Upload
buique
View
213
Download
0
Embed Size (px)
Citation preview
S~te Size (3 x 800 rn2)
Australian Institute of Architects
Dwellings permitted under DV306 M U Code Table A2
GFA permitted under DV306 for an amalgamated sirngl.e dwelling block site@ 50% of site area
Area per dwelling (including mandatory car park zone)
Construction cost per dwelling @ S1500.00/sqm
Land cost based on a an estimated average detached house price: $500,000 x 3 blocks
Land cost per dwelling
Cost to construct (land + dwelling + CUC)
15% profit (margin required by financiers to finance)
1 0% fees and charges
Average total cost per dwelling
2,400
6
1200
200
$300.000.00
s 1.500.000.00
$300.000.00
$622,500.00
593.375.00
$62!250.00
$778,125.00
rypot ettca eve opment w1t
Item Site Size (3 x 800m2)
0
Australian Institute of Architects
ttJsa 1on exc u mg
Dwellings permitted under DV306 MU Code Table A2
GFA permitted under DV306 for an amalgamated single dwelling block site@ 50% of site area
Area per dwelling (including mandatory car park zone )/2
Construction cost per dwelling@ $1500.00/sqm
Land cost based on an estimated average detached house price: $500,000 x 3 blocks
Land cost per dwelling
. Cost to construct (land+ dweUing + CUC)
15% profit (margin required by financiers to finance)
10% fees and charges
Average total cost per dwelling
Value 2,400
6
1200
100
$1 50.000.00
$1,500,000.00
$300:000.00
$472,500.00
$70,875.00
$47 ~250.00
$590,625.00
Australian Institute of Architects
Organisational Chart 8 March 2012
II----II Deputy Director·Gener-~1 Sue Morrell
Roads and Public Transport Executive Director
Paul Peters
ACTION Bus Services Director
James Roncon
Roads ACT Director
Tony Gil
CllnberrJ Connect Director
03vld Colussi
DlrectoroteSeNices Executive Director
Kim S!nlth
OperationJI Support Director
D3vid ROU!Sion
Australian Institute of Architects
Organisation Chart Environment and Sustainable Development Directorate Government Architect
AIJstllr Sw:1yn
Office of the Cor:>missioncr for the fnvlronmcnt BobNe·l
Tr.msport Planning
Strategic City Plannlnc and Desicn
Urb~n RCUKh .and N\.l:ys.ll
Sodallnfn..r.Nttua Pol.cy
De:;• en ,.o_..cy
Land and Infrastructure Plan nine
lnfraJtt\lcture Policy
L;.nd PoiJC'(
canberra lnu;l'ilttct Urban 1.'-Jnerwily:
Climate Change, fnergy and Sustainabillty Policy
Ent'lY El'icltr.ct PtOJitu
Chmatt Chance EMriY Polley
Su;ulnabllrtv ,oUcy (waste I
Water Policy Wa:-tr,alq
W.a~r~IC*:
Nature Conservation Policy PJ~nninc Con:tMl'ion ;snd U.nd
Con~tiVItor Uat.:on
N.atunal Rt;.ourc« Mana,em«n~
N.nural En'lironmu.~
Heritage
Olfector Corporate
Georrrey Rutledge
Finance and Governance
Human Resources and Corporate
Mlnlsterials, Government and Legal Services
Communications
General Counsel
Director Construction Services
Craie Simmons
Construction Occupations and Licencing
Utilities, land Regulation and Compliance
Customer Service
Information Services
Office of the Surveyor-General
Sustainability Pror:rams
Office of the Dinxtor·Gonor~l
Director Environment Protection
and Water regulation Bob Neil
Environment Protection EtwtrOnmer.t i"rotect'lon
\•, atu R~vrc6 Envuc-nment Prote:ction
Territory Plan Revi@W and Implementation
Merit Assessment
Impact Code and fstate Assessment
Lease Administration
NOVEMBER 2011 Canberra Connect 13 22 81
,
'
Australian Institute of Architects
Summary of Effects of DV 306
·• interim effects have caused confusion
• Impact on cost
:. RZ 2 even less useful than previous in : ~ increasing density
. : • . Government has acquiesced to minority :.- i:nterest groups at the expense of the city -making and a sustainability agenda.
DV 306 PRESENTATION TO ACT LEGISLATIVE ASSEMBLY JULY 2012
. - -···· ---. ·-- -·
_(
~ I
' r--,
I
"""-- it...._.,
--
-I
Australian Institute of Architects
-' I
I 1'-- !~
~-
Nt::T 1G~U!..:I IS. "1i I /\T ~.<o-vo<-fo--.Jt:. LOst;:.!: 0 <.1T ~
J.:::Vl!JN 110u:t IS: I..OSINC.. 11$. OWN A'H~ 1"7'(' -ro "T1-l"01L NOC:.t-i\:CX.JR