ATS Operation Guidelines - Ver 4 40- 09-07-19

Embed Size (px)

Citation preview

  • 7/30/2019 ATS Operation Guidelines - Ver 4 40- 09-07-19

    1/36

    Alvarion Training Services (ATS): OperationGuidelines

    ATS

    July 2009

  • 7/30/2019 ATS Operation Guidelines - Ver 4 40- 09-07-19

    2/36

    ATS Operation Guidelines Legal Rights

    Copyright 2009 Alvarion Ltd. All rights reserved.

    The material contained herein is proprietary, privileged, and confidential and owned by Alvarion or itsthird party licensors. No disclosure thereof shall be made to third parties without the express writtenpermission of Alvarion Ltd.

    Alvarion Ltd. reserves the right to alter the equipment specifications and descriptions in this publicationwithout prior notice. No part of this publication shall be deemed to be part of any contract or warrantyunless specifically incorporated by reference into such contract or warranty.

    Alvarion, BreezeCOM, WALKair, WALKnet, BreezeNET, BreezeACCESS, BreezeLINK,BreezeMAX, BreezeLITE, BreezePHONE, 4Motion, BreezeCONFIG, AlvariSTAR,AlvariCRAFT, MGW, eMGW and/or other products and/or services referenced here in are eitherregistered trademarks, trademarks or service marks of Alvarion Ltd.

    All other names are or may be the trademarks of their respective owners.WiMAX Forum is a registered trademark of the WiMAX Forum. WiMAX, the WiMAX Forum logo,WiMAX Forum Certified, and the WiMAX Forum Certified logo are trademarks of the WiMAX Forum.

    Limitation of Liability:

    (a) Alvarion shall not be liable to the purchaser or to any third party, for any loss of profits, loss of use,interruption of business or for any indirect, special, incidental, punitive or consequential damages of anykind, whether arising under breach of contract, tort (including negligence), strict liability or otherwise andwhether based on this agreement or otherwise, even if advised of the possibility of such damages.

    (b) To the extent permitted by applicable law, in no event shall the liability for damages hereunder ofAlvarion or its employees or agents exceed the purchase price paid for the product by purchaser, norshall the aggregate liability for damages to all parties regarding any product exceed the purchase pricepaid for that product by that party (except in the case of a breach of a partys confidentiality obligations).

    (c) Alvarion ltd. reserves the right to alter the services content, description and/or prices provided in thispublication without prior notice. No part of this publication shall be deemed to be part of any contract orwarranty unless specifically incorporated by reference into such a contract or warranty.

    ii

  • 7/30/2019 ATS Operation Guidelines - Ver 4 40- 09-07-19

    3/36

    ATS Operation Guidelines Contents

    Contents

    1 About ATS Operat ions Guidel ines ......................................................1

    2 Executive Summary .................................................................................1

    2.1 Certification Programs ............................................................................................. 2

    2.2 On-The-Job (OJT) Training ...................................................................................... 2

    2.3 Tutor ial Seminars ...................................................................................................... 2

    3 Train ing Services .....................................................................................3

    3.1 Certification Programs ............................................................................................. 3

    3.1.1 Types of Sessions............................................................................................... 3

    3.1.2 Certification Terms............................................................................................... 3

    3.1.3 Certification Validity ............................................................................................. 3

    3.1.4 Terms and Conditions.......................................................................................... 3

    3.1.5 Certification Levels............................................................................................... 3

    3.1.5.1 CASS - Certified Alvarion System Specialist................................................................. 4

    3.1.5.2 - CAIT - Certified Alvarion Installation Technician.........................................................5

    3.1.5.3 CASO - Certified Alvarion System Operator..................................................................5

    3.1.6 Certificate Format................................................................................................ 6

    3.1.7 Sessions Locations.............................................................................................. 6

    3.1.8 Fees ..................................................................................................................... 7

    3.1.9 Certification Tracks Table.................................................................................... 8

    iii

  • 7/30/2019 ATS Operation Guidelines - Ver 4 40- 09-07-19

    4/36

    ATS Operation Guidelines Contents

    4 Alvar ion Certif ied Training Centers (ACTC) ..........................................9

    Appendix A. Certification Agendas .........................................................11

    CASS 4M - GNMS ............................................................................................................... 12

    CASS B-MAX TDD - GNMS................................................................................................ 14

    CASS B-MAX FDD - GNMS................................................................................................ 16

    CAIT B-MAX FDD................................................................................................................ 18

    CASO B-MAX TDD - GNMS ............................................................................................... 19

    CASO B-MAX FDD - GNMS ............................................................................................... 20

    CASS BA-VL/BNET-B - EMS ............................................................................................. 23

    CAIT BA-VL/BNET-B .......................................................................................................... 24

    CASS WA1 LCI ................................................................................................................... 25

    CAIT WA1............................................................................................................................ 26

    Delta CASS WA1 LCI-to-NMS............................................................................................ 27

    CASS WA3 .......................................................................................................................... 28

    CASS eMGW....................................................................................................................... 29

    CAIT eMGW (CPE).............................................................................................................. 31

    CASO eMGW....................................................................................................................... 32

    iv

  • 7/30/2019 ATS Operation Guidelines - Ver 4 40- 09-07-19

    5/36

    ATS Operation Guidelines 0BAbout ATS Operations Guidelines

    1 About ATS Operations Guidelines

    Alvarion Training Services (ATS) Operation Guidelines provides detailed

    information regarding the education and training programs in effect in

    Alvarion.

    Detailed Agendas are presented for each certification track, as well as target

    audiences and prerequisites.

    Prices for the services described are listed in a separate document, the

    Alvarion Customer Service Price List.

    2 Executive Summary

    As the leader in the broadband wireless access (BWA) market, Alvarion is

    committed to the highest levels of products and services offered to its

    customers and partners.

    Alvarion Training Services (ATS) is the entity in charge of providing

    Education Services through which the information on latest Alvarion

    products developments flows to users, strategic channels, distributors and

    resellers. These services provide high quality frontal instruction as well as

    practical hands-on sessions, intended to enhance participants capabilities

    to install / operate / support Alvarion systems.

    For Alvarion users, these education services increase the staff competence,

    providing the skills it needs to raise its performance and the efficiency of its

    operations.

    For Alvarion strategic channels, distributors and resellers staff, the

    education services provide the detailed information needed for successful

    market support of the products.

    Education Services are provided on customer premises as well as on ATS

    modern premises in Tel Aviv, Israel; Mountain View CA / US; Paris, France;

    Bucharest, Romania; Montevideo, Uruguay, Mexico City, Mexico.

    Education Services are also available in entities nominated as Alvarion

    Certified Training Centers (ACTC) around the world.

