Automated Continuous Streamflow and Water-Quality Monitoring in the Blackstone River at the Massachusetts-Rhode Island State Line
U.S. Geological SurveyNew England Water Science Center
in cooperation with
Massachusetts Dept. of Environmental ProtectionDivision of Watershed Management
US Department of InteriorUS Geological SurveyU.S. Department of the Interior
U.S. Geological Survey
Objectives:• Monitor streamflow and water-quality at USGS station 01111230 (Blackstone River at Millville, MA)• Collect data sufficient to produce reliable estimates of nutrient, suspended-sediment and trace-metal loads crossing the Massachusetts-Rhode Island state line• Use surrogate water-quality indicators to develop equations to calculate real-time estimates of constituent loads
Approach:• Automated, composite sampling to provide a more
accurate record of total loads and also variations in loads.
DRAFT
Automated flow-proportional sampling with in-line filtration
Refrigerator
Logger, modem, and relayenclosure
Pump and Filtrationenclosure
Heater
Sampling and filtration pumps
Filter bank for metalsamples
Flow switch
Ventedholding vessels
Pinch valvesKeypad and battery backup
To refrigerated sample containers
DRAFT
Manual EWI sampling from RR bridge for quality assurance of automatedflow-proportional point samples
DRAFT
US Department of InteriorUS Geological Survey
Flow duration curve at Route 122 and manually sampled events at Millville
sampled eventsBridge/Point/Blank samples
04/16/14 flow: 1370 cfs
Point sample 03/24/14 flow: 687 cfs
Point sample 06/26/14 and 07/03/14
flows: 116 and 87 cfs
Bridge/Point sample 06/19/14 flow: 172 cfs
Bridge/Point sample 05/01/14 flow: 1250 cfs
Provisional data pending final approval
14-day nutrient loads, Blackstone River at Millville-October 2012 to November 2013
Provisional data pending final approval
US Department of InteriorUS Geological Survey
Four-day metals loads, Blackstone River at Millville-October 2012 to November 2013
Provisional data pending final approval
Initial regressions on particulate metals and in situ turbidity
US Department of InteriorUS Geological Survey
Provisional data pending final approval
US Department of InteriorUS Geological Survey
Conclusions:• Continuous records and point samples collected in the Blackstone River at the MA-RI state line are representative of water-quality conditions in the river.• Transport of nutrient and trace-metal species across the MA-RI state line can be monitored by automated, flow- proportional sampling.• Continuous, real-time loads for nutrients,
trace metals, and other constituents of interest may be
estimated from surrogate records.• Uncertainties associated with load estimates need to be confirmed.
DRAFT