Created Haluza Based on Ext.doc.id Status
Approved Kubelka Customer Alpiq Generation (CZ) Doc. kind TECHNICAL DESCRIPTIONProject Title
ATS MV TESTSKLADNO K7 POWER PLANT
MAIN ELECTRIC SYSTEMS Ref. designation DCC
=7B__ &EEC100Resp. Project ID Document ID Rev. Release date Lang. Page
ABB s.r.o., Power Systems D1060 2013-10-25 en 1/ 34
7&&-AB-E0-DS-0007-0-EAlpiq Generation (CZ) s.r.o.Dubsk 257CZ - 272 03 Kladno
Customer Principal Customer Doc. No.
Kraftanlagen Power Plants GmbHRidlerstr. 31cD - 80339 Mnchen
TECHNICAL REPORT
ATS MV TESTS
8/10/2019 ATS MV Description
2/34
Doc.kind TECHNICAL DESCRIPTION
TitleATS MV TESTS
Resp. Document ID Rev. Lang. Page
ABB s.r.o., Power Systems en 2
Vyhrazujem
esivechnaprvanatutodokumentaciainformacevnobsaen.Koprovn,pouvn
jakoiposto
upentetmstranmbezsouhlasuautorajepsn
zakzno.
ABBs.r.o.
Wereserveallrightsinthisdo
cumentandintheinformationcontainedtherein.Reproduction,useor
disclosuretothirdpartieswithoutexpressauthorityisstrictlyforbidden.
ABBs.r.o.
CONTENT
GENERAL............................................................................................................................................... 4
1 Switching-over sequence with overlapping.................................................................................. 5
1.1 TEST 1 - Transfer from operation mode No. 1 to operation mode No. 2 ................................... 51.1.1 Preconditions.............................................................................................................................. 51.1.2 Test start by................................................................................................................................ 5
1.1.3 Expected behavior...................................................................................................................... 51.1.4 Potential risks............................................................................................................................. 61.1.5 Check......................................................................................................................................... 6
1.2 TEST 2 - Transfer from operation mode No. 2 to operation mode No. 3 ................................... 71.2.1 Preconditions.............................................................................................................................. 7
1.2.2 Test start by................................................................................................................................ 71.2.3 Expected behavior...................................................................................................................... 71.2.4 Potential risks............................................................................................................................. 71.2.5 Check......................................................................................................................................... 8
1.3 TEST 3 - Transfer from operation mode No. 3 to operation mode No. 1 ................................... 91.3.1 Preconditions.............................................................................................................................. 9
1.3.2 Test start by................................................................................................................................ 91.3.3 Expected behavior...................................................................................................................... 91.3.4 Potential risks............................................................................................................................. 91.3.5 Check....................................................................................................................................... 10
1.4 TEST 4 - Transfer from operation mode No. 1 to operation mode No. 5 ................................. 111.4.1 Preconditions............................................................................................................................ 111.4.2 Test start by.............................................................................................................................. 11
1.4.3 Expected behavior.................................................................................................................... 111.4.4 Potential risks........................................................................................................................... 121.4.5 Check....................................................................................................................................... 12
1.5 TEST 5 - Transfer from operation mode No. 5 to operation mode No. 4 ................................. 13
1.5.1 Preconditions............................................................................................................................ 131.5.2 Test start by.............................................................................................................................. 13
1.5.3 Expected behavior.................................................................................................................... 131.5.4 Potential risks........................................................................................................................... 141.5.5 Check....................................................................................................................................... 14
1.6 TEST 6 - Transfer from operation mode No. 4 to operation mode No. 2 ................................. 151.6.1 Preconditions............................................................................................................................ 151.6.2 Test start by.............................................................................................................................. 151.6.3 Expected behavior.................................................................................................................... 151.6.4 Potential risks........................................................................................................................... 161.6.5 Check....................................................................................................................................... 16
2 Automatic activation of ATS Uninterrupted switching sequences......................................... 172.1 TEST 7 - Automatic activation of ATS by undervoltage U
8/10/2019 ATS MV Description
3/34
Doc.kind TECHNICAL DESCRIPTION
TitleATS MV TESTS
Resp. Document ID Rev. Lang. Page
ABB s.r.o., Power Systems en 3
Vyhrazujem
esivechnaprvanatutodokumentaciainformacevnobsaen.Koprovn,pouvn
jakoiposto
upentetmstranmbezsouhlasuautorajepsn
zakzno.
ABBs.r.o.
Wereserveallrightsinthisdo
cumentandintheinformationcontainedtherein.Reproduction,useor
disclosuretothirdpartieswithoutexpressauthorityisstrictlyforbidden.
ABBs.r.o.
3.1 TEST 9 - Automatic activation of ATS by overvoltage U > 1,1 * Un (> 7.0kV)........................ 223.1.1 Test start by.............................................................................................................................. 22
3.1.2 Expected behavior.................................................................................................................... 233.1.3 Potential risks........................................................................................................................... 233.1.4 Check....................................................................................................................................... 23
3.2 TEST 10 - Transfer from operation mode No. 2 to operation mode No. 3 -
U>10% .............. 253.2.1 Preconditions............................................................................................................................ 253.2.2 Test start by.............................................................................................................................. 25
3.2.3 Expected behavior.................................................................................................................... 263.2.4 Potential risks........................................................................................................................... 263.2.5 Check....................................................................................................................................... 26
3.3 TEST 11 - Fire alarm in unit transformer box (main protection) ............................................ 283.3.1 Preconditions............................................................................................................................ 283.3.2 Test start by.............................................................................................................................. 28
3.3.3 Expected behavior.................................................................................................................... 283.3.4 Potential risks........................................................................................................................... 293.3.5 Check....................................................................................................................................... 29
3.4 TEST 12 - Simulation of failure in backup transformer (main protection) ............................. 303.4.1 Preconditions............................................................................................................................ 30
3.4.2 Test start by.......................................................................................................................... 303.4.3 Expected behavior.................................................................................................................... 303.4.4 Potential risks........................................................................................................................... 313.4.5 Check....................................................................................................................................... 31
4 Switching with time delay .......................................................................................................... 32
4.1 TEST 13 - Transfer from operation mode No. 2 to operation mode No. 3 if the voltagemeasuring system is faulty .................................................................................................................. 32
4.1.1 Preconditions............................................................................................................................ 324.1.2 Test start by.............................................................................................................................. 32
4.1.3 Expected behavior.................................................................................................................... 324.1.4 Potential risks........................................................................................................................... 33
4.1.5 Check....................................................................................................................................... 33
5 Other tests................................................................................................................................... 34
8/10/2019 ATS MV Description
4/34
8/10/2019 ATS MV Description
5/34
Doc.kind TECHNICAL DESCRIPTION
TitleATS MV TESTS
Resp. Document ID Rev. Lang. Page
ABB s.r.o., Power Systems en 5
Vyhrazujem
esivechnaprvanatutodokumentaciainformacevnobsaen.Koprovn,pouvn
jakoiposto
upentetmstranmbezsouhlasuautorajepsn
zakzno.
