4
ELSEVIER Int. J. Production Economics 46--47 (1996) 633-636 international joumal of product!on economics Author Index to Volumes 46 and 47 Abdel-Malek, L. and N. Asadathorn, An analytical approach to process planning with rework option Agrell, P.J. and J. Wikner, A coherent methodology for productivity analysis employing integrated partial efficiency Alnestig, P. and A. Segerstedt, Product costing in ten Swedish manufacturing companies Asadathorn, N., see Abdel-Malek, L. 46 47 (19961 511 46-47 (1996) 401 46 47(1996) 441 46 47 (1996i 511 Berry, D. and M.M. Naim, Quantifying the relative improvements of redesign strategies in a P.C. supply chain Bertrand, J.W.M. and H.P.G. van Ooijen, Integrating material coordination and capacity load smoothing in multi-product multi-phase production systems Bolmsj6, G.S., see Dahl+n, P. Boone, T., S.P. Johnson, M. Sisk and D.C. Whybark, An analysis of research on international operations networks Bruun, P. and R.N. Mefford, A framework for selecting and introducing appropriate produc- tion technology in developing countries Brynz~r, H. and M.I. Johansson, Storage location assignment: Using the product structure to reduce order picking times Buitenhek, R., see Zijm, W.H.M. 46 47 (19961 181 46 47 (1996) 1 46 47 (1996} 459 46 47 (1996) 477 46 47 (1996) 197 46-47 (1996) 595 46.47 (1996) 165 Charalambopoulos, A., see Lagodimos, A.G. Chik'~n, A. and K. Demeter, Services provided by manufacturing The Hungarian case 46-47 (1996) 621 46 47 (1996) 489 Dahl6n, P. and G.S. Bolmsj6, Life-cycle cost analysis of the labor factor de Kok, T., see van Donselaar, K. de Souza, A., see Kingsman, B. de Vries, J., see van der Vaart, J.T. Dekker, R., see van der Laan, E. Dellaert, N. and E. van de Poel, Global inventory control in an academic hospital Dellaert, N.P. and M.T. Melo, Stochastic lot-sizing: Solution and heuristic methods Demeter, K., see Chikan, A. Diega, S.N.L., see Perrone, G. 46 47 (1996) 459 46 47 (1996) 285 4647 (1996) 219 46-47 (1996) 137 4647 (1996) 339 46 47 (1996) 277 46-47 (1996) 261 46J,7 (1996) 489 46 47 (1996) 549 Erkip, N., see Giillii, R. 46 47 (1996} 311 Fortemps, P., C.O.M. Pirlot, J. Teghem and D. Tuyttens, Using metaheuristics for solving a production scheduling problem in a chemical firm. A case study Frauendorfer, K. and E, K6nigsperger, Concepts for improving scheduling decisions: An application in the chemical industry Fr6hner, K.-D. and K. Iwata, Evaluating designing principles of Japanese production systems 46-47 (1996) 13 46-47 (19961 27 46-47 (1996) 211 0925-5273/96/$15.00 Copyright (@ 1996 Elsevier Science B.V. All rights reserved

Author index to volumes 46 and 47

  • View
    215

  • Download
    0

Embed Size (px)

Citation preview

Page 1: Author index to volumes 46 and 47

ELSEVIER Int. J. Production Economics 46--47 (1996) 633-636

international joumal of

product!on economics

Author Index to Volumes 46 and 47

Abdel-Malek, L. and N. Asadathorn, An analytical approach to process planning with rework option

Agrell, P.J. and J. Wikner, A coherent methodology for productivity analysis employing integrated partial efficiency

Alnestig, P. and A. Segerstedt, Product costing in ten Swedish manufacturing companies Asadathorn, N., see Abdel-Malek, L.

46 47 (19961 511

46-47 (1996) 401 46 47(1996) 441 46 47 (1996i 511

Berry, D. and M.M. Naim, Quantifying the relative improvements of redesign strategies in a P.C. supply chain

Bertrand, J.W.M. and H.P.G. van Ooijen, Integrating material coordination and capacity load smoothing in multi-product multi-phase production systems

Bolmsj6, G.S., see Dahl+n, P. Boone, T., S.P. Johnson, M. Sisk and D.C. Whybark, An analysis of research on international

operations networks Bruun, P. and R.N. Mefford, A framework for selecting and introducing appropriate produc-

tion technology in developing countries Brynz~r, H. and M.I. Johansson, Storage location assignment: Using the product structure to

reduce order picking times Buitenhek, R., see Zijm, W.H.M.

