  • 8/10/2019 ATS MV Description

    1/34

    We reserve all rights in this document and in the information contained therein. Reproduction, use or disclosure to third parties without express authority is strictly forbidden. ABB s.r.o.

    Created Haluza Based on Ext.doc.id Status

    Approved Kubelka Customer Alpiq Generation (CZ) Doc. kind TECHNICAL DESCRIPTIONProject Title

    ATS MV TESTSKLADNO K7 POWER PLANT

    MAIN ELECTRIC SYSTEMS Ref. designation DCC

    =7B__ &EEC100Resp. Project ID Document ID Rev. Release date Lang. Page

    ABB s.r.o., Power Systems D1060 2013-10-25 en 1/ 34

    7&&-AB-E0-DS-0007-0-EAlpiq Generation (CZ) s.r.o.Dubsk 257CZ - 272 03 Kladno

    Customer Principal Customer Doc. No.

    Kraftanlagen Power Plants GmbHRidlerstr. 31cD - 80339 Mnchen

    TECHNICAL REPORT

    ATS MV TESTS

  • 8/10/2019 ATS MV Description

    2/34

    Doc.kind TECHNICAL DESCRIPTION

    TitleATS MV TESTS

    Resp. Document ID Rev. Lang. Page

    ABB s.r.o., Power Systems en 2

    Vyhrazujem

    esivechnaprvanatutodokumentaciainformacevnobsaen.Koprovn,pouvn

    jakoiposto

    upentetmstranmbezsouhlasuautorajepsn

    zakzno.

    ABBs.r.o.

    Wereserveallrightsinthisdo

    cumentandintheinformationcontainedtherein.Reproduction,useor

    disclosuretothirdpartieswithoutexpressauthorityisstrictlyforbidden.

    ABBs.r.o.

    CONTENT

    GENERAL............................................................................................................................................... 4

    1 Switching-over sequence with overlapping.................................................................................. 5

    1.1 TEST 1 - Transfer from operation mode No. 1 to operation mode No. 2 ................................... 51.1.1 Preconditions.............................................................................................................................. 51.1.2 Test start by................................................................................................................................ 5

    1.1.3 Expected behavior...................................................................................................................... 51.1.4 Potential risks............................................................................................................................. 61.1.5 Check......................................................................................................................................... 6

    1.2 TEST 2 - Transfer from operation mode No. 2 to operation mode No. 3 ................................... 71.2.1 Preconditions.............................................................................................................................. 7

    1.2.2 Test start by................................................................................................................................ 71.2.3 Expected behavior...................................................................................................................... 71.2.4 Potential risks............................................................................................................................. 71.2.5 Check......................................................................................................................................... 8

    1.3 TEST 3 - Transfer from operation mode No. 3 to operation mode No. 1 ................................... 91.3.1 Preconditions.............................................................................................................................. 9

    1.3.2 Test start by................................................................................................................................ 91.3.3 Expected behavior...................................................................................................................... 91.3.4 Potential risks............................................................................................................................. 91.3.5 Check....................................................................................................................................... 10

    1.4 TEST 4 - Transfer from operation mode No. 1 to operation mode No. 5 ................................. 111.4.1 Preconditions............................................................................................................................ 111.4.2 Test start by.............................................................................................................................. 11

    1.4.3 Expected behavior.................................................................................................................... 111.4.4 Potential risks........................................................................................................................... 121.4.5 Check....................................................................................................................................... 12

    1.5 TEST 5 - Transfer from operation mode No. 5 to operation mode No. 4 ................................. 13

    1.5.1 Preconditions............................................................................................................................ 131.5.2 Test start by.............................................................................................................................. 13

    1.5.3 Expected behavior.................................................................................................................... 131.5.4 Potential risks........................................................................................................................... 141.5.5 Check....................................................................................................................................... 14

    1.6 TEST 6 - Transfer from operation mode No. 4 to operation mode No. 2 ................................. 151.6.1 Preconditions............................................................................................................................ 151.6.2 Test start by.............................................................................................................................. 151.6.3 Expected behavior.................................................................................................................... 151.6.4 Potential risks........................................................................................................................... 161.6.5 Check....................................................................................................................................... 16

    2 Automatic activation of ATS Uninterrupted switching sequences......................................... 172.1 TEST 7 - Automatic activation of ATS by undervoltage U

  • 8/10/2019 ATS MV Description

    3/34

    Doc.kind TECHNICAL DESCRIPTION

    TitleATS MV TESTS

    Resp. Document ID Rev. Lang. Page

    ABB s.r.o., Power Systems en 3

    Vyhrazujem

    esivechnaprvanatutodokumentaciainformacevnobsaen.Koprovn,pouvn

    jakoiposto

    upentetmstranmbezsouhlasuautorajepsn

    zakzno.

    ABBs.r.o.

    Wereserveallrightsinthisdo

    cumentandintheinformationcontainedtherein.Reproduction,useor

    disclosuretothirdpartieswithoutexpressauthorityisstrictlyforbidden.

    ABBs.r.o.

    3.1 TEST 9 - Automatic activation of ATS by overvoltage U > 1,1 * Un (> 7.0kV)........................ 223.1.1 Test start by.............................................................................................................................. 22

    3.1.2 Expected behavior.................................................................................................................... 233.1.3 Potential risks........................................................................................................................... 233.1.4 Check....................................................................................................................................... 23

    3.2 TEST 10 - Transfer from operation mode No. 2 to operation mode No. 3 -

    U>10% .............. 253.2.1 Preconditions............................................................................................................................ 253.2.2 Test start by.............................................................................................................................. 25

    3.2.3 Expected behavior.................................................................................................................... 263.2.4 Potential risks........................................................................................................................... 263.2.5 Check....................................................................................................................................... 26

    3.3 TEST 11 - Fire alarm in unit transformer box (main protection) ............................................ 283.3.1 Preconditions............................................................................................................................ 283.3.2 Test start by.............................................................................................................................. 28

    3.3.3 Expected behavior.................................................................................................................... 283.3.4 Potential risks........................................................................................................................... 293.3.5 Check....................................................................................................................................... 29

    3.4 TEST 12 - Simulation of failure in backup transformer (main protection) ............................. 303.4.1 Preconditions............................................................................................................................ 30

    3.4.2 Test start by.......................................................................................................................... 303.4.3 Expected behavior.................................................................................................................... 303.4.4 Potential risks........................................................................................................................... 313.4.5 Check....................................................................................................................................... 31

    4 Switching with time delay .......................................................................................................... 32

    4.1 TEST 13 - Transfer from operation mode No. 2 to operation mode No. 3 if the voltagemeasuring system is faulty .................................................................................................................. 32

    4.1.1 Preconditions............................................................................................................................ 324.1.2 Test start by.............................................................................................................................. 32

    4.1.3 Expected behavior.................................................................................................................... 324.1.4 Potential risks........................................................................................................................... 33

    4.1.5 Check....................................................................................................................................... 33

    5 Other tests................................................................................................................................... 34

  • 8/10/2019 ATS MV Description

    4/34

  • 8/10/2019 ATS MV Description

    5/34

    Doc.kind TECHNICAL DESCRIPTION

    TitleATS MV TESTS

    Resp. Document ID Rev. Lang. Page

    ABB s.r.o., Power Systems en 5

    Vyhrazujem

    esivechnaprvanatutodokumentaciainformacevnobsaen.Koprovn,pouvn

    jakoiposto

    upentetmstranmbezsouhlasuautorajepsn

    zakzno.