ABBs.r.o.
Wereserveallrightsinthisdo
cumentandintheinformationcontainedtherein.Reproduction,useor
disclosuretothirdpartieswithoutexpressauthorityisstrictlyforbidden.
ABBs.r.o.
1 Switching-over sequence with overlapping
1.1 TEST 1 - Transfer from operation mode No. 1 to operation mode No. 2
Switching-over sequence with overlapping will be carried out manually on ATS panel.
1.1.1 Preconditions
K7 POWER PLANT STATUS
Boiler MCRTurbine load
Home consumption 7BBT01
Home consumption 0BBT01
Tap changer for 7BBT01 in remote and auto YES NO
Voltage of 7BBT01 secondary side(shall be 6.3 kV)
Tap position of 7BBT01 (shall be 11)
Tap changer for 0BBT01 in remote and auto YES NO
Voltage of 0BBT01 secondary side(shall be 6.3 kV)
Tap position of 0BBT01 (shall be 11)
Redundant power supply of all three feedwater pumps
YES NO
MV ATS
Ready YES NO
On YES NO
Remote YES NO
Block YES NO
Operation mode No.
Voltage on both inlets present and synchronizedProtection terminal REF activatedProtection terminals REF are measuring voltage on VTs, there is no failure in voltage measuring circuits
Initial status - inlet 7BBA01 on, coupling 7BBA04 off and 0BBD04 on, inlet 0BBD01 on, inlet7BBB01 on, coupling 7BBB04 off and 0BBC04 on, inlet 0BBC01 on operation mode No. 1
1.1.2 Test start by...
2x pushing of S42 push-button
1.1.3 Expected behavior
Desired response of ATS - transfer to operation mode No. 2, i.e. switching-over from inlet 0BBD01 tocoupling 7BBA04 and from inlet 0BBC01 to coupling 7BBB04.
8/10/2019 ATS MV Description
6/34
Doc.kind TECHNICAL DESCRIPTION
TitleATS MV TESTS
Resp. Document ID Rev. Lang. Page
ABB s.r.o., Power Systems en 6
Vyhrazujem
esivechnaprvanatutodokumentaciainformacevnobsaen.Koprovn,pouvn
jakoiposto
upentetmstranmbezsouhlasuautorajepsn
zakzno.
ABBs.r.o.
Wereserveallrightsinthisdo
cumentandintheinformationcontainedtherein.Reproduction,useor
disclosuretothirdpartieswithoutexpressauthorityisstrictlyforbidden.
ABBs.r.o.
1.1.4 Potential risks
Trip of HVS systems.
1.1.5 Check
CB 7BBA01 7BBA04 0BBD01 7BBB01 7BBB04 0BBC01 0BBC04 0BBD04
Initial status X O X X O X X X
Response X X O X X O X X
Check
MV ATS
Ready YES NO
On YES NO
Remote YES NO
Block YES NO
Operation mode No.
K7 POWER PLANT STATUS
Boiler MCR
Turbine load
Home consumption 7BBT01
Home consumption 0BBT01
Failures of technology consumersYES NO
...........................................................
...........................................................
Questions / Points
8/10/2019 ATS MV Description
7/34
Doc.kind TECHNICAL DESCRIPTION
TitleATS MV TESTS
Resp. Document ID Rev. Lang. Page
ABB s.r.o., Power Systems en 7
Vyhrazujem
esivechnaprvanatutodokumentaciainformacevnobsaen.Koprovn,pouvn
jakoiposto
upentetmstranmbezsouhlasuautorajepsn
zakzno.
ABBs.r.o.
Wereserveallrightsinthisdo
cumentandintheinformationcontainedtherein.Reproduction,useor
disclosuretothirdpartieswithoutexpressauthorityisstrictlyforbidden.
ABBs.r.o.
1.2 TEST 2 - Transfer from operation mode No. 2 to operation mode No. 3
Switching-over sequence with overlapping will be carried out manually on ATS panel.
1.2.1 Preconditions
K7 POWER PLANT STATUS
Boiler MCR
Turbine loadHome consumption 7BBT01
Home consumption 0BBT01
MV ATS
Ready YES NO
On YES NO
Remote YES NO
Block YES NO
Operation mode No.
Voltage on both inlets present and synchronizedProtection terminal REF activatedProtection terminals REF are measuring voltage on VTs, there is no failure in voltage measuring circuits
Initial status - inlet 7BBA01 on, coupling 7BBA04 on, coupling 0BBD04 on, inlet 0BBD01 off,
inlet 7BBB01 on, coupling 7BBB04 on and 0BBC04 on, inlet 0BBC01 off operation mode No. 2
1.2.2 Test start by...
2x pushing of S43 push-button
1.2.3 Expected behavior
Desired response of ATS - transfer to operation mode No. 3, i.e. switching-over from inlet 7BBA01 toinlet 0BBD01 and from inlet 7BBB01 to inlet 0BBC01.
1.2.4 Potential risks
Trip of K7 power plant.
8/10/2019 ATS MV Description
8/34
Doc.kind TECHNICAL DESCRIPTION
TitleATS MV TESTS
Resp. Document ID Rev. Lang. Page
ABB s.r.o., Power Systems en 8
Vyhrazujem
esivechnaprvanatutodokumentaciainformacevnobsaen.Koprovn,pouvn
jakoiposto
upentetmstranmbezsouhlasuautorajepsn
zakzno.
