in 25 minutes)
Wide Area : Schedules & Drawal from SCADA system at LDCs
Wide Area: signal sent from LDCs to selected power stations
Power station A: RSD Power station B: Ropar Power Station C: LehraMohabbat Power Station D: Bhatinda The power stations can either wire the same for unit tripping or generation reduction through secondary control. Refer Annex-I.B
3
Voltage < 200 kV at sub-station for more than 5 minutes
Shed load at the 34 x 220 kV sub-stations identified in S no 1 above. Refer Annex-I.C
Stage 1: Alarm (208 kV) Local area:
Local area:
Under Voltage Load Shedding (UVLS).
Stage 2: Automatic (200 kV for more than 5 minutes)
Bus voltage Measurement at the 34 x 220 kV substations
34 UVLS relays required one each at the thiry four 220 kV sub-stations identified at S no. 1 above.
Stage 3: 185 kV 30 seconds
4
ICT / line loading crossing normal operating limits
Shed load in designated areas Shed load in designated
areas
Refer Annex-I.D
Stage-1: Manual (SLDC level) Stage-2; Automatic through PLC
ICT’s flow at (1) 400kV Amritsar_PG, (2) 400kV Ludhiana_PG, (3) 400kV Malerkotla_PG, (4) 400kV Patialala_PG, (5) 400kV Moga_PG (6) 400kV Jallandhar_PG
Wide Area : Signal sent from respective stations to shed radial load at nearby 220kV S/s
Stage-1: Manual (SLDC level) Stage-2; Automatic through PLC
Line flows of 220 kV Nalagarh-Mohali lines
220kV Barnala-Lehramohabbat lines
Wide Area : Signal sent from 220kV Mohali, 220kV Lehramohabbat to shed radial load at nearby 220kV S/s
7
5 Flows crossing TTC and ∆ P > 100 MW
Shed load in the feeders identified at S no 1 Group A, B, C,D,E,F &G in rotation
Automatic
Local area: Wide Area:
NO
RTH
ERN
REG
ION
-PU
NJA
B
No. of measurements aggregated at NRLDC SCADA
Signal sent from NRLDC to the 34 x 220 kV substations identified at S no 1 above.
6**
Sudden loss of generation > 1000 MW or loss of high capacity corridor
Loss of Generation / High capacity corridor Refer Annex-I.E
Automatic Local area:(1)Measurement at Ropar TPS**
Wide Area: Shed loads identified at Sl. No.1
**Proposed SPS : 1) SPS for reliable evacuation of Ropar TPS generation
7
Angular difference exceeding cut off value
Shed load in Group A, B, C,D,E,F &G by rotation
Automatic Wide Area Synchrophasor measurements at RLDC/SLDC
Wide Area: Signal sent to 34 x 220 kV substations
Angle pairs to be decided. True Wide Area Protection
8
UFR 1: 49.0 Hz
Punjab peak load: 8439 MW. UFR to cover at least 60% or 5063 MW. Identify 37 x (220 kV substations & 66kV Substations)
Automatic Local Area Local area: [Refer Annex XI]
49.0 Hz: 5 substations: 800 MW
UFR 2: 48.8 Hz
48.8 Hz: 10 substations: 1250 MW
UFR 3: 48.6 Hz
48.6 Hz: 10 substations: 1250 MW
UFR 4: 48.4 Hz
48.4 Hz : 12 substations: 1750 MW
30 UFRs required with df/dt feature to take care of S no 9 also.
9 Df/dt: 49.9 Hz plus 0.1, 0.2 Hz/sec
Designated feeder in each control area
Automatic Local area Local area Part loads in S no 8 could be covered through df/dt relays also. Say UFR4 could be covered through df/dt also.
10 Islanding at 47.9 Hz
Power stations, loads Refer Annex-I.F
Automatic Local area Local area
Islands :
(1)Ropar TPS with load at 220kV Gobindgarh-1
(2)Lehra Mohabbat TPS with load at 220kV Himatpura
(3)Bhatinda TPS (GNDTPS) with load at 220kV Mukatsar
** Separate sheet for lines not associated with any state but trunk line. 1) Telemetery of all feeders a must. 2) Reset command from control centre for restoration 3) Ability to select any combination of sub-stations at LDC PLC 4) Detailed logic at PLC level; audit trail for change in logic by authorised users (5) Master server or PLCs for archiving, logs etc. (6) For UFR, UVLS station EL should be provided.
Note: Load node(at 220kV) in a group has been taken of nearby area/or of a particular area. It is suggested that load nodes may be taken from different location in a group to reduce the impact of load shed in a single/particular area.
8
Annex 1.2-Automated defence plan summary for secure operation of grids…….Haryana System
S No
Logic Control Action Manual or Automatic
Measurements as input for control
action (Local / Wide Area)
Control Action (Local / Wide Area)
Remarks
1
∆ P > 150 MW ∆ P = Actual-Schd and freq < 50 Hz
Shed load in Haryana in identified five groups A, B, C,D,& E each group constituting 150 MW or 12% of
schedule.Rotation logic and sequence to be programmed at SLDC and RLDC PLCs
Stage 1 : Manual Stage 2 : Automatic (From SLDC PLC after 15 minutes) Stage 3 : Backup (from NRLDC PLC after 20 minutes)
Wide Area : Schedules & Drawal from SCADA system at LDCs
Wide Area: signal sent from LDC to (14 x 220 kV sub-stations in 5 groups, each group would have 3 x 220 kV sub-stations and 3 x 132/66 kV feeders would be identified at each substn.(Feeder list is enclosed in Annex-II.A)
Group A: Abdullapur, Shahbad,Tepla ,Pehowa, Kaul all 220 kV sub-stations Group B: Gurgaon Sec-72, Gurgaon Sec-52 all 220 kV sub-stations Group C: Kaithal,Cheeka,Durala,Narwana all 220 kV sub-stations Group D: NunaMajra, Rohtak,Sampla, all 220 kV sub-stations Group E: Hisar IA, Hisar BBMB, Kirori all 220 kV sub-stations
NO
RTH
ERN
REG
ION
-HA
RY
AN
A
2
∆ P < -150 MW and freq > 50 Hz ∆ P = Actual-Schd
Send signal to designated power stations A, B, C,D,& E . Rotation logic and sequence to be programmed at SLDC and NRLDC PLC
Stage 1 : Manual Stage 2 : Automatic (From SLDC PLC 15 minutes) Stage 3 : Backup (from NRLDC PLC in 25 minutes)
Wide Area : Schedules & Drawal from SCADA system at LDCs
Wide Area: signal sent from LDCs to selected
power stations Annex-II.B
Power station A: Khedar Power station B: DCRTP Power Station C: Panipat New Power Station D: Faridabad Gas Power Station E: MGSTPS The power stations can either wire the same for unit tripping or generation reduction through secondary control.
3
Voltage < 200 kV at sub-station for more than 5 minutes
Shed load at the 14 x 220 kV sub-stations identified in S no 1 above.
Stage 1: Alarm (208 kV)
Local area:
Local area: Annex-II.C
Under Voltage Load Shedding (UVLS).
Stage 2: Automatic (200 kV for more than 5 minutes)
Bus voltage Measurement at the 14 x 220 kV substations
Sixteen UVLS relays required one each at the sixteen 220 kV sub-stations identified at S no. 1 above.
Stage 3: 185 kV 30 seconds
9
S No
Logic Control Action Manual or Automatic
Measurements as input for control
action (Local / Wide Area)
Control Action (Local / Wide Area)
Remarks
4**
ICT / line loading crossing normal operating limits
Shed load in designated areas Refer Annex II.D
Stage-1: Manual (SLDC level) Stage-2; Automatic through PLC
ICT’s flow at 400kV Abdullapur 400kV Sonepat 400kV Hissar 400kV Khedar 400kV Kaithal 400kV Fatehabad 400kV Bahadurgarh 400kV Kirori 400kV Daulatabad 400kV Panchkulla
Wide Area : Signal sent from respective stations to shed radial load at nearby 220kV S/s
NO
RTH
ERN
REG
ION
-HA
RY
AN
A
ICT / line loading crossing normal operating limits
Shed load in designated areas Refer Annex II.D
Stage-1: Manual (SLDC level) Stage-2; Automatic through PLC
Line flows of 220 kV Samaypur-Ballabhgarh lines 220 kV Ballabhgah – Charkhi Dadri, 220 kV Samaypur – Charkhi Dadri, 220 kV Hissar (BBMB)- Hissar IA D/C lines
Wide Area : Signal sent from 220kV Samaypur, 220kV Charkhi dadri & 220kV Hissar_IA to shed 220kV radial load
5 Flows crossing TTC and ∆ P > 100 MW
Shed load in the feeders identified at S no 1 Group A to Group E in rotation
Automatic
Local area: No. of measurements aggregated at NRLDC SCADA
Wide Area: Signal sent from NRLDC to the 14x 220 kV substations identified at S no 1 above.
6**
Sudden loss of generation > 1000 MW or loss of high capacity corridor
Loss of Generation / High capacity corridor Refer Annex II.E
Automatic Local area: (1)Measurement at Khedar TPS
Wide Area: Shed loads identified at Sl. No.1
Existing SPS: 1) SPS for tripping of HVDC Mundra-Mahendergarh Proposed SPS : 1) SPS for reliable evacuation of Panipat TPS stage I & II generation
10
S No
Logic Control Action Manual or Automatic
Measurements as input for control
action (Local / Wide Area)
Control Action (Local / Wide Area)
Remarks
7
Angular difference exceeding cut off value
Shed load in Group A or B or C by rotation
Automatic
Wide Area Synchrophasor measurements at RLDC/SLDC
Wide Area: Signal sent to 14 x 220 kV substations
Angle pairs to be decided. True Wide Area Protection
NO
RTH
ERN
REG
ION
-HA
RY
AN
A
8
UFR 1: 49.0 Hz
Haryana peak load: 6416 MW. UFR to cover at least 60% or 3850 MW. Identify 35 x 220 kV substations.
Automatic
Local Area
Local area: [Refer Annex XI]
49.0 Hz: 5 substations: 600 MW
UFR 2: 48.8 Hz 48.8 Hz: 10 substations: 1000 MW UFR 3: 48.6
Hz 48.6 Hz: 10 substations: 1000 MW
UFR 4: 48.4 Hz
48.4 Hz : 10 substations: 1250 MW
30 UFRs required with df/dt feature to take care of S no 9 also.
9 Df/dt: 49.9 Hz plus 0.1, 0.2 Hz/sec
Designated feeder in each control area
Automatic Local area Local area Part loads in S no 8 could be covered through df/dt relays also. Say UFR4 could be covered through df/dt also
10 Islanding at 47.9 Hz
Power stations, loads Refer Annex II.F
Automatic
Local area
Local area
Islands :
(1)Panipat TPS with load at 220kV Saifidon
(2)Khedar TPS with load at 220kV Kirori
(3)Yamuna nagar TPS with load at 220kV Jorian
(4) Mahatma Gandhi TPS with load at 220kV Kabulpur
(5)Jhajjar TPS with load at 400/220kV daulatabad
(6)Faridabad GPS with load at 220kV Samaypur
(6)Faridabad GPS with load at 220kV Samaypur
** Separate sheet for lines not associated with any state but trunk line. 1) Telemetery of all feeders a must. 2) Reset command from control centre for restoration 3) Ability to select any combination of sub-stations at LDC PLC 4) Detailed logic at PLC level; audit trail for change in logic by authorised users (5) Master server or PLCs for archiving, logs etc. (6) For UFR, UVLS station EL should be provided.
Note: Load node(at 220kV) in a group has been taken of nearby area/or of a particular area. It is suggested that load nodes may be taken from different location in a group to reduce the impact of load shed in a single/particular area.
11
Annex 1.3-Automated defence plan summary for secure operation of grids…….Rajasthan System
S No
Logic Control Action Manual or Automatic
Measurements as input for control
action (Local / Wide Area)
Control Action (Local / Wide
Area) Remarks
1
∆ P > 150 MW ∆ P = Actual-Schd and freq < 50 Hz
Shed load in Rajasthan in identified six groups A, B, C,D, E ,F & G each group constituting 150 MW or 12% of
schedule.Rotation logic and sequence to be programmed at SLDC and RLDC PLCs
Stage 1 : Manual Stage 2 : Automatic (From SLDC PLC after 15 minutes) Stage 3 : Backup (from NRLDC PLC after 20 minutes)
Wide Area : Schedules & Drawal from SCADA system at LDCs
Wide Area: signal sent from LDC to (31 x 220 kV sub-stations in 6 groups, each group would have ~4-5 x 220 kV sub-stations and 3 x 132/66 kV feeders would be identified at each substn.(Feeder list is enclosed in Annex-III.A)
GroupA:Bharatpur,Dholpur,Mandawar,SawaiMadhopur all 220 kV sub-stations Group B: Jaipur,Phulera,Chomu,Reengus, Khetri,Chirawa all 220 kV sub-stations Group C: Bhiwadi,Kotputli,Alwar,Bassi,Kukas all 220 kV sub-stations Group D: Sikar,Dhod,Ratangarh,Jhunjhunu,SriDoongarpur all 220 kV sub-stations Group E: Merta,Kheenvsar, Bhoplagarh all 220 kV sub-stations Group F: Kankroli,Sirohi,Bhinmal,Pindwara,Sanchore,Jalore all 220 kV sub-stations Group G: Jhalawar, Modak all 220 kV sub-stations
NO
RTH
ERN
REG
ION
-RA
JASTH
AN
2
∆ P < -150 MW and freq > 50 Hz ∆ P = Actual-Schd
Send signal to designated power stations A, B, C,D, E ,F & G. Rotation logic and sequence to be programmed at SLDC and NRLDC PLC
Stage 1 : Manual Stage 2 : Automatic (From SLDC PLC 15 minutes) Stage 3 : Backup (from NRLDC PLC in 25 minutes)
Wide Area : Schedules & Drawal from SCADA system at LDCs
Wide Area: signal sent from LDCs to selected power stations Refer Annex III.B
Power station A: Suratgarh TPS Power station B: KTPS Power Station C: Chhabra Power Station D: Giral TPS Power Station E: Rajwest Power Station F: Dholpur CCGT Power Station G: Barsinghsar The power stations can either wire the same for unit tripping or generation reduction through secondary control.
3
Voltage < 200 kV at sub-station for more than 5 minutes
Shed load at the 31 x 220 kV sub-stations identified in S no 1 above. Refer Annex III.C
Stage 1: Alarm (208 kV)
Local area:
Local area:
Under Voltage Load Shedding (UVLS).
Stage 2: Automatic (200 kV for more than 5 minutes)
Bus voltage Measurement at the 18 x 220 kV substations
31 UVLS relays required one each at the thirty one 220 kV sub-stations identified at S no. 1 above.
Stage 3: 185 kV 30 seconds
4**
ICT / line loading crossing normal operating limits
Shed load in designated areas
Stage-1: Manual (SLDC level) Stage-2; Automatic through PLC
ICT’s flow at 400kV Bassi_PG** 400kV Bhiwadi_PG** 400kV Kankroli_PG, 400kV Bhinmal_PG, 400kV Jodhpur_PG
Wide Area : Signal sent from respective stations to shed radial load at nearby 220kV S/s
**SPS approved and under implementation for Contingency due to tripping of Transformers operating in Parallel at Bassi_PG & Bhiwadi
12
S No
Logic Control Action Manual or Automatic
Measurements as input for control
action (Local / Wide Area)
Control Action (Local / Wide
Area) Remarks
Shed load in designated areas Refer Annex III.D
Stage-1: Manual (SLDC level) Stage-2; Automatic through PLC
Line flows of 220kV Bhiwadi-Kushkhera line-1&2, 220kV Sikandra-Bharatpur line, 400kV Bassi-Heerapura line - 1 & 2
Wide Area : Signal sent from Bhiwadi_PG, Bharatpur & Bassi_PG to shed radial load at nearby 220kV S/s
NO
RTH
ERN
REG
ION
-RA
JASTH
AN
5
Flows crossing TTC and ∆ P > 100 MW
Shed load in the feeders identified at S no 1 Group A, B, C,D, E ,F & G. in rotation
Automatic
Local area: No. of measurements aggregated at NRLDC SCADA
Wide Area: Signal sent from NRLDC to the 31 x 220 kV substations identified at S no 1 above.
6**
Sudden loss of generation > 1000 MW or loss of high capacity corridor
Loss of Generation / High capacity corridor Refer Annex III.E
Automatic Local area: (1)Measurement at Suratgarh SPTS
Wide Area: Shed loads identified at Sl. No.1
7
Angular difference exceeding cut off value
Shed load in Group A or B or C by rotation
Automatic
Wide Area Synchrophasor measurements at RLDC/SLDC
Wide Area: Signal sent to 31 x 220 kV substations
Angle pairs to be decided. True Wide Area Protection
8
UFR 1: 49.0 Hz
Rajasthan peak load: 6332 MW. UFR to cover at least 60% or 3799 MW. Identify 35 x 220 kV substations.
Automatic Local Area Local area: [Refer Annex XI]
49.0 Hz: 5 substations: 600 MW
UFR 2: 48.8 Hz
48.8 Hz: 10 substations: 1000 MW
UFR 3: 48.6 Hz
48.6 Hz: 10 substations: 1000 MW
UFR 4: 48.4 Hz
48.4 Hz : 10 substations: 1200 MW
30 UFRs required with df/dt feature to take care of S no 9 also.
13
S No
Logic Control Action Manual or Automatic
Measurements as input for control
action (Local / Wide Area)
Control Action (Local / Wide
Area) Remarks
9 Df/dt: 49.9 Hz plus 0.1, 0.2 Hz/sec
Designated feeder in each control area
Automatic Local area Local area Part loads in S no 8 could be covered through df/dt relays also. Say UFR4 could be covered through df/dt also.
NO
RTH
ERN
REG
ION
-RA
JASTH
AN
10 Islanding at 47.9 Hz
Power stations, loads Refer Annex III.F
Automatic Local area Local area
Islands :
(1)Kota TPS with load at 220kV Kota
(2)Suratgarh TPS with load at 220kV Suratgarh Old,
(3) Chabra TPS with load at 220kV Jhalawar
(4) Dholpur TPS with load at 220kV Basere
(5)Barsingsar with load at 220kV Bikaner
(6)Rajwest TPS with load at 220kV Barmer
(7) Giral TPS with load at 220kV Akal
(8)VSLP with load at 220kV Bikaner
(8) Anta GPS with load at 220kV Sawaimadhopur/ Dausa
** Separate sheet for lines not associated with any state but trunk line. 1) Telemetery of all feeders a must. 2) Reset command from control centre for restoration 3) Ability to select any combination of sub-stations at LDC PLC 4) Detailed logic at PLC level; audit trail for change in logic by authorised users (5) Master server or PLCs for archiving, logs etc. (6) For UFR, UVLS station EL should be provided.
Note: Load node(at 220kV) in a group has been taken of nearby area/or of a particular area. It is suggested that load nodes may be taken from different location in a group to reduce the impact of load shed in a single/particular area.
14
Annex 1.4-Automated defence plan summary for secure operation of grids…….Delhi System
S No
Logic Control Action Manual or Automatic
Measurements as input for control action (Local / Wide Area)
Control Action (Local / Wide Area) Remarks
1
∆ P > 150 MW ∆ P = Actual-Schd and freq < 50 Hz
Shed load in Delhi in identified three groups A, B, C & D each group constituting 150 MW or 12% of
schedule.Rotation logic and sequence to be programmed at SLDC and RLDC PLCs
Stage 1 : Manual Stage 2 : Automatic (From SLDC PLC after 15 minutes) Stage 3 : Backup (from NRLDC PLC after 20 minutes)
Wide Area : Schedules & Drawal from SCADA system at LDCs
Wide Area: signal sent from LDC to 20 x 220 kV sub-stationsin 3 groups, each group would have 5 x 220 kV sub-stations and 3 x 66 kV feeders would be identified at each substn.(Feeder list is enclosed in Annex-IV.A)
Group A: Narela, Shalimar Bagh, Rohini, South of Wazirabad, Kashmere Gate all 220 kV sub-stations Group B: Gopalpur, Geeta Colony, Patparganj, Rajghat, Pragati all 220 kV sub-stations Group C: Mehrauli, Najafgarh, Vasant Kunj, Dwarka-1, Dwarka-2 all 220 kV sub-stations GroupD:Okhla,SaritaVihar,MasjidMoth,Parkstreet,LodhiRoad all 220kV sub-stations
NO
RTH
ERN
REG
ION
-DELH
I
2
∆ P < -150 MW and freq > 50 Hz ∆ P = Actual-Schd
Send signal to designated power stations A, B and C. Rotation logic and sequence to be programmed at SLDC and NRLDC PLC
Stage 1 : Manual Stage 2 : Automatic (From SLDC PLC 15 minutes) Stage 3 : Backup (from NRLDC PLC in 25 minutes)
Wide Area : Schedules & Drawal from SCADA system at LDCs
Wide Area: signal sent from LDCs to selected power stations Annex-IV.B
Power station A: BTPS Power station B: Pragati Power Station C: Bawana Gas The power stations can either wire the same for unit tripping or generation reduction through secondary control.
3
Voltage < 200 kV at sub-station for more than 5 minutes
Shed load at the 20 x 220 kV sub-stations identified in S no 1 above.
Stage 1: Alarm (208 kV)
Local area:
Local area Annex-IV.C:
Under Voltage Load Shedding (UVLS).
Stage 2: Automatic (200 kV for more than 5 minutes)
Bus voltage Measurement at the 20 x 220 kV substations
Fifteen UVLS relays required one each at the twnty 220 kV sub-stations identified at S no. 1 above.
Stage 3: 185 kV 30 seconds
4**
ICT / line loading crossing normal operating limits
Shed load in designated areas
Stage-1: Manual (SLDC level) Stage-2; Automatic through PLC
Local area: 220 kV Ballabgarh-BTPS flow exceeding 150 MW each circuit towards BTPS
Wide Area : Signal sent from BTPS to 220 kV Mehrauli and Okhla substations Annex-IV.D
Identify 5 x 66 kV feeders each at Mehrauli and Okhla substations. Note: Delhi already has SPS for overloading of Mandaula, Bawana and Bamnauli 400/220 kV ICTs.
5
Flows crossing TTC and ∆ P > 100 MW
Shed load in the feeders identified at S no 1 Group A, B, C & D in rotation
Automatic
Local area: No. of measurements aggregated at NRLDC SCADA
Wide Area: Signal sent from NRLDC to the 20 x 220 kV substations identified at S no 1 above.
15
S No
Logic Control Action Manual or Automatic
Measurements as input for control action (Local / Wide Area)
Control Action (Local / Wide Area) Remarks
6**
Sudden loss of generation > 1000 MW or loss of high capacity corridor
Loss of high capacity corridors
Automatic
Local area: measurement at Mandaula (PG) sub-station 1) Change of 1000 MW on Dadri-Mandaula D/C or Mandaula-Bawana D/C
Wide Area: In case of Dadri-Mandaula D/C trip Group A or B. In case of Mandaula-Bawana D/C trip Group C. Annex-IV.E
SPS for Contingency due to tripping of Transformers operating in Parallel 1) Existing SPS : Bamnauli, Ballbgarh 2) Proposed : Mahranibagh, Bawana
NO
RTH
ERN
REG
ION
-DELH
I
7
Angular difference exceeding cut off value
Shed load in Group A or B or C or D by rotation
Automatic
Wide Area Synchrophasor measurements at RLDC/SLDC
Wide Area: Signal sent to 20x 220 kV substations
Angle pairs to be decided. True Wide Area Protection
8
UFR I: 49.0 Hz
Delhi peak load: 5500 MW. UFR to cover at least 60% or 3300 MW. Identify 30 x 220 kV substations.
Automatic Local Area Local area: Refer Annex XI
49.0 Hz: 6 substations: 500 MW 48.4 Hz: 1000 MW
UFR 2: 48.8 Hz
48.8 Hz: 8 substations: 800 MW
UFR3: 48.6 Hz
48.6 Hz: 8 substations: 1000 MW
UFR4: 48.4 Hz
30 UFRs required with df/dt feature to take care of S no 9 also.
9 Df/dt: 49.9 Hz plus 0.1, 0.2 Hz/sec
Designated feeder in each control area
Automatic Local area Local area Part loads in S no 8 could be covered through df/dt relays also. Say UFR4 could be covered through df/dt also.
10 Islanding at 47.9 Hz
Power stations, loads
Automatic Local area Local area Annex-IV.F
Pragati, Bawana, BTPS islands. (15 UFRs required say)
** Separate sheet for lines not associated with any state but trunk line. 1) Telemetery of all feeders a must. 2) Reset command from control centre for restoration 3) Ability to select any combination of sub-stations at LDC PLC 4) Detailed logic at PLC level; audit trail for change in logic by authorised users (5) Master server or PLCs for archiving, logs etc. (6) For UFR, UVLS station EL should be provided.
Note: Load node(at 220kV) in a group has been taken of nearby area/or of a particular area. It is suggested that load nodes may be taken from different location in a group to reduce the impact of load shed in a single/particular area.
16
Annex 1.5-Automated defence plan summary for secure operation of grids…….UttarPradesh System
S No
Logic Control Action Manual or Automatic
Measurements as input for control action (Local / Wide Area)
Control Action (Local / Wide Area)
Remarks
1
∆ P > 150 MW ∆ P = Actual-Schd and freq < 50 Hz
Shed load in UttarPradesh in identified ten groups A, B, C,D,E,F,G,H,I&J each group constituting 150 MW or 12% of
schedule.Rotation logic and sequence to be programmed at SLDC and RLDC PLCs
Stage 1 : Manual Stage 2 : Automatic (From SLDC PLC after 15 minutes) Stage 3 : Backup (from NRLDC PLC after 20 minutes)
Wide Area : Schedules & Drawal from SCADA system at LDCs
Wide Area: signal sent from LDC to (~35 x 220 kV sub-stations in 10 groups, each group would have ~3-4 x 220 kV sub-stations and ~3-4 x 132/66 kV feeders would be identified at each substn. (Feeder enclosed in Annex-V.A)
Group A: GreaterNoida, Noida sec-20, Noida sec-129 all 220 kV sub-stations Group B: Agra (Sikandra), Firozabad all 220 kV sub-stations Group C: Gokul,Hathras, Aligarh (132kV) Group D: Baraut,Khurja, Jahangirabad all 220 kV sub-stations Group E: Moradabad, Nehtaur, Sambhal, CBGanj all 220 kV sub-stations Group F: Nanauta, Shamli,Sharanpur all 220 kV sub-stations Group G: Nara,Gajraula, Simbholi,Shatabdinagar all 220 kV sub-stations Group H: Panki, ChibroMau,Mainpuri all 220 kV sub-stations Group I: Paricha,Orai,Safai,Etah, all 220 kV sub-stations Group J: Fatehpur,Banda, RewaRoad, all 220 kV sub-stations
NO
RTH
ERN
REG
ION
-UTTA
RP
RA
DESH
2
∆ P < -150 MW and freq > 50 Hz ∆ P = Actual-Schd
Send signal to designated power stations A, B, C,D,E,F,G,H,I&J. Rotation logic and sequence to be programmed at SLDC and NRLDC PLC
Stage 1 : Manual Stage 2 : Automatic (From SLDC PLC 15 minutes) Stage 3 : Backup (from NRLDC PLC in 25 minutes)
Wide Area : Schedules & Drawal from SCADA system at LDCs
Wide Area: signal sent from LDCs to selected power stations Annex-V.B
Power station A: AnparaA&B Power station B: Tanda Power Station C: AnparaC Power Station D: Obra Power Station E: Rosa-1 Power Station F: Paricha Power Station G: Rosa-2 Power Station H: VishnuPrayag The power stations can either wire the same for unit tripping or generation reduction through secondary control.
3
Voltage < 200 kV at sub-station for more than 5 minutes
Shed load at the 35 x 220 kV sub-stations identified in S no 1 above.
Stage 1: Alarm (208 kV)
Local area:
Local area: Annex-V.C
Under Voltage Load Shedding (UVLS).
Stage 2: Automatic (200 kV for more than 5 minutes)
Bus voltage Measurement at the 35 x 220 kV substations
35 UVLS relays required one each at the thirty five 220 kV sub-stations identified at S no. 1 above.
Stage 3: 185 kV 30 seconds
17
S No
Logic Control Action Manual or Automatic
Measurements as input for control action (Local / Wide Area)
Control Action (Local / Wide Area)
Remarks
4**
ICT / line loading crossing normal operating limits
Shed load in designated areas
Stage-1: Manual (SLDC level) Stage-2; Automatic through PLC
ICT’s flow at 400kV Greater Noida_UP 400kV Muzaffarnagar_UP 400kV Allahabad_PG 400kV Meerut_PG 400kV Kanpur_PG 400kV Mainpuri_PG 400kV Moradabad_UP** 400kV Muradnagar_UP ** 400kV Agra_UP ** 400kV Bareilley_UP** 400kV Mandola**
Wide Area : Signal sent from respective stations to shed radial load at nearby 220kV S/s [Annex-V.D]
** SPS proposal approved and under implementation for contingency due to tripping of Transformers operating in Parallel at Moradabad_UP, Muradnagar_UP, Agra_UP, Mandola_PG and Bareilley_UP N
OR
THER
N R
EGIO
N-U
TTAR
PR
AD
ESH
Shed load in designated areas
Stage-1: Manual (SLDC level) Stage-2; Automatic through PLC
Measurement of 220kV line flow of : 220kV Lucknow-Chinhat line, 220kV Mainpuri(PG)-Ferozabad line 220kV Mainpuri-Harduaganj line
Wide Area : Signal sent from respective stations to shed radial load at nearby 220kV S/s [Annex-V.D]
5
Flows crossing TTC and ∆ P > 100 MW
Shed load in the feeders identified at S no 1 Group A, B, C,D,E,F,G,H,I&J in rotation
Automatic
Local area: No. of measurements aggregated at NRLDC SCADA
Wide Area: Signal sent from NRLDC to the 35 x 220 kV substations identified at S no 1 above.
6**
Sudden loss of generation > 1000 MW or loss of high capacity corridor
Loss of high capacity corridors/ loss of generation
Automatic
Local area: (1) Measurement at Panki_UP : flow on 400kV Unnao-Panki line
Wide Area: Signal sent from respective stations to load groups identified at Sl. No. 1 [Annex-V.E]
SPS already in service (1) SPS for Agra-Gwalior lines (2) SPS for HVDC Rihand-Dadri (3) SPS for HVDC Balia-Bhiwadi (4) SPS for Gorakhpur-Muzaffarpur lines SPS approved and under implementation (1) SPS for reliable evacuation of Parichha TPS (2) SPS for reliable evacuation of Roza TPS (3) SPS for contingency due to tripping of multiple lines from 400 kV Dadri
18
S No
Logic Control Action Manual or Automatic
Measurements as input for control action (Local / Wide Area)
Control Action (Local / Wide Area)
Remarks
7
Angular difference exceeding cut off value
Shed load in Group A, B, C,D,E,F,G,H,I&J by rotation
Automatic
Wide Area Synchrophasor measurements at RLDC/SLDC
Wide Area: Signal sent to 35 x 220 kV substations
Angle pairs to be decided. True Wide Area Protection
NO
RTH
ERN
REG
ION
-UTTA
RP
RA
DESH
8
UFR 1: 49.0 Hz
Uttar Pradesh peak load: 9706 MW. UFR to cover at least 60% or 5824 MW. Identify 34 x 220 kV substations.
Automatic Local Area Local area: [Refer Annex XI]
49.0 Hz: 5 substations: 1000 MW
UFR 2: 48.8 Hz
48.8 Hz: 10 substations: 1500 MW
UFR 3: 48.6 Hz
48.6 Hz: 10 substations: 1500 MW [Refer Annex C]
UFR 4: 48.4 Hz
48.4 Hz : 9 substations: 1800 MW
30 UFRs required with df/dt feature to take care of S no 9 also.
9 Df/dt: 49.9 Hz plus 0.1, 0.2 Hz/sec
Designated feeder in each control area
Automatic Local area Local area Part loads in S no 8 could be covered through df/dt relays also. Say UFR4 could be covered through df/dt also.
10 Islanding at 47.9 Hz
Power stations, loads Automatic Local area Local area Annex-V.F
Islands :
(1) Obra TPS with load at 220kV Rewa road,
(2) Panki TPS with load at 220kV Panki ,
(3) Parichha TPS with load at 132kV Jhansi
(4) Tanda TPS with load at 220kV Bast/ 220kV Gorakhpur
(5) Harduaganj TPS with load at 220kV Etah/ Atrauli
(6) Roza TPS with load ata 220kV Shahjahanpur/ Badaun
** Separate sheet for lines not associated with any state but trunk line. 1) Telemetery of all feeders a must. 2) Reset command from control centre for restoration 3) Ability to select any combination of sub-stations at LDC PLC 4) Detailed logic at PLC level; audit trail for change in logic by authorised users (5) Master server or PLCs for archiving, logs etc. (6) For UFR, UVLS station EL should be provided.
Note: Load node (at 220kV) in a group has been taken of nearby area/or of a particular area. It is suggested that load nodes may be taken from different location in a group to reduce the impact of load shed in a single/particular area.
19
Annex 1.6-Automated defence plan summary for secure operation of grids…….Uttarakhand System
S No
Logic Control Action Manual or Automatic
Measurements as input for control
action (Local / Wide Area)
Control Action (Local / Wide Area)
Remarks
1
∆ P > 100 MW ∆ P = Actual-Schd and freq < 50 Hz
Shed load in Uttarakhand in identified two groups A &B each group constituting 100 MW or 12% of
schedule.Rotation logic and sequence to be programmed at SLDC and RLDC PLCs
Stage 1 : Manual Stage 2 : Automatic (From SLDC PLC after 15 minutes) Stage 3 : Backup (from NRLDC PLC after 20 minutes)
Wide Area : Schedules & Drawal from SCADA system at LDCs
Wide Area: signal sent from LDC to (4x 220 kV sub-stations in 2 groups, each group would have ~4 x 220 kV sub-stations and ~3-4 x 132/66 kV feeders would be identified at each substn.(Feeder enclosed in Annexure-VI.A)
Group A: PanthNagar, Ranikhet all 220 kV sub-stations Group B: Roorkee, Rishikesh all 220 kV sub-stations
NO
RTH
ERN
REG
ION
-UTTA
RA
KH
AN
D
2
∆ P < -100 MW and freq > 50 Hz ∆ P = Actual-Schd
Send signal to designated power stations A and B . Rotation logic and sequence to be programmed at SLDC and NRLDC PLC
Stage 1 : Manual Stage 2 : Automatic (From SLDC PLC 15 minutes) Stage 3 : Backup (from NRLDC PLC in 25 minutes)
Wide Area : Schedules & Drawal from SCADA system at LDCs
Wide Area: signal sent from LDCs to selected power stations Annexure-VI.B
Power station A: Power station B: Power Station C: The power stations can either wire the same for unit tripping or generation reduction through secondary control.
3
Voltage < 200 kV at sub-station for more than 5 minutes
Shed load at the 4x 220 kV sub-stations identified in S no 1 above.
Stage 1: Alarm (208 kV)
Local area:
Local area: Annexure-VI.C
Under Voltage Load Shedding (UVLS).
Stage 2: Automatic (200 kV for more than 5 minutes)
Bus voltage Measurement at the 4x 220 kVsubstations
4 UVLS relays required one each at the four 220 kV sub-stations identified at S no. 1 above.
Stage 3: 185 kV 30 seconds
4**
ICT / line loading crossing normal operating limits
Shed load in designated areas
Stage-1: Manual (SLDC level) Stage-2; Automatic through PLC
ICT’s flow at 400kV Rishikesh_PG 400kV Roorkee_PG 400kV Kashipur
Wide Area : Signal sent from respective stations to shed radial load at nearby 220 kV S/s
(Annexure-VI.D)
Shed load in designated areas
Stage-1: Manual (SLDC level) Stage-2; Automatic through PLC
Line flows of 400kV Moradabad-Kashipur line
Wide Area : ** SPS for contingency due to tripping of 400 kV Moradabad-Kashipur line approved and under implementation
20
S No
Logic Control Action Manual or Automatic
Measurements as input for control
action (Local / Wide Area)
Control Action (Local / Wide Area)
Remarks
5
Flows crossing TTC and ∆ P > 100 MW
Shed load in the feeders identified at S no 1 Group A & B in rotation
Automatic
Local area: No. of measurements aggregated at NRLDC SCADA
Wide Area: Signal sent from NRLDC to the 4 x 220 kV substations identified at S no 1 above.
NO
RTH
ERN
REG
ION
-UTTA
RA
KH
AN
D
6**
Sudden loss of generation > 1000 MW or loss of high capacity corridor
Loss of Generation / High capacity corridor
Automatic Local area: Wide Area: Annexure-VI.E
7
Angular difference exceeding cut off value
Shed load in Group A or B by rotation
Automatic
Wide Area Synchrophasor measurements at RLDC/SLDC
Wide Area: Signal sent to 4 x 220 kV substations
Angle pairs to be decided. True Wide Area Protection
8
UFR 1: 49.0 Hz
Uttarakhand peak load: 1532 MW. UFR to cover at least 60% or 919 MW. Identify 20 x (132 kV substations & 66kV Substations)
Automatic Local Area Local area: Refer Annex XI
49.0 Hz: 3 substations: 100 MW
UFR 2: 48.8 Hz
48.8 Hz: 5 substations: 250 MW
UFR 3: 48.6 Hz
48.6 Hz: 5 substations: 250 MW [Refer Annex C]
UFR 4: 48.4 Hz
48.4 Hz : 7 substations: 300 MW
10 UFRs required with df/dt feature to take care of S no 9 also.
9 Df/dt: 49.9 Hz plus 0.1, 0.2 Hz/sec
Designated feeder in each control area
Automatic Local area Local area Part loads in S no 8 could be covered through df/dt relays also. Say UFR4 could be covered through df/dt also.
10 Islanding at 47.9 Hz
Power stations, loads
Automatic Local area Local area Islands : Annexure-VI.F
** Separate sheet for lines not associated with any state but trunk line. 1) Telemetery of all feeders a must. 2) Reset command from control centre for restoration 3) Ability to select any combination of sub-stations at LDC PLC 4) Detailed logic at PLC level; audit trail for change in logic by authorised users (5) Master server or PLCs for archiving, logs etc. (6) For UFR, UVLS station EL should be provided.
Note: Load node(at 220kV) in a group has been taken of nearby area/or of a particular area. It is suggested that load nodes may be taken from different location in a group to reduce the impact of load shed in a single/particular area.
21
Annex 1.7-Automated defence plan summary for secure operation of grids…….Jammu & Kashmir System
S No
- Control Action Manual or Automatic
Measurements as input for control action (Local / Wide Area)
Control Action (Local / Wide Area)
Remarks
1
∆ P > 100 MW ∆ P = Actual-Schd and freq < 50 Hz
Shed load in Jammu&Kashmir in identified two groups A &B each group constituting 100 MW or 12% of
schedule.Rotation logic and sequence to be programmed at SLDC and RLDC PLCs
Stage 1 : Manual Stage 2 : Automatic (From SLDC PLC after 15 minutes) Stage 3 : Backup (from NRLDC PLC after 20 minutes)
Wide Area : Schedules & Drawal from SCADA system at LDCs
Wide Area: signal sent from LDC to (11x 132 kV sub-stations in 2 groups, each group would have 3 x 220 kV sub-stations and ~2-4 x 132/66 kV feeders would be identified at each substn.(Feeder enclosed in Annexure-VII.A)
Group A: Jammu, Baran, Hiranagar all 220 kV sub-stations Group B: Ziankote,Pampore,Mirbazar all 220 kV sub-stations N
OR
THER
N R
EGIO
N-JA
MM
U &
KA
SHM
IR
2
∆ P < -150 MW and freq > 50 Hz ∆ P = Actual-Schd
Send signal to designated power stations A and B. Rotation logic and sequence to be programmed at SLDC and NRLDC PLC
Stage 1 : Manual Stage 2 : Automatic (From SLDC PLC 15 minutes) Stage 3 : Backup (from NRLDC PLC in 25 minutes)
Wide Area : Schedules & Drawal from SCADA system at LDCs
Wide Area: signal sent from LDCs to selected power stations Annexure-VII.B
Power station A: Power station B: Power Station C: The power stations can either wire the same for unit tripping or generation reduction through secondary control.