46 47 (19961 181

4 6 47 (1996) 1 46 47 (1996} 459

46 47 (1996) 477

46 47 (1996) 197

46-47 (1996) 595 46.47 (1996) 165

Charalambopoulos, A., see Lagodimos, A.G. Chik'~n, A. and K. Demeter, Services provided by manufacturing The Hungarian case

46-47 (1996) 621 46 47 (1996) 489

Dahl6n, P. and G.S. Bolmsj6, Life-cycle cost analysis of the labor factor de Kok, T., see van Donselaar, K. de Souza, A., see Kingsman, B. de Vries, J., see van der Vaart, J.T. Dekker, R., see van der Laan, E. Dellaert, N. and E. van de Poel, Global inventory control in an academic hospital Dellaert, N.P. and M.T. Melo, Stochastic lot-sizing: Solution and heuristic methods Demeter, K., see Chikan, A. Diega, S.N.L., see Perrone, G.

46 47 (1996) 459 46 47 (1996) 285 4647 (1996) 219 46-47 (1996) 137 4647 (1996) 339 46 47 (1996) 277 46-47 (1996) 261 46J,7 (1996) 489 46 47 (1996) 549

Erkip, N., see Giillii, R. 46 47 (1996} 311

Fortemps, P., C.O.M. Pirlot, J. Teghem and D. Tuyttens, Using metaheuristics for solving a production scheduling problem in a chemical firm. A case study

Frauendorfer, K. and E, K6nigsperger, Concepts for improving scheduling decisions: An application in the chemical industry

Fr6hner, K.-D. and K. Iwata, Evaluating designing principles of Japanese production systems

46-47 (1996) 13

46-47 (19961 27 46-47 (1996) 211

0925-5273/96/$15.00 Copyright (@ 1996 Elsevier Science B.V. All rights reserved

Page 2: Author index to volumes 46 and 47

634 Author Index to Volumes 46-47

Gaalman, G.J.C. and W.M. Nawijn, Tool sharing in parallel part production Gaalman, G., see Land, M. Golenko-Ginzburg, D., A. Gonik and S. Kesler, Hierarchical decision-making model for

planning and controlling stochastic projects Golenko-Ginzburg, D., Z. Sinuany-Stern and V. Kats, A multilevel decision-making system

with multiple resources for controlling cotton harvesting Gonik, A., see Goelnko-Ginzburg, D. Gover, C.P.M., What and how about quality function deployment (QFD) Gregory, M., see Neely, A. Gregory, M.J., see Platts, K.W. Grobel, T., see Z/ilch, G. Grubbstr6m, R.W. and A. Molinder, Safety production plans in MRP-systems using transform

methodology G/ill/i, R. and N. Erkip, Optimal allocation policies in a two-echelon inventory problem with

fixed shipment costs

46~47 (1996) 521 46-47 (1996) 535

46-47 (1996) 39

46-47 (1996) 55 46 47 (1996) 39 46-47 (1996) 575 46-47 (1996) 423 4647 (1996) 233 4647 (1996) 251

46-47 (1996) 297

46~47 (1996) 311

Hartman, T.E. and J.E. Storbeck, Input congestion in loan operations Hendry, L., see Kingsman, B.

46-47 (1996) 413 4647 (1996) 219

Inderfurth, K. and R. Schefer, Analysis of order-up-to-S inventory policies under cash flow market value maximization

Irianto, D., Inspection and correction policies in setting economic product tolerance Iwata, K., see Fr6hner, K.-D.

46-47 (1996) 323 46-47 (1996) 587 46~47 (1996) 211

Johansen, S.G., Transfer pricing of a service department facing random demand Johansen, S.G. and A. Thorstenson, Optimal (r, Q) inventory policies with Poisson demands

and lost sales: discounted and undiscounted cases Johansson, M.I., see Brynzar, H. Johnson, S.P., see Boone, T.

46-47 (1996) 351

46-47 (1996) 359 46-47 (1996) 595 46-47 (1996) 477

Kats, V., see Golenko-Ginzburg, D. Kavgalaki, A., see Lagodimos, A.G. Kesler, S., see Goelnko-Ginzburg, D. Kingsman, B., L. Hendry, A. Mercer and A. de Souza, Responding to customer enquiries in

make-to-order companies Problems and solutions K6nigsperger, E., see Frauendorfer, K. Korpela, J. and M. Tuominen, A decision support system for strategic issues management of

logistics

46-47 (1996) 55 46-47 (1996) 621 46-47 (1996) 39

46-47 (1996) 219 46-47 (1996) 27

46-47 (1996) 605

Lagodimos, A.G., A. Charalambopoulos, A. Kavgalaki, Computer-aided packing shop schedul- ing in a manufacturing plant

Land, M. and G. Gaalman, Workload control concepts in job shops: A critical assessment Leussink, R.A.M., see Schutten, J.M.J. Liski, E.P. and T. Nummi, The marking for bucking under uncertainty in automatic harvesting

of forests

46-47 (1996) 62l 46-47 (1996) 535 46-47 (1996) 119

46-47 (1996) 373

McGee, V.E. and D.F. Pyke, Periodic production scheduling at a fastener manufacturer Mefford, R.N., see Bruun, P. Melo, M.T., see Dellaert, N.P. Mercer, A., see Kingsman, B. Mills, J., see Neely, A. Mills, J.F., see Platts, K.W. Miltenburg, J. and D. Sparling, Managing and reducing total cycle time: models and analysis Minifie, J.R. and V.L. West, American health care reform: An international perspective Molinder, A., see Grubbstr6m, R.W.