ABBs.r.o.
Wereserveallrightsinthisdo
cumentandintheinformationcontainedtherein.Reproduction,useor
disclosuretothirdpartieswithoutexpressauthorityisstrictlyforbidden.
ABBs.r.o.
1.2.5 Check
CB 7BBA01 7BBA04 0BBD01 7BBB01 7BBB04 0BBC01 0BBC04 0BBD04
Initial status X X O X X O X X
Response O X X O X X X X
Check
MV ATS
Ready YES NO
On YES NO
Remote YES NO
Block YES NO
Operation mode No.
K7 POWER PLANT STATUS
Boiler MCR
Turbine load
Home consumption 7BBT01
Home consumption 0BBT01
Failures of technology consumersYES NO
...........................................................
...........................................................
Questions / Points
8/10/2019 ATS MV Description
9/34
Doc.kind TECHNICAL DESCRIPTION
TitleATS MV TESTS
Resp. Document ID Rev. Lang. Page
ABB s.r.o., Power Systems en 9
Vyhrazujem
esivechnaprvanatutodokumentaciainformacevnobsaen.Koprovn,pouvn
jakoiposto
upentetmstranmbezsouhlasuautorajepsn
zakzno.
ABBs.r.o.
Wereserveallrightsinthisdo
cumentandintheinformationcontainedtherein.Reproduction,useor
disclosuretothirdpartieswithoutexpressauthorityisstrictlyforbidden.
ABBs.r.o.
1.3 TEST 3 - Transfer from operation mode No. 3 to operation mode No. 1
Switching-over sequence with overlapping will be carried out manually on DCS panel.
1.3.1 Preconditions
K7 POWER PLANT STATUS
Boiler MCR
Turbine loadHome consumption 7BBT01
Home consumption 0BBT01
MV ATS
Ready YES NO
On YES NO
Remote YES NO
Block YES NO
Operation mode No.
Voltage on both inlets present and synchronizedProtection terminal REF activatedProtection terminals REF are measuring voltage on VTs, there is no failure in voltage measuring circuits
Initial status - inlet 7BBA01 off, coupling 7BBA04 on and 0BBD04 on, inlet 0BBD01 on, inlet
7BBB01 off, coupling 7BBB04 on and 0BBC04 on, inlet 0BBC01 on operation mode No. 3
1.3.2 Test start by...
2x pushing of DCS buttons for state 1
1.3.3 Expected behavior
Desired response of ATS - transfer to operation mode No. 1, i.e. switching-over from coupling 7BBA04to inlet 7BBA01 and from coupling 7BBB04 to inlet 7BBB01.
1.3.4 Potential risks
Trip of K7 boiler.
8/10/2019 ATS MV Description
10/34
Doc.kind TECHNICAL DESCRIPTION
TitleATS MV TESTS
Resp. Document ID Rev. Lang. Page
ABB s.r.o., Power Systems en 10
Vyhrazujem
esivechnaprvanatutodokumentaciainformacevnobsaen.Koprovn,pouvn
jakoiposto
upentetmstranmbezsouhlasuautorajepsn
zakzno.
ABBs.r.o.
Wereserveallrightsinthisdo
cumentandintheinformationcontainedtherein.Reproduction,useor
disclosuretothirdpartieswithoutexpressauthorityisstrictlyforbidden.
ABBs.r.o.
1.3.5 Check
CB 7BBA01 7BBA04 0BBD01 7BBB01 7BBB04 0BBC01 0BBC04 0BBD04
Initial status O X X O X X X X
Response X O X X O X X X
Check
MV ATS
Ready YES NO
On YES NO
Remote YES NO
Block YES NO
Operation mode No.
K7 POWER PLANT STATUS
Boiler MCR
Turbine load
Home consumption 7BBT01
Home consumption 0BBT01
Failures of technology consumers
YES NO
...........................................................
...........................................................
Questions / Points
8/10/2019 ATS MV Description
11/34
Doc.kind TECHNICAL DESCRIPTION
TitleATS MV TESTS
Resp. Document ID Rev. Lang. Page
ABB s.r.o., Power Systems en 11
Vyhrazujem
esivechnaprvanatutodokumentaciainformacevnobsaen.Koprovn,pouvn
jakoiposto
upentetmstranmbezsouhlasuautorajepsn
zakzno.
ABBs.r.o.
Wereserveallrightsinthisdo
cumentandintheinformationcontainedtherein.Reproduction,useor
disclosuretothirdpartieswithoutexpressauthorityisstrictlyforbidden.
ABBs.r.o.
1.4 TEST 4 - Transfer from operation mode No. 1 to operation mode No. 5
Switching-over sequence with overlapping will be carried out manually on DCS panel.
1.4.1 Preconditions
K7 POWER PLANT STATUS
Boiler MCR
Turbine loadHome consumption 7BBT01
Home consumption 0BBT01
Redundant power supply of all three feedwater pumps
YES NO
MV ATS
Ready YES NO
On YES NO
Remote YES NO
Block YES NO
Operation mode No.
Voltage on both inlets present and synchronized
Protection terminal REF activatedProtection terminals REF are measuring voltage on VTs, there is no failure in voltage measuring circuits
Initial status - inlet 7BBA01 on, coupling 7BBA04 off, coupling 0BBD04 on, inlet 0BBD01 on,inlet 7BBB01 on, coupling 7BBB04 off and 0BBC04 on, inlet 0BBC01 on operation mode No. 1
1.4.2 Test start by...
2x pushing of DCS button for state 5
1.4.3 Expected behavior
Desired response of ATS - transfer to operation mode No. 5, i.e. switching-over from inlet 0BBD01 tocoupling 7BBA04 and from inlet 7BBB01 to coupling 7BBB04.
8/10/2019 ATS MV Description
12/34
Doc.kind TECHNICAL DESCRIPTION
TitleATS MV TESTS
Resp. Document ID Rev. Lang. Page
ABB s.r.o., Power Systems en 12
Vyhrazujem
esivechnaprvanatutodokumentaciainformacevnobsaen.Koprovn,pouvn
jakoiposto
upentetmstranmbezsouhlasuautorajepsn
zakzno.
