Upload
arpit-gupta
View
218
Download
0
Tags:
Embed Size (px)
DESCRIPTION
Citation preview
MEBESTO PRODUCTS
Presented By:
Maninder kaur
Neelam Monga
Arpit Gupta
Nitin Kochhar
Introduction of MEBESTO
Manufacturers & Suppliers of Two Wheeler Spare Parts
Main Clients – Honda & Hero Honda
Specialised products – Foot Rest Rubber Set & Brake Rod
An ISO 9001-2008 Certified Company
Product Profile
Foot Rest Rubber SetBrake Rod
Raw Material
IRON PIPE
SQUARE IRON PIPE
ROUND IRON PIPE
Production Process of Foot Rest Rubber Set
On Cutter •Cutting of Pipe
On Rust Cleaner
•Rust Cleaning
On Drilling Machine
•Drilling
On Tipper Cutter
•Tip Cutting
Contd…
On Stamping Press •Stamping
Powder Coating
Rubber Coating
Accessories Fitting
Packaging
Production Process of Brake Rod
•Forging
•Operation on press
Contd…
•Spot Welding
•Zinc Coating
•Packing
Packaging
Brand Packing Loose Packing
Transportation
According to Customers’ Preferences
Tempos are used for local delivery of order.
Tempos are taken on fare.
Quality Control
DEFINATION Quality control may be defined as that industrial management
technique or group of technique by means of which product of uniform quality are manufactured”.
OBJECTIVETo access the quality of raw material, semi finished goods and
finished goods.To see whether the product confirms to the predetermined
standards.To suggest suitable improvement.To develop quality consciousness.To reduce the wastage.
Quality Control (Contd…)
Highest Priority
Durability, Quality and Dependability is main aim of quality program.
3 steps checking
Incoming Material
Inspection Test
Checking when production starts
Checking at the time of packing
Maintenance Management Maintenance is defined as “an act of keeping
something in good condition by checking or repairing it regularly”.
OR “An activity carried out for any equipment or
asset to ensure its reliability to perform its function”
Objectives of Maintenance Management
Minimum Breakdown Time.
Utilization of Optimum Capacity.
To keep the life of the equipment.
To ensure the highest availability.
Improve productivity.
Ensure safety.
Maintenance Policy of Mebesto
Preventive maintenance.
Record is maintained for each machinery.
Each machine runs for 12 hrs a day.
Backup is available for each machinery in case of any repair or break down.
Inventory Management
Raw material is acquired from Gobindgarh.
Minimum & Maximum level of stock is taken into consideration before placing a order.
Order is placed when the stock reaches the minimum level.
5 to 10 percent is raw material wastage.
Order is placed 1 week before the stock reaches minimum level .
Production ReportDaily production report is made at MEBESTO.
Different type report made are-
Packaging report.
Defective piece report.
Customer complaint report.
Thank you….