    The following Education Services are defined:

    Certification Programs

    On-The-Job (OJT) Training

    Tutorial Seminars

    1

  • 7/30/2019 ATS Operation Guidelines - Ver 4 40- 09-07-19

    6/36

    ATS Operation Guidelines 1BExecutive Summary

    2.1 Certification Programs

    Organized as task oriented certification tracks, these programs are targeted

    to operations / support staff in Alvarion equipment user entities as well as

    in Alvarion strategic channels, distribution channels and reseller entities.

    Different certification tracks are defined for each Alvarion Product Line,

    targeted to different staff categories. Each track has a distinct curriculum,

    tailored to its target audiences specific task in the organization, such as

    installers, Network Operation Center (NOC) staff, Operation & Maintenance

    Center (O&MC) staff, etc.

    Individuals that succeed in passing the relevant tests are granted

    certification, for a limited period of time. The validity of the certification may

    be extended, by participating in updating sessions as advertised from time

    to time.

    2.2 On-The-Job (OJT) Training

    While all Certification Programs include invaluable hands-on sessions,

    nothing can be compared with the experience gathered through actual

    installations in the field. When more actual experience with installing /

    operating the systems is required, OJT is the right tool to be used. During

    OJT sessions Alvarion technical staff provides on-site support and guidance

    for actual installation and / or activation of Alvarion products. OJT allows

    the user or channel to take advantage of Alvarions technical staffexperience and expertise minimizing the chances of making errors at the

    very beginning of the operation.

    OJT is the best tool for increasing user or channels self-confidence in

    installing and operating Alvarion products.

    2.3 Tutorial Seminars

    Dealing with generic technology topics and technology implementation in

    Alvarion equipment, Tutorial Seminars provide guidelines for correct

    integration of Alvarion equipment into communications networks, as well as

    for the integration of Alvarion equipment parameters into radio and

    capacity planning tools.

    Tutorial seminars assume that participants have significant knowledge in

    the relevant field, and present only guidelines related to the way in which

    specific technologies and tools should be used in an Alvarion equipment

    populated environment.

    Tutorial seminars do not entitle participants to any Certification.

    2

  • 7/30/2019 ATS Operation Guidelines - Ver 4 40- 09-07-19

    7/36

    ATS Operation Guidelines 2BTraining Services

    3 Training Services

    3.1 Certification Programs

    3.1.1 Types of Sessions

    Certification sessions Sessions, at the end of which participants are

    tested, and certificates are issued. Every Certificate is identified by a

    Certificate Number (CN).

    Updating sessions Sessions, at the end of which participants are

    tested, and the validity date of their certificates is extended.

    3.1.2 Certi fication Terms

    Certification is provided to every person that successfully passes the testthat concludes every certification training session.

    3.1.3 Certi fication Valid ity

    Certification is granted for a 12 month period following the successful

    completion of the training sessions. For example, certificates issued at

    the end of a training session held in February 2009 are valid until

    February 30, 2010.

    The certification validity may be extended, by participating in updating

    sessions and/or passing a re-certification test.

    Extended validity Certificates are issued with same Certificate Number

    (CN), but with a new validity date.

    The validity date appears on the certificate.

    3.1.4 Terms and Condit ions

    All training services provided by Alvarion Training Services are in

    accordance with ATS Terms and Conditions document. The document can

    be found here.

    3.1.5 Certi fication Levels

    Different task oriented certification levels are defined for each Alvarion's

    product line*, targeting different roles, as follows:

    CASS: Certified Alvarion System Specialist

    CAIT: Certified Alvarion Installation Technician

    CASO: Certified Alvarion System Operator

    3

    http://212.179.112.46/mod/resource/view.php?inpopup=true&id=16http://212.179.112.46/mod/resource/view.php?inpopup=true&id=16
  • 7/30/2019 ATS Operation Guidelines - Ver 4 40- 09-07-19

    8/36

    ATS Operation Guidelines 2BTraining Services

    For some of the products, certification levels come in different flavors, as

    follows*:

    LCI: Covers product management via Local Craft Interface (LCI)

    EMS: Focuses on product management via Element Management

    System (EMS) application

    NMS: Focuses on product management via product's dedicated

    Network Management System (NMS) application

    GNMS: Focuses on product management via Alvarion Generic

    Network Management System application (AlvariSTAR)

    NOTE

    As different products have different complexity levels and features, not all certification levelsand flavors are available for each Product Line. For actual available certification levels (per

    product) see Certification Tracks Table in this document (on page 7).

    3.1.5.1 CASS - Certified Alvarion System Specialist

    Task description CASS supervises NOC (Network Operation Center) or OMC (Operation and

    Maintenance Center) activities as well as installation, maintenance and

    troubleshooting operations.

    CASS is the first escalation level for NOC/OMC staff (CASO trained) and field

    engineers (CASE trained).

    Target audience Technical staff intended to supervise NOC/OMC and field activities, such as

    installation, maintenance, and troubleshooting and technical staff intended to

    provide technical pre-sales and post-sales support.

    Basic syllabus System description, installation, commissioning, operation, maintenance and

    system management, including hands-on sessions.

    Prerequisites Basic relevant data/voice networking and radio technologies knowledge.

    Customer Support

    Center

    Access allowed to Alvarion Customer Support Center (CSC) web based

    application for initiation and tracking of:

    Technical calls

    Non-technical calls

    Repair Material Authorization (RMA) requests

    4

  • 7/30/2019 ATS Operation Guidelines - Ver 4 40- 09-07-19

    9/36

    ATS Operation Guidelines 2BTraining Services

    3.1.5.2 - CAIT - Certified Alvarion Installation Technician

    Task description CAIT is the person executing the mechanical installation of Alvarion systems,

    including poles, antennas, connectors, etc. CAITs responsibility is to bring the

    system to the level where the radio link is active (link commissioning).

    Target audience Staff in charge of installing Base Station Equipment (mechanical installation)

    and CPE (Customer Premises Equipment).

    Basic syllabus Base Station and CPE installation and installation verification.

    Prerequisites Certified radio installers, aware of the local regulations related to radio systems

    installation in their specific country.

    Customer Support

    Center

    No access to Customer Support Center (CSC) web based application.

    3.1.5.3 CASO - Certified Alvarion System Operator

    Task description CASO is the typical NOC/OMC operator who registers new network subscribers,

    activates their respective services, and executes service commissioning. CASO

    also monitors network traffic and elements status, reacting to abnormal

    conditions as reflected by management system alarms.

    Target audience NOC/OMC staff

    Basic syllabus Management application basics +advanced, subscribers definition andactivation, services definition and commissioning, troubleshooting and recovery

    procedures, including hands-on.

    Prerequisites Basic management systems knowledge.

    Customer Support

    Center

    No access to Customer Support Center (CSC) web based application.

    5

  • 7/30/2019 ATS Operation Guidelines - Ver 4 40- 09-07-19

    10/36

    ATS Operation Guidelines 2BTraining Services

    3.1.6 Certificate Format

    A formal Certificate is issued to each

    certified person.