ABBs.r.o.
Wereserveallrightsinthisdo
cumentandintheinformationcontainedtherein.Reproduction,useor
disclosuretothirdpartieswithoutexpressauthorityisstrictlyforbidden.
ABBs.r.o.
1.4.4 Potential risks
Trip of HVS systems and K7 boiler.
1.4.5 Check
CB 7BBA01 7BBA04 0BBD01 7BBB01 7BBB04 0BBC01 0BBC04 0BBD04
Initial status X O X X O X X X
Response X X O O X X X X
Check
MV ATS
Ready YES NO
On YES NO
Remote YES NO
Block YES NO
Operation mode No.
K7 POWER PLANT STATUS
Boiler MCR
Turbine load
Home consumption 7BBT01
Home consumption 0BBT01
Redundant power supply of all three feedwater pumps
YES NO
Failures of technology consumers
YES NO
...........................................................
...........................................................
Questions / Points
8/10/2019 ATS MV Description
13/34
Doc.kind TECHNICAL DESCRIPTION
TitleATS MV TESTS
Resp. Document ID Rev. Lang. Page
ABB s.r.o., Power Systems en 13
Vyhrazujem
esivechnaprvanatutodokumentaciainformacevnobsaen.Koprovn,pouvn
jakoiposto
upentetmstranmbezsouhlasuautorajepsn
zakzno.
ABBs.r.o.
Wereserveallrightsinthisdo
cumentandintheinformationcontainedtherein.Reproduction,useor
disclosuretothirdpartieswithoutexpressauthorityisstrictlyforbidden.
ABBs.r.o.
1.5 TEST 5 - Transfer from operation mode No. 5 to operation mode No. 4
Switching-over sequence with overlapping will be carried out manually on ATS panel.
1.5.1 Preconditions
K7 POWER PLANT STATUS
Boiler MCR
Turbine loadHome consumption 7BBT01
Home consumption 0BBT01
Redundant power supply of all threefeed water pumps
YES NO
MV ATS
Ready YES NO
On YES NO
Remote YES NO
Block YES NO
Operation mode No.
Voltage on both inlets present and synchronized
Protection terminal REF activatedProtection terminals REF are measuring voltage on VTs, there is no failure in voltage measuring circuits
Initial status - inlet 7BBA01 on, coupling 7BBA04 on, coupling 0BBD04 on, inlet 0BBD01 off,inlet 7BBB01 off, coupling 7BBB04 on and 0BBC04 on, inlet 0BBC01 on operation mode No. 5
1.5.2 Test start by...
2x pushing of S44 push-button
1.5.3 Expected behavior
Desired response of ATS - transfer to operation mode No. 4, i.e. switching-over from inlet 7BBA01 to
inlet 0BBD01 and from inlet 0BBC01 to inlet 7BBB01.
8/10/2019 ATS MV Description
14/34
Doc.kind TECHNICAL DESCRIPTION
TitleATS MV TESTS
Resp. Document ID Rev. Lang. Page
ABB s.r.o., Power Systems en 14
Vyhrazujem
esivechnaprvanatutodokumentaciainformacevnobsaen.Koprovn,pouvn
jakoiposto
upentetmstranmbezsouhlasuautorajepsn
zakzno.
ABBs.r.o.
Wereserveallrightsinthisdo
cumentandintheinformationcontainedtherein.Reproduction,useor
disclosuretothirdpartieswithoutexpressauthorityisstrictlyforbidden.
ABBs.r.o.
1.5.4 Potential risks
Trip of HVS systems and K7 boiler.
1.5.5 Check
CB 7BBA01 7BBA04 0BBD01 7BBB01 7BBB04 0BBC01 0BBC04 0BBD04
Initial status X X O O X X X X
Response O X X X X O X X
Check
MV ATS
Ready YES NO
On YES NO
Remote YES NO
Block YES NO
Operation mode No.
K7 POWER PLANT STATUS
Boiler MCR
Turbine load
Home consumption 7BBT01
Home consumption 0BBT01
Redundant power supply of all three feedwater pumps
YES NO
Failures of technology consumers
YES NO
...........................................................
...........................................................
Questions / Points
8/10/2019 ATS MV Description
15/34
Doc.kind TECHNICAL DESCRIPTION
TitleATS MV TESTS
Resp. Document ID Rev. Lang. Page
ABB s.r.o., Power Systems en 15
Vyhrazujem
esivechnaprvanatutodokumentaciainformacevnobsaen.Koprovn,pouvn
jakoiposto
upentetmstranmbezsouhlasuautorajepsn
zakzno.
ABBs.r.o.
Wereserveallrightsinthisdo
cumentandintheinformationcontainedtherein.Reproduction,useor
disclosuretothirdpartieswithoutexpressauthorityisstrictlyforbidden.
ABBs.r.o.
1.6 TEST 6 - Transfer from operation mode No. 4 to operation mode No. 2
Switching-over sequence with overlapping will be carried out manually on DCS panel.
1.6.1 Preconditions
K7 POWER PLANT STATUS
Boiler MCR
Turbine loadHome consumption 7BBT01
Home consumption 0BBT01
Redundant power supply of all threefeed water pumps
YES NO
MV ATS
Ready YES NO
On YES NO
Remote YES NO
Block YES NO
Operation mode No.
Voltage on both inlets present and synchronized
Protection terminal REF activatedProtection terminals REF are measuring voltage on VTs, there is no failure in voltage measuring circuits
Initial status - inlet 7BBA01 off, coupling 7BBA04 on and 0BBD04 on, inlet 0BBD01 on, inlet7BBB01 on, coupling 7BBB04 on and 0BBC04 on, inlet 0BBC01 off operation mode No. 4
1.6.2 Test start by...
2x pushing of DCS button for state 2
1.6.3 Expected behavior
Desired response of ATS - transfer to operation mode No. 2, i.e. switching-over from inlet 0BBD01 to
inlet 7BBA01.
8/10/2019 ATS MV Description
16/34
Doc.kind TECHNICAL DESCRIPTION
TitleATS MV TESTS
Resp. Document ID Rev. Lang. Page
ABB s.r.o., Power Systems en 16
Vyhrazujem
esivechnaprvanatutodokumentaciainformacevnobsaen.Koprovn,pouvn
jakoiposto
upentetmstranmbezsouhlasuautorajepsn
zakzno.