3
Voltage < 200 kV at sub-station for more than 5 minutes
Shed load at the 11 x 220 kV sub-stations identified in S no 1 above.
Stage 1: Alarm (208 kV) Local area:
Local area: Annexure-VII.C
Under Voltage Load Shedding (UVLS).
Stage 2: Automatic (200 kV for more than 5 minutes)
Bus voltage Measurement at the 15 x 220 kV substations
Fifteen UVLS relays required one each at the fifteen 220 kV sub-stations identified at S no. 1 above.
Stage 3: 185 kV 30 seconds
4**
ICT / line loading crossing normal operating limits
Shed load in designated areas
Stage-1: Manual (SLDC level) Stage-2; Automatic through PLC
ICT’s flow at 400kV Wagoora_PG, 400kV Kishenpur_PG
Wide Area : Signal sent from respective station to at nearby 220kV S/s [Annexure-VII.D]
Shed load in designated areas
Stage-1: Manual (SLDC level) Stage-2; Automatic through PLC
Line flows of 220 kV Sarna-Hiranagar S/C, 220 kV Salal-Jammu lines D/C
Wide Area : Signal sent from Hiranagar & Jammu to nearby 132kV S/s [Annexure-VII.D]
22
S No
- Control Action Manual or Automatic
Measurements as input for control action (Local / Wide Area)
Control Action (Local / Wide Area)
Remarks
5
Flows crossing TTC and ∆ P > 100 MW
Shed load in the feeders identified at S no 1 Group A, B in rotation
Automatic
Local area: No. of measurements aggregated at NRLDC SCADA
Wide Area: Signal sent from NRLDC to the 11 x 220 kV substations identified at S no 1 above.
NO
RTH
ERN
REG
ION
-JAM
MU
& K
ASH
MIR
6**
Sudden loss of generation > 1000 MW or loss of high capacity corridor
Loss of Generation / High capacity corridor
Automatic Local area: Wide Area: Annexure-VII.E
SPS proposed : 1) Tripping of 400kV Kishenpur-Wagoora circuits (monitoring at 400 kV Wagoora substation) 2) Tripping of 220 kV Pampore-Mirbazar-Ramban/Kishenpur 3) Load through off, power export from Kashmir valley (Summer scenario)
7
Angular difference exceeding cut off value
Shed load in Group A or B by rotation
Automatic
Wide Area Synchrophasor measurements at RLDC/SLDC
Wide Area: Signal sent to 15 x 220 kV substations
Angle pairs to be decided. True Wide Area Protection
8
UFR 1: 49.0 Hz
Jammu & Kashmir peak load: 1619 MW. UFR to cover at least 60% or 971 MW. Identify 20 x (132 kV substations )
Automatic Local Area Local area: [Refer Annex XI]
49.0 Hz: 3 substations: 100 MW
UFR 2: 48.8 Hz
48.8 Hz: 5 substations: 250 MW
UFR 3: 48.6 Hz
48.6 Hz: 5 substations: 250 MW
UFR 4: 48.4 Hz
48.4 Hz : 7 substations: 360 MW
10 UFRs required with df/dt feature to take care of S no 9 also.
9 Df/dt: 49.9 Hz plus 0.1, 0.2 Hz/sec
Designated feeder in each control area
Automatic Local area Local area Part loads in S no 8 could be covered through df/dt relays also. Say UFR4 could be covered through df/dt also.
10 Islanding at 47.9 Hz
Power stations, loads Automatic Local area Local area Annexure-VII.F
** Separate sheet for lines not associated with any state but trunk line. 1) Telemetery of all feeders a must. 2) Reset command from control centre for restoration 3) Ability to select any combination of sub-stations at LDC PLC 4) Detailed logic at PLC level; audit trail for change in logic by authorised users (5) Master server or PLCs for archiving, logs etc. (6) For UFR, UVLS station EL should be provided.
Note: Load node(at 220kV) in a group has been taken of nearby area/or of a particular area. It is suggested that load nodes may be taken from different location in a group to reduce the impact of load shed in a single/particular area.
23
Annex 1.8-3Automated defence plan summary for secure operation of grids…….Himachal Pradesh System
S No
Logic Control Action Manual or Automatic
Measurements as input for control action (Local / Wide Area)
Control Action (Local / Wide Area) Remarks
1
∆ P > 100 MW ∆ P = Actual-Schd and freq < 50 Hz
Shed load in HimachalPradesh in identified two groups A &B each group constituting 100 MW or 12% of
schedule.Rotation logic and sequence to be programmed at SLDC and RLDC PLCs
Stage 1 : Manual Stage 2 : Automatic (From SLDC PLC after 15 minutes) Stage 3 : Backup (from NRLDC PLC after 20 minutes)
Wide Area : Schedules & Drawal from SCADA system at LDCs
Wide Area: signal sent from LDC to (6 x 220 & 2 x 132 kV sub-stations in 2 groups, each group would have 3x 220 & 132 kV sub-stations and 2 x 132/66 kV feeders would be identified at each substn.(Feeder enclosed in Annexure-VIII.A)
Group A: UparNangal,Baddi,Kunihar all 220 kV sub-stations Group B: 220kV Jessore, 132kV Dehra,Kangra sub-stations N
OR
THER
N R
EGIO
N-H
IMA
CH
AL P
RA
DESH
2
∆ P < -150 MW and freq > 50 Hz ∆ P = Actual-Schd
Send signal to designated power stations A and B. Rotation logic and sequence to be programmed at SLDC and NRLDC PLC
Stage 1 : Manual Stage 2 : Automatic (From SLDC PLC 15 minutes) Stage 3 : Backup (from NRLDC PLC in 25 minutes)
Wide Area : Schedules & Drawal from SCADA system at LDCs
Wide Area: signal sent from LDCs to selected power stations Annexure-VIII.B
Power station A: Baspa Power station B: Power Station C: The power stations can either wire the same for unit tripping or generation reduction through secondary control.
3
Voltage < 200 kV at sub-station for more than 5 minutes
Shed load at the 6 x 220kV & 2 x 132 kV sub-stations identified in S no 1 above.
Stage 1: Alarm (208 kV)
Local area:
Local area: Annexure-VIII.C
Under Voltage Load Shedding (UVLS).
Stage 2: Automatic (200 kV for more than 5 minutes)
Bus voltage Measurement at the 4 x 220 kV substations
Six UVLS relays required one each at the four 220 kV sub-stations & two 132kV S/s identified at S no. 1 above.
Stage 3: 185 kV 30 seconds
4**
ICT / line loading crossing normal operating limits
Shed load in designated areas
Stage-1: Manual (SLDC level) Stage-2; Automatic through PLC
ICT’s flow at 400kV Nalagarh_PG, 400kV Dehar
Wide Area : Signal sent from Nalagarh_PG & Dehar to shed radial load at nearby 220 kV S/s [Annexure-VIII.D)
5
Flows crossing TTC and ∆ P > 100 MW
Shed load in the feeders identified at S no 1 Group A, B in rotation
Automatic
Local area: No. of measurements aggregated at NRLDC SCADA
Wide Area: Signal sent from NRLDC to the 6 x 220 kV substations identified at Sl. No. 1 above.
24
S No
Logic Control Action Manual or Automatic
Measurements as input for control action (Local / Wide Area)
Control Action (Local / Wide Area) Remarks
6**
Sudden loss of generation > 1000 MW or loss of high capacity corridor
Loss of Generation / High capacity corridor
Automatic Local area: Wide Area: Annexure-VIII.E
NO
RTH
ERN
REG
ION
-HIM
AC
HA
L PR
AD
ESH
7
Angular difference exceeding cut off value
Shed load in Group A or B by rotation
Automatic
Wide Area Synchrophasor measurements at RLDC/SLDC
Wide Area: Signal sent to 6 x 220 kV substations
Angle pairs to be decided. True Wide Area Protection
8
UFR 1: 49.0 Hz
Himachal peak load: 1050 MW. UFR to cover at least 60% or 630 MW. Identify 25 x (132 kV substations & 66kV Substations)
Automatic Local Area Local area:[ Refer Annex XI]
49.0 Hz: 5 substations: 100 MW
UFR 2: 48.8 Hz
48.8 Hz: 5 substations: 150 MW
UFR 3: 48.6 Hz
48.6 Hz: 5 substations: 150 MW [See Annex-C]
UFR 4: 48.4 Hz
48.4 Hz : 10 substations: 230 MW
10 UFRs required with df/dt feature to take care of S no 9 also.
9 Df/dt: 49.9 Hz plus 0.1, 0.2 Hz/sec
Designated feeder in each control area
Automatic Local area Local area Part loads in S no 8 could be covered through df/dt relays also. Say UFR4 could be covered through df/dt also.
10 Islanding at 47.9 Hz
Power stations, loads Automatic Local area Local area Annexure-VIII.F
** Separate sheet for lines not associated with any state but trunk line. 1) Telemetery of all feeders a must. 2) Reset command from control centre for restoration 3) Ability to select any combination of sub-stations at LDC PLC 4) Detailed logic at PLC level; audit trail for change in logic by authorised users (5) Master server or PLCs for archiving, logs etc. (6) For UFR, UVLS station EL should be provided.
Note: Load node(at 220kV) in a group has been taken of nearby area/or of a particular area. It is suggested that load nodes may be taken from different location in a group to reduce the impact of load shed in a single/particular area.
25
Annex 1.9-Automated defence plan summary for secure operation of grids…….Chandigarh System
S No
Logic Control Action Manual or Automatic
Measurements as input for control action (Local / Wide Area)
Control Action (Local / Wide Area)
Remarks
1
∆ P > 35 MW ∆ P = Actual-Schd and freq < 50 Hz
Shed load in Chandigarh in identified a groups A constituting constituting 35 MW or 12% of
schedule.Rotation logic and sequence to be programmed at SLDC and RLDC PLCs
Stage 1 : Manual Stage 2 : Automatic (From SLDC PLC after 15 minutes) Stage 3 : Backup (from NRLDC PLC after 20 minutes)
Wide Area : Schedules & Drawal from SCADA system at LDCs
Wide Area: signal sent from LDC to (1x 220 kV sub-stations in a group, a group would have 1 x 220 kV sub-stations and 1-2 x 66 kV feeders would be identified at each substn. Annexure-IX.A
Group A: Kishengarh all 220 kV sub-stations
NO
RTH
ERN
REG
ION
-CH
AN
DIG
AR
H
2
∆ P < -35 MW and freq > 50 Hz ∆ P = Actual-Schd
Send signal to designated power stations A.Rotation logic and sequence to be programmed at SLDC and NRLDC PLC
Stage 1 : Manual Stage 2 : Automatic (From SLDC PLC 15 minutes) Stage 3 : Backup (from NRLDC PLC in 25 minutes)
Wide Area : Schedules & Drawal from SCADA system at LDCs
Wide Area: signal sent from LDCs to selected power stations Annexure-IX.B
Power station A: Power station B: Power Station C: The power stations can either wire the same for unit tripping or generation reduction through secondary control.
3
Voltage < 200 kV at sub-station for more than 5 minutes
Shed load at the 1 x 220kV sub-stations identified in S no 1 above.
Stage 1: Alarm (208 kV)
Local area:
Local area: Annexure-IX.C
Under Voltage Load Shedding (UVLS).
Stage 2: Automatic (200 kV for more than 5 minutes)
Bus voltage Measurement at the 1 x 220 kV substations
1 UVLS relays required one each at the one 220 kV sub-stations identified at S no. 1 above.
Stage 3: 185 kV 30 seconds
4**
ICT / line loading crossing normal operating limits
Shed load in designated areas Shed load in designated areas
Annexure-IX.D
5 Flows crossing TTC and ∆ P > 100 MW
Shed load in the feeders identified at S no 1 Group A in rotation
Automatic
Local area: No. of measurements aggregated at NRLDC SCADA
Wide Area: Signal sent from NRLDC to the 1 x 220 kV substations identified at S no 1 above.
26
S No
Logic Control Action Manual or Automatic
Measurements as input for control action (Local / Wide Area)
Control Action (Local / Wide Area)
Remarks
6**
Sudden loss of generation > 1000 MW or loss of high capacity corridor
Loss of Generation / High capacity corridor
Annexure-IX.E
NO
RTH
ERN
REG
ION
-CH
AN
DIG
AR
H
7
Angular difference exceeding cut off value
Shed load in Group A by rotation
Automatic Wide Area Wide Area: Angle pairs to be decided. True Wide Area Protection
8
UFR 1: 49.0 Hz
Chadigarh peak load: 254 MW. UFR to cover at least 60% or 152 MW. Identify 20 x (132 kV substations )
Automatic Local Area Local area: Refer Annex XI
49.0 Hz: 3 substations: 20 MW
UFR 2: 48.8 Hz 48.8 Hz: 5 substations: 35 MW [See AnnexC]
UFR 3: 48.6 Hz 48.6 Hz: 5 substations: 35 MW
UFR 4: 48.4 Hz 48.4 Hz : 7 substations: 60 MW
4 UFRs required with df/dt feature to take care of S no 9 also.
9 Df/dt: 49.9 Hz plus 0.1, 0.2 Hz/sec
Designated feeder in each control area
Automatic Local area Local area Part loads in S no 8 could be covered through df/dt relays also. Say UFR4 could be covered through df/dt also.
10 Islanding at 47.9 Hz
Power stations, loads Automatic Local area Local area Annexure-IX.F
** Separate sheet for lines not associated with any state but trunk line. 1) Telemetery of all feeders a must. 2) Reset command from control centre for restoration 3) Ability to select any combination of sub-stations at LDC PLC 4) Detailed logic at PLC level; audit trail for change in logic by authorised users (5) Master server or PLCs for archiving, logs etc. (6) For UFR, UVLS station EL should be provided.
Note: Load node(at 220kV) in a group has been taken of nearby area/or of a particular area. It is suggested that load nodes may be taken from different location in a group to reduce the impact of load shed in a single/particular area.
27
Annex I.A- Punjab -Feeders list for Remote tripping
220kv S/S Feeder MW
Group-A Bahadurgarh 66kV Maghar Sahib, Rodjaghi 19
155 Rajpura 66kV Saraibanjara, Mohikalan 26
Nabha 220KV Power Grid Patiala-Nabha 40
Rajla *Local Load 35
Patran *Local Load 35
Group-B Barnala 66kV Karamgarh, Pakhoke 22
165 Amloh 66kV Agaul, Samaspur 23
Pakhowal 220KV Pakhowal-Mehal Kalan (66KV Mehal Kalan(Kutba), Thikriwala, Thuliwal) 50
Sunam 66kV Lehra, Mangwal, Ubhawal, Longowal, Sunam ckt 1&2, Local Grid 70
Group-C Moga 132 KV Samad Bhai (Bhagta Bhai) 9
145
132KV Moga (220KV) - Badni Kalan 20
Ferozpur 33kV Ghoker Haihar, 33kV Chugate Wala, 33kV Tibbi 36
Baghapurana *Local Load 30
Botiawala 66kV Kamalgarh, Behatgujran, Thatha Sahib, Kasowana, Sabrawan 40
Sadiq 132KV Sadiq-Faridkot 10
Group-D Muktsar 220KV Muktsar-Gubaya(66KV Dhandi Qdeem, Fazlika, Laduka, Bairoke Jhariwala, Jiwan Arian.) 90
203 132KV Muktsar-Jalalabad(66KV Bajeke, Nureke & 11KV Local 18 no.feeders.) 25
132 KV Mukatsar(Malout Road City, Sattanwala, Lubancwali, Lubana) 8
LehraMohabbat 220KV Lehra Mohabbat-Himmatpura ckt.-1&2 80
Group-E Verpal 132KV Verpal (220KV) – Hakima Gate - Skatri Bagh 18
208
Patti 220KV Patti-Algaon (66KV Amarkot, Lakhna, Khem Karan.) 40
132KV Patti(220KV) - Bhikhiwind 45
132kV Tarantaran (Verpal/Patti/Jalandhar) 18
WadalaGranthian 66kV Udhonangal 30
132 KV SRI Hargobindpur 5
132 KV Dhariwal (Batala) 10
132 KV Kathunangal (Batala) 17
Butari 66kV Saidpur, Nagoke, Khadur Sahib, Beas 25
Group-F Nakodar 132 KV Nakodar (Masunpur) 1.2
153.3
*Local load 25
Kartarpur *Local load 25
Goraya 132 KV Nawanshahr (Gharshankar) 1.5
*132kV Phagwara 10
Jallandhar *132kV Jalandhar-ChildernPark/SC/RC factory 20
132 KV Kapurthala (33kV Kalasnghia, 33kV Ucha, 33kV Hothian, 33kV Tiba) 8
132 KV Bhogpur (Begowal,Kala Bakra) 27.6
Jamsher *Local load 20
RehanaJattan *Local load 15
Group-G Laltokalan 66kV Narangwal 15
154.7
FerozpurRoad *Local load 20
Humbran *Local load 15
Jagraon *Local load 20
Ropar 132 KV Ropar (Bur Majra, Kurali, Parsali) 19.2
Kohara 66kV Kohara Chaura, Kohara Bhani Sahib 22
Kharar 132 KV Kharar (Wadali, Majra Mulanpur, Majri, Banur) 22
132kV Doraha 132 KV Doraha (Korsen) 6.5
132KV Doraha-Bilaspur-Sihora 15
* : Proposed feeder NOTE:-More groups would have to be identified to cover upto 5000MW load.
28
Annex I.B- Punjab- List of power stations for generation regulation
Sl.No. Power Station Installed
capacity in MW
1. RSD 600
2. ROPAR 1260
3. LehraMohabbat 920
4. Bhatinda 440
29
Annex I.C- Punjab –Nodes identified for Under Voltage Load Shedding
Sl.No Group 220kV S/S
1 Group-A Bahadurgarh
2 Rajpura
3 Nabha
4 Rajla
5 Patran
6 Group-B Barnala
7 Amloh
8 Pakhowal
9 Sunam
10 Group-C Moga
11 Ferozpur
12 Baghapurana
13 Botiawala
14 Sadiq
15 Group-D Muktsar
16 LehraMohabbat
17 Group-E Verpal
18 Patti
19 WadalaGranthian
20 Butari
21 Group-F Nakodar
23 Kartarpur
24 Goraya
25 Jallandhar
26 Jamsher
27 RehanaJattan
28 Group-G Laltokalan
29 FerozpurRoad
30 Humbran
31 Jagraon
32 Ropar
33 Kohara
34 Kharar
NOTE:-More 220kV Substations would have to be identified.
30
Annex I.D- Punjab – Feeders selected for ICT/ line loading crossing normal operating limits
a) Contingency due to increased loading of Transformers operating in Parallel
Sl No.
Sub-Station No. of ICT * Capacity per ICT
Total Transformation Capacity (MVA)
Load group in which shedding to be done
1 Amritsar_PG 2 * 315 630 Load group-E
2 Ludhiana_PG 3 * 315 945 Load group G
3 Malerkotla_PG 2 * 315 + 1*500 1130 Load group B
4 Patiala_PG 2 * 315 + 1*500 1130 Load group A
5 Moga_PG 3 * 250 + 1 * 315
1065 Load group C
6 Jallandhar_PG 2 * 315 630 Load group F
Load shedding to occur depending on no. of ICTs in operation.
b) Contingency due to increased flow in lines
Sl No. Name of line Contingency Action
1 220kV Nalagarh-Mohali lines
Line carrying more than 150MW Shed load group in A
2 220kV Barnala-
Lehramohabbat line
Line carrying more than 150MW Shed load in group C
31
Annex I.E- Punjab – Feeders selected for loss of generation >1000MW/
High capacity corridor
a) Contingency due to sudden loss of generation > 1000 MW
Sl No.
Plant/ Station No. of Unit * Capacity
per Unit (MW)
Total Effective Capacity
(MW)
Load group in which shedding to be done upon generation loss/ tripping of
line
1 Ropar TPS 6 x210 1260 Group A & F & G
NOTE:-More groups would have to be identified.
Annex I.F- Punjab –Power stations selected for Islanding at 47.9Hz
Sl.NO Islands :
1 (1)Ropar TPS with load at 220kV Gobindgarh-1
2 (2)Lehra Mohabbat TPS with load at 220kV Himatpura
3 (3)Bhatinda TPS (GNDTPS) with load at 220kV Mukatsar
32
Annex II.A.Haryana -Feeders list for Remote tripping
Haryana
220kv S/S Feeder MW
Group-A Abdullapur *Local load 30
150
Shahbad *Local load 30
Tepla *Local load 30
Pehowa *Local load 30
Kaul *Local load 30
Group-B Gurgaon Sec-72 220kV Gurgaon Sector 72 Ckt-1&2 350
505 Daultabad 66kV Gurgaon Sector 23-Daulatabad Ckt-1&2 120
66kV Harsaru-Daulatabad Ckt-1&2 35
Group-C Kurukshetra 132kV Pehowa-Kurukshetra 60
170 33kV Ajrana, 33kV Kimach, 11kv Bhadurpura, 11kV Pipli-1 feeders 60
Jagadhari(Khera) 66kV Sadhora-Khera Ckt-1 25
66kV Sadhora-Khera ckt-2 25
Group-D Panipat (BBMB) 132kV Samalkha, 132kV Karnal, 132kv Israna, 33kV feeders 120
220 132kV Sonepat-Sewah 60
Dhulkote 66kV Dhulkote-Babyal, 66kV Dhulkote-Ambala city ckt-1&2 40
Group-E Hisar IA
215
Hisar BBMB
Kirori 132kV Barwala-Kirori 25
132kV Adampur-Kirori 25
132kV Bhunar-Kirori ckt-1&2 165
* : Proposed feeder NOTE:-More groups would have to be identified to cover upto 3900MW load.
33
Annex II.B- Haryana- List of power stations for generation regulation
Sl.No. Power Station Installed
capacity in MW
1. Power station A: Khedar
1200
2. Power station B: DCRTP 600
3. Power Station C: Panipat New 1367
4. Power Station D: Faridabad Gas 431
5. Power Station E: MGSTPS 1500
34
Annex II.C- Haryana –Nodes identified for Under Voltage Load Shedding
Sl.No Group 220kV S/S
1
Group-A
Abdullapur
2 Shahbad
3 Tepla
4 Pehowa
5 Kaul
6 Group-B
Gurgaon Sec-72
7 Daultabad
8 Group-C
Kurukshetra
9 Jagadhari(Khera)
10 Group-D
Panipat (BBMB)
11 Dhulkote
12
Group-E
Hisar IA
13 Hisar BBMB
14 Kirori
NOTE:-More 220kV Substations would have to be identified.
35
Annex II.D- Haryana – Feeders selected for ICT/ line loading crossing normal operating limits
a) Contingency due to increased loading of Transformers operating in Parallel
Sl
No.
Sub-Station No. of ICT *
Capacity per ICT
(MVA)
Total
Transformation
Capacity (MVA)
Load group in which shedding to be
done
1 Abdullapur 3 * 315 945 Group A
2 Sonepat 2 * 315 630 Group D
3 Hissar 3 * 315 945 Group E
4 Khedar 2 * 315 + 1*500 1130 Group E
5 Kaithal 2 * 315 630 Group A
6 Fatehabad 2 * 315 630 Group E
7 Bahadugarh 1 * 315 + 1*500 815 Group B
8 Kirori 3*315 945 Group E
9 Daulatabad 3*315 945 Group B
10 Panchkulla 2*315 630 Group A
Load shedding to occur depending on no. of ICTs in operation.
b) Contingency due to increased flow in lines
Sl No. Name of line Contingency Action
1 220kV Samaypur-Ballabhgarh
lines
Line carrying more than 150MW Shed load group in B
2 220 kV Samaypur –
CharkhiDadri
Line carrying more than 150MW Shed load in group B
3 220kV Hissar (BBMB)- Hissar
IA D/C lines
Line carrying more than 150MW Shed load in group E
4 220 kV Ballabhgah –
CharkhiDadri
Line carrying more than 150MW Shed load in group B
36
Annex II.E- Haryana – Feeders selected for loss of generation >1000MW/
High capacity corridor
a) Contingency due to sudden loss of generation > 1000 MW
Sl No.
Plant/ Station No. of Unit * Capacity
per Unit (MW)
Total Effective Capacity
(MW)
Load group in which shedding to be doneupon generation loss/ tripping of
line
1 Khedar TPS 2 * 600 1200 Group A & Group E
2. Proposed SPS for reliable evacuation of Panipat TPS stage I & II generation
To be finalized
NOTE:-More groups would have to be identified.
37
Annex II.F- Haryana –Power stations selected for Islanding at 47.9Hz
Sl.NO Islands :
1 (1)Panipat TPS with load at 220kV Saifidon
2 (2)Khedar TPS with load at 220kV Kirori
3 (3)Yamuna nagar TPS with load at 220kV Jorian
4 (4) Mahatma Gandhi TPS with load at 220kV Kabulpur
5 (5)Jhajjar TPS with load at 400/220kV daulatabad
6 (6)Faridabad GPS with load at 220kV Samaypur
38
Annex III.A- Rajasthan -Feeders list for Remote tripping
220kV S/S Feeder MW
Group-A Bharatpur 132 kV Kaman 12
170
132 kV Kherli 19
132 kV Kumher 8
Dholpur 132 kV Rajakheda 17
132 kV Basedi 16
132 kV Roopwas 6
Mandawar 132 kV Mahuwa 5
132 kV Sikandra 33
132 kV Sikrai 5
SawaiMadhopur 132 kV Uniara 5
132 kV Tonk 20
132 kV Khandar 16
132 kV Badoti 8
Group-B Jaipur *Local load 20
157
Phulera *Local load 15
Chomu 132 kV Kaladera 18
132 kV Ajeetgarh 22
Reengus *Local load 15
Khetri *Local load 20
Chirawa 132 kV Chand Gothi 21
132 kV Surajgarh 17
132 kV Dulana 9
Group-C Bhiwadi *Local load 30
152
Kotputli 132 kV Manoharpur 31
132 kV Paota 20
132 kV Patan 16
Alwar *Local load 20
Kukas *Local load 15
Bassi *Local load 20
* : Proposed feeder NOTE:-More groups would have to be identified to cover upto 3800MW load.
39
Annex III.A- Rajasthan -Feeders list for Remote tripping
Group 220kV S/S Feeder MW
Group-D Sikar 132 kV Ranoli 21
195
132 kV Kudan 14
132 kV Piprali 22
Dhod 132 kV DHOD LOCAL 23
132 kV Kachhawa 14
132 kV Losal 20
132 kV Khood 16
Ratangarh
Jhunjhunu
SriDoongarpur 132 kV Sri Doongargarh 23
132 kV Dulchasar 12
132 kV Reri 17
132 kV Upani 13
220kv S/S Feeder MW
Group-E Merta 132 kV Merta Road 25
165
132 kV Roon 26
Kheenvsar 132 kV Hesaba 21
132 kV Narwa 10
132 kV Soyla 20
BhopalGarh 132 kV Local 16
132 kV Bhopalgarh 23
132 kV Baori 24
Group-F Kankroli 132 kV Mokhampura 27
230
132 kV Nathdwara 17
Sirohi 132 kV Reodar 20
132 kV Badgaon 5
132 kV Ramseen 9
Pindwara 132 kV Pindwara 11
132 kV Abu Road 17
Bhinmal 132 kV Bhinmal Local 27
132 kV Bagora 12
132 kV Jeewana 11
132 kV Sankad 11
Jalore 132 kV Bagra 11
132 kV Padru 18
132 kV Mandawala 12
Sanchore 132 kV Galifa 5
132 kV Bhadroona 17
Group-G Jhalawar 132 kV Manoharthana 9
111
132 kV Khanpur 24
132 kV Bakani 13
132 kV Eklara 18
Modak 132 kV Bhawani Mandi 19
132 kV Mandan Town 7
132 kV Mayla 21
* : Proposed feeder NOTE:-More groups would have to be identified to cover upto 3900MW load.
40
Annex III.B- Rajasthan - List of power stations for generation regulation
Sl.No. Power Station Installed
capacity in MW
1. Power station A: Suratgarh TPS
1500
2.
Power station B: Kota TPS
1240
3.
Power Station C: Chhabra
500
4.
Power Station D: Giral TPS
250
5.
Power Station E: Rajwest
135
6. Power Station F: Dholpur CCGT 330
7. Power Station G: Barsinghsar 25
0
41
Annex III.C- Rajasthan –Nodes identified for Under Voltage Load Shedding
Sl. No Group 220kV S/S 1 Group-A
Bharatpur
2 Dholpur 3 Mandawar
4 SawaiMadhopur
5
Group-B
Jaipur
6 Phulera 7 Chomu
8 Reengus 9 Khetri
10 Chirawa 11 GroupC
Bhiwadi
12 Kotputli
13 Alwar 14 Kukas
15 Bassi
16 Group-D
Sikar
17 Dhod 18 Ratangarh
19 Jhunjhunu
20 SriDoongarpur
21 Group-E
Merta 22 Kheenvsar
23 BhopalGarh 24 Group-F
Kankroli
25 Sirohi
26 Pindwara 27 Bhinmal
28 Jalore 29 Sanchore
30 Group-G
Jhalawar
31 Modak NOTE:-More 220kV Substations would have to be identified.
42
Annex III D- Rajasthan – Feeders selected for ICT/ line loading crossing normal operating limits
a) Contingency due to increased loading of Transformers operating in Parallel
Sl No.
Sub-Station No. of ICT * Capacity per ICT (MVA)
Total Transformation Capacity (MVA)
Load group in which shedding to be done
1 Kankroli_PG 3 * 315 945 Group F
2 Bhinmal_PG 2 * 315 630 Group F
3 Jodhpur_PG 2 * 315 630 Group E
Load shedding to occur depending on no. of ICTs in operation.
b) Contingency due to increased flow in lines
Sl No.
Name of line Contingency Action
1 220kV Bhiwadi-Kushkhera line-1&2 Line carrying more than 150MW Shed load group in C
2 220kV Sikandra-Bharatpur line-&2 Line carrying more than 150MW Shed load in group A
3 400kV Bassi-Heerapura line - 1 & 2 Line carrying more than 500 MW Shed load in group C
43
Annex III.E- Rajasthan – Feeders selected for loss of generation >1000MW/
High capacity corridor
a) Contingency due to generation los > 1000MW
Sl No.
Plant/ Station No. of Unit * Capacity
per Unit (MW) Total Effective Capacity (MW)
Load group in which shedding to be done upon generation loss>1000MW
1 Suratgarh TPS 250 * 6 1500 Group E, Group D, Group C
b) Contingency due to sudden loss of high capacity corridor
Sl
No. Name of line Contingency
Action: Shed load group in
1 400kV BassiHeerapura line-1&2
Tripping of line & antecedent
flow >500MW Group-B, Group-C
NOTE:-More groups would have to be identified.
44
Annex III.F- Rajasthan –Power stations selected for Islanding at 47.9Hz
Sl.NO Islands 1
(1)Kota TPS with load at 220kV Kota
2 (2)Suratgarh TPS with load at 220kV Suratgarh Old,
3 (3) Chabra TPS with load at 220kV Jhalawar
4 (4) Dholpur TPS with load at 220kV Basere
5 (5)Barsingsar with load at 220kV Bikaner
6 (6)Rajwest TPS with load at 220kV Barmer
7 (7) Giral TPS with load at 220kV Akal
8 (8)VSLP with load at 220kV Bikaner
9 (9) Anta GPS with load at 220kV Sawaimadhopur/ Dausa
45
Annex IV.A.Delhi -Feeders list for Remote tripping
Delhi
220kv S/S Feeder MW Total
Group-A Narela 30
150
Shalimar Bagh 30
Rohini 30
South of wazirabad 30
KashmiriGate 30
Group-B Gopalpur 30
150
GeetaColony 30
Patparganj 30
Rajghat 30
Pragti 30
Group-C Mehrauli 30
150
Najafgarh 30
Vasant Kunj 30
Dwarka-1 30
Dwarka-2 30
Group-D Okhla 30
150
MasjidMoth 30
SaritaVihar 30
Parkstreet 30
LodhiRoad 30
* : Proposed feeder
NOTE:-More groups would have to be identified to cover upto 3300MW load.
46
Annex IV.B- Delhi - List of power stations for generation regulation
Sl.No. Power Station Installed
capacity in MW
1. Power station A: BTPS
705
2. Power station B: Pragati
330
3. Power Station C: Bawana Gas
677
47
Annex IV.C- Delhi –Nodes identified for Under Voltage Load Shedding
Sl.No Group 220kV S/S
1
Group-A
Narela
2 Shalimar Bagh
3 Rohini
4 South of wazirabad
5 KashmiriGate
6
Group-B
Gopalpur
7 GeetaColony
8 Patparganj
9 Rajghat
10 Pragti
11
Group-C
Mehrauli
12 Najafgarh
13 Vasant Kunj
14 Dwarka-1
15 Dwarka-2
16
Group-D
Okhla
17 MasjidMoth
18 SaritaVihar
19 Parkstreet
20 LodhiRoad
NOTE:-More 220kV Substations would have to be identified.
48
Annex IV.D- Delhi – Feeders selected for ICT/ line loading crossing normal operating limits
a) Contingency due to tripping of lines
Sl No. Name of line Contingency Action
1 220kV Ballabgarh-BTPS Line carrying more than 150MW
(Flow towards BTPS)
Shed load in Group C
Note:- Delhi already has SPS for overloading of Mandaula, Bawana and Bamnauli 400/220kV ICTs.
Annex IV.E- Feeders selected for loss of generation >1000MW/
High capacity corridor
a) Contingency due to sudden loss of high capacity corridor
Sl No. Name of line Contingency Action: Shed load in group
1 Dadri-Mandaula D/C Change of more than 100MW flow Group A or B.
2 Mandaula-Bawana D/C Change of more than 100MW flow Group C
NOTE:-More groups would have to be identified.
Annex IV.F- Delhi –Power stations selected for Islanding at 47.9Hz
Sl.NO Islands
1 Pragati islands.
2 Bawana islands.
3 BTPS islands.
49
Annex V.A- Uttarpradesh -Feeders list for Remote tripping
220kV S/S Feeder MW
Group-A GreaterNoida *Local load 50
150 Noida sec-20 *Local load 50
Noida sec-129 *Local load 50
Group-B Agra 132kV Agra-Etmadpur 40
155
*132kV Agra-Bhimnagari/Fatehbad 15
Firozabad 132kV Firozabad-Shikohabad 50
132kV Firozabad-Pinhat 30
132kV Firozabad-Salempur 20
Group-C Gokul 132kV Gokul-Kosi 40
185
Hathras 132kV Metai(Hathras)-Iglas 20
132kV Metai-Sasni 20
132kV Hathras-Aligarh-III 40
132kV Aligarh 132kV Boner-Sikandarrao 25
132kV Sarsaul-Khair 40
Group-D Dadri
200
Loni
Baraut 132kV Chaprauli 40
132kV Nirpura 60
Khurja 132kV Sikarpur/Debai 50
Jahangirabad 132kV Lakhwati 50
Group-E Moradabad 132kV Moradabad-Bilaspur 40
180
132kV Moradabad-Kanthroad 40
Nehtaur 132kV Nehtaur-Bijnore 50
132kV Nehtaur-Chandrapur 50
Sambhal
CB Ganj
50
Annex V.A- Uttarpradesh -Feeders list for Remote tripping
220kV S/S Feeder MW
Group-F Nanauta
205
Shamli 132kV Jhinjhana 40
132kV Kharad 25
132kV Jassala 20
Saharanpur 132kV Chutmalpur 70
132kV Ambala Road 50
Group-G Nara *local load 10
175
Gajraula *local load 10
Simbholi 132kV Babugarh 25
132kV Syana 60
132kV Hapur 60
ShatabdiNagar *local load 10
Group-H Panki 132kV Panki-Dibiyapur 40
180
132kV Panki-Bilhour 20
ChibroMau 132kV ChibraMau-Fatehgarh-I &II 70
132kV ChibraMau-Kannauj 50
Mainpuri
Group-I Paricha 132kV Paricha-Mauranipur 20
210
132kV Orai-Pukhrayan 30
Orai 132kV Orai-II-Orai(I&II) 70
Safai 132kV Safai-Etwah 50
Etah 132kV Etah-Kasganj 40
Group-J Fatehpur 132kV Fatehpur-Khaga 20
190
Banda 132kV Banda-Mahoba 20
132kV Banda-Karvi 50
132kV Banda-II - Banda I 60
132kV Banda-Rath 40
RewaRoad
* : Proposed feeder
NOTE:-More groups would have to be identified to cover upto 5900MW load.
51
Annex V.B- Uttarpradesh - List of power stations for generation regulation
Sl.No. Power Station Installed
capacity in MW
1. Power station A: AnparaA&B
1630
2. Power station B: Tanda
440
3. Power Station C: Anpara C
600
4 Power Station D: Obra 1442
5 Power Station E: Rosa-1 600
6 Power Station F: Paricha 640
7 Power Station G: Rosa-2 600
8 Power Station H: VishnuPrayag 400
52
Annex V.C- Uttarpradesh –Nodes identified for Under Voltage Load Shedding
Sl.NO Group 220kV S/S
1 Group-A
GreaterNoida
2 Noida sec-20
3 Noida sec-129
4 Group-B
Agra
5 Firozabad
6 Group-C
Gokul
7 Hathras
8 132kV Aligarh
9 Group-D
Dadri
10 Loni
11 Baraut
12 Khurja
13 Jahangirabad
14
Group-E
Moradabad
15 Nehtaur
16 Sambhal
17 CB Ganj
18 220kV S/S
19 Group-F
Nanauta
20 Shamli
21 Saharanpur
22 Group-G
Nara
23 Gajraula
24 Simbholi
25 ShatabdiNagar
26 Group-H
Panki
27 ChibroMau
28 Mainpuri
29 Group-I
Paricha
30 Orai
31 Safai
32 Etah
33 Group-J
Fatehpur
34 Banda
35 RewaRoad
NOTE:-More 220kV Substations would have to be identified.
53
Annex V.D- Uttarpradesh – Feeders selected for ICT/ line loading crossing normal operating limits
a) Contingency due to increased loading of Transformers operating in Parallel
Sl No.
Sub-Station No. of ICT * Capacity per ICT (MVA)
Total Transformation Capacity (MVA)
Load group in which shedding to be done
1 Greater Noida (UPPTCL) 3 * 315 945 Group-A
2 Muzaffarnagar (UPPTCL) 2 * 315 630 Group-F
3 Allahabad (PG) 2 * 315 630 Group-J
4 Meerut (PG) 3 * 315 945 Group-K
5 Kanpur (PG) 2 * 315 630 Group-H
6 Mainpuri_PG 2 * 315 630 Group-I
Load shedding to occur depending on no. of ICTs in operation. Note:- ** SPS proposal approved and under implementation for contingency due to tripping of Transformers
operating in Parallel at Moradabad_UP, Muradnagar_UP, Agra_UP, Mandola_PG and Bareilley_UP.
b) Contingency due to increased flow in lines
Sl No.
Name of line Contingency Action
1 220kVLucknow-Chinhat line Line carrying more than 150MW Shed load at 220kV Chihat/Hardoi road
2 220kV Mainpuri-Ferozabad Line Line carrying more than 150MW Shed load in group B
3 220kV Mainpuri(UP)-Harduaganj line Line carrying more than 150MW Shed load in groupI
54
Annex V.E- Uttarpradesh – Feeders selected for loss of generation >1000MW/
High capacity corridor
a) Contingency due to generation los > 1000MW
Sl No. Plant/ Station Load group in which shedding to be
done upon generation loss>1000MW
1
SPS for reliable evacuation of Parichha TPS (under implementation)
To be finalized
2 SPS for reliable evacuation of Roza TPS(under implementation)
To be finalized
3
SPS for contingency due to tripping of multiple lines from 400 kV Dadri (under implementation)
To be finalized
a) Contingency due to sudden loss of high capacity corridor
Sl No.
Name of line Contingency Action : Shed load in
group
1 400kV Unnao-Panki Line
Tripping of line & antecedent
flow >500MW Group H
NOTE:-More groups would have to be identified.
