Facilities Services 2700 Judge Fran Jamieson Way Viera, Florida 32940-6601 Campus Capital Needs Sales Surtax Funded Attachment F Estimate Detail Report Condition Code Facility Cambridge Elementary 1.56 $565,886 District School Security $21,041 1.00 Building Access Security Equipment $21,041 Public Access Control 1.00 $21,041 Educational Technology $181,424 2.14 Technology Building Cabling $13,151 Structured Cabling 4.00 $13,151 Technology Equipment Renewal $90,247 Computer Replacement 3.00 $11,204 Server Replacement 1.00 $45,001 Switch Replacement 4.00 $3,603 Telephone System Replacement 1.00 $18,761 Wireless Access Points Replacement 1.00 $11,678 Classroom Technology Infrastructure (Electrical, HVAC and Data) $78,026 Student Stations Power/ Technology HVAC 1.00 $78,026 Facility Renewal $363,421 1.35 Safety and Building Code Deficiency Corrections $7,224 Fire Safety / Sanitation / Code Compliance 1.00 $7,224 Air Conditioning and Air Distribution Equipment Renewal $96,437 HVAC Systems EPA NonͲCompliant Refrigerant 1.00 $96,437 Roofing System Renewal $160,000 Relocatable Covered Walkways (SREF) 1.00 $160,000 Exterior Building Wall Finish System Renewal $11,431 Exterior Finish 2.00 $5,775 Exterior Sealants 2.00 $2,237 Soffits 2.00 $3,418 Building Water and Sanitary Piping System Renewal $19,333 Supply Piping 1.17 $19,333 Water Heating System Renewal $25,424 Water Heaters 1.00 $25,424 Electrical Distribution System Renewal $43,571 Panel Boards 1.00 $22,896 Panel boards Condition / Capacity 2.00 $20,676 July 22, 2014

Attachment F - Agenda Plus. Login52 05 Building Automation System Replacement and bipolar ionization (GPS) units $338,234.21 ‐$338,234.21 52 06 Air Conditioning and Air Distribution

  • Upload
    others

  • View
    1

  • Download
    0

Embed Size (px)

Citation preview

  • Facilities Services2700 Judge Fran Jamieson WayViera, Florida 32940-6601

    Campus Capital Needs Sales Surtax Funded

    Attachment F

    Estimate

    Detail ReportCondition CodeFacility

    Cambridge Elementary 1.56 $565,886District School Security $21,0411.00

    Building Access Security Equipment $21,041Public Access Control 1.00 $21,041

    Educational Technology $181,4242.14

    Technology Building Cabling $13,151Structured Cabling 4.00 $13,151

    Technology Equipment Renewal $90,247Computer Replacement 3.00 $11,204Server Replacement 1.00 $45,001Switch Replacement 4.00 $3,603Telephone System Replacement 1.00 $18,761Wireless Access Points Replacement 1.00 $11,678

    Classroom Technology Infrastructure (Electrical, HVAC and Data) $78,026Student Stations Power/ Technology HVAC 1.00 $78,026

    Facility Renewal $363,4211.35

    Safety and Building Code Deficiency Corrections $7,224Fire Safety / Sanitation / Code Compliance 1.00 $7,224

    Air Conditioning and Air Distribution Equipment Renewal $96,437HVAC Systems EPA Non Compliant Refrigerant 1.00 $96,437

    Roofing System Renewal $160,000Relocatable Covered Walkways (SREF) 1.00 $160,000

    Exterior Building Wall Finish System Renewal $11,431Exterior Finish 2.00 $5,775Exterior Sealants 2.00 $2,237Soffits 2.00 $3,418

    Building Water and Sanitary Piping System Renewal $19,333Supply Piping 1.17 $19,333

    Water Heating System Renewal $25,424Water Heaters 1.00 $25,424

    Electrical Distribution System Renewal $43,571Panel Boards 1.00 $22,896Panel boards Condition / Capacity 2.00 $20,676

    July 22, 2014

  • Exhibit B ‐‐ Sales Surtax Summary Form

    Cambridge ElementaryConstruction Manager Firm Name: Canaveral Construction  Date: December 16, 2019

    DISTRICT SCHOOL SECURITY60 01 Perimeter/Entry Fencing and Gates60 02 Building Access and Security Equipment

    EDUCATIONAL TECHNOLOGY65 01 Technology Building Cabling65 02 Technology Equipment Renewal65 03 Classroom Technology Infrastructure (Electrical, HVAC, Data)