    Fields in the Certificate:

    Name of certified person

    Name of certified persons

    employer

    Country of employer

    Level of certification awarded

    Certificate Number (CN): There are

    two types of CNs that differ from

    one another by their prefix: ATS-

    yym-mdd-xxxx or CC-AAAA-yym-

    mdd-xxxx

    ATS: Indicates that the

    sessions were carried out by

    Alvarion personnel.

    CC-AAAA: Indicates that the sessions took place in an Alvarion

    Certified Training Center:

    { CC: country code of the country in which the issuing ACTC is

    located.

    { AAAA: unique identifying code of the training center.

    Both CNs include the following information:

    yym-mdd - The date of the first certificate issue

    xxxx - An ATS administrated serial number.

    Session number - ATS session identifier

    Validity date

    Training Director signature

    3.1.7 Sessions Locations

    Both Certification sessions and Updating sessions are available as in-house

    as well as public events.

    In-house sessions - are organized on customer premises at dates and

    locations to be agreed between customer and Alvarion Training Services

    (ATS).

    6

  • 7/30/2019 ATS Operation Guidelines - Ver 4 40- 09-07-19

    11/36

    ATS Operation Guidelines 2BTraining Services

    Public sessions - are organized by Alvarion Training Services (ATS) on

    topics, dates and locations advertised on alvarion.com web site and via

    direct mail. Usually, public sessions are organized on ATS premises or

    first class hotels around the world. Participants in public sessions

    arrive from different organizations and different countries. The

    presentation language for each public session is included in sessions

    advertising information.

    3.1.8 Fees

    Participation in training sessions is charged as advertised in Alvarion

    effective Services Price List.

    In-house sessions are charged based on Alvarion's price list plus

    lecturer travel and accommodations expenses. The charge is fixed,

    regardless the number of participants (up to the maximum allowed).

    The number of participants is limited to a maximum of 12 persons, in

    order to ensure to participants fair access to the products during

    hands-on sessions.

    Public sessions are charged per participant, as advertised for each

    individual session.

    7

  • 7/30/2019 ATS Operation Guidelines - Ver 4 40- 09-07-19

    12/36

    8

    ATS Operation Guidelines 2BTraining Services

    3.1.9 Certi fication Tracks Table

    CASS

    CertifiedAlvarionSystem

    Specialist

    CAIT

    CertifiedAlvarion

    InstallationTechnician

    CASO

    CertifiedAlvarionSystemOperator

    4Motion

    CASS 4M(GNMS)(5 days)

    BreezeMAX

    FDD

    CASSB-MAX(GNMS)(5 days)

    CAITB-MAX(1 day)

    CASOB-MAX(GNMS)(3 days)

    BreezeMAX

    TDD

    CASSB-MAX(GNMS)(5 days)

    CASOB-MAX(GNMS)(3 days)

    BreezeACCESS

    VL

    BreezeNET B

    CASSBA-VLBN-B

    (EMS)(3 days)

    CAITBA-VLBN-B

    (2 days)

    -

    WALKair 1000

    CASSWA1(LCI)

    (5 days)

    CAITWA1

    (1 day)-

    WALKair 3000 CASSWA3(4 days)

    - -

    eMGW

    CASSeMGW(5 days)

    CAITeMGW(3 days)

    CASOeMGW(3 days)

    Legend:

    LCI - Local Craft Interface (serial)

  • 7/30/2019 ATS Operation Guidelines - Ver 4 40- 09-07-19

    13/36

    ATS Operation Guidelines 3BAlvarion Certified Training Centers (ACTC)

    EMS - Element Management System

    NMS - Dedicated Network Management System

    GNMS - Generic Management System (AlvariSTAR)

    - B ree zeACCESS

    - WALKa i r 1000

    This is to certify that

    w w w . a l v a r i o n . c o m

    N e t w ACC l t d .

    R oma n i a

    is an appointed

    Alvar ion Cert i f ied Trai ning Cent er

    Sorin M. SCHWARTZDirector - Training & Documentation

    for the following Product Line(s):

    ALCTC_ID : RO-NWA

    Valid until: December 2006

    4 Alvarion Certified Training Centers (ACTC)

    For the purpose of increasing the number of Alvarion certified staff,

    Alvarion Training Services (ATS) appoints independent Alvarion Certified

    Training Centers (ACTC) entitled to provide training sessions on Alvarion

    behalf in their respective territories.

    Participants in ACTC organized training sessions are awarded Alvarion

    official certificates.

    Public sessions organized by ACTC are advertised on Alvarion Education

    Center web site.

    Appointment as ACTC allows the respective entity to:

    Provide technical knowledge to its customers / end users, drastically

    reducing the

    number of

    service calls

    received.

    Establish itself

    as a knowledge

    center in its

    territory

    Make training a

    source of

    revenues and

    profit

    1. Appointment as ACTC is done through an appointment letter, and is

    valid for 12 Months.

    2. Every ACTC is identified by an ACTC-ID as follows:

    ACTC-ID = ACTC country code (2 characters) + ACTC code (3 or 4

    characters).

    3. An ACTC Certificate indicating the ACTC-ID is issued to each

    nominated ACTC

    4. Basic conditions for nomination as ACTC:

    Staff with relevant certification, to execute the training sessions

    Reasonable training facilities

    9

  • 7/30/2019 ATS Operation Guidelines - Ver 4 40- 09-07-19

    14/36

    ATS Operation Guidelines 3BAlvarion Certified Training Centers (ACTC)

    Basic Alvarion training equipment for hands-on sessions (kits are

    defined for every Product Line)

    Well organized registration mechanisms and data base

    Regular reporting to ATS of training sessions' participants' names

    and coordinates.

    Acceptable quality of the training sessions provided, as reported by

    participants in random checks executed by ATS.

    ATS reserves the right to execute periodic checks, including annual

    audits, and to withdraw or not to renew the ACTC nomination, if the

    above conditions are not satisfied.

    5. The training sessions in ACTC make use of the standard material

    provided by ATS for each specific degree. ACTC however, is entitled to

    add any other material deemed necessary for any specific presentation.

    6. Actual certification sessions are held only by certified staff.

    7. Based on the participants lists provided to it by ACTC, ATS prints

    Certificates and mails them to ACTC for distribution.