    ABBs.r.o.

    Wereserveallrightsinthisdo

    cumentandintheinformationcontainedtherein.Reproduction,useor

    disclosuretothirdpartieswithoutexpressauthorityisstrictlyforbidden.

    ABBs.r.o.

    1 Switching-over sequence with overlapping

    1.1 TEST 1 - Transfer from operation mode No. 1 to operation mode No. 2

    Switching-over sequence with overlapping will be carried out manually on ATS panel.

    1.1.1 Preconditions

    K7 POWER PLANT STATUS

    Boiler MCRTurbine load

    Home consumption 7BBT01

    Home consumption 0BBT01

    Tap changer for 7BBT01 in remote and auto YES NO

    Voltage of 7BBT01 secondary side(shall be 6.3 kV)

    Tap position of 7BBT01 (shall be 11)

    Tap changer for 0BBT01 in remote and auto YES NO

    Voltage of 0BBT01 secondary side(shall be 6.3 kV)

    Tap position of 0BBT01 (shall be 11)

    Redundant power supply of all three feedwater pumps

    YES NO

    MV ATS

    Ready YES NO

    On YES NO

    Remote YES NO

    Block YES NO

    Operation mode No.

    Voltage on both inlets present and synchronizedProtection terminal REF activatedProtection terminals REF are measuring voltage on VTs, there is no failure in voltage measuring circuits

    Initial status - inlet 7BBA01 on, coupling 7BBA04 off and 0BBD04 on, inlet 0BBD01 on, inlet7BBB01 on, coupling 7BBB04 off and 0BBC04 on, inlet 0BBC01 on operation mode No. 1

    1.1.2 Test start by...

    2x pushing of S42 push-button

    1.1.3 Expected behavior

    Desired response of ATS - transfer to operation mode No. 2, i.e. switching-over from inlet 0BBD01 tocoupling 7BBA04 and from inlet 0BBC01 to coupling 7BBB04.

  • 8/10/2019 ATS MV Description

    6/34

    Doc.kind TECHNICAL DESCRIPTION

    TitleATS MV TESTS

    Resp. Document ID Rev. Lang. Page

    ABB s.r.o., Power Systems en 6

    Vyhrazujem

    esivechnaprvanatutodokumentaciainformacevnobsaen.Koprovn,pouvn

    jakoiposto

    upentetmstranmbezsouhlasuautorajepsn

    zakzno.

    ABBs.r.o.

    Wereserveallrightsinthisdo

    cumentandintheinformationcontainedtherein.Reproduction,useor

    disclosuretothirdpartieswithoutexpressauthorityisstrictlyforbidden.

    ABBs.r.o.

    1.1.4 Potential risks

    Trip of HVS systems.

    1.1.5 Check

    CB 7BBA01 7BBA04 0BBD01 7BBB01 7BBB04 0BBC01 0BBC04 0BBD04

    Initial status X O X X O X X X

    Response X X O X X O X X

    Check

    MV ATS

    Ready YES NO

    On YES NO

    Remote YES NO

    Block YES NO

    Operation mode No.

    K7 POWER PLANT STATUS

    Boiler MCR

    Turbine load

    Home consumption 7BBT01

    Home consumption 0BBT01

    Failures of technology consumersYES NO

    ...........................................................

    ...........................................................

    Questions / Points

  • 8/10/2019 ATS MV Description

    7/34

    Doc.kind TECHNICAL DESCRIPTION

    TitleATS MV TESTS

    Resp. Document ID Rev. Lang. Page

    ABB s.r.o., Power Systems en 7

    Vyhrazujem

    esivechnaprvanatutodokumentaciainformacevnobsaen.Koprovn,pouvn

    jakoiposto

    upentetmstranmbezsouhlasuautorajepsn

    zakzno.

    ABBs.r.o.

    Wereserveallrightsinthisdo

    cumentandintheinformationcontainedtherein.Reproduction,useor

    disclosuretothirdpartieswithoutexpressauthorityisstrictlyforbidden.

    ABBs.r.o.

    1.2 TEST 2 - Transfer from operation mode No. 2 to operation mode No. 3

    Switching-over sequence with overlapping will be carried out manually on ATS panel.

    1.2.1 Preconditions

    K7 POWER PLANT STATUS

    Boiler MCR

    Turbine loadHome consumption 7BBT01

    Home consumption 0BBT01

    MV ATS

    Ready YES NO

    On YES NO

    Remote YES NO

    Block YES NO

    Operation mode No.

    Voltage on both inlets present and synchronizedProtection terminal REF activatedProtection terminals REF are measuring voltage on VTs, there is no failure in voltage measuring circuits

    Initial status - inlet 7BBA01 on, coupling 7BBA04 on, coupling 0BBD04 on, inlet 0BBD01 off,

    inlet 7BBB01 on, coupling 7BBB04 on and 0BBC04 on, inlet 0BBC01 off operation mode No. 2

    1.2.2 Test start by...

    2x pushing of S43 push-button

    1.2.3 Expected behavior

    Desired response of ATS - transfer to operation mode No. 3, i.e. switching-over from inlet 7BBA01 toinlet 0BBD01 and from inlet 7BBB01 to inlet 0BBC01.

    1.2.4 Potential risks

    Trip of K7 power plant.

  • 8/10/2019 ATS MV Description

    8/34

    Doc.kind TECHNICAL DESCRIPTION

    TitleATS MV TESTS

    Resp. Document ID Rev. Lang. Page

    ABB s.r.o., Power Systems en 8

    Vyhrazujem

    esivechnaprvanatutodokumentaciainformacevnobsaen.Koprovn,pouvn

    jakoiposto

    upentetmstranmbezsouhlasuautorajepsn

    zakzno.