55
Annex V.F- Uttarpradesh –Power stations selected for Islanding at 47.9Hz
Sl.NO Islands
1 (1)Obra TPS with load at 220kV Rewa road,
2 (2)Panki TPS with load at 220kV Panki ,
3 (3) Parichha TPS with load at 132kV Jhansi
4 (4) Tanda TPS with load at 220kV Bast/ 220kV Gorakhpur
5 (5) Harduaganj TPS with load at 220kV Etah/ Atrauli
6 (6) Roza TPS with load ata 220kV Shahjahanpur/ Badaun
56
Annex VI.A- Uttarakhand -Feeders list for Remote tripping
Uttarakhand
220kV S/S Feeder MW
Group-A Panthnagar 220kV Bareilley-Pantnagar 152 172
Ranikhet 132kV Almorah-Ranikhet 20
Group-B Roorkee 132kV Roorkee-Manglore 30
130 132kV Roorkee-Laksar 40
Rishikesh 132kV Rishikesh-Srinagar 60
NOTE:-More groups would have to be identified to cover upto 900MW load.
Annex VI.B- Uttarakhand - List of power stations for generation regulation
Sl.No. Power Station Installed
capacity in MW
1. NIL
57
Annex VI.C- Uttarakhand –Nodes identified for Under Voltage Load Shedding
Sl. NO Group 220kV S/S
1 Group-A
Panthnagar
2 Ranikhet
3
Group-B
Roorkee
4 Rishikesh
NOTE:-More 220kV Substations would have to be identified.
Annex VI.D- Uttarakhand – Feeders selected for ICT/ line loading crossing normal
operating limits
a) Contingency due to increased loading of Transformers operating in Parallel
Sl No.
Sub-Station No. of ICT * Capacity per ICT (MVA)
Total Transformation Capacity (MVA)
Load group in which shedding to be done
1 Roorkee_PG 2 * 315 630 Group B
2 Rishikesh_PG 2 * 315 630 Group B
3 Kashipur 2 * 315 630 Shed loads in Kashipur/ Thakurdwara/ Bajpur
Load shedding to occur depending on no. of ICTs in operation.
b) Contingency due to increased flow in lines
Sl No. Name of line Contingency Action
1 400 kV Moradabad-Kashipur
line
SPS for tripping of Moradabad-Kashipur line is under
implementation.
58
Annex VI.E- Uttarakhand – Feeders selected for loss of generation >1000MW / High capacity corridor
a) Contingency due to sudden loss of high capacity corridor
Sl No. Name of line Contingency Action: Shed load in group
1 NIL
b) Contingency due to sudden loss of generation >1000MW
Sl No. Name of line Contingency Action: Shed load in group
1 NIL
Annex VI.F- Uttarakhand –Power stations selected for Islanding at 47.9Hz
Sl.NO Islands :
1 NIL
59
Annex VII.A- Jammu & Kashmir -Feeders list for Remote tripping
Jammu&Kashmir
220kV S/S Feeder MW
Group-A Jammu 132 kV Jammu-Sidhra -1 38
131
132 kV Jammu-Sidhra -2 38
Mirbazar 132 kV Mir Bazar-Tethar 8
132 kV Mir Bazar - Mattan 32
132 kV Mir Bazar - Lissar 15
Group-B Ziankote 132 kV Zainakote- Bemina-1 54
148 132 kV Zainakote- Bemina-2 54
Hiranagar 132 kV Hira Nagar - Kathua-1 20
132 kV Hira Nagar - Kathua- 2 20
Group-C Jammu 132 kV Jammu-Kalakote 60
286 132 kV Jammu- Miran Sahib 50
Ziankote 132 kV Zainakote-Pattan-1 88
132 kV Zainakote- Pattan-1 88
Group-D Baran 132 kV Baran-Canal-1 40
216 132 kV Baran-Canal -2 40
Ziankote 132 kV Zainakote-Waganpora-1 68
132 kV Zainakote- Waganpora 2 68
Group-E Hiranagar 132 kV Hira Nagar - Kathua-1 20
170
132 kV Hira Nagar - Kathua- 2 20
Baran 132 kV Barn-Akhnoor 25
Mirbazar 132 kV Mir Bazar- Wanpoh-1 58
132 kV Mir Bazar- Wanpoh -2 47
* : Proposed feeder
NOTE:-More groups would have to be identified to cover upto 1000MW load.
60
Annex VII.B- Jammu & Kashmir - List of power stations for generation regulation
Sl.No. Power Station Installed
capacity in MW
1. NIL
Annex VII.C- Jammu & Kashmir –Nodes identified for Under Voltage Load
Shedding
Sl. NO
Group 220kV S/S
1 Group-A
Jammu
2 Mirbazar
3 Group-B
Ziankote
4 Hiranagar
5 Group-C
Jammu
6 Ziankote
7 Group-D
Baran
8 Ziankote
9 Group-E
Hiranagar
10 Baran
11 Mirbazar
NOTE:-More 220kV Substations would have to be identified.
61
Annex VII.D- Jammu & Kashmir – Feeders selected for ICT/ line loading crossing normal operating limits
c) Contingency due to increased loading of Transformers operating in Parallel
Sl No.
Sub-Station No. of ICT * Capacity per ICT (MVA)
Total Transformation Capacity (MVA)
Load group in which shedding to be done
1 Wagoora_PG 4 * 315 1260 Group B
2 Kishenpur_PG 2 * 315 630 Group A
Load shedding to occur depending on no. of ICTs in operation.
d) Contingency due to increased flow in lines
Sl No. Name of line Contingency Action
1 220 kV Sarna-Hiranagar S/C Line carrying more than 150MW Shed load group in A
2 220 kV Salal-Jammu lines D/C Line carrying more than 150MW Shed load in group A
62
Annex VII.E- Jammu & Kashmir – Feeders selected for loss of generation >1000MW / High capacity corridor
a) Contingency due to sudden loss of high capacity corridor
Sl No. Name of line Contingency Action: Shed load in
group
1
SPS proposed :
1) Tripping of 400kV Kishenpur-Wagoora circuits
(monitoring at 400 kV Wagoora substation)
2) Tripping of 220 kV Pampore-Mirbazar-
Ramban/Kishenpur
3) Load through off, power export from Kashmir valley
(Summer scenario)
b) Contingency due to sudden loss of generation >1000MW
Sl No. Name of line Contingency Action: Shed load in group
1 NIL
NOTE:-More groups would have to be identified.
Annex VII.F- Jammu & Kashmir –Power stations selected for Islanding at 47.9Hz
Sl.NO Islands :
1 NIL
63
Annex VIII.A- Himachal Pradesh -Feeders list for Remote tripping
HimachalPradesh
220kv S/S Feeder MW
Group-A UparNanagal 66kV Uprala Nangal-Nalagarh Ckt-1&2 110
132 Baddi *Local load
10
Kunihar 132kV Kunihar-Solan-Parwanoo: 66kV Pinjore-Parwanoo 12
Group-B Dehra 132kV Dehra-Amb ckt-1&2
70
105 Jessore 132kV Kandrori-Jassor
25
Kangra *Local load 10
* : Proposed feeder
NOTE:-More groups would have to be identified to cover upto 650MW load.
Annex VIII.B- Himachal Pradesh List of power stations for generation regulation
Sl.No. Power Station Installed
capacity in MW
1. Power Station: Baspa
300
64
Annex VIII C- Himachal Pradesh –Nodes identified for Under Voltage Load
Shedding
Sl. NO
Group 220kv S/S
1
Group-A
UparNanagal
2 Baddi
3 Kunihar
4
Group-B
Dehra
5 Jessore
6 Kangra
Annex VIII.D- Himachal Pradesh -Feeders selected for ICT/ line loading crossing normal operating limits
a) Contingency due to increased loading of Transformers operating in Parallel
Sl No.
Sub-Station No. of ICT * Capacity per ICT (MVA)
Total Transformation Capacity (MVA)
Load group in which shedding to be done
1 Nalagarh_PG 2 * 315 630 Group A
2 Dehar 1 * 250 250 Shed load at 132kV Kangoo
Load shedding to occur depending on no. of ICTs in operation.
65
Annex VIII.E- Himachal Pradesh – Feeders selected for loss of generation >1000MW / High capacity corridor
a) Contingency due to sudden loss of high capacity corridor
Sl No. Name of line Contingency Action: Shed load in
group
1 NIL
b) Contingency due to sudden loss of generation >1000MW
Sl No. Name of line Contingency Action: Shed load in
group
1 NIL
Annex VIII.F- Himachal Pradesh –Power stations selected for Islanding at 47.9Hz
Sl.NO Islands :
1 NIL
66
Annex IX.A- Chandigarh -Feeders list for Remote tripping
Chandigarh
220kv S/S Feeder MW
Group-A Kishengarh 66 kV Kishangarh to Manimajra Feeder 16
44
66 KV Kishangarh to Industrial Area Phase-I 28
NOTE:-More groups would have to be identified to cover upto 150MW load.
Annex IX.B- Chandigarh List of power stations for generation regulation
Sl.No. Power Station Installed
capacity in MW
1. NIL
Annex IX C- Chandigarh –Nodes identified for Under Voltage Load Shedding
SL.NO Group 220kv S/S
1. Group-A Kishengarh
67
Annex IX.D- Chandigarh – Feeders selected for ICT/ line loading crossing normal operating limits
Contingency due to increased loading of Transformers operating in Parallel
Sl No.
Sub-Station No. of ICT * Capacity per ICT (MVA)
Total Transformation Capacity (MVA)
Load group in which shedding to be done
1 NIL
2
a) Contingency due to increased flow in lines
Sl No. Name of line Contingency Action
1 NIL
Annex IX.E- Chandigarh – Feeders selected for loss of generation >1000MW / High capacity corridor
a) Contingency due to sudden loss of high capacity corridor
Sl No. Name of line Contingency Action: Shed load in
group
1 NIL
b) Contingency due to sudden loss of generation >1000MW
Sl No. Name of line Contingency Action: Shed load in
group
1 NIL
Annex IX.F- Chandigarh –Power stations selected for Islanding at 47.9Hz
Sl.NO Islands :
1 NIL
68
Annex X.A- Regional Level- Feeders selected in case of loss of generation >1000MW / loss of high capacity corridor
1) Regional
a) Contingency due to sudden loss of generation > 1000 MW
Sl No.
Plant/ Station No. of Unit * Capacity per Unit (MW)
Total Effective Capacity (MW)
Load group in which shedding to be done upon generation loss > 1000MW
1 Tehri HEP 4*250 1000 Uttar Pradesh (Group K, Group E)
2 Jhakri HEP 6*250 1500 Punjab(GroupA, Group G), Haryana (Group
A)
3 Karcham HEP 4*250 1000 Punjab(Group A, Group G), Haryana (Group
A)
4 Sigrauli STPS 5*200 + 2*500 2000 U.P (Group J), Haryana (Group B), Delhi
(Group C)
5 Rihand STPS 4*500 2000 U.P (Group J), Haryana (Group B), Delhi
(Group C)
a) Contingency due to sudden loss of high capacity corridor
Sl No. Name of line Contingency Action: Shed load group in
1 400kV Koteshwar(PG)-Meerut line-
1&2
Tripping of line & antecedent flow >500MW Uttar Pradesh (GroupK,
Group E)
2 400kV Kanpur-Ballabgarh Line 1, 2 & 3 Tripping of line & antecedent flow > 500MW Haryana (Group B )
3 400kV Nalagarh-Patiala line 1&2 Tripping of line & antecedent flow > 500MW Punjab(Group A, Group G)
5
(1) SPS for Agra-Gwalior lines (2) SPS for HVDC Rihand-Dadri (3) SPS for HVDC Balia-Bhiwadi (4) SPS for Gorakhpur-Muzaffarpur lines (5) SPS for tripping of HVDC Mundra-Mahendergarh
69
Annexure XI- UFR & df/dt setting
Present UFR Scheme
PROPOSED UFR Scheme
STATES Peak MW Met 2011-12
60% of peak load
Load relief in MW
49.0 Hz 48.8 Hz 48.6 Hz 48.4 Hz Total
Punjab 8439 5063 800 1250 1250 1750 5050
Haryana 6416 3850 600 1000 1000 1250 3850
Rajasthan 6332 3799 600 1000 1000 1200 3800
Delhi 5500 3300 500 800 1000 1000 3300
UP 9706 5824 1000 1500 1500 1800 5800
Uttarakhand 1532 919 100 250 250 300 900
J & K 1619 971 100 250 250 360 960
HP 1050 630 100 150 150 230 630
Chandigarh 254 152 20 35 35 60 150
TOTAL 40848 24508 3820 6235 6435 7950 24440
STATES Peak MW Met 2008-09
Load relief in MW
48.8 Hz 48.6 Hz 48.2 Hz Total
Punjab 7309 180 220 400 800
Haryana 4791 110 140 350 600
Rajasthan 6101 120 150 425 695
Delhi 4034 110 140 350 600
UP 8248 190 240 475 905
Uttarakhand 1267 30 30 100 160
J & K 1380 40 50 75 165
HP 1014 20 20 75 115
Chandigarh 279 0 10 0 10
TOTAL 29504 800 1000 2250 4050
70
Annexure XI- UFR & df/dt setting
Present df/dt Scheme
STATES
Load relief in MW
Stage-I, 49.9 Hz, 0.1Hz/Sec
Stage-II, 49.9 Hz, 0.2Hz/Sec
Stage-III, 49.9 Hz,
0.2Hz/Sec Total
Punjab 430 490 490 1410
Haryana 280 310 310 900
Rajasthan 330 370 370 1070
Delhi 250 280 280 810
UP 500 280 280 1060
Uttarakhand 70 70 70 210
J & K 90 90 90 270
HP 50 70 70 190
Chandigarh 0 50 50 100
TOTAL 2000 2010 2010 6020
71
EXHIBIT 2
AUTOMATED DEFENCE PLAN FOR
EASTERN REGION
72
Annexure-2.1- Automated Defence plan summary-Eastern Region- BSEB System
S No
Logic Control Action Manual or Automatic Measurements as input for control action (Local / Wide
Area)
Control Action (Local / Wide Area)
Remarks
EASTER
N R
EGIO
N-B
IHA
R
1 ∆ P > 150 MW ∆ P = Actual-Schd and freq< 50 Hz
Shed load in Bihar. Identify three groups A, B, C each group constituting 80-130 MW or 12% of schedule. Logic and sequence to be programmed at SLDC and RLDC PLCs
Stage 1 : Manual Stage 2 : Automatic (From SLDC PLC after 15 minutes) Stage 3 : Backup (from ERLDC PLC after 20 minutes)
Wide Area : Schedules & Drawal from SCADA system at LDCs
Wide Area: signal sent from LDC to selected 132KV substations for tripping of 132KV feeders to get desired relief
Group A: 132KV Substation Katihar, Saharsa, Supaul, Udaykishangunj, Naugachia, khagaria (80MW) Group B: 132KV Substation Gaya, Tekari, Goh, Belaganj, Masauri(110) Jahanabad, Bodh gaya– Excluding of traction loads (130MW) Group C: 132KV Substation: Vaisali, Sheetalpur, Chapra, Ekma, Siwan (90)
2 ∆ P < -150 MW ∆ P = Actual-Schd and freq> 50 Hz
Send signal to designated power stations A, B Rotation logic and sequence to be programmed at SLDC and ERLDC PLC
Stage 1 : Manual Stage 2 : Automatic (From SLDC PLC 15 minutes) Stage 3 : Backup (from ERLDC PLC in 25 minutes)
Wide Area : Schedules & Drawal from SCADA system at LDCs
Wide Area: signal sent from LDCs to Two power stations
Power station A: Barauni Power station B: Muzzafarpur
3 Voltage <IEGC Band of 95% for 400KV or Voltage < 200KV at 220kV substation for more than 5 minutes
Shed load at node as per details given in Annexure-2.A
Stage 1: Alarm (209/390 kV) Stage 2: Automatic (200/380 kV for more than 5 minutes) Stage 3: 185/370 kV 30 seconds
Local area: Bus voltage Measurement at substations
Local area:
Detail Action plan is given in Annexure-2.A 9UVLS relays required
4 ICT / line loading crossing normal operating limits
Shed load in designated areas Stage-1: Manual (SLDC level) Stage-2; Automatic through PLC
Local area: Measurement at substations
Wide Area : Signal sent from substations to nearby areas
Detail Action plan is given in Annexure-2.B
5 Flows crossing TTCirrespective of frequency
Shed load or reduce generation as detailed in Annexure-2.C
Automatic Local area: No. of measurements aggregated at ERLDC SCADA
Wide Area: Signal sent fromERLDC to the substations/Generating station identified at Annexure-2.C
Detail Action plan is given in Annexure-2.C
6 Sudden loss of generation > 1000 MW or loss of high capacity corridor
Loss of high capacity corridors Automatic Local area: measurement at Power station or substation
Wide Area: Signal send to many areas
Detail Action plan is given in Annexure-2.D
7 Angular difference exceeding cut off value
Shed load at designated areas and generation reduction at selected power station
Automatic Wide AreaSynchrophasor measurements at RLDC/SLDC
Wide Area: Signal sent to many areas
Angle pairs to be decided. True Wide Area Protection
8 UFR I: 49.0 Hz UFR 2: 48.8 Hz UFR3: 48.6 Hz UFR4: 48.4 Hz
Designated feeder in each control area
Automatic Local Area Local area: 49.0 Hz: 6 substations: 200 MW 48.4 Hz: 300 MW 48.8 Hz: 8 substations: 300 MW 48.6 Hz: 8 substations: 300 MW 50 UFRs and 20 UFR with df/dt feature are required to take care of S no 9 also.Existing feeder wise detail of UFR is in Annexure-2.E
9 Df/dt: 49.9 Hz plus 0.1, 0.2 Hz/sec
Designated feeder in each control area
Automatic Local area Local area Part loads in S no 8 could be covered through df/dtrelays also. Say UFR4 could be covered through df/dt also.
10 Islanding at 47.9 Hz Power stations, loads Automatic Local area Local area Detail Action plan is given in Annexure-2.F
73
Annexure-2.2- Automated Defence plan summary -Eastern Region- DVC System
S No
Logic Control Action Manual or Automatic Measurements as input for control action (Local /
Wide Area)
Control Action (Local / Wide Area)
Remarks
EASTER
N R
EGIO
N-D
VC
1 ∆ P > 150 MW ∆ P = Actual-Schd and freq< 50 Hz
Shed load in DVC. Identify three groups A,B and C each group constituting 80-130 MW or 12% of
schedule.. Logic and sequence to be programmed at SLDC and RLDC PLCs
Stage 1 : Manual Stage 2 : Automatic (From SLDC PLC after 15 minutes) Stage 3 : Backup (from ERLDC PLC after 20 minutes)
Wide Area : Schedules &Drawal from SCADA system at LDCs
Wide Area: signal sent from LDC to selected 132Kv substations for tripping of 132Kv feeders to get desired relief
Group A: 132KV Girdih(100 Mw),Burdwan (90 MW)(excluding loads earmarked for UFLS) Group B: 132KV Jamsedpur (100 MW)Putki/Patherdih/Nimiaghat –total ≈ 100MW(excluding coal feeders) Group C: 220 kV Muchipara (130MW), Parulia(130 MW)
2 ∆ P < -150 MW ∆ P = Actual-Schd and freq> 50 Hz
Send signal to designated power stations A, B Rotation logic and sequence to be programmed at SLDC and ERLDC PLC
Stage 1 : Manual Stage 2 : Automatic (From SLDC PLC 15 minutes) Stage 3 : Backup (from ERLDC PLC in 25 minutes)
Wide Area : Schedules &Drawal from SCADA system at LDCs
Wide Area: signal sent from LDCs to Two power stations
Power station A: Mejia B, DSTPS Power station B: CTPS, Mejia TPS, Bokaro, Waria TPS
3 Voltage <IEGC Band of 95% or Voltage < 200KV at substation for more than 5 minutes
Shed load at node as per details given in annexure-2.A
Stage 1: Alarm (209/390 kV) Stage 2: Automatic (200/380 kV for more than 5 minutes) Stage 3: 185/370 kV 30 seconds
Local area: Bus voltage Measurement at substations
Local area:
Detail Action plan is given in Annexure-2.A 5UVLS relays required
4 ICT / line loading crossing normal operating limits
Shed load in designated areas Stage-1: Manual (SLDC level) Stage-2; Automatic through PLC
Local area: Measurement at substations
Wide Area : Signal sent from substations to nearby areas
Detail Action plan is given in Annexure-2.B
5 Flows crossing TTC irrespective of frequency
Shed load or reduce generation as detailed in Annexure-2.C
Automatic Local area: No. of measurements aggregated at ERLDC SCADA
Wide Area: Signal sent fromERLDC to the substations/Generating station identified at Annexure-2.C
Detail Action plan is given in Annexure-2.C
6 Sudden loss of generation > 1000 MW or loss of high capacity corridor
Loss of high capacity corridors Automatic Local area: measurement at Power station or substation
Wide Area: Signal send to many areas
Detail Action plan is given in Annexure-2.D
7 Angular difference exceeding cut off value
Shed load at designated areas and generation reduction at selected power station
Automatic Wide AreaSynchrophasor measurements at RLDC/SLDC
Wide Area: Signal sent to many areas
Angle pairs to be decided. True Wide Area Protection
8 UFR I: 49.0 Hz UFR 2: 48.8 Hz UFR3: 48.6 Hz UFR4: 48.4 Hz
Designated feeder in each control area
Automatic Local Area Local area: 49.0 Hz: 6 substations: 200 MW 48.4 Hz: 300MW 48.8 Hz: 8 substations: 300 MW 48.6 Hz: 8 substations: 300 MW 55 UFRs and 20 UFR with df/dt feature are required to take care of S no 9 also. Existing feeder wise detail of UFR is in Annexure-2.E
9 Df/dt: 49.9 Hz plus 0.1, 0.2 Hz/sec
Designated feeder in each control area
Automatic Local area Local area Part loads in S no 8 could be covered through df/dtrelays also. Say UFR4 could be covered through df/dt also.
10 Islanding at 47.9 Hz Power stations, loads Automatic Local area Local area Detail Action plan is given in Annexure-2.F
74
Annexure-2.3- Automated Defence plan summary -Eastern Region- JSEB System
S No
Logic Control Action Manual or Automatic Measurements as input for control action (Local / Wide
Area)
Control Action (Local / Wide Area) Remarks
EASTER
N R
EGIO
N-JSEB
1 ∆ P > 150 MW ∆ P = Actual-Schd and freq< 50 Hz
Shed load in Jharkhand. Identify three groups A, B and Ceach group constituting 80-130 MW or 12% of schedule.. Logic and sequence to be programmed at SLDC and RLDC PLCs
Stage 1 : Manual Stage 2 : Automatic (From SLDC PLC after 15 minutes) Stage 3 : Backup (from ERLDC PLC after 20 minutes)
Wide Area : Schedules &Drawal from SCADA system at LDCs
Wide Area: signal sent from LDC to selected 132Kv substations for tripping of 132Kv feeders to get desired relief
Group A: 132KV Adityapur (100 Mw)(excluding traction load and loads earmarked for UFLS) Group B: 132KV Golmuri, Salgajhari, Jadugoda (95 MW Group C: 132KV Hatia (100MW) (excluding loads identified for UFLS)
2 ∆ P < -150 MW ∆ P = Actual-Schd and freq> 50 Hz
Send signal to designated power stations A, B Rotation logic and sequence to be programmed at SLDC and ERLDC PLC
Stage 1 : Manual Stage 2 : Automatic (From SLDC PLC 15 minutes) Stage 3 : Backup (from ERLDC PLC in 25 minutes)
Wide Area : Schedules &Drawal from SCADA system at LDCs
Wide Area: signal sent from LDCs to Two power stations
Power station A: Tenughat Power station B: Patratu
3 Voltage < IEGC Band of 95% or Voltage < 200KV at substation for more than 5 minutes
Shed load at node
Stage 1: Alarm (209/390 kV) Stage 2: Automatic (200/380 kV for more than 5 minutes) Stage 3: 185/370 kV 30 seconds
Local area: Bus voltage Measurement at substations
Local area:
Detail Action plan is given in Annexure-2.A
4 ICT / line loading crossing normal operating limits
Shed load in designated areas Stage-1: Manual (SLDC level) Stage-2; Automatic through PLC
Local area: Measurement at substations
Wide Area : Signal sent from substations to nearby areas
Detail Action plan is given in Annexure-2.B
5 Flows crossing TTCirrespective of frequency
Shed load or reduce generation as
detailed in Annexure-2.C
Automatic Local area: No. of measurements aggregated at ERLDC SCADA
Wide Area: Signal sent fromERLDC to the substations/Generating station identified at Annexure-2.C
Detail Action plan is given in Annexure-2.C
6 Sudden loss of generation > 1000 MW or loss of high capacity corridor
Loss of high capacity corridors Automatic Local area: measurement at Power station or substation
Wide Area: Signal send to many areas
Detail Action plan is given in Annexure-2.D
7 Angular difference exceeding cut off value
Shed load at designated areas and generation reduction at selected power station
Automatic Wide AreaSynchrophasor measurements at RLDC/SLDC
Wide Area: Signal sent to many areas
Angle pairs to be decided. True Wide Area Protection
8 UFR I: 49.0 Hz UFR 2: 48.8 Hz UFR3: 48.6 Hz UFR4: 48.4 Hz
Designated feeder in each control area Automatic Local Area Local area: 49.0 Hz: 6 substations: 80 MW48.4 Hz: 120 MW 48.8 Hz: 8 substations: 120 MW 48.6 Hz: 8 substations: 120 MW 30 UFRs required with df/dt feature to take care of S no 9 also. Existing feeder wise detail of UFR is in Annexure-2.E
9 Df/dt: 49.9 Hz plus 0.1, 0.2 Hz/sec
Designated feeder in each control area Automatic Local area Local area Part loads in S no 8 could be covered through df/dtrelays also. Say UFR4 could be covered through df/dt also.
10 Islanding at 47.9 Hz Power stations, loads Automatic Local area Local area Detail Action plan is given in Annexure-2.F
75
Annexure-2.4- Automated Defence plan summary -Eastern Region-ODISHA System
S No
Logic Control Action Manual or Automatic Measurements as input for control action (Local / Wide
Area)
Control Action (Local / Wide Area) Remarks
EASTER
N R
EGIO
N-O
DISH
A
1 ∆ P > 150 MW ∆ P = Actual-Schd and freq< 50 Hz
Shed load in Orissa. Identify three groups A,B and Ceach group constituting 80-130 MW or 12% of schedule.. Logic and sequence to be programmed at SLDC and RLDC PLCs
Stage 1 : Manual Stage 2 : Automatic (From SLDC PLC after 15 minutes) Stage 3 : Backup (from ERLDC PLC after 20 minutes)
Wide Area : Schedules &Drawal from SCADA system at LDCs
Wide Area: signal sent from LDC to selected 132Kv substations for tripping of 132Kv feeders to get desired relief
Group A: 132KV Jeynagar,Theruvali,Behrampur (110 MW)(excluding loads earmarked for UFLS) Group B: 132 kVNayagrah, Chandaka (local), R. Singpur, Puri, Nimapara(100 MW) Group C: 132 kV Brajrajnagar, Bargarh (120 MW)(excluding loads earmarked for UFLS)
2 ∆ P < -150 MW ∆ P = Actual-Schd and freq> 50 Hz
Send signal to designated power stations A, B Rotation logic and sequence to be programmed at SLDC and ERLDC PLC
Stage 1 : Manual Stage 2 : Automatic (From SLDC PLC 15 minutes) Stage 3 : Backup (from ERLDC PLC in 25 minutes)
Wide Area : Schedules &Drawal from SCADA system at LDCs
Wide Area: signal sent from LDCs to Two power stations
Power station A: IBTPS, TTPS Power station B: Sterlite
3 Voltage <IEGC Band of 95%or Voltage < 200KV at substation for more than 5 minutes
Shed load at node as per details given in annexure-2.A
Stage 1: Alarm (209/390 kV) Stage 2: Automatic 200/380 kV for more than 5 minutes) Stage 3: 185/370 kV 30 seconds
Local area: Bus voltage Measurement at substations
Local area:
Detail Action plan is given in Annexure-2.A
4 ICT / line loading crossing normal operating limits
Shed load in designated areas Stage-1: Manual (SLDC level) Stage-2; Automatic through PLC
Local area: Measurement at substations
Wide Area : Signal sent from substations to nearby areas
Detail Action plan is given in Annexure-2.B
5 Flows crossing TTCirrespective of frequency
Shed load or reduce generation as detailed in Annexure-2.C
Automatic Local area: No. of measurements aggregated at ERLDC SCADA
Wide Area: Signal sent from ERLDC to the substations/Generating station identified at Annexure-2.C
Detail Action plan is given in Annexure-2.C
6 Sudden loss of generation > 1000 MW or loss of high capacity corridor
Loss of high capacity corridors Automatic Local area: measurement at Power station or substation
Wide Area: Signal send to many areas
Detail Action plan is given in Annexure-2.D
7 Angular difference exceeding cut off value
Shed load at designated areas and generation reduction at selected power station
Automatic Wide AreaSynchrophasor measurements at RLDC/SLDC
Wide Area: Signal sent to many areas
Angle pairs to be decided. True Wide Area Protection
8 UFR I: 49.0 Hz UFR 2: 48.8 Hz UFR3: 48.6 Hz UFR4: 48.4 Hz
Designated feeder in each control area Automatic Local Area Local area: 49.0 Hz: 6 substations: 300 MW 48.4 Hz: 450 MW 48.8 Hz: 8 substations: 450 MW 48.6 Hz: 8 substations: 450 MW 80 UFRs and 30 UFR withdf/dt feature are required to take care of S no 9 also. Existing feeder wise detail of UFR is in Annexure-2.E
9 Df/dt: 49.9 Hz plus 0.1, 0.2 Hz/sec
Designated feeder in each control area Automatic Local area Local area Part loads in S no 8 could be covered through df/dtrelays also. Say UFR4 could be covered through df/dt also.
10 Islanding at 47.9 Hz Power stations, loads Automatic Local area Local area Detail Action plan is given in Annexure-2.F
76
Annexure-2.5- Automated Defence plan summary-Eastern Region-SIKKIM System
S No
Logic Control Action Manual or Automatic Measurements as input for control action (Local /
Wide Area)
Control Action (Local / Wide Area)
Remarks
EASTER
N R
EGIO
N-SIK
KIM
1 ∆ P > 150 MW ∆ P = Actual-Schd and freq< 50 Hz
Shed load in Sikkim. Identify in a group constituting 20 MW or 12% of
schedule. Logic and sequence to be programmed at SLDC and RLDC PLCs
Stage 1 : Manual Stage 2 : Automatic (From SLDC PLC after 15 minutes) Stage 3 : Backup (from ERLDC PLC after 20 minutes)
Wide Area : Schedules &Drawal from SCADA system at LDCs
Wide Area: signal sent from LDC to selected 132Kv substations for tripping of 132Kv feeders to get desired relief
Group A: 132KV Substation Gangtok, Melli
2 ∆ P < -150 MW ∆ P = Actual-Schd and freq> 50 Hz
N/A Stage 1 : Manual Stage 2 : Automatic (From SLDC PLC 15 minutes) Stage 3 : Backup (from ERLDC PLC in 25 minutes)
Wide Area : Schedules &Drawal from SCADA system at LDCs
Wide Area: signal sent from LDCs to Two power stations
Surrender of ISGS (thermal) share by manual action
3 Voltage <IEGC Band of 95% for 400KV or Voltage < 200KV at substation for more than 5 minutes
Shed load at node as per details given in annexure-2.A
Stage 1: Alarm (209/390 kV) Stage 2: Automatic 200/380 kV for more than 5 minutes) Stage 3: 185/370 kV 30 seconds
Local area: Bus voltage Measurement at substations
Local area:
Detail Action plan is given in Annexure-2.A
4 ICT / line loading crossing normal operating limits
Shed load in designated areas Stage-1: Manual (SLDC level) Stage-2; Automatic through PLC
Local area: Measurement at substations
Wide Area : Signal sent from substations to nearby areas
Detail Action plan is given in Annexure-2.B
5 Flows crossing TTC irrespective of frequency
Shed load or reduce generation as detailed in Annexure-2.C
Automatic Local area: No. of measurements aggregated at ERLDC SCADA
Wide Area: Signal sent from ERLDC to the substations/Generating station identified at Annexure-2.C
Detail Action plan is given in Annexure-2.C
6 Sudden loss of generation > 1000 MW or loss of high capacity corridor
Loss of high capacity corridors Automatic Local area: measurement at Power station or substation
Wide Area: Signal send to many areas
Detail Action plan is given in Annexure-2.D
7 Angular difference exceeding cut off value
Shed load at designated areas and generation reduction at selected power station
Automatic Wide AreaSynchrophasor measurements at RLDC/SLDC
Wide Area: Signal sent to many areas
Angle pairs to be decided. True Wide Area Protection
8 UFR I: 49.0 Hz UFR 2: 48.8 Hz UFR3: 48.6 Hz UFR4: 48.4 Hz
Designated feeder in each control area
Automatic Local Area Local area: 49.0 Hz: 7 MW 48.4 Hz: 10 MW 48.8 Hz: 10 MW 48.6 Hz: 10 MW 3UFRs and 1 UFR with df/dt feature are required to take care of S no 9 also.Existing feeder wise detail of UFR is in Annexure-2.E
9 Df/dt: 49.9 Hz plus 0.1, 0.2 Hz/sec
Designated feeder in each control area
Automatic Local area Local area Part loads in S no 8 could be covered through df/dtrelays also. Say UFR4 could be covered through df/dt also.
10 Islanding at 47.9 Hz Power stations, loads Automatic Local area Local area Detail Action plan is given in Annexure-2.F
77
Annexure-2.6- Automated Defence plan summary-Eastern Region-West Bengal System
S
No
Logic Control Action Manual or Automatic Measurements as input for control action (Local /
Wide Area)
Control Action (Local / Wide Area)
Remarks
EASTER
N R
EGIO
N-W
EST BEN
GA
L
1 ∆ P > 150 MW ∆ P = Actual-Schd and freq< 50 Hz
Shed load in West Bengal. Identify three groups A,B and C each group constituting 80-130 MW or 12% of
schedule..Logic and sequence to be programmed at SLDC and RLDC PLCs
Stage 1 : Manual Stage 2 : Automatic (From SLDC PLC after 15 minutes) Stage 3 : Backup (from ERLDC PLC after 20 minutes)
Wide Area : Schedules &Drawal from SCADA system at LDCs
Wide Area: signal sent from LDC to selected 132Kv substations for tripping of 132Kv feeders to get desired relief
Group A: 132KV Bishnupur (120 MW) (excluding traction load) Group B: 132 kVBehrampur (110 MW) Group C: 132 kV Barasat (130 MW) (excluding traction load)
2 ∆ P < -150 MW ∆ P = Actual-Schd and freq> 50 Hz
Send signal to designated power stations A, B Rotation logic and sequence to be programmed at SLDC and ERLDC PLC
Stage 1 : Manual Stage 2 : Automatic (From SLDC PLC 15 minutes) Stage 3 : Backup (from ERLDC PLC in 25 minutes)
Wide Area : Schedules &Drawal from SCADA system at LDCs
Wide Area: signal sent from LDCs to Two power stations
Power station A: Kolaghat, Sagardighi, Bakreswar Power station B: DPL, Bandel, PPSP(if running in gen mode)
3 Voltage <IEGC Band of 95%or Voltage < 200KV at substation for more than 5 minutes
Shed load at node as per details given in annexure-2.A
Stage 1: Alarm (209/390 kV) Stage 2: Automatic (200/380 kV for more than 5 minutes) Stage 3: 185/370 kV 30 seconds
Local area: Bus voltage Measurement at substations
Local area:
Detail Action plan is given in Annexure-2.A
4 ICT / line loading crossing normal operating limits
Shed load in designated areas Stage-1: Manual (SLDC level) Stage-2; Automatic through PLC
Local area: Measurement at substations
Wide Area : Signal sent from substations to nearby areas
Detail Action plan is given in Annexure-2.B
5 Flows crossing TTC irrespective of frequency
Shed load or reduce generation as detailed in Annexure-2.C
Automatic Local area: No. of measurements aggregated at ERLDC SCADA
Wide Area: Signal sent from ERLDC to the substations/Generating station identified at Annexure-2.C
Detail Action plan is given in Annexure-2.C
6 Sudden loss of generation > 1000 MW or loss of high capacity corridor
Loss of high capacity corridors Automatic Local area: measurement at Power station or substation
Wide Area: Signal send to many areas
Detail Action plan is given in Annexure-2.D
7 Angular difference exceeding cut off value
Shed load at designated areas and generation reduction at selected power station
Automatic Wide AreaSynchrophasor measurements at RLDC / SLDC
Wide Area: Signal sent to many areas
Angle pairs to be decided. True Wide Area Protection
8 UFR I: 49.0 Hz UFR 2: 48.8 Hz UFR3: 48.6 Hz UFR4: 48.4 Hz
Designated feeder in each control area
Automatic Local Area Local area: 49.0 Hz: 6 substations: 700 MW 48.4 Hz: 1050 MW 48.8 Hz: 8 substations: 1050 MW 48.6 Hz: 8 substations: 1050 MW 180 UFRs and 70 UFRs df/dt feature are required to take care of S no 9 also. Existing feeder wise detail of UFR is in Annexure-2.E
9 Df/dt: 49.9 Hz plus 0.1, 0.2 Hz/sec
Designated feeder in each control area
Automatic Local area Local area Part loads in S no 8 could be covered through df/dtrelays also. Say UFR4 could be covered through df/dt also.
