Upload
nhi
View
33
Download
2
Tags:
Embed Size (px)
DESCRIPTION
Australian National Speed Measurement Program: Technology, Type Approval, Verification Eur Ing Dr Richard Brittain LLB Manager, Legal Metrology Authority Appointments. Introduction Regulation of vehicle-speed in Australia Pattern approval testing criteria under discussion - PowerPoint PPT Presentation
Citation preview
OIML TC7/SC4 NIST 16-18 July 2013
1
Australian National Speed Measurement Program: Technology, Type Approval, Verification
Eur Ing Dr Richard Brittain LLBManager, Legal Metrology Authority Appointments
OIML TC7/SC4 NIST 16-18 July 2013
Australian National Speed Measurement Program
2
Introduction
Regulation of vehicle-speed in Australia
Pattern approval testing criteria under discussion
Field calibration of vehicle speed measuring instruments
OIML TC7/SC4 NIST 16-18 July 2013
Australian National Speed Measurement Program
3
Introduction
Chartered Engineer/Physicist/Scientist
Solicitor and Barrister Supreme Court of News South Wales
~21 years in legal metrology
Manager, Legal Metrology Authority Appointments
NMI division of DIICCSRTE
OIML TC7/SC4 NIST 16-18 July 2013
Australian National Speed Measurement Program
4
Introduction
OIML TC7/SC4 NIST 16-18 July 2013
Australian National Speed Measurement Program
5
Regulation of vehicle-speed in Australia
Same size as USA (minus Alaska)
Population ~23 million
Federation of States (like USA)
8 ‘States’ (6 States + 2 self governing Territories)
OIML TC7/SC4 NIST 16-18 July 2013
Australian National Speed Measurement Program
6
Regulation of vehicle-speed in Australia
Constitution specific responsibilities – Commonwealth- residual States (like USA)
Inverse of Canadian constitution?
Common law country (like USA) – presumption of innocence and adversarial
Regulation of traffic speed - State responsibility
OIML TC7/SC4 NIST 16-18 July 2013
Australian National Speed Measurement Program
7
Regulation of vehicle-speed in Australia
Commonwealth – through NMI gives effect to international treaty obligations wrt measurement
Treaty of the Metre - 1947
OIML Convention - 1959
National Measurement Act 1960 (Cth)
OIML TC7/SC4 NIST 16-18 July 2013
Australian National Speed Measurement Program
8
Australian National Speed Measurement Program
Regulation of vehicle-speed in Australia
Commonwealth – through NMI gives effect to international treaty obligation wrt measurement
8
PERTH
DARWIN
Alice Springs
SYDNEY CANBERRA
MELBOURNE
BRISBANE
HOBART
ADELAIDE
LauncestonUlverstone
WarragulBairnsdale
WarrnamboolGeelong
BendigoAlbury
Queanbeyan / Kingston
Wollongong
Orange
Wagga Wagga
Dubbo
Tamworth
Armidale
Gosford
Newcastle
Coffs Harbour
Port Macquarie
Lismore
Southport Toowoomba
Maroochydore
Hervey Bay
Rockhampton
Cairns
Townsville
http://www.measurement.gov.au
OIML TC7/SC4 NIST 16-18 July 2013
Australian National Speed Measurement Program
9
Regulation of vehicle-speed in Australia
National Measurement Act 1960 (Cth)
Australian legal units of measurement (ALUMs)
reflect SI units into Australian law
Sole legal units of measurement for physical quantities
Veracity of legal measurements – ALUMs
OIML TC7/SC4 NIST 16-18 July 2013
Australian National Speed Measurement Program
10
Regulation of vehicle-speed in Australia
Traceability to ALUMs – legal traceability
ALUMs realized by standards
Australian primary standards of measurement
Verification
Australian secondary standards of measurement reference standards of measurement etc
OIML TC7/SC4 NIST 16-18 July 2013
Australian National Speed Measurement Program
11
Regulation of vehicle-speed in Australia
Veracity of legal measurements – ALUMs by
means of...
reference to...
comparison with...
derivation from...