    10

  • 7/30/2019 ATS Operation Guidelines - Ver 4 40- 09-07-19

    15/36

    ATS Operation Guidelines 3BAlvarion Certified Training Centers (ACTC)

    Appendix A. Certification Agendas

    CASS 4M - GNMS

    CASS B-MAX TDD - GNMS

    CASS B-MAX FDD - GNMS

    CAIT B-MAX FDD

    CASO B-MAX TDD - GNMS

    CASO B-MAX FDD - GNMS

    CASS BA-VL/BNET-B - EMS

    CAIT BA-VL/BNET-B

    CASS WA1 LCI

    CAIT WA1

    Delta CASS WA1 LCI-to-NMS

    CASS WA3

    CASS eMGW

    CAIT eMGW (CPE)

    CASO eMGW

    11

  • 7/30/2019 ATS Operation Guidelines - Ver 4 40- 09-07-19

    16/36

    ATS Operation Guidelines 3BAlvarion Certified Training Centers (ACTC)

    CASS 4M - GNMS

    Certified Alvarion System Specialist 4Motion

    Generic Network Management System (AlvariSTAR)

    (5 days) (back to Certification Tracks Table) (081028)

    Day 2Day 1

    Time Topics Time Topics

    9:00 10:40 - 4Motion Solution Overview 9:00 10:40 -EMS introduction

    10:40 - 11:00 Coffee Break 10:40 - 11:00 Coffee Break

    11:00 - 11:50- Cell Site Architecture- MS and CPE Architecture

    11:00 - 11:50 - EMS Pre configuration parameters

    11:50 - 12:00 Coffee Break 11:50 - 12:00 Coffee Break

    12:00 - 13:00- Cell Site Architecture contd- MS and CPE Architecture

    12:00 - 13:00 - Software Upgrade via CLI

    13:00 - 14:00 Lunch 13:00 - 14:00 Lunch

    14:00 - 14:50 - BTS installation- CPE installation 14:00 - 14:50 - Hand on- CLI Software upgrade

    14:50 - 15:00 Coffee Break 14:50 - 15:00 Coffee Break

    15:00 - 15:50- User management Interfaces- CLI Basic commands- Managing users and privileges

    15:00 - 15:50

    - Hands on- EMS installation- Pre configuration parameters / CLIcommands

    15:50 - 16:00 Coffee Break 15:50 - 16:00 Coffee Break

    16:00 - 17:00- Hands on- User Management Interfaces- Managing users and privileges

    16:00 - 17:00- Hands on- AlvariSTAR General Management

    Day 3 Day 4Time Topics Time Topics

    9:00 10:40- Sector Association configuration flow- Equipment configuration- Radio configuration

    9:00 10:40- Service provisioning task flow- QoS parameters- ASN services configuration

    10:40 - 11:00 Coffee Break 10:40 - 11:00 Coffee Break

    11:00 - 11:50 - Radio configuration (cond) 11:00 - 11:50 - ASN service configuration contd

    11:50 - 12:00 Coffee Break 11:50 - 12:00 Coffee Break

    12:00 - 13:00 - Connectivity provisioning 12:00 - 13:00- Lookup Table configuration- E2E QoS Marking

    13:00 - 14:00 Lunch 13:00 - 14:00 Lunch

    14:00 - 14:50- Hands on- Equipment configuration

    14:00 - 14:50- Hands on- Service configuration from ASN GUI

    14:50 - 15:00 Coffee Break 14:50 - 15:00 Coffee Break

    15:00 - 15:50- Hands on- Connectivity provisioning

    15:00 - 15:50- Hands on- QoS Marking and service configuration

    15:50 - 16:00 Coffee Break 15:50 - 16:00 Coffee Break

    16:00 - 17:00- Hands on- Radio configuration and sectorassociation

    16:00 - 17:00- Hands on- Lookup table configuration

    12

  • 7/30/2019 ATS Operation Guidelines - Ver 4 40- 09-07-19

    17/36

    ATS Operation Guidelines 3BAlvarion Certified Training Centers (ACTC)

    CASS 4M - GNMS

    Certified Alvarion System Specialist BreezeMAX FDD

    Generic Network Management System (AlvariSTAR)

    (5 days) (081028)

    Day 3

    Time Topics

    9:00 10:40- Mobility configuration- Network Entry & Troubleshooting

    10:50 - 11:00 Coffee Break

    11:00 - 11:50- Hands on

    - Mobility configuration11:50 - 12:00 Coffee Break

    12:00 - 13:00- Hands on- Troubleshooting

    13:00 - 14:00 Lunch

    14:00 - 14:50- Hands on- Maintenance

    14:50 - 15:00 Coffee Break

    15:00 - 15:50 - Course summary

    15:50 - 16:00 Coffee Break

    16:00 - 17:00 - Certification test

    13

  • 7/30/2019 ATS Operation Guidelines - Ver 4 40- 09-07-19

    18/36

    ATS Operation Guidelines 3BAlvarion Certified Training Centers (ACTC)

    CASS B-MAX TDD - GNMS

    Certified Alvarion System Specialist BreezeMAX FDD

    Generic Network Management System (AlvariSTAR)

    (5 days) (back to Certification Tracks Table) (080211)

    Time Topics Time Topics

    9:00 - 11:30 - Base Station (BS) architecture 9:00 - 11:30CLI commissioning - BS ParametersCLI commissioning - SU Parameters

    11:30 - 12:00 Coffee Break 11:30 - 12:00 Coffee Break

    12:00 - 13:00 - Base Station (BS) Installation 12:00 - 13:00 - Maintenance Basics

    13:00 - 14:00 Lunch 13:00 - 14:00 Lunch

    14:00 - 15:30- Subscriber Unit (SU) architecture- Subscriber Unit (SU) Installation

    14:00 - 15:30- Hands-On- CLI commissioning - BS Parameters- CLI commissioning - SU Parameters

    15:30 - 16:00 Coffee Break 15:30 - 16:00 Coffee Break

    16:00 - 17:00 - Management tools 16:00 - 17:00- Hands-On

    - Maintenance Basics

    Time Topics Time Topics

    9:00 - 11:00 - BreezeMAX Services 9:00 - 11:00 Using Networking and VLANs

    11:00 - 11:30 Coffee Break 11:00 - 11:30 Coffee Break

    11:30 - 13:00 - BreezeMAX Services (cont'd) 11:30 - 13:00- Alvaristar

    - Installation- General parameters- Device driver

    13:00 - 14:00 Lunch 13:00 - 14:00 Lunch

    14:00 - 15:30- Hands-On

    - Basic Service14:00 - 15:30

    - Hands-On- Using Networking and VLANs

    15:30 - 16:00 Coffee Break 15:30 - 16:00 Coffee Break

    16:00 - 17:00

    - Hands-On (Cont'd)

    - Basic Service 16:00 - 17:00

    - Hands-On

    - Using Networking and VLANs

    Day 3 Day 4

    Day 1 Day 2

    14

  • 7/30/2019 ATS Operation Guidelines - Ver 4 40- 09-07-19

    19/36

    ATS Operation Guidelines 3BAlvarion Certified Training Centers (ACTC)

    CASS B-MAX TDD - GNMS

    Certified Alvarion System Specialist BreezeMAX FDD

    Generic Network Management System (AlvariSTAR)