10 Islanding at 47.9 Hz Power stations, loads Automatic Local area Local area Detail Action plan is given in Annexure-2.F
78
Annexure-2.A- Feeders list for Voltage crossing the limits
Voltage < IEGC Band of 95% for 400KV or Voltage < 200KV at 220kV substation for more than 5 minutes
Action
POWERGRID
Muzaffarpur 400 kV Trip Darbhanga 2X100 MVA , 220/132kV ICTs
N. Purnea 400 kV Trip 33kV feeders from Naugachia, Khagaria ,Katiharand Purnea (SLDC to identify)
Biharshariff 400 kV Trip 33kV feeders fromEkangarsarai, Hulasgarh, Lakhisarai, Barh,Hatidah, Jamalpur,Jamui(SLDC to identify)
Sasaram 400 kV Trip 33kV feeders fromDehri, Karmnasa, Bikramgunj(SLDC to identify)
Arrah 220KV Trip 33kV feeders fromDigha, Bakshar, Arrah(SLDC to identify)
Gaya 400 kV Trip 33kV feedersfrom Gaya (SLDC to identify)
Patna 400 kV Trip 33kV feedersfromBihta, Digha, Gaighat and Mithapur(SLDC to identify)
Durgapur 400 kV Trip 33kV feedersfromBardhaman and Kalipahari,Mankar and Ukhra, Bidhannagar(SLDC to identify)
Maithon 400 kV Trip 33kV feedersfromMaithon and 220kV Burnpurand also from Kalyaneswari S/Stn
Rourkella 400 kV Trip 33kV feedersfromRourkella(O), Tarkera ,Barkot ,Chandiposh(SLDC to identify)
Jamshedpur 400 kV Trip 33kV feedersfromAdityapur and Golmuri (Chandil)(SLDC to identify))
Rengali 400 kV Trip load from Barkot(SLDC to identify)
Jeypore 400 kV Trip 33kV feedersfromSunabeda, Damonjodi and T. Khunti (SLDC to identify)
Baripada 400 kV Trip 33kV feedersfrom Baripada(OPTCL) and Rairangpur (SLDC to identify)
Subhasgram400 kV Trip 220kV CLC and 33kV feedersfrom L’Kantapur
Binaguri 400 kV Trip 132kV Siliguri, 2 miles, Moinaguri, Chalsa (SLDC to identify)
Malda 220kV Trip 33kV feedersfromBalurghat and Raiganj (SLDC to identify)
Siliguri 220kV Trip33kV feedersfromLebong, Rammam and TCF (SLDC to identify)
Dalkohla 220KV Trip 33kV feedersfrom Dalkohla(SLDC to identify)
Birpara 220kV Trip 33kV feedersfromAlipurduar (SLDC to identify)
BSEB
Khagaul 220KV Trip 33kV feedersfrom Bihta, Khagaul(SLDC to identify)
Bodhgaya 220KV Trip 33kV feedersfrom Gaya ,Rafigunj, Nawadah(SLDC to identify)
Dehri 220kV Trip 33kV feeders from Bikramganj, Sasaram, Dumraon (SLDC to identify)
Begusarai220kV Trip 33kV feeders from Begusarai, Dalsingsarai (SLDC to identify)
Gopalganj220kV Trip 33kV feeders from Gopalganj, Ekma, Siwan
Darbhanga220kV Trip 33kV feeders from Darbhanga, Phulparas, Madhubani (SLDC to identify)
79
Annexure-2.A- Feeders list for Voltage crossing the limits Voltage < IEGC Band of 95% for 400KV or Voltage < 200KV at 220kV substation for more than 5 minutes
Action
DVC
Kalyaneshwari 220KV Trip 33kV feedersfrom Burnpur, Kalyaneshwari(SLDC to identify)
Barjora 220KV Trip 33kV feedersfrom Barjora(SLDC to identify)
Dhanbad220kV Trip 33kV feeders from Dhanbad (SLDC to identify)
Jamshedpur220kV Trip 33kV feeders from Jamshedpur (SLDC to identify)
JSEB
Hatia 220KV Trip 33kV feedersfromKamdara, Hatia, Gumla(SLDC to identify)
Chandil 220kV Trip 33kV feedersfrom Chandil,Golmuri,Jadugoda
OPTCL
Tarkera 220Kv Trip 33kV feedersfromTarkera, Raigangpur(SLDC to identify)
Bolangir 220KV Trip 33kV feedersfrom Bolangir, Patnagarah(SLDC to identify)
Meramundali 400 kV Trip 132 or 33kV feedersfrom Meeramandali and Bhanjnagar(SLDC to identify)
Chandaka 220KV Trip 33kV feedersfrom Chandaka, Kesura, Nimipara(SLDC to identify)
Mendhasal 400 kV Trip 33kV feedersfrom Khurda and Nimapara / R.S. Pur(SLDC to identify)
Bhadrak 220KV Trip 33kV feedersfrom Soro, Dhamra(SLDC to identify)
Balasore 220KV Balasore, Jaleswar
WBSETCL
Jeerat 400 kV Trip 33kV feedersfromAshoknagar and Barasat(SLDC to identify)
Arambagh 400 kV Trip 33kV feedersfromRainaMidnapur, Jhargram and Birsingha(SLDC to identify)
Satgachia 220KV Trip 33kV feedersfrom Mahachanda, Katwa(SLDC to identify)
Bishnupur 220KV Trip 33kV feedersfromBishnupur, Bakura(SLDC to identify)
Gokarna 220kV Trip 33kV feeders from Gokarna, Rampurhat, Lalgola, Beharampur (SLDC to identify)
Satgachia 200kV Trip 33kV feeders from Satgachia, Dhatrigram, Mankar, Khanyan (SLDC to identify)
Krishnanagar 220kV Trip 33kV feeders from Krishnanagar, Debogram (SLDC to identify)
Kasba 220kV Trip 33kV feeders from Kasba, Sonarpur and Salt Lake (SLDC to identify)
L.Kantapur 220kV Trip 33kV feeders from L. Kantapur (SLDC to identify)
Howrah 220kV Trip 33kV feeders from Howrah, Liluah and Dankuni (SLDC to identify)
Midnapore 220kV Trip 33kV feeders from Midnapore, Chandrakona and Jhargram (SLDC to identify)
N. Haldia 220kV Trip 33kV feeders from N Haldia, Haldia and Contai (SLDC to identify)
Asansol 220kV Trip 33kV feeders from Asansol (SLDC to identify)
Bidhannagar 220kV Trip 33kV feeders from Bidhannagar, Bolpur and Ukhra (SLDC to identify)
Note : Quantum of load to be shed and their location to be identified by concerned RPC/RLDC/SLDC
80
Annexure-2.B- - Action plan for ICT / line loading crossing normal operating limits
Line Action
400kV Farakka-Malda D/C
1 O/D only by NR – SPS to shed load in NR 2 O/D only by NER – SPS to shed load in NER 3 O/D by NR & NER – Both SPS to operate 4.Restriction of Generation(upto 200 MW depending upon the line loading above SIL) at Farkka through SPS 5 Restriction of over injection from WR. 6 Restriction under drawl from ER constituents through SPS. 7 Generation reduction(upto 200 MW depending upon the line loading above SIL) through SPS at Sagardigi, Bakreshwar
400kV Rourkella-Talcher D/C
1 SPS to shed load in Odishaat Meramandali\ Mendhasal/ Bhanjnahgar areas, if it is O/D.
2 SPS to shed load in W. Bengal at Kharagpur/ Bishnupur/ Arambag/ Jeerat if it is O/D 3 If Both Orissa and West Bengal is overdrawing SPS to operate to shed load in both the control areas
400kV Kahalgaon-Biharshariff Q/C
1 SPS to shed load in NR in case of O/D by NR 2 SPS to shed load around Biharshariff (132KV Substation Gaya, Jahanabad, Bodhgaya) in case of O/D by BSEB 3 Restriction of Generation(upto 200 MW depending upon the line loading above SIL) at Khalgaon through SPS 4 O/D by NR as well as BSEB – Both SPS to operate
400kV Maithon – Kahalgaon D/C
1 SPS to shed load in NR in case of O/D by NR 2 SPS to shed load around Biharshariff(132KV Substation Gaya, Jahanabad, Bodh gaya) in case of O/D by BSEB 3 Generation reduction (upto 150 MW depending upon the line loading above SIL) through SPS at Mejia’B’, DSTPS of DVC. 4 Generation reduction (upto 150 MW depending upon the line loading above SIL) through SPS at IPP vis SEL and MPL
400kV SEL – Rourkella D/C
1 SPS to reduce generation in Chattisgarh area / Korba in WR in case of U/D by WR 2 SPS to reduce generation(upto the order of over injection) of SEL in case of O/I by SEL 3 U/D by WR and O/I by SEL – Both SPS to operate
220kV Budhipadar-Tarkera D/C
SPS to shed generation in Chattisgarh area of WR, Vedanata(VAL), IB TPS, 220 kV SEL(upto the order of 100 MW) at 220Kv
Note : Quantum of load / generation to be shed and their location to be identified by concerned RPC/RLDC/SLDCs
81
Annexure-2.C-Action plan for TTC violation
TTC
violation Cause Action
1 ER-NR Over loading of 1. 400KV Farkka-
Malda 2. 400KV
Kahalgaon-Biharshariff
1 O/D only by NR – SPS to shed load in NR 2 O/D only by NER – SPS to shed load in NER 3 O/D by NR & NER – Both SPS to operate 4 Restriction of Generation(upto 200 MW depending upon the line loading above SIL) at Farkka and Kahalgaon through SPS 5 Restrictionover injection from WR. 6 Restriction under drawl from ER constituents through SPS 7 Generation reduction(upto 200 MW depending upon the line loading above SIL) through SPS at Sagardigi, Bakreshwar in case of loading of Farkka-Malda 8 Restrict over drawl by BSEB in case of overloading of Kahalgaon-Biharshariff(load shed at 132KV Substation Gaya, Jahanabad, Bodh gaya)
2 ER-NER 400KV Farakka-Malda
1 Load shed through SPS in NER 2 Restriction of Generation(upto 150 MW depending upon the line loading above SIL) at Farkka through SPS 3.Generationreduction(upto 150 MW depending upon the line loading above SIL) through SPS at Sagardigi, Bakreshwar 4. Increase Generation at Teesta through manual action
3 ER-SR 400KV Rourkela-Talcher
1 SPS to shed load in Odisha if it is O/D at 132 kV Nayagrah, Chandhka. 2 SPS to shed load in W. Bengal (particularly in south Bengal areaat 132 kV Barasat)if it is O/D
4 WR-ER 1. 400 kV Maithon-Khalgaon
2. 400 kV Khalgaon-Biharsariff
3. 220 kV Budhipadar-Tarkera
1. Injection Reduction from WR by SPS. 2 Generation reduction (upto 150 MW depending upon the line loading above SIL)through SPS at Mejia’B’, DSTPS of DVC. 3 Generation reduction (upto 150 MW depending upon the line loading above SIL)through SPS at IPP visSEL and MPL.
5 SR-ER 1. 400 kV Talcher-Rourkela
1 Restrict over generation(upto 300 MW depending upon the line loading above SIL) at TTPS, Indravati, Balimela and Upper Kolabthrough SPS
2Restriction in generation (upto 150 MW depending upon the line loading above SIL) of West Bengal through SPS if it is under drawing at KTPS, Bakreshwar
6 NER-ER 400 kV Purnea-Muzzafarpur
1 Restriction of Over injection of NER by SPS 2 Restriction of Over injection of (upto 200 MW depending upon the line loading above SIL)Teesta, Tala and chukhaby SPS
Note : Quantum of load / generation to be shed and their location to be identified by concerned RPC/RLDC/SLDCs
82
Annexure- 2.D-Action Plan for Loss of Loss of generation>1000MW/high capacity corridor High Capacity Corridor Tripping
Line Action
400kV Farakka-MaldaS/C 1 O/D only by NR – SPS to shed load in NR 2 O/D only by NER – SPS to shed load in NER 3 O/D by NR & NER – Both SPS to operate 4.Restriction of Generation(upto 200 MW depending upon the line loading above SIL) at Farkka through SPS 5 Restriction of over injection from WR. 6 Restriction under drawl from ER constituents through SPS. 7 Generation reduction(upto 300 MW depending upon the line loading above SIL) through SPS at Sagardigi, Bakreshwar
400kV Rourkella-Talcher S/C 1 SPS to shed load in Odisha at Meramandali\ Mendhasal/ Bhanjnahgar areas,
if it is O/D. 2 SPS to shed load in W. Bengal at Kharagpur/ Bishnupur/ Arambag/ Jeerat if it is O/D 3 If Both Orissa and West Bengal is overdrawing SPS to operate to shed load in both the control areas
400kV Kahalgaon-Biharshariff S/C
1 SPS to shed load in NR in case of O/D by NR 2 SPS to shed load around Biharshariff (132KV Substation Gaya, Jahanabad, Bodhgaya) in case of O/D by BSEB 3 Restriction of Generation(upto 250 MW depending upon the line loading above SIL) at Khalgaon through SPS 4 O/D by NR as well as BSEB – Both SPS to operate
400kV Maithon – Kahalgaon S/C
1 SPS to shed load in NR in case of O/D by NR 2 SPS to shed load around Biharshariff (132KV Substation Gaya, Jahanabad, Bodh gaya) in case of O/D by BSEB 3 Generation reduction (upto 300 MW depending upon the line loading above SIL) through SPS at Mejia’B’, DSTPS of DVC. 4 Generation reduction (upto 300 MW depending upon the line loading above SIL) through SPS at IPP vis SEL and MPL
400kV SEL – Rourkella S/C 1 SPS to reduce generation in Chattisgarh area / Korba in WR in case of U/D by WR 2 SPS to reduce generationupto 300 MW depending upon the line loading above SIL) of SEL in case of O/I by SEL 3 U/D by WR and O/I by SEL – Both SPS to operate
400 kV Purnea-Muzzafarpur S/C
1.O/D only by NR – SPS to shed load in NR 2 Reduction of Over injection (upto 450 MW depending upon the
line loading above SIL)of Teesta, Tala and chukha 3 Restriction of Over injection of NER by SPS
400KV Kahalgaon-Barh S/C 1 SPS to shed load in NR in case of O/D by NR 2 Generation reduction (upto 300 MW depending upon the line
loading above SIL)at Kahalgaon power station
220kV Budhipadar-Tarkera S/C SPS to shed generation in Chattisgarh area of WR, Vedanata (VAL), IB TPS, 220 kV SEL(upto the order of 200 MW depending upon the line loading) at 220Kv
Note : Quantum of load / generation to be shed and their location to be identified by concerned RPC/RLDC/SLDCs
83
Annexure- 2.D-Action Plan for Loss of Loss of generation>1000MW/high capacity corridor
Sudden Loss of Generation >1000MW:- Generating plant Action
1 Farakka Super Thermal Power station( Relief of 1086MW approx.)
132KV Bishnupur (120 MW), Behrampur (110 MW), Barasat (130 MW), Burdwan (90 MW), Malda,
Ukhara, Bolpur, MankaDharampur 220 kV Muchipara (130MW), Parulia(130 MW), Barjora (100MW)
2 Kahalgaon Super Thermal Power station (relief of 780MW approx.)
132KV Substation Katihar, Saharsa, Supaul, Udayganj, Navgachia, khagaria (80Mw) 132KV Substation Gaya, Jahanabad, Bodh gaya (130MW) 132KV Substation Dehri, Sonnagar, Karmnasa (120MW) 220KV Muzzafarpur (300MW)
3 Talcher super Thermal Power Station (Relief of 500MW approx.)
132KV Jeynagar,Theruvali,Behrampur (110 MW), Nayagrah, Chandhka(100 MW), Brajrajnagar, Bargarh (120 MW), bidanasi (70mw), choudwar (50MW), cuttack (50MW)
4 Kolaghat Thermal Power station (Relief of 936MW approx.)
132KV Bishnupur (120 MW), Behrampur (110 MW), Barasat (130 MW), Burdwan (90 MW), Ramgrah(126 MW) 220 kV Muchipara (130MW), Parulia(130 MW), Barjora (100MW)
5 Bakreshwar Thermal Power station (Relief of 936MW approx.)
132KV Bishnupur (120 MW), Behrampur (110 MW), Barasat (130 MW), Burdwan (90 MW), Ramgrah(126 MW) 220 kV Muchipara (130MW), Parulia(130 MW), Barjora (100MW)
6 Maithon Power Ltd (Relief of 986MW approx.)
132KV Adityapur (100 Mw), Namkum (90MW), Hatia (120MW) 132KV Girdih(100 Mw), Burdwan (90 MW), Jamsedpur (100MW), Ramgrah(126 MW), 220 kV Muchipara (130MW), Parulia(130 MW)
Note : Quantum of load / generation to be shed and their location to be identified by concerned RPC/RLDC/SLDCs
84
Annexure-2.E- Existing feeder-wise detail of UFR
STATUS OF STAGEWISE UNDER FREQUENCY RELAYS (UFRs) INSTALLED AT DIFFERENT SUB-STATIONS /
FEEDERWISE / EXPECTED LOAD RELIEF (MW) OF THE ER CONSTITUENTS
Stages Sl. No.
Name of EHT Sub-stations
Connected 33 kV Feeders Load in MW
BSEB
1 48.8 Hz
Frequency
1. Gaighat Meena Bazar 15 MW
2. Fatuah Katra 15 MW
Meena Bazar 22 MW
3. Mithapur PESU – V 18 MW
TOTAL 70 MW
II 48.6 Hz
Frequency
1. Gaighat City 20 MW
2. Mithapur PESU – I & II 22 MW
TOTAL 42 MW
III 48.2 Hz.
Frequency
Nil Nil Nil
DVC-A.
I 48.8 Hz.
Frequency
1. Belmuri WBSEB Belmuri 22.5 MW
2. Putki JSEB Godhor f1(14) + Bhuli f2 (5.1) 17.2 MW
JSEB Ganeshpur (f1)(12) 10.8 MW
II 48.6 Hz.
Frequency
3 Putki BCCL Bastacola (12.5 ) BCCL Bhalgora (13.5) BCCL Katras (7.2) + JSEB Katras (10) +
JSEB KatrasSijua (2.5)
41.1 MW
4. Ramgarh CCL Giddi (16) 14.4 MW
CCL Sirka (6) 5.4 MW
III 48.2 Hz.
Frequency
5. Kumardhubi DPSCO Dishergarh 28.8 MW
JSEB Mugma 15.3 MW
6. Kalipahari WBSEB Kanyapur (29) + ECL Satgram (Fdr2 ) (5)
30.6 MW
DPSCO Sheebpur 34.2 MW
DPSCO J. K. Nagar 18.0 MW
DVC B. UFR setting for Emergent Condition of the system
47.6 Hz. 1. DPSCO Luchipur 33.8 MW
2. Koderma JSEB Koderma 27.0 MW
BalajeeElectrosteel Ltd. 11.0 MW
3 Giridih JSEB Giridih 27.0 MW
CCL Giridih 3.4 MW
4 Ramgrh JSEB Ramgarh (One Fdr) 31.5 MW
5 Burdwan WBSEB Burdwan 43.2 MW
6 Patherdih JSEB Gobindpur (19) + JSEB Mukunda (4) +
BCCL Koilanagar (4.7)
24.9 MW
7 Patherdih Patherdih Rail (14) 11.7 MW
85
Annexure-2.E- Existing feeder-wise detail of UFR
JSEB
I 48.8 Hz.
Frequency
1.
132 / 33 kV Hatia Argora 09 MW
2. 132 / 33 kV Adityqapur Adityapur - I 17 MW
II 48.6 Hz
Frequency
3.
132 / 33 kV Adityqapur Adityapur - II 13 MW
III 48.2 Hz
Frequency
4. 132 / 33 kV Hatia Brambey 11 MW
5. 32 / 33 kV Namkum Kokar ( R ) 17 MW
OPTCL A.
I 48.8 Hz.
Frequency
1. Bolangir 33 kV Dumberbhal 003 MW
33 kV Dunguripali 010 MW
33 kV Patnagarh 006 MW
2. Bargarh 33 kV Dunguri 010 MW
3. Jaipur Road 33 kV Anandpur 010 MW
4. Bhadrak 33 kV Dhamnagar
012 MW
33 kV Gopinathpur 011 MW
5 Bhanjanagar 33 kV Khatribarpur 004 MW
33 kV Belaguntha 004 MW
33 kV Surada 007 MW
II 48.6 Hz
Frequency (Instant)
6 Aska 33 kV Buguda 006 MW
33 kV Nuagaon 006 MW
Berhampur 33 kV Chikiti 007 MW
Cuttack 33 kV Balikuda 008 MW
Balasore 33 kV Nilagiri 010 MW
Theruvali 33 kV Bisam Cuttack 005 MW
Sambalpur 33 kV Rengali 006 MW
33 kV Putibandh 014 MW
Rourkela 33 kV Lathikata 015 MW
III 48.2 Hz.
Frequency
Chandaka 132 kV Nimapada 025 MW
Duburi 132 kV Duburi – Bhadr – Jajpur (Town) 080 MW
86
Annexure-2.E- Existing feeder-wise detail of UFR
WBSETCL
I 48.8 Hz.
Frequency
1. Liluah 132 kV S/Stn. Liluah, Kona, Baltikuri I & II, Jangalpur, Makardah
63 MW
2. Falta 132 kV S/Stn. FEPZ IV
08 MW
3. NJP 220 / 132 kV S/Stn. Group Control Transformer for 11 kV Feeder &Rabindranagar 33 kV Feeder
10 MW
II 48.6 Hz.
Frequency
4. Siliguri 132 kV S/Stn. Deshbandhupur A, Rabindranagar, Siliuguri I & II Housing Board
60 MW
5. Darjeeling 132 kV S/Stn. LKEBONG Happy Valley &Ghoom 35 MW
III 48.2 Hz.
Frequency
6 Salt Lake 132 kV S/Stn. M1-1, M2-1 & II, M3-I & II, M5-1 & II
83 MW
7 NBU 132 kV S/Stn. UJANU, TCF, KHANTAL, PANSIDEWA TEESTA 11 KV, BAGDOGRA – 11 KV
23 MW
IV 47.6 Hz.
Frequency
8. Jeerat 400 kV S/Stn. 132 kV Barasat I & II, 132 kV Ashoknagar I & II, 220 kV Kasba I, II & III
&Lakshmikantapur
540 MW
9 Durgapur 220 kV S/Stn. 132 kV Bolpur Feeder, 132 kV Sainthia Feeder, 132 kV Bishnupur I & II Feeder
160 MW
10. BTPS 132 KV AdisaptagramCkt. I & II 60 MW
CESC
I 48.8 Hz.
Frequency
1. Majerhat S/Stn.(Gp – 1) 33 kV Barisha T3
Summer Winter
6 MW 5 MW
33 kV Thakurpukur T1 13 MW 7.5 MW
33 kV F. Chakmir S/S-I / Behala T- 1 4.5 MW 2 MW
Jadavpore S/Stn. (Gp – 1)
33 kV F. Tollygunge D/S T – 1 13 MW 6 MW
Ballygunge East D/S T – 1 ( 6kV T-1)
9 MW 6 MW
Fore Shore Rd D/S ( 4 Nos. 6 Fdrs.) 17.2 MW 9.8 MW
Princep St D/S ( 5 nos. – 6 Fdrs.) 12.8 MW 10 MW
2 Majerhat S/Stn. (Gp – 2) 33 kV F. Thakurpukur T-2/Behala (N) T-1
26 MW 14 MW
33 kV F. Tollygunge D/S T-1/South City T-1 Shalimar D/S ( 5 nos. 6 kV
Fdrs)
21 MW 8.5 MW
Jadavpore S/Stn.(Gp – 2)
33 kV F. Tollygunge D/S T-1/South City T-1
26 MW 14 MW
Shalimar D/S ( 5 Nos. 6 kV Fdrs) 7.3 MW 6.1 MW
II 48.6 Hz.
Frequency
3 Ritchie D/S 6 nos. 6 kV Fdrs 10.3 MW 7.9 MW
Canal D/S 6 nos. 6 kV Fdrs 17.6 MW 8.6 MW
Chakmir S/Stn. All 33 kV Fdrs& 55 MVA T – 1 45 MW 29 MW
Jadavpur S/Stn. 33 kV F. Jadavpur T3, Jadavpur T1
23 MW 12 MW
III 48.2 Hz.
Frequency
BRS (Liluah S/Stn.) Import 1, 2 & 3 110 MW 80 MW
87
Annexure-2.F- Islanding schemes
Existing Islanding schemes
Station/System Islanding scheme Criteria
CHPC (Bhutan) One machine (84 MW) alongwithThimpu Load gets islande with
opening of bus coupler breaker
Low Frequency
( 47.0Hz)
CESC The entire system gets islanded at Kasba ( the synchronising
point)
Low frequency
(47.8 Hz) Or
High frequency
(52.5 Hz)
NALCO(CPP in Orissa
system)
Main –I bus connects all lines connecting OPTCL Network
Main –II bus connects plant load and generators
Bus coupler breaker opens to isolate plant with generators from
rest of the system
Low Freq( 47.4
Hz)
ICCL(CPP within
Orissa system)
The plant gets connected to OPTCL network at 132kV.
The 132/33 kV Transformer gets isolated from 132kV system
Low Freq ( 47.5
Hz)
RSP (CPP in Orissa
system)
CP2 has 2 units 60MW each generating at 11kV and connected to
132 bus through 132/33 transformer
CP1 has 3 units, 45 MW each, generating at 6.6 kV and connected
to 33 kV bus through 33/6/6kV Transformer
Scheme I : All units gets islanded by opening of 132kV lines
Scheme II: One unit may remain with Grid and get islanded by
opening of 132kV and 33kV Bus coupler CBs
Low
frequency(Both
the schemes
operate at 47.6
Hz)
Bhushan Power &
Steel (CPP in Orissa
system)
130MW TG#1 & TG#2 will get islanding status in Governor, AVR
and Siprotect Relays through PLC Logic. For this all status of
breaker in MRSS (220kV Main breaker# 1,220kV Main breaker#2,
and Bus coupler) and 220kV cable feeder #1 at 130MW power
plant wired up to PLC in 130MW
Arya ISPAT and
power Ltd. (CPP in
Orissa system)
Whenever the 18 MW TG set is running in synchronization
condition with OPTCL Grid following relays have been
envisaged for islanding purpose of 18 MW TG set:
1)MICOM-P341, Areva make
2)6RW 6000, Siemens make
MICOM-P341 shall sense any rate of changed of frequency and
the variation of voltages between Grid supply and generation.
Accordingly, it shall give trip command to Grid incomer
breaker.
Instead of above, the electrical quantities like U/V, O/V, U/F,
O/F are measured by MICOM-P341 as well as 6RW 6000 and
give trip command to Grid incomer breaker
Under
frequency 47.5
Hz for 2.5 Sec
Over Frequency
52.6 Hz for 2.5
Sec
88
Annexure-2.F -Existing Islanding schemes
Maithon Ispat
Limited (CPP in
Orissa system)
In the scheme, Micom P 341 Relay, Areva Make, operates during Grid
Disturbance and it gives Trips command to SMS TIE 2 breaker and
220 kV incomer breaker and consequently incomer breaker gives trip
command to 20/25 and 28/35 MVA transformer 220 kV incomer
breaker and 11 kV ALONE Breaker through interlocks
IFFCO (CPP in Orissa
system)
Whenever there is a disturbance in the system, the relay
calculates the current &voltage parameters and evaluates the
type of fault. Then the relay gives the alarm/ trip command.
When a trip command actuates by the relay, it operates the
master trip relay and subsequently trips the corresponding
132KV Grid incomer breaker. This results in clearing the fault
and isolating the TG set from feeding the fault current. Also
there is a provision for tripping of downstream 33KV Grid
Under
frequency 48.0
Hz for 0 Sec
Over Frequency
52.0 Hz for 1.0
Sec
Hindalco(CPP in
Orissa system)
The power system of CGP of Hindalco Industries Ltd is
connected to grid at 132 kV level through two number of Alco
feeders from Burla Power House to their 132 kV main receiving
substation. They have got grid islanding scheme in order to
survive during grid disturbance. The disturbance in the grid is
sensed by the Numerical Relay Micom P 341 through following
four criteria and it opens the grid connecting breakers in their
main receiving substation.
Under
frequency 48.0
Hz
Over Frequency
51.5 Hz
IMFA (CPP in Orissa
system)
Islanding of 108 MW captive Power Plant is done by sensing
frequency
Under
frequency 48.0
Hz
Rate of fall of
frequency
0.8Hz/Sec
IBTPS Islanding of IBTPS is done using LADR (Load Accessed
Directional Relay) technique.
From every feeder, lock out tripping pulse is extended to LADR
relay at BC panel. Continuously the dI/dt on the system due to
the available of target loads and enerators are monitored by
the relay and as per the
allowable load limit, this relay sends command for shedding.
Different proposed islanding scheme:-
Islanding Scheme:-
Bus-1:- IB (1,3), AT1&2, Korba-2, Bhusan-(1,2), SPS
Bus-2:- IB (2,4), Vedanta(1,2), Korba-3,Katapali (1,2)
Tarkera(1,2), Raigarh
89
VAL (CPP in Orissa
system)
VAL is a captive power plant having generation of 9 x 135 MW
and connected to the grid at 220 kV level via 220 kV VAL-
Budhipadar D/C line. It has a facility to island itself from grid in
case of any sever disturbance in grid
Under
frequency
48.5Hz
Rate of fall of
frequency 1.2
Hz/Sec 0.2 Sec
delay.
Under
frequency 48.0
Hz 0.5 Sec
delay.
Bokaro steel
ltd.(DVC)
Get islanded with 180MW load along with its captive
generation
Under
frequency 47.5
Hz
Eastern Region -Proposed islanding schemes
Station/System Islanding scheme (LOAD) Criteria
FSTPP Following loads are considered for islanding of one unit of Farakka Kahalgaon, Sabour, Banka, Sultangunj, Lalmatia, Dumka, sahebgunj with total load of 147MW.
Under frequency 47.6Hz
Bakreswar TPS Following loads are considered for islanding of one unit of Bakreshwar TPS Bakreshwar, satgachia, Kanaya, Gokarn, Raghunathpur, Lalgola, Katwa with total load 335MW
Under frequency 47.6Hz
Bandel Following loads are considered for islanding of one unit of Bandel TPS Plant load, Adisaptgram (118Mw)
Under frequency 47.6Hz
MPL Load near Maithon and Kalyaneshwari Under frequency 47.6Hz
KhSTPP Load at Plant load, Biharshariff Under frequency 47.6Hz
TSTPP Load at Talcher and Meeramandali Under frequency 47.6Hz
Kolaghat TPS Load at Kolaghat, Tamluk, Uluberia, Domjur, Jangipara Under frequency 47.6Hz
DSTPS Plant load and Load near Jamshedpur, Ramchandrapur, Adityapur, Chandil
Under frequency 47.6Hz
90
EXHIBIT 3
AUTOMATED DEFENCE PLAN FOR WESTERN REGION
91
Annex-3.1- Automatic Defence Plan summary for Secure Operation of grids……..Western Region
Gujarat System
S No Logic Control Action
Manual or Automatic
Measurements as input for control
action (Local / Wide Area)
Control Action (Local / Wide Area)
Remarks
WESTER
N R
EGIO
N-G
UJA
RA
T
1 ∆ P > 150 MW ∆ P = Actual-Schd and freq < 50 Hz
Shed load in Gujarat in identified groups each group constituting 150 MW or 12% of schedule. Rotation logic and sequence to be programmed at SLDC and RLDC PLCs
Stage 1 : Manual Stage 2 : Automatic (From SLDC PLC after 15 minutes) Stage 3 : Backup (from WRLDC PLC after 20 minutes)
Wide Area : Schedules & Drawal from SCADA system at LDCs
signal sent from LDC to selected 220/132/66 kV substations for tripping of feeders to get desired relief
The feeders list is given in Annex 3.C. The confirmation for the feeder & grouping need to be finalized.
2 ∆ P < -150 MW ∆ P = Actual-Schd and freq> 50 Hz
Send signal to designated power stations A-E. Rotation logic and sequence to be programmed at SLDC and WRLDC PLC
Stage 1 : Manual Stage 2 : Automatic (From SLDC PLC 15 minutes) Stage 3 : Backup (from WRLDC PLC in 25 minutes)
Wide Area: Schedules & Drawal from SCADA system at LDCs. UNDERDRAWALS AND OVER INJECTIONS
Wide Area: signal sent from LDCs/WRLDC to power stations
Power station A: Vadinar(1200) Power station B: ADANI(4260) Power Station C: Wanakbori(1470) Power Station D:Torrent(1637) Power Station E: Ukai,SLPP, Kutch,Akri, Sikka(1640) Total capacity:10207 MW@ The power stations can either wire the same for unit tripping or generation reduction through secondary control.
3 Voltage <200 kV at sub-station for more than 5 minutes
Shed load at the selected 220 kV sub-stations identified in S no 1 above.
Stage 1: Alarm (208 kV) Stage 2: Automatic (200 kV for more than 5 minutes) Stage 3: 185 kV 30 seconds
Local area: Bus voltage Measurement at the selected 220 kV substations
Local area:
Under Voltage Load Shedding (UVLS). NO SCHEM Exist As of now. UVLS relays required one each at the 220 kV sub-stations identified at S no. 1 above. Scheme proposed at Jetpur
4** ICT / line
loading
crossing
normal
operating
limits
Shed load in designated areas
Stage-1: Manual (SLDC level) Stage-2; Automatic through PLC
Local area: 400 kV Hadala - Jetpur flow exceeding 500 MW towards Jetpur
Wide Area : Signal sent fromJetpur to 220 kV Jetpur and 400 kV Essar(Vadinar)
Identify 132 kV and 66 KVfeeders atJetpur substation. Reduce gen at Essar(Vadinar)
Shed load in designated areas
Stage-1: Manual (SLDC level) Stage-2; Automatic through PLC
Local area: 400 kV SSP-Asoj/Kasor flow exceeding 500 MW each circuit towards Asoj/Kasor
Wide Area : Signal sent from Asoj to 132 kV Asoj and Gotri substations
Identify 132 kV and 66 KV feeders each at Asojr and Gotri substations. Note: GETCO already has SPS for Overloading of Adani-Sami-Dehgam, Adani-Versana/Hadala and tripping of Mundra-M’garh HVDC.
5 Flows crossing TTC and ∆ P > 100 MW
Load Shed down stream
Automatic Local area: No of measurement aggregate in LDC SCADA
Wide Area: Signal sent from LDC to many areas in the state
92
6 Sudden loss of generation > 1000 MW or loss of high capacity corridor
Loss of high capacity corridors
Automatic Local area: measurement at CGPL s/s for Change of 1000 MW on sum of lineflows on Bachhau, Chorania and Jepur lines.
Wide Area: Trip feeders in Gujarat and Maharashtra as per share allocation
WESTER
N R
EGIO
N-G
UJA
RA
T
7 Angular difference exceeding cut off value
Load Shed in designated area
Automatic
Wide Area Synchrophasor measurements at RLDC/SLDC
Wide Area: Signal sent to 220/132/11kV SS
V'chal-Asoj
8 UFR I: 49.0 Hz UFR 2: 48.8 Hz UFR3: 48.6 Hz UFR4: 48.4 Hz
Gujarat Peak Load: 12000 MW UFR to cover at least 60% or 7200 MW. i.e. 65x220 KV Substations.
Automatic Local Local 49.0 Hz : 14 Substations: 1540 MW 48.8 Hz: 17 Substations: 1870 MW 48.6 Hz : 17 Substations: 1870 MW 48.4 Hz : 17 Substations: 1870 MW
9 Df/dt: 49.9 Hz plus 0.1, 0.2 Hz/sec
designated feeder in each control area.
Automatic Local Local UFR 4 of Sl No. 8
10 Islanding at 47.9 Hz
Power stations, Loads Automatic Local Local Please refer Annex 3.B
** Separate sheet for lines not associated with any state but trunk line. 1) Telemetery of all feeders a must. 2) Reset command from control centre for restoration 3) Ability to select any combination of sub-stations at LDC PLC 4) Detailed logic at PLC level; audit trail for change in logic by authorised users (5) Master server or PLCs for archiving, logs etc. (6) For UFR, UVLS station EL should be provided.
93
Annex 3.2- Automatic Defence Plan summary for Secure Operation of grids……..Western Region
Chattisgarh System
S No
Logic Control Action
Manual or Automatic
Measurements as input for control
action (Local / Wide Area)
Control Action (Local / Wide Area)
Remarks
WESTER
N R
EGIO
N-C
HA
TTISGA
RH
1 ∆ P > 150 MW ∆ P = Actual-Schd and freq < 50 Hz
Shed load in Chattisgarh in identified groups, each group constituting 150 MW or 12% of schedule. Rotation logic and sequence to be programmed at SLDC and RLDC PLCs
Stage 1 : Manual Stage 2 : Automatic (From SLDC PLC after 15 minutes) Stage 3 : Backup (from WRLDC PLC after 20 minutes)
Wide Area : Schedules & Drawal from SCADA system at LDCs
signal sent from LDC to selected 220/132/66 kV substations for tripping of feeders to get desired relief
The feeders list is given in Annex 3.D. The confirmation for the feeder & grouping need to be finalized.
2 ∆ P < -150 MW ∆ P = Actual-Schd and freq> 50 Hz
Send signal to designated power stations A-C Rotation logic and sequence to be programmed at SLDC and WRLDC PLC
Stage 1 : Manual Stage 2 : Automatic (From SLDC PLC 15 minutes) Stage 3 : Backup (from WRLDC PLC in 25 minutes)
Wide Area : Schedules &Drawal from SCADA system at LDCs. UNDERDRAWALS AND OVER INJECTIONS
Wide Area: signal sent from LDCs/WRLDC to power stations
Power station A: Korba(east) (440MW) Power station B: Korba(East-ext)(500) Power Station C: Korba(west)(840) Total capacity:1780MW The power stations can either wire the same for unit tripping or generation reduction through secondary control.
3 Voltage <200 kV at sub-station for more than 5 minutes
Shed load at the selected 220 kV sub-stations identified in S no 1 above.
Stage 1: Alarm (208 kV) Stage 2: Automatic (200 kV for more than 5 minutes) Stage 3: 185 kV 30 seconds
Local area: Bus voltage Measurement at the selected 220 kV substations
Local area:
Under Voltage Load Shedding (UVLS). Exist at Indore 400 kV __UVLS relays required one each at the 220 kV sub-stations identified at S. no. 1 above.
4**
ICT / line loading crossing normal
operating limits
Reduce Generationat designated power stations
Stage-1: Manual (SLDC level) Stage-2; Automatic through PLC
Local area: 220 kV Korba(W)-Kotmikla D/C exceeds 180MW each
Wide Area: Signal sent from Korba(w) to Gen stns at 220 kV and 400 kVKorba(W)
Reduce generation by 100MW each at 220 kV and 400 kV generating stations at Korba(W)
Reduce Generation at designated power stations
Stage-1: Manual (SLDC level) Stage-2; Automatic through PLC
Local area: 220 kV Korba(E)-RaigarhS/C exceeds 180MW OR 220 kV Raigarh-Raigarh D/C exceeds 180MW each
Wide Area: Signal sent from Raigarh to Gen stns at Korba(E), JSPCL(C’garh control area), DSPM, BALCO(C’garh control area)
Reduce generation by 100MW each at Korba(E), DSPM JSPCL and BALCO
94
5 Flows crossing TTC and ∆ P > 100 MW
Load Shed down stream Automatic Local area: No of measurement aggregate in LDC SCADA
Wide Area: Signal sent from LDC to many areas in the stte
WESTER
N R
EGIO
N-G
UJA
RA
T 6 Sudden loss of
generation > 1000 MW or loss of high capacity corridor
7 Angular difference exceeding cut off value
Load Shed in designated area Automatic
Wide Area Synchrophasor measurements at RLDC/SLDC
Wide Area: Signal sent to 220/132/11kV SS
Sipat-Indore
8 UFR I: 49.0 Hz UFR 2: 48.8 Hz UFR3: 48.6 Hz UFR4: 48.4 Hz
Chhatisgarh Peak Load: 3300 MW UFR to cover at least 60% or 1980 MW. i.e 18x220 KV Substations.
Automatic Local Local 49.0 Hz : 3 Substations: 330 MW 48.8 Hz: 5 Substations: 550 MW 48.6 Hz : 5 Substations: 550 MW 48.4 Hz : 5 Substations: 550 MW
9 Df/dt: 49.9 Hz plus 0.1, 0.2 Hz/sec
designated feeder in each control area.
Automatic Local Local UFR 4 of Sl No. 8
10 Islanding at 47.9 Hz
Power stations, Loads Automatic Local Local Please refer Annex 3.B
** Separate sheet for lines not associated with any state but trunk line. 1) Telemetery of all feeders a must. 2) Reset command from control centre for restoration 3) Ability to select any combination of sub-stations at LDC PLC 4) Detailed logic at PLC level; audit trail for change in logic by authorised users (5) Master server or PLCs for archiving, logs etc. (6) For UFR, UVLS station EL should be provided.
95
Annex 3.3- Automatic Defence Plan summary for Secure Operation of grids……..Western Region
Maharastra System
S No
Logic Control Action
Manual or Automatic Measurements as input
for control action (Local / Wide Area)
Control Action (Local / Wide Area)
Remarks
WESTER
N R
EGIO
N-M
AH
AR
ASTR
A
1 ∆ P > 150 MW ∆ P = Actual-Schd and freq < 50 Hz
Shed load in in identified groups, each group constituting 150 MW or 12% of schedule. Rotation logic and sequence to be programmed at SLDC and RLDC PLCs
Stage 1 : Manual Stage 2 : Automatic (From SLDC PLC after 15 minutes) Stage 3 : Backup (from WRLDC PLC after 20 minutes)
Wide Area : Schedules & Drawal from SCADA system at LDCs
signal sent from LDC to selected 220/132/66 kV substations for tripping of feeders to get desired relief
The feeders list is given in Annex 3.E. The confirmation for the feeder & grouping need to be finalized.
2 ∆ P < -150 MW ∆ P = Actual-Schd and freq> 50 Hz
Send signal to designated power stations A-E. Rotation logic and sequence to be programmed at SLDC and WRLDC PLC
Stage 1 : Manual Stage 2 : Automatic (From SLDC PLC 15 minutes) Stage 3 : Backup (from WRLDC PLC in 25 minutes)
Wide Area : Schedules &Drawal from SCADA system at LDCs. UNDERDRAWALS AND OVER INJECTIONS
Wide Area: signal sent from LDCs/WRLDC to power stations
Power station A: Nasik, Bhusawal(1570MW) Power station B: Paras,Parali(1630) Power Station C: C;pur(2340) Power Station D: K’kheda(1480) Power Station E@: Uran, Trombay, Dahanu(, JSW(3802) Total capacity:10822MW The power stations can either wire the same for unit tripping or generation reduction through secondary control.
3 Voltage <200 kV at sub-station for more than 5 minutes
Shed load at the selected 220 kV sub-stations identified in S no 1 above.
Stage 1: Alarm (208 kV) Stage 2: Automatic (200 kV for more than 5 minutes) Stage 3: 185 kV 30 seconds
Local area: Bus voltage Measurement at the selected 220 kV substations
Local area:
Under Voltage Load Shedding (UVLS). NO SCHEM Exist As of now. UVLS relays required one each at the 220 kV sub-stations identified at S no. 1 above. Scheme is proposed at 400 kV Karad
4**
ICT / line loading crossing normal operating limits
Shed load in designated areas
Stage-1: Manual (SLDC level) Stage-2; Automatic through PLC
Local area: 400 kV Parli-Lonikhand flow exceeding 500 MW each circuit towards Lonikhand
Wide Area : Signal sent from lonikhand to 220 kV Theur and Bhosari substations
Identify 132 kV and 22 KV feeders each at Theur and Bhosari substations. Note: MSETCL already has intertripping schemes for overloading of Padgha, Aurangabad, Babheleshwar, Lonikhand, Parli, Kalwa, Jejuri and Chakan 400/220 kV ICTs.
