27
Attachment A - Approved FY 2014 Revenue Sharing Allocations Project # Locality's Priority RoadName Location Scope Project Administration FY 2014 State Match Allocations Bristol District Abingdon (Town of) Construction Priority 0372-140-R68 1 French Moore Boulevard Cook Street French Moore Blvd cul-de-sac FR: TO: Extend Road Locality UPC 104231 $552,000 Abingdon (Town of) total $552,000 1 project Bluefield (Town of) Construction Priority 9999-143-R16 1 Various Routes Various Routes Various Routes FR: TO: Reconstruction Locality UPC 104145 $340,000 U000-143-R18 2 Highland Avenue/High Street Town Limits Montrose Street FR: TO: Reconstruction Locality UPC 104229 $250,000 9999-143-R17 3 Various routes Pleasantview Drive Valley Dale FR: TO: Sidewalk (new construction) Locality UPC 104146 $50,000 Bluefield (Town of) total $640,000 3 projects Bristol (City of) Construction Priority 0011-102-716 1 Lee Highway 850 feet east of Blevins Boulevard Exit 5 Northbound Off Ramp FR: TO: Widening (ex. 2 to 4 lanes) Locality UPC 103394 $10,000,000 Bristol (City of) total $10,000,000 1 project Page 1 of 27 Approved FY 2014 Revenue Sharing Program Allocations June 19, 2013

Attachment A - Approved FY 2014 Revenue Sharing Allocations

Embed Size (px)

Citation preview

Page 1: Attachment A - Approved FY 2014 Revenue Sharing Allocations

Attachment A - Approved FY 2014 Revenue Sharing Allocations

Project # Locality's

Priority RoadName Location Scope

Project

Administration

FY 2014 State Match

Allocations

Bristol District

Abingdon (Town of)

Construction Priority

0372-140-R681

French Moore Boulevard Cook Street

French Moore Blvd cul-de-sacFR:

TO:

Extend RoadLocality

UPC 104231$552,000

Abingdon (Town of) total $552,0001 project

Bluefield (Town of)

Construction Priority

9999-143-R161

Various Routes Various Routes

Various RoutesFR:

TO:

ReconstructionLocality

UPC 104145$340,000

U000-143-R182

Highland Avenue/High

Street

Town Limits

Montrose StreetFR:

TO:

ReconstructionLocality

UPC 104229$250,000

9999-143-R173

Various routes Pleasantview Drive

Valley DaleFR:

TO:

Sidewalk (new construction)Locality

UPC 104146$50,000

Bluefield (Town of) total $640,0003 projects

Bristol (City of)

Construction Priority

0011-102-7161

Lee Highway 850 feet east of Blevins Boulevard

Exit 5 Northbound Off RampFR:

TO:

Widening (ex. 2 to 4 lanes)Locality

UPC 103394$10,000,000

Bristol (City of) total $10,000,0001 project

Page 1 of 27Approved FY 2014 Revenue Sharing Program AllocationsJune 19, 2013

Page 2: Attachment A - Approved FY 2014 Revenue Sharing Allocations

Project # Locality's

Priority RoadName Location Scope

Project

Administration

FY 2014 State Match

Allocations

Bristol District

Buchanan (County of)

Construction Priority

0080-013-R741

0.01 Mi. w. Rte. 623

0.37 Mi. W. Rte. 623FR:

TO:

ReconstructionLocality

UPC 102757$1,060,000

9999-013-R072

Various Routes Various Routes

Various RoutesFR:

TO:

ReconstructionVDOT

UPC 104140$1,000,000

Buchanan (County of) total $2,060,0002 projects

Dickenson (County of)

Construction Priority

9999-025-R801

Various Routes Various

VariousFR:

TO:

ReconstructionVDOT

UPC 104147$1,000,000

Dickenson (County of) total $1,000,0001 project

Norton (City of)

Construction Priority

SRTS-146-1111

Park Avenue and Park

Avenue NE

Rte. 23 Business/Park Avenue NE

Rte. 23 Business/Park AvenueFR:

TO:

Sidewalk (new construction)Locality

UPC 87182$375,000

Norton (City of) total $375,0001 project

Russell (County of)

Construction Priority

9999-083-R461

Various Routes Various routes

Various routesFR:

TO:

ReconstructionVDOT

UPC 104141$400,000

9999-083-R472

Various Routes Various routes

Various routesFR:

TO:

ReconstructionVDOT

UPC 104142$300,000

0663-083-R483 0.95 Mi. N. Rte. 661FR:

TO:

Bridge ReplacementVDOT

UPC 10269$100,000

Russell (County of) total $800,0003 projects

Page 2 of 27Approved FY 2014 Revenue Sharing Program AllocationsJune 19, 2013

Page 3: Attachment A - Approved FY 2014 Revenue Sharing Allocations

Project # Locality's

Priority RoadName Location Scope

Project

Administration

FY 2014 State Match

Allocations

Bristol District

Smyth (County of)

Construction Priority

0011-086-R661

Lee Highway and Brown's

Subdivision Road

Lee Highway (Rte. 11) & Brown's

Subd. Rd. (Rte. F005)

Lee Highway (Rte. 11) & Brown's

Subd. Rd. (Rte. F005)

FR:

TO:

Intersection ImprovementLocality

UPC 104227$31,000

9999-086-R652

Green Acres Drive,

Evergreen Court

Chilhowie

0.12 Mile N. Rte. 607

Route 607, Flatwood Acres RoadFR:

TO:

Rural AdditionsVDOT

UPC 104193$187,500

Smyth (County of) total $218,5002 projects

Tazewell (County of)

Construction Priority

9999-092-R611

Various Routes Various Routes

Various RoutesFR:

TO:

ReconstructionVDOT

UPC 104143$900,000

9999-092-R622

Various Routes Various Routes

Various RoutesFR:

TO:

GuardrailVDOT

UPC 104144$100,000

Tazewell (County of) total $1,000,0002 projects

Wythe (County of)

Construction Priority

9999-098-R651

Int. E. Lee Trinkle Dr. Rte. 792

0.5 Mi. E. Int. Rte. 77FR:

TO:

New RoadLocality

UPC 104226$413,500

9999-098-R652

Bertha Farms Rd. 0.58 Mi.N. Rte. 608

Int. Rte. 608FR:

TO:

Rural AdditionsVDOT

UPC 104192$179,500

9999-098-R633

Bearwallow Rd. Int. Rte. 613

Int. Grouse Ridge Rd.FR:

TO:

Rural AdditionsVDOT

UPC 104191$229,500

0726-098-R644

Conners Valley End of State maintenance

Cattle guard at end of existing

pavement

FR:

TO:

ReconstructionVDOT

UPC 104230$267,000

Wythe (County of) total $1,089,5004 projects

Page 3 of 27Approved FY 2014 Revenue Sharing Program AllocationsJune 19, 2013

Page 4: Attachment A - Approved FY 2014 Revenue Sharing Allocations

Project # Locality's

Priority RoadName Location Scope

Project

Administration

FY 2014 State Match

Allocations

Culpeper District

Albemarle (County of)

Construction Priority

0000-002-R781

Various Locations Various locations

Various locationsFR:

TO:

Sidewalk (new construction)Locality

UPC 104159$750,000

0029-002-R772

Seminole Trail Polo Grounds Rd., potentially to

Airport Rd

Hydraulic RoadFR:

TO:

Signals/Traffic ServicesVDOT

UPC 104153$360,000

Albemarle (County of) total $1,110,0002 projects

Charlottesville (City of)

Maintenance Priority

0000-104-2731

Various Bridge Locations Citywide

CitywideFR:

TO:

Bridge Rehabilitation

(maintenance) LocalityUPC 104765

$154,761

Charlottesville (City of) total $154,7611 project

Culpeper (County of)

Construction Priority

0681-023-R131

Jacobs Ford Road Route 751

Route 788FR:

TO:

Pave Unpaved RoadVDOT

UPC 54364$243,249

0751-023-R132

Dragoon Road End of State Maintenance

Route 681FR:

TO:

Pave Unpaved RoadVDOT

UPC 54365$171,704

0716-023-R013

Whippoorwill Lane Route 636 - Glebe Way

0.02 ME Route 1045 - Stoney Run

Drive

FR:

TO:

Pave Unpaved RoadVDOT

UPC 58108$213,035

0626-023-R354

Holly Springs Road Route 611

Route 639FR:

TO:

Pave Unpaved RoadVDOT

UPC 104154$216,372

0746-023-R365

Settletown Place End of State Maintenance

Route 714FR:

TO:

Pave Unpaved RoadVDOT

UPC 104155$226,886

Culpeper (County of) total $1,071,2465 projects

Page 4 of 27Approved FY 2014 Revenue Sharing Program AllocationsJune 19, 2013

Page 5: Attachment A - Approved FY 2014 Revenue Sharing Allocations

Project # Locality's

Priority RoadName Location Scope

Project

Administration

FY 2014 State Match

Allocations

Culpeper District

Fluvanna (County of)

Construction Priority

0015-032-5721

James Madison Highway Roundabout

Intersection Rte. 15 & Rte. 53FR:

TO:

Intersection ImprovementVDOT

UPC 98213$275,000

Fluvanna (County of) total $275,0001 project

Orange (Town of)

Construction Priority

0000-275-R161

Belleview Avenue Washington Street

Main StreetFR:

TO:

ReconstructionLocality

UPC 104156$45,000

0000-275-R172

Belleview Avenue Nelson Street

Newton StreetFR:

TO:

ReconstructionLocality

UPC 104157$27,000

0000-275-R183

Various Locations Various Locations

Various LocationsFR:

TO:

ReconstructionLocality

UPC 104158$279,050

Maintenance Priority

0000-275-1191

Madison Road South Food Lion Entrance

Main StreetFR:

TO:

Pavement Overlay (maintenance)Locality

UPC 104762$93,408

0000-275-1202

Spicers Mill Road Belleview Avenue

Madison RoadFR:

TO:

Pavement Overlay (maintenance)Locality

UPC 104763$7,505

0000-275-1213

Selma Road Berry Hill Road

Main StreetFR:

TO:

Pavement Overlay (maintenance)Locality

UPC 104764$26,688

Orange (Town of) total $478,6516 projects

Warrenton (Town of)

Maintenance Priority

0880-156-3042

Bear Wallow Road Broadview Avenue

Western Corporate LimitsFR:

TO:

Pavement Overlay (maintenance)Locality

UPC 104766$51,617

Warrenton (Town of) total $51,6171 project

Page 5 of 27Approved FY 2014 Revenue Sharing Program AllocationsJune 19, 2013

Page 6: Attachment A - Approved FY 2014 Revenue Sharing Allocations

Project # Locality's

Priority RoadName Location Scope

Project

Administration

FY 2014 State Match

Allocations

Fredericksburg District

Fredericksburg (City of)

Construction Priority

U000-111- 2331

Fall Hill Ave. and Mary

Washington Boulevard

Carl D. Silver Parkway

Rappahannock Canal (0.7 miles

west of Jeff Davis Hwy)

FR:

TO:

Widening (ex. 2 to 4 lanes)VDOT

UPC 88699$2,880,000

U000-111-r652

Littlepage Street Monroe Street

Brompton StreetFR:

TO:

ReconstructionLocality

UPC 104166$145,000

U000-111-R663

Prince Edward Street Canal Street

George StreetFR:

TO:

ReconstructionLocality

UPC 104167$370,000

Maintenance Priority

U000-M65-R141

Various Locations Various Locations

Various LocationsFR:

TO:

Pavement Overlay (maintenance)Locality

UPC 104431$214,809

Fredericksburg (City of) total $3,609,8094 projects

Gloucester (County of)

Construction Priority

0017-036-R021

George Washington

Hwy/TC Walker Road

Approximately 1,000ft east of US 17

Intersection of US 17 and TC

Walker Road

FR:

TO:

Intersection ImprovementLocality

UPC 104163$1,000,000

Gloucester (County of) total $1,000,0001 project

Spotsylvania (County of)

Construction Priority

0000-088-5931

VRE Commuter Rail

Station

CSX/US Rte 17 Bypass

Rte 656 Crossroads PkwyFR:

TO:

New RoadLocality

UPC 93066$655,300

Spotsylvania (County of) total $655,3001 project

Page 6 of 27Approved FY 2014 Revenue Sharing Program AllocationsJune 19, 2013

Page 7: Attachment A - Approved FY 2014 Revenue Sharing Allocations

Project # Locality's

Priority RoadName Location Scope

Project

Administration

FY 2014 State Match

Allocations

Fredericksburg District

Stafford (County of)

Construction Priority

0610-089-6081

Garrisonville Road Onville Road (641)

Eustace Road (751)FR:

TO:

Widening (ex. 2 to 4 lanes)Locality

UPC 98847$500,000

0652-089-R232

Truslow Road Plantation Drive

Berea Church RoadFR:

