22
Platinum Gold AUSTRALIA SHAREPOINT CONFERENCE MARCH 8+9 2011

Ausspc 2011 operational frameworks and deployment

Embed Size (px)

DESCRIPTION

 

Citation preview

Page 1: Ausspc 2011 operational frameworks and deployment

P la t inum

Go ld

AUSTRALIASHAREPOINTCONFERENCEMARCH 8+9 2011

Page 2: Ausspc 2011 operational frameworks and deployment

OPERATIONAL GOVERNANCE

Joel Oleson

@joeloleson

Quest Software

Page 3: Ausspc 2011 operational frameworks and deployment

AGENDA• Deployment Example: The Vasa

• Why do we need Governance or Operations Frameworks?

• Intro to ITIL

• Intro to MOF v4

• Intro to Agile Scrum Project Management Methodology

Page 4: Ausspc 2011 operational frameworks and deployment

THE STORY OF THE VASA THE GREATEST MILITARY SHIP

Page 5: Ausspc 2011 operational frameworks and deployment

THE VASA – DEPLOYMENT NIGHTMARE!• Designed by Henrik Hybertsson to be

the mightiest warship in the world

• Maiden voyage was designed to be propaganda for the Swedish king Gustavus Adolphus

• 150 people on board• 30-50 died in the disaster

• Salvaged in 1961

• Initial declared sank due to "imprudence and negligence“

• Inquiries declared it was well built, but poorly proportioned

Page 6: Ausspc 2011 operational frameworks and deployment

WHY USE GOVERNANCE OR OPERATIONS FRAMEWORKS?

“Governance and Management frameworks are designed to support and optimize the quality of the service…”

Page 7: Ausspc 2011 operational frameworks and deployment

ITIL – IT INFRASTRUCTURE LIBRARY• “The fastest cars have the best brakes…”

Page 8: Ausspc 2011 operational frameworks and deployment

ITIL 5 ELEMENTS OF LIFECYCLE• Strategy

• Design

• Transition

• Operation

• Continual Improvement

Page 9: Ausspc 2011 operational frameworks and deployment

MICROSOFT OPERATIONS FRAMEWORK MOF V4

Page 10: Ausspc 2011 operational frameworks and deployment

ESSENTIAL IT SERVICE MANAGEMENT• Process, People, and Technology (PPT)

• Strategy, Tactics and Operations (STO)

• Separation of Duties (SoD)

• Strategic Alignment Model Enhanced (SAME)

• Deming’s Plan-Do-Check-Act Management Cycle (PDCA)

Page 11: Ausspc 2011 operational frameworks and deployment

WHO, WHAT, HOW & WHY

People

ProcessTechnology

Page 12: Ausspc 2011 operational frameworks and deployment

KEY SERVICE MANAGEMENT QUESTIONS• Who will secure sensitive information?

• Who will assign users & permissions in SharePoint 2010?

• Who will create and approve content for sites?

• Who will be able to create new sites?

• Who will be able to publish content to Web sites?

• Who will be able to customize sites?

Page 13: Ausspc 2011 operational frameworks and deployment

STRATEGY TO OPERATIONS

OBJECTIVES ARE TRANSLATED INTO SPECIFIC GOALS, DIRECTED AND CONTROLLED

Strategy

Tactics

Operations

Page 14: Ausspc 2011 operational frameworks and deployment

SEPARATION OF DUTIES

Businessactivities

determineand use

Informationmanagement

design andcontrol

Technologymanagement

buildand run

Information Technology

Business Information Support

Page 15: Ausspc 2011 operational frameworks and deployment

SHAREPOINT SERVICE QUALITY CONTROLS• SharePoint 2010 farm structure farm and service topology

• Minimum Performance level

• Disaster Recovery - Recovery Time Objective, Recovery Point Objective

• Information Architecture – Managed Metadata, Tagging, Content Structure, Web structure: Site vs. Site Collection, Site & Doc Templates

• Taxonomy - Who are the owners, what are the content levels, what is the taxonomy

• Subarea design. What kind of data flow, content control, and site structure will be used? Who is responsible for defining that?

Page 16: Ausspc 2011 operational frameworks and deployment

SHAREPOINT SERVICE QUALITY CONTROLS• User and Security Group management

• Quality Assurance & Test

• Risk management

• Contract management

• Development Methodologies

• Configuration management, including documentation

• Business and Service Requirements – i.e.

Page 17: Ausspc 2011 operational frameworks and deployment

MOF ESSENTIAL PHASES

Plan

Deliver

Operate

Manage the Underlying Layer

Page 18: Ausspc 2011 operational frameworks and deployment

WHAT IS THE NEXT MILESTONE?

Milestones are constructed both to reassure the traveller that the proper path is being followed and to indicate distance travelled

Page 19: Ausspc 2011 operational frameworks and deployment

IT SERVICE IMPROVEMENTSSince IT services are recognized as strategic business assets, organizations need to continually improve the contribution of IT services to business functions, in terms of better results at lower cost.

Page 20: Ausspc 2011 operational frameworks and deployment

GETTING AGILE WITH SCRUM• Project Management Framework for handling rapidly

changing requirements.

• Scrum is an agile process for software development.

• With Scrum, projects progress via a series of iterations called sprints.

• Each sprint is typically 2-4 weeks long.

• Scrum is ideally suited for projects with rapidly changing or highly emergent requirements.

Page 21: Ausspc 2011 operational frameworks and deployment

QUESTIONS

Page 22: Ausspc 2011 operational frameworks and deployment

Silver Sponsors

Bronze Sponsors

Gold Sponsors