    (5 days) (080211)

    Day 5

    Time Topics

    9:00 - 11:00 End point devices (Voice Gateway)

    11:00 - 11:30 Coffee Break

    11:30 - 13:00- Super lab ecosystem hands on(cont'd)

    13:00 - 14:00 Lunch

    14:00 - 15:30- Super lab ecosystem hands on(cont'd)

    15:30 - 16:00 Coffee Break

    16:00 - 17:00 - Certification Test

    15

  • 7/30/2019 ATS Operation Guidelines - Ver 4 40- 09-07-19

    20/36

    ATS Operation Guidelines 3BAlvarion Certified Training Centers (ACTC)

    CASS B-MAX FDD - GNMS

    Certified Alvarion System Specialist BreezeMAX FDD

    Generic Network Management System (AlvariSTAR)

    (5 days)(back to Certification Tracks Table) (060124)

    Time Topics Time Topics

    9:00 - 11:00- Broadband Wireless Access concepts- Radio technologies basics- OFDM Overview

    9:00 - 11:00 - BreezeMAX Services

    11:00 - 11:30 Coffee Break 11:00 - 11:30 Coffee Break

    11:30 - 13:00

    - BreezeMAX system architecture -overview- Management tools- Commissioning

    - Network entry process

    11:30 - 13:00 - BreezeMAX Services (cont'd)

    13:00 - 14:00 Lunch 13:00 - 14:00 Lunch

    14:00 - 15:30 - BreezeMAX features 14:00 - 15:30- BreezeMAX Services - Case Studies -parameters setting (interactive session)

    15:30 - 16:00 Coffee Break 15:30 - 16:00 Coffee Break

    16:00 - 17:00- BreezeMAX

    - Installation16:00 - 17:00

    - BreezeMAX Services - Case Studies -parameters setting (interactive session)

    Time Topics Time Topics

    9:00 - 11:00

    - BreezeMAX- Maintenance basics- Troubleshooting case studies- LCI Menus

    9:00 - 11:00

    - BreezeMAX system management(contd)

    - AlvariSTAR installation (WIN)- AlvariSTAR installation (WIN)

    verification- AlvariSTAR post installation

    activities- Hands-on - AlvariSTAR installation

    11:00 - 11:30 Coffee Break 11:00 - 11:30 Coffee Break

    11:30 - 13:00 - Network Gateway (NG) 11:30 - 13:00 - Hands-on - AlvariSTAR set-up

    13:00 - 14:00 Lunch 13:00 - 14:00 Lunch

    14:00 - 15:30- NMS fundamentals- BreezeMAX system management- AlvariSTAR functionality

    14:00 - 15:30- BreezeMAX - hands-on via AlvariSTAR

    - air link commissioning

    15:30 - 16:00 Coffee Break 15:30 - 16:00 Coffee Break

    16:00 - 17:00

    - BreezeMAX system management(contd)

    - AlvariSTAR BreezeMAX device driver- Service commissioning

    16:00 - 17:00

    - BreezeMAX - hands-on via AlvariSTAR

    - Services commissioning- Maintenance (s/w upgrade, etc.)

    Day 3 Day 4

    Day 1 Day 2

    16

  • 7/30/2019 ATS Operation Guidelines - Ver 4 40- 09-07-19

    21/36

    ATS Operation Guidelines 3BAlvarion Certified Training Centers (ACTC)

    CASS B-MAX FDD - GNMS

    Certified Alvarion System Specialist BreezeMAX FDD

    Generic Network Management System (AlvariSTAR)

    (5 days) (060124)

    Day 5

    Time Topics

    9:00 - 11:00- AlvariCRAFT Element ManagementSystem

    11:00 - 11:30 Coffee Break

    11:30 - 13:00 - Alvarions Voice Gateways

    13:00 - 14:00 Lunch

    14:00 - 15:30- Alvarions Voice Gateways

    - Hands-on

    15:30 - 16:00 Coffee Break

    16:00 - 17:00 - Certification Test

    17

  • 7/30/2019 ATS Operation Guidelines - Ver 4 40- 09-07-19

    22/36

    ATS Operation Guidelines 3BAlvarion Certified Training Centers (ACTC)

    CAIT B-MAX FDD

    Certified Alvarion Installation Technician BreezeMAX FDD

    (1 day) (back to Certification Tracks Table) (050824)

    Day 1

    Time Topics

    9:00 - 11:00- BreezeMAX system architecture -overview

    11:00 - 11:30 Coffee Break

    11:30 - 13:00 - BreezeMAX Commissioning

    13:00 - 14:00 Lunch

    14:00 - 15:30 - BreezeMAX Installation

    15:30 - 16:00 Coffee Break

    16:00 - 17:00 - BreezeMAX Installation Hands-on

    18

  • 7/30/2019 ATS Operation Guidelines - Ver 4 40- 09-07-19

    23/36

    ATS Operation Guidelines 3BAlvarion Certified Training Centers (ACTC)

    CASO B-MAX TDD - GNMS

    Certified Alvarion System Operator - BreezeMAX

    Generic Network Management System (AlvariSTAR)

    (3 days) (back to Certification Tracks Table) (080814)

    Time Topics Time Topics

    9:00 - 11:30- Base Station (BS) architecture- Subscriber Unit (SU) architecture

    9:00 - 11:30 Using Networking and VLANs

    11:30 - 12:00 Coffee Break 11:30 - 12:00 Coffee Break

    12:00 - 13:00Commissioning - BS ParametersCommissioning - SU Parameters

    12:00 - 13:00- Alvaristar

    - General parameters

    - Device driver

    13:00 - 14:00 Lunch 13:00 - 14:00 Lunch

    14:00 - 15:30 - BreezeMAX Services 14:00 - 15:30- Hands-On

    - AlvariSTAR General Parameters- Commissioning - BS Parameters

    15:30 - 16:00 Coffee Break 15:30 - 16:00 Coffee Break

    16:00 - 17:00 - Introduction to AlvariSTAR 16:00 - 17:00- Hands-On- CLI commissioning - SU Parameters

    Time Topics

    9:00 - 11:00- Hands-On

    - Basic Service

    11:00 - 11:30 Coffee Break

    11:30 - 13:00 - Hands-On- Using Networking and VLANs

    13:00 - 14:00 Lunch

    14:00 - 15:30 End point devices (Voice Gateway)

    15:30 - 16:00 Coffee Break

    16:00 - 17:00 - Certification Test

    Day 3

    Day 2Day 1

    19

  • 7/30/2019 ATS Operation Guidelines - Ver 4 40- 09-07-19

    24/36

    ATS Operation Guidelines 3BAlvarion Certified Training Centers (ACTC)

    CASO B-MAX FDD - GNMS

    Certified Alvarion System Operator BreezeMAX FDD

    Generic Network Management System (AlvariSTAR)