ABBs.r.o.
Wereserveallrightsinthisdo
cumentandintheinformationcontainedtherein.Reproduction,useor
disclosuretothirdpartieswithoutexpressauthorityisstrictlyforbidden.
ABBs.r.o.
1.6.4 Potential risks
Trip of HVS systems and K7 boiler.
1.6.5 Check
CB 7BBA01 7BBA04 0BBD01 7BBB01 7BBB04 0BBC01 0BBC04 0BBD04
Initial status O X X X X O X X
Response X X O X X O X X
Check
MV ATS
Ready YES NO
On YES NO
Remote YES NO
Block YES NO
Operation mode No.
K7 POWER PLANT STATUS
Boiler MCR
Turbine load
Home consumption 7BBT01
Home consumption 0BBT01
Tap changer for 7BBT01 in remote and auto YES NO
Voltage of 7BBT01 secondary side
(shall be 6.3 kV)
Tap position of 7BBT01 (shall be 11)
Tap changer for 0BBT01 in remote and auto YES NO
Voltage of 0BBT01 secondary side(shall be 6.3 kV)
Tap position of 0BBT01 (shall be 11)
Failures of technology consumersYES NO
...........................................................
...........................................................
Questions / Points
8/10/2019 ATS MV Description
17/34
Doc.kind TECHNICAL DESCRIPTION
TitleATS MV TESTS
Resp. Document ID Rev. Lang. Page
ABB s.r.o., Power Systems en 17
Vyhrazujem
esivechnaprvanatutodokumentaciainformacevnobsaen.Koprovn,pouvn
jakoiposto
upentetmstranmbezsouhlasuautorajepsn
zakzno.
ABBs.r.o.
Wereserveallrightsinthisdo
cumentandintheinformationcontainedtherein.Reproduction,useor
disclosuretothirdpartieswithoutexpressauthorityisstrictlyforbidden.
ABBs.r.o.
2 Automatic activation of ATS Uninterrupted switching sequences
2.1 TEST 7 - Automatic activation of ATS by undervoltage U
8/10/2019 ATS MV Description
18/34
Doc.kind TECHNICAL DESCRIPTION
TitleATS MV TESTS
Resp. Document ID Rev. Lang. Page
ABB s.r.o., Power Systems en 18
Vyhrazujem
esivechnaprvanatutodokumentaciainformacevnobsaen.Koprovn,pouvn
jakoiposto
upentetmstranmbezsouhlasuautorajepsn
zakzno.
ABBs.r.o.
Wereserveallrightsinthisdo
cumentandintheinformationcontainedtherein.Reproduction,useor
disclosuretothirdpartieswithoutexpressauthorityisstrictlyforbidden.
ABBs.r.o.
2.1.3 Potential risks
Trip of HVS systems.
2.1.4 Check
CB 7BBA01 7BBA04 0BBD01 7BBB01 7BBB04 0BBC01 0BBC04 0BBD04
Initial status O X X O X X X X
Response X X O X X O X X
Check
MV ATS
Ready YES NO
On YES NO
Remote YES NO
Block YES NO
Switching - immediately YES NO
Operation mode No.
K7 POWER PLANT STATUS
Boiler MCR
Turbine load
Home consumption 7BBT01
Home consumption 0BBT01
Tap changer for 7BBT01 in remote and auto YES NO
Tap changer for 0BBT01 in remote and auto YES NO
Failures of technology consumersYES NO
...........................................................
...........................................................
Questions / Points
8/10/2019 ATS MV Description
19/34
Doc.kind TECHNICAL DESCRIPTION
TitleATS MV TESTS
Resp. Document ID Rev. Lang. Page
ABB s.r.o., Power Systems en 19
Vyhrazujem
esivechnaprvanatutodokumentaciainformacevnobsaen.Koprovn,pouvn
jakoiposto
upentetmstranmbezsouhlasuautorajepsn
zakzno.
ABBs.r.o.
Wereserveallrightsinthisdo
cumentandintheinformationcontainedtherein.Reproduction,useor
disclosuretothirdpartieswithoutexpressauthorityisstrictlyforbidden.
ABBs.r.o.
2.2 TEST 8 - Automatic activation of ATS by undervoltage U
8/10/2019 ATS MV Description
20/34
Doc.kind TECHNICAL DESCRIPTION
TitleATS MV TESTS
Resp. Document ID Rev. Lang. Page
ABB s.r.o., Power Systems en 20
Vyhrazujem
esivechnaprvanatutodokumentaciainformacevnobsaen.Koprovn,pouvn
jakoiposto
upentetmstranmbezsouhlasuautorajepsn
zakzno.
ABBs.r.o.
Wereserveallrightsinthisdo
cumentandintheinformationcontainedtherein.Reproduction,useor
disclosuretothirdpartieswithoutexpressauthorityisstrictlyforbidden.
ABBs.r.o.
2.2.2 Expected behavior
Desired response of ATS - switching-over from inlet 0BBD01 to 7BBA01 and 0BBC01 to 7BBB01 from operation mode No. 3 to mode No. 2. ON and OFF commands will sended to relevant CBs at the sametime. After switching must be ATS Block and Off.
2.2.3 Potential risks
Trip of HVS systems and K7 boiler due to allowed voltage range from +- 20% of consumers.
2.2.4 Check
CB 7BBA01 7BBA04 0BBD01 7BBB01 7BBB04 0BBC01 0BBC04 0BBD04
Initial status O X X O X X X X
Response X X O X X O X X
Check
MV ATS
Ready YES NO
On YES NO
Remote YES NO
Block YES NOSwitching immediately after 5seclower then 80% of Un (5.04kV)
YES NO
Operation mode No.
K7 POWER PLANT STATUS
Boiler MCR
Turbine load
Home consumption 7BBT01
Home consumption 0BBT01Tap changer for 7BBT01 in remote and auto YES NO
Tap changer for 0BBT01 in local and not in auto YES NO
Voltage of 7BBA
Tap position of 7BBT01
Tap position of 0BBT01
Failures of technology consumers
YES NO
...........................................................