    FACILITY RENEWAL50 00 Facility Renewal  $36,435.00 ‐$36,435.0051 01 Safety and Building Code Deficiency Corrections $7,224.00 $7,224.0051 02 ADA Code Deficiency Correction51 03 Fire Alarm System Renewal52 04 Central Mechanical Plant Renewal52 05 Cooling and Heating Control System Renewal $51,781.85 ‐$51,781.8552 05 Building Automation System Replacement and bipolar ionization (GPS) units $338,234.21 ‐$338,234.2152 06 Air Conditioning and Air Distribution Equipment Renewa $599,505.49 $96,437.00 ‐$503,068.4953 07 Roofing System Renewal $160,000.00 $160,000.0053 08 Exterior Building Wall Finish System Renewal $11,431.00 $11,431.0053 09 Exterior Door/Window/Louver System Renewal52 10 Building Water and Sanitary Piping System Renewal $45,167.13 $19,333.00 ‐$25,834.1352 11 Water Heating System Renewal $25,424.00 $25,424.0054 12 Electrical Supply System (Transformers, Switchgear, Wiring) Renewa54 13 Electrical Distribution System Renewal $152,672.93 $43,571.00 ‐$109,101.9354 14 Electrical Components (Lightning Protection, Intercom, Generator) Renewal*54 15 Interior and Exterior Lighting Equipment Renewal52 16 Air Supply and Exhaust System Renewal52 17 Site Utility Systems (Gas, Electric, Storm, Water, Sanitary) Renewal

    Reserve for relocatable walkway project $160,000.00 ‐$160,000.00Contingency applied to the projectBudgeted but not encumbered (admin)Additional admin & permitting  $10,000.00 ‐$10,000.00Sales surtax supplement 1/14/2020 ‐$700,000.00 $700,000.00Sales surtax supplement3/10/2020 ‐$340,000.00 $340,000.00

       

    $1,187,361.60 $363,420.00 $36,435.00 ‐$870,000.00 $0.00 $9,623.40

    BalanceAdminGroup/Category Description Proposed Price Attachment F Spent & Encumbered Other

  • Month Year Revenue Cumulative Security 50% ET 15% Facilities 35% Total

    August  2019 $1,294,012 $1,294,012 $647,006 $194,102 $452,904 $1,294,012September 2019 $3,474,204 $4,768,216 $1,737,102 $521,131 $1,215,971 $3,474,204October 2019 $3,440,101 $8,208,317 $1,720,051 $516,015 $1,204,035 $3,440,101November 2019 $4,526,234 $12,734,551 $2,263,117 $678,935 $1,584,182 $4,526,234December 2019 $3,425,373 $16,159,924 $1,712,687 $513,806 $1,198,881 $3,425,373January 2020 $3,477,814 $19,637,738 $1,738,907 $521,672 $1,217,235 $3,477,814February 2020 $5,420,075 $25,057,813 $2,710,038 $813,011 $1,897,026 $5,420,075March  2020 $3,315,493 $28,373,306 $1,657,747 $497,324 $1,160,423 $3,315,493April 2020 $3,355,854 $31,729,160 $1,677,927 $503,378 $1,174,549 $3,355,854May  2020 $5,389,791 $37,118,951 $2,694,896 $808,469 $1,886,427 $5,389,791June 2020 $3,554,107 $40,673,058 $1,777,054 $533,116 $1,243,937 $3,554,107July 2020 $3,574,694 $44,247,752 $1,787,347 $536,204 $1,251,143 $3,574,694August 2020 $4,954,442 $49,202,194 $2,477,221 $743,166 $1,734,055 $4,954,442September 2020 $3,474,204 $52,676,398 $1,737,102 $521,131 $1,215,971 $3,474,204October 2020 $3,440,101 $56,116,499 $1,720,051 $516,015 $1,204,035 $3,440,101November 2020 $4,526,234 $60,642,733 $2,263,117 $678,935 $1,584,182 $4,526,234December 2020 $3,425,373 $64,068,106 $1,712,687 $513,806 $1,198,881 $3,425,373January 2021 $3,477,814 $67,545,920 $1,738,907 $521,672 $1,217,235 $3,477,814February 2021 $5,420,075 $72,965,995 $2,710,038 $813,011 $1,897,026 $5,420,075

    Total $72,965,995 $35,835,992 $10,750,797 $25,085,194 $72,965,995Estimated based on prior year receipts

    Approved/Requested Allocations: Security ET Facilities Total Original Amount Reduction