OIML TC7/SC4 NIST 16-18 July 2013
Australian National Speed Measurement Program
12
Regulation of vehicle-speed in Australia
Standards of measurement
Certified measuring instruments
Australian certified reference materials
Combinations of one or more
OIML TC7/SC4 NIST 16-18 July 2013
Australian National Speed Measurement Program
13
Regulation of vehicle-speed in Australia
National metrological control
Measuring instruments in ‘use for trade’ – determine
consideration in respect of transaction; or
amount of a tax
OIML TC7/SC4 NIST 16-18 July 2013
Australian National Speed Measurement Program
14
Regulation of vehicle-speed in Australia
National metrological control
Legal Measuring instruments – determine physical quantities
law enforcement purposes
demonstrating compliance (or otherwise) with legal limit (State or Commonwealth)
in issue in litigation
OIML TC7/SC4 NIST 16-18 July 2013
Australian National Speed Measurement Program
15
Regulation of vehicle-speed in Australia
National metrological control
Metrological control system
pattern (or type) approval
Conformity to type auditing (CTT)
Certification/verification
Speed – certified measuring instruments
OIML TC7/SC4 NIST 16-18 July 2013
Australian National Speed Measurement Program
16
Regulation of vehicle-speed in Australia
National metrological control
Metrological control system
pattern (or type) approval
conformity to type auditing (CTT)
certification/verification
OIML TC7/SC4 NIST 16-18 July 2013
Australian National Speed Measurement Program
17
Regulation of vehicle-speed in Australia
National metrological control
Measuring instruments in ‘use for trade’
mandatory metrological control by Commonwealth
pattern (or type) approval
conformity to type auditing (CTT)
verification + mark (generally or batch certificate)
OIML TC7/SC4 NIST 16-18 July 2013
Australian National Speed Measurement Program
18
Regulation of vehicle-speed in Australia
National metrological control
Legal measuring instruments – inc. speed
national (Commonwealth) metrological control optional
pattern (or type) approval
conformity to type auditing (CTT)
certification - mark and certificate
certified measuring instruments
OIML TC7/SC4 NIST 16-18 July 2013
Australian National Speed Measurement Program
19
Regulation of vehicle-speed in Australia
National metrological control
Certificate – pattern approval CMI, ACRMs, RSM etc
may be received in evidence in:
State courts
Commonwealth courts
any proceeding authorized to receive nod examine evidence
OIML TC7/SC4 NIST 16-18 July 2013
Australian National Speed Measurement Program
20
Regulation of vehicle-speed in Australia
National metrological control
Certificate – pattern approval CMI, ACRMs, RSM etc
taken to be correctly issued
signed by the purported signatory
signatory taken to be authorized
unless the contrary is established
OIML TC7/SC4 NIST 16-18 July 2013
Australian National Speed Measurement Program
21
Regulation of vehicle-speed in Australia
Current situation
Regulation of traffic speed
State law and regulators
police
roads and traffic authorities
OIML TC7/SC4 NIST 16-18 July 2013
Australian National Speed Measurement Program
22
Regulation of vehicle-speed in Australia
Current situation
Development of national measurement/legal metrology system/infrastructure
Under discussion with State regulators
Pattern approval based on revised OIML R91
unless not practicable; or
not in the ‘national interest’
OIML TC7/SC4 NIST 16-18 July 2013
Australian National Speed Measurement Program
23
Regulation of vehicle-speed in Australia
Current situation
Some engagement by States with national infrastructure
Use of legally traceable standards
Fitness for purpose (design/pattern/type)
ascertained by each jurisdiction
not based on OIML R91
OIML TC7/SC4 NIST 16-18 July 2013
Australian National Speed Measurement Program
24
Regulation of vehicle-speed in Australia
Current situation
Requirements/criteria for fitness for purpose
jurisdiction specific criteria
experience (reputation?)
Australian standards
OIML TC7/SC4 NIST 16-18 July 2013
Australian National Speed Measurement Program
25
Regulation of vehicle-speed in Australia
Current situation
Standards Australia - criteria
AS 2898 Radar speed detection
Part 1 Functional requirements and definitions Part 2 Operational procedures
AS 4691 Laser-based see detection devices
Part 1 Definitions and device requirements Part 2 Operational procedures
OIML TC7/SC4 NIST 16-18 July 2013
Australian National Speed Measurement Program
26
Regulation of vehicle-speed in Australia
Current situation
NMI input to revision of OIML R91
Based on discussions:
traffic regulators
measuring instrument suppliers
pattern approval criteria pre-R91 revision
aligned with revised R91
OIML TC7/SC4 NIST 16-18 July 2013
Australian National Speed Measurement Program
27
Regulation of vehicle-speed in Australia
Current situation
NMI draft pattern approval requirements
Under discussion:
format - OIML B6-2 Directives for OIML technical work. Part 2: Guide to the drafting and presentation of OIML publications
testing - OIML D 11 General requirements for electronic measuring instruments
OIML TC7/SC4 NIST 16-18 July 2013
Australian National Speed Measurement Program
28
Regulation of vehicle-speed in Australia
Current situation
NMI draft pattern approval requirements
Scope?
narrow or wide?
all at once or staged?