    (3 days) (back to Certification Tracks Table) (070829)

    Day 2Day 1

    Time Topics Time Topics

    9:00 - 11:00- BreezeMAX system architecture -overview

    9:00 - 11:00- BreezeMAX Services - Case Studies -Contd parameters setting (interactivesession)

    11:00 - 11:30 Coffee Break 11:00 - 11:30 Coffee Break

    11:30 - 13:00- BreezeMAX Commissioning

    - BreezeMAX Services

    11:30 - 13:00- Network Gateway (NG)- Voice Gateway (VG)

    13:00 - 14:00 Lunch 13:00 - 14:00 Lunch

    14:00 - 15:30 - BreezeMAX Services (cont'd) 14:00 - 15:30

    - BreezeMAX system management- AlvariSTAR architecture- AlvariSTAR BreezeMAX device

    driver

    15:30 - 16:00 Coffee Break 15:30 - 16:00 Coffee Break

    16:00 - 17:00- BreezeMAX Services - Case Studies -parameters setting (interactive session)

    16:00 - 17:00- BreezeMAX system management(contd)

    - AlvariSTAR set-up

    Day 3

    Time Topics

    9:00 - 11:00- BreezeMAX system management

    - Hands-on - AlvariSTAR set-up

    11:00 - 11:30 Coffee Break

    11:30 - 13:00- BreezeMAX system management(contd)

    - Hands-on - AlvariSTAR set-up

    13:00 - 14:00 Lunch

    14:00 - 15:30

    - BreezeMAX system management(contd)

    - Hands-on - servicescommissioning via

    AlvariSTAR

    15:30 - 16:00 Coffee Break

    16:00 - 17:00- BreezeMAX

    - Hands-on - NG Management- Hands-on - VG Management

    20

  • 7/30/2019 ATS Operation Guidelines - Ver 4 40- 09-07-19

    25/36

    ATS Operation Guidelines 3BAlvarion Certified Training Centers (ACTC)

    CASS B-MAX TDD - GNMS

    Certified Alvarion System Specialist BreezeMAX TDD

    Generic Network Management System (AlvariSTAR)

    (5 days) (back to Certification Tracks Table) (07-08-16)

    Day 2Day 1

    Time Topics Time Topics

    9:00 - 11:30- BWA concepts- Radio technologies-basics- OFDM

    9:00 - 11:30CLI commissioning - BS ParametersCLI commissioning - SU Parameters

    11:30 - 12:00 Coffee Break 11:30 - 12:00 Coffee Break

    12:00 - 13:00- Base Station (BS) architecture- Base Station (BS) Installation

    12:00 - 13:00 - Maintenance Basics

    13:00 - 14:00 Lunch 13:00 - 14:00 Lunch

    14:00 - 15:30- Subscriber Unit (SU) architecture- Subscriber Unit (SU) Installation

    14:00 - 15:30- Hands-On- CLI commissioning - BS Parameters- CLI commissioning - SU Parameters

    15:30 - 16:00 Coffee Break 15:30 - 16:00 Coffee Break

    16:00 - 17:00 - Management tools 16:00 - 17:00- Hands-On

    - Maintenance Basics

    Day 4Day 3

    Time Topics Time Topics

    9:00 - 11:00 - BreezeMAX Services 9:00 - 11:00 Using Networking and VLANs

    11:00 - 11:30 Coffee Break 11:00 - 11:30 Coffee Break

    11:30 - 13:00 - BreezeMAX Services (cont'd) 11:30 - 13:00

    - Alvaristar- Installation

    - General parameters- Device driver

    13:00 - 14:00 Lunch 13:00 - 14:00 Lunch

    14:00 - 15:30- Hands-On

    - Basic Service14:00 - 15:30

    - Hands-On- Using Networking and VLANs

    15:30 - 16:00 Coffee Break 15:30 - 16:00 Coffee Break

    16:00 - 17:00- Hands-On (Cont'd)

    - Basic Service16:00 - 17:00

    - Hands-On- Using Networking and VLANs

    21

  • 7/30/2019 ATS Operation Guidelines - Ver 4 40- 09-07-19

    26/36

    ATS Operation Guidelines 3BAlvarion Certified Training Centers (ACTC)

    CASS B-MAX TDD - GNMS

    Certified Alvarion System Specialist BreezeMAX TDD

    Generic Network Management System (AlvariSTAR)

    (5 days) (06-01-24)

    Day 5

    Time Topics

    9:00 - 11:00 End point devices (Voice Gateway)

    11:00 - 11:30 Coffee Break

    11:30 - 13:00- Super lab ecosystem hands on(cont'd)

    13:00 - 14:00 Lunch

    14:00 - 15:30- Super lab ecosystem hands on(cont'd)

    15:30 - 16:00 Coffee Break

    16:00 - 17:00 - Certification Test

    22

  • 7/30/2019 ATS Operation Guidelines - Ver 4 40- 09-07-19

    27/36

    ATS Operation Guidelines 3BAlvarion Certified Training Centers (ACTC)

    CASS BA-VL/BNET-B - EMS

    Certified Alvarion System Specialist BreezeACCESS-

    VL/BreezeNET-B

    Element Management System (AlvariCRAFT)

    (3 days) (back to Certification Tracks Table) (22-01-09)

    Day 1

    Time Topics Time Topics

    9:00 - 11:00 - System Architecture 9:00 - 11:00- Advanced radio interfacecommissioning

    11:00 - 11:30 Coffee Break 11:00 - 11:30 Coffee Break

    11:30 - 13:00- System Installation- Management and maintenance 11:30 - 13:00

    - Advanced radio interface

    commissioning(hands-on)

    13:00 - 14:00 Lunch 13:00 - 14:00 Lunch

    14:00 - 15:30 - Basic radio interface commissioning 14:00 - 15:30 - Security

    15:30 - 16:00 Coffee Break 15:30 - 16:00 Coffee Break

    16:00 - 17:00- Basic radio interface commissioning(hands-on)

    16:00 - 17:00 - Security (hands-on)

    Time Topics

    9:00 - 11:00- QoS

    11:00 - 11:30 Coffee Break

    11:30 - 13:00- QoS (hands-on)- Management and maintenance (hands-on)

    13:00 - 14:00 Lunch

    14:00 - 15:30 - Superlab

    15:30 - 16:00 Coffee Break

    16:00 - 17:00 - Certification test

    Day 3

    Day 2

    23

  • 7/30/2019 ATS Operation Guidelines - Ver 4 40- 09-07-19

    28/36

    ATS Operation Guidelines 3BAlvarion Certified Training Centers (ACTC)

    CAIT BA-VL/BNET-B

    Certified Alvarion Installation Technician BreezeACCESS-

    VL/BreezeNET-B

    (2 days) (back to Certification Tracks Table) (19-04-09)

