Aura Phase III Details

Embed Size (px)

Citation preview

  • 8/3/2019 Aura Phase III Details

    1/14

    Aura - Phase III

  • 8/3/2019 Aura Phase III Details

    2/14

    Site Location on Master Plan

    Aura Site

  • 8/3/2019 Aura Phase III Details

    3/14

    Satellite Image

    Aura Site

  • 8/3/2019 Aura Phase III Details

    4/14

    Project Layout

  • 8/3/2019 Aura Phase III Details

    5/14

    Project Elevation

  • 8/3/2019 Aura Phase III Details

    6/14

    Phase III Details

    Number of towers: 2Towers F & G

    Total no. of apartments :110

    Four apartment per floor

    Structure : G+13

    Categories of apartments: 3 BHK + Servant : 1875 & 1900 sq.ft.

  • 8/3/2019 Aura Phase III Details

    7/14

    Apartment Layout

  • 8/3/2019 Aura Phase III Details

    8/14

    Floor Layout

  • 8/3/2019 Aura Phase III Details

    9/14

    Price & Other Charges

    Basic Rs. 3875 psqft

    Car Park Rs. 2,50,000

    Club Membership Rs. 1,00,000

    Power Back Up Rs. 75,000

    EDC & IDC Rs. 373 Per Sqft

    IBMS Rs. 50 Per Sqft

    ECC As Actual

    Registration As Actual

    Service Tax As actual

    PLC As actual

  • 8/3/2019 Aura Phase III Details

    10/14

    PLC Charges

    PLC ( per apartment )

    Ground floor Rs 150 psqft

    First floor Rs 175 psqft

    Second floor Rs 150 psqft

    Third floor Rs 125 psqft

    Ground + Park Rs 200 psqft

    First + Park Rs 200 psqft

    Second + Park Rs 200 psqft

    Third + Park Rs 200 psqft

    Fourth + Park Rs.175 psqft

    Fifth + Park Rs.175 psqft

    Park Facing Rs150 psqft

  • 8/3/2019 Aura Phase III Details

    11/14

    Payment Plan

    Booking Amount :

    8.5 Lac 3+Srv BHK

    Within 60 days 20% of total consideration less booking

    amountOn completion of ground floor slab 10% of Total Consideration

    On completion of 3rd floor roof slab 5 % of Total Consideration

    On completion of 6th floor roof slab 10% of Total Consideration

    On completion of 9th floor roof slab 5 % of Total Consideration

    On completion of 12th floor roof slab 10% of Total Consideration

    On completion of super structure 10% of Total Consideration

    On starting of external paint 5% of Total Consideration

    On completion of flooring 10 % of Total Consideration

    On completion of services 10% of Total Consideration

    At the time of pocession5% of Total Consideration +

    ECC,IBMS,Registration

  • 8/3/2019 Aura Phase III Details

    12/14

    Specifications

    S.N. DESCRIPTION

    1. LIVING/DINING ROOM

    Floor Vitrified Tiles.

    Skirting -Granite.

    Wall /Ceiling Plastic emulsion paint.

    2 Master Bed Room.

    Wooden flooring/Skirting.

    Wall /Ceiling plastic emulsion paint.

    3 Bed Rooms.

    Vitrified tile f looring/Skirting.Wall /Ceiling plastic emulsion paint.

    4 KITCHEN

    Floor Anti Skid Ceramic Tiles

    Wall Ceramic Tiles up to 2-0 above counter + Acrylic emulsion paint.

    Wall /Ceiling Plastic emulsion paint.

    Counter polished Granite top

    Fitting/Fixtures Single Bowl stainless steel sink With Jaquar Sink Mixture.

    5 MASTER TOILET

    Floor Ceramic Tiles

    Wall Ceramic Tiles up to 7-0 in wet area.

    Ceiling Grid Ceiling

    CP fittingJaquar Premium Quality.

    Sanitary Ware Wall hung WC ROCA/Equivalent.

    Granite counter with wash basin.

    6 OTHER TOILETS

    Floor Ceramic Tiles

    Wall Ceramic Tiles up to 7-0 in wet area.

    Ceiling Grid Ceiling

    CP fittingJaquar Premium Quality.

    Sanitary Ware Wall hung WC ROCA/Equivalent.

    Granite counter with wash basin.

  • 8/3/2019 Aura Phase III Details

    13/14

    Specifications

    7 BALCONIES

    Floor-Textured Ceramics Tiles

    M.S. Railing

    8 Servant Toilet.

    Anglo Indian WC.

    One counter less Wash Basin.

    Ceramic Tile flooring.

    Wall Tiles up to 900 mm Ht.

    9 DOORS

    Frame Hardwood +Paint

    Door Shutter Masonite Skin moulded Door Shutters + Paint

    Hardware - S/S Finish

    10 WINDOWS

    Window - UPVC

    Ventilators UPVC

    11 ENTRANCE LOBBY (Typ & G.F.)

    Floor :-Granite Stone

    Wall/CeilingPlastic emulsion paint.

    12

    LIFT LOBBY Cladding

    Lift face Wall. Granite stone( all other wall paint)

    13. STAIRCASE

    Kota Stone

    Wall Dry Distemper

    M.S. Railing

    14. ELECTRICAL

    Modular Switches

    Telephone Point in Living/Master Bedroom

    TV Points in living/Master Bedroom

  • 8/3/2019 Aura Phase III Details

    14/14

    Note :

    All the information statedherein are tentative andsubject to change at thesole discretion of the

    Company.