OIML TC7/SC4 NIST 16-18 July 2013
Australian National Speed Measurement Program
29
Regulation of vehicle-speed in Australia
Challenges
National metrological control system
adoption
treaty obligations
start date
transition
legal process
OIML TC7/SC4 NIST 16-18 July 2013
Australian National Speed Measurement Program
30
Pattern approval criteria under discussion
general requirements/reference conditions
general and environmental (climatic) disturbances and influences
mechanical disturbances and influences
electrical, electromagnetic and radio frequency disturbances
electrical, mains power supply disturbances and influence
electrical, battery power influences
other performance tests
technical requirements
OIML TC7/SC4 NIST 16-18 July 2013
Australian National Speed Measurement Program
31
Pattern approval criteria under discussion
General requirements
speed kilometres per hour (km/h) time Coordinated Universal Time (UTC) + appropriate offset scale interval 1 km/h range 30 to 250 km/h
MPEs ±2 km/h up to 100 km/h then ±2% pattern approval testing; ±3 km/h up to 100 km/h then ±3% field certification
OIML TC7/SC4 NIST 16-18 July 2013
Australian National Speed Measurement Program
32
Pattern approval criteria under discussion
Reference conditions
ambient temperature 20 °C ±2 °C
relative humidity 30 to 70%
atmospheric pressure 86 kPa to 106 kPa
power voltage 230 V +10% -6% - frequency of 50 Hz
or as are specified in the certificate of pattern approval
OIML TC7/SC4 NIST 16-18 July 2013
Australian National Speed Measurement Program
33
Pattern approval criteria under discussion
General and environmental (climatic) disturbances and influences
dry heat (non condensing) - OIML D11 severity level 3
cold -10°C for 2 hours - OIML D11 severity level 2
damp heat, cyclic (condensing) - OIML D11 severity level 2
water - OIML D11 severity level 2
sand and dust - OIML D11 severity level 1
OIML TC7/SC4 NIST 16-18 July 2013
Australian National Speed Measurement Program
34
Pattern approval criteria under discussion
Mechanical disturbances and influences
vibration (random) - OIML D11 severity level 1
vibration (sinusoidal) - OIML D11 severity level 1
mechanical shock - OIML severity level 2
OIML TC7/SC4 NIST 16-18 July 2013
Australian National Speed Measurement Program
35
Pattern approval criteria under discussion
Electrical, electromagnetic and radio frequency disturbances
radiated radio-frequency electromagnetic fields 80 – 1400 MHz or 3 GHz/6GHz if possible - OIML D11 severity level 3
conducted radio-frequency electromagnetic fields - OIML D11 severity level 3
electrostatic discharge - OIML D11 severity level 3
bursts (transients) + surges on signal, data and control line - OIML D11 severity level 3
OIML TC7/SC4 NIST 16-18 July 2013
Australian National Speed Measurement Program
36
Pattern approval criteria under discussion
Electrical, mains power supply disturbances and influences
AC mains voltage variation - OIML D11 severity level 1
AC mains frequency variation - OIML D11 severity level 1
AC mains voltage dips, shorts interruptions and voltage variations - OIML D11 severity level 3
bursts (transients) on AC and DC mains - OIML D11 severity level 3
OIML TC7/SC4 NIST 16-18 July 2013
Australian National Speed Measurement Program
37
Pattern approval criteria under discussion
Electrical, battery power influences
low voltage of internal battery - OIML D11 severity level 1
power from external 12 V and 24 V road vehicle batteries (if applicable) - OIML D11 severity level C for 12 Volt batteries and level F for 24 Volt batteries)
established whether any accompanying “flash” system was activated on each simulation
OIML TC7/SC4 NIST 16-18 July 2013
Australian National Speed Measurement Program
38
Pattern approval criteria under discussion
Other performance tests
aperture setting of image capturing component (if applicable)
flash rate (if applicable)
mounting of illuminators - a pole or bracket representative of mounting hardware normally used for operational purposes
OIML TC7/SC4 NIST 16-18 July 2013
Australian National Speed Measurement Program
39
Pattern approval criteria under discussion
Other performance tests
aperture setting of image capturing component (if applicable)
flash rate (if applicable)
mounting of illuminators - a pole or bracket representative of mounting hardware normally used for operational purposes