    ABBs.r.o.

    Wereserveallrightsinthisdo

    cumentandintheinformationcontainedtherein.Reproduction,useor

    disclosuretothirdpartieswithoutexpressauthorityisstrictlyforbidden.

    ABBs.r.o.

    1.2.5 Check

    CB 7BBA01 7BBA04 0BBD01 7BBB01 7BBB04 0BBC01 0BBC04 0BBD04

    Initial status X X O X X O X X

    Response O X X O X X X X

    Check

    MV ATS

    Ready YES NO

    On YES NO

    Remote YES NO

    Block YES NO

    Operation mode No.

    K7 POWER PLANT STATUS

    Boiler MCR

    Turbine load

    Home consumption 7BBT01

    Home consumption 0BBT01

    Failures of technology consumersYES NO

    ...........................................................

    ...........................................................

    Questions / Points

  • 8/10/2019 ATS MV Description

    9/34

    Doc.kind TECHNICAL DESCRIPTION

    TitleATS MV TESTS

    Resp. Document ID Rev. Lang. Page

    ABB s.r.o., Power Systems en 9

    Vyhrazujem

    esivechnaprvanatutodokumentaciainformacevnobsaen.Koprovn,pouvn

    jakoiposto

    upentetmstranmbezsouhlasuautorajepsn

    zakzno.

    ABBs.r.o.

    Wereserveallrightsinthisdo

    cumentandintheinformationcontainedtherein.Reproduction,useor

    disclosuretothirdpartieswithoutexpressauthorityisstrictlyforbidden.

    ABBs.r.o.

    1.3 TEST 3 - Transfer from operation mode No. 3 to operation mode No. 1

    Switching-over sequence with overlapping will be carried out manually on DCS panel.

    1.3.1 Preconditions

    K7 POWER PLANT STATUS

    Boiler MCR

    Turbine loadHome consumption 7BBT01

    Home consumption 0BBT01

    MV ATS

    Ready YES NO

    On YES NO

    Remote YES NO

    Block YES NO

    Operation mode No.

    Voltage on both inlets present and synchronizedProtection terminal REF activatedProtection terminals REF are measuring voltage on VTs, there is no failure in voltage measuring circuits

    Initial status - inlet 7BBA01 off, coupling 7BBA04 on and 0BBD04 on, inlet 0BBD01 on, inlet

    7BBB01 off, coupling 7BBB04 on and 0BBC04 on, inlet 0BBC01 on operation mode No. 3

    1.3.2 Test start by...

    2x pushing of DCS buttons for state 1

    1.3.3 Expected behavior

    Desired response of ATS - transfer to operation mode No. 1, i.e. switching-over from coupling 7BBA04to inlet 7BBA01 and from coupling 7BBB04 to inlet 7BBB01.

    1.3.4 Potential risks

    Trip of K7 boiler.

  • 8/10/2019 ATS MV Description

    10/34

    Doc.kind TECHNICAL DESCRIPTION

    TitleATS MV TESTS

    Resp. Document ID Rev. Lang. Page

    ABB s.r.o., Power Systems en 10

    Vyhrazujem

    esivechnaprvanatutodokumentaciainformacevnobsaen.Koprovn,pouvn

    jakoiposto

    upentetmstranmbezsouhlasuautorajepsn

    zakzno.

    ABBs.r.o.

    Wereserveallrightsinthisdo

    cumentandintheinformationcontainedtherein.Reproduction,useor

    disclosuretothirdpartieswithoutexpressauthorityisstrictlyforbidden.

    ABBs.r.o.

    1.3.5 Check

    CB 7BBA01 7BBA04 0BBD01 7BBB01 7BBB04 0BBC01 0BBC04 0BBD04

    Initial status O X X O X X X X

    Response X O X X O X X X

    Check

    MV ATS

    Ready YES NO

    On YES NO

    Remote YES NO

    Block YES NO

    Operation mode No.

    K7 POWER PLANT STATUS

    Boiler MCR

    Turbine load

    Home consumption 7BBT01

    Home consumption 0BBT01

    Failures of technology consumers

    YES NO

    ...........................................................

    ...........................................................

    Questions / Points

  • 8/10/2019 ATS MV Description

    11/34

    Doc.kind TECHNICAL DESCRIPTION

    TitleATS MV TESTS

    Resp. Document ID Rev. Lang. Page

    ABB s.r.o., Power Systems en 11

    Vyhrazujem

    esivechnaprvanatutodokumentaciainformacevnobsaen.Koprovn,pouvn

    jakoiposto

    upentetmstranmbezsouhlasuautorajepsn

    zakzno.

    ABBs.r.o.

    Wereserveallrightsinthisdo

    cumentandintheinformationcontainedtherein.Reproduction,useor

    disclosuretothirdpartieswithoutexpressauthorityisstrictlyforbidden.

    ABBs.r.o.

    1.4 TEST 4 - Transfer from operation mode No. 1 to operation mode No. 5

    Switching-over sequence with overlapping will be carried out manually on DCS panel.

    1.4.1 Preconditions

    K7 POWER PLANT STATUS

    Boiler MCR

    Turbine loadHome consumption 7BBT01

    Home consumption 0BBT01

    Redundant power supply of all three feedwater pumps

    YES NO

    MV ATS

    Ready YES NO

    On YES NO

    Remote YES NO

    Block YES NO

    Operation mode No.

    Voltage on both inlets present and synchronized

    Protection terminal REF activatedProtection terminals REF are measuring voltage on VTs, there is no failure in voltage measuring circuits

    Initial status - inlet 7BBA01 on, coupling 7BBA04 off, coupling 0BBD04 on, inlet 0BBD01 on,inlet 7BBB01 on, coupling 7BBB04 off and 0BBC04 on, inlet 0BBC01 on operation mode No. 1

    1.4.2 Test start by...

    2x pushing of DCS button for state 5

    1.4.3 Expected behavior

    Desired response of ATS - transfer to operation mode No. 5, i.e. switching-over from inlet 0BBD01 tocoupling 7BBA04 and from inlet 7BBB01 to coupling 7BBB04.

  • 8/10/2019 ATS MV Description

    12/34

    Doc.kind TECHNICAL DESCRIPTION

    TitleATS MV TESTS

    Resp. Document ID Rev. Lang. Page

    ABB s.r.o., Power Systems en 12

    Vyhrazujem

    esivechnaprvanatutodokumentaciainformacevnobsaen.Koprovn,pouvn

    jakoiposto

    upentetmstranmbezsouhlasuautorajepsn

    zakzno.