    Repayment of temporary transfer ‐ security to facilities 9,332,130.58$          9,332,130.58$      Allocation to security previously approved but not used) 280,144.46$              280,144.46$         Building Automation System plan (Board approved September 24, 2019) ‐ under study ‐ defer 200,000$                200,000.00$         Columbia, McAuliffe, Challenger 7 HVAC (Board approved September 24, 2019) 7,000,000$            7,000,000.00$       Board agenda 3/10Computer replacement (Board approved September 24, 2019) 500,000$                500,000.00$         Longleaf Elementary facility renewal ‐ GMP pending ICOC Approved 12/11/2019 250,000$                250,000.00$          Board agenda 3/10Cocoa Beach High facility renewal ‐ GMP pending ICOC Approved 12/11/2019 1,000,000$            1,000,000.00$      Satellite High facility renewal ‐ GMP pending ICOC Approved 12/11/2019 1,200,000$            1,200,000.00$      Mims Elementary facility renewal ‐ supplemental funding ICOC Approved 12/11/2019 1,200,000$            1,200,000.00$       Board agenda 1/28McNair Elementary facility renewal ‐ supplemental funding ICOC Approved 12/11/2019 950,000$                950,000.00$          Board agenda 3/10 $1,000,000 50,000$                   Edgewood Jr./Sr. High facility renewal ‐ supplemental funding ICOC Approved 12/11/2019 1,550,000$            1,550,000.00$       Board agenda 3/10 $1,600,000 50,000$                   Additional allocation Columbia, McAuliffe, Challenger 7 HVAC ICOC Approved 12/11/2019 2,000,000$            2,000,000.00$       Board agenda 3/10Cambridge Elementary facility renewal ‐ supplemental request  ICOC Approved 01/09/2020 700,000$                700,000.00$          Board agenda 1/14Enterprise Elementary facility renewal ‐ supplemental request  ICOC Approved 01/09/2020 650,000$                650,000.00$          Board agenda 1/14Titusville High facility renewal ‐ supplemental request ICOC Approved 01/09/2020 770,000$                770,000.00$          Board agenda 1/14Imperial Estates facility renewal ‐ supplemental request  ICOC Approved 01/09/2020 520,000$                520,000.00$          Board agenda 1/14Astronaut High facility renewal ‐ supplemental request ICOC Approved 01/09/2020 460,000$                460,000.00$          Board agenda 1/28Space Coast Jr./Sr. High facility renewal ‐ supplemental request ICOC Approved 01/09/2020 300,000$                300,000.00$          Board agenda 1/28 $450,000 150,000$                 Suntree Elementary  ICOC Approved 01/09/2020 ‐$                        ‐$                        Board agenda 2/11 $240,000 240,000$                 Manatee Elementary ‐ supplemental request ICOC Approved 01/09/2020 400,000$                400,000.00$          Board agenda 1/28 $460,000 60,000$                   Sunrise Elementary  ICOC Approved 01/09/2020 230,000$                230,000.00$          Board agenda 2/11 $270,000 40,000$                   Gardendale Alternative Learning Center ‐ GMP pending ICOC Approved 01/09/2020 200,000$                200,000.00$         Clearlake Adult Education Center  ICOC Approved 01/09/2020 300,000$                300,000.00$         Cocoa Beach Jr./Sr. High AHU 8.2  ICOC Approved 01/09/2020 200,000$                200,000.00$          Board agenda 1/14Bayside High structural repair ‐ GMP pending ICOC Approved 01/09/2020 400,000$                400,000.00$         Jupiter Elementary ‐ GMP pending ICOC Approved 01/09/2020 100,000$                100,000.00$          Board agenda 3/10Riviera Elementary ‐ GMP pending ICOC Approved 01/09/2020 250,000$                250,000.00$          Board agenda 3/10 $300,000 50,000$                   Palm Bay High (roof top AHUs Building 7 and elevator)  ICOC Approved 01/09/2020 500,000$                500,000.00$          Board agenda 2/11Palm Bay High (3 new chillers) ‐ pending further investigation ICOC Approved 01/09/2020 1,400,000$            1,400,000.00$      

    Gardendale (additional allocation) ICOC Approved 2/19/2020 100,000$               Longleaf (additional allocation) ICOC Approved 2/19/2020 200,000$                Board agenda 3/10Satellite High School (additional allocation) ICOC Approved 2/19/2020 200,000$               Cambridge building automation system ICOC Approved 2/19/2020 340,000$                Board agenda 3/10 350,000$                 10,000$                   Riviera (additional allocation) ICOC Approved 2/19/2020 ‐$                        Board agenda 3/10 40,000$                   40,000$                   Jupiter (additional allocation) ICOC Approved 2/19/2020 5,000$                    Board agenda 3/10 40,000$                   35,000$                   Viera High School ‐ supplemental request ICOC Approved 2/19/2020 680,000$                Board agenda 3/10 700,000$                 20,000$                   Creel (security request) ICOC Approved 2/19/2020 400,000$                  Educational technology ‐ computer refreshment ICOC Approved 2/19/2020 1,500,000$           Palm Bay High ‐ defer chiller replacement pending further investigation ICOC Approved 2/19/2020 (1,000,000)$          Building automation system study (defer) ICOC Approved 2/19/2020 (200,000)$             Edgewood drainage ICOC Approved 2/19/2020 305,000$                Board agenda 3/10 $320,000 15,000$                   

    Total Allocation 10,012,275$              2,000,000$            23,360,000$          35,372,275$          $760,000

    Net Remaining Allocation 25,823,716$              8,750,797$            1,725,194$            37,593,720$         

    February 19, 2020 ICOC agendaChanges from prior approved allocation

    Projected Revenue over $198 Million Preliminary Recommended Distribution

    Updated 02/23/2020

  • Cambridge allocation worksheet with BASCambridge BAS AttachmentsAttachment F funded sales tax projects Cambridgeover 198 million worksheet 02 15 2020 updated 02 21Cambridge ES DDC Controls & GPS Units CO 1 Signed