Atlanta Atlanta-Fulton County Fulton County Emergency Management Agency Emergency Management Agency Team Members Adam Barb Emergency Water Distribution Plan Spring 2008 Jeannell Baker Ashley Elleby Kendria Favors Tobey Fowler Iesha Scott Disclaimer: This presentation has been created within the context of the Senior Design Project and the Georgia Institute of Technology does not officially sanction its content. Client Contact William Smith Director of Operations, AFCEMA [email protected] Senior Design Advisor Dr. Ozlem Ergun Faculty, Georgia Institute of Technology [email protected]

AtlantaAtlanta--Fulton County Fulton County Emergency ... · Walk-Up Point Driving Public Walking Public Entrance ... Pallet Jack Operators Security Public ... AFCEMA Emergency Response

  • Upload
    ngonga

  • View
    214

  • Download
    0

Embed Size (px)

Citation preview

AtlantaAtlanta--Fulton County Fulton County Emergency Management AgencyEmergency Management Agency

Team Members

Adam Barb

Emergency Water Distribution PlanSpring 2008

Jeannell Baker

Ashley Elleby

Kendria Favors

Tobey Fowler

Iesha Scott

Disclaimer: This presentation has been created within the context of the Senior Design Project and the Georgia Institute

of Technology does not officially sanction its content.

Client ContactWilliam Smith

Director of Operations,AFCEMA

[email protected]

Senior Design AdvisorDr. Ozlem Ergun

Faculty,Georgia Institute of Technology

[email protected]

Introduce team, advisor, and client

Lake Lanier Water Elevations

1045

1050

1055

1060

1065

1070

1075

Leve

l (Fe

et)

Problem DescriptionProblem Description

Cutoff

April 17, 2008

Figure 1: Lake Lanier elevation levels

http://water.sam.usace.army.mil/gage/bufelev.htm

January 1, 20081052 ft.

April 1, 20081056 ft.

Average Levels

1070 ft. (-14)

1035

1040

1045

J F M A M J J A S O N D

Month

Cutoff1035 ft. (+21)

2007 Start-End

-12 ft.

2

General POD LayoutClient DescriptionClient Description

• Atlanta-Fulton County Emergency Management Agency

– AFCEMA– County level response– Water distribution network

needed for Fulton County• Point of Distribution

– POD

Figure 2: USACE POD layout to serve 5,000 people per day

April 17, 2008 3

– POD– Loading points– Commodities

• Logistic Staging Area– LSA– Pre-event staging– Inventory buffer

Define what a POD and LSA are Explain FEMA and GEMA interaction

Presentation OutlinePresentation OutlineI. Problem DescriptionII. Client DescriptionIII. MethodologyIV. DeliverablesV. SummaryVI. Questions

I. Problem DescriptionII. Client DescriptionIII. Methodology

i. POD and LSA Locationsii. POD Layoutiii. Population Estimateiv. Service Levels of PODv. Cost of Operation

April 17, 2008 4

v. Cost of Operationvi. POD Placement Modelvii. Water Replenishment Schedule

IV. DeliverablesV. SummaryVI. Questions

Methodology: POD and LSA LocationsMethodology: POD and LSA Locations

• POD Requirements– Size– Facility– Political

• LSA Requirements– Size– Facility

– Airports

140 Feet

W W W W W W W W W W

����

30 Feet�

POD Size Constraints

April 17, 2008

– Airports– High security

• Data Source– Atlanta Regional Commission– GIS Clearinghouse

Figure 3: Space required for a five loading point POD

237 Gallons per Pallets

W W

30 Feet�

35 Feet

WPallet

� Car

3 People per Car

One Loading Point

5

Explain footage needed for a loading point

Methodology: POD and LSA LocationsMethodology: POD and LSA Locations

Alpharetta

Johns Creek

Mountain Park

Roswell

Sandy Springs

Milton

Fulton County Map of Locations

39 PODs Verified

2 LSAs Verified

April 17, 2008

LSA Location

POD Location

Legend

Figure 3: Fulton County city map using GIS data sectioned by Census tract.

Atlanta

Union CityPalmetto

HapevilleFairburn

College Park

East Point

6

Define a tract Mention distance from a POD to it’s LSA wants to minimized

Methodology: POD LayoutMethodology: POD Layout

Loading Point

Water Storage

Walk-Up Point

Driving Public

Walking Public

EntranceExit

Legend

Truck Point

April 17, 2008 7

Water Storage

Resource Area

Figure 5: South Fulton Tennis Center 5634 Mason Road SW, Atlanta GA 30349

Explain that this is a google earth pic and this is how we verified the POD locaitons Describe and define the purpose of the POD Explain what a loading point is, flow, range from 3 to 60