    ABBs.r.o.

    Wereserveallrightsinthisdo

    cumentandintheinformationcontainedtherein.Reproduction,useor

    disclosuretothirdpartieswithoutexpressauthorityisstrictlyforbidden.

    ABBs.r.o.

    1.4.4 Potential risks

    Trip of HVS systems and K7 boiler.

    1.4.5 Check

    CB 7BBA01 7BBA04 0BBD01 7BBB01 7BBB04 0BBC01 0BBC04 0BBD04

    Initial status X O X X O X X X

    Response X X O O X X X X

    Check

    MV ATS

    Ready YES NO

    On YES NO

    Remote YES NO

    Block YES NO

    Operation mode No.

    K7 POWER PLANT STATUS

    Boiler MCR

    Turbine load

    Home consumption 7BBT01

    Home consumption 0BBT01

    Redundant power supply of all three feedwater pumps

    YES NO

    Failures of technology consumers

    YES NO

    ...........................................................

    ...........................................................

    Questions / Points

  • 8/10/2019 ATS MV Description

    13/34

    Doc.kind TECHNICAL DESCRIPTION

    TitleATS MV TESTS

    Resp. Document ID Rev. Lang. Page

    ABB s.r.o., Power Systems en 13

    Vyhrazujem

    esivechnaprvanatutodokumentaciainformacevnobsaen.Koprovn,pouvn

    jakoiposto

    upentetmstranmbezsouhlasuautorajepsn

    zakzno.

    ABBs.r.o.

    Wereserveallrightsinthisdo

    cumentandintheinformationcontainedtherein.Reproduction,useor

    disclosuretothirdpartieswithoutexpressauthorityisstrictlyforbidden.

    ABBs.r.o.

    1.5 TEST 5 - Transfer from operation mode No. 5 to operation mode No. 4

    Switching-over sequence with overlapping will be carried out manually on ATS panel.

    1.5.1 Preconditions

    K7 POWER PLANT STATUS

    Boiler MCR

    Turbine loadHome consumption 7BBT01

    Home consumption 0BBT01

    Redundant power supply of all threefeed water pumps

    YES NO

    MV ATS

    Ready YES NO

    On YES NO

    Remote YES NO

    Block YES NO

    Operation mode No.

    Voltage on both inlets present and synchronized

    Protection terminal REF activatedProtection terminals REF are measuring voltage on VTs, there is no failure in voltage measuring circuits

    Initial status - inlet 7BBA01 on, coupling 7BBA04 on, coupling 0BBD04 on, inlet 0BBD01 off,inlet 7BBB01 off, coupling 7BBB04 on and 0BBC04 on, inlet 0BBC01 on operation mode No. 5

    1.5.2 Test start by...

    2x pushing of S44 push-button

    1.5.3 Expected behavior

    Desired response of ATS - transfer to operation mode No. 4, i.e. switching-over from inlet 7BBA01 to

    inlet 0BBD01 and from inlet 0BBC01 to inlet 7BBB01.

  • 8/10/2019 ATS MV Description

    14/34

    Doc.kind TECHNICAL DESCRIPTION

    TitleATS MV TESTS

    Resp. Document ID Rev. Lang. Page

    ABB s.r.o., Power Systems en 14

    Vyhrazujem

    esivechnaprvanatutodokumentaciainformacevnobsaen.Koprovn,pouvn

    jakoiposto

    upentetmstranmbezsouhlasuautorajepsn

    zakzno.

    ABBs.r.o.

    Wereserveallrightsinthisdo

    cumentandintheinformationcontainedtherein.Reproduction,useor

    disclosuretothirdpartieswithoutexpressauthorityisstrictlyforbidden.

    ABBs.r.o.

    1.5.4 Potential risks

    Trip of HVS systems and K7 boiler.

    1.5.5 Check

    CB 7BBA01 7BBA04 0BBD01 7BBB01 7BBB04 0BBC01 0BBC04 0BBD04

    Initial status X X O O X X X X

    Response O X X X X O X X

    Check

    MV ATS

    Ready YES NO

    On YES NO

    Remote YES NO

    Block YES NO

    Operation mode No.

    K7 POWER PLANT STATUS

    Boiler MCR

    Turbine load

    Home consumption 7BBT01

    Home consumption 0BBT01

    Redundant power supply of all three feedwater pumps

    YES NO

    Failures of technology consumers

    YES NO

    ...........................................................

    ...........................................................

    Questions / Points

  • 8/10/2019 ATS MV Description

    15/34

    Doc.kind TECHNICAL DESCRIPTION

    TitleATS MV TESTS

    Resp. Document ID Rev. Lang. Page

    ABB s.r.o., Power Systems en 15

    Vyhrazujem

    esivechnaprvanatutodokumentaciainformacevnobsaen.Koprovn,pouvn

    jakoiposto

    upentetmstranmbezsouhlasuautorajepsn

    zakzno.

    ABBs.r.o.

    Wereserveallrightsinthisdo

    cumentandintheinformationcontainedtherein.Reproduction,useor

    disclosuretothirdpartieswithoutexpressauthorityisstrictlyforbidden.

    ABBs.r.o.

    1.6 TEST 6 - Transfer from operation mode No. 4 to operation mode No. 2

    Switching-over sequence with overlapping will be carried out manually on DCS panel.

    1.6.1 Preconditions

    K7 POWER PLANT STATUS

    Boiler MCR

    Turbine loadHome consumption 7BBT01

    Home consumption 0BBT01

    Redundant power supply of all threefeed water pumps

    YES NO

    MV ATS

    Ready YES NO

    On YES NO

    Remote YES NO

    Block YES NO

    Operation mode No.

    Voltage on both inlets present and synchronized

    Protection terminal REF activatedProtection terminals REF are measuring voltage on VTs, there is no failure in voltage measuring circuits

    Initial status - inlet 7BBA01 off, coupling 7BBA04 on and 0BBD04 on, inlet 0BBD01 on, inlet7BBB01 on, coupling 7BBB04 on and 0BBC04 on, inlet 0BBC01 off operation mode No. 4

    1.6.2 Test start by...

    2x pushing of DCS button for state 2

    1.6.3 Expected behavior

    Desired response of ATS - transfer to operation mode No. 2, i.e. switching-over from inlet 0BBD01 to

    inlet 7BBA01.

  • 8/10/2019 ATS MV Description

    16/34

    Doc.kind TECHNICAL DESCRIPTION

    TitleATS MV TESTS

    Resp. Document ID Rev. Lang. Page

    ABB s.r.o., Power Systems en 16

    Vyhrazujem

    esivechnaprvanatutodokumentaciainformacevnobsaen.Koprovn,pouvn

    jakoiposto

    upentetmstranmbezsouhlasuautorajepsn

    zakzno.