5 Flows crossing TTC and ∆ P > 100 MW
Load Shed down stream Automatic Local area: No of measurement aggregate in LDC SCADA
Wide Area: Signal sent from LDC to many areas in the stte
96
6 Sudden loss of generation > 1000 MW or loss of high capacity corridor
Loss of high capacity corridors
Automatic Local area: measurement at Khandwa S/S for Change of 1000 MW on Seoni-Khandwa D/C or Khandwa-Dhule D/C
Wide Area: In case of Seoni-KhndwaD/C trip feeders in MP near Nepanagar, Julwania,Nimrani,Chhegaon In case of either of the trippings trip feeders in Dhule,Malegaon,chalisgaon,Padghe areas
WESTER
N R
EGIO
N-M
AH
AR
ASTR
A
Loss of high capacity corridors
Automatic Local area: measurement at Parli s/s for Change of 1000 MW on parli-Lonikhand D/C
Wide Area: Trip feeders in Lonikhand and Karad areas in Maharashtra
Loss of high capacity corridors
Automatic Local area: measurement at Bhadrawati s/s for Change of 1000 MW on Raipur-Bhadrawati -2&3 or Bhilai-Bhadrawati and Raipur-Bhadrawati-I
Wide Area: Trip feeders in Maharashtra
Loss of high capacity corridors
Automatic Local area: measurement at CGPL s/s for Change of 1000 MW on sum of lineflows on Bachhau, Chorania and Jepur lines.
Wide Area: Trip feeders in Gujarat and Maharashtra as per share allocation
7 Angular difference exceeding cut off value
Load Shed in designated area
Automatic Wide Area Synchrophasor measurements at RLDC/SLDC
Wide Area: Signal sent to 220/132/11kV SS
Korba-Kalwa Gwalior-Dhule
8 UFR I: 49.0 Hz UFR 2: 48.8 Hz UFR3: 48.6 Hz UFR4: 48.4 Hz
Maharashtra Peak Load: 17500 MW UFR to cover at least 60% or 10500 MW. i.e 100x220 KV Substations.
Automatic Local Local 49.0 Hz : 20 Substations: 2200 MW 48.8 Hz: 26 Substations: 2860 MW 48.6 Hz : 27 Substations: 2970 MW 48.4 Hz : 27 Substations: 2970 MW
9 Df/dt: 49.9 Hz plus 0.1, 0.2 Hz/sec
designated feeder in each control area.
Automatic Local Local UFR 4 of Sl No. 8
10 Islanding at 47.9 Hz
Power stations, Loads Automatic Local Local Please refer Annex 3.B
** Separate sheet for lines not associated with any state but trunk line. 1) Telemetery of all feeders a must. 2) Reset command from control centre for restoration 3) Ability to select any combination of sub-stations at LDC PLC 4) Detailed logic at PLC level; audit trail for change in logic by authorised users (5) Master server or PLCs for archiving, logs etc. (6) For UFR, UVLS station EL should be provided.
97
Annex 3.4-Automatic Defence Plan summary for Secure Operation of grids……..Western Region
Madhyapradesh System
S No
Logic Control Action
Manual or Automatic
Measurements as input for control
action (Local / Wide Area)
Control Action (Local / Wide Area)
Remarks W
ESTERN
REG
ION
-MA
DH
YA
PR
AD
ESH
1 ∆ P > 150 MW ∆ P = Actual-Schd and freq < 50 Hz
Shed load in Madhyapradesh in identified groups, each group constituting 150 MW or 12% of schedule. Rotation logic and sequence to be programmed at SLDC and RLDC PLCs
Stage 1 : Manual Stage 2 : Automatic (From SLDC PLC after 15 minutes) Stage 3 : Backup (from WRLDC PLC after 20 minutes)
Wide Area : Schedules & Drawal from SCADA system at LDCs
signal sent from LDC to selected 220/132/66 kV substations for tripping of feeders to get desired relief
The feeders list is given in Annex 3.F. The confirmation for the feeder & grouping need to be finalized.
2 ∆ P < -150 MW ∆ P = Actual-Schd and freq> 50 Hz
Send signal to designated power stations A-C Rotation logic and sequence to be programmed at SLDC and WRLDC PLC
Stage 1 : Manual Stage 2 : Automatic (From SLDC PLC 15 minutes) Stage 3 : Backup (from WRLDC PLC in 25 minutes)
Wide Area : Schedules &Drawal from SCADA system at LDCs. UNDERDRAWALS AND OVER INJECTIONS
Wide Area: signal sent from LDCs/WRLDC to power stations
Power station A: Amarkantak (450MW) Power station B: Satpura(1142) Power Station C: SGTPS(1340) Total capacity:2932MW The power stations can either wire the same for unit tripping or generation reduction through secondary control.
3 Voltage <200 kV at sub-station for more than 5 minutes
Shed load at the selected 220 kV sub-stations identified in S no 1 above.
Stage 1: Alarm (208 kV) Stage 2: Automatic (200 kV for more than 5 minutes) Stage 3: 185 kV 30 seconds
Local area: Bus voltage Measurement at the selected 220 kV substations
Local area:
Under Voltage Load Shedding (UVLS). Exist at Indore 400 kV UVLS relays required one each at the 220 kV sub-stations identified at S no. 1 above. Scheme is proposed at Bhopal, Bina
4**
ICT / line loading crossing normal operating limits
Shed load in designated areas
Stage-1: Manual (SLDC level) Stage-2; Automatic through PLC
Local area: 400/220 kV ICTs at Khandwa exceeds 250MVA each towards 220 KV.
Wide Area : Signal sent from Khandwa to 220 kV Chhegaon, Nepanagar substations
Identify 132 kV and 33KV feeders each at Chhegaon and Nepanagar substations. Note: MPPTCL already has intertripping schemes for overloading of Nagda and Indore 400/220 kV ICTs as intimated by them,.
Shed load in designated areas
Stage-1: Manual (SLDC level) Stage-2; Automatic through PLC
Local area: 220 kV Kotmikla-Amarkantak D/C exceeds 180MW each
Wide Area: Signal sent from Amarkantak to Rewa, Jabalpur, Katni,Kymore,Satna
Designated 132 kV and 33kV feeders to be identified .
98
5 Flows crossing TTC and ∆ P > 100 MW
Load Shed down stream Automatic Local area: No of measurement aggregate in LDC SCADA
Wide Area: Signal sent from LDC to many areas in the stte
To be part of item 1, 2 & 3 (selectable by user depending upon time)
WESTER
N R
EGIO
N- M
AD
HY
AP
RA
DESH
6 Sudden loss of generation > 1000 MW or loss of high capacity corridor
Loss of high capacity corridors
Automatic Local area: measurement at Khandwa S/S for Change of 1000 MW on Seoni-Khandwa D/C or Khandwa-Dhule D/C
Wide Area: In case of Seoni-KhndwaD/C trip feeders in MP near Nepanagar, Julwania,Nimrani,Chhegaon In case of either of the trippings trip feeders in Dhule,Malegaon,chalisgaon,Padghe areas
7 Angular difference exceeding cut off value
Load Shed in designated area
Automatic
Wide Area Synchrophasor measurements at RLDC/SLDC
Wide Area: Signal sent to 220/132/11kV SS
V'chal-Gwalior
8 UFR I: 49.0 Hz UFR 2: 48.8 Hz UFR3: 48.6 Hz UFR4: 48.4 Hz
Madhya Pradesh Peak Load: 8000 MW UFR to cover at least 60% or 4800 MW. i.e 44x220 KV Substations.
Automatic Local Local 49.0 Hz : 9 Substations: 990 MW 48.8 Hz: 11 Substations: 1210 MW 48.6 Hz : 12 Substations: 1320 MW 48.4 Hz : 12 Substations: 1320 MW
9 Df/dt: 49.9 Hz plus 0.1, 0.2 Hz/sec
Designated feeder in each control area.
Automatic Local Local UFR 4 of Sl No. 8
10 Islanding at 47.9 Hz
Power stations, Loads Automatic Local Local Please refer Annex 3.B
** Separate sheet for lines not associated with any state but trunk line. 1) Telemetery of all feeders a must. 2) Reset command from control centre for restoration 3) Ability to select any combination of sub-stations at LDC PLC 4) Detailed logic at PLC level; audit trail for change in logic by authorised users (5) Master server or PLCs for archiving, logs etc. (6) For UFR, UVLS station EL should be provided.
99
Annex 3.A- Regional Level- List of ISGS for generation regulation & line loading crossing
normal operating limits
S No
Logic Control Action Measurements as input for control
action (Local / Wide Area)
Control Action (Local / Wide
Area)
Control Action (Local / Wide Area)
Remarks WESTER
N R
EGIO
N- ISG
S
1 ∆ P < -150 MW ∆ P = Actual-Schd and freq> 50 Hz
Send signal to designated power stations A-E. Rotation logic and sequence to be programmed at SLDC and WRLDC PLC
Stage 1 : Manual Stage 2 : automatic (from WRLDC PLC in 15 minutes)
Wide Area : Schedules &Drawal from SCADA system at LDCs. UNDERDRAWALS AND OVER INJECTIONS
Wide Area: signal sent from LDCs/WRLDC to power stations
Power station A: CGPL(1660) Power station B:KSTPS-I & II(2100),KSTPS-III(500) Power Station C: VSTPS –I, II & III (3260),Power Station D:Sipat-I & II(2980), E:RGPPL(1970); F: Kawas(656), G: Jhanore(657), H: NSPCL(500); I:JPL(1000); J:Lanco(600), K: ACB(135) Total capacity:14018MW The power stations can either wire the same for unit tripping or generation reduction through secondary control.
Line loading crossing the normal operating limits
S No
Logic Control Action Measurements as input for control
action (Local / Wide Area)
Control Action (Local / Wide Area)
Control Action (Local / Wide Area) Remarks WESTER
N R
EGIO
N- K
ey lin
e lo
adin
g
crossin
g limits
1 Bhilai flow gate
Reduce generation at designated power stations and also shed load in designated areas
Stage-1: Manual (SLDC level) Stage-2; Automatic through PLC
Local area: 400 kV Bhilaiflowgate exceeds 3200MW
Wide area: Signal sent from Bhilai to Gen stnsKorba(E), Korba(W), DSPM, LANCO, JPL and load centres Aurangabad,Akola,Wardha,Warora, Seoni, Chhindwara and Khapaswamy
Reduce gen by 50MW each at designated S/S and 132 kV and 33 kV feeders to be identified
2 SUGEN-Vapi
Reduce generation at designated power stations and also shed load in designated areas
Stage-1: Manual (SLDC level) Stage-2; Automatic through PLC
Local area: 400 kV SUGEN-Vapi exceeds 500MW
Wide area: Signal sent from Vapi to SUGEN, Gandhar and to load centres Padghe and Boisar
Reduce gen 100MW at SUGEN and identify loads at 110kV Padghe and 110kV Boisar
100
Annex-3.B WESTERN REGION- Islanding Schemes
Sr No
State Capital Peak Load MW
Nearest Plant +capacity
Links Status
1 Maharashtra
Mumbai 3200 TATA, REL 2200MW
220 kV n/w from Grid at Kalwa/Tromay, Boisar/Borivali
Existing,
2 M.P Bhopal 200 HEG graphite, Satpura 1-5,6,7
220 kV Satpura-Itarasi-Bhopal(150 km)
NA
3 Chhattisgarh
Raipur 150 Nspcl: tech min:170;
bsp:170mw
400 kV nspcl-Raipur D/c, 14 kms
NA
4 Gujarat Ahmedabad 300 Sabarmati(400) Vatwa(100) GIPL-I(145)
Watwa, 15kms Existing
5 Goa Panajim 25MW REL,+GSPL(60) 27 kms NA
101
GUJARAT Load Shed Scheme Annexure-3.C
Sr.No. S/s
Name Feeder
Average Load
Selected for Remote Control
from SCADA
Tele Control
MW 150MW OD
Voltage < IEGC 95%
Line Loading
SIL
Flow 1 above
TTC
Flow 2 above
TTC
Sudden Loss of 1000
Angular Diff
Any Other
1 1 ASEDA 4
Noa Available / To be
implemented Yes Yes Yes No Yes Yes No No
2 2 DUNAVADA 10 No No Yes Yes No No Yes No
3 3 Hajipur 19 No No Yes Yes No No Yes Yes
4 4 KALANA 6 No No Yes Yes No No Yes No
5 5 Katosan 13 No Yes Yes No No No Yes Yes
6 6 Akhaj 6 No No Yes Yes No No Yes No
7 7 AMBAJI 4 No No Yes Yes No No Yes Yes
8 8 AMIRGADH 10
9 9 Amodra 12
10 10 ANAVADA 27
11 11 Balodhar 8
12 12 BHADRADA 9
13 13 BHALAK 6
14 14 Chadarni 10
15 15 CHANDISAR 22
16 16 CHARADA 7
17 17 DAHISAR 4
18 18 Dalpur 14
19 19 DANTA 27
20 20 Dantod 12
21 21 DASAJ 4
22 22 Debhari 2
23 23 Dethrota 9
24 24 dholka City 13
25 25 Gadhi 4
26 26 GANGVA 27
102
GUJARAT Load Shed Scheme Annexure-3.C
Sr.No. S/s
Name Feeder
Average Load
Selected for Remote Control
from SCADA
Tele Control
MW 150MW OD
Voltage < IEGC 95%
Line Loading
SIL
Flow 1 above
TTC
Flow 2 above
TTC
Sudden Loss of 1000
Angular Diff
Any Other
27 27 GIDASAN 13
28 28 Golvada 3
29 29 HEBATPUR 16
30 30 Hingtiya 11
31 31 HIRPURA 5
32 32 HPCL ( PRIVATE) 3
33 33 Ingoli 7
34 34 IQBALGADH 13
35 35 Itla 8
36 36 JALOTRA 27
37 37 JANGRAL 15
38 38 Kalidungari 5
39 39 KALYANA 6
40 40 KAMBOI 5
41 41 Kasana 3
42 42 Kerala 14
43 43 KHANPUR 11
44 44 Khatraj 8
45 45 Kherva 12
46 46 KHIMANA 11
47 47 KIMBUVA 15
48 48 Koth 14
49 49 Kundla 6
50 50 LADOL 5
51 51 Lai-ranasan 21
52 52 MAHARAJA CEMENT 4
53 53 Makadchampa 8
54 54 MALAN 7
55 55 Malpur 22
56 56 MANDALI 10
103
GUJARAT Load Shed Scheme Annexure-3.C
Sr.No. S/s
Name Feeder
Average Load
Selected for Remote Control
from SCADA
Tele Control
MW 150MW OD
Voltage < IEGC 95%
Line Loading
SIL
Flow 1 above
TTC
Flow 2 above
TTC
Sudden Loss of 1000
Angular Diff
Any Other
57 57 Medha 7
58 58 Meghraj 23
59 59 Moti adraj 10
60 60 Mudarda 4
61 61 MUJPUR 4
62 62 Munpur 5
63 63 NAVA SUDASANA 3
64 64 Nikoda 15
65 65 OTALPUR 3
66 66 PALNPUR 2 9
67 67 Pansar 11
68 68 Poshina 2
69 69 Punsari 2
70 70 RAJPUR 8
71 71 Ramgadhi 2
72 72 RAMPUR 2
73 73 RASANA 1
74 74 RASULPUR 3
75 75 Rellawada 10
76 76 Sadara 4
77 77 SAMMDHI 12
78 78 SAMSERPURA 28
79 79 SATLASANA 20
80 80 SHANKHESWAR 6
81 81 Simej 8
82 82 Sinawada 8
83 83 soni 15
84 84 Sundarpur 8
85 85 Tharad 18
86 86 Udalpur 10
87 87 Unava 3
104
GUJARAT Load Shed Scheme Annexure-3.C
Sr.No. S/s
Name Feeder
Average Load
Selected for Remote Control
from SCADA
Tele Control
MW 150MW OD
Voltage < IEGC 95%
Line Loading
SIL
Flow 1 above
TTC
Flow 2 above
TTC
Sudden Loss of 1000
Angular Diff
Any Other
88 88 VADASAN 4
89 89 VAKTAPURA 5
90 90 VALAM 6
91 91 VARAHI 7
92 92 VARETHA 12
93 93 Vasai(m) 9
94 94 VASAN 3
95 95 Veda 11
96 96 Vijaynagar 3
97 97 VIRAMPUR 2
98 98 Virpur 6
99 99 Didarada 6
100 100 Dudhava 7
101 101 Jaloya 4
102 102 Piluda 18
103 103 Runi 6
104 104 Tadav 4
105 105 BHAT 7
106 106 Chuda 23
107 107 dama 8
108 108 KAMALPUR 5
109 109 KANJ 6
110 110 KUHA 5
111 111 PATDI 9
112 112 Ranpur 15
113 113 Torda 16
114 114 VADGAM 7
115 115 VANOD 5
116 116 66 KV Jasdan-II(Gadhadiya)
8
117 117 66 KV Sultanpur 7
105
GUJARAT Load Shed Scheme Annexure-3.C
Sr.No. S/s
Name Feeder
Average Load
Selected for Remote Control
from SCADA
Tele Control
MW 150MW OD
Voltage < IEGC 95%
Line Loading
SIL
Flow 1 above
TTC
Flow 2 above
TTC
Sudden Loss of 1000
Angular Diff
Any Other
118 118 66 KV Ramod 9
119 119 66 KV Mota Devaliya
8
120 120 66 KV Umrali 5
121 121 66 KV Jamwadi 8
122 122 66 KV Faldang 6
123 123 66 KV Virnagar 4
124 124 66 KV Bhadala 2
125 125 66 KV Lajai 6
126 126 66 KV Chanchapar 3
127 127 66 KV Vejalpar 1
128 128 66 KV GHUTU 6
129 129 66 KV KALIKANAGAR
7
130 130 66 KV Ravapar 1
131 131 66 KV Kagdadi 1
132 132 66 KV Kuvadava 7
133 133 66 KV Mavadi 4
134 134 66 KV NAGARPIPALIYA
3
135 135 66 KV Bangawadi 4
136 136 66 KV Limbada 5
137 137 66 KV Sindhavadar 2
138 138 66 KV Thikariyali 3
139 139 66 KV Khengarka 6
140 140 66 KV Bhojpara 6
141 141 66 KV Daldi 3
142 142 66 KV Lakaddhar 3
143 143 66 KV Mokha 6
144 144 66 KV Khambhara 8
145 145 66 KV Siracha 8
146 146 66 KV Talwana 4
147 147 66 KV Dumra 8
106
GUJARAT Load Shed Scheme Annexure-3.C
Sr.No. S/s
Name Feeder
Average Load
Selected for Remote Control
from SCADA
Tele Control
MW 150MW OD
Voltage < IEGC 95%
Line Loading
SIL
Flow 1 above
TTC
Flow 2 above
TTC
Sudden Loss of 1000
Angular Diff
Any Other
148 148 66 KV Nirona 3
149 149 66 KV Nanimau 5
150 150 66 KV VAGHOT 1
151 151 66 KV Balasar 3
152 152 66 KV Amrapar 2
153 153 66 KV Gundaran 2
154 154 66 KV Simran 7
155 155 66 KV Gawadaka 7
156 156 66 KV Malaviya Pipariya
5
157 157 66 KV Khambhala 5
158 158 66 KV Tori 6
159 159 66 KV Kalatalav 6
160 160 66 KV Ratanpur 7
161 161 66 KV Dharwala 8
162 162 66 KV Malapara 7
163 163 66 KV Chavnd 3
164 164 66 KV Datha 6
165 165 66 KV Pasvi 5
166 166 66 KV Kadamgiri 4
167 167 66 KV Dungar 9
168 168 66 KV Otha 5
169 169 66 KV Vangar 2
170 170 66 KV Kadiyali 3
171 171 66 KV Gadhakada 4
172 172 66 KV Devala 4
173 173 66 KV Rabarika 4
174 174 66 KV Ghodidhar 6
175 175 66 KV Sardarnagar 6
176 176 66 KV Moti Dharai 1
177 177 66 KV Panvi 6
107
GUJARAT Load Shed Scheme Annexure-3.C
Sr.No. S/s
Name Feeder
Average Load
Selected for Remote Control
from SCADA
Tele Control
MW 150MW OD
Voltage < IEGC 95%
Line Loading
SIL
Flow 1 above
TTC
Flow 2 above
TTC
Sudden Loss of 1000
Angular Diff
Any Other
178 178 66 KV Sar 9
179 179 66 KV Nathugadh 4
180 180 66 KV Kolki 5
181 181 66 KV Shethvadala 5
182 182 66 KV Raydi 6
183 183 66 KV Moti Paneli 2
184 184 66 KV Mandasan 5
185 185 66 KV Navi Haliyad 9
186 186 66 KV Khambhaliya 5
187 187 66 KV Vekariya 6
188 188 66 KV Mendapara 7
189 189 66 KV Vadala 0
190 190 66 KV Amarapur 6
191 191 66 KV Ishra 3
192 192 66 KV Alidar 7
193 193 66 KV Jashadhar 6
194 194 66 KV Singsar[Lodhva]
7
195 195 66 KV Sindhaj 6
196 196 66 KV Agatray 8
197 197 66 KV Patrama 2
198 198 66 KV Navagam 1
199 199 66 KV Lath 1
200 200 66 KV Nanadiya 3
201 201 66 KV Bhader 1
202 202 66 KV Wadhwan 7
203 203 66 KV Digsar 7
204 204 66 KV Dholia 9
205 205 66 KV Umarda 7
206 206 66 KV Lakhanka 6
207 207 66 KV Panshina 3
108
GUJARAT Load Shed Scheme Annexure-3.C
Sr.No. S/s
Name Feeder
Average Load
Selected for Remote Control
from SCADA
Tele Control
MW 150MW OD
Voltage < IEGC 95%
Line Loading
SIL
Flow 1 above
TTC
Flow 2 above
TTC
Sudden Loss of 1000
Angular Diff
Any Other
208 208 66 KV Moti vavdi 7
209 209 66 KV VASTADI 4
210 210 66 KV DHOLERA 4
211 211 66 KV Bavli 10
212 212 66 KV Narali 7
213 213 66 KV Chandragadh
9
214 214 66 KV Baisabgadh 2
215 215 66 KV Gurukul 4
216 216 66 KV Virpur 6
217 217 66 KV Dhavana 6
218 218 66 KV Vanod 2
219 219 66 KV Kamalpur 3
220 220 66 KV PIPALI 9
221 221 66 KV PIPARTODA 7
222 222 66 KV NAVAGAM 5
223 223 66 KV Morkanda 7
224 224 66 KV Nagajar 9
225 225 66 KV Bhadukiya 5
226 226 66 KV Shapar 6
227 227 66 KV Beraja 4
228 228 66 KV Motavadala 4
229 229 66 KV Meghpar 7
230 230 66 KV Babarzar 3
231 231 66 KV Gorana 8
232 232 66 KV Modpar 5
233 233 66 KV Kanchapur 3
234 234 66 KV Gosa 2
235 235 66 KV Khageshri 8
236 236 66 KV Chhaya 3
237 237 66 KV Ramgadh 5
109
GUJARAT Load Shed Scheme Annexure-3.C
Sr.No. S/s
Name Feeder
Average Load
Selected for Remote Control
from SCADA
Tele Control
MW 150MW OD
Voltage < IEGC 95%
Line Loading
SIL
Flow 1 above
TTC
Flow 2 above
TTC
Sudden Loss of 1000
Angular Diff
Any Other
238 238 66 KV Vanavad 3
239 239 66 KV Ambarama 6
240 240 66 KV Modpar 4
241 241 66 KV Bakharala 5
242 242
66KV BHACHHARWADA S/S 4
243 243 66KV BORDA 0
244 244 66KV DAHELI S/S 4
245 245 66KV DEDIAPADA 2
246 246 66KV NETRANG 9
247 247 66KV SADARAPANI S/S 1
248 248 66KV SAGBARA 3
249 249 220KV DAHEJ S/S 7
250 250 66KV HANSOT S/S 2
251 251 66KV KADOD 4
252 252 66KV MULLER S/S 2
253 253 66KV PALEJ 15
254 254 66KV PANETHA S/S 6
255 255 66KV ZANOR S/S 6
256 256 220KV MORA(L&T) 0
257 257 66KV JIAV 5
258 258 66KV KOSAD 4
259 259 66KV KOSMADA 2
260 260 66KV OLPAD 12
261 261 66KV SARTHANA 11
262 262 66KV ARETH 4
263 263 66KV KARANJ 14
264 264 66KV SIVAN 4
265 265 66KV TARSADI (KHARACH) S/S 9
110
GUJARAT Load Shed Scheme Annexure-3.C
Sr.No. S/s
Name Feeder
Average Load
Selected for Remote Control
from SCADA
Tele Control
MW 150MW OD
Voltage < IEGC 95%
Line Loading
SIL
Flow 1 above
TTC
Flow 2 above
TTC
Sudden Loss of 1000
Angular Diff
Any Other
266 266 66 KV AHWA S/S 2
267 267 66 KV DHARAMPUR S/S 9
268 268 66 KV FADVEL S/S 4
269 269 66 KV KAKADKOPAR S/S 4
270 270 66 KV KAPRADA S/S 2
271 271 66 KV KHERGAM S/S 7
272 272 66 KV NAVSARI CITY S/S 3
273 273 66 KV VANSDA S/S 5
274 274 66 KV WAGHAI S/S 3
275 275 VALSAD CITY S.S. 9
276 276 66KV BAMANIYA 6
277 277 66KV NIZER 11
278 278 66KV RUMKITALAV 0
279 279 66KV SHAMPURA 3
280 280 66KV UCHCHHAL 4
111
CHHATISHGARH Load Shed Scheme Annexure-3.D
Sr.No. S/s Name Feeder Average
Load Selected for Remote Control from SCADA
Tele Control
MW
150MW OD
Voltage < IEGC 95%
Line Loading
SIL
Flow 1
above TTC
Flow 2 above
TTC
Sudden Loss of 1000
Angular Diff
Any Other
RAIGARH
1 220 kV Rajgarh 33 kV Sarangarh-I Feeder 10.7 Noa Available / To be
implemented No No Yes Yes No No Yes Yes
2 132 kV Raigarh 33 kV Sarangarh -II
Feeder 10.8 No No Yes Yes No No Yes No
3 132 Sarangarh 33 kV Saraipali Feeder 4.5 No Yes Yes No No No Yes Yes
4 33 kV Sarangarh Feeder 9.7 Yes Yes Yes No Yes Yes No No
5 33 kV Baramkela Feeder 8.4 No No Yes Yes No No Yes No
6 33 kV Sarsiwa Feeder 10.1 Yes Yes Yes No Yes Yes No No
7 132 Baramkela 33 kV Baramkela Feeder 5.8
8 33 kV Salheona Feeder 6.9
9 33 kV Saria Feeder 11.8
10 33 kV Lendhra Feeder 4.9
11 132 kV Kharsiya 33 kV Nandeli Feeder 0
12 33 kV Chaple Feeder 4.4
13 33 kV Madanpur Feeder 5.2
14 33 kV Bhelwadih Feeder 0.5
15 132 kV Patthal
Gaon 33 kV Parshabahar
Feeder 3.2
16 33 kV Jashpur Feeder 3.5
17 33 kV Seetapur Feeder 4
18 33 kV Dharamjaygarh
Feeder 7.6
19 33 kV Lailunga Feeder 1.1
MAHASAMUND
20 132kV
Mahasamund 33 kV Arang Feeder 9.4
21 33 kV Rajim Feeder 12.2
22 33 kV Bagbahra Feeder 11.3
23 33 kV Fingeshwar Feeder 10.3
24 220 kV Paraswani 33 kV Patewa Feeder 6.8
25 33 kV Sirpur Feeder 0.9
26 132 kV Jhalap 33 kV Jhalap Feeder 6.4
27 33 kV Pithora Feeder 11
28 33 kV Raitham Feeder 1.9
29 33 kV Bawankera Feeder 8.1
30 132 Saraipali 33 kV Basana Feeder (1) 11.3
31 33 kV Basana Feeder (2) 10.2
112
CHHATISHGARH Load Shed Scheme Annexure-3.D
Sr.No. S/s Name Feeder Average
Load Selected for Remote Control from SCADA
Tele Control
MW
150MW OD
Voltage < IEGC 95%
Line Loading
SIL
Flow 1
above TTC
Flow 2 above
TTC
Sudden Loss of 1000
Angular Diff
Any Other
32 33 kV Sagarpali Feeder 2.5
33 33 kV Navarangpur
Feeder 12.9
34 33 kV Baloda Feeder 4.6
35 132 KV Bagbahra 33 kV Sunsuriya Feeder 1.8
36 33 kV Temari Feeder 0
CHAMPA CIR
37 132 kV Champa 33 kV Bamhinidih 8.1
38 33 kV Urga Feeder 7.3
39 33 kV Shakti Feeder 3
40 33 kV Kharsiya Feeder 5.9
41 220 kV Banari 33 kV Nawagarh 7.9
42 132 kV S/S Darri 33 kV Katghora (Rural) 4.7
43 132 kV S/S Shakti 33 kV Adhabhar Feeder 7.9
44 33 kV Malkharoda
Feeder-I 8
45 33 kV Malakharoda
Feeder-II 9
46 33 kV Faguram Feeder-1 0
47 33 kV Faguram Feeder -2 1.4
48 33 kV Nadehibhatta
Feeder 2.5
49 132 kV Akaltara 33 kV Baloda Bazar 7.7
50 33 kV Shivrinarayan 8.5
51 33 kV Akaltara 2 2.7
DURG
52 132 Kv Bhiali 33 kV Neonara 5.8
53 33 kV Patan 7.9
54 220 kV Curur 33 kV Balod 4.7
55 33 kV Pallari 1.8
56 33 kV Nipani 1.2
57 132 kV Dhamadha 33 kV Dhamadha 1.8
58 33kV Nankatti 2.1
59 33 kV Dalgaon 3.7
60 33 kV Saja 3.5
61 33 kV Parpodi 5.7
62 33 kV Liliya 2.9
63 132 kV Dalliraj 33 kV Mohala Feeder 4.1
113
CHHATISHGARH Load Shed Scheme Annexure-3.D
Sr.No. S/s Name Feeder Average
Load Selected for Remote Control from SCADA
Tele Control
MW
150MW OD
Voltage < IEGC 95%
Line Loading
SIL
Flow 1
above TTC
Flow 2 above
TTC
Sudden Loss of 1000
Angular Diff
Any Other
64 33 kV Bhantipratappur 9.5
65 33 kV Bald Feeder 3.9
66 132 kV Gunderdehi 33 kV Gunderdehi Feeder
67 33 kV Reeva Gahan
Feeder 4.6
68 33 kV Sikosha Feeder 3.1
69 33 kV Arjunda Feeder 1.3
70 132 kV Nawagarh 33 kV Nawagarh Feeder 4.2
71 33 kV Chhiraha Feeder 3.5
72 33 kV Sambalpur Feeder 3.9
73 132 kV Saja 33 kV Thelka Feeder 2.9
74 33 kV Bortara Feeder 0.8
75 33 kV Mohgaon Feeder 3.5
76 132 kV Bemetara 33 kV Matka Feeder 2.7
77 33 kV Bemetara Rural
Feeder 2.8
78 33 kV Sarada Feeder 2.2
BILASPUR
79 132 kV S/S Silpahri 33 kV Malhar 5.8
80 33 kV Bartori 3
81 132 kV S/S Bilaspur 33 kV Akaltara 6.3
82 33 kV Takhatpur 7.3
83 33 kV Belgahana 7.8
84 33 kV Kota 9.3
85 132 kV S/S Mungeli 33 kV Lormi 10.8
86 33 kV Pathariya 6.8
87 33 kV Takhatpur 6.2
88 33 kV Fasterpur 0
89 220 kV S/S Kotmikala 33 kV Kotmikala 1.5
90 33 kV Marwahi 1.5
91 33 kV Gaurela 5.6
92 33 kV Rani Atari 0.4
93 33 kV Pendra 4
94 132 kV
Rajnandgaon 33 kV Padpori 4.8
95 132 kV Kawardha 33 kV Pipariya Feeder 6
96 33 kV Bodla Feeder 10.1
114
CHHATISHGARH Load Shed Scheme Annexure-3.D
Sr.No. S/s Name Feeder Average
Load Selected for Remote Control from SCADA
Tele Control
MW
150MW OD
Voltage < IEGC 95%
Line Loading
SIL
Flow 1
above TTC
Flow 2 above
TTC
Sudden Loss of 1000
Angular Diff
Any Other
97 33 kV Ruse Feeder 6.6
98 33 kV Indori Feeder 2.8
99 33 kV Lohara Feeder 4.6
100 33 kV Ramhepur Feeder 0.1
101 132 kV
Donagargarh 33 kV Tumdibod 1.5
102 220 kV Thelkadih 33 kV Khairagarh 5.7
103 33 kV Chumka 2.2
115
MAHARASTRA Load Shed Scheme Annexure-3.E
Sr.No.
S/s Name Feeder Avera
ge Load
Selected for Remote Control
from SCADA
Tele Control
MW
150MW OD
Voltage < IEGC 95%
Line Loading
SIL
Flow 1
above TTC
Flow 2
above TTC
Sudden Loss of 1000
Angular Diff
Any Other
Kalwa Zone
1 400KV Kalwa2 Nil No No Yes Yes No No Yes No
2 220KV Kalwa1 220/22KV (50 MVA)LTR1 27 NO No Yes Yes No No No Yes Yes
3 220/22KV (50 MVA)LTR2 28 NO No No Yes Yes No No Yes No
4 100KVMukund A 37 NO No Yes Yes No No No Yes Yes
5 100KVMukund B 36 NO No No Yes Yes No No Yes No
6 100KV Nocil A 30 NO No No Yes Yes No No Yes No
7 100KV Nocil B 40 NO No Yes Yes No No No Yes Yes
8 100KV Reliance 7 NO No No Yes Yes No No Yes No
9 100KV Vashi A 59 NO
10 100KV Vashi B 34 NO
11 220KV Uran 220/22KV LTR1 (50MVA) 14 Yes 14
12 220/22KV LTR2 (50MVA) 6 Yes 6
13 220KV Borivali Nil 0
14 400KV Khargar 220/33KV LTR1(50MVA) 31 Yes 31
15 220/33KV LTR2(50MVA) 28 Yes 28
16 220KV Mulund 220/22KV LTR1 31 NO
17 220/22KV LTR2 29 Yes 29
18 220/22KV LTR3 25 NO
19 220/22KV LTR4 28 NO
20 220KV Nerul 220/33KV LTR1(50MVA) 22 Yes 22
21 220/33KV LTR2(50MVA) 20 NO
22 220KV Trombay Nil 0
23 220KV Colourchem
220/22KV LTR1(50MVA) 25 NO
24 220/22KV LTR2(50MVA) 32 Yes 32
25 220/22KV LTR3(50MVA) 26 NO
26 220/22KV LTR4(50MVA) 7 NO
27 220KV Taloja 100KV Taloja -A 33 NO
28 100KV Taloja -B 41 NO
116
MAHARASTRA Load Shed Scheme Annexure-3.E
Sr.No.
S/s Name Feeder Avera
ge Load
Selected for Remote Control
from SCADA
Tele Control
MW
150MW OD
Voltage < IEGC 95%
Line Loading
SIL
Flow 1
above TTC
Flow 2
above TTC
Sudden Loss of 1000
Angular Diff
Any Other
29 100KV BOC 11 NO
30 100KV FGIL 7 NO
31
220/22KV LTR1(100MVA)
47 Yes 47
32
220/22KV LTR2(100MVA)
50 Yes 50
33 220KV Mahape 220/22KV (50 MVA)LTR1 37 NO
34 220/22KV (50 MVA)LTR2 38 Yes 38
35 220/22KV (50 MVA)LTR3 24 NO
36 400KV Padghe 220/22KV LTR1 14 Yes 14
37 220/22KV LTR2 3 NO
38 220KV Apta 100/22KV (20MVA) LTR1 13 Yes 13
39 100/22KV (20MVA) LTR2 16 Yes 16
40 100KV JITA 21 NO
41 100KV Reliance 9 NO
42 100KV Khopoli A 25 NO
43 100kv Bhokarpara 21 NO
44 100KV Musco-A 35 NO
45 100KV Musco-B 38 NO
46 100KV Thal 17 NO
47 100KV Patalganga 14 NO
48 132KV Boisar-I 132/33KV (50MVA)LTR1 27 Yes 27
49 132/33KV (50MVA)LTR2 22 NO
50 132/11KV (20MVA)LTR1 9 NO
51 132/11KV (25MVA)LTR2 8 NO
52 132/11KV (25MVA)LTR3 8 NO
53 220KV Kandalgaon
220/22KV (50 MVA)LTR1 12 NO
54 220/22KV (50 MVA)LTR2 12 NO
55 100KV Roha-A 13 Yes 13
117
MAHARASTRA Load Shed Scheme Annexure-3.E
Sr.No.
S/s Name Feeder Avera
ge Load
Selected for Remote Control
from SCADA
Tele Control
MW
150MW OD
Voltage < IEGC 95%
Line Loading
SIL
Flow 1
above TTC
Flow 2
above TTC
Sudden Loss of 1000
Angular Diff
Any Other
56 100KV Roha-B 13 NO
57 100KV Mhasala 9 NO
58 400KV Nagothane
220/22KV (25MVA)LTR1 8 Yes 8
59 220/22KV (25MVA)LTR2 8 NO
60 100 Ambarnath 100/22KV (50MVA)LTR1 17 NO
61 100/22KV (50MVA)LTR2 14 NO
62 100/22KV (50MVA)LTR3 20 Yes 20
63 100KV Bhiwandi 100/22KV (50MVA)LTR1 27 Yes 27
64 100/22KV (50MVA)LTR2 20 NO
65 100/22KV (50MVA)LTR3 29 NO
66 100/22KV (50MVA)LTR4 19 NO
67 100/22KV (50MVA)LTR5 25 NO
68 220KV Bombay -Dying
Nil 0
69 220KV Dombivali
220/22KV (50 MVA)LTR1 23 Yes 23
70 220/22KV (50 MVA)LTR2 30 NO
71 220KV Ghatghar Nil 0
72 220KV Kamba 220/22KV (50 MVA)LTR1 21 NO
73 220/22KV (50 MVA)LTR2 26 Yes 26
74 220/22KV (50 MVA)LTR3 26 Yes 26
75 220/22KV (50 MVA)LTR4 25 NO
76 220KV Kolshet 100/22KV (50MVA)LTR1 28 Yes 28
77 100/22KV (50MVA)LTR2 26 NO
78 100KV Kharbao 79 NO
79 220KV Temghar 220/22KV (50 MVA)LTR1 35 Yes 35
80 220/22KV (50 MVA)LTR2 36 NO
81 220/22KV (50 MVA)LTR3 31 Yes 31
82 220/22KV (50 MVA)LTR4 26 NO
118
MAHARASTRA Load Shed Scheme Annexure-3.E
Sr.No.
S/s Name Feeder Avera
ge Load
Selected for Remote Control
from SCADA
Tele Control
MW
150MW OD
Voltage < IEGC 95%
Line Loading
SIL
Flow 1
above TTC
Flow 2
above TTC
Sudden Loss of 1000
Angular Diff
Any Other
83 220/22KV (50 MVA)LTR5 31 NO
84 100KV Padghe1 100/22KV (50MVA)LTR1 22 NO
85 100/22KV (50MVA)LTR2 17 NO
86 100KV Kharbao 11 NO
87 100KV Pise 17 NO
88 100KV Mohane 49 NO
89 100KV Murbad-A 17 NO
90 100KV Murbad-B 17 NO
91 100KV Shahapur-A 12 Yes 12
92 100KV Shahapur-B 12 NO
93 100KV Panjarpore 10 NO
94 220KV Mahad 220/22KV (50 MVA)LTR1 17 Yes 17
95 220/22KV (50 MVA)LTR2 16 NO
96 100KV Vasai 100/22KV (50MVA)LTR1 37 NO
97 100/22KV (50MVA)LTR2 38 NO
98 100/22KV (50MVA)LTR3 40 Yes 40
99 100KV TSS-I 35 NO
100 100KV TSS-II 5 NO
101 220KV Wada 220/22KV (50 MVA)LTR1 25 NO
102 220/22KV (50 MVA)LTR2 33 Yes 33
103 220/22KV (50 MVA)LTR3 30 NO
104 220/22KV (50 MVA)LTR4 31 Yes 31
Pune Zone
105 400KV Lonikand 220KV Kathpur 92 NO
106 220KV Khadaki 126 NO
107 220KV Sanaswadi A 155 NO
108 220KV Sanaswadi B 153 NO
109 220/22KV (50 MVA)LTR1 33 NO
110 220/22KV (50 MVA)LTR2 37 Yes 37
119
MAHARASTRA Load Shed Scheme Annexure-3.E
Sr.No.