46-47 (1996) 65 46-47 (1996) 197 46-47 (1996) 261 46-47 (1996) 219 46-47 (1996) 423 46-47 (1996) 233 46-47 (1996) 89 46-47 (1996) 497 46-47 (1996) 297

Page 3: Author index to volumes 46 and 47

Author Index to Volumes 46 47 635

Naim, M,M,. see Berry, D. Nawijn, W.M., see Gaalman, G.J.C. Neely, A., J. Mills, K. Platts, M. Gregory and H. Richards, Performance measurement system

design: Should process based approaches be adopted? Neely, AD., see Platts, K.W. Nummi, T., see Liski, E.P.

Paranko, J., Cost of free capacity Perrone, G. and S.N.L. Diega, Strategic FMS design under uncertainty: A fuzzy set theory

based model Pirlot, C.O.M., see Fortemps, P. Platts, K.W., J.F. Mills, A.D. Neely, M,J. Gregory and A.H. Richards, Evaluating manufactur-

ing strategy formulation processes Platts, K., see Neely, A. Pyke, D.F., see McGee, V.E.

Richards, A.H., see Platts, K.W. Richards, H., see Neely, A. Ridder, A., see van der Laan, E. Ritchie, P.C. and J.E. Rowcroft, Choice of metric in the measurement of relative productive

efficiency Rowcroft, J.E., see Ritchie, P.C. Rutten, W., see van Donselaar, K.

Salomon, M., see van der Laan, E. Sauer, N., Optimization of cyclic manufacturing systems with stochastic manufacturing times

using event graphs Schefer, R., see Inderfurth, K. Schjaer-Jacobsen, H., A new method for evaluating worst- and best-case (WBC) economic

consequences of technological development Schmidt, G., Modelling production scheduling systems Schutten, J.M.J. and R.A.M. Leussink, Parallel machine scheduling with release dates, due

dates and family setup times Segerstedt, A., Formulas of MRP Segerstedt, A., see Alnestig, P. Sinuany-Stern, Z., see Golenko-Ginzburg, D. Sisk, M., see Boone, T. Sparling, D., see Miltenbrug, J. Storbeck, J.E., see Hartman, T.E.

Teghem, J., see Fortemps, P. Thorstenson, A., see Johansen, S.G. Tuominen, M., see Korpela, J. Tuyttens, D.. see Fortemps, P.

van der Laan, E., R. Dekker, M. Salomon and A. Ridder, An (s, Q) inventory model with remanufacturing and disposal

van de Poel, E., see Dellaert, N. van der Vaart, J.T., J. de Vries and J. Wijngaard, Complexity and uncertainty of materials

procurement in assembly situation van Donselaar, K., T, de Kok and W. Rutten, Two replenishment strategies for the lost sales

inventory model: A comparison van Ooijen, H.P.G., see Bertrand, J.W.M.

West, V.L., see Minifie, J.R. Whybark, D.C., see Boone, T. Wijngaard, J., see van der Vaart, J.T. Wikner, J., see Agrell, P.J.

46 47 46 47

4647 46 47 46 47

46 47

46 47 46-47

46 47 4647 46 47

46 47 46-47 46 47

46 47 46 47 46 47

4647

46 47 46 47

46 47 46 47

46 47 46 47 46 47 46 47 46 47 46 47 46 47

46 47 46 47 46 47 46 47

46 47 46 47

46 47

(1996) 181 (1996) 521

(1996) 423 (1996) 233 (1996) 373

(1996) 469

(1996) 549 (1996) 13

(1996) 233 (1996) 423 (1996) 65

(1996) 233 (1996) 423 (1996) 339

(1996) 433 (1996) 433 (1996) 285

(1996) 339

(1996) 387 (1996) 323

(t996 241 (1996 109

(1996 119 (1996 127 (1996 441 (1996 55 (1996 477 11996 89 (1996 413

(1996) 13 (1996) 359 (1996) 605 (1996) 13

(1996) 339 (1996) 277

(1996) 137

46 47 (1996) 285 46 -47 (1996) 1

46-47 46 47 46 47 46 47

(1996) 497 (1996) 477 (1996) 137 (1996) 401

Page 4: Author index to volumes 46 and 47

636 Author Index to Volumes 46-47

Z/ipfel, G., Production planning in the case of uncertain individual demand: Extension for an MRP II concept

Zavanella, L., Guidelines for tool store dimensioning in flexible manufacturing using an analytical technique

Zijm, W.H.M. and R. Buitenhek, Capacity planning and lead time management Ziilch, G. and T. Grobel, Shaping the organization of order processing with the simulation tool

FEMOS

46-47 (1996) 153

46-47 (1996) 563 46-47 (1996) 165

46-47 (1996) 251