    ABBs.r.o.

    Wereserveallrightsinthisdo

    cumentandintheinformationcontainedtherein.Reproduction,useor

    disclosuretothirdpartieswithoutexpressauthorityisstrictlyforbidden.

    ABBs.r.o.

    1.6.4 Potential risks

    Trip of HVS systems and K7 boiler.

    1.6.5 Check

    CB 7BBA01 7BBA04 0BBD01 7BBB01 7BBB04 0BBC01 0BBC04 0BBD04

    Initial status O X X X X O X X

    Response X X O X X O X X

    Check

    MV ATS

    Ready YES NO

    On YES NO

    Remote YES NO

    Block YES NO

    Operation mode No.

    K7 POWER PLANT STATUS

    Boiler MCR

    Turbine load

    Home consumption 7BBT01

    Home consumption 0BBT01

    Tap changer for 7BBT01 in remote and auto YES NO

    Voltage of 7BBT01 secondary side

    (shall be 6.3 kV)

    Tap position of 7BBT01 (shall be 11)

    Tap changer for 0BBT01 in remote and auto YES NO

    Voltage of 0BBT01 secondary side(shall be 6.3 kV)

    Tap position of 0BBT01 (shall be 11)

    Failures of technology consumersYES NO

    ...........................................................

    ...........................................................

    Questions / Points

  • 8/10/2019 ATS MV Description

    17/34

    Doc.kind TECHNICAL DESCRIPTION

    TitleATS MV TESTS

    Resp. Document ID Rev. Lang. Page

    ABB s.r.o., Power Systems en 17

    Vyhrazujem

    esivechnaprvanatutodokumentaciainformacevnobsaen.Koprovn,pouvn

    jakoiposto

    upentetmstranmbezsouhlasuautorajepsn

    zakzno.

    ABBs.r.o.

    Wereserveallrightsinthisdo

    cumentandintheinformationcontainedtherein.Reproduction,useor

    disclosuretothirdpartieswithoutexpressauthorityisstrictlyforbidden.

    ABBs.r.o.

    2 Automatic activation of ATS Uninterrupted switching sequences

    2.1 TEST 7 - Automatic activation of ATS by undervoltage U

  • 8/10/2019 ATS MV Description

    18/34

    Doc.kind TECHNICAL DESCRIPTION

    TitleATS MV TESTS

    Resp. Document ID Rev. Lang. Page

    ABB s.r.o., Power Systems en 18

    Vyhrazujem

    esivechnaprvanatutodokumentaciainformacevnobsaen.Koprovn,pouvn

    jakoiposto

    upentetmstranmbezsouhlasuautorajepsn

    zakzno.

    ABBs.r.o.

    Wereserveallrightsinthisdo

    cumentandintheinformationcontainedtherein.Reproduction,useor

    disclosuretothirdpartieswithoutexpressauthorityisstrictlyforbidden.

    ABBs.r.o.

    2.1.3 Potential risks

    Trip of HVS systems.

    2.1.4 Check

    CB 7BBA01 7BBA04 0BBD01 7BBB01 7BBB04 0BBC01 0BBC04 0BBD04

    Initial status O X X O X X X X

    Response X X O X X O X X

    Check

    MV ATS

    Ready YES NO

    On YES NO

    Remote YES NO

    Block YES NO

    Switching - immediately YES NO

    Operation mode No.

    K7 POWER PLANT STATUS

    Boiler MCR

    Turbine load

    Home consumption 7BBT01

    Home consumption 0BBT01

    Tap changer for 7BBT01 in remote and auto YES NO

    Tap changer for 0BBT01 in remote and auto YES NO

    Failures of technology consumersYES NO

    ...........................................................

    ...........................................................

    Questions / Points

  • 8/10/2019 ATS MV Description

    19/34

    Doc.kind TECHNICAL DESCRIPTION

    TitleATS MV TESTS

    Resp. Document ID Rev. Lang. Page

    ABB s.r.o., Power Systems en 19

    Vyhrazujem

    esivechnaprvanatutodokumentaciainformacevnobsaen.Koprovn,pouvn

    jakoiposto

    upentetmstranmbezsouhlasuautorajepsn

    zakzno.

    ABBs.r.o.

    Wereserveallrightsinthisdo

    cumentandintheinformationcontainedtherein.Reproduction,useor

    disclosuretothirdpartieswithoutexpressauthorityisstrictlyforbidden.

    ABBs.r.o.

    2.2 TEST 8 - Automatic activation of ATS by undervoltage U

  • 8/10/2019 ATS MV Description

    20/34

    Doc.kind TECHNICAL DESCRIPTION

    TitleATS MV TESTS

    Resp. Document ID Rev. Lang. Page

    ABB s.r.o., Power Systems en 20

    Vyhrazujem

    esivechnaprvanatutodokumentaciainformacevnobsaen.Koprovn,pouvn

    jakoiposto

    upentetmstranmbezsouhlasuautorajepsn

    zakzno.

    ABBs.r.o.

    Wereserveallrightsinthisdo

    cumentandintheinformationcontainedtherein.Reproduction,useor

    disclosuretothirdpartieswithoutexpressauthorityisstrictlyforbidden.

    ABBs.r.o.

    2.2.2 Expected behavior

    Desired response of ATS - switching-over from inlet 0BBD01 to 7BBA01 and 0BBC01 to 7BBB01 from operation mode No. 3 to mode No. 2. ON and OFF commands will sended to relevant CBs at the sametime. After switching must be ATS Block and Off.

    2.2.3 Potential risks

    Trip of HVS systems and K7 boiler due to allowed voltage range from +- 20% of consumers.

    2.2.4 Check

    CB 7BBA01 7BBA04 0BBD01 7BBB01 7BBB04 0BBC01 0BBC04 0BBD04

    Initial status O X X O X X X X

    Response X X O X X O X X

    Check

    MV ATS

    Ready YES NO

    On YES NO

    Remote YES NO

    Block YES NOSwitching immediately after 5seclower then 80% of Un (5.04kV)

    YES NO

    Operation mode No.

    K7 POWER PLANT STATUS

    Boiler MCR

    Turbine load

    Home consumption 7BBT01

    Home consumption 0BBT01Tap changer for 7BBT01 in remote and auto YES NO

    Tap changer for 0BBT01 in local and not in auto YES NO

    Voltage of 7BBA

    Tap position of 7BBT01

    Tap position of 0BBT01

    Failures of technology consumers

    YES NO

    ...........................................................