S/s Name Feeder Avera
ge Load
Selected for Remote Control
from SCADA
Tele Control
MW
150MW OD
Voltage < IEGC 95%
Line Loading
SIL
Flow 1
above TTC
Flow 2
above TTC
Sudden Loss of 1000
Angular Diff
Any Other
111 220KV Bosary 220/22KV (50 MVA)LTR1 33 Yes 33
112 220/22KV (50 MVA)LTR2 35 Yes 35
113 220/22KV (50 MVA)LTR3 40 NO
114 220KV Chinchwad
100KV Talegaon 45 Yes 45
115 100KV Ganeshkhind 40 NO
116 132KV Khiradi 66 NO
117 132KV Rahatani 79 NO 79
118 132KV Chakan 45 Yes 45
119 400KV Jejuri Nil 0
120 220KV Theur 132KV Yawat 56 Yes 56
121 132KV Sanaswadi 14 Yes 14
122 132KV Kharadi 64 NO
123 220/22KV LTR1(50MVA) 19 Yes 19
124 220/22KV LTR2(50MVA) 28 NO
125 220KV Baramati 220/33KV (50MVA)LTR1 20 NO
126 220/33KV (25MVA)LTR2 17 Yes 17
127 132KV Baramati 16 NO
128 132kv Bharat Force 4 NO
129 220KV Hinjewadi
220/22KV (50 MVA)LTR1 26 Yes 26
130 220/22KV (25 MVA)LTR2 24 NO
131 220/22KV (50 MVA)LTR3 0 NO
132 220KV Jejuri-I 220/33KV (50MVA)LTR1 13 Yes 13
133 220/33KV (50MVA)LTR2 13 NO
134 220KV Kurkumbh
132KV Janai 6 NO
135 132KV Daund 64 Yes 64
136 220/33KV (50MVA)LTR1 17 NO
137 220/33KV (50MVA)LTR2 16 Yes 16
120
MAHARASTRA Load Shed Scheme Annexure-3.E
Sr.No.
S/s Name Feeder Avera
ge Load
Selected for Remote Control
from SCADA
Tele Control
MW
150MW OD
Voltage < IEGC 95%
Line Loading
SIL
Flow 1
above TTC
Flow 2
above TTC
Sudden Loss of 1000
Angular Diff
Any Other
138 220KV Parvati 132KV Rastapeth 39 NO
139 220/22KV (50 MVA)LTR1 47 NO
140 220/22KV (50 MVA)LTR2 26 NO
141 220/22KV (50 MVA)LTR3 33 NO
142 220/22KV (50 MVA)LTR4 26 NO
143 220KV Phursungi
132KV Kothrud 63 NO
144 132KV Kamthadi 26 NO
145 132KV Phursungi-A 64 NO
146 132KV Phursungi-B 62 NO
147 220kv Ranjangaon
132KV Whirlpool 54 NO
148 132KV Supa 40 NO
149 220/22KV (50 MVA)LTR1 31 NO
150 220/22KV (50 MVA)LTR2 26 Yes 26
151 220KV Solapur2 132KV Mohal 64 NO
152 132KV Naldurg 16 Yes 16
153 132KV Omarga 21 NO
154 132KV Akot 38 NO
155 132KV Degaon-1 26 NO
156 132KV Degaon-2 26 NO
157 132/33KV (50MVA)LTR1 26 NO
158 132/33KV (50MVA)LTR2 18 Yes 18
159 132KV Chinchali-kathi 22 NO
160 132KV Akkalkot 32 Yes 32
161 400KV Solapur3 Nil 0
162 220KV Jeur 132KV Kurduwadi 22 NO
163 132KV Karjat 24 Yes 24
164 132KV P'wadi 15 NO
165 220KV 132KV Velapur 17 Yes 17
121
MAHARASTRA Load Shed Scheme Annexure-3.E
Sr.No.
S/s Name Feeder Avera
ge Load
Selected for Remote Control
from SCADA
Tele Control
MW
150MW OD
Voltage < IEGC 95%
Line Loading
SIL
Flow 1
above TTC
Flow 2
above TTC
Sudden Loss of 1000
Angular Diff
Any Other
Malinagar
166 132KV Bawda 41 Yes 41
167 132KV Shripur 0 NO
168 220/33KV (25 MVA)LTR1 26 NO
169 220/33KV (25 MVA)LTR2 26 Yes 26
170 132/11KV (25MVA)LTR1 6 NO
171
132/11KV (12.5MVA)LTR2
8 NO
172 220KV Urse 220/33 KV (50MVA)LTR1 11 NO
173 220KV Alephata 220KV Kathapur 99 NO
174 132KV Narayangaon 50 NO
175 220/33KV (50 MVA)LTR1 21 Yes 21
176 220/33KV (50 MVA)LTR2 21 Yes 21
177 220KV Pandharpur
110KV Pandharpur 9 NO
178 132KV Sangola 19 Yes 19
179 132KV Dighachi 35 NO
180 132KV Mangalwadha 26 Yes 26
Aurangabad Zone
Aurangabad DC 0
181 400KV Aurangabad3
220/33KV (50MVA)LTR1 27 Yes 27
182 220/33KV (50MVA)LTR2 21 NO
183 220KV Nanded 132KV Hingoli 26 NO
184 132KV Tamsa 26 Yes 26
185 132KV Nanded-I 32 NO
186 132KV Narsi 20 Yes 20
187 132KV Umari 13 Yes 13
188 132/33KV (50MVA)LTR1 11 NO
189 132/33KV (25MVA)LTR2 12 Yes 12
122
MAHARASTRA Load Shed Scheme Annexure-3.E
Sr.No.
S/s Name Feeder Avera
ge Load
Selected for Remote Control
from SCADA
Tele Control
MW
150MW OD
Voltage < IEGC 95%
Line Loading
SIL
Flow 1
above TTC
Flow 2
above TTC
Sudden Loss of 1000
Angular Diff
Any Other
190 132/11KV (16MVA)LTR3 4 NO
191 132/11KV (25MVA)LTR4 3 Yes 3
192 220KV Parbhani 132KV Purna 18 Yes 18
193 132KV Jintur 38 NO
194 132KV Partur 34 Yes 34
195 132KV Parbhani2-A 30 NO
196 132KV Parbhani2-B 27 NO
197 132KV Pathari 28 Yes 28
198 220KV Aurangabad2
132KV Gangapur 28 NO
199 132KV SAT 4 NO
200 132KV Wajuj-1 31 NO
201 132KV Wajuj-2 31 NO
202 132KV Garware 12 NO
203 132KV Sawangi 12 NO
204 132KV Pishor 37 Yes 37
205 220KV Chitegaon
132KV Garware 7 NO
206 132KV Satara 25 Yes 25
207 132 KV Yeldari 132KV Risod 10 yes 10
208 132KV Jintur 10 NO
209 220KV Jalna 132KV Ambad 35 Yes 35
210 132KV Badnapur 7 NO
211 132KV Kahyanagar 42 NO
212 132KV MIDC 54 NO
213 220/33KV (50MVA)LTR1 35 NO
214 220/33KV (50MVA)LTR2 35 Yes 35
215 132KV Paithan 132KV Georai 25 NO
216 132/33KV (50MVA)LTR1 13 NO
217 132/33KV (50MVA)LTR2 13 Yes 13
123
MAHARASTRA Load Shed Scheme Annexure-3.E
Sr.No.
S/s Name Feeder Avera
ge Load
Selected for Remote Control
from SCADA
Tele Control
MW
150MW OD
Voltage < IEGC 95%
Line Loading
SIL
Flow 1
above TTC
Flow 2
above TTC
Sudden Loss of 1000
Angular Diff
Any Other
218 132/11KV (10MVA)LTR1 4 Yes 4
219 132/11KV (10MVA)LTR2 3 NO
Parly2 DC
220 400KV Parly2 132KV Gangakhed 48 NO
221 132KV Kalam 37 NO
222 132KV MIDC 17 NO
223 220KV Parly-1 132/33KV (25MVA)LTR1 7 NO
224 132/33KV (25MVA)LTR2 15 Yes 15
225 220KV Beed 132KV Telgaon 54 Yes 54
226 131KV Beed-1 54 NO
227 132KV Beed-2 0 NO
228 132KV R'moha 0 NO
229 132KV Georai 32 NO
230 220KV Murud 220/33KV (50MVA)LTR1 14 Yes 14
231 220/33KV (25MVA)LTR2 14 NO
232 220KV Harangul 220/33KV LTR1 8 NO
233 220/33KV LTR2 8 Yes 8
234 132KV Udgir 26 NO
235 132KV Nilanga 31 NO
236 132KV Ujani-I 42 NO
237 132KV Ujani-II 29 NO
238 132KV Latur 132/33KV LTR1 7 NO
239 132/33KV LTR2 7 Yes 7
240 132/11KV LTR3 6 NO
241 132KV MIDC 5 NO
242 220KV Osmanabad
220/33KV (50MVA)LTR1 15 NO
243 220/33KV (50MVA)LTR2 15 Yes 15
244 220KV Parly Extn
Nil 0
124
MAHARASTRA Load Shed Scheme Annexure-3.E
Sr.No.
S/s Name Feeder Avera
ge Load
Selected for Remote Control
from SCADA
Tele Control
MW
150MW OD
Voltage < IEGC 95%
Line Loading
SIL
Flow 1
above TTC
Flow 2
above TTC
Sudden Loss of 1000
Angular Diff
Any Other
245 132KV Harsool 132/33KV (50MVA)LTR1 17 NO
246 132/33KV (50MVA)LTR2 17 NO
247 132/11KV (25MVA)LTR3 6 NO
248 132/11KV (25MVA)LTR4 6 NO
249 132KV Chiklthn-A 27 NO
250 132KV Chiklthn-B 27 NO
251 132KV Sawangi 28 Yes 28
Amravati Zone
252 400KV Akola2 Nil
253 220KV Amravati 132/11KV (25MVA)LTR1 2 NO
254 132/11KV (25MVA)LTR2 2 Yes 2
255
132/11KV (12.5MVA)LTR3
3 NO
256 132/66KV (25MVA)LTR4 12 NO
257 132/66KV (25MVA)LTR5 12 NO
258 132KV Chandurbazar 24 Yes 24
259 132KV Morshi 26 NO
260 132KV Tiosa 20 Yes 20
261 132KV Lalkhedi 53 NO
262 220KV Badnera TSS-1 11 NO
263 TSS-2 12 NO
264 220/33KV (25MVA)LTR1 14 NO
265 220/33KV (25 MVA)LTR2 9 Yes 9
266 132KV Paras 132KV Warwat Bakal 19 NO
267 132KV Patur 38 NO
268 132KV Akot 10 Yes 10
269 132/66KV (25MVA)LTR1 2 NO
270 220KV Pusad 220/66KV(50MVA) LTR1 22 NO
271 220/33KV(50MVA) LTR2 20 NO
272 220/33KV(25MVA) LTR3 21 Yes 21
125
MAHARASTRA Load Shed Scheme Annexure-3.E
Sr.No.
S/s Name Feeder Avera
ge Load
Selected for Remote Control
from SCADA
Tele Control
MW
150MW OD
Voltage < IEGC 95%
Line Loading
SIL
Flow 1
above TTC
Flow 2
above TTC
Sudden Loss of 1000
Angular Diff
Any Other
273 132KV Umarkhed 69 Yes 69
274 132KV Gunj 15 NO
275 132KV Digras 50 NO
276 132KV Jambazar 13 Yes 13
277 220KV Akola 132/33KV (25MVA)LTR1 7 NO
278 132/33KV (25MVA)LTR2 14 yes 14
279 132KV Akola MIDC 19 NO
280 220KV Chikhali 132/33KV (50MVA)LTR1 12 NO
281 132/33KV (50MVA)LTR2 3 Yes 3
282 132KV Khamgaon 37 NO
283 132KV Buldhana 42 NO
284 132KV Dhad 4 Yes 4
285 132KV Dusarbid 17 Yes 17
286 132KV Mehkar 40 NO
287 220KV Dhamangaon
220/33KV(25MVA) LTR1 2 NO
288 220/33KV(25MVA) LTR2 2 NO
289 132KV Malkapur 132KV Bodwad 25 NO
290 132KV Khamgaon 27 NO
291 132KV Motala 31 Yes 31
292 132/11KV (10MVA)LTR1 2 NO
293 132/11KV (10MVA)LTR2 7 NO
294 132/33KV (50MVA)LTR3 12 NO
295 132/33KV (50MVA)LTR4 12 Yes 12
296 220KV Paras Extn
Nil 0
Karad Zone
New Koyna DC
297 400kv New Koyna
Nil
126
MAHARASTRA Load Shed Scheme Annexure-3.E
Sr.No.
S/s Name Feeder Avera
ge Load
Selected for Remote Control
from SCADA
Tele Control
MW
150MW OD
Voltage < IEGC 95%
Line Loading
SIL
Flow 1
above TTC
Flow 2
above TTC
Sudden Loss of 1000
Angular Diff
Any Other
298 KDPH Nil
299 220KV Koyna 1 & 2
220/33KV(50MVA) LTR1 2 NO
300 220/33KV(50MVA) LTR2 2 NO
301 220KV Koyna3 220/33KV(25MVA) LTR1 6 NO
302 110/33KV(16MVA) LTR2 7 NO
303 110KV Ratnagiri 13 Yes 13
304 400KV Koyna 4 Nil
305 220KV Sawantwadi
220/33KV(50MVA) LTR1 12 NO
Karad DC
306 400KV Karad2 Nil 0
307 220KV Karad1 220/33KV(25MVA) LTR1 21 Yes 21
308 110/33KV(25MVA) LTR1 21 Yes 21
309 110KV Kale 41 NO
310 110KV Tembu 25 NO
311 110KV Kirloskarwadi 17 NO
312 110KV Diganchi 12 NO
313 110KV Mayani 66 NO
314 110KV Atit 25 NO
315 220KV Lonnand 132KV VIR 35 NO
316 132kv Phaltan A 48 Yes 48
317 132kv Phaltan B 49 NO
318 132KV Wai 9 Yes 9
319 132KV Polychem 3 NO
320 132KV Satara road 35 NO
321 220KV Miraj 220/33KV(50MVA) LTR1 26 NO
322 220/33KV(50MVA) LTR2 30 NO
323 110KV Vishrambaug 1 31 NO
324 110KV Vishrambaug 2 33 NO
127
MAHARASTRA Load Shed Scheme Annexure-3.E
Sr.No.
S/s Name Feeder Avera
ge Load
Selected for Remote Control
from SCADA
Tele Control
MW
150MW OD
Voltage < IEGC 95%
Line Loading
SIL
Flow 1
above TTC
Flow 2
above TTC
Sudden Loss of 1000
Angular Diff
Any Other
325 110KV Jaishingpur 37 NO
326 110KV Kurundwad 19 Yes 19
327 110KV Mahankal-2 22 NO
328 110KV Tasgaon 30 Yes 30
329 110/11KV(25MVA) LTR1 9 NO
330 110KV Mahankal-1 25 Yes 25
331 220KV Vita 220/33KV(50MVA) TR-1 13 NO
332 220/33KV(50MVA) TR-2 12 NO
333 220KV Ichalkaranji
220/33KV(50MVA) LTR-1
32 NO
334
220/33KV(50MVA) LTR-1
30 Yes 30
335 220KV Malharpeth
220/33KV(50MVA) LTR-1
10 NO
336
220/33KV(50MVA) LTR-2
21 NO
337 220KV Peth
220/33KV(50MVA) LTR-1
16 NO
338
220/33KV(50MVA) LTR-2
16 NO
339 132KV Walegaon 7 NO
340 132KV Shirala 34 Yes 34
Kolhapur DC 0 NO
341 400KV Kolhapur 220KV Chikodi 0 NO
342 220KV Kolhapur 220KV Chikodi 0 NO
343 220/33KV (50MVA)LTR1 18 NO
344 220/33KV (50MVA)LTR2 20 Yes 20
345 110KV Kothali 10 NO
346 110KV Puikadi 26 NO
347 110KV Ichalkaranji 62 NO
348 110KV Shirgaon 44 Yes 44
128
MAHARASTRA Load Shed Scheme Annexure-3.E
Sr.No.
S/s Name Feeder Avera
ge Load
Selected for Remote Control
from SCADA
Tele Control
MW
150MW OD
Voltage < IEGC 95%
Line Loading
SIL
Flow 1
above TTC
Flow 2
above TTC
Sudden Loss of 1000
Angular Diff
Any Other
349 110KV D'ganga 7 NO
350 110KV B-Camp1 13 NO
351 110KV B-Camp2 15 NO
352 220KV Tillari Nil
353 220KV Halkarni 220/33KV (25MVA)LTR1 7 NO
354 220/33KV (25MVA)LTR2 5 Yes 5
355 220KV Mumewadi
220/33KV (25MVA)LTR1 4 NO
356 220/33KV (25MVA)LTR2 8 Yes 8
357 220/33KV (50MVA)LTR3 8 Yes 8
358 220KV Kharepatan
220/33KV (25MVA)LTR1 8 NO
359 132KV Talebazar 6 NO
360 132KV Kankawali 31 Yes 31
361 110KV Shiroli 110KV Wathar 44 NO
362 110/33KV (25MVA)LTR1 12 Yes 12
363 110/11KV (16MVA)LTR2 7 NO
364 110/11KV (16MVA)LTR3 9 NO
Nagpur Zone
365 220KV Ambazari 132KV Arvi 27 Yes 27
366 132KV Pardi 49 NO
367 132KV Hingna-II 50 NO
368 132/11KV (25MVA)LTR1 12 NO
369 132/11KV (25MVA)LTR2 12 Yes 12
370 132KV Mankapur-I 59 NO
371 132KV Mankapur-II 40 NO
372 132KV Hingna-I 54 NO
373 220KV Bhandara 132/11KV (16MVA)LTR1 4 NO
374 132/33KV (25MVA)LTR2 3 Yes 3
375 132KV Ambora-I 7 NO
129
MAHARASTRA Load Shed Scheme Annexure-3.E
Sr.No.
S/s Name Feeder Avera
ge Load
Selected for Remote Control
from SCADA
Tele Control
MW
150MW OD
Voltage < IEGC 95%
Line Loading
SIL
Flow 1
above TTC
Flow 2
above TTC
Sudden Loss of 1000
Angular Diff
Any Other
376 132KV Mouda 20 NO
377 132KV Kardha 30 NO
378 132KV Madgi-I 9 NO
379 132KV Madgi-II 9 NO
380 132KV Tekepar 24 Yes 24
381 132KV Kanhan 12 NO
382 400KV Chandrapur
220/66KV LTR3 (50MVA) 12 NO
383 220KV Kalmeshwar
132/11KV(25MVA)LTR1 5 NO
384 132/11KV(16MVA)LTR2 4 NO
385 132/33KV(50MVA)LTR3 7 Yes 7
386 132KV Saoner 12 Yes 12
387 132KV Katol 34 NO
388 220KV Kanhan 132/11KV (25MVA)LTR1 2 NO
389 132/11KV (25MVA)LTR2 7 Yes 7
390 132/33KV (25MVA)LTR3 9 NO
391 132/33KV (25MVA)LTR4 9 Yes 9
392 132KV Mauda 20 NO
393 132KV Pardi 30 NO
394 132KV Uppalwadi 15 NO
395 400KV Koradi Nil 0
396 220KV Wardha 220/66KV(50MVA) LTR1 12 NO
397 220/66KV(50MVA) LTR2 14 Yes 14
398 220kv Warora 220/33KV(50MVA) LTR1 14 NO
399 220/33KV(50MVA) LTR2 14 NO
400 220/66KV(50MVA) LTR1 31 NO
401 220/66KV(50MVA) LTR2 31 Yes 31
402 220KV Bhugaon 132KV Deoli 37 Yes 37
403 220/33KV (25MVA)LTR1 10 NO
130
MAHARASTRA Load Shed Scheme Annexure-3.E
Sr.No.
S/s Name Feeder Avera
ge Load
Selected for Remote Control
from SCADA
Tele Control
MW
150MW OD
Voltage < IEGC 95%
Line Loading
SIL
Flow 1
above TTC
Flow 2
above TTC
Sudden Loss of 1000
Angular Diff
Any Other
404 220KV Hinganghat
132/33KV(25MVA)LTR1 7 NO
405 132/33KV(25MVA)LTR2 10 Yes 10
406 220KV Purti Nil 0 0
407 220KV Butibori 220/33KV(50MVA)LTR1 20 NO
408 220/33KV(50MVA)LTR2 17 NO
409 220/33KV(50MVA)LTR3 22 Yes 22
410 132KV Khapri-1 21 NO
411 132KV Khapri-2 21 NO
412 220KV Ghadchandur
220/66KV LTR1 43 NO
413 220/66KV LTR2 46 Yes 46
414 220/33KV LTR1 2 NO
415 220KV Khaparkheda
Nil 0
Nasik Zone
Nasik DC 0 NO
416 220KV Nasik GCR
132KV Ambad 54 NO
417 132KV Jindal 26 NO
418 132KV Sinnar 35 NO
419 132KV Ranwad 58 NO
420 132KV Ozar-A 31 NO
421 132KV Ozar-B 34 NO
422 132KV Pachpatta 37 NO
423 220KV Ahmadnagar
220/33KV (25MVA)LTR1 3 Yes 3
424 220/33KV (25MVA)LTR2 2 NO
425 132KV Kedgaon 40 NO
426 132KV Ashti 31 Yes 31
131
MAHARASTRA Load Shed Scheme Annexure-3.E
Sr.No.
S/s Name Feeder Avera
ge Load
Selected for Remote Control
from SCADA
Tele Control
MW
150MW OD
Voltage < IEGC 95%
Line Loading
SIL
Flow 1
above TTC
Flow 2
above TTC
Sudden Loss of 1000
Angular Diff
Any Other
427 400KV Babhaleshwar
Nil 0
428 400KV Vaitarna Nil 0
429 132KV Nasik OCR
132KV Takli 47 NO
430 132KV Satpur 52 NO
431 132KV Railway 1 18 NO
432 132KV Railway 2 18 NO
433 132KV Sinner MIDC 46 NO
434 132/33KV (50MVA)LTR 1 38 Yes 38
435 132/33KV (50MVA)LTR 2 38 Yes 38
436
132/6.6KV Station Transformer
2 NO
437 132KV Bhandardara
Nil 0
438 220KV Malegaon
220/33KV(50MVA)LTR1 29 NO
439 220/33KV(50MVA)LTR2 29 Yes 29
440 132KV Nampur 19 Yes 19
441 132KV Malegaon-1 17 NO
442 132KV Malegaon-2 35 NO
443 132KV Malegaon-3 27 NO
444 132KV Nandurbar
132KV Visarwadi 28 NO
445 132/33KV (25MVA)LTR1 7 NO
446 132/33KV (25MVA)LTR2 7 NO
447 132/11KV (16MVA)LTR3 4 NO
448 220kv Valve 220/33KV LTR1 56 NO
449 220/33KV LTR2 43 NO
450 220KV 132KV Ambad 44 NO
132
MAHARASTRA Load Shed Scheme Annexure-3.E
Sr.No.
S/s Name Feeder Avera
ge Load
Selected for Remote Control
from SCADA
Tele Control
MW
150MW OD
Voltage < IEGC 95%
Line Loading
SIL
Flow 1
above TTC
Flow 2
above TTC
Sudden Loss of 1000
Angular Diff
Any Other
Raymonds
451 132KV Adgaon 32 Yes 32
452 132KV Igatpuri 58 NO
453 132KV Jindal 21 NO
454 220KV Satana 132KV Kalwan 40 Yes 40
455 132KV Taharabad 0 NO
456 132/33KV LTR1(50 MVA) 12 Yes 12
457 132/33KV LTR2 12 NO
458 132/11KV LTR1 10 NO
Dhule DC
459 400kv Dhule2 Nil
460 132KV Bhusawal 132KV Nimbhora 11 Yes 11
461 132KV Pahur 45 NO
462 132KV Yawal 31 Yes 31
463 132KV Jalgaon-1 54 NO
464 132KV Jalgaon-2 0 NO
465 132KV Muktainagar 14 NO
466 132/33KV (25MVA)LTR1 7 NO
467 132/33KV (25MVA)LTR2 8 Yes 8
468 132/11KV (10MVA)LTR3 7 NO
469 400kv Bhusawal2
Nil
470 220KV Chalisgaon
132KV Kannad 26 Yes 26
471 132KV Chalisgaon-1 21 NO
472 132KV Chalisgaon-2 21 NO
473 132KV Dhule City 53 Yes 53
474 132KV Pimparkhed 34 NO
475 132KV Amalner 132/33KV LTR1(50 MVA) 10 NO
476 132/33KV LTR2(50 MVA) 15 Yes 15
133
MAHARASTRA Load Shed Scheme Annexure-3.E
Sr.No.
S/s Name Feeder Avera
ge Load
Selected for Remote Control
from SCADA
Tele Control
MW
150MW OD
Voltage < IEGC 95%
Line Loading
SIL
Flow 1
above TTC
Flow 2
above TTC
Sudden Loss of 1000
Angular Diff
Any Other
477 132/11KV LTR1(50MVA) 7 NO
478 220KV Dhule-1 132KV Dhule City 51 Yes 51
479 132KV Nardhane 76 NO
480 220/33KV (25MVA)LTR1 8 NO
481 220/33KV (25MVA)LTR2 7 NO
482 220KV Dondaicha
132KV Dondaicha 53 NO
483 220/33KV LTR1 7 NO
484 132KV Sakari 132/33KV( 50MVA) LTR1 13 NO
485 132/33KV( 50MVA) LTR2 13 NO
486 132/33KV( 50MVA) LTR3 13 NO
487
132/11KV( 12.5MVA) LTR1
2 NO
488 132/11KV( 16MVA) LTR2 2 NO
489 220KV Shahada 132KV Taloja 26 Yes 26
490 132/33KV (50MVA)LTR1 16 NO
491 132/33KV (50MVA)LTR2 8 NO
492 132/11KV (16MVA)LTR1 6 NO
493 132/11KV (10MVA)LTR2 5 NO
494 132KV Supa 132KV Shirur 15 NO
495 132/33KV(25MVA)LTR1 14 NO
496 132/33KV(25MVA)LTR2 10 NO
497 132KV Pachora 132KV Pahur 26 Yes 26
498 132/33KV (50MVA)LTR1 13 NO
499 132/33KV (50MVA)LTR2 13 Yes 13
500
132/25KV (10.8MVA)LTR1
8 NO
501
132/25KV (10.8MVA)LTR2
8 NO
502 132/11KV (10MVA)LTR1 3 NO
134
MAHARASTRA Load Shed Scheme Annexure-3.E
Sr.No.
S/s Name Feeder Avera
ge Load
Selected for Remote Control
from SCADA
Tele Control
MW
150MW OD
Voltage < IEGC 95%
Line Loading
SIL
Flow 1
above TTC
Flow 2
above TTC
Sudden Loss of 1000
Angular Diff
Any Other
503 132/11KV (10MVA)LTR2 3 NO
504 132KV Pathardi 132KV Shevgon 15 Yes 15
505 132KV Beed 2 NO
506 132/33KV (50MVA)LTR1 13 Yes 13
507 132/33KV (50MVA)LTR2 7 NO
508 132/11KV (16MVA)LTR1 5 NO
509 132KV Manmad 132KV Lasalgaon 19 NO
510 132KV Yeola 14 Yes 14
511 132KV Ozar 6 NO
512 132KV Pimperkhed 24 NO
513 132/33KV(50MVA)LTR1 14 Yes 14
514 132/33KV(25MVA)LTR2 7 NO
515 132/11KV(16MVA)LTR1 7 NO
516 132/11KV(10MVA)LTR2 7 NO
135
MADHYA PRADESH Load Shed Scheme Annexure-3.F
Sr. No.
S/s Name Feeder Average
Load
Selected for Remote Control
from SCADA
Tele Control
MW
150MW OD
Voltage < IEGC
95%
Line Loading SIL
Flow 1
above
TTC
Flow 2
above TTC
Sudden Loss of 1000
Angular Diff
Any Other
Sagar MW
Noa Available / To be
implemented
1 220KV S/s Sagar 132KV Gourjhamer
15 No No Yes Yes No No Yes No
Satna
No Yes Yes No No No Yes Yes
2 220 KV BIRSINGHPUR 132 KV UMARIYA 16 Yes Yes Yes No Yes Yes No No
3 220 KV SATNA 132 KV MAJHGAWAN 9 No No Yes Yes No No Yes No
4 220 KV SATNA 132 KV PAWAI 11 Yes Yes Yes No Yes Yes No No
5 220 KV SATNA 132 KV PANNA 34
6 220 KV REWA 132 KV MANGAWAN +Katra 39
7 220 KV SIDHI 132 KV MAUGANJ 18
400KV Bhopal
8 132 KV S/S VIDISHA
132 KV GAIRATGANJ
15
9 133 KV S/S VIDISHA
132 KV Shamshabad
6
Gwalior
10 220 KV Malanpur
132 KV Ambah 20
11 220 KV Mehgaon
132 KV Porsa 12
12 220 KV Mehgaon
132 KV Seonda 19
13 220 KV 132 KV Lahar+ Ron 24
136
MADHYA PRADESH Load Shed Scheme Annexure-3.F
Sr. No.
S/s Name Feeder Average
Load
Selected for Remote Control
from SCADA
Tele Control
MW
150MW OD
Voltage < IEGC
95%
Line Loading SIL
Flow 1
above
TTC
Flow 2
above TTC
Sudden Loss of 1000
Angular Diff
Any Other
Mehgaon
Bhopal
14 220 KV S/S BAIRAGARH
132 KV SHYAMPUR 8
15 132 KV S/S BETUL
132 KV GUDGAON 9
16 220 KV S/S ASHTHA
132 KV ICHHAWAR 4
17 220 KV S/S ASHTHA
132 KV POLAI KALA 7
18 220 KV S/S ASHTHA
132 KV BERCHHA 5
Indore
19 220 KV S/s Julwaniya
132 KV Sendhwa+Pansemal
46
20 220 KV S/s Nimrani
132 KV Kasrawad 10
21 220KV S/S Rajgarh
132KV Petlawad 4
400KV Indore
22 220 KV S/s Pithampur
132 KV Bagdi 13
23 220 KV S/s Pithampur
132 KV Betma 11
24 220 KV S/s Pithampur
132 KV Jamli 28
400KV Khandwa
25 220 KV S/s Nepa
132 KV Badgaon 21
137
MADHYA PRADESH Load Shed Scheme Annexure-3.F
Sr. No.
S/s Name Feeder Average
Load
Selected for Remote Control
from SCADA
Tele Control
MW
150MW OD
Voltage < IEGC
95%
Line Loading SIL
Flow 1
above
TTC
Flow 2
above TTC
Sudden Loss of 1000
Angular Diff
Any Other
Ujjain
26 220KV S/S Barnagar
132KV Kanwan 20
27 220KV S/S Barnagar
132KV Gautampura 13
400KV Nagda
28 220 KV S/S Nagda
132KV Nagda - Alot
24
29 220KV S/S Neemuch
132KV Ratangarh 20
138
EXHIBIT 4
AUTOMATED DEFENCE PLAN FOR SOUTHERN REGION
139
Annexure-4.1 Automated defence plan summary for Southern Region- Andhra Pradesh system
S No
Logic Control Action Manual or Automatic Measurements as input
for control action (Local / Wide Area)
Control Action (Local / Wide Area)
Remarks
SOU
THER
N R
EGIO
N-A
ND
HR
A P
RA
DESH
1
∆ P > 150 MW or 12 % of schedule whichever is less ∆ P = Actual-Schd and freq < 50 Hz
Shed load in AP Discoms. Identify three groups A, B, C each group constituting (approxi) 250 MW or 12 % of schedule. Rotation logic and sequence to be programmed at SLDC and RLDC PLCs
Stage 1 : Manual Stage 2 : Automatic (From SLDC PLC after 15 minutes) Stage 3 : Backup (from SRLDC PLC after 20 minutes)
Wide Area : Schedules & Drawal from SCADA system at LDCs
Wide Area: signal sent from LDC to 22 x 220 /132kV sub-stations in 3 groups, and have 9 nos 132 Kv radial feeders and 13x 33 kV loads would be identified .
Group A,B &C Feeders list (including All Discoms such as NPDCL,SPDCL,EPDCL and CPDCL) is enclosed at Annexure- 4.A PLC logic from SRLDC needs to be deigned
2
∆ P < -150 MW ∆ P = Actual-Schd and freq > 50 Hz
Send signal to All power stations in all Discoms. Logic and sequence to be programmed at SLDC and SRLDC PLC
Stage 1 : Manual Stage 2 : Automatic (From SLDC PLC 15 minutes) Stage 3 : Backup (from SRLDC PLC in 25 minutes)
Wide Area : Schedules & Drawal from SCADA system at LDCs
Wide Area: signal sent from LDCs to All power station in AP control area (generators above 200 MW).
The power stations can either wire the same for un it or generation reduction through secondary control. The following generators are Identified. Rayaseema unit 1-5, KTPS 9, 10, and 11, Simhadri unit 1 &2, VTPS-1-7 and kakatiya unit 1. Logic is to be designed from SLDC/SRLDC
3
Voltage < 200 kV at sub-station for more than 5 minutes
Shed load at the 6 x 220 kV sub-stations.
Stage 1: Alarm (208 kV) Stage 2: Automatic (200 kV for more than 5 minutes) Stage 3: 185 kV 30 seconds
Local area: Bus voltage Measurement at the 6 x 220 kV substations
Local area:
Under Voltage Load Shedding (UVLS). Six UVLS relays required one each at 220 kV sub-stations: Chittur, Palamaneru, Kalkiri, Renigunta, Kodur, Rajampet
4**
ICT / line loading crossing normal operating limits
1.Shed/Trip Generation at Srisailem left bank plant
Stage-1: Manual (SLDC level) Stage-2: Automatic through PLC
Local area: 1. if 400kV Srisailem-Karnool SC line violates KLLCL.
Local Area :
Regional & state: Annexure-4.B
5
Flows crossing TTC and ∆ P > 100 MW
Shed loads identified Automatic
Local area: No. of measurements aggregated at SRLDC SCADA
Wide area: signal sent to identified stations: 110kV Salem, 110kv Deviakurchi, 110kV Rasipuram, and 110kV Pudanchndai.
Note:S1-S2 bid area SPS already agreed and implementation stage
140
6**
Sudden loss of generation > 1000 MW or loss of high capacity corridor
Shed loads in designated areas
Automatic Local area: measurement at Power station level/ substation level
Wide area: signal sent to many areas
Regional: Annexure-4.C SO
UTH
ERN
REG
ION
-AN
DH
RA
PR
AD
ESH
7
Angular difference exceeding cut off value
Shed load or back down generation
Automatic
Wide area: Synchrophasor measurements at RLDC/SLDC
Wide area: signal sent to identified stations
Annexure-4.D
8
UFR I: 49.0 Hz UFR 2: 48.8 Hz UFR3: 48.6 Hz
30% Simultaneous Maximum demand of SR-33037 MW(9911 MW) AP UFR is 35.6% of 9911 MW(Average ratio of energy ratio and peak demand ratio)
Automatic Local area Local area
49.0 Hz: 13 substations: 801MW (during peak hours) 49.0 Hz: 17 substations: 798MW (during off peak hours) 48.8 Hz: 18 substations: 1123MW 48.6 Hz: 9 substations: 1327 MW presently the UFR setting on the above feeders are 48.8Hz,48.5Hz and 48.2 and it is proposed for change the setting as per the recommendation in forthcoming PCC /OCC metting The Details of feeders are encclosed at Annexure-4.E
9 Df/dt: 49.9 Hz plus 0.1, 0.2 Hz/sec
Designated feeder in each control area
Automatic Local area Local area
About 1767 MW relief is connected. in 33kv feeder, 132 Kv feeders and 132/33 kv transformers. Presently Df/Dt setting is 49.3 Hz with 0.3Hz/seconds and it is proposed to change the setting as per the recommendation in forthcoming PCC /OCC meeting Annexure-4.E
10 Islanding at 47.9 Hz
Power stations, Loads Automatic Local area Local area Rayalaseema TPS, Simhadri, VTPS, KTPS islands (29 UFRs required say)
** Separate sheet for lines not associated with any state but trunk line. 1) Telemetery of all feeders a must. 2) Reset command from control centre for restoration 3) Ability to select any combination of sub-stations at LDC PLC 4) Detailed logic at PLC level; audit trail for change in logic by authorised users (5) Master server or PLCs for archiving, logs etc. (6) For UFR, UVLS station EL should be provided. Note:UFR relays for islanding has been considered as single relay. However for islanding it is prodent to consider 2 of 3 scheme with 2 separate frequency sources. BOQ may be appropriately changed(x3) in case this methodology is adopted
141
Annexure-4.2 Automated defence summary plan for Southern Region- Karnataka system
S No
Logic Control Action Manual or Automatic Measurements as input for control action (Local / Wide Area)
Control Action (Local / Wide Area)
Remarks
SOU
THER
N R
EGIO
N-K
AR
NA
TAK
A
1
∆ P > 150 Mw or 12 % of schedule which ever is less ∆ P = Actual-Schd and freq < 50 Hz
Shed load in KAR system Identify three groups A, B, C each group constituting (approxi) 110 MW or 12 % of schedule. Rotation logic and sequence to be programmed at SLDC and RLDC PLCs
Stage 1 : Manual Stage 2 : Automatic (From SLDC PLC after 15 minutes) Stage 3 : Backup (from SRLDC PLC after 20 minutes)
Wide Area : Schedules & Drawal from SCADA system at LDCs
Wide Area: signal sent from LDC to 7x 66 kV sub-stations in 3 groups, and have 11nos 66 Kv radial feeders are identified .
Group A,B &C Feeders list is enclosed at Annexure- 4.A About 363MW the relief expected. PLC logic from SRLDC needs to be deigned
2
∆ P < -150 MW ∆ P = Actual-Schd and freq > 50 Hz
Send signal to All Thermal power stations Logic and sequence to be programmed at SLDC and SRLDC PLC
Stage 1 : Manual Stage 2 : Automatic (From SLDC PLC 15 minutes) Stage 3 : Backup (from SRLDC PLC in 25 minutes)
Wide Area : Schedules & Drawal from SCADA system at LDCs
Wide Area: signal sent from LDCs to All power station in KARNATAKA control area (generators above (200 MW).
The power stations can either wire the same for un it or generation reduction through secondary control. The following generators are Identified., BTPS , RTPS, UPCL and Jindal , Logic is to be designed from SLDC/SRLDC
3
Voltage < 200 kV at sub-station for more than 5 minutes
Shed load at the 21 x 220 kV sub-stations.
Stage 1: Alarm (208 kV) Stage 2: Automatic (200 kV for more than 5 minutes) Stage 3: 185 kV 30 seconds
Local area: Bus voltage Measurement at the 21 x 220 kV substations
Local area:
Under Voltage Load Shedding (UVLS). Twenty one UVLS relays required one each at 220 kV sub-stations: Bidadi, Somanahalli, Subramnyapura, HSR layout Naganathpura, Hoody, Hebbal, Whitefield, HAL, Nelamangala, Peenya, D.B.Pura, Antharasanahally, Dobspet, Basthipura,Hootagalli, Tubinkere, AStation, EDC compound, Kunigal and Kadakola
4** ICT / line loading crossing normal operating limits
1.Back down/Trip Generation at BTPS/Jindal 2. Back down/Trip Generation at UPCL
Stage-1: Manual (SLDC level) Stage-2: Automatic through PLC
Local area: 1.if Flow on 400kV Hiriyur-Nelamangala DC line exceeds KLLCL 2. if Flow on 400kV UPCL-Hassan DC line exceeds KLLCL
Wide Area: 1. Signal sent to identified stations:BTPS, Jindal Local area: 2.Signal sent to identified station: UPCL
Regional & state: Annexure-4.B
142
5
Flows crossing TTC and ∆ P > 100 MW
Shed loads identified Automatic Local area: No. of measurements aggregated at SRLDC SCADA
Wide area: signal sent to identified stations: 110kV Salem, 110kv Deviakurchi, 110kV Rasipuram, and 110kV Pudanchndai.
