Upload
vokhue
View
213
Download
0
Embed Size (px)
Citation preview
ENVISAT Validation Workshop
Dec, 2002
ESRIN
ESRIN
130 ESA Staff (7%)250 Industry Staff
Dec, 2002
ESRIN Activities
ESOC
•Communication : Web portal
Vega Department : •small launchers
Informatics Department: ESA Corporate SW and Networks
Dec, 2002
Earth Observation Exploitation Department: EO mission operation and exploitation
High Rate MissionsPRESENT
FUTURE• ERS-1 (ESA)• LANDSAT 1-2-3-4 (USA)• JERS-1 (J)• MOS-1a/b (J)• SEASAT (USA)• SPOT 1/3 (F)• METRIC CAMERA (USA/D)
• ERS-2 (ESA)• ENVISAT (ESA)• SPOT 1/2/4 (F) incl ‘Vegetation’• LANDSAT 5-7 (USA)
• ALOS (J)• SPOT 5• RADARSAT 1/2/3 (CND) •IRS P6 (India)•Rocsat-2 (Taiwan)•EOS-Aura (US, 2003)
PAST
Low Rate missions
• ERS 1 (ESA• HCMM (USA)• NIMBUS 7(USA)• NOAA 10-13 (USA)• OCTS (J)• NSCATT (J/USA)
• ERS 2 (ESA)• ENVISAT (ESA)• SEAWiFS (USA)• NOAA 15/16 (USA)• IRS P3 MOS (INDIA/D)• QSCATT (USA) • EOS-MODIS Terra, Acqua(USA)•Chris/Proba
• ADEOS 2 (J)•Cloudsat (US)•Icesat (US)•Calipso (US/F, 2004)
EO-Exploitation DepartmentOperations and Exploitation of
EO Missions & Data
Exploitation Projects (DUP, MD, GMES…)Dec, 2002
After 11 years of ERS:
ERS-2 still operationala wealth of science and application results
(SAR Interferometry)technological progress,
(ERS-1/2 Tandem Phase, Geodetic Phase)consolidation of a large (thousands) EO user community huge data archives as basis for long-term environmental monitoring established (11 years measurements)
-> ERS-2 Operations being continued
ERS (1991 - 2002)
Dec, 2002
ENVISAT Commissioning & Operations Phase-in Schedule
Launch SODAP Commissioning Calibration Workshop Commissioning
Validation Workshop, Phase-in of non-cal/val PisOperations Readiness Review-1, Hand-over
Initial Operations Phase,Phase-in of DEs Operations Readiness –2
Full Operations Phase…. 2006
Product Validation and Evolution
Dec, 2002
Hazards11%
Hydrology9%
Renewable resources
14%
Geodesy1%
Oceanography20%
Coastal zones monitoring
9%
Land environment6%
Atmosphere22%
Ice5%
Geology2%Topographic
mapping1%
• 674 accepted AO projects (100 cal/val)• 160 new cat-1 projects accepted• 47 Countries• -> 250 non-cal/val projects already phased in
North America
Europe
Oceania
South America
Asia
Africa
ENVISAT: Projects’ Status today
Dec, 2002
+ Launch & Injection excellent+ Unique combination of
instruments ; all Instruments working outstanding
+ technical status extremely positive for long operations
+ funding until end 2006 committed+ Artemis likely to be recovered by
Feb 2003+ ERS-2 still alive and in operations
ENVISAT: Situation today
- Launch was late- Artemis not available- data for validation
activities distributed late, back-log processing difficult
Dec, 2002
ENVISAT: tomorrow
A unique combination of instruments and data for scientific, public benefit, operational and commercial use for several years
In context with other missions : continuation of observations and projects for 15 years of monitoring
Dec, 2002