    Day 1 Day 2

    Time Topics Time Topics

    9:00 - 11:00 - System Architecture 9:00 - 11:00- Security- Best Practices and Troubleshooting

    11:00 - 11:30 Coffee Break 11:00 - 11:30 Coffee Break

    11:30 - 13:00- System Installation- Management and maintenance

    11:30 - 13:00- Security (hands-on)- Management and Maintenance (hands-on)

    13:00 - 14:00 Lunch 13:00 - 14:00 Lunch

    14:00 - 15:30 - Radio Link Commissioning 14:00 - 15:30 - Troubleshooting lab

    15:30 - 16:00 Coffee Break 15:30 - 16:00 Coffee Break

    16:00 - 17:00- Radio Link Commissioning(hands-on)

    16:00 - 17:00 - Certification Test

    24

  • 7/30/2019 ATS Operation Guidelines - Ver 4 40- 09-07-19

    29/36

    ATS Operation Guidelines 3BAlvarion Certified Training Centers (ACTC)

    CASS WA1 LCI

    Certified Alvarion System Specialist - WALKair 1000

    Local Craft Interface

    (5 days) (back to Certification Tracks Table) (060116)

    Day 2Day 1

    Time Topics Time Topics

    9:00 - 11:00

    - Radio technologies- QAM- Antennas- Power budget

    9:00 - 11:00- Air link commissioning- Radio parameters- Administrative parameters

    11:00 - 11:30 Coffee Break 11:00 - 11:30 Coffee Break

    11:30 - 13:00 - WALKair 1000 - technical description 11:30 - 13:00- Link budget- DOs and DONTs

    13:00 - 14:00 Lunch 13:00 - 14:00 Lunch

    14:00 - 15:30- WALKair 1000 - technical description(contd)

    14:00 - 15:30 - Air link commissioning - Hands on

    15:30 - 16:00 Coffee Break 15:30 - 16:00 Coffee Break

    16:00 - 17:00 - WALKair 1000 - installation 16:00 - 17:00 - Radio planning fundamentals

    Day 4Day 3

    Time Topics Time Topics

    9:00 - 11:00- E1 / V.35 technologies- Leased line (E1 / FE1 / V.35) services

    9:00 - 11:00- Ethernet / IP technologies- Frame Relay technology

    11:00 - 11:30 Coffee Break 11:00 - 11:30 Coffee Break

    11:30 - 13:00 - Leased line (E1 / FE1 / V.35) services(hands-on)

    11:30 - 13:00 - Ethernet / Frame Relay Services

    13:00 - 14:00 Lunch 13:00 - 14:00 Lunch

    14:00 - 15:30 - V5.x / POTS / ISDN technologies 14:00 - 15:30- Ethernet / Frame Relay Services(hands-on)

    15:30 - 16:00 Coffee Break 15:30 - 16:00 Coffee Break

    16:00 - 17:00- V5.x / POTS / ISDN services- V5.x / POTS / ISDN services (handson)

    16:00 - 17:00 - Capacity calculation guidelines

    25

  • 7/30/2019 ATS Operation Guidelines - Ver 4 40- 09-07-19

    30/36

    ATS Operation Guidelines 3BAlvarion Certified Training Centers (ACTC)

    CAIT WA1

    Certified Alvarion Installation Technician - WALKair 1000

    (1 day) (back to Certification Tracks Table) (051228)

    Day 1

    Time Topics

    9:00 - 11:00- Introduction to WALKair architecture- Introduction to WALKair components- WALKair installation

    11:00 - 11:30 Coffee Break

    11:30 - 12:00 - WALKair installations case studies

    12:00 - 13:00 Lunch

    13:00 - 15:30 - WALKair installation hands on

    15:30 - 16:00 Coffee Break

    16:00 - 17:00 - WALKair installation hands on

    26

  • 7/30/2019 ATS Operation Guidelines - Ver 4 40- 09-07-19

    31/36

    ATS Operation Guidelines 3BAlvarion Certified Training Centers (ACTC)

    Delta CASS WA1 LCI-to-NMS

    Delta Certified Alvarion System Specialist - WALKair 1000

    Local Craft Interface to Network Management System (WALKnet)

    (2 days) (back to Certification Tracks Table) (060629)

    Time Topics Time Topics

    9:00 - 11:00

    Network management - concepts- Management functions- Agent- Management Information Base (MIB)

    9:00 - 11:00- HP OpenView Installation (Hands-On)- WALKnet installation (Hands-On)

    11:00 - 11:30 Coffee Break 11:00 - 11:30 Coffee Break

    11:30 - 13:00 - HP OpenView 11:30 - 13:00

    - WALKnet Operation (hands-on)- Creating maps- Link commissioning

    - Services configuration13:00 - 14:00 Lunch 13:00 - 14:00 Lunch

    14:00 - 15:30- WALKnet

    - Configuration management- Performance management

    14:00 - 15:30

    - WALKnet Operation (hands-on) (contd)- Security- Performance monitoring and

    statistics

    15:30 - 16:00 Coffee Break 15:30 - 16:00 Coffee Break

    16:00 - 17:00 - WALKnet installation 16:00 - 17:00

    - Data bases- WinNT

    - ODBC- ACCESS

    Day 1 Day 2

    27

  • 7/30/2019 ATS Operation Guidelines - Ver 4 40- 09-07-19

    32/36

    ATS Operation Guidelines 3BAlvarion Certified Training Centers (ACTC)

    CASS WA3

    Certified Alvarion System Specialist - WALKair 3000

    (4 days) (back to Certification Tracks Table) (051103)

    Time Topics Time Topics

    9:00 - 11:00 WALKair 3000 System Description 9:00 - 11:00 Link Budget and RF planning

    11:00 - 11:30 Coffee Break 11:00 - 11:30 Coffee Break

    11:30 - 13:00 WALKair 3000 System Description (cont) 11:30 - 13:00 Installation

    13:00 - 14:00 Lunch 13:00 - 14:00 Lunch

    14:00 - 15:30 WALKair 3000 Services 14:00 - 15:30 WALKnet introduction

    15:30 - 16:00 Coffee Break 15:30 - 16:00 Coffee Break

    16:00 - 17:00 Air Protocol 16:00 - 17:00 System commissioning

    Time Topics Time Topics

    9:00 - 11:00- Link Establishment- Link Acceptance Test

    9:00 - 11:00 Acceptance test

    11:00 - 11:30 Coffee Break 11:00 - 11:30 Coffee Break

    11:30 - 13:00 Link establishment - Hands on 11:30 - 13:00 SW download and Configuration Load

    13:00 - 14:00 Lunch 13:00 - 14:00 Lunch

    14:00 - 15:30 Services Configuration 14:00 - 15:30SW download and Configuration LoadHands on