    ...........................................................

  • 8/10/2019 ATS MV Description

    21/34

    Doc.kind TECHNICAL DESCRIPTION

    TitleATS MV TESTS

    Resp. Document ID Rev. Lang. Page

    ABB s.r.o., Power Systems en 21

    Vyhrazujem

    esivechnaprvanatutodokumentaciainformacevnobsaen.Koprovn,pouvn

    jakoiposto

    upentetmstranmbezsouhlasuautorajepsn

    zakzno.

    ABBs.r.o.

    Wereserveallrightsinthisdo

    cumentandintheinformationcontainedtherein.Reproduction,useor

    disclosuretothirdpartieswithoutexpressauthorityisstrictlyforbidden.

    ABBs.r.o.

    Questions / Points

    Note:

    Voltage on 35kV bus bar could be changed back to normal conditions. Separation from other consumer

    also not longer necessary.

  • 8/10/2019 ATS MV Description

    22/34

    Doc.kind TECHNICAL DESCRIPTION

    TitleATS MV TESTS

    Resp. Document ID Rev. Lang. Page

    ABB s.r.o., Power Systems en 22

    Vyhrazujem

    esivechnaprvanatutodokumentaciainformacevnobsaen.Koprovn,pouvn

    jakoiposto

    upentetmstranmbezsouhlasuautorajepsn

    zakzno.

    ABBs.r.o.

    Wereserveallrightsinthisdo

    cumentandintheinformationcontainedtherein.Reproduction,useor

    disclosuretothirdpartieswithoutexpressauthorityisstrictlyforbidden.

    ABBs.r.o.

    3 Automatic activation of ATS Residual voltage switching

    3.1 TEST 9 - Automatic activation of ATS by overvoltage U > 1,1 * Un (> 7.0kV)

    K7 POWER PLANT STATUS

    Boiler MCR

    Turbine load

    Home consumption 7BBT01

    Home consumption 0BBT01

    Tap changer for 7BBT01 in remote and auto YES NO

    Voltage of 7BBT01 secondary side(shall be 6.3 kV)

    Tap position of 7BBT01

    Tap changer for 0BBT01 in remote and auto YES NO

    Voltage of 0BBT01 secondary side(shall be 6.3 kV)

    Tap position of 0BBT01

    MV ATS

    Ready YES NO

    On YES NO

    Remote YES NO

    Block YES NO

    Operation mode No.

    Voltage on both inlets present and synchronized

    Protection terminal REF activatedProtection terminals REF are measuring voltage on VTs, there is no failure in voltage measuring circuits

    Initial status - inlet 7BBA01 on, coupling 7BBA04 on and 0BBD04 on, inlet 0BBD01 off, inlet7BBB01 on, coupling 7BBB04 on and 0BBC04 on, inlet 0BBC01 off operation mode No. 2

    3.1.1 Test start by...

    1. Tap changer for 7BBT01 shall be switched to local mode and not automatic

    Tap changer for 7BBT01 in localmode and not in auto

    YES NO

    Voltage of 7BBT01 secondary side

    Tap position of 7BBT01

    2. Increase the voltage by tap changer

  • 8/10/2019 ATS MV Description

    23/34

    Doc.kind TECHNICAL DESCRIPTION

    TitleATS MV TESTS

    Resp. Document ID Rev. Lang. Page

    ABB s.r.o., Power Systems en 23

    Vyhrazujem

    esivechnaprvanatutodokumentaciainformacevnobsaen.Koprovn,pouvn

    jakoiposto

    upentetmstranmbezsouhlasuautorajepsn

    zakzno.

    ABBs.r.o.

    Wereserveallrightsinthisdo

    cumentandintheinformationcontainedtherein.Reproduction,useor

    disclosuretothirdpartieswithoutexpressauthorityisstrictlyforbidden.

    ABBs.r.o.

    3.1.2 Expected behavior

    Desired response of ATS: the CBs (7BBA01, 7BBB01) CLOSE commands of the switching sequencesare transmitted. The CBs (0BBC01, 0BBD01) closing occurs if the busbar residual voltage has dropped to0,4.Un. Transfer to operation mode No. 3, i.e. switching-over from inlet 7BBA01 to inlet 0BBD01 and frominlet 7BBB01 to inlet 0BBC01.

    After switching must be ATS Block and Off.

    3.1.3 Potential risks

    Trip of HVS systems and K7 boiler due to high voltage.

    3.1.4 Check

    CB 7BBA01 7BBA04 0BBD01 7BBB01 7BBB04 0BBC01 0BBC04 0BBD04

    Initial status X X O X X O X X

    Response O X X O X X X X

    Check

    MV ATS

    Ready YES NO

    On YES NO

    Remote YES NOBlock YES NO

    Operation mode No.

    K7 POWER PLANT STATUS

    Boiler MCR

    Turbine load

    Home consumption 7BBT01

    Home consumption 0BBT01

    Tap changer for 7BBT01 in local and not in auto YES NO

    Voltage of 7BBT01 secondary side

    Tap position of 7BBT01

    Tap changer for 0BBT01 in remote and auto YES NO

    Voltage of 0BBT01 secondary side(shall be 6.3 kV)

    Tap position of 0BBT01

    Failures of technology consumersYES NO

    ...........................................................

    ...........................................................

  • 8/10/2019 ATS MV Description

    24/34

    Doc.kind TECHNICAL DESCRIPTION

    TitleATS MV TESTS

    Resp. Document ID Rev. Lang. Page

    ABB s.r.o., Power Systems en 24

    Vyhrazujem

    esivechnaprvanatutodokumentaciainformacevnobsaen.Koprovn,pouvn

    jakoiposto

    upentetmstranmbezsouhlasuautorajepsn

    zakzno.

    ABBs.r.o.

    Wereserveallrightsinthisdo

    cumentandintheinformationcontainedtherein.Reproduction,useor

    disclosuretothirdpartieswithoutexpressauthorityisstrictlyforbidden.

    ABBs.r.o.

    Questions / Points

  • 8/10/2019 ATS MV Description

    25/34

    Doc.kind TECHNICAL DESCRIPTION

    TitleATS MV TESTS

    Resp. Document ID Rev. Lang. Page

    ABB s.r.o., Power Systems en 25

    Vyhrazujem

    esivechnaprvanatutodokumentaciainformacevnobsaen.Koprovn,pouvn

    jakoiposto

    upentetmstranmbezsouhlasuautorajepsn

    zakzno.

    ABBs.r.o.