Note:S1-S2 bid area SPS already agreed and implementation stage
SOU
THER
N R
EGIO
N-K
AR
NA
TAK
A
6**
Sudden loss of generation > 1000 MW or loss of high capacity corridor
Shed loads in designated areas
Automatic Local area: measurement at Power station level/ substation level
Wide area: signal sent to many areas
Regional: Annexure-4.C
7
Angular difference exceeding cut off value
Shed load or back down generation
Automatic Wide area: Synchrophasor measurements at RLDC/SLDC
Wide area: signal sent to identified stations
Annexure-4.D
8
UFR I: 49.0 Hz UFR 2: 48.8 Hz UFR3: 48.6 Hz
30% Simultaneous Maximum demand of SR-33037 MW(9911 MW) KA UFR is 23.7% of 9911 MW(Average ratio of energy ratio and peak demand ratio)
Automatic Local area Local area
49.0 Hz: 24 substations: 476MW 48.8 Hz: 24 substations: 667MW 48.6 Hz: 27 substations: 762MW presently the UFR setting on the above feeders are 48.8Hz,48.5Hz and 48.2 and it is proposed for change the setting as per the recommendation in forthcoming PCC /OCC meeting The Details of feeders are enclosed at Annexure-4.E
9 Df/dt: 49.9 Hz plus 0.1, 0.2 Hz/sec
Designated feeder in each control area
Automatic Local area Local area
About 593MW relief is connected in 66 Kv and 110Kv feeders. Presently Df/Dt setting is 49.3 Hz with 0.3Hz/seconds and it is proposed for change the setting as per the recommendation in forthcoming PCC /OCC meeting Annexure-4.E
10 Islanding at 47.9 Hz
Power stations, Loads Automatic Local area Local area Kaiga, BTPS, RTPS, Varahi islands (30 UFRs required say)
** Separate sheet for lines not associated with any state but trunk line. 1) Telemetery of all feeders a must. 2) Reset command from control centre for restoration 3) Ability to select any combination of sub-stations at LDC PLC 4) Detailed logic at PLC level; audit trail for change in logic by authorised users (5) Master server or PLCs for archiving, logs etc. (6) For UFR, UVLS station EL should be provided. Note:UFR relays for islanding has been considered as single relay. However for islanding it is prodent to consider 2 of 3 scheme with 2 separate frequency sources. BOQ may be appropriately changed(x3) in case this methodology is adopted
143
Annexure-4.3 Automated defence summary plan for Southern Region- Kerala system
S No
Logic Control Action Manual or Automatic Measurements as input for control action (Local / Wide Area)
Control Action (Local / Wide Area)
Remarks
SOU
THER
N R
EGIO
N-K
ERA
LA
1
∆ P > 150 Mw or 12 % of schedule which ever is less ∆ P = Actual-Schd and freq < 50 Hz
Shed load in Kerala system Identify three groups A, B, C each group constituting (approxi) 75 MW or 12 % of schedule. Rotation logic and sequence to be programmed at SLDC and RLDC PLCs
Stage 1 : Manual Stage 2 : Automatic (From SLDC PLC after 15 minutes) Stage 3 : Backup (from SRLDC PLC after 20 minutes)
Wide Area : Schedules & Drawal from SCADA system at LDCs
Wide Area: signal sent from LDC to 8 x 220 /110kV sub-stations in 3 groups, and have 8 nos 110 Kv and one 66 KV radial feeders are identified .
Group A,B &C Feeders list is enclosed at Annexure- 4.A About 252 MW during peak hours and 125 MW during off peak hours the relief expected. PLC logic from SRLDC needs to be deigned
2
∆ P < -150 MW ∆ P = Actual-Schd and freq > 50 Hz
Send signal to All Hydro power stations Logic and sequence to be programmed at SLDC and SRLDC PLC
Stage 1 : Manual Stage 2 : Automatic (From SLDC PLC 15 minutes) Stage 3 : Backup (from SRLDC PLC in 25 minutes)
Wide Area : Schedules & Drawal from SCADA system at LDCs
Wide Area: signal sent from LDCs to All power station in kerala control area (generators above (50 MW).
The power stations can either wire the same for un it or generation reduction through secondary control. The following generators are Identified.,IDUKKI Logic is to be designed from SLDC/SRLDC
3
Voltage < 200 kV at sub-station for more than 5 minutes
Shed load at the 14x 220 kV sub-stations identified.
Stage 1: Alarm (208 kV) Stage 2: Automatic (200 kV for more than 5 minutes) Stage 3: 185 kV 30 seconds
Local area: Bus voltage Measurement at the 14 x 220 kV substations
Local area:
Under Voltage Load Shedding (UVLS). Fourteen(14) UVLS relays to be installed at 220kV substations: Kalamassery, Palakkad, Madakathara, Areakode, Kaniyampet, Shornur, Malaparamba, Vadakara, Kanjirode, Talaparamba, Kasarkode, Phothenkode, Edappan, Kundara
4**
ICT / line loading crossing normal operating limits
Shed loads in designated areas
Stage-1: Manual (SLDC level) Stage-2: Automatic through PLC
Local area: 1.if Flow on 220kV Idukki-LP-Madakathara DC line exceeds KLLCL or 400kV Udumalpet-Palakkad DC line flow exceeds KLLCL or Madakathara ICT flow exceeds 280 MW
Wide Area: Signal sent to identified stations: Madakathara, Palakkad, Malaparamba
Note: SPS at Madakathara:In case of tripping one of ICTs or 220kV Idukki-LP-Madakathara trips and other ICT flow is more than rated capacity or flow on 220kv lines >180 MW then trip 250 MW at Madakathara, Palakkad and Areakode.
Regional & state: Annexure-4.B
5
Flows crossing TTC and ∆ P > 100 MW
Shed loads identified Automatic Local area: No. of measurements aggregated at SRLDC SCADA
Wide area: signal sent to identified stations: 110kV Salem, 110kv Deviakurchi, 110kV Rasipuram, and 110kV Pudanchndai.
Note:S1-S2 bid area SPS already agreed and implementation stage
6**
Sudden loss of generation > 1000 MW or loss of high capacity corridor
Shed loads in designated areas
Automatic Local area: measurement at Power station level/ substation level
Wide area: signal sent to many areas
Regional: Annexure-4.C
144
7
Angular difference exceeding cut off value
Shed load or back down generation
Automatic Wide area: Synchrophasor measurements at RLDC/SLDC
Wide area: signal sent to identified stations
Annexure-4.D SO
UTH
ERN
REG
ION
-KER
ALA
8
UFR I: 49.0 Hz UFR 2: 48.8 Hz UFR3: 48.6 Hz
30% Simultaneous Maximum demand of SR-33037 MW(9911 MW) Kerala UFR is 8.6% of 9911 MW(Average ratio of energy ratio and peak demand ratio)
Automatic Local area Local area
49.0 Hz: 3 substations: 186MW (during peak hours) 49.0 Hz: 3 substations: 95MW (during off peak hours) 48.8 Hz: 3 substations: 198MW (during peak hours) 48.8 Hz: 3 substations: 123MW (during off peak hours) 48.6 Hz: 5 substations: 439MW (during peak hours) 48.6 Hz: 5 substations: 283MW (during off peak hours) presently the UFR setting on the above feeders are 48.8Hz,48.5Hz and 48.2 and it is proposed for change the setting as per the recommendation in forthcoming PCC /OCC meeting The Details of feeders are enclosed at Annexure-4.E
9 Df/dt: 49.9 Hz plus 0.1, 0.2 Hz/sec
Designated feeder in each control area
Automatic Local area Local area
About 175 Mw during peak hours and 121 Mw during off peak hours relief is connected in 66kv feeder, and 110Kv feeders. Presently Df/Dt setting is 49.3 Hz with 0.3Hz/seconds and it is proposed for change the setting as per the recommendation in forthcoming PCC /OCC meeting Annexure-4.E
10 Islanding at 47.9 Hz
Power stations, loads Automatic Local area Local area Kayamkulam &Sabarigiri, Idukki&LP island(15UFRs required say)
** Separate sheet for lines not associated with any state but trunk line. 1) Telemetery of all feeders a must. 2) Reset command from control centre for restoration 3) Ability to select any combination of sub-stations at LDC PLC 4) Detailed logic at PLC level; audit trail for change in logic by authorised users (5) Master server or PLCs for archiving, logs etc. (6) For UFR, UVLS station EL should be provided. Note: UFR relays for islanding has been considered as single relay. However for islanding it is prodent to consider 2 of 3 scheme with 2 separate frequency sources. BOQ may be appropriately changed(x3) in case this methodology is adopted
145
Annexure-4.4 Automated defence plan summary for Southern Region- Pondycherry system
S No
Logic Control Action Manual or Automatic Measurements as input for control action (Local
/ Wide Area)
Control Action (Local / Wide Area)
Remarks
SOU
THER
N R
EGIO
N-P
ON
DY
CH
ERR
Y
1 ∆ P > 50 Mw or 12 % of schedule which ever is less ∆ P = Actual-Schd and freq < 50 Hz
Shed load in Pondy system to be Identified three groups A, B, C Rotation logic and sequence to be programmed at SLDC and RLDC PLCs
Stage 1 : Manual Stage 2 : Automatic (From SLDC PLC after 15 minutes) Stage 3 : Backup (from SRLDC PLC after 20 minutes)
Wide Area : Schedules & Drawal from SCADA system at LDCs
Wide Area: Signal sent from LDC and radial feeders are yet to be identified .
Group A,B &C Feeders list to be submiited by pondy PLC logic from SLDC / SRLDC needs to be deigned
8 UFR I: 49.0 Hz UFR 2: 48.8 Hz UFR3: 48.6 Hz
30% Simultaneous Maximum demand of SR-33037 MW(9911 MW) AP UFR is 0.09% of 9911 MW(Average ratio of energy ratio and peak demand ratio)
Automatic Local Area Local area: 49.0 Hz: 3 substations: 22 MW 48.8 Hz: 3 substations: 34 MW 48.6 Hz: 27 substations: 36MW presently the UFR setting on the above feeders are 48.8Hz,48.5Hz and 48.2 and it is proposed for change the setting as per the recommendation in forthcoming PCC /OCC meeting The Details of feeders are enclosed at Annexure-4.E
9 Df/dt: 49.9 Hz plus 0.1, 0.2 Hz/sec
Designated feeder in Pondy control area
Automatic Local area Local area Df/Dt relay connected feeders yet to be received from pondy .
146
Annexure-4.5 Automated defence plan summary for Southern Region -TamilNadu system
S No
Logic Control Action Manual or Automatic Measurements as input
for control action (Local / Wide Area)
Control Action (Local / Wide Area)
Remarks
SOU
THER
N R
EGIO
N-TA
MILN
AD
U
1
∆ P > 150 Mw or 12 % of schedule which ever is less ∆ P = Actual-Schd and freq < 50 Hz
Shed load in TN system Identified three groups A, B, C each group constituting (approxi) 200 MW or 12 % of schedule. Rotation logic and sequence to be programmed at SLDC and RLDC PLCs
Stage 1 : Manual Stage 2 : Automatic (From SLDC PLC after 15 minutes) Stage 3 : Backup (from SRLDC PLC after 20 minutes)
Wide Area : Schedules & Drawal from SCADA system at LDCs
Wide Area: signal sent from LDC to 23x 110 kV sub-stations in 3 groups, and have 26 nos 110 Kv radial feeders are identified .
Group A,B &C Feeders list is enclosed at Annexure- 4.A About 647 MW the relief expected. PLC logic from SRLDC needs to be deigned
2
∆ P < -150 MW ∆ P = Actual-Schd and freq > 50 Hz
Send signal to All Thermal power stations Logic and sequence to be programmed at SLDC and SRLDC PLC
Stage 1 : Manual Stage 2 : Automatic (From SLDC PLC 15 minutes) Stage 3 : Backup (from SRLDC PLC in 25 minutes)
Wide Area : Schedules & Drawal from SCADA system at LDCs
Wide Area: Signal sent from LDCs to All power station in TN control area (generators above (200 MW).
The power stations can either wire the same for un it or generation reduction through secondary control. The following generators are Identified., NCTPS , MTPS, TTPS, Logic is to be designed from SLDC/SRLDC
3
Voltage < 200 kV at sub-station for more than 5 minutes
Shed load at the 22 x 220 kV sub-stations.
Stage 1: Alarm (208 kV) Stage 2: Automatic (200 kV for more than 5 minutes) Stage 3: 185 kV 30 seconds
Local area:Bus voltage Measurement at the 22x 220 kV substations
Local area:
Under Voltage Load Shedding (UVLS). Twenty two UVLS relays required one each at 220 kV sub-stations: Siruseri, KITS Park, SPKoil, Sriperumbudur, Gummidipoondi, Koratur, Koyambedu, Kadaperi, Mamambankam ,Taramani, Almatti, Manali, Oragadam, Kil Pauk, Todiyarpet, Mylapore , Perumbalur, Tanjavur, Samayapuram, Ponnapuram,Palladam, udumalpet
4**
ICT / line loading crossing normal operating limits
Shed/Trip Wind Generation at Kayathar, Veerannam, Sanganeri, Udayathur and SR Pudur.
Stage-1: Manual (SLDC level) Stage-2: Automatic through PLC
Local area: if Flow on any of Tirunelvelli ICT exceeds 280 MW or if Flow on 230kV line connected to tirunelvelli exceeds KLLCL
Wide Area: signal sent to identified stations: Kayathar, Veerannam, Sanganeri, Udayathur and SR Pudur.
Regional & state: Annexure-4.B
5 Flows crossing TTC and ∆ P > 100 MW
Shed loads identified Automatic Local area: No. of measurements aggregated at SRLDC SCADA
Wide area: signal sent to identified stations: 110kV Salem, 110kv Deviakurchi, 110kV Rasipuram, and 110kV Pudanchndai.
Note:S1-S2 bid area SPS already agreed and implementation stage
147
6**
Sudden loss of generation > 1000 MW or loss of high capacity corridor
Shed loads in designated areas Automatic Local area: measurement at Power station level/ substation level
Wide area: signal sent to many areas
Regional: Annexure-4.C
SOU
THER
N R
EGIO
N-TA
MILN
AD
U
7
Angular difference exceeding cut off value
Shed load or back down generation
Automatic Wide area: Synchrophasor measurements at RLDC/SLDC
Wide area: signal sent to identified stations
Annexure-4.D
8
UFR I: 49.0 Hz UFR 2: 48.8 Hz UFR3: 48.6 Hz
30% Simultaneous Maximum demand of SR-33037 MW(9911 MW) AP UFR is 31.2% of 9911 MW(Average ratio of energy ratio and peak demand ratio)
Automatic Local area Local area
49.0 Hz: 24 substations: 798MW 48.8 Hz: 29 substations: 1036MW 48.6 Hz: 15 substations: 1180MW Presently the UFR setting on the above feeders are 48.8Hz,48.5Hz and 48.2 and it is proposed for change the setting as per the recommendation in forthcoming PCC /OCC meeting. The Details of feeders are enclosed at Annexure-4.E
9 Df/dt: 49.9 Hz plus 0.1, 0.2 Hz/sec
Designated feeder in each control area
Automatic Local area Local area
About 559MW relief is connected in 110Kv feeders. Presently Df/Dt setting is 49.3 Hz with 0.3Hz/seconds and it is proposed for change the setting as per the recommendation in forthcoming PCC /OCC meeting Annexure-4.E
10 Islanding at 47.9 Hz
Power stations, Loads Automatic Local area Local area TTPS &Hydro, MTPS, Neyveli TPS, Kundah Complex& PUSHEP islands (35 UFRs required say)
** Separate sheet for lines not associated with any state but trunk line. 1) Telemetery of all feeders a must. 2) Reset command from control centre for restoration 3) Ability to select any combination of sub-stations at LDC PLC 4) Detailed logic at PLC level; audit trail for change in logic by authorised users (5) Master server or PLCs for archiving, logs etc. (6) For UFR, UVLS station EL should be provided. Note:UFR relays for islanding has been considered as single relay. However for islanding it is prodent to consider 2 of 3 scheme with 2 separate frequency sources. BOQ may be appropriately changed(x3) in case this methodology is adopted
148
Annexure 4.A- Feeders list for Remote tripping
APTRANSCO
List of 132 kV Radial Feeders and 132/33 kV Transformers for Remote Tripping from SLDC
Sl.No. Name of the Station Name of the feeder Type of feeder Load
GROUP A
1 220 KV Tandur 132 KV Pargi + Dhamasagar Radial 50
2 220 KV AP Carbides 132 KV Gadwal Radial 50
3 220 KV AP Carbides 132 KV Alampur Radial 25
4 220 KV Jagityal 132/33 KV Dharmapuri Radial 25
5 220 KVNirmal 132/33 KV Transformers (Local) 33 KV loads 20
6 220 KV Garividi 132/33 KV Transformers (Local) 33 KV Loads 30
7 220 KV Nellore 132/33 KV Atmakur Radial 30
8 220 KV Renigunta 132/33 KV Transformers(Local) 33 KV Loads 25
GROUP B
1 220 KV Narket Pally 132 KV Ramanapet01 Radial 30
2 220 KV Narket Pally 132 KV Ramanapet-2 Radial 30
3 220 KV Bhongir 132/33 KV Transformer (Local) 33 KV loads 35
4 220 KV Kalwakurthy 132/33 KV Transformers (Local) 33 KV Loads 85
5 220 KV Durshed 132/33 KV Transformers (Local) 33 KV Loads 20
6 220 KV Dichpally 132/33 KV Transformers (Local) 33 KV Loads 20
7 220 KV Markapur 132/33 KV Transformers (Local) 33 KV Loads 15
8 220 KV Rajampata 132/33 KV Transformers (Local) 33 KV Loads 25
GROUP C
1 220 KV Siddipet 132 KV Habsipur Radial 40
2 220 KV Ananthapur 132/33 KV Transformers (Local) 33 KV Loads 75
3 220 KV Waddekothapally 132/33 KV Padanagaram Radial 30
4 220 KV Bhimadole 132/33 KV Transformers (Local) 33 KV Loads 30
5 220 KV Chittoor 132/33 KV Transformers (Local) 33 KV Loads 50
6 220 KV Bommur 132/33 KV Transformers (Local) 33 KV Loads 60
149
Annexure 4.A - Feeders list for Remote tripping
TAMILNADU
110 KV Automatic Load disconnection scheme under regulatory measure
Sl.No. Name of 110 KV Feeder Load in MW
GROUP A
1 110 KV Ami-Kannamangalam 20
2 110 KV Mosur - Thiruthani 30
4 110 KV Pudukkottai - Adhanakottai 32
5 110 KV Sembatty - Dindugal # 24
6 110KV Ssamayapuram - KKPM #1 10
7 110 KV Thudiyalur - Arasur #1 50
8 110 KV Salem - Rasipuram 15
9 110 KV Gobi - Kolapalur SS 7
10 110 KV Hosur - Udhanapally 5
11 110 KV Arasur GE 16
GROUP B
1 110 KV Ami - Sandhavasal 23
2 110 KV Mosur - Sali 56
3 110 KV Perambalur - Thuralyur 30
4 110 KV Kodikuruchi - Veerasigamani 20
5 110 KV Kavanoor - Paramakudi # 20
6 110 KV Palladam - Sandhaipettai 35
7 110 KV Kariyamangalam - Vellichandhai 30
GROUP C
1 110 KV Cuddalore - Capperhills 12
2 110 KV Villupuram - Devikuruchi 12
3 110 KVPugalur - Kabilarmalai 32
4 110 KV Kodikuruchi - Veerasigamani 20
5 110 KV .K. Mandapam - Thudiyalur #1 50
6 110 KV Pudhanchandhal - Rasipuram 30
7 110 KV Kariamangalam - Dharmapuri 17
8 110 kV Kariamangalam - Kariamangalam 110 36
9 110 Kv Thiruvannamalai-kanchi 15
150
Annexure-4.A Feeders List for Remote tripping
KARNATAKA
KAR FEEDERS TO BE TRIPPED AS REGULATORY MEASURES
Sl.No. Expected Relief
GROUP A
1 66 KV Smnhly - Kanakapura Feeders 1 &2 40
2 66KV D.B. Pur -Chkblpr Feeders 1 & 2 38
3 66 KV Tbnkre-Pandavpura Feeder 23
4 66 KV Mnrbad-Sokke Feeder 20
GROUP B
1 66 KV smnhly-Kumbalgodu Feeder 1 17
2 66 KV D.B. Pur-Devanahalli Feeders 1 & 2 25
3 66 JV Tbnkre-S.R. patna Feeder 22
4 100 VA Transformer @ Kusthagi 50
GROUP C
1 66 KV Bidadadi-Ramanagram Feeder 38
2 100 KV Narendra -M.K. Hubli Feeder 60
3 66 KV Tbnkre-Nagmangala Feeder 30
KSEB
Sl.NO. Sub-station Feeder Voltage
Load relief (MW)
Peak Off Peak
GROUP A
1 Mylatty 220 KV Mylatty-Kanjangad - Cheruvathur 110 KV 20 11
2 Madakkathara 400 KV Madakkathara-Cherpu 110 KV 24 9
3 Kanhirode 220 KV Mundayad #2 110 KV 30 16
GROUP B
1 Kaniampetta 220 KV Kaniampetta - Bathery - Kuthumunda 66 KV 15 7
2 Pothencode 220 KV Pothencode - Attingal 110 KV 39 18
3 Thaliparamba 220 kV Payyannur 110 KV 28 18
GROUP C
1 Kaniampetta 220KV Madakkathara - Valappad 110 KV 20 9
2 Pothencode 220 KV Mundayad #1 110 KV 30 16
3 Nallalam 220 KV Chelari - Kizhissery 110 KV 46 21
151
Annexure 4.B-Key Line/ICT loading crossing normal operating limits
Sr. No
Transmission line Existing/ Already Proposed SPS (A) Modified SPS (B)
1 400kV Vijayawada-Nellore DC line
Back down generation of 430 MW at Vemagiri complex if flow on each line >550 and one of the line Trips.
To be modified to include KLLCL in addition to (A).
2 400kV Nellore-Almatti DC line
Trip one unit of Simhapuri and Meenakshi each if flow on each line >550 and one of the line Trips.
To be modified to include KLLCL in addition to (A).
3 400kV Srisailem-Karnool SC line
- It is proposed to trip one unit at Srisailem left bank station if KLLCL violates.
4 400kV Khammam-Nagarjunasagar(Tallapalli)
-
It is proposed to Backdown generation at KTPS Unit-11if KLLCL violates (or trip Unit-9&10 after commissioning of ICT at KTPS).
5 400kV Gooty-Somanahalli SC line and 400kV Gooty-Nelamangala SC line
-
It is proposed to trip loads of about 300-400 MW in Bangalore area if KLLCL violates.
6 400kV RTPS-Gooty DC line - It is required at the time of SR-NEW Grid synchronization.
7 400kV Hiriyur-Nelamangala DC line
One of the line trips and if other line current flow is 1150< I <1450 A then trip Jindal one unit (300 MW). Else if other line current flow is I >1450 A then trip BTPS one unit (500MW).
To be modified to include KLLCL in addition to (A).
8 400kV UPCL – Hassan DC line
- It is proposed to Backdown generation at UPCL if KLLCL violates.
9 220kV Idukki-Lower Periyar-Madakathara DC line , 400/220kV ICTs
In case of tripping one of ICTs or 220kV Idukki-LP-Madakathara trips and other ICT flow is more than rated capacity or flow on 220kv lines >180 MW then trip 250 MW at Madakathara, Palakkad and Areakode
To be modified to include KLLCL of 400kV Udumalpet-Palakkad DC line in addition to (A).
10 400kV Somanahalli-Salem SC line and 400kV Hosur-Salem SC line
Shed loads of 300 MW at Salem if flow on one of line >550 MW and one of the line trips.
To be modified to include KLLCL in addition to (A).
11 400/230kV Tirunelvelli ICTs -
Flow on any ICT exceeds 280 MW, trip wind generation farms at Kayathar, Veerannam, Sanganeri, Udayathur and SR Pudur.
12
230kV Tirunelvelli-Kayathar, 230kV Tirunelvelli-Udayathur, 230kV Tirunelvelli- Saganeri, 230kV Tirunelvelli-Veerannam
-
Flow on 230kV Tirunelvelli-Kayathar, 230kV Tirunelvelli-Udayathur, 230kV Tirunelvelli- Saganeri, 230kV Tirunelvelli-Veerannam exceeds KLLCL, trip wind generation farms at Kayathar, Veerannam, Sanganeri, Udayathur and SR Pudur.
152
Annxure 4.C- Sudden loss of generation>1000 MW or loss of high capacity corridor
Sr. No. 6: Sudden loss of generation>1000 MW or loss of high capacity corridor
Sr.
No.
Generation loss/ Loss High Capacity
Corridor
Defence Mechanism avialable
1 HVDC Talcher-Kolar Poles tripping SPS is available to Shed loads at designated stations: Table-1&2
2 Loss of Kudamkulam Units
(yet to be commissioned)
SPS will be made available with unit commissioning to Shed
loads at designated station:Table-1&2
Table-1: Trip Signal-1A
153
Annxure 4.C- Sudden loss of generation>1000 MW or loss of high capacity corridor
Table-2: Trip Signal-2
154
Annexure 4.D Angular difference exceeding cut off value
Sr. No. 7: Angular difference exceeding cut off value(COV)
Presently, the PMU’s at following locations are being commissioned.
i. 400kv Ramagundam SS
ii. 400kV Gazuwaka SS
iii. 400kV Vijayawada SS
iv. 400kV Gooty SS
v. 400kV Sriperumbudur SS
vi. 400kV Kolar
vii. 400kV Narendra SS
viii. 400kV Somanahalli SS
ix. 400kV Trichur SS
x. 400kV Tirunelvelli
(Demo project by M/s Kalkitech not considered).
The following schemes can be considered,
400kV Vijayawada-Sriperumbudur angle beyond COV-initiate Vijayawada-Nellore
SPS+import reduction at Gazuwaka HVDC by 100 MW (due to ER Grid Voltage issues)
and Load shedding at Chennai area.
400kV Ramagundam - Somanahalli angle beyond COV- initiate Generation back at NTPC
Ramagundam TPS/ run back at Chandrapur HVDC flow towards SR o be reduced.
400kV Somanahalli-Salem angle exceeds COV-initiate S1-S2 SPS scheme.
400kV Salem-Trichur angle exceeds COV-initiate SPS at Madakathara.
400kV Narendra-Somanahalli angle exceeds COV-initiate Gooty-Somanahalli SPS.
400kV Ramagundam - Tirunelvelli angle beyond COV- initiate Generation back at NTPC
Ramagundam TPS /run back at Chandrapur HVDC flow towards SR o be reduced.
400kV Gazuwaka - Tirunelvelli angle beyond COV- initiate Generation back at NTPC Simhadri TPS
+import reduction at Gazuwaka HVDC by 100 MW (due to ER Grid Voltage issues)
155
Annexure 4.E-UFR and df/dt settings
156
157
158
159
160
161
162
163
164
165
166
167
168
169
170
171
172
EXHIBIT 5
AUTOMATED DEFENCE PLAN FOR NORTH EASTERN REGION
173
Annexure 5.1- Automatic Defense Plan summary for North Eastern Region N
OR
TH EA
STERN
REG
ION
-AR
UN
AC
HA
L PR
AD
ESH
Arunachal Pradesh
Sl.
N
o
Logic Control Action Manual/Automatic
Measurements as Input for control
area (Local / Wide Area)
Control Action (Local / Wide Area)
Remarks Action By
1
∆ P > 5 MW , ∆ P = Actual-Schd and freq < 50 Hz
Shed Load in Arunachal Pradesh. Rotate load-shedding in A,B,C,D groups of load. Rotation logic and sequence to be programmed at SLDC and NERLDC PLC. After shedding of any load, the following should be maintained : 1) Line loading (min. of Z3, SIL and stability limit) ; 2) Bus Voltages (within IEGC band) ; 3) Angular Difference (within cut-off value)
Stage 1 : Manual Stage 2 : Automatic (From SLDC PLC after 15 minutes) Stage 3 : Backup (from NERLDC PLC after 20 minutes)
Wide Area : Schedules & Drawal from Augmented SCADA system at LDCs
Wide Area: signal sent from LDC to identified sub-stations in 4 groups; each group having similar loads; 33 kV feeders would be identified at each substn.
Gr A : Ziro, Daporizo, Along (in any or all Substations)
NERLDC, CTU and SLDC, Arunachal
Pradesh
Gr B: Nirjuli (PG), Naharlagun (in any or all Substations)
Gr C: Khupi Substation
Gr D: Deomali Substation
At present there is no proper infrastructure in Aruncahal Pradesh SLDC
2
∆ P < 5 MW , ∆ P = Actual-Schd and freq > 50 Hz
Send signal to ISGS to reduce generation. Rotation logic and sequence to be programmed at NERLDC PLC. After reduction of generation, the following should be maintained : 1) Line loading (min. of Z3, SIL and stability limit) ; 2) Bus Voltages (within IEGC band) ; 3) Angular Difference (within cut-off value)
Stage 1 : Manual Stage 2 : Automatic (From NERLDC PLC after 15 minutes)
Wide Area : Schedules & Drawal from Augmented SCADA system at RLDC
Wide Area: signal sent from RLDC to appropriate ISGS
The power stations can wire for generation
reduction, if reqd., wire for unit tripping. RLDC would take necessary action to
revise schedule in appropriate ISGS.
NERLDC, CTU and SLDC, Arunachal
Pradesh
3 Voltage < 120 kV for 5 minutes
Shed load at the Nodes
Stage 1: Alarm (126 kV) Stage 2: Automatic (120 kV for more than 5 minutes) Stage 3: 112 kV for 30 seconds
Local area: Bus Voltage Measurements Wide Area: Bus Voltage Measurements at NERLDC Augmented SCADA
Wide Area : No UVLS required at present
NERPC to Finalize schemes
4 Transfomer-1 at Nirjuli crossing limits
Shed load in Itanagar 33 kV Feeders
Stage-1: Manual (SLDC level) Stage-2; Automatic through PLC
Local area: Loading of Tranformer-1 at Nirjuli Wide area: Loading of Tranformer-1 at Nirjuli through Augmented SCADA
Wide Area : Signal sent from SLDC to Gr.B substations
CTU and SLDC, Arunachal Pradesh
174
Transfomer-2 at Nirjuli crossing limits
Shed load in Itanagar 33 kV Feeders
Stage-1: Manual (SLDC level) Stage-2; Automatic through PLC
Local area: Loading of Tranformer-1 at Nirjuli Wide area: Loading of Tranformer-1 at Nirjuli through Augmented SCADA
Wide Area : Signal sent from SLDC to Gr.B substations
CTU and SLDC, Arunachal Pradesh N
OR
TH EA
STERN
REG
ION
-AR
UN
AC
HA
L PR
AD
ESH
5
Flows crossing TTC irrespective of frequency
Shed load in the feeders identified at S no 1 Group A, B,C and D in rotation
Automatic
Wide area: No. of measurements aggregated at NERLDC Augmented SCADA
Wide Area: Signal sent via wiring from NERLDC for load shedding
NERLDC and CTU
6 Loss of High Capacity corridors
Shed load in identified feeders Automatic Local area: Wide Area : Not required NERLDC and SLDC, Arunachal Pradesh
7
Angular difference exceeding cut off value
Shed load in the feeders identified as Group A, B, C, D in rotation
Automatic Wide Area :
Wide Area: Signal sent to all 132 kV and 220 kV substations
Angle pairs to be decided. NERLDC and SLDC, Arunachal Pradesh
8
UFR I: 49.0 Hz
Arunachal UFR requirement : 50 MW Automatic Local Area (pickup frequency = 49.0 Hz)
Local area : Stg-I = 10 MW,
7 Nos. UFRs required for Arunachal Pradesh
NERPC to Finalize schemes and change pickup / stage frequencies as given
UFR 2: 48.8 Hz Stg II = 15 MW,
UFR3: 48.6 Hz Stg III = 15 MW ; Balance 10 MW for survival of Islands
Wide Area: Activation / Deactivation of UFRs for near load-generation balance
9 Df/dt: 49.9 Hz plus 0.2 Hz/sec
Designated feeder in each control area
Automatic Local Area Local Area Not required
10 Islanding at 47.9 Hz
Power stations , loads Automatic Local Area Local Area AGBPP islands with loads of Gr.D
NERPC to Finalize schemes
175
Annexure 5.2- Automatic Defense Plan summary for North Eastern Region
NO
RTH
EASTER
N R
EGIO
N-A
SSAM
Assam
Sl. No.
Logic Control Action Manual/Automatic
Measurements as Input for control
area (Local / Wide Area)
Control Action (Local / Wide Area)
Remarks Action By
1
∆ P > 40 MW , ∆ P = Actual-Schd and freq < 50 Hz
Shed Load in Assam. Rotate load-shedding in A,B,C,D,E,F,G groups of load. Rotation logic and sequence to be programmed at SLDC and NERLDC PLC. After shedding of any load, the following should be maintained : 1) Line loading (min. of Z3, SIL and stability limit) ; 2) Bus Voltages (within IEGC band) ; 3) Angular Difference (within cut-off value)
Stage 1 : Manual Stage 2 : Automatic (From SLDC PLC after 15 minutes) Stage 3 : Backup (from NERLDC PLC after 20 minutes)
Wide Area : Schedules & Drawal from Augmented SCADA system at LDCs
Wide Area: signal sent from LDC to identified sub-stations in 7 groups; 33 kV feeders would be identified at each substn.
Gr A : Dhaligaon, Jogighopa, Barnagar, Rangia, Nalbari, Gossaigaon, Gauripur, (in any or all Substations)
NERLDC, CTU and SLDC, Assam
Gr B: Kahelipara, Narangi, Dispur, Chandrapur, Sarusajai, Baghjap and Amingaon, (in any or all Substations)
Gr C: Samguri, Sankardevnagar, Diphu (in any or all Substations)
Gr D: Depota, Rowta, Sipajhar, (in any or all Substations)
Gr E: Mariani, Jorhat, Bokakhat, Tinsukia, Dibrugarh, Nazira, Moran, Ledo, Golaghat , Bokajan, Sibsagar, Lakwa, Namrup (in any or all Substations)
Gr F : Panchgram, Pailapool, Srikona, Dullavcherra , Haflong, Umrangshoo, (in any or all Substations)
Gr G: Gohpur, North Lakhimpur, Dhemaji, Majuli (in any or all Substations)
2
∆ P < 40 MW , ∆ P = Actual-Schd and freq > 50 Hz
Send signal to designated power stations A, B and C to reduce generation,. Rotation logic and sequence to be programmed at SLDC and NERLDC PLC. After reduction of generation, the following should be maintained : 1) Line loading (min. of Z3, SIL and stability limit) ; 2) Bus Voltages (within IEGC band) ; 3) Angular Difference (within cut-off value)
Stage 1 : Manual Stage 2 : Automatic (From SLDC PLC after 15 minutes) Stage 3 : Backup (from NERLDC PLC after 20 minutes)
Wide Area : Schedules & Drawal from Augmented SCADA system at LDCs
Wide Area: signal sent from LDCs to power stations in A,B and C
Stn A : Langpi HPS
NERLDC, CTU and SLDC, Assam
Stn B : Lakwa TPS
Stn C: Namrup TPS
The power stations can wire for generation reduction through secondary control, if reqd., wire for unit tripping.
176
3 Voltage < 120 kV for more than 5 min
Shed load at 132 kV Substations identified in Sl.No.1 above
Stage 1: Alarm (126 kV) Stage 2: Automatic (120 kV for more than 5 minutes) Stage 3: 112 kV for 30 seconds
Local area: No. of measurements aggregated at NERLDC Augmented SCADA
Local area: Bus Voltage Measurements Wide Area: Bus Voltage Measurements at NERLDC Augmented SCADA
Under Voltage Load Shedding (UVLS). 2 Nos. UVLS relays required at 132 kV substations where Under-voltage phenomenon observed
NERLDC and SLDC, Assam
NO
RTH
EASTER
N R
EGIO
N-A
SSAM
4
ICT / line loading crossing normal operating limits
Line loading limits to be maintained as per min.(Z3, SIL, Stability limit). Load to be shed in designated areas upon crossing limits
Stage-1: Manual (SLDC level) Stage-2; Automatic through PLC
Local area:
Wide Area : Signal sent from SLDC to identified substations
Details of feeders given in annexure 5.A
SLDC, Assam
5
Flows crossing TTC irrespective of frequency
Shed load in the feeders identified at S no 1 Group A, B,C,D,E,F and G in rotation Automatic
Local area: No. of measurements aggregated at NERLDC Augmented SCADA
Wide Area: Signal sent via wiring from NERLDC for load shedding
NERLDC and CTU
6 Loss of High Capacity corridors
Shed Load
Automatic
Details of feeders given in annexure 5.A
NERLDC and SLDC, Assam
7
Angular difference exceeding cut off value
Shed load in the feeders identified as Group A, B, C, D,E,F,G in rotation Automatic Wide Area :
Wide Area: Signal sent to all 132 kV substations Angle pairs to be decided.
NERLDC and SLDC, Assam
8
UFR I: 49.0 Hz
Assam UFR requirement : 240 MW Automatic Local Area (pickup frequency = 49.0 Hz)
Local area : Stg-I = 20 MW,
45 Nos. UFRs required for Assam
NERPC to Finalize schemes and change pickup / stage frequencies as given
UFR 2: 48.8 Hz Stg II = 40 MW,
UFR3: 48.6 Hz Stg III = 50 MW
UFR4: 48.4 Hz Stg IV = 50 MW ; Balance 80 MW for survival of Islands
Wide Area: Activation / Deactivation of UFRs for near load-generation balance
9 Df/dt: 49.9 Hz plus 0.2 Hz/sec
Designated feeder in each control area
Automatic Local Area Local Area Not required
10 Islanding at 47.9 Hz
Power stations , loads Automatic Local Area Local Area NTPS Islands (with NTPS and Nazira load), AGBPP islands (Tinsukia load)
NERPC to Finalize schemes
177
Annexure 5.3- Automatic Defense Plan summary for North Eastern Region
NO
RTH
EASTER
N R
EGIO
N-M
AN
IPU
R
Manipur
Sl. No.
Logic Control Action Manual/Automatic
Measurements as Input for control
area (Local / Wide Area)
Control Action (Local / Wide Area)
Remarks Action By
1
∆ P > 5 MW , ∆ P = Actual-Schd and freq < 50 Hz
Shed Load in Manipur. Rotate load-shedding in A,B,C,D groups of load. Rotation logic and sequence to be programmed at SLDC and NERLDC
PLC. After shedding of any load, the following should be maintained : 1)
Line loading (min. of Z3, SIL and stability limit) ; 2) Bus Voltages (within IEGC band) ; 3) Angular
Difference (within cut-off value)
Stage 1 : Manual Stage 2 : Automatic (From SLDC PLC after 15 minutes) Stage 3 : Backup (from NERLDC PLC after 20 minutes)
Wide Area : Schedules & Drawal from .Augmented SCADA system at LDCs
Wide Area: signal sent from LDC to identified sub-stations in 4 groups; 66kV or 33 kV feeders would be identified at each substn.
Gr.A : Yurembam,Karong,Yaingangpokpi (in any or all Substations)
NERLDC, CTU and SLDC, Manipur
Gr.B: Ningthoukong, Churachandpur, Kakching, Kongba (in any or all Substations)
Gr.C : Jiribam substation
Gr.D: Rengpang substation
At present there is no proper infrastructure in Manipur SLDC
2
∆ P < 5 MW , ∆ P = Actual-Schd and freq > 50 Hz
Send signal to ISGS to reduce generation. Rotation logic and
sequence to be programmed at NERLDC PLC. After reduction of
generation, the following should be maintained : 1) Line loading (min. of
Z3, SIL and stability limit) ; 2) Bus Voltages (within IEGC band) ; 3)
Angular Difference (within cut-off value)
Stage 1 : Manual Stage 2 : Automatic (From NERLDC PLC after 15 minutes)
Wide Area : Schedules & Drawal from Augmented SCADA system at RLDC
Wide Area: signal sent from RLDC to appropriate ISGS
The power stations can wire for generation reduction , if reqd., wire for unit tripping. RLDC would take
necessary action to revise schedule in appropriate ISGS.