    15:30 - 16:00 Coffee Break 15:30 - 16:00 Coffee Break

    16:00 - 17:00 Services - Hands on 16:00 - 17:00 Installation - Hands on

    Day 3 Day 4

    Day 1 Day 2

    28

  • 7/30/2019 ATS Operation Guidelines - Ver 4 40- 09-07-19

    33/36

    ATS Operation Guidelines 3BAlvarion Certified Training Centers (ACTC)

    CASS eMGW

    Certified Alvarion System Specialist - Enhanced MultiGain Wireless

    system

    (5 days) (back to Certification Tracks Table) (051226)

    Day 2Day 1

    Time Topics Time Topics

    9:00 - 11:00- Integrated Access Systems- Technologies- Intro to V.5.2

    9:00 - 11:00- Introduction to IMS networkmanagement system

    11:00 - 11:30 Coffee Break 11:00 - 11:30 Coffee Break

    11:30 - 13:00- Technologies- Intro to V.5.2 (contd)

    11:30 - 13:00

    - System Configuration via IMS LocalCraft

    Hands-on

    - System configuration via IMS Local13:00 - 14:00 Lunch 13:00 - 14:00 Lunch

    14:00 - 15:30- System Overview

    - Air interface14:00 - 15:30

    Hands-on- System configuration via IMS LocalCraft

    15:30 - 16:00 Coffee Break 15:30 - 16:00 Coffee Break

    16:00 - 17:00

    - System Overview- Features- Capacity- Deployment

    16:00 - 17:00

    - IMS Local Craft installation

    Hands-on- Local Craft installation

    Day 4Day 3

    Time Topics Time Topics

    9:00 - 11:00

    - Regional IMS installation

    Hands-on- Regional server installation- Re ional clientinstallation

    9:00 - 11:00

    Installation guidelines- Base Station

    - eRPCU- eRPC

    11:00 - 11:30 Coffee Break 11:00 - 11:30

    11:30 - 13:00Hands-on

    - Regional server installation- Regional client installation

    11:30 - 13:00

    Hands on:- Base Station

    - eRPCU

    - eRPC13:00 - 14:00 Lunch 13:00 - 14:00 Lunch

    14:00 - 15:30

    - HMON

    Hands-on- CPE configuration tool (HFIT200)- CPE configuration tool (HMON)

    14:00 - 15:30Installation guidelines

    - eFAU - CPE (Subscriber Unit)

    15:30 - 16:00 Coffee Break 15:30 - 16:00 Coffee Break

    16:00 - 17:00 - Layer 2 operation concepts 16:00 - 17:00Hands on:- CPE components installation

    29

  • 7/30/2019 ATS Operation Guidelines - Ver 4 40- 09-07-19

    34/36

    ATS Operation Guidelines 3BAlvarion Certified Training Centers (ACTC)

    CASS eMGW

    Certified Alvarion System Specialist - Enhanced MultiGain Wireless

    system

    (5 days) (051226)

    Day 1

    Time Topics

    9:00 - 11:00Hands on: IMSFault management

    Task Manager

    11:00 - 11:30 Coffee Break

    11:30 - 13:00 System troubleshooting

    13:00 - 14:00 Lunch

    14:00 - 15:30 System troubleshooting

    15:30 - 16:00 Coffee Break

    16:00 - 17:00 - Session summary

    30

  • 7/30/2019 ATS Operation Guidelines - Ver 4 40- 09-07-19

    35/36

    ATS Operation Guidelines 3BAlvarion Certified Training Centers (ACTC)

    CAIT eMGW (CPE)

    Certified Alvarion Installation Technician - Enhanced MultiGain

    Wireless system

    (3 days) (back to Certification Tracks Table) (050922)

    Day 2Day 1

    Time Topics Time Topics

    9:00 - 11:00- System Overview

    - Air interface- Features

    9:00 - 11:00- HMON- Hands-on - HMON

    11:00 - 11:30 Coffee Break 11:00 - 11:30 Coffee Break

    11:30 - 13:00

    - System Overview- Capacity- Deployment

    - Components

    11:30 - 13:00 - Hands-on - HFIT 200

    13:00 - 14:00 Lunch 13:00 - 14:00 Lunch

    14:00 - 15:30- Installation guidelines

    - CPE (Subscriber Unit)14:00 - 15:30 - Hands-on Installation CPE

    15:30 - 16:00 Coffee Break 15:30 - 16:00 Coffee Break

    16:00 - 17:00- Installation guidelines

    - CPE (Subscriber Unit) (contd)16:00 - 17:00

    - Hands-on - Testing- voice services- data services

    Day 3

    Time Topics

    9:00 - 11:00 - Hands-on - Troubleshooting

    11:00 - 11:30 Coffee Break

    11:30 - 13:00 - Hands-on - Troubleshooting

    13:00 - 14:00 Lunch

    14:00 - 15:30 - Hands-on - HMON S/W upgrade

    15:30 - 16:00 Coffee Break

    16:00 - 17:00 - Hands-on - HMON S/W upgrade

    31

  • 7/30/2019 ATS Operation Guidelines - Ver 4 40- 09-07-19

    36/36

    ATS Operation Guidelines 3BAlvarion Certified Training Centers (ACTC)

    CASO eMGW

    Certified Alvarion System Operator - Enhanced MultiGain Wireless

    system

    (3 days) (back to Certification Tracks Table) (050922)

    Day 2Day 1

    Time Topics Time Topics

    9:00 - 11:00 - eMGW System overview 9:00 - 11:00 - Installation: IMS Local Craft

    11:00 - 11:30 Coffee Break 11:00 - 11:30 Coffee Break

    11:30 - 13:00 - IMS Overview 11:30 - 13:00

    - Hands On: IMS Local Craft installationFull installation (Including Oracle)Upgrades

    Troubleshooting

    13:00 - 14:00 Lunch 13:00 - 14:00 Lunch

    14:00 - 15:30- System Configuration via IMS LocalCraft

    14:00 - 15:30- Installation:

    -IMS Regional Server-IMS Regional Client

    15:30 - 16:00 Coffee Break 15:30 - 16:00 Coffee Break

    16:00 - 17:00

    Hands-on- System configuration via IMS LocalCraft- Subscribers declaration via IMS

    16:00 - 17:00- Hands on: Installation

    -IMS Regional Server-IMS Regional Client

    Day 3

    Time Topics

    9:00 - 11:00- Hands on:IMS Fault Management:IMS Task Manager

    11:00 - 11:30 Coffee Break

    11:30 - 13:00

    - Hands on- SW Upgrade for radio units

    - TM collection- PM collection

    13:00 - 14:00 Lunch

    14:00 - 15:30- HMON- Hands on: HMON

    15:30 - 16:00 Coffee Break

    16:00 - 17:00- Hands on: Troubleshooting- Using IMS & HMON