Attachment D Maps
Figure 1: Project Overview
Figure 2: Project Vicinity & Watersheds
Figure 3: Index Map with Sheet Numbers
Figure 4: Representative Map of Impacts to Waters under the Water Board and CDFG Jurisdictions (Highwind Substation - outfall structures) [Source: Sheet 1 of Figure 3, WDR Permit Application Package]
Figure 5: Representative Map of Impacts to Waters under the Water Board and CDFG Jurisdictions (Construct 8 – permanent tower footing O&M area in drainage) [Source: Sheet 3 of Figure 3, WDR Permit Application Package]
Figure 6: Representative Map of Impacts to Waters under the Water Board and CDFG Jurisdictions (Construct 13 – Installation of three McCarthy drains) [Source: Sheet 4 of Figure 3, WDR Permit Application Package]
Figure 7: Representative Map of Impacts to Waters under the Water Board and CDFG Jurisdictions (Construct 16 – New Access Road plus installation of two McCarthy drains; Construct 17 – widening of existing access road, installation of new McCarthy drain and maintenance grading of existing access road) [Source: Sheet 6 of Figure 3, WDR Permit Application Package]
Figure 8: Representative Map of Impacts to Waters under the Water Board and CDFG Jurisdictions (Construct 27 – Installation of new McCarthy drain in wetland habitat) [Source: Sheet 14 of Figure 3, WDR Permit Application Package]
Figure 9: Representative Map of Impacts to Waters under the Water Board and CDFG Jurisdictions (Construct 33 –Construct 33 and permanent O&M area located within stream channel and will be converted to rip-rap lined channel for approximately 32 feet) [Source: Sheet 20 of Figure 3, WDR Permit Application Package]
Figure 10: Representative Map of Impacts to Waters under the Water Board and CDFG Jurisdictions (Constructs 44-46 – widening of existing access road, AC Mitigation – zinc ribbon installation, maintenance grading, as well as installation of concrete v-ditch and new concrete outlet, gabion retaining wall, and McCarthy drain) [Source: Sheet 23 of Figure 23, WDR Permit Application Package]
!(
!(
!(
!(
!(
!(
!(
!(
!(
!(
!(
!(
Kern County
Los Angeles County
Rosamond
Chino
Mesa
Gould
Vincent
Antelope
Goodrich
Mira Loma
Rio Hondo
Whirlwind
Windhub
Highwind
!!!
!!!
!!!
!!!!!!!!!
!!!
!!!
!!!!!!!!!!!!
!!!
!\!\Carson City
Oakland
CA
NV
San Diego
Los Angeles
FresnoSan Jose
LasVegas
Bakersfield
Sacramento
Legend
!( Substation
Antelope Transmission Project
Segment 3B
Segment 3A
Segment 2
Tehachapi Renewable Transmission Project
Segments 4-11
Telecom
66kV
Base map: ESRI Streetmap
Source: Figure 1, WDR Permit Application Package
North America, 2008
0 94.5
Miles ±
Figure 1Project Area Map
Attachment DAntelope Transmission Project – Segment 3B
")
")
")")")
")
")
")
")
")
")
")
")
")
")
")
")
")") ") ") ") ") ") ") ") ") ") ") ") ") ") ") ") ") ")
")
") ")
")
")
")
")")
")
")
")")
")") ")
")
") ") ") ")")")
")")
")")
")
")
")
")
")
")
")
")
")
")
")")
")
")
")
")
Highwind Substation
Windhub Substation
ANTELOPE
FREMONT
Legend
Segment 3B
Segment 3A
Segment 2") New Structure
Impact Areas
Permanent
Temporary
Watershed
Topo
0 4,5002,250
Feet±