NERLDC, CTU and SLDC, Manipur
3 Voltage < 120 kV for 5 minutes
Shed load at 132 kV Substations identified in Sl.No.1 above
Stage 1: Alarm (126 kV) Stage 2: Automatic (120 kV for more than 5 minutes) Stage 3: 112 kV for 30 seconds
Local area: Bus Voltage Measurements Wide Area: Bus Voltage Measurements at NERLDC Augmented SCADA
Wide Area : Signal sent from LDC to 132 kV Substations
Under Voltage Load Shedding (UVLS). 1 Nos. UVLS relays required at 132 kV substations where Under-voltage phenomenon observed
NERLDC and SLDC, Manipur
178
4
Line loading of 132 kV Loktak-Ningthoukong S/C crossing line
Shed load in Gr. A and Gr. B as in Sl.No.1
Stage-1: Manual (SLDC level) Stage-2; Automatic through PLC
Local area: Loading of132 kV Loktak-Ningthoukong S/C Wide area: Loading of 132 kV Loktak-Ningthoukong S/C through Augmented SCADA
Wide Area : Signal sent from SLDC to 132 kV Substations
SLDC, Manipur
NO
RTH
EASTER
N R
EGIO
N-M
AN
IPU
R
5
Flows crossing TTC irrespective of frequency
Shed load in the feeders identified at S no 1 Group A, B,C and D in rotation
Automatic
Wide area: No. of measurements aggregated at NERLDC Augmented SCADA
Wide Area: Signal sent via wiring from NERLDC for load shedding
NERLDC and CTU
6
Loss of 132 kV Loktak-Imphal line
Shed load in Gr. A and Gr. B Automatic
Local Area : Measurement at 132 kV Loktak Substation through Augmented SCADA
Wide Area : Shed load in Gr. A and Gr. B
NERLDC and SLDC, Manipur
Loss of 132 kV Loktak-Ningthoukong
Shed load in Gr. A and Gr. B Automatic
Local Area : Measurement at 132 kV Loktak Substation through Augmented SCADA
Wide Area : Shed load in Gr. A and Gr. B
NERLDC and SLDC, Manipur
7
Angular difference exceeding cut off value
Shed load in the feeders identified as Group A, B, C, D in rotation
Automatic Wide Area : Wide Area: Signal sent to all 132 kVsubstations
Angle pairs to be decided. NERLDC and SLDC, Manipur
8
UFR I: 49.0 Hz
Manipur UFR requirement : 50 MW Automatic Local Area (pickup frequency = 49.0
Hz)
Local area : Stg-I = 10 MW,
10 Nos. UFRs required for Manipur
NERPC to Finalize
schemes and change pickup
/ stage frequencies as
given
UFR 2: 48.8 Hz Stg II = 15 MW,
UFR3: 48.6 Hz Stg III = 15 MW ; Balance 10 MW for survival of Islands
Wide Area: Activation / Deactivation of UFRs for near load-generation balance
9 Df/dt: 49.9 Hz plus 0.2 Hz/sec
Designated feeder in each control area
Automatic Local Area Local Area Not required
10 Islanding at 47.9 Hz
Power stations , loads Automatic Local Area Local Area Loktak Island (3 Nos. with multiple contacts) with loads in Gr.B above
NERPC to Finalize schemes
179
Annexure 5.4- Automatic Defense Plan summary for North Eastern Region
NO
RTH
EASTER
N R
EGIO
N-M
EGH
ALA
YA
Meghalaya
Sl. No.
Logic Control Action Manual/Automatic
Measurements as Input for control
area (Local / Wide Area)
Control Action (Local / Wide Area)
Remarks Action By
1
∆ P > 10 MW , ∆ P = Actual-Schd and freq < 50 Hz
Shed Load in Meghalaya. Rotate load-shedding in A,B,C,D groups of load. Rotation logic and sequence
to be programmed at SLDC and NERLDC PLC. After shedding of any
load, the following should be maintained : 1) Line loading (min. of Z3, SIL and stability limit) ; 2)
Bus Voltages (within IEGC band) ; 3) Angular Difference (within cut-
off value)
Stage 1 : Manual Stage 2 : Automatic
(From SLDC PLC after 15 minutes) Stage 3 : Backup
(from NERLDC PLC after 20 minutes)
Wide Area : Schedules & Drawal from
Augmented SCADA system at LDCs
Wide Area: signal sent from LDC
to identified sub-stations
in 3 groups; 33 kV feeders would be identified at each
substn.
Gr A : Mawlai, Nongstoin, Cherrapunjee, Nangalbibra, Tura (Ronkhon), (in any or all Substations)
NERLDC, CTU and SLDC, Meghalaya
Gr B: Khleihriat, Lumshnong, Industrial customers at Lumshnong, (in any or all Substations)
Gr C: EPIP II, EPIP I, Mawngap, Industrial customers at EPIP I and EPIP II, (in any or all Substations)
Gr D: Umiam, NEHU, NEIGRIHMS (in any or all Substations)
2
∆ P < 10 MW , ∆ P = Actual-Schd and freq > 50 Hz
Send signal to designated power stations A, B, C, D, E to reduce generation,. Rotation logic and sequence to be programmed at
SLDC and NERLDC PLC. After reduction of generation, the
following should be maintained : 1) Line loading (min. of Z3, SIL and
stability limit) ; 2) Bus Voltages (within IEGC band) ; 3) Angular
Difference (within cut-off value)
Stage 1 : Manual Stage 2 : Automatic
(From SLDC PLC after 15 minutes) Stage 3 : Backup
(from NERLDC PLC after 20 minutes)
Wide Area : Schedules & Drawal from
Augmented SCADA system at LDCs
Wide Area: signal sent from LDCs to power stations in
A,B and C
Stn A : Leshka HPS
NERLDC, CTU and SLDC, Meghalaya
Stn B : Umiam I HPS
Stn C : Umiam II HPS
Stn D : Umiam III HPS
Stn E : Umiam IV HPS
The power stations can wire for generation reduction through secondary control, if reqd., wire for unit tripping.
3 Voltage < 120 kV for 5 minutes
Shed load at 132 kV Substations identified in Sl.No.1 above
Stage 1: Alarm (126 kV) Stage 2: Automatic (120 kV for more than 5 minutes) Stage 3: 112 kV for 30 seconds
Local area: Bus Voltage Measurements Wide Area: Bus Voltage Measurements at NERLDC Augmented SCADA
Wide Area : Signal sent from LDC to 132 kV Substations
Under Voltage Load Shedding (UVLS). 2 Nos. UVLS relays required at 132 kV substations where Under-voltage phenomenon observed
NERLDC and SLDC, Meghalaya
180
4
132 kV Killing - EPIP II S/C crossing line limit (min. of Z3, SIL and Stability limit)
Shed Load at Gr.C and if necessary, at Gr.A and Gr. D as in Sl.No.1
Stage-1: Manual (SLDC level) Stage-2; Automatic through PLC
Local area: Loading of132 kV Killing - EPIP II S/C Wide area: Loading of 132 kV Killing - EPIP II S/C S/C through Augmented SCADA
Wide Area : Signal sent from SLDC 132 kV substations in Gr.C and Gr.A
SLDC, Meghalaya
NO
RTH
EASTER
N R
EGIO
N-M
EGH
ALA
YA
132 kV Umiam I - Mawlai S/C crossing line limit (min. of Z3, SIL and Stability limit)
Shed Load at Gr.A and Gr.D
Stage-1: Manual (SLDC level) Stage-2; Automatic through PLC
Local area: Loading of132 kV Umiam I - Mawlai S/C Wide area: Loading of 132 kV Umiam I - Mawlai S/C through Augmented SCADA
Wide Area : Signal sent from SLDC to Gr.A and Gr.B substations
SLDC, Meghalaya
5
Flows crossing TTC irrespective of frequency
Shed load in the feeders identified at S no 1 Group A, B, C and D in rotation
Automatic
Wide area: No. of measurements aggregated at NERLDC Augmented SCADA
Wide Area: Signal sent via wiring from NERLDC for load shedding
NERLDC and CTU
6
Loss of 132 kV Umiam I - Mawlai line or Umiam I - Umiam Line
Shed Load at Gr.A and Gr.D Automatic
Local Area : Measurement at 132 kV Mawlai Substation through Augmented SCADA
Wide Area : Shed Load at Gr.A and Gr.D
NERLDC and SLDC, Meghalaya
Loss of 132 kV Killing - EPIP II S/C
Shed load in Gr.C and Gr.B Automatic
Local Area : Line loading of 132 kV Killing - EPIP II S/C for one circuit outage through Augmented SCADA
Wide Area : Shed load in Gr.C and Gr.B
NERLDC and SLDC, Meghalaya
181
7
Angular difference exceeding cut off value
Shed load in the feeders identified as Group A, B, C and D in rotation
Automatic Wide Area : Wide Area: Signal sent to all 132 kVsubstations
Angle pairs to be decided. NERLDC and SLDC, Meghalaya
NO
RTH
EASTER
N R
EGIO
N-M
EGH
ALA
YA
8
UFR I: 49.0 Hz
Meghalaya UFR requirement : 60 MW
Automatic Local Area (pickup frequency = 49.0
Hz)
Local area : Stg-I = 10 MW,
25 Nos. UFRs required for Meghalaya
NERPC to Finalize schemes and
change pickup / stage frequencies
as given
UFR 2: 48.8 Hz Stg II = 15 MW,
UFR3: 48.6 Hz Stg III = 15 MW ; Balance 20 MW for survival of Islands
Wide Area: Activation / Deactivation of UFRs for near load-generation balance
9 Df/dt: 49.9 Hz plus 0.2 Hz/sec
Designated feeder in each control area
Automatic Local Area Local Area Not required
10 Islanding at 47.9 Hz
Power stations , loads Automatic Local Area Local Area
Island forming with Umiam St IV, Umiam St III, Umiam St I, Leshka Gneration and Mawlai & NEHU load
NERPC to Finalize schemes
182
Annexure 5.5- Automatic Defense Plan summary for North Eastern Region
NO
RTH
EASTER
N R
EGIO
N-M
IZOR
AM
Mizoram
Sl. No.
Logic Control Action Manual/Automatic Measurements as Input for control area (Local /
Wide Area)
Control Action (Local / Wide
Area) Remarks Action By
1
∆ P > 5 MW , ∆ P = Actual-Schd and freq < 50 Hz
Shed Load in Mizoram. Rotate load-shedding in A,B and C groups of load.
Rotation logic and sequence to be programmed at SLDC and NERLDC PLC.
After shedding of any load, the following should be maintained : 1)
Line loading (min. of Z3, SIL and stability limit) ; 2) Bus Voltages (within IEGC band) ; 3) Angular
Difference (within cut-off value)
Stage 1 : Manual Stage 2 : Automatic (From SLDC PLC after 15 minutes) Stage 3 : Backup (from NERLDC PLC after 20 minutes)
Wide Area : Schedules & Drawal from
Augmented SCADA system at LDCs
Wide Area: signal sent
from LDC to identified sub-
stations in 3 groups; 33
kV feeders would be
identified at each substn.
Gr A : Luangmual Substation
NERLDC, CTU and SLDC, Mizoram
Gr B: Kolasib Substation
Gr C: Zimabawk, Serchip , Lunglei, Saitual (in any or all Substations)
At present there is no proper infrastructure in Mizoram SLDC
2
∆ P < 5 MW , ∆ P = Actual-Schd and freq > 50 Hz
Send signal to ISGS to reduce generation. Rotation logic and
sequence to be programmed at NERLDC PLC. After reduction of
generation, the following should be maintained : 1) Line loading (min. of
Z3, SIL and stability limit) ; 2) Bus Voltages (within IEGC band) ; 3)
Angular Difference (within cut-off value)
Stage 1 : Manual Stage 2 : Automatic (From NERLDC PLC after 15 minutes)
Wide Area : Schedules & Drawal from Augmented SCADA system at RLDC
Wide Area: signal sent from RLDC to appropriate ISGS
The power stations can wire for
generation reduction , if reqd., wire for unit tripping. RLDC would take necessary action to revise schedule in
appropriate ISGS.
NERLDC, CTU and SLDC, Mizoram
3 Voltage < 120 kV for 5 minutes
Shed load at 132 kV Substations identified in Sl.No.1 above
Stage 1: Alarm (126 kV) Stage 2: Automatic (120 kV for more than 5 minutes) Stage 3: 112 kV for 30 seconds
Local area: Bus Voltage Measurements Wide Area: Bus Voltage Measurements at NERLDC Augmented SCADA
Wide Area : Signal sent from LDC to 132 kV Substations
Under Voltage Load Shedding (UVLS). 1 Nos. UVLS relays required at 132 kV substations where Under-voltage phenomenon observed
NERLDC and SLDC, Mizoram
183
4
ICT / line loading crossing normal operating limits
Shed load in designated feeders
Stage-1: Manual (SLDC level) Stage-2; Automatic through PLC
Local Area: Wide Area: SLDC, Mizoram
NO
RTH
EASTER
N R
EGIO
N-M
IZOR
AM
5
Flows crossing TTC irrespective of frequency
Shed load in the feeders identified at S no 1 Group A, B and C in rotation
Automatic
Wide area: No. of measurements aggregated at NERLDC Augmented SCADA
Wide Area: Signal sent via wiring from NERLDC for load shedding
NERLDC and CTU
6 Loss of High Capacity Corridor
Shed load in designated feeders Automatic NERLDC and SLDC, Mizoram
7
Angular difference exceeding cut off value
Shed load in the feeders identified as Group A , B and C in rotation
Automatic Wide Area :
Wide Area: Signal sent to all 132 kVsubstations
Angle pairs to be decided.
NERLDC and SLDC, Mizoram
8
UFR I: 49.0 Hz
Mizoram UFR requirement : 25 MW Automatic Local Area (pickup frequency = 49.0 Hz)
Local area : Stg-I = 3 MW,
6 Nos. UFRs required for Meghalaya
NERPC to Finalize schemes and change
pickup / stage frequencies as given
UFR 2: 48.8 Hz Stg II = 6 MW,
UFR3: 48.6 Hz
Stg III = 6 MW ; Balance 10 MW for survival of Islands
Wide Area: Activation / Deactivation of UFRs for near load-generation balance
9 Df/dt: 49.9 Hz plus 0.2 Hz/sec
Designated feeder in each control area Automatic Local Area Local Area Not required
10 Islanding at 47.9 Hz
Power stations , loads Automatic Local Area Local Area
Presently formation of islands not considered and no sufficient generation in Mizoram control area
NERPC to Finalize schemes
184
Annexure 5.6- Automatic Defence Plan summary for North Eastern Region
NO
RTH
EASTER
N R
EGIO
N-N
AG
ALA
ND
Nagaland
Sl. No.
Logic Control Action Manual/Automatic Measurements as
Input for control area (Local / Wide Area)
Control Action (Local / Wide
Area) Remarks Action By
1
∆ P > 5 MW , ∆ P = Actual-Schd and freq < 50 Hz
Shed Load in Nagaland. Rotate load-shedding in A, B and C groups of load. Rotation logic and sequence to be programmed at SLDC and NERLDC PLC. After shedding of any load, the following should be maintained : 1) Line loading (min. of Z3, SIL and stability limit) ; 2) Bus Voltages (within IEGC band) ; 3) Angular Difference (within cut-off value)
Stage 1 : Manual Stage 2 : Automatic (From SLDC PLC after 15 minutes) Stage 3 : Backup (from NERLDC PLC after 20 minutes)
Wide Area : Schedules & Drawal from Augmented SCADA system at LDCs
Wide Area: signal sent from LDC identified sub-stations in 2 groups; 33 kV feeders would be identified at each substn.
Gr A : Dimapur, Chumukedima, Ganeshnagar, Power house, Dairy Farm , Nito Farm (in any or all Substations)
NERLDC, CTU and SLDC, Nagaland
Gr B: Mokokchung, Zunheboto, Tuli, Nagnimora, Tizit, Mon (in any or all Substations)
Gr C: Kohima, Khipire, Tuensang, Meluri, Wokha (in any or all Substations)
At present there is no proper infrastructure in Nagaland SLDC
2
∆ P < 5 MW , ∆ P = Actual-Schd and freq > 50 Hz
Send signal to ISGS to reduce generation. Rotation logic and sequence to be programmed at NERLDC PLC. After reduction of generation, the following should be maintained : 1) Line loading (min. of Z3, SIL and stability limit) ; 2) Bus Voltages (within IEGC band) ; 3) Angular Difference (within cut-off value)
Stage 1 : Manual Stage 2 : Automatic (From NERLDC PLC after 15 minutes)
Wide Area : Schedules & Drawal from Augmented SCADA system at RLDC
Wide Area: signal sent from RLDC to appropriate ISGS
The power stations can wire for generation reduction , if reqd., wire for unit tripping. RLDC would take necessary action to revise schedule in appropriate ISGS.
NERLDC, CTU and SLDC, Nagaland
3 Voltage < 120 kV for 5 minutes
Shed load at 132 kV Substations identified in Sl.No.1 above
Stage 1: Alarm (126 kV) Stage 2: Automatic (120 kV for more than 5 minutes) Stage 3: 112 kV for 30 seconds
Local area: Bus Voltage Measurements Wide Area: Bus Voltage Measurements at NERLDC Augmented SCADA
Wide Area : Signal sent from LDC to 132 kV Substations
Under Voltage Load Shedding (UVLS). 1 Nos. UVLS relays required at 132 kV substations where Under-voltage phenomenon observed
NERLDC and SLDC, Nagaland
185
4
132 kV Dimapur (PG) - Dimapur S/C crossing line limit (min. of Z3, SIL and Stability limit)
Shed load at Gr. A substations as in Sl.No.1
Stage-1: Manual (SLDC level) Stage-2; Automatic through PLC
Local area: Loading of 132 kV Dimapur (PG) - Dimapur S/C Wide area: Loading of 132 kV Dimapur (PG) - Dimapur S/C through Augmented SCADA
Wide Area : Signal sent from SLDC 132 kV substations in Gr.A, Gr.B and Gr.C
SLDC, Nagaland
NO
RTH
EASTER
N R
EGIO
N-N
AG
ALA
ND
5
Flows crossing TTC irrespective of frequency
Shed load in the feeders identified at S no 1 Group A, B and C in rotation
Automatic
Wide area: No. of measurements aggregated at NERLDC Augmented SCADA
Wide Area: Signal sent via wiring from NERLDC for load shedding
NERLDC and CTU
6
Loss of 132 kV Dimapur(PG)-Dimapur line
Shed Load at Gr.A Automatic
Local Area : Measurement at 132 kV Dimapur(PG) Substation -
Wide Area : Shed Load at Gr.A
NERLDC and SLDC, Nagaland
Loss of 220/132 kV, 100 MVA, Dimapur ICT
Shed load at Gr.A Automatic
Local Area : Measurement at 132 kV Dimapur(PG) Substation -
Wide Area : Shed Load at Gr.A
NERLDC and SLDC, Nagaland
7
Angular difference exceeding cut off value
Shed load in the feeders identified as Group A and B in rotation
Automatic Wide Area :
Wide Area: Signal sent to all 132 kVsubstations
Angle pairs to be decided. NERLDC and SLDC, Nagaland
8
UFR I: 49.0 Hz
Nagaland UFR requirement : 35 MW
Automatic Local Area (pickup frequency = 49.0 Hz)
Local area : Stg-I = 5 MW,
17 Nos. UFRs required for Nagaland
NERPC to Finalize
schemes and change
pickup / stage frequencies
as given
UFR 2: 48.8 Hz Stg II = 10 MW,
UFR3: 48.6 Hz
Stg III = 10 MW ; Balance 10 MW for survival of Islands
Wide Area: Activation / Deactivation of UFRs for near load-generation balance
9 Df/dt: 49.9 Hz plus 0.2 Hz/sec
Designated feeder in each control area
Automatic Local Area Local Area Not required
10 Islanding at 47.9 Hz
Power stations , loads Automatic Local Area Local Area Doyang Island with Mokokchung load (Gr.B)
NERPC to Finalize schemes
186
Annexure 5.7- Automatic Defense Plan summary for North Eastern Region
NO
RTH
EASTER
N R
EGIO
N-TR
IPU
RA
Tripura
Sl. No.
Logic Control Action Manual/Automatic Measurements as
Input for control area (Local / Wide Area)
Control Action (Local / Wide
Area) Remarks Action By
1
∆ P > 10 MW , ∆ P = Actual-Schd and freq < 50 Hz
Shed Load in Tripura. Rotate load-shedding in A,B and C groups of load. Rotation logic and sequence to be programmed at SLDC and NERLDC PLC. After shedding of any load, the following should be maintained : 1) Line loading (min. of Z3, SIL and stability limit) ; 2) Bus Voltages (within IEGC band) ; 3) Angular Difference (within cut-off value)
Stage 1 : Manual Stage 2 : Automatic (From SLDC PLC after 15 minutes) Stage 3 : Backup (from NERLDC PLC after 20 minutes)
Wide Area : Schedules & Drawal from Augmented SCADA system at LDCs
Wide Area: signal sent from LDC to identified sub-stations in 2 groups; 33 kV feeders would be identified at each substn.
Gr A : Agartala (79 Tilla), Dhalabil, Kamalpur, Kailashohor, PK Bari, Dharmanagar (in any or all Substations)
NERLDC, CTU and SLDC, Tripura
Gr B: Budhjangnagar, Jirania, Teliamura, Ambassa (in any or all Substations)
Gr C: Udaipur, Amarpur, RabindraNagar, Bagafa, Gokul Nagar, Badarghat, Belonia, Sabroom, Satchand (in any or all Substations)
2
∆ P < 10 MW , ∆ P = Actual-Schd and freq > 50 Hz
Send signal to designated power stations A, B, C to reduce generation,. Rotation logic and sequence to be programmed at SLDC and NERLDC PLC. After reduction of generation, the following should be maintained : 1) Line loading (min. of Z3, SIL and stability limit) ; 2) Bus Voltages (within IEGC band) ; 3) Angular Difference (within cut-off value)
Stage 1 : Manual Stage 2 : Automatic (From SLDC PLC after 15 minutes) Stage 3 : Backup (from NERLDC PLC after 20 minutes)
Wide Area : Schedules & Drawal from Augmented SCADA system at LDCs
Wide Area: signal sent from LDCs to power stations in A,B and C
Stn A : Gumti HPS
NERLDC, CTU and SLDC, Tripura
Stn B : Baramura Gas PP
Stn C: Rokhia TPS The power stations can wire for generation reduction through secondary control, if reqd., wire for unit tripping.
3 Voltage < 120 kV for 5 minutes
Shed load at 132 kV Substations identified in Sl.No.1 above
Stage 1: Alarm (126 kV) Stage 2: Automatic (120 kV for more than 5 minutes) Stage 3: 112 kV for 30 seconds
Local area: Bus Voltage Measurements Wide Area: Bus Voltage Measurements at NERLDC Augmented SCADA
Wide Area : Signal sent from LDC to 132 kV Substations
Under Voltage Load Shedding (UVLS). 2 Nos. UVLS relays required at 132 kV substations where Under-voltage phenomenon observed
NERLDC and SLDC, Tripura
4
132 kV AGTPP- Agartala S/C crossing line limit (min. of Z3, SIL and Stability limit)
Shed Load at Gr.A and then at Gr.B substations as in Sl.No.1
Stage-1: Manual (SLDC level) Stage-2; Automatic through PLC
Local area: Loading of 132 kV AGTPP- Agartala S/C Wide area: Loading of 132 kV AGTPP- Agartala S/C through Augmented SCADA
SLDC, Tripura
187
132 kV AGTPP-Kumarghat S/C crossing line limit (min. of Z3, SIL and Stability limit)
Reduce injection of Stns. A, B and C of Tripura as in Sl.No.2
Stage-1: Manual (SLDC level) Stage-2; Automatic through PLC
Local area: Loading of 132 kV AGTPP-Kumarghat S/C Wide area: Loading of 132 kV AGTPP-Kumarghat S/C through Augmented SCADA
SLDC, Tripura
NO
RTH
EASTER
N R
EGIO
N-TR
IPU
RA
5
Flows crossing TTC irrespective of frequency
Load shedding to be done
Stage-1: Manual (SLDC level) Stage-2; Automatic through PLC
Wide area: No. of measurements aggregated at NERLDC Augmented SCADA
Wide Area: Signal sent via wiring from NERLDC for load shedding
NERLDC and CTU
6 Loss of High Capacity Corridor
Loss of High Capacity corridors Automatic NERLDC and SLDC, Tripura
7
Angular difference exceeding cut off value
Shed load in the feeders identified as Group A and B in rotation
Automatic Wide Area :
Wide Area: Signal sent to all 132 kVsubstations
Angle pairs to be decided. NERLDC and SLDC, Tripura
8
UFR I: 49.0 Hz
Tripura UFR requirement : 40 MW Automatic Local Area (pickup frequency = 49.0 Hz)
Local area : Stg-I = 5 MW,
18 Nos. UFRs required for Tripura
NERPC to Finalize schemes and change pickup / stage frequencies as given
UFR 2: 48.8 Hz Stg II = 10 MW,
UFR3: 48.6 Hz
Stg III = 15 MW ; Balance 10 MW for survival of Islands
Wide Area: Activation / Deactivation of UFRs for near load-generation balance
9 Df/dt: 49.9 Hz plus 0.2 Hz/sec
Designated feeder in each control area
Automatic Local Area Local Area Not required
10 Islanding at 47.9 Hz
Power stations , loads Automatic Local Area Local Area Rokhia Island (with loads of Gr.C), AGTPP Island (with Agartala Load)
NERPC to Finalize schemes
188
Annex 5.A- Intra Regional - Line Loading crossing the normal operating limits, TTC violation, Loss of Gen/High capacity corridor N
ER- IN
TRA
-REG
ION
AL LIN
E LOA
DIN
G C
RO
SSING
THE LIM
ITS
Sl. No.
Logic Control Action Manual/Automatic Measurements as Input for control area (Local / Wide
Area)
Control Action (Local / Wide Area)
Remarks Action By
4
Loading of 220 kV AGBPP-Mariani S/C crossing line limit (min. of Z3, SIL and Stability limit)
Reduce generation of AGBPP
Stage-1: Manual (AGBPP for generation reduction , SLDC
Assam for reduction of requisition)
Local Area : Loading of 220 kV AGBPP-Mariani S/C crossing limits
Local Area : Augmented SCADA system data ; Wide Area : Gr. E of Assam
The power stations can wire for generation reduction through secondary control, if reqd., wire for unit tripping..
NERLDC, CTU and SLDCs
Loading of 220 kV AGBPP-Misa S/C crossing line limit (min. of Z3, SIL and Stability limit)
Reduce generation of AGBPP
Stage-1: Manual (AGBPP for generation reduction , SLDC
Assam for reduction of requisition)
Local Area : Loading of 220 kV AGBPP-Misa S/C crossing limits
Local Area : Augmented SCADA system data ; Wide Area : Gr. E of Assam
The power stations can wire for generation reduction through secondary control, if reqd., wire for unit tripping.
NERLDC,CTU and SLDCs
Line loading of 132 kV Loktak-Imphal S/C crossing line limit (min. of Z3, SIL and Stability limit)
Reduce generation of Loktak HEP
Stage-1: Manual (SLDC level) Stage-2; Automatic through PLC
Line loading of 132 kV Loktak-Imphal S/C crossing limits
Local Area : Augmented SCADA system data
The power stations can wire for generation reduction through secondary control, if reqd., wire for unit tripping.For this, necessary amendments in clause 6.5.20 of IEGC are to be proposed.
NERLDC and SLDCs
Loading of 220 / 132 kV , 160 MVA Kopili ICT crossing limit
Reduce loads in southern part of NER Grid (South Assam (Gr.F of Assam), Mizoram, Tripura and if needed, Manipur) and Gr.B part of Meghalaya load fed from Khleihriat
Stage-1: Manual (SLDC level) Stage-2; Automatic through PLC
Local Area : Loading of 220/132 kV, 160 MVA, Kopili ICT crossing limits
Wide Area : Signal sent from RLDC to SLDCs and further to importants substations
NERLDC and SLDCs
189
Loading of 132 kV Khandong-Khleihriat S/C crossing line limit (min. of Z3, SIL and Stability limit)
Reduce loads in Gr.B part of Meghalaya load fed from Khleihriat
Stage-1: Manual (SLDC level) Stage-2; Automatic through PLC
Local Area : Loading of 132 kV Khandong-Khleihriat S/C crossing limits
Wide Area : Signal sent from RLDC to SLDCs and further to importants substations
NERLDC and SLDCs
NER
- INTR
A-R
EGIO
NA
L LINE LO
AD
ING
CR
OSSIN
G TH
E LIMITS
Loading of 132 kV Khleihriat - Badarpur S/C crossing line limit (min. of Z3, SIL and Stability limit)
Reduce loads in southern part of NER Grid (South Assam (Gr.F of Assam) , Mizoram, Tripura and if needed, Manipur)
Stage-1: Manual (SLDC level) Stage-2; Automatic through PLC
Local Area : Loading of 132 kV Khleihriat - Badarpur S/C crossing limits
Wide Area : Signal sent from RLDC to SLDCs and further to importants substations
NERLDC and SLDCs
Loading of 132 kV Khandong - Haflong S/C crossing line limit (min. of Z3, SIL and Stability limit)
Reduce loads in southern part of NER Grid (South Assam (Gr.F of Assam), Mizoram, Tripura and if needed, Manipur)
Stage-1: Manual (SLDC level) Stage-2; Automatic through PLC
Local Area : Loading of 132 kV Khandong - Haflong S/C crossing limits
Wide Area : Signal sent from RLDC to SLDCs and further to importants substations
NERLDC and SLDCs
Loading of 132 kV Dimapur - Imphal S/C crossing line limit (min. of Z3, SIL and Stability limit)
Reduce loads in southern part of NER Grid (South Assam(Gr.F of Assam), Mizoram, Tripura and if needed, Manipur)
Stage-1: Manual (SLDC level) Stage-2; Automatic through PLC
Local Area : Loading of 132 kV Dimapur - Imphal S/C crossing limits
Wide Area : Signal sent from RLDC to SLDCs and further to importants substations
NERLDC and SLDCs
Line loading of 132 kV Loktak-Jiribam S/C crossing line limit (min. of Z3, SIL and Stability limit)
Back down generation of Loktak HPS or shed load in South Assam (Gr.F of Assam), Mizoram and Tripura
Stage-1: Manual (SLDC level) Stage-2; Automatic through PLC
Local Area : Augmented SCADA system ;Wide Area : Signal sent from SLDC to 132 kV Substations
Wide Area : Signal sent from RLDC to SLDCs and further to importants substations
The power stations can wire for generation reduction through secondary control, if reqd., wire for unit tripping.For this, necessary amendments in clause 6.5.20 of IEGC are to be proposed.
NERLDC and SLDCs
190
Loading of 132 kV Ranganadi-Nirjuli S/C line crossing limit (min. of Z3, SIL and Stability limit)
Shed load in Gr.A and Gr.B in Arunchal Pradesh and in Gr.G of Assam
Stage-1: Manual (SLDC level) Stage-2; Automatic through PLC
Loading of 132 kV Ranganadi-Nirjuli S/C line crossing limits
Wide Area : Signal sent from RLDC to SLDCs and further to importants substations
NERLDC and SLDCs
NER
- INTR
A-R
EGIO
NA
L TTC V
IOLA
TION
/LOSS O
F GEN
Loading of 220 kV BTPS-Agia S/C line crossing limit (min. of Z3, SIL and Stability limit)
Shed load in all violating states of NER in proportion
Stage-1: Manual (SLDC level) Stage-2; Automatic through PLC
Local Area : Loading of 400 kV NewSiliguri - Bongaigaon S/C crossing limits
Wide Area : Signal sent from RLDC to SLDCs and further to importants substations
NERLDC and SLDCs
5
Flows crossing TTC irrespective of frequency
Shed load in all violating states of NER in proportion
Automatic Wide Area: No. of measurements aggregated at NERLDC Augmented SCADA
Wide Area: Signal sent via wiring from NERLDC for load shedding
NERLDC
6
Loss of High Capacity corridors
Loss of High Capacity corridors / Generation
Automatic
Loss of units of Ranganadi HPS
Shed load in all states of NER in proportion
Automatic Local Area: Measurement at 132 kV Ranganadi substation
Local Area: Proportionate load shedding in all states of NER as per GOI share
NERLDC and SLDCs
Loss of units of Loktak HPS
Shed Load in southern part of NER Grid (Manipur, South Assam, Mizoram, Tripura )
Automatic Local Area: Measurement at 132 kV Loktak substation
Local Area: Load shedding in southern part of NER Grid (Manipur, South Assam, Mizoram, Tripura)
NERLDC and SLDCs
Loss of units of AGBPP
Shed load in Gr.E of Assam system
Automatic Local Area: Measurement at 220 kV AGBPP substation
Wide Area: Load shedding in Gr.E of Assam system
NERLDC and SLDCs
Loss of units of AGTPP
Shed load in Tripura system
Automatic Local Area: Measurement at 132 kV AGTPP substation
Wide Area: Load shedding in entire Tripura system
NERLDC and SLDCs
191
Loss of 400 kV Bongaigaon - Balipara S/C line
Shed load in all states of NER in proportion
Automatic Local Area : Measurement at 400 kV Bongaigaon Substation -
Wide Area: Load shedding entire NER system
NERLDC and SLDCs
NER
- INTR
A-R
EGIO
NA
L LOSS O
F HIG
H C
AP
AC
ITY C
OR
RID
OR
Loss of 400 kV NewSiliguri - Bongaigaon S/C line
Shed load in all states of NER in proportion
Automatic Local Area : Measurement at 400 kV Bongaigaon Substation -
Wide Area: Load shedding entire NER system
NERLDC and SLDCs
Loss of 220/132 kV , 160 MVA ICT at Kopili
Shed Load in southern part of NER Grid (South Assam, Mizoram, Tripura and ,if needed, Manipur system) and Gr.B part of Meghalaya load fed from Khleihriat
Automatic Local Area : Measurement at 132 kV Kopili Substation -
Wide Area: Load shedding in southern part of NER Grid (South Assam, Mizoram, Tripura and if needed, Manipur) and Gr.B part of Meghalaya load fed from Khleihriat
NERLDC and SLDCs
Loss of 220 kV Misa - Mariani Line
Reduce generation of AGBPP
Automatic Local Area : Measurement at 220 kV Mariani Substation -
Reduce generation of AGBPP
NERLDC and SLDCs
Loss of 132 kV Khandong-Khleihriat S/C crossing line
Shed Load in Gr.B part of Meghalaya load
Automatic Local Area : Measurement at 220 kV Khleihriat Substation
Wide Area: Load shedding in Gr.B part of Meghalaya load fed from Khleihriat
NERLDC and SLDCs
Loss of 132 kV Khleihriat - Badarpur S/C line
Shed Load in outhern part of NER Grid (South Assam (Gr.F of Assam), Mizoram, Tripura and if needed, Manipur)
Automatic Local Area : Measurement at 220 kV Khleihriat Substation
Wide Area: Load shedding in southern part of NER Grid (South Assam, Mizoram, Tripura and if needed, Manipur)
NERLDC and SLDCs
Loss of 132 kV Khandong - Haflong S/C line
Shed Load in outhern part of NER Grid (South Assam (Gr.F of Assam), Mizoram, Tripura and if needed, Manipur)
Automatic Local Area : Measurement at 132 kV Khandong Substation -
Wide Area: Load shedding in southern part of NER Grid (South Assam, Mizoram, Tripura and if needed, Manipur)
NERLDC and SLDCs
192
Loss of 132 kV Dimapur - Imphal S/C line
Shed Load in outhern part of NER Grid (South Assam (Gr.F of Assam), Mizoram, Tripura and Manipur)
Automatic Local Area : Measurement at 132 kV Imphal Substation
Wide Area: Load shedding in southern part of NER Grid (South Assam, Mizoram, Tripura and if needed, Manipur)
NERLDC and SLDCs
NER
- INTR
A-R
EGIO
NA
L LOSS O
F HIG
H C
AP
AC
ITY C
OR
RID
OR
Loss of 132 kV Loktak - Jiribam S/C line
Back down generation of Loktak HPS or shed load in South Assam, Mizoram and Tripura+
Automatic Local Area : Measurement at 132 kV Loktak Substation -
Wide Area: Back down generation of Loktak HPS or shed load in South Assam, Mizoram and Tripura
The power stations can wire for generation reduction through secondary control, if reqd., wire for unit tripping.For this, necessary amendments in clause 6.5.20 of IEGC are to be proposed.
NERLDC and SLDCs
Loss of 132 kV Ranganadi-Nirjuli S/C line
Shed load in Gr.A and Gr.B in Arunchal Pradesh and in Gr.G of Assam
Automatic Local Area : Measurement at 132 kV Nirjuli Substation -
Wide Area : Shed load in Gr.A and Gr.B in Arunchal Pradesh and in Gr.G of Assam
NERLDC and SLDCs
Loss of 220 kV BTPS-Agia S/C line Shed load in all states of
NER in proportion
Automatic Local Area : Measurement at 132 kV BTPS Substation -
Wide Area : Load shedding to be done in entire system of NER
NERLDC and SLDCs
Loss of 132 kV BTPS-Dhaligaon S/C line
Back down Stns. A, B and C of Assam system
Automatic Local Area : Measurement at 132 kV BTPS Substation -
Wide Area: Injection of Stns. A, B and C to be reduced
NERLDC and SLDCs
193
Annex 5.B-NER-Islanding Schemes Note: All islanding scheme will set at 47.8 Hz Instantaneous till the revised AUFR settings in place.
Sr.
No Scheme Island size
Frequency of island
initiation status
Group/Stat
e
NER
- ISLAN
DIN
G SC
HEM
ES
1
Islanding of entire NER after disconnecting 400 kV Bongaigaon –
Binaguri D/C line & 220 kV Salakati –Birpara D/C line from Bongaigaon
& Salakati respectively with the help of UFR relays
1200 - 1800 MW 48.2 Hz instantaneous Proposed NER
2
Loktak(NHPC) Generation with Manipur load by disconnecting 132 kV
Loktak- Jiribam-II & 132 kV Dimapur – Imphal lines with the help of
UFR relays
35 - 100 MW 47.8 Hz instantaneous Proposed Loktak &
Manipur
3 DHEP with part of Nagaland(Mokakchung Load) disconnecting 132 kV
Doyang – Dimapur D/C line with the help of UFR relays 7 -10 MW 47.8 Hz instantaneous Proposed
DHEP &
Nagaland
4 NTPS(Assam) with part of upper Assam load 40 - 60 MW 47.8 Hz instantaneous Already in
place Assam
5 KLHEP(Assam) with Guwahati load 40 – 80 MW 47.8 Hz instantaneous
Proposed.
Being
studied by
Assam.
Assam
194
Annex 5.B-NER-Islanding Schemes Note: All islanding scheme will set at 47.8 Hz Instantaneous till the revised AUFR settings in place.
Sr.
No Scheme Island size
Frequency of island
initiation status
Group/St
ate
NER
- ISLAN
DIN
G SC
HEM
ES
6 AGTPP(NEEPCO) generation with Agartala(Tripura) load 40 – 70 MW 47.8 Hz
instantaneous Proposed
AGTPP &
Tripura
7 Rokhia(Tripura) generation with load of adjoining area 20 - 40 MW 47.8 Hz
instantaneous
Proposed.
Being
studied by
Tripura.
Tripura
8 Umium Stage-I & Stage-II, Kyrdamkulai Stage – III & Stage – IV with
Mawlai , Nehu & Neghrim load 60 – 80 MW
47.8 Hz
instantaneous
Proposed.
Being
studied by
Meghalaya.
Meghala
ya
9 AGBPP(NEEPCO) generation with Tinsukia, Mariani (Assam) &
Deomali (AP) load 80 – 120 MW
47.8 Hz
instantaneous Proposed.
AGBPP,
Assam &
AP