Aug 4, 2005 Hcal sx5 status/issues

Aug 4, 2005

  • Upload
    sian

  • View
    32

  • Download
    0

Embed Size (px)

DESCRIPTION

Aug 4, 2005. Hcal sx5 status/issues. overview. CCM temperature readout DAQs for sx5hcal HCAL installation status SATOCRICH. CCM: to modify or not to modify. 1. ccm does not have  a perfect design (with respect to temperature measurement). - PowerPoint PPT Presentation

Citation preview

Page 1: Aug 4, 2005

Aug 4, 2005

Hcal sx5 status/issues

Page 2: Aug 4, 2005

overview

• CCM temperature readout

• DAQs for sx5hcal

• HCAL installation status

• SATOCRICH

Page 3: Aug 4, 2005

CCM: to modify or not to modify1. ccm does not have  a perfect design (with respect to

temperature measurement). 2. vladimir/vitali tried to improve it by introducing 0.5Mohm

resistors between signal and ground.    this solution cured original problem (presence of signal from

channels even if no temperature probe is connected). 3. vladimir noticed that with 0.5Mohm resistors, there is still a

problem of correlation between channels.    he checked that by introducing 1.3khom resistors to ground,

the correlation is effectively gone. 

Page 4: Aug 4, 2005

Not to modify ?4. however this solution is no good, as it makes temp sensors 4 times less sensiitve.    for voltage definition, inside CCM there is 6kohm resistor. by introducing 1.3kohm, we get    ~ 4 times less volts/deg C. so we go from granularity of 1.5deg (original design) to ~ 6deg

(1.3kohm). 5. one can expect that if we introduce lower resistors (maybe 20kohm)  in parallel with 6kohm

internal resistor, then temp sensitivity wil change only minimally. and this  would be the best compromise.

 6. however, at this point, we think that is may not be worth an affort to patch up CCM design.    we have installed all 18 CCMs on HE-, and another 18 CCMs on HB+.    we plan to start installation of CCMs, RMs, and Calboxes on HE+ starting aug8.    so at that point any additional modification jobs on CCMs delay installation and    commissioning of all hcal subsystems significantly. 7. we think it is better invest our time into proper  installation and commissioning of hcal.    in order to give us reliable temp control on RBXes, we will continue (german is leading this

effort)    to develop/install independent temp sensor/control system.

Page 5: Aug 4, 2005

DAQs for sx5hcal1. moe3 (hb+ side), until end of august                                                        hb+ wiresourcing                                                        long-term burn-in of hb rbx                                                        satocrich  project

when drew/jeremy are ready to setup/test hcal internal trigger in september, we will use also moe3 for this

 2. moe6: (hb- side), until end of september:  hb- qc/burn-in                                                                       he- laser + wiresourcing 3. 3rd daq (parts from fnal/b28):   as soon as it is fuctional:                                                  he+ commissioning                                                  ho+2 commissioning

Page 6: Aug 4, 2005

Many people are now working full-time in sx5:

vitali smirnov, peter goncharov, vladimir epshteyn, sasha vishnevski, petr moissenz, alexei volkov, tola lipatov, alexei shnyrev, german martinez, Alexi Mestvirishvili , michal szleper, alvin laasanen, oscar gonzalez, salim cerci  numan Bakirci, pelin kurt, huseyin topakli,

also support upport from arjan, ianos, richard

Page 7: Aug 4, 2005

he- status

• All (but one) HE- sector fixed: s8/rm3, on HV (need time to access) s14/rm1/ch11 recovered• Started to reposition OF p. panel to its

final (?) location on HE- (near) side• Water flow OK in all sectors , 25deg water,

RBXes at 35-37 deg, DCS LV cutoff set at 45deg

• Two aux. patch panels installed

Page 8: Aug 4, 2005

he- plans for next two weeks(aug4-aug18)

• Laser commissioning (using old/qc laser)

check optical path (laser-> 80m cable-> aux p. panel -> 20m cable -> LDB -> Calbox -> HPD

check timing of sectors with laser after OF p. panel is installed in new place

Page 9: Aug 4, 2005

Preparing for 5mCi sourcing of he-

• 5mCi source installation into ‘rewamped’ source driver (ianos/alvin)

• Radiation zone issues (pawel/sasha)• Source logistics (sasha)• Upgrade of DAQ: HTRs, 2nd DCC (arjan) w/o Slink64 only two (maybe 4?) spigots at a time • Sourcing analysis (peter m.)

Page 10: Aug 4, 2005

he- action items

• Add two more HV power supplies (sergey)

• Start laser work (configuration file- arjan)

• Reconnect OF p. panel (peter/vladimir)

• Aux p. panels (sasha, nicolai)

• Calbox channels assignment (alexei)

• HEM/burn-in analysis (pelin/husain/irina)

• Start assembly of source elevator (alexei)

Page 11: Aug 4, 2005

he+ status

• All copper and OF cables installed

• Satelite cables (TTC, Calbox readout) pulled

• Water to be connected this week

• LDB installed, connected to RBXes

• Ready to start installation of RMs, CCMs, Calboxes

• Ready to connect OF to p. panels

Page 12: Aug 4, 2005

he+ plans for august

• Install DCS system (sergey)

• Install HV system (sergey/alexei)

• Start working on LV system (CAEN style, arjan/vladimir)

• Connect cables to 3rd DAQ (still not at sx5)

Page 13: Aug 4, 2005

hb+ status

• started wire sourcing of hb+ wedges with 1.5mCi source

• so far 3 wedges done, hope to reach a rate of 1 wedge/day

• Day-time: install cables/run LED test

• Eve-time: wiresourcing

• In parallel, we do long term stability test/burn-in of one of hb RBXes

Page 14: Aug 4, 2005

satocrich project

(german, irina, numan, pete m., peter g., pawel)

Install four muon counters:

two 40cmx80cm, inner radius of w15

two 30cmx108cm, outer radius of w6

Feed coincidence to princeton trigger board (arjan)

See signal in few towers (phi=2,3, eta=1-5)

Also working on event display (andrei loginov)