Upload
kangbahar
View
6
Download
0
Tags:
Embed Size (px)
Citation preview
5/28/2018 Australian Paper - Gas Fired Boiler #9
1/3
Australian Paper, Maryvale, Vic
APA Group, Euroa, Vic
Victorian Desalination Project, Wonthaggi, Vic
Patricia Baleen, Newmerella, Vic
Gippsland Water, Morwell, Vic
Woodside Petroleum/Otway Gas Plant, Port
Campbell, Vic
Esso, Hastings, Vic
Lang Lang processing gas plant, Vic
Toyota Mechanical Division, Altona Vic
Thompson Dam, Vic
Hazelwood Power, Hazelwood, Vic
Telstra Dome/Etihad, Docklands, Vic
Australian Paper
Gas Fired Boiler #9
In June 2012, Primaweld was awarded the contract to supply labour and resources to repair the economiser
and bifurcation sections of #9 gas fired boiled at Australian Paper Maryvale Mill. The duration of this shut
lasted a total of 4 weeks and was finished early July 2012
3rd Effect Head Replacement
Fabrication of a 4.2 metre diameter, 16mm thick stainless steel vessel. This 9 tonne top section of the vessel
was fitted on site and welded in place during the 10 day May 2012 shut.
E4 Evaporator Upgrade (SITE)
During 2011, Primaweld undertook this project consisting of the removal of an existing vessel, refurbish of the
existing structure and install new vessel with new piping and ducting system
Raw Water Upgrade
Supply and Fabrication of 300-500nb stainless steel pipe line including site installation, NDT & hydro testing.
M1, M2 Gantry Crane Replacement
Replacement of existing gantry cranes with brand new equivalents including removal and reinstallation of
existing roof structures
M5 Steam Upgrade
Fabrication and Installation of new steam lines including NDT testing
Burke Street Pipe Bridge (Pulp Mill Project)
Supply, fabrication & partial assembly of several secti ons of the "burke Street" pipe bridge and access towers.
Home
About UsNews
Services
Safety and Quality
Projects
Contact Us
ISO 9001
Australian Paper - Gas Fired Boiler #9 http://primaweld.com.au/index.php/projects/australian-paper/
1 of 3 26/03/2014 16:34
5/28/2018 Australian Paper - Gas Fired Boiler #9
2/3
M1 High consistency refiner upgrade
Blow Tank
As part of the Batch mill upgrade, Primaweld was awarded the supply, fabrication, testing and i nstallation of
the blow tank. Material used was 2205 Stainless Steel and had a circumference of approx. 7.5m, was 36
metres long and weight 80 tonnes.
M5 Paper Machine (SITE)
Australian Paper installed a new paper machine and some major upgrades took place in order to service their
latest demands. At a cost of $ 830,000 the contract was awarded to Primaweld in February 1997 with
completion in June 1997. Primaweld's responsibility under this contract was to supply materials (structural
steel and piping), shop fabrication and installation on site.
Australian Paper - Gas Fired Boiler #9 http://primaweld.com.au/index.php/projects/australian-paper/
2 of 3 26/03/2014 16:34
5/28/2018 Australian Paper - Gas Fired Boiler #9
3/3
Sign In to Edit this Site
2014 Primaweld Group.
Built with concrete5 - an open source CMS
Australian Paper - Gas Fired Boiler #9 http://primaweld.com.au/index.php/projects/australian-paper/
3 of 3 26/03/2014 16:34