15
ATNF Operations Time allocation statistics TAC – proposed changes ATOA update Operations restructure External user feedback

ATNF Operations Time allocation statistics TAC – proposed changes ATOA update Operations restructure External user feedback

Embed Size (px)

Citation preview

Page 1: ATNF Operations Time allocation statistics TAC – proposed changes ATOA update Operations restructure External user feedback

ATNF Operations

Time allocation statistics TAC – proposed changes ATOA update Operations restructure External user feedback

Page 2: ATNF Operations Time allocation statistics TAC – proposed changes ATOA update Operations restructure External user feedback

Time allocation at Parkes and ATCA

Time allocation April 2006 to March 2007

0.0

10.0

20.0

30.0

40.0

50.0

60.0

70.0

0-200 200-400 400-600 600-800 800-1000

1000-1200

>1200

Total time required for project (hours)

Tim

e al

loca

ted

over

12

mon

ths

(%)

ATCA Parkes

~55% of time at Parkes is allocated to Large Projects~40% of time at Compact Array is allocated to Large Projects~60% of Parkes time is allocated to pulsar projects.

Page 3: ATNF Operations Time allocation statistics TAC – proposed changes ATOA update Operations restructure External user feedback

Parkes

05

101520253035404550

2004

OCT

2005

APRS

2005

OCT

S

2006

APRS

2006

OCT

S

2007

APRS

2007

OCT

S

2008

APRS

Semester

Num

ber o

f pro

posa

ls

Received Scheduled

Page 4: ATNF Operations Time allocation statistics TAC – proposed changes ATOA update Operations restructure External user feedback

Parkes time allocation

0102030405060708090

2006 2007 2008

Year

Tim

e al

loca

ted/

Tim

e re

ques

ted

(%)

Small projects Large projects

Page 5: ATNF Operations Time allocation statistics TAC – proposed changes ATOA update Operations restructure External user feedback

TAC: Changes

All proposals received

0

50

100

150

200

250

1998

JAN

T

1998

MAY

T

1998

SEPT

1999

JAN

T

1999

MAY

T

1999

SEPT

2000

JAN

T

2000

MAY

T

2000

OC

TT

2001

JAN

T

2001

MAY

T

2001

SEPT

2002

JAN

T

2002

MAY

T

2002

SEPT

2003

JAN

T

2003

MAY

T

2003

SEPT

2004

JAN

T

2004

MAY

T

2004

OC

TS

2005

APR

S

2005

OC

TS

2006

APR

S

2006

OC

TS

2007

APR

S

2007

OC

TS

2008

APR

S

term/semester

Num

ber

Page 6: ATNF Operations Time allocation statistics TAC – proposed changes ATOA update Operations restructure External user feedback

TAC: Changes - goals

Reduce the load on TAC members to about 15 – 20 proposals per semester

Increase the range of scientific expertise

Involve overseas users in the TAC process

Establish TAC process that is scalable

Aim to start new process for 2009APRS

Page 7: ATNF Operations Time allocation statistics TAC – proposed changes ATOA update Operations restructure External user feedback

TAC: Proposed changes (not finalised)Proposals reviewed by about six sub-panels, each with 3 or 4 members.

Each sub-panel has leader in Australia

All panel members access proposals through OPAL

Panels set up primarily by topic area

Panel leaders collate and merge comments for their subset of proposals

Panel leaders and TAC Chair meet to briefly review all proposals

ATNF provides TAC administration and meeting coordination

Page 8: ATNF Operations Time allocation statistics TAC – proposed changes ATOA update Operations restructure External user feedback

ATOA Update•ATCA data loaded to 10 Feb 2008

•Now loading ATCA data (from tapes) to end-April 2008

•MOPS data now available for May – 26 Nov 2006 (same interface)

Next stages:

•Load MOPS data to mid-July 2007 (data files already in Marsfield)

•ATCA data streaming from Narrabri to Marsfield with ‘continuous’ loading

•ATOA upgrades for CABB

•Continue with MOPS transfer & loading

•ATOA upgrades for VLBI

Page 9: ATNF Operations Time allocation statistics TAC – proposed changes ATOA update Operations restructure External user feedback

ATNF Future Operations: User input

So far:

3 March – 9 April: The Future Operations Plan was presented and discussed with USYD, UNSW, UTAS, Swinb, UWA, RSAA, ADFA

19 March: Open forum held in Marsfield

What next?:

End-May: Joint ATNF/ATUC summary of user input (Chapman & Sadler)

June 1-5: McConnell& Chapman at AAS meeting in St Louis

June 2008: ATNF response to points raised

11 June: ATCA Science Day in Marsfield

End-July: version 2 of ‘ATNF Future Operations’