    Wereserveallrightsinthisdo

    cumentandintheinformationcontainedtherein.Reproduction,useor

    disclosuretothirdpartieswithoutexpressauthorityisstrictlyforbidden.

    ABBs.r.o.

    3.2 TEST 10 - Transfer from operation mode No. 2 to operation mode No. 3 -

    U>10%

    3.2.1 Preconditions

    K7 POWER PLANT STATUS

    Boiler MCR

    Turbine load

    Home consumption 7BBT01Home consumption 0BBT01

    Tap changer for 7BBT01 in remote and auto YES NO

    Voltage of 7BBT01 secondary side(shall be 6.3 kV)

    Tap position of 7BBT01 (shall be 11)

    Tap changer for 0BBT01 in remote and auto YES NO

    Voltage of 0BBT01 secondary side(shall be 6.3 kV)

    Tap position of 0BBT01 (shall be 11)

    MV ATS

    Ready YES NO

    On YES NO

    Remote YES NO

    Block YES NO

    Operation mode No.

    Voltage on both inlets present and synchronizedProtection terminal REF activated

    Protection terminals REF are measuring voltage on VTs, there is no failure in voltage measuring circuits

    Initial status - inlet 7BBA01 on, coupling 7BBA04 on, coupling 0BBD04 on, inlet 0BBD01 off,inlet 7BBB01 on, coupling 7BBB04 on and 0BBC04 on, inlet 0BBC01 off operation mode No. 2

    3.2.2 Test start by...

    Settings DU>0,1.Unby tapchanger 7BBT01 and (or) 0BBT01. Therefore voltage of 7BBT01 shall beincreased by 5 positions to >6.678kV and voltage of 0BBT01 shall be decreased by 5 positions to 6.678 kV)

  • 8/10/2019 ATS MV Description

    26/34

    Doc.kind TECHNICAL DESCRIPTION

    TitleATS MV TESTS

    Resp. Document ID Rev. Lang. Page

    ABB s.r.o., Power Systems en 26

    Vyhrazujem

    esivechnaprvanatutodokumentaciainformacevnobsaen.Koprovn,pouvn

    jakoiposto

    upentetmstranmbezsouhlasuautorajepsn

    zakzno.

    ABBs.r.o.

    Wereserveallrightsinthisdo

    cumentandintheinformationcontainedtherein.Reproduction,useor

    disclosuretothirdpartieswithoutexpressauthorityisstrictlyforbidden.

    ABBs.r.o.

    Tap position of 7BBT01 (shall be 16)

    Tap changer for 0BBT01 in local and not inauto

    YES NO

    Voltage of 0BBT01 secondary side(shall be

  • 8/10/2019 ATS MV Description

    27/34

    Doc.kind TECHNICAL DESCRIPTION

    TitleATS MV TESTS

    Resp. Document ID Rev. Lang. Page

    ABB s.r.o., Power Systems en 27

    Vyhrazujem

    esivechnaprvanatutodokumentaciainformacevnobsaen.Koprovn,pouvn

    jakoiposto

    upentetmstranmbezsouhlasuautorajepsn

    zakzno.

    ABBs.r.o.

    Wereserveallrightsinthisdo

    cumentandintheinformationcontainedtherein.Reproduction,useor

    disclosuretothirdpartieswithoutexpressauthorityisstrictlyforbidden.

    ABBs.r.o.

    Tap changer for 0BBT01 in remote and auto YES NO

    Voltage of 0BBT01 secondary side(shall be 6.3 kV)

    Tap position of 0BBT01 (shall be 11)

    Failures of technology consumersYES NO

    ...........................................................

    ...........................................................

    Questions / Points

  • 8/10/2019 ATS MV Description

    28/34

    Doc.kind TECHNICAL DESCRIPTION

    TitleATS MV TESTS

    Resp. Document ID Rev. Lang. Page

    ABB s.r.o., Power Systems en 28

    Vyhrazujem

    esivechnaprvanatutodokumentaciainformacevnobsaen.Koprovn,pouvn

    jakoiposto

    upentetmstranmbezsouhlasuautorajepsn

    zakzno.

    ABBs.r.o.

    Wereserveallrightsinthisdo

    cumentandintheinformationcontainedtherein.Reproduction,useor

    disclosuretothirdpartieswithoutexpressauthorityisstrictlyforbidden.

    ABBs.r.o.

    3.3 TEST 11 - Fire alarm in unit transformer box (main protection)

    Simulation of active one sensor inside of unit transformer box. FAS will send command to protectionsystem to deenergize unit transformer, auxilliary transformer and ripple filter. As result ATS shall act withinterruption - switching with residual voltage.

    NOTE: This test will done together with FAS test and deluge test in unit transformer box.

    3.3.1 Preconditions

    K7 POWER PLANT STATUS

    Boiler MCR

    Turbine load

    Home consumption 7BBT01

    Home consumption 0BBT01

    Redundant power supply of all threefeed water pumps

    YES NO

    MV ATS

    Ready YES NO

    On YES NO

    Remote YES NO

    Block YES NO

    Operation mode No.

    Voltage on both inlets present and synchronizedProtection terminal REF activatedProtection terminals REF are measuring voltage on VTs, there is no failure in voltage measuring circuits

    Initial status - inlet 7BBA01 on, coupling 7BBA04 on and 0BBD04 on, inlet 0BBD01 off, inlet

    7BBB01 on, coupling 7BBB04 on and 0BBC04 on, inlet 0BBC01 off operation mode No. 2

    3.3.2 Test start by...

    Simulation of active one maximum temperature detectors FAS inside of unit transformer box.

    3.3.3 Expected behavior

    Desired response of ATS: the CBs (7BBA01, 7BBB01) CLOSE commands of the switching sequencesare transmitted. The CBs (0BBC01, 0BBD01) closing occurs if the busbar residual voltage has dropped to

    0,4.Un. Transfer to operation mode No. 3, i.e. switching-over from inlet 7BBA01 to inlet 0BBD01 and frominlet 7BBB01 to inlet 0BBC01.

    After switching must be ATS Block and Off.

  • 8/10/2019 ATS MV Description

    29/34

    Doc.kind TECHNICAL DESCRIPTION

    TitleATS MV TESTS

    Resp. Document ID Rev. Lang. Page

    ABB s.r.o., Power Systems en 29

    Vyhrazujem

    esivechnaprvanatutodokumentaciainformacevnobsaen.Koprovn,pouvn

    jakoiposto

    upentetmstranmbezsouhlasuautorajepsn

    zakzno.

    ABBs.r.o.