TO:

ReconstructionLocality

UPC 102916$1,908,500

0630-089-2023

Courthouse Road Cedar Lane

Winding Creek RoadFR:

TO:

Widening (ex. 2 to 4 lanes)VDOT

UPC 4632$6,089,500

0001-089-R324

Jefferson Davis Highway About 0.1 miles north of Route 630

(Courthouse Road)

About 0.1 miles south of Route 630

(Courthouse Road)

FR:

TO:

Turn LanesLocality

UPC 103085$1,502,000

Stafford (County of) total $10,000,0004 projects

Westmoreland (County of)

Construction Priority

0000-096-R971

Cople Drive Route 1505

Route 1501FR:

TO:

Pave Unpaved RoadVDOT

UPC 104164$35,000

9999-096-R982

Woodland Drive (North) Route 1505

Route 1501FR:

TO:

Pave Unpaved RoadVDOT

UPC 104165$39,068

Westmoreland (County of) tota $74,0682 projects

Hampton Roads District

Emporia (City of)

Construction Priority

U000-109-1801

East Atlantic Street East Atlantic Street fork with

Southampton Street

US 58 BYPFR:

TO:

ReconstructionLocality

UPC 93307$215,115

Emporia (City of) total $215,1151 project

Page 7 of 27Approved FY 2014 Revenue Sharing Program AllocationsJune 19, 2013

Page 8: Attachment A - Approved FY 2014 Revenue Sharing Allocations

Project # Locality's

Priority RoadName Location Scope

Project

Administration

FY 2014 State Match

Allocations

Hampton Roads District

Greensville (County of)

Construction Priority

0614-40-7431

Otterdam Road 22,000 feet north

Exit 13 on I-95FR:

TO:

Widening (ex. 2 to 4 lanes)Locality

UPC 104362$3,376,220

Greensville (County of) total $3,376,2201 project

Hampton (City of)

Construction Priority

9999-114-R642

North Campus Parkway Commander Shepard Boulevard

Magruder BoulevardFR:

TO:

New RoadLocality

UPC 104369$140,000

9999-114-R653

Franklin Street Pembroke Avenue

Lincoln StreetFR:

TO:

New RoadLocality

UPC 104367$262,500

0258-114-R664

Mercury Boulevard Armistead Avenue

750ft west of Coliseum DriveFR:

TO:

Sidewalk (new construction)Locality

UPC 104368$587,500

9999-114-R675

Freeman Drive 1800ft +/- west of Armistead

Avenue

Armistead AvenueFR:

TO:

ReconstructionLocality

UPC 104372$587,500

Hampton (City of) total $1,577,5004 projects

James City (County of)

Construction Priority

0612-047-R591

Longhill Road 124ft SE from Longhill Rd/ Olde

Towne Rd intersection

80ft SE from Longhill Rd/ Olde

Towne Rd intersection

FR:

TO:

Signals/Traffic ServicesVDOT

UPC 104360$30,000

9999-047-R602

Williamsburg West

Subdivision Roads

153 Country Club Drive

Longhill Road/Country Club Drive

intersection

FR:

TO:

ReconstructionVDOT

UPC 104356$200,000

0005-047-R613

John Tyler

Hwy/Monticello Ave.

Capital Trail

600 ft W & 400ft E of the Rt321/Rt

5 intersection

FR:

TO:

Bikeways/TrailsVDOT

UPC 104327$25,000

James City (County of) total $255,0003 projects

Page 8 of 27Approved FY 2014 Revenue Sharing Program AllocationsJune 19, 2013

Page 9: Attachment A - Approved FY 2014 Revenue Sharing Allocations

Project # Locality's

Priority RoadName Location Scope

Project

Administration

FY 2014 State Match

Allocations

Hampton Roads District

Newport News (City of)

Construction Priority

0060-121-R181

Warwick Boulevard J. Clyde Morris Boulevard

Lake Maury BridgeFR:

TO:

Bridge ReplacementLocality

UPC 101279$375,000

9999-121-R662

Prince Drew Road Moores Lane North

Warwick BoulevardFR:

TO:

ReconstructionLocality

UPC 104373$1,100,000

9999-121-R673

Gwynn Circle Cul-de-sac

East of Linbrook DrivetFR:

TO:

Drainage ImprovementsLocality

UPC 104375$375,000

9999-121-R684

Citywide Various Locations

Various LocationsFR:

TO:

Sidewalk (new construction)Locality

UPC 104376$150,000

0143-121-R695

Jefferson Avenue Center Avenue

Jefferson AvenueFR:

TO:

Signals/Traffic ServicesLocality

UPC 104377$147,500

9999-121-R707

Hoopes Road Old Courthouse Way

Denbigh BoulevardFR:

TO:

ReconstructionLocality

UPC 104378$1,150,000

Newport News (City of) total $3,297,5006 projects

Norfolk (City of)

Construction Priority

U000-122-R981

Intersection of 21st St &

Llewellyn Ave.

Intersection of 21st & Llewellyn Ave.FR:

TO:

Intersection ImprovementLocality

UPC 104379$200,000

0407-122-R992

E. Indian River Rd. (300-

400 Blk)

Approx 500 ft west of Pescara Creek

Culvert centerline

Approx 500 ft east of Pescara Creek

Culvert centerline

FR:

TO:

Bikeways/TrailsLocality

UPC 104381$200,000

0407-122-R003

W. Indian River Rd (300-

400 Blk)

Approx. 500 ft west of Spotico

Creek Culvert centerline

Approx 500 ft east of Spotico Creek

Culvert centerline

FR:

TO:

Bikeways/TrailsLocality

UPC 104382$200,000

Maintenance Priority

9999-122-R034

Westminster Avenue Stapleton Street

Ballentine BoulevardFR:

TO:

Pavement Overlay (maintenance)Locality

UPC 104383$108,333

Norfolk (City of) total $708,3334 projects

Page 9 of 27Approved FY 2014 Revenue Sharing Program AllocationsJune 19, 2013

Page 10: Attachment A - Approved FY 2014 Revenue Sharing Allocations

Project # Locality's

Priority RoadName Location Scope

Project

Administration

FY 2014 State Match

Allocations

Hampton Roads District

Portsmouth (City of)

Construction Priority

0017-124-R901

High Street Seagrove Road/Carney Street

Grayson StreetFR:

TO:

Bridge ReplacementLocality

UPC 102715$1,000,000

U000-124-R064

Elliot Avenue Elliot Street

Freedom AvenueFR:

TO:

Extend RoadLocality

UPC 104390$720,000

Maintenance Priority

0239-124-R072

Victory Boulevard Entrance north of the Bridge

Driveway entrance south of bridgeFR:

TO:

Bridge Rehabilitation

(maintenance) LocalityUPC 104384

$30,952

0017-124-R083

High Street Seagrove Road/Carney Street

Grayson StreetFR:

TO:

Bridge Rehabilitation

(maintenance) LocalityUPC 104385

$77,381

Portsmouth (City of) total $1,828,3334 projects

Suffolk (City of)

Construction Priority

U000-133-R761

Kenyon Road Connector Route 58

Terminus of Kenyon CourtFR:

TO:

New RoadLocality

UPC 104359$2,000,000

0614-133-3542

Nansemond

Parkway/Wilroy Road

Willroy Road

Nansemond ParkwayFR:

TO:

Intersection ImprovementLocality

UPC 102995$800,000

0058-133-3553

Route 58 bypass and

Godwin Blvd

Suffolk Bypass

Godwin BlvdFR:

TO:

Intersection ImprovementLocality

UPC 102998$500,000

U000-133-3774

College Drive/Harbour

View Blvd.

Harborview Blvd

College DriveFR:

TO:

Intersection ImprovementLocality

UPC 104361$1,000,000

0010-133-3785

Chuckatuck Village Int

Improvements

Kings Hwy (Rte 125)

Godwin BlvdFR:

TO:

Intersection ImprovementLocality

UPC 104332$750,000

0460-133-3796

Pruden Boulevard existing box culvert location

Existing box culvert locationFR:

TO:

Drainage ImprovementsLocality

UPC 104333$425,000

Suffolk (City of) total $5,475,0006 projects

Page 10 of 27Approved FY 2014 Revenue Sharing Program AllocationsJune 19, 2013

Page 11: Attachment A - Approved FY 2014 Revenue Sharing Allocations

Project # Locality's

Priority RoadName Location Scope

Project

Administration

FY 2014 State Match

Allocations

Hampton Roads District

Virginia Beach (City of)

Construction Priority

0000-134-7701

Centerville Turnpike Kempsville Road

Indian River RoadFR:

TO:

Widening (ex. 2 to 4 lanes)Locality

UPC 103005$10,000,000

Virginia Beach (City of) total $10,000,0001 project

Williamsburg (City of)

Construction Priority

0060-137-R491

York Street Quarterpath Road (SR 637)

Page Street (SR 5/US 60)FR:

TO:

Sidewalk (new construction)Locality

UPC 104334$305,750

Williamsburg (City of) total $305,7501 project

Lynchburg District

Danville (City of)

Construction Priority

0058-108-R961

Riverside Drive Piney Forest Road

Courtland StreetFR:

TO:

Drainage ImprovementsLocality

UPC 104174$200,000

9999-108-R972

North Davis Drive Piney Forest Road

Franklin TurnpikeFR:

TO:

Drainage ImprovementsLocality

UPC 104175$425,000

Danville (City of) total $625,0002 projects

Farmville (Town of)

Maintenance Priority

9999-144-R291

Germantown/Second/Dosw

ell/Cedar/

E.Third

FR:

TO:

Pavement Overlay (maintenance)Locality

UPC 104176$78,618

Farmville (Town of) total $78,6181 project

Page 11 of 27Approved FY 2014 Revenue Sharing Program AllocationsJune 19, 2013

Page 12: Attachment A - Approved FY 2014 Revenue Sharing Allocations

Project # Locality's

Priority RoadName Location Scope

Project

Administration

FY 2014 State Match

Allocations

Lynchburg District

Lynchburg (City of)

Construction Priority

0460-118-R191

Timberlake Road Leesville Road

Northwest ExpresswayFR:

TO:

Intersection ImprovementLocality

UPC 101211$500,000

U000-118-R962

Greenview Drive Eastern City Limits

Hermitage RoadFR:

TO:

Widening (ex. 2 to 4 lanes)Locality

UPC 87145$850,000

0221-118-R294

Lakeside Dr. Blue Ridge St.

Lynchburg College entranceFR:

TO:

Intersection ImprovementLocality

UPC 104169$800,000

Maintenance Priority

0501-118-R303

Main Street Structure 8005- Main Street over

Expressway

Structure 8005- Main Street over

Expressway

FR:

TO:

Bridge Rehabilitation

(maintenance) LocalityUPC 104173

$263,094

Lynchburg (City of) total $2,413,0944 projects

Pittsylvania (County of)

Construction Priority

0640-071-R231

Spring Garden Road .36 miles north of route 678

.35 miles north of route 678FR:

TO:

Bridge ReplacementVDOT

UPC 104172$145,000

Pittsylvania (County of) total $145,0001 project

Northern Virginia District

Alexandria (City of)

Maintenance Priority

U000-100-R981

Eisenhower Avenue Clermont Avenue

South Van Dorn StreetFR:

TO:

Pavement Overlay (maintenance)Locality

UPC 104432$123,809

Alexandria (City of) total $123,8091 project

Page 12 of 27Approved FY 2014 Revenue Sharing Program AllocationsJune 19, 2013

Page 13: Attachment A - Approved FY 2014 Revenue Sharing Allocations

Project # Locality's

Priority RoadName Location Scope

Project

Administration

FY 2014 State Match

Allocations

Northern Virginia District

Arlington (County of)

Construction Priority

0309-000-R121

Old Dominion Drive 38th Street North

North Glebe RoadFR:

TO:

Sidewalk (new construction)Locality

UPC 87271$77,568

BR00-000-7402

Carlin Springs Road

Bridge

Carlin Springs / George Mason Drive

Carlin Springs / George Mason DriveFR:

TO:

Bridge ReplacementLocality

UPC 95636$536,243

0110-000-1033

Jefferson Davis Hwy Memorial Bridge

North Pentagon parking lotFR:

TO:

Bikeways/TrailsLocality

UPC 58598$110,587

0027-000-R074

Washington Blvd Columbia Pike

Arlington BlvdFR:

TO:

Bikeways/TrailsLocality

UPC 87156$133,000

6587-000-R895

Boundary Channel Drive Connector Rd

Long Bridge DrFR:

TO:

ReconstructionLocality

UPC 104323$2,500,000

Arlington (County of) total $3,357,3985 projects

Fairfax (City of)

Construction Priority

U000-151-R711

George T. Snyder Trail Chain Bridge Road

Plantation ParkwayFR:

TO:

Bikeways/TrailsLocality

UPC 104223$65,000

0050-151-R752

Fairfax Boulevard Fairfax Circle

Draper CircleFR:

TO:

ReconstructionLocality

UPC 104232$528,500

0050-151-R733

Fairfax Boulevard Fairchester Drive

Kamp WashingtonFR:

TO:

ReconstructionLocality

UPC 104234$414,500

0050-151-R744

Fairfax Boulevard and Oak Street

Intersection of Fairfax BlvdFR:

TO:

ReconstructionLocality

UPC 104233$650,000

Maintenance Priority

U000-151-R795

Jermantown Road,

Pickett Road, University

Dr

Various Locations

Various LocationsFR:

TO:

Pavement Overlay (maintenance)Locality

UPC 104407$68,726

Fairfax (City of) total $1,726,7265 projects

Page 13 of 27Approved FY 2014 Revenue Sharing Program AllocationsJune 19, 2013

Page 14: Attachment A - Approved FY 2014 Revenue Sharing Allocations

Project # Locality's

Priority RoadName Location Scope

Project

Administration

FY 2014 State Match

Allocations

Northern Virginia District

Fairfax (County of)

Construction Priority

8102-029-0651

Jones Branch Drive Jones Branch Dr (Rte 5062)

Dolley Madison Blvd (Rte 123)FR:

TO:

New RoadLocality

UPC 103907$10,000,000

Fairfax (County of) total $10,000,0001 project

Falls Church (City of)

Construction Priority

U000-110-R421

Citywide Various Locations

Various LocationsFR:

TO:

ReconstructionLocality

UPC 98172$500,000

Maintenance Priority

U000-110-R692

East Broad Street Church Place

North Roosevelt StreetFR:

TO:

Pavement Overlay (maintenance)Locality

UPC 104429$18,000

U000-110-R703

Hillwood Ave Smallwood Way and S. Roosevelt

St. to E. Broad St.

E. Annandale Rd.FR:

TO:

Pavement Overlay (maintenance)Locality

UPC 104408$74,856

Falls Church (City of) total $592,8563 projects

Herndon (Town of)

Maintenance Priority

U000-235-R551

Various Locations Various Locations

Various LocationsFR:

TO:

Pavement Overlay (maintenance)Locality

UPC 104409$116,071

Herndon (Town of) total $116,0711 project

Page 14 of 27Approved FY 2014 Revenue Sharing Program AllocationsJune 19, 2013

Page 15: Attachment A - Approved FY 2014 Revenue Sharing Allocations

Project # Locality's

Priority RoadName Location Scope

Project

Administration

FY 2014 State Match

Allocations

Northern Virginia District

Leesburg (Town of)

Construction Priority

U000-253-3121

Sycolin Road 500ft South of Tavistock Road

Town of Leesburg South Corporate

Limit

FR:

TO:

Widening (ex. 2 to 4 lanes)Locality

UPC 102895$1,000,000

Maintenance Priority

U000-253-R252

Various Locations Various Locations

Various LocationsFR:

TO:

Pavement Overlay (maintenance)Locality

UPC 104415$154,761

Leesburg (Town of) total $1,154,7612 projects

Loudoun (County of)

Construction Priority

0901-053-R141

Claiborne Parkway Ryan Road (772)

Croson (Rte. 645)FR:

TO:

Extend RoadLocality

UPC 102858$1,000,000

0620-029-0172

Braddock Road Braddock Road @ Pleasant Valley

Road

Braddock Road @ Pleasant Valley

Road

FR:

TO:

Intersection ImprovementVDOT

UPC 103318$1,000,000

0625-053-R443

Waxpool Road Broderick Drive (Rte. 1070)

Pacific Boulevard (Rte. 1036)FR:

TO:

Intersection ImprovementLocality

UPC 104292$3,200,000

0771-053-P424

The Woods Road Evergreen Mill Road (Rte. 621)

Stonewood LaneFR:

TO:

Pave Unpaved RoadVDOT

UPC 90725$1,400,000

Loudoun (County of) total $6,600,0004 projects

Page 15 of 27Approved FY 2014 Revenue Sharing Program AllocationsJune 19, 2013

Page 16: Attachment A - Approved FY 2014 Revenue Sharing Allocations

Project # Locality's

Priority RoadName Location Scope

Project

Administration

FY 2014 State Match

Allocations

Northern Virginia District

Manassas (City of)

Construction Priority

U000-155-R851

Prince William Street Intersection of Wellington Road

Intersection of Grantt AvenueFR:

TO:

ReconstructionLocality

UPC 104238$1,804,500

Maintenance Priority

U000-155-R892

Ashton Avenue Intersection of Confederate Trail

Intersection of Godwin DriveFR:

TO:

Pavement Overlay (maintenance)Locality

UPC 104412$90,226

Manassas (City of) total $1,894,7262 projects

Prince William (County of)

Construction Priority

0640-076-R981

Minnieville Road Dumfries Road (Route 234)

Spriggs Road (Route 643)FR:

TO:

Widening (ex. 2 to 4 lanes)Locality

UPC 103484$10,000,000

Prince William (County of) tota $10,000,0001 project

Vienna (Town of)

Construction Priority

U000-153-R851

Various Town roadways

VariousFR:

TO:

Sidewalk (new construction)Locality

UPC 104235$500,000

Maintenance Priority

U000-153-R912

Various Town roadways

VariousFR:

TO:

Pavement Overlay (maintenance)Locality

UPC 104433$89,762

Vienna (Town of) total $589,7622 projects

Page 16 of 27Approved FY 2014 Revenue Sharing Program AllocationsJune 19, 2013

Page 17: Attachment A - Approved FY 2014 Revenue Sharing Allocations

Project # Locality's

Priority RoadName Location Scope

Project

Administration

FY 2014 State Match

Allocations

Richmond District

Amelia (County of)

Construction Priority

0666-004-R511

Cedar Lane Dead End

04-614 Dennisville RoadFR:

TO:

Pave Unpaved RoadVDOT

UPC 104199$53,575

0660-004-R522

Mills Lane Dead End

04-704 Mills CourtFR:

TO:

Pave Unpaved RoadVDOT

UPC 104200$56,413

0704-004-R533

Mills Court Dead End

0.40 MN 04-704FR:

TO:

Pave Unpaved RoadVDOT

UPC 104201$19,525

0680-004-R544

Maxey Lane Dead End

04-614 Dennisville RoadFR:

TO:

Pave Unpaved RoadVDOT

UPC 104206$28,038

0717-004-R555

Hall Road Dead End

04-614 Dennisville RoadFR:

TO:

Pave Unpaved RoadVDOT

UPC 104207$13,850

0689-004-R566

Flippen Lane Dead End

04-614 Dennisville RoadFR:

TO:

Pave Unpaved RoadVDOT

UPC 104208$25,200

0695-004-R577

Flinn Lane Dead End

04-607 West Creek RoadFR:

TO:

Pave Unpaved RoadVDOT

UPC 104209$25,200

0683-004-R588

Chula School Lane Dead End

04-705 Mt Olive LaneFR:

TO:

Pave Unpaved RoadVDOT

UPC 104210$39,388

0710-004-R599

Hills Lane Dead End

04-683FR:

TO:

Pave Unpaved RoadVDOT

UPC 104211$11,013

Amelia (County of) total $272,2029 projects

Blackstone (Town of)

Construction Priority

0040-142-R621

S. Main Street to Church

Street

Church Street

Baptist Church (Near Irvin Street)FR:

TO:

Pavement Overlay (maintenance)Locality

UPC 104276$49,000

Blackstone (Town of) total $49,0001 project

Page 17 of 27Approved FY 2014 Revenue Sharing Program AllocationsJune 19, 2013

Page 18: Attachment A - Approved FY 2014 Revenue Sharing Allocations

Project # Locality's

Priority RoadName Location Scope

Project

Administration

FY 2014 State Match

Allocations

Richmond District

Brunswick (County of)

Construction Priority

0703-012-R311

Johnson Run Road Route 604

Brunswick/Greensville County LineFR:

TO:

Rural AdditionsVDOT

UPC 102923$25,000

Brunswick (County of) total $25,0001 project

Chesterfield (County of)

Construction Priority

9999-020-R411

Walton Park Rd Walton Pk Ln:Walton Pk Rd -

Browns Hill

Walton Park Rd Coral View -

Queensgate

FR:

TO:

Sidewalk (new construction)Locality

UPC 102945$382,546

4700-020-R751

Deer Run Drive Chital Dr

360FR:

TO:

Sidewalk (new construction)Locality

UPC 104285$617,454

0609-020-R782

Old Centraila Rd Glen Oaks Ct Rt 3585

Castlebury Rd Rt 1552FR:

TO:

Sidewalk (new construction)Locality

UPC 104288$250,000

0649-020-R792

Newbys Br Rd Belmont Rd Rt 651

Hagood La Rt 914FR:

TO:

ReconstructionLocality

UPC 104289$1,800,000

0678-020-R772

Providence Rd Woodward Dr

60FR:

TO:

Sidewalk (new construction)Locality

UPC 104287$1,800,000

0720-020-R802

Lucks Lane E Evergreen Pkwy Rt 3970

Spirea Rd Rt 2780FR:

TO:

Widening (ex. 2 to 4 lanes)Locality

UPC 104290$1,800,000

0144-020-R812

Harrowgate Rd School St Rt 1508

Old Hundred Rd Rt 1505FR:

TO:

Sidewalk (new construction)Locality

UPC 104291$300,000

1107-020-6742

E. River Rd Colonial Hts City Line Rt 1106

Granger St Rt 1121FR:

TO:

Widening (ex. 2 to 4 lanes)Locality

UPC 104083$1,800,000

0618-020-R762

Old Bermuda Hundred Rd

at Old Stage Rd

Intersection

1000ft East of Old Stage Rd

Intersection

I-95FR:

TO:

ReconstructionLocality

UPC 104286$1,250,000

Chesterfield (County of) total $10,000,0009 projects

Page 18 of 27Approved FY 2014 Revenue Sharing Program AllocationsJune 19, 2013

Page 19: Attachment A - Approved FY 2014 Revenue Sharing Allocations

Project # Locality's

Priority RoadName Location Scope

Project

Administration

FY 2014 State Match

Allocations

Richmond District

Colonial Heights (City of)

Maintenance Priority

U000-106-R461

White Sand Ct End

Intersection @ Heron Run DrFR:

TO:

Pavement OverlayLocality

UPC 104508$82,952

Colonial Heights (City of) total $82,9521 project

Hanover (County of)

Construction Priority

0054-042-R081

E. Patrick Henry Rd Woodside Lane

At Int Rt 54FR:

TO:

Turn LanesLocality

UPC 104275$750,000

Hanover (County of) total $750,0001 project

Henrico (County of)

Construction Priority

0615-043-R941

Creighton Road Richmond Corporate Limits

Sandy LaneFR:

TO:

ReconstructionLocality

UPC 104274$1,495,000

9999-043-R952

Shady Grove Road and

Old Nuckols Road

300 feet east of Shady Grove Road

500 feet south of Old Nuckols RoadFR:

TO:

Sidewalk (new construction)Locality

UPC 104277$69,000

Maintenance Priority

9999-043-R013

Gaskins Road Park-and-

Ride Facility

2900 Gaskins RoadFR:

TO:

Pavement Overlay (maintenance)Locality

UPC 104511$55,250

Henrico (County of) total $1,619,2503 projects

Page 19 of 27Approved FY 2014 Revenue Sharing Program AllocationsJune 19, 2013

Page 20: Attachment A - Approved FY 2014 Revenue Sharing Allocations

Project # Locality's

Priority RoadName Location Scope

Project

Administration

FY 2014 State Match

Allocations

Richmond District

Hopewell (City of)

Construction Priority

U000-116-R756

Cattail Creek Drainage

Channel

Elm Street

S. 20th Street under the Norfolk

Southern RR Tracks

FR:

TO:

Drainage ImprovementsLocality

UPC 104278$161,000

Maintenance Priority

U000-116-R761

East Broadway Ramsey Street

Grade crossing connection from

Riverview Avenue

FR:

TO:

Bridge Rehabilitation

(maintenance) LocalityUPC 104509

$22,069

U000-116-R772

South 6th Avenue LaPrade Street

Grade crossing connection from

South 7th Avenue

FR:

TO:

Bridge Rehabilitation

(maintenance) LocalityUPC 104510

$11,143

Hopewell (City of) total $194,2123 projects

Powhatan (County of)

Construction Priority

0622-072-5811

Dorset Road Route 60 at Batterson Road

Dorset RoadFR:

TO:

Intersection ImprovementLocality

UPC 103116$1,000,000

1343-072-R912

Carter Gallier Blvd Luck Stone Road

Carter Gallier BlvdFR:

TO:

Extend RoadLocality

UPC 104214$1,500,000

0714-072-R893

Winterfield Road Route 711

Winterfield RoadFR:

TO:

New RoadLocality

UPC 104212$800,000

0676-072-R904

Urbine Road Route 60

Stave Mill RoadFR:

TO:

Extend RoadLocality

UPC 104213$1,000,000

Powhatan (County of) total $4,300,0004 projects

Page 20 of 27Approved FY 2014 Revenue Sharing Program AllocationsJune 19, 2013

Page 21: Attachment A - Approved FY 2014 Revenue Sharing Allocations

Project # Locality's

Priority RoadName Location Scope

Project

Administration

FY 2014 State Match

Allocations

Richmond District

Richmond (City of)

Construction Priority

U000-127-R462

Citywide Various Locations

Various LocationsFR:

TO:

ReconstructionLocality

UPC 104215$650,000

U000-127-R473

Citywide Various Locations

Various LocationsFR:

TO:

Bridge ReplacementLocality

UPC 104216$550,000

U000-127-R484

Citywide Various Locations

Various LocationsFR:

TO:

Bridge ReplacementLocality

UPC 104217$200,000

U000-127-R495

Citywide Various Locations

Various LocationFR:

TO:

ReconstructionLocality

UPC 104218$970,000

U000-127-R506

Citywide Various Locations

Various LocationsFR:

TO:

ReconstructionLocality

UPC 104279$200,000

U000-127-R517

Citywide Various Locations

Various LocationsFR:

TO:

Signals/Traffic ServicesLocality

UPC 104280$200,000

U000-127-R558

Franklin Street 18th Street

14th StreetFR:

TO:

ReconstructionLocality

UPC 104284$1,250,000

U000-127-R529

Deepwater Terminal Road Goodes Street

Deepwater Terminal North TerminusFR:

TO:

New RoadLocality

UPC 104281$250,000

U000-127-R5310

Kinsley Various Locations

Various LocationsFR:

TO:

Drainage ImprovementsLocality

UPC 104282$600,000

U000-127-R5411

Willow Oaks Area 5 Various Locations

Various LocationsFR:

TO:

Drainage ImprovementsLocality

UPC 104283$130,000

Maintenance Priority

U000-127-R671

Citywide

FR:

TO:

Pavement Overlay (maintenance)Locality

UPC 104507$1,547,614

Richmond (City of) total $6,547,61411 projects

Page 21 of 27Approved FY 2014 Revenue Sharing Program AllocationsJune 19, 2013

Page 22: Attachment A - Approved FY 2014 Revenue Sharing Allocations

Project # Locality's

Priority RoadName Location Scope

Project

Administration

FY 2014 State Match

Allocations

Salem District

Blacksburg (Town of)

Construction Priority

U000-150-R141

Townwide

various locations townwideFR:

TO:

Drainage ImprovementsLocality

UPC 102741$80,000

U000-150-R152

Townwide

various locations townwideFR:

TO:

Sight DistanceLocality

UPC 102746$25,000

U000-150-R363

Townwide

various locations townwideFR:

TO:

Sidewalk (maintenance

replacement) LocalityUPC 104239

$25,000

U000-150-R354

Townwide

various locations townwideFR:

TO:

Sidewalk (new construction)Locality

UPC 104240$37,500

U000-150-R125

Townwide Tee Street

North Main Street (460- Business)FR:

TO:

Sidewalk (new construction)Locality

UPC 104241$50,000

Maintenance Priority

U000-150-R371

Various Roads Various Locations

Various LocationsFR:

TO:

Pavement Overlay (maintenance)Locality

UPC 104254$69,643

Blacksburg (Town of) total $287,1436 projects

Christiansburg (Town of)

Construction Priority

U000-154-R121

Ellett Rd/Cambria St Crab Creek

Near the Intersection of Ellett Road

and Cambria St

FR:

TO:

Drainage ImprovementsLocality

UPC 104242$468,849

Maintenance Priority

U000-154-R021

Various Various Roads throughout Town

Various Roads throughout TownFR:

TO:

Pavement Overlay (maintenance)Locality

UPC 104296$154,761

Christiansburg (Town of) total $623,6102 projects

Page 22 of 27Approved FY 2014 Revenue Sharing Program AllocationsJune 19, 2013

Page 23: Attachment A - Approved FY 2014 Revenue Sharing Allocations

Project # Locality's

Priority RoadName Location Scope

Project

Administration

FY 2014 State Match

Allocations

Salem District

Martinsville (City of)

Maintenance Priority

U000-120-R861

Church/Main/Bridge/Leste

r/Walnut/Clay

Clay Street

Moss StreetFR:

TO:

Pavement Overlay (maintenance)Locality

UPC 104298$69,643

Martinsville (City of) total $69,6431 project

Montgomery (County of)

Construction Priority

0710-060-R201

Blue Springs Road 0.3 miles south of Route 620

Route 620 (Gum Log Road (Pulaski)

Blue Springs Road)

FR:

TO:

Pave Unpaved RoadVDOT

UPC 104244$37,500

0639-060-R912

Mt. Pleasant Road Route 675 (Split Rail Road)

Route 742 (Archer Road)FR:

TO:

Widening (ex. 2 to 4 lanes)VDOT

UPC 104245$250,000

0617-060-R923

Brush Creek Road Route 601 (Poff School Road)

Route 615 (Pilot Road)FR:

TO:

ReconstructionVDOT

UPC 104246$125,000

0717-060-R934

Old Sourwood Road end of state maintenance

Route 610 (Huffville Road)FR:

TO:

Pave Unpaved RoadLocality

UPC 104297$87,500

Montgomery (County of) total $500,0004 projects

Pearisburg (Town of)

Construction Priority

U000-279-R251

Thomas Dr./School Board

Rd./Eagle Dr./Tannery

Various Locations

Various LocationsFR:

TO:

ReconstructionLocality

UPC 104247$60,000

Pearisburg (Town of) total $60,0001 project

Page 23 of 27Approved FY 2014 Revenue Sharing Program AllocationsJune 19, 2013

Page 24: Attachment A - Approved FY 2014 Revenue Sharing Allocations

Project # Locality's

Priority RoadName Location Scope

Project

Administration

FY 2014 State Match

Allocations

Salem District

Roanoke (City of)

Construction Priority

0220-128-R341

Franklin Road Bridge over

NSRW

500' south of bridge

500' north of bridgeFR:

TO:

Bridge ReplacementLocality

UPC 104248$1,800,000

U000-128-R322

City-Wide Storm Drain

Improvements

Various locations City-Wide

Various locations City-WideFR:

TO:

Drainage ImprovementsLocality

UPC 104250$1,120,000

U000-128-R333

City-Wide Curb Gutter &

Sidewalk (New Constn)

Various locations City-Wide

Various locations City-WideFR:

TO:

Sidewalk (new construction)Locality

UPC 104251$750,000

U000-128-R214

Roanoke River Greenway

Construction

Salem City Limits

Bridge Street in Roanoke CityFR:

TO:

Bikeways/TrailsLocality

UPC 102769$600,000

Maintenance Priority

U000-128-R373

City-Wide Paving Various locations City-Wide

Various locations City-WideFR:

TO:

Pavement Overlay (maintenance)Locality

UPC 104302$1,168,451

Roanoke (City of) total $5,438,4515 projects

Rocky Mount (Town of)

Construction Priority

0640-157-R661

Scuffling Hill Road Old Fort Road

Grayson StreetFR:

TO:

Drainage ImprovementsLocality

UPC 104252$451,317

Rocky Mount (Town of) total $451,3171 project

Vinton (Town of)

Construction Priority

U000-149-R431

Glade Creek Greenway Virginia Avenue

Walnut AvenueFR:

TO:

Bikeways/TrailsLocality

UPC 104253$81,000

Vinton (Town of) total $81,0001 project

Page 24 of 27Approved FY 2014 Revenue Sharing Program AllocationsJune 19, 2013

Page 25: Attachment A - Approved FY 2014 Revenue Sharing Allocations

Project # Locality's

Priority RoadName Location Scope

Project

Administration

FY 2014 State Match

Allocations

Staunton District

Augusta (County of)

Construction Priority

0636-007-4681

Goose Creek Road Route 250

0.78 miles west of Route 285FR:

TO:

New RoadLocality

UPC 76043$5,055,614

0870-007-R072

Point Lookout Road Route 615

Route 616FR:

TO:

ReconstructionVDOT

UPC 104260$75,000

Augusta (County of) total $5,130,6142 projects

Frederick (County of)

Construction Priority

RS14-034-R351

Airport Road and Warrior

Drive

Tevis Street

Route 522FR:

TO:

New RoadLocality

UPC 104262$2,800,000

Frederick (County of) total $2,800,0001 project

Harrisonburg (City of)

Construction Priority

RS14-115-R391

Northend Greenway Liberty Street

Mount Clinton PikeFR:

TO:

Bikeways/TrailsLocality

UPC 104259$600,000

RS14-115-R412

Bluestone Trail Intersection of Beery Road/Wellness

Drive

Port Republic RoadFR:

TO:

Bikeways/TrailsLocality

UPC 104258$450,000

Maintenance Priority

RS14-115-R423

Citywide Paving Various Locations

Various LocationsFR:

TO:

Pavement Overlay (maintenance)Locality

UPC 104317$278,571

Harrisonburg (City of) total $1,328,5713 projects

Page 25 of 27Approved FY 2014 Revenue Sharing Program AllocationsJune 19, 2013

Page 26: Attachment A - Approved FY 2014 Revenue Sharing Allocations

Project # Locality's

Priority RoadName Location Scope

Project

Administration

FY 2014 State Match

Allocations

Staunton District

Rockingham (County of)

Construction Priority

0000-082-R571

South East Connector Route 33

Reservoir StreetFR:

TO:

New RoadLocality

UPC 98292$1,000,000

Rockingham (County of) total $1,000,0001 project

Shenandoah (County of)

Construction Priority

RS14-085-R791

Roberts Road 925ft So of Roberts Rd

900ft So of Roberts RdFR:

TO:

Drainage ImprovementsVDOT

UPC 104261$6,250

Shenandoah (County of) total $6,2501 project

Staunton (City of)

Construction Priority

1426-132-R381

Western State Hospital

Entrance

1,650 lineal feet northeast

Intersection of State Route 1426 and

U.S. Route 250

FR:

TO:

ReconstructionLocality

UPC 104257$955,000

Staunton (City of) total $955,0001 project

Strasburg (Town of)

Construction Priority

U000-306-1021

Queen Street the intersection of N. Massanutten

St & Quuen St

500f t W of the intx. of Queen St &

N. Massanuntten S

FR:

TO:

ReconstructionVDOT

UPC 52050$104,000

RS14-306-R481

North Massanutten Street/

Old Valley Pike

The exsiting sidewalk along N.

Massanutten Street

Food Lion North Parking lot

Entrance

FR:

TO:

Bikeways/TrailsLocality

UPC 104263$520,750

Strasburg (Town of) total $624,7502 projects

Page 26 of 27Approved FY 2014 Revenue Sharing Program AllocationsJune 19, 2013

Page 27: Attachment A - Approved FY 2014 Revenue Sharing Allocations

Project # Locality's

Priority RoadName Location Scope

Project

Administration

FY 2014 State Match

Allocations

Staunton District

Warren (County of)

Construction Priority

RS14-093-R641

Old Oak Lane Mosby's Meadown Lane

Rte. 690FR:

TO:

Rural AdditionsLocality

UPC 104264$160,000

RS14-093-R652

Homestead Drive 0.34 mile north

Rte. 55FR:

TO:

Rural AdditionsLocality

UPC 104265$85,000

RS14-093-R713

Winchester Road and Rt 522

Int of Rt 340FR:

TO:

Intersection ImprovementVDOT

UPC 104428$1,011,550

Warren (County of) total $1,256,5503 projects

Winchester (City of)

Construction Priority

RS14-138-R101

Hope Drive

Extension/Papermill and

Tevis

Pleasant Valley Road

Wilson Blvd.FR:

TO:

Extend RoadLocality

UPC 104266$4,000,000

RS14-138-R112

Meadow Branch Buckner Drive

Merrimans LaneFR:

TO:

Extend RoadLocality

UPC 104267$2,000,000

RS14-138-R123

Nester Drive Jefferson Street

Seldon DriveFR:

TO:

Extend RoadLocality

UPC 104268$750,000

RS14-138-R134

Valley Avenue Sheridan Avenue

Southwerk StreetFR:

TO:

Drainage ImprovementsLocality

UPC 104269$400,000

Maintenance Priority

RS14-138-R146

Citywide Paving Various Locations

Various LocationsFR:

TO:

Pavement Overlay (maintenance)Locality

UPC 104346$154,761

Winchester (City of) total $7,304,7615 projects

Statewide Total:

FY 2014 Revenue Sharing Program summary

$154,429,914197 projects

Page 27 of 27Approved FY 2014 Revenue Sharing Program AllocationsJune 19, 2013