7
Aurrekoetxea_SP_Author_Alpha6_Block4_Question.ppt Barcelona 12-15 May 2003 WORK ORDER MANAGEMENT USING A COMMUNICATIONS INTEGRAL SYSTEMS

Aurrekoetxea_SP_Author_Alpha6_Block4_Question.ppt Barcelona 12-15 May 2003 WORK ORDER MANAGEMENT USING A COMMUNICATIONS INTEGRAL SYSTEMS

Embed Size (px)

Citation preview

Page 1: Aurrekoetxea_SP_Author_Alpha6_Block4_Question.ppt Barcelona 12-15 May 2003 WORK ORDER MANAGEMENT USING A COMMUNICATIONS INTEGRAL SYSTEMS

Aurrekoetxea_SP_Author_Alpha6_Block4_Question.ppt

Barcelona 12-15 May 2003

WORK ORDER MANAGEMENT

USING A COMMUNICATIONS

INTEGRAL SYSTEMS

Page 2: Aurrekoetxea_SP_Author_Alpha6_Block4_Question.ppt Barcelona 12-15 May 2003 WORK ORDER MANAGEMENT USING A COMMUNICATIONS INTEGRAL SYSTEMS

Aurrekoetxea_SP_Author_Alpha6_Block4_Question.ppt

Barcelona 12-15 May 2003

- System completely implemented with 2 modules: * LV meter installation * LV disconnection and restoration

- Covering 1.3 millions of Work Orders

- The system allows the WO management from different locations, accesing by INTERNET, and uploading and downloding WO directly from the field PDA using GSM/GPRS or by Basic Telephone Network

INTRODUCTION

Page 3: Aurrekoetxea_SP_Author_Alpha6_Block4_Question.ppt Barcelona 12-15 May 2003 WORK ORDER MANAGEMENT USING A COMMUNICATIONS INTEGRAL SYSTEMS

Aurrekoetxea_SP_Author_Alpha6_Block4_Question.ppt

Barcelona 12-15 May 2003

- The organization is based in WOMC (Work Order Management Center) geographically distributed

MODELLING

- Remote access to the system from the WOMC, using ADSL linet to access via INTERNET

- Uploading and downloading of WO in field on the PDA using the Basic Telephone Network

- The same using GSM/GPRS

Page 4: Aurrekoetxea_SP_Author_Alpha6_Block4_Question.ppt Barcelona 12-15 May 2003 WORK ORDER MANAGEMENT USING A COMMUNICATIONS INTEGRAL SYSTEMS

Aurrekoetxea_SP_Author_Alpha6_Block4_Question.ppt

Barcelona 12-15 May 2003

NAT Server

Data Base

HOST

EXTERNAL PC

Metaframe Server

AIX

CommunicationsServer

CRADLE

PDA

FTP

CRADLE

PDA

MODEM

Internet Connection

“GSM/GPRS” CONNECTION

PDA

“BTN” CONNECTION

BUREAU - PC

ARCHITECTURE

Page 5: Aurrekoetxea_SP_Author_Alpha6_Block4_Question.ppt Barcelona 12-15 May 2003 WORK ORDER MANAGEMENT USING A COMMUNICATIONS INTEGRAL SYSTEMS

Aurrekoetxea_SP_Author_Alpha6_Block4_Question.ppt

Barcelona 12-15 May 2003

BENEFITS

- Field management optimization reduces costs and improves field workers efficiency

- The WO management may be executed from different locations

- The real-time WO status by be known due to the on-line uploading and downloading

Page 6: Aurrekoetxea_SP_Author_Alpha6_Block4_Question.ppt Barcelona 12-15 May 2003 WORK ORDER MANAGEMENT USING A COMMUNICATIONS INTEGRAL SYSTEMS

Aurrekoetxea_SP_Author_Alpha6_Block4_Question.ppt

Barcelona 12-15 May 2003

MOVILCOM PROJECT

- Mobile communication integral system oriented to public services and utility companies

- Development based in a pluridisciplinar consortium (SISTEPLAN, ROBOTIKER, GIROA and IBERDROLA)

- The goals for IBERDROLA:

* Optimization and location via GPS + GIS* Facilities inventory georreference updating

Page 7: Aurrekoetxea_SP_Author_Alpha6_Block4_Question.ppt Barcelona 12-15 May 2003 WORK ORDER MANAGEMENT USING A COMMUNICATIONS INTEGRAL SYSTEMS

Aurrekoetxea_SP_Author_Alpha6_Block4_Question.ppt

Barcelona 12-15 May 2003

IMPROVEMENTS

FUTURE TRENDS