    Wereserveallrightsinthisdo

    cumentandintheinformationcontainedtherein.Reproduction,useor

    disclosuretothirdpartieswithoutexpressauthorityisstrictlyforbidden.

    ABBs.r.o.

    3.3.4 Potential risks

    Trip of HVS systems.

    3.3.5 Check

    CB 7BBA01 7BBA04 0BBD01 7BBB01 7BBB04 0BBC01 0BBC04 0BBD04

    Initial status X X O X X O X X

    Response O X X O X X X X

    Check

    MV ATS

    Ready YES NO

    On YES NO

    Remote YES NO

    Block YES NO

    Operation mode No.

    K7 POWER PLANT STATUS

    Boiler MCR

    Turbine load

    Home consumption 7BBT01

    Home consumption 0BBT01

    Failures of technology consumersYES NO

    ...........................................................

    ...........................................................

    Questions / Points

  • 8/10/2019 ATS MV Description

    30/34

  • 8/10/2019 ATS MV Description

    31/34

    Doc.kind TECHNICAL DESCRIPTION

    TitleATS MV TESTS

    Resp. Document ID Rev. Lang. Page

    ABB s.r.o., Power Systems en 31

    Vyhrazujem

    esivechnaprvanatutodokumentaciainformacevnobsaen.Koprovn,pouvn

    jakoiposto

    upentetmstranmbezsouhlasuautorajepsn

    zakzno.

    ABBs.r.o.

    Wereserveallrightsinthisdo

    cumentandintheinformationcontainedtherein.Reproduction,useor

    disclosuretothirdpartieswithoutexpressauthorityisstrictlyforbidden.

    ABBs.r.o.

    3.4.4 Potential risks

    Trip of HVS system.

    3.4.5 Check

    CB 7BBA01 7BBA04 0BBD01 7BBB01 7BBB04 0BBC01 0BBC04 0BBD04

    Initial status O X X O X X X X

    Response X X O X X O X X

    Check

    MV ATS

    Ready YES NO

    On YES NO

    Remote YES NO

    Block YES NO

    Operation mode No.

    K7 POWER PLANT STATUS

    Boiler MCR

    Turbine load

    Home consumption 7BBT01

    Home consumption 0BBT01

    Failures of technology consumersYES NO

    ...........................................................

    ...........................................................

    Questions / Points

  • 8/10/2019 ATS MV Description

    32/34

    Doc.kind TECHNICAL DESCRIPTION

    TitleATS MV TESTS

    Resp. Document ID Rev. Lang. Page

    ABB s.r.o., Power Systems en 32

    Vyhrazujem

    esivechnaprvanatutodokumentaciainformacevnobsaen.Koprovn,pouvn

    jakoiposto

    upentetmstranmbezsouhlasuautorajepsn

    zakzno.

    ABBs.r.o.

    Wereserveallrightsinthisdo

    cumentandintheinformationcontainedtherein.Reproduction,useor

    disclosuretothirdpartieswithoutexpressauthorityisstrictlyforbidden.

    ABBs.r.o.

    4 Switching with time delay

    4.1 TEST 13 - Transfer from operation mode No. 2 to operation mode No. 3 if the voltage

    measuring system is faulty

    4.1.1 Preconditions

    K7 POWER PLANT STATUS

    Boiler MCRTurbine load

    Home consumption 7BBT01

    Home consumption 0BBT01

    MV ATS

    Ready YES NO

    On YES NO

    Remote YES NO

    Block YES NO

    Operation mode No.

    Voltage on both inlets present and synchronized

    Protection terminal REF activatedProtection terminals REF are measuring voltage on VTs, there is no failure in voltage measuring circuits

    Initial status - inlet 7BBA01 on, coupling 7BBA04 on, coupling 0BBD04 on, inlet 0BBD01 off,inlet 7BBB01 on, coupling 7BBB04 on and 0BBC04 on, inlet 0BBC01 off operation mode No. 2

    4.1.2 Test start by...

    Simulation of failure in voltage measuring circuits - tripping FCM18 in the panel 7BBA01 and 7BBB01.

    2x pushing of S43 push-button4.1.3 Expected behavior

    Desired response of ATS: switching-over from inlet 7BBA01 to 0BBD01 and 7BBB01 to 0BBC01 from

    operation mode No. 2 to mode No. 3. Switching leads to power supply interruption the delay corresponds tothe time limit of REF internal logic (1 s).

    After switching must be ATS Block and Off.

  • 8/10/2019 ATS MV Description

    33/34

    Doc.kind TECHNICAL DESCRIPTION

    TitleATS MV TESTS

    Resp. Document ID Rev. Lang. Page

    ABB s.r.o., Power Systems en 33

    Vyhrazujem

    esivechnaprvanatutodokumentaciainformacevnobsaen.Koprovn,pouvn

    jakoiposto

    upentetmstranmbezsouhlasuautorajepsn

    zakzno.

    ABBs.r.o.

    Wereserveallrightsinthisdo

    cumentandintheinformationcontainedtherein.Reproduction,useor

    disclosuretothirdpartieswithoutexpressauthorityisstrictlyforbidden.

    ABBs.r.o.

    4.1.4 Potential risks

    Trip of K7 boiler.

    4.1.5 Check

    CB 7BBA01 7BBA04 0BBD01 7BBB01 7BBB04 0BBC01 0BBC04 0BBD04

    Initial status X X O X X O X X

    Response O X X O X X X X

    Check

    MV ATS

    Ready YES NO

    On YES NO

    Remote YES NO

    Block YES NO

    Switching time delay 1s YES NO

    Operation mode No.

    MV SWITCHGEARS

    7BBA01 FCM18 - OFF YES NO

    7BBB01 FCM18 - OFF YES NO

    K7 POWER PLANT STATUS

    Boiler MCR

    Turbine load

    Home consumption 7BBT01

    Home consumption 0BBT01Redundant power supply of all three feed waterpumps

    YES NO

    Failures of technology consumersYES NO

    ...........................................................

    ...........................................................

    Questions / Points

  • 8/10/2019 ATS MV Description

    34/34

    Vyhrazujem

    esivechnaprvanatutodokumentaciainformacevnobsaen.Koprovn,pouvn

    jakoiposto

    upentetmstranmbezsouhlasuautorajepsn

    zakzno.

    ABBs.r.o.

    Wereserveallrightsinthisdo

    cumentandintheinformationcontainedtherein.Reproduction,useor

    disclosuretothirdpartieswithoutexpressauthorityisstrictlyforbidden.

    ABBs.r.o.

    5 Other tests

    Other tests were tested in factory during FAT, tested then on site without any motor load. These tests were

    sufficient and there is no need to repeat them.