OIML TC7/SC4 NIST 16-18 July 2013
Australian National Speed Measurement Program
40
Pattern approval criteria under discussion
Technical requirements
requirements for construction
security of operation
protection against fraud
ease of reading
materials and construction
adjustment and correction
OIML TC7/SC4 NIST 16-18 July 2013
Australian National Speed Measurement Program
41
Pattern approval criteria under discussion
Technical requirements
installation conditions
rated operating conditions - at least -10 °C to +60 °C
marks and inscriptions - uniquely identified /pattern approved/certified
indicating devices – additional/alternative approved
certification marks - in accordance with relevant legislation
OIML TC7/SC4 NIST 16-18 July 2013
Australian National Speed Measurement Program
42
Field calibration of vehicle speed measuring instruments using precision radar/lidar
Proposed national metrological control system
pattern approval
(conformity to type (CTT) auditing)
certification – marked and certificate issued
‘certified measuring instruments’
OIML TC7/SC4 NIST 16-18 July 2013
Australian National Speed Measurement Program
4343
SIUnits
Australianlegal units ofMeasurement
AustralianPrimary Standards
AustralianSecondary Standards
State Primary ReferenceStandards of StandardsMeasurement
WorkingStandards
Measurements in industry, commerce and the community
First Level Standards
General Conference of Weights and Measures (CGPM)
National Measurement Institute (NMI)
NATA Laboratories and legal metrology authorities
Second Level Standards
Third Level Standards
National Measurement Legislation
Legal Traceability
Traceability
OIML TC7/SC4 NIST 16-18 July 2013
Australian National Speed Measurement Program
44
national pattern approval standard
pattern approval testing
National Instrument Test Procedures
initial certification/verification
subsequent certification/verification
use for legal purposes(legally traceable measurements)
pattern compliance
OIML TC7/SC4 NIST 16-18 July 2013
Australian National Speed Measurement Program
45
OIMLtreaty
NationalMeasurement
Legislation
ALUMS PatternApproval
AustralianMeasurement
standards
Metretreaty SI units
Certification/verification
Pattern compliance
Legally traceablemeasurements
OIML TC7/SC4 NIST 16-18 July 2013
Australian National Speed Measurement Program
46
SIUnits
Australianlegal units ofMeasurement
AustralianPrimary Standards
AustralianSecondary Standards
State Primary ReferenceStandards of StandardsMeasurement
WorkingStandards
Measurements in industry, commerce and the community
OIMLtreaty
NationalMeasurement
Legislation
ALUMS PatternApproval
AustralianMeasurement
standards
Metretreaty SI units
Certification/verification
Pattern compliance
Legally traceablemeasurements
OIML TC7/SC4 NIST 16-18 July 2013
Australian National Speed Measurement Program
47
Field calibration of vehicle speed measuring instruments using precision radar/lidar
Certification – field testing
provides additional public confidence over and above bench testing/simulation
based on manufacturer’s instructions
legally traceable to ALUMs
OIML TC7/SC4 NIST 16-18 July 2013
Australian National Speed Measurement Program
48
Field calibration of vehicle speed measuring instruments using precision radar/lidar
Certification – Field testing
Field testing
directed vehicles
speed measured by precision radar/lidar
MPE ±3 km/h or 3%
accuracy (uncertainty) of field testing ~± 1 km/h
precision radar or lidar theoretical limit of accuracy ≥0.01 km/h
OIML TC7/SC4 NIST 16-18 July 2013
Australian National Speed Measurement Program
49
Field calibration of vehicle speed measuring instruments using precision radar/lidar
Certification – Precision radar
range 0 to 99.9 km/h
resolution 0.1 km/h
no leading digit display over 99.9 km/h
accuracy be increased by:
increased internal oscillator stability (external oscillator?) reduced computation truncations and algorithm errors
OIML TC7/SC4 NIST 16-18 July 2013
Australian National Speed Measurement Program
50
Field calibration of vehicle speed measuring instruments using precision radar/lidar
Certification – Precision lidar
display resolution currently 1 km/h
calculated resolution 0.1 km/h
range up to 320 km/h
greater accuracy requires accessing and using pre-display data
51
National Measurement InstituteBradfield RoadWest Lindfield NSW 2070Australia
Phone: + 61 2 8467 3600
Email: [email protected]