...........................................................
8/10/2019 ATS MV Description
21/34
Doc.kind TECHNICAL DESCRIPTION
TitleATS MV TESTS
Resp. Document ID Rev. Lang. Page
ABB s.r.o., Power Systems en 21
Vyhrazujem
esivechnaprvanatutodokumentaciainformacevnobsaen.Koprovn,pouvn
jakoiposto
upentetmstranmbezsouhlasuautorajepsn
zakzno.
ABBs.r.o.
Wereserveallrightsinthisdo
cumentandintheinformationcontainedtherein.Reproduction,useor
disclosuretothirdpartieswithoutexpressauthorityisstrictlyforbidden.
ABBs.r.o.
Questions / Points
Note:
Voltage on 35kV bus bar could be changed back to normal conditions. Separation from other consumer
also not longer necessary.
8/10/2019 ATS MV Description
22/34
Doc.kind TECHNICAL DESCRIPTION
TitleATS MV TESTS
Resp. Document ID Rev. Lang. Page
ABB s.r.o., Power Systems en 22
Vyhrazujem
esivechnaprvanatutodokumentaciainformacevnobsaen.Koprovn,pouvn
jakoiposto
upentetmstranmbezsouhlasuautorajepsn
zakzno.
ABBs.r.o.
Wereserveallrightsinthisdo
cumentandintheinformationcontainedtherein.Reproduction,useor
disclosuretothirdpartieswithoutexpressauthorityisstrictlyforbidden.
ABBs.r.o.
3 Automatic activation of ATS Residual voltage switching
3.1 TEST 9 - Automatic activation of ATS by overvoltage U > 1,1 * Un (> 7.0kV)
K7 POWER PLANT STATUS
Boiler MCR
Turbine load
Home consumption 7BBT01
Home consumption 0BBT01
Tap changer for 7BBT01 in remote and auto YES NO
Voltage of 7BBT01 secondary side(shall be 6.3 kV)
Tap position of 7BBT01
Tap changer for 0BBT01 in remote and auto YES NO
Voltage of 0BBT01 secondary side(shall be 6.3 kV)
Tap position of 0BBT01
MV ATS
Ready YES NO
On YES NO
Remote YES NO
Block YES NO
Operation mode No.
Voltage on both inlets present and synchronized
Protection terminal REF activatedProtection terminals REF are measuring voltage on VTs, there is no failure in voltage measuring circuits
Initial status - inlet 7BBA01 on, coupling 7BBA04 on and 0BBD04 on, inlet 0BBD01 off, inlet7BBB01 on, coupling 7BBB04 on and 0BBC04 on, inlet 0BBC01 off operation mode No. 2
3.1.1 Test start by...
1. Tap changer for 7BBT01 shall be switched to local mode and not automatic
Tap changer for 7BBT01 in localmode and not in auto
YES NO
Voltage of 7BBT01 secondary side
Tap position of 7BBT01
2. Increase the voltage by tap changer
8/10/2019 ATS MV Description
23/34
Doc.kind TECHNICAL DESCRIPTION
TitleATS MV TESTS
Resp. Document ID Rev. Lang. Page
ABB s.r.o., Power Systems en 23
Vyhrazujem
esivechnaprvanatutodokumentaciainformacevnobsaen.Koprovn,pouvn
jakoiposto
upentetmstranmbezsouhlasuautorajepsn
zakzno.
ABBs.r.o.
Wereserveallrightsinthisdo
cumentandintheinformationcontainedtherein.Reproduction,useor
disclosuretothirdpartieswithoutexpressauthorityisstrictlyforbidden.
ABBs.r.o.
3.1.2 Expected behavior
Desired response of ATS: the CBs (7BBA01, 7BBB01) CLOSE commands of the switching sequencesare transmitted. The CBs (0BBC01, 0BBD01) closing occurs if the busbar residual voltage has dropped to0,4.Un. Transfer to operation mode No. 3, i.e. switching-over from inlet 7BBA01 to inlet 0BBD01 and frominlet 7BBB01 to inlet 0BBC01.
After switching must be ATS Block and Off.
3.1.3 Potential risks
Trip of HVS systems and K7 boiler due to high voltage.
3.1.4 Check
CB 7BBA01 7BBA04 0BBD01 7BBB01 7BBB04 0BBC01 0BBC04 0BBD04
Initial status X X O X X O X X
Response O X X O X X X X
Check
MV ATS
Ready YES NO
On YES NO
Remote YES NOBlock YES NO
Operation mode No.
K7 POWER PLANT STATUS
Boiler MCR
Turbine load
Home consumption 7BBT01
Home consumption 0BBT01
Tap changer for 7BBT01 in local and not in auto YES NO
Voltage of 7BBT01 secondary side
Tap position of 7BBT01
Tap changer for 0BBT01 in remote and auto YES NO
Voltage of 0BBT01 secondary side(shall be 6.3 kV)
Tap position of 0BBT01
Failures of technology consumersYES NO
...........................................................
...........................................................
8/10/2019 ATS MV Description
24/34
Doc.kind TECHNICAL DESCRIPTION
TitleATS MV TESTS
Resp. Document ID Rev. Lang. Page
ABB s.r.o., Power Systems en 24
Vyhrazujem
esivechnaprvanatutodokumentaciainformacevnobsaen.Koprovn,pouvn
jakoiposto
upentetmstranmbezsouhlasuautorajepsn
zakzno.
ABBs.r.o.
Wereserveallrightsinthisdo
cumentandintheinformationcontainedtherein.Reproduction,useor
disclosuretothirdpartieswithoutexpressauthorityisstrictlyforbidden.
ABBs.r.o.
Questions / Points
8/10/2019 ATS MV Description
25/34
Doc.kind TECHNICAL DESCRIPTION
TitleATS MV TESTS
Resp. Document ID Rev. Lang. Page
ABB s.r.o., Power Systems en 25
Vyhrazujem
esivechnaprvanatutodokumentaciainformacevnobsaen.Koprovn,pouvn
jakoiposto
upentetmstranmbezsouhlasuautorajepsn
zakzno.
ABBs.r.o.