Page 10: ATNF Operations Time allocation statistics TAC – proposed changes ATOA update Operations restructure External user feedback

1010

1. Restructure Operations into Science Operations & Engineering Operations

2. Establish Science Operations Centre (SOC) at central location (initially Marsfield)

3. Streamline scheduling and observing modes

Future Operations: Overview

Page 11: ATNF Operations Time allocation statistics TAC – proposed changes ATOA update Operations restructure External user feedback

11

Telescopes SystemsTelescopes Systems& Science Services& Science Services

Computing infrastructureComputing infrastructureScientific software & Scientific software &

ArchivesArchivesVisitor servicesVisitor services

Receivers, LO, conversionReceivers, LO, conversion

Digital, servoDigital, servo

CryogenicsCryogenicsMechanical, Drives, & Mechanical, Drives, &

ElectricalElectrical

Science Science OperationsOperations

Engineering Engineering OperationsOperations

National National Facility Facility

OperationsOperations

ATNF Operations Structure

Page 12: ATNF Operations Time allocation statistics TAC – proposed changes ATOA update Operations restructure External user feedback

ATNF Operations : Theme, Streams and Projects StructureTheme Leader : David McConnell (ATNF Assistant Director: Operations)Research Program Leader: Jessica Chapman

Engineering OperationsStream Leader: Brett Dawson

Science OperationsStream Leader: Phil Edwards

Telescope Ops& Sci Services

(TOSS)

ComputingInfrastructure

(CI)

Science Computing & Archives

(SCA)

VisitorsServices

(VS)

Digital, Servo& Electronics

(DSE)

Receivers, LO& Conversion

(RLOC)

Cryogenics(CRYO)

Mechanical, Drives, & Electrical

(MDE)

Project LeaderP. Edwards (N)

K. Brooks (M, 0.5)J. Chapman (M)B. Hiscock* (N)B. Indermuehle (N)S. Mader* (P)C. Phillips (M)J. Reynolds (P)J. Sarkissian (P)A.Tzioumis (M)R. Wark (N)---------------------------System Scientist (P)System Scientist (N)

Project LeaderS. Amy (M)

B. Lennon (N)V. McIntyre* (M)G. Spratt (P, 0.8)----------------------Comp. support (M)

Project LeaderM. Wieringa (N)

D. Brodrick (N, 0.5)M. Calabretta (M)S. Hoyle* (P)A. Kosmynin (M)S. Mader* (P)M. Marquarding (M, 0.2)V. McIntyre* (M)E. Troup (N, 0.5)

Project LeaderV. Drazenovic (M, 0.7)

J. Cole (P)J. Hockings (P)J. Houldsworth (N, 0.6)S. Ingram (P)E. Kachwalla (M, 0.5)M. McFee (N)M. Rees (N)C. Wilson (N, 0.6)

CasualsP. Alexander (N)D. Brennan (N)C. Cummins (Mopra)S.J. Dodd* (N)R. Kelly (N)P. Kelly (N)

CPS supportA. Evans (P)L. Williams (P)B. Wilson (P)

Project LeaderP. Mirtschin* (N)

M. Hill* (N)B. Hiscock* (N)S. Hoyle* (P)A. Hunt* (P)S. Munting* (N)B. Preisig* (P)T. Ruckley (P)--------------Technician (N)Technician (P)

Project LeaderJ. McFee (N)

P. Mirtschin* (N)S. Munting* (N)K. Reeves* (P)M. Smith (P)---------------------Engineering grad (N)RF Systems (P)

Project LeaderJ. Wilson* (N)

K. Reeves (P)B. Tough (N)

Project LeaderT. Wilson (N)

J. Crocker (P)M. Hill* (N)A. Hunt* (P)T. Lees (P, 0.6)C. Leven (N, 0.1)B. Preisig* (P)T. Ruckley* (P)G. Sunderland (N, 0.7)B. Turner (P, 0.6)N. Webster (N)

CasualsS. J. Dodd* (N)--------------------Antennas position (N)

Site Managers &Technical

Coordinators

Parkes

B. Dawson (SM)B. Preisig (TC)

Narrabri and Mopra

B. Hiscock (SM &TC)

Operations: Themes, Streams and Projects Structure (right-hand side)

Page 13: ATNF Operations Time allocation statistics TAC – proposed changes ATOA update Operations restructure External user feedback

Photo: Aly Indermuehle, Narrabri Courier

Page 14: ATNF Operations Time allocation statistics TAC – proposed changes ATOA update Operations restructure External user feedback

Photos: Aly Indermuehle, Narrabri Courier

Page 15: ATNF Operations Time allocation statistics TAC – proposed changes ATOA update Operations restructure External user feedback

Photo: Aly Indermuehle, Narrabri Courier