Source: Figure 2, WDR Permit Application Package
Figure 2Project Vicinity & Watersheds
Attachment DAntelope Transmission Project – Segment 3B
")
")
")
")")
")
")
")
")
")
")
")
")
")
")
")
")
")
") ") ") ") ") ") ") ") ") ") ") ") ") ") ") ") ") ")
")
") ")
")
")
")
")
")
")
")
")
")
")
") ")
")
") ") ") ")
")
")
")
")
")")
")
")
")
")
")
")
")
")
")
")
")
")
")
")
")
")
7
6
9
5
8
4
3
2
1
11
19
23
25 26 27
28
29
30
10
32
33
34
35 36 37
38
24
15 18
222120
16 17
13 14
12
31
58
Oak Creek Rd
Cameron Canyon Rd
tS ht09
Tehachapi Willow Springs Rd
tC ykco
R
Josh
ua W
ay
58
Rocky Ct
Legend
Segment 3B
Segment 3A
Segment 2") New Structure
Impact Areas
Permanent
Temporary
Mapbook Index
0 3,1001,550
Feet±
Source: Figure 3, WDR Permit Application Package
Figure 3Index Map with Sheet Numbers
Attachment DAntelope Transmission Project – Segment 3B
3B-1-S-1
3B-1-S-2
Const 2
Const 1
Highwind Sub
LegendSegment 3B
Segment 3A
Segment 2
New Structure
Jurisdictional WatersState Streambed (CDFG/SWRCB)
CDFG Riparian
Wetland
Survey Area
ImpactsAvoided - No Impact
Impacts to Jurisdictional Waters
Permanent
Temporary
Permanent Road
Temporary Road
11
151316
05
07
20
06
04
02
12
03
14
01
17
08
21
0910
182219
23 2524
262827
313029
3332
3534
3836 37
0 200100
Feet
Source: Sheet 1 of Figure 3, WDR Permit Application Package
Figure 4Representative Map of Impacts to Waters
under the Water Board and CDFG Jurisdictions(Highwind Substation – outfall structures)
Attachment DAntelope Transmission Project – Segment 3B
3B-1-R-6
3B-1-S-5
3B-1-S-6
Const 9
Const 8
Const 7
LegendSegment 3B
Segment 3A
Segment 2
New Structure
Jurisdictional WatersState Streambed (CDFG/SWRCB)
CDFG Riparian
Wetland
Survey Area
ImpactsAvoided - No Impact
Impacts to Jurisdictional Waters
Permanent
Temporary
Permanent Road
Temporary Road
11
151316
05
07
20
06
04
02
12
03
14
01
17
08
21
0910
182219
23 2524
262827
313029
3332
3534
3836 37
0 200100
Feet
Source: Sheet 3 of Figure 3, WDR Permit Application Package
Figure 5Representative Map of Impacts to Waters
under the Water Board and CDFG Jurisdictions(Construct 8 – permanent tower footing O&M
area in drainage)Attachment D
Antelope Transmission Project – Segment 3B
3B-1-S-5
3B-2-S-12
3B-2-S-10
3B-2-S-11
Const 12
Const 11
Const 10
LegendSegment 3B
Segment 3A
Segment 2
New Structure
Jurisdictional WatersState Streambed (CDFG/SWRCB)
CDFG Riparian
Wetland
Survey Area
ImpactsAvoided - No Impact
Impacts to Jurisdictional Waters
Permanent
Temporary
Permanent Road
Temporary Road
11
151316
05
07
20
06
04
02
12
03
14
01
17
08
21
0910
182219
23 2524
262827
313029
3332
3534
3836 37
0 200100
Feet
Source: Sheet 4 of Figure 3, WDR Permit Application Package
Figure 6Representative Map of Impacts to Waters
under the Water Board and CDFG Jurisdictions(Constructs 10–12 – Installation of three McCarthy drains)
Attachment DAntelope Transmission Project – Segment 3B
3B-4-R-23
3B-2-R-15
3B-2-S-16
3B-4-S-23
3B-2-S-15
Const 17
Const 18
LegendSegment 3B
Segment 3A
Segment 2
New Structure
Jurisdictional WatersState Streambed (CDFG/SWRCB)
CDFG Riparian
Wetland
Survey Area
ImpactsAvoided - No Impact
Impacts to Jurisdictional Waters