Wereserveallrightsinthisdo
cumentandintheinformationcontainedtherein.Reproduction,useor
disclosuretothirdpartieswithoutexpressauthorityisstrictlyforbidden.
ABBs.r.o.
3.2 TEST 10 - Transfer from operation mode No. 2 to operation mode No. 3 -
U>10%
3.2.1 Preconditions
K7 POWER PLANT STATUS
Boiler MCR
Turbine load
Home consumption 7BBT01Home consumption 0BBT01
Tap changer for 7BBT01 in remote and auto YES NO
Voltage of 7BBT01 secondary side(shall be 6.3 kV)
Tap position of 7BBT01 (shall be 11)
Tap changer for 0BBT01 in remote and auto YES NO
Voltage of 0BBT01 secondary side(shall be 6.3 kV)
Tap position of 0BBT01 (shall be 11)
MV ATS
Ready YES NO
On YES NO
Remote YES NO
Block YES NO
Operation mode No.
Voltage on both inlets present and synchronizedProtection terminal REF activated
Protection terminals REF are measuring voltage on VTs, there is no failure in voltage measuring circuits
Initial status - inlet 7BBA01 on, coupling 7BBA04 on, coupling 0BBD04 on, inlet 0BBD01 off,inlet 7BBB01 on, coupling 7BBB04 on and 0BBC04 on, inlet 0BBC01 off operation mode No. 2
3.2.2 Test start by...
Settings DU>0,1.Unby tapchanger 7BBT01 and (or) 0BBT01. Therefore voltage of 7BBT01 shall beincreased by 5 positions to >6.678kV and voltage of 0BBT01 shall be decreased by 5 positions to 6.678 kV)
8/10/2019 ATS MV Description
26/34
Doc.kind TECHNICAL DESCRIPTION
TitleATS MV TESTS
Resp. Document ID Rev. Lang. Page
ABB s.r.o., Power Systems en 26
Vyhrazujem
esivechnaprvanatutodokumentaciainformacevnobsaen.Koprovn,pouvn
jakoiposto
upentetmstranmbezsouhlasuautorajepsn
zakzno.
ABBs.r.o.
Wereserveallrightsinthisdo
cumentandintheinformationcontainedtherein.Reproduction,useor
disclosuretothirdpartieswithoutexpressauthorityisstrictlyforbidden.
ABBs.r.o.
Tap position of 7BBT01 (shall be 16)
Tap changer for 0BBT01 in local and not inauto
YES NO
Voltage of 0BBT01 secondary side(shall be
8/10/2019 ATS MV Description
27/34
Doc.kind TECHNICAL DESCRIPTION
TitleATS MV TESTS
Resp. Document ID Rev. Lang. Page
ABB s.r.o., Power Systems en 27
Vyhrazujem
esivechnaprvanatutodokumentaciainformacevnobsaen.Koprovn,pouvn
jakoiposto
upentetmstranmbezsouhlasuautorajepsn
zakzno.
ABBs.r.o.
Wereserveallrightsinthisdo
cumentandintheinformationcontainedtherein.Reproduction,useor
disclosuretothirdpartieswithoutexpressauthorityisstrictlyforbidden.
ABBs.r.o.
Tap changer for 0BBT01 in remote and auto YES NO
Voltage of 0BBT01 secondary side(shall be 6.3 kV)
Tap position of 0BBT01 (shall be 11)
Failures of technology consumersYES NO
...........................................................
...........................................................
Questions / Points
8/10/2019 ATS MV Description
28/34
Doc.kind TECHNICAL DESCRIPTION
TitleATS MV TESTS
Resp. Document ID Rev. Lang. Page
ABB s.r.o., Power Systems en 28
Vyhrazujem
esivechnaprvanatutodokumentaciainformacevnobsaen.Koprovn,pouvn
jakoiposto
upentetmstranmbezsouhlasuautorajepsn
zakzno.
ABBs.r.o.
Wereserveallrightsinthisdo
cumentandintheinformationcontainedtherein.Reproduction,useor
disclosuretothirdpartieswithoutexpressauthorityisstrictlyforbidden.
ABBs.r.o.
3.3 TEST 11 - Fire alarm in unit transformer box (main protection)
Simulation of active one sensor inside of unit transformer box. FAS will send command to protectionsystem to deenergize unit transformer, auxilliary transformer and ripple filter. As result ATS shall act withinterruption - switching with residual voltage.
NOTE: This test will done together with FAS test and deluge test in unit transformer box.
3.3.1 Preconditions
K7 POWER PLANT STATUS
Boiler MCR
Turbine load
Home consumption 7BBT01
Home consumption 0BBT01
Redundant power supply of all threefeed water pumps
YES NO
MV ATS
Ready YES NO
On YES NO
Remote YES NO
Block YES NO
Operation mode No.
Voltage on both inlets present and synchronizedProtection terminal REF activatedProtection terminals REF are measuring voltage on VTs, there is no failure in voltage measuring circuits
Initial status - inlet 7BBA01 on, coupling 7BBA04 on and 0BBD04 on, inlet 0BBD01 off, inlet
7BBB01 on, coupling 7BBB04 on and 0BBC04 on, inlet 0BBC01 off operation mode No. 2
3.3.2 Test start by...
Simulation of active one maximum temperature detectors FAS inside of unit transformer box.
3.3.3 Expected behavior
Desired response of ATS: the CBs (7BBA01, 7BBB01) CLOSE commands of the switching sequencesare transmitted. The CBs (0BBC01, 0BBD01) closing occurs if the busbar residual voltage has dropped to
0,4.Un. Transfer to operation mode No. 3, i.e. switching-over from inlet 7BBA01 to inlet 0BBD01 and frominlet 7BBB01 to inlet 0BBC01.
After switching must be ATS Block and Off.
8/10/2019 ATS MV Description
29/34
Doc.kind TECHNICAL DESCRIPTION
TitleATS MV TESTS
Resp. Document ID Rev. Lang. Page
ABB s.r.o., Power Systems en 29
Vyhrazujem
esivechnaprvanatutodokumentaciainformacevnobsaen.Koprovn,pouvn
jakoiposto
upentetmstranmbezsouhlasuautorajepsn
zakzno.
ABBs.r.o.