Permanent
Temporary
Permanent Road
Temporary Road
11
151316
05
07
20
06
04
02
12
03
14
01
17
08
21
0910
182219
23 2524
262827
313029
3332
3534
3836 37
0 200100
Feet
Source: Sheet 6 of Figure 3, WDR Permit Application Package
Figure 7Representative Map of Impacts to Waters
under the Water Board and CDFG Jurisdictions(Constructs 17 and 18 – New Access Road
plus installation of two McCarthy drains,widening of existing access road,
installation of new McCarthy drain andmaintenance grading of existing access road)
Attachment DAntelope Transmission Project – Segment 3B
3B-4-W-30
3B-6-W-37
3B-4-W-32
3B-4-R-32
3B-4-S-31
3B-4-S-32
3B-4-S-30
3B-4-S-30
3B-6-S-37
3B-4-S-32
Const 29
Const 28
Const 27
LegendSegment 3B
Segment 3A
Segment 2
New Structure
Jurisdictional WatersState Streambed (CDFG/SWRCB)
CDFG Riparian
Wetland
Survey Area
ImpactsAvoided - No Impact
Impacts to Jurisdictional Waters
Permanent
Temporary
Permanent Road
Temporary Road
11
151316
05
07
20
06
04
02
12
03
14
01
17
08
21
0910
182219
23 2524
262827
313029
3332
3534
3836 37
0 200100
Feet
Source: Sheet 14 of Figure 3, WDR Permit Application Package
Figure 8Representative Map of Impacts to Waters
under the Water Board and CDFG Jurisdictions(Construct 27 – Installation of newMcCarthy drain in wetland habitat)
Attachment DAntelope Transmission Project – Segment 3B
3B-6-S-43
Tehachapi Willow Springs RdConst 35
Const 34
Const 33
LegendSegment 3B
Segment 3A
Segment 2
New Structure
Jurisdictional WatersState Streambed (CDFG/SWRCB)
CDFG Riparian
Wetland
Survey Area
ImpactsAvoided - No Impact
Impacts to Jurisdictional Waters
Permanent
Temporary
Permanent Road
Temporary Road
11
151316
05
07
20
06
04
02
12
03
14
01
17
08
21
0910
182219
23 2524
262827
313029
3332
3534
3836 37
0 200100
Feet
Source: Sheet 20 of Figure 3, WDR Permit Application Package
Figure 9Representative Map of Impacts to Waters
under the Water Board and CDFG Jurisdictions(Construct 33 – Construct 33 and permanent O&M arealocated within stream channel and will be converted to
rip-rap lined channel for approximately 32 feet)Attachment D
Antelope Transmission Project – Segment 3B
3B-7-R-60
3B-7-R-60
3B-7-S-60
3B-8-S-69
3B-8-S-78
3B-8-S-67
3B-8-S-65
3B-7-S-55
3B-8-S-63
3B-7-S-54
3B-8-S-68
3B-8-S-100
3B-8-S-64
3B-8-S-56
3B-8-S-66
3B-8-S-71
Oak Creek Rd
Const 46
Const 45Const 44
LegendSegment 3B
Segment 3A
Segment 2
New Structure
Jurisdictional WatersState Streambed (CDFG/SWRCB)
CDFG Riparian
Wetland
Survey Area
ImpactsAvoided - No Impact
Impacts to Jurisdictional Waters
Permanent
Temporary
Permanent Road
Temporary Road
11
151316
05
07
20
06
04
02
12
03
14
01
17
08
21
0910
182219
23 2524
262827
313029
3332
3534
3836 37
0 200100
Feet
Source: Sheet 23 of Figure 3, WDR Permit Application Package
Figure 10Representative Map of Impacts to Waters
under the Water Board and CDFG Jurisdictions(Constructs 44-46 – widening of existing access
road, AC Mitigation – zinc ribbon installation,maintenance grading, as well as
installation of concrete v-ditch and new concreteoutlet, gabion retaining wall, and McCarthy drain)
Attachment DAntelope Transmission Project – Segment 3B