Wereserveallrightsinthisdo
cumentandintheinformationcontainedtherein.Reproduction,useor
disclosuretothirdpartieswithoutexpressauthorityisstrictlyforbidden.
ABBs.r.o.
3.3.4 Potential risks
Trip of HVS systems.
3.3.5 Check
CB 7BBA01 7BBA04 0BBD01 7BBB01 7BBB04 0BBC01 0BBC04 0BBD04
Initial status X X O X X O X X
Response O X X O X X X X
Check
MV ATS
Ready YES NO
On YES NO
Remote YES NO
Block YES NO
Operation mode No.
K7 POWER PLANT STATUS
Boiler MCR
Turbine load
Home consumption 7BBT01
Home consumption 0BBT01
Failures of technology consumersYES NO
...........................................................
...........................................................
Questions / Points
8/10/2019 ATS MV Description
30/34
8/10/2019 ATS MV Description
31/34
Doc.kind TECHNICAL DESCRIPTION
TitleATS MV TESTS
Resp. Document ID Rev. Lang. Page
ABB s.r.o., Power Systems en 31
Vyhrazujem
esivechnaprvanatutodokumentaciainformacevnobsaen.Koprovn,pouvn
jakoiposto
upentetmstranmbezsouhlasuautorajepsn
zakzno.
ABBs.r.o.
Wereserveallrightsinthisdo
cumentandintheinformationcontainedtherein.Reproduction,useor
disclosuretothirdpartieswithoutexpressauthorityisstrictlyforbidden.
ABBs.r.o.
3.4.4 Potential risks
Trip of HVS system.
3.4.5 Check
CB 7BBA01 7BBA04 0BBD01 7BBB01 7BBB04 0BBC01 0BBC04 0BBD04
Initial status O X X O X X X X
Response X X O X X O X X
Check
MV ATS
Ready YES NO
On YES NO
Remote YES NO
Block YES NO
Operation mode No.
K7 POWER PLANT STATUS
Boiler MCR
Turbine load
Home consumption 7BBT01
Home consumption 0BBT01
Failures of technology consumersYES NO
...........................................................
...........................................................
Questions / Points
8/10/2019 ATS MV Description
32/34
Doc.kind TECHNICAL DESCRIPTION
TitleATS MV TESTS
Resp. Document ID Rev. Lang. Page
ABB s.r.o., Power Systems en 32
Vyhrazujem
esivechnaprvanatutodokumentaciainformacevnobsaen.Koprovn,pouvn
jakoiposto
upentetmstranmbezsouhlasuautorajepsn
zakzno.
ABBs.r.o.
Wereserveallrightsinthisdo
cumentandintheinformationcontainedtherein.Reproduction,useor
disclosuretothirdpartieswithoutexpressauthorityisstrictlyforbidden.
ABBs.r.o.
4 Switching with time delay
4.1 TEST 13 - Transfer from operation mode No. 2 to operation mode No. 3 if the voltage
measuring system is faulty
4.1.1 Preconditions
K7 POWER PLANT STATUS
Boiler MCRTurbine load
Home consumption 7BBT01
Home consumption 0BBT01
MV ATS
Ready YES NO
On YES NO
Remote YES NO
Block YES NO
Operation mode No.
Voltage on both inlets present and synchronized
Protection terminal REF activatedProtection terminals REF are measuring voltage on VTs, there is no failure in voltage measuring circuits
Initial status - inlet 7BBA01 on, coupling 7BBA04 on, coupling 0BBD04 on, inlet 0BBD01 off,inlet 7BBB01 on, coupling 7BBB04 on and 0BBC04 on, inlet 0BBC01 off operation mode No. 2
4.1.2 Test start by...
Simulation of failure in voltage measuring circuits - tripping FCM18 in the panel 7BBA01 and 7BBB01.
2x pushing of S43 push-button4.1.3 Expected behavior
Desired response of ATS: switching-over from inlet 7BBA01 to 0BBD01 and 7BBB01 to 0BBC01 from
operation mode No. 2 to mode No. 3. Switching leads to power supply interruption the delay corresponds tothe time limit of REF internal logic (1 s).
After switching must be ATS Block and Off.
8/10/2019 ATS MV Description
33/34
Doc.kind TECHNICAL DESCRIPTION
TitleATS MV TESTS
Resp. Document ID Rev. Lang. Page
ABB s.r.o., Power Systems en 33
Vyhrazujem
esivechnaprvanatutodokumentaciainformacevnobsaen.Koprovn,pouvn
jakoiposto
upentetmstranmbezsouhlasuautorajepsn
zakzno.
ABBs.r.o.
Wereserveallrightsinthisdo
cumentandintheinformationcontainedtherein.Reproduction,useor
disclosuretothirdpartieswithoutexpressauthorityisstrictlyforbidden.
ABBs.r.o.
4.1.4 Potential risks
Trip of K7 boiler.
4.1.5 Check
CB 7BBA01 7BBA04 0BBD01 7BBB01 7BBB04 0BBC01 0BBC04 0BBD04
Initial status X X O X X O X X
Response O X X O X X X X
Check
MV ATS
Ready YES NO
On YES NO
Remote YES NO
Block YES NO
Switching time delay 1s YES NO
Operation mode No.
MV SWITCHGEARS
7BBA01 FCM18 - OFF YES NO
7BBB01 FCM18 - OFF YES NO
K7 POWER PLANT STATUS
Boiler MCR
Turbine load
Home consumption 7BBT01
Home consumption 0BBT01Redundant power supply of all three feed waterpumps
YES NO
Failures of technology consumersYES NO
...........................................................
...........................................................
Questions / Points
8/10/2019 ATS MV Description
34/34
Vyhrazujem
esivechnaprvanatutodokumentaciainformacevnobsaen.Koprovn,pouvn
jakoiposto
upentetmstranmbezsouhlasuautorajepsn
zakzno.
ABBs.r.o.
Wereserveallrightsinthisdo
cumentandintheinformationcontainedtherein.Reproduction,useor
disclosuretothirdpartieswithoutexpressauthorityisstrictlyforbidden.
ABBs.r.o.
5 Other tests
Other tests were tested in factory during FAT, tested then on site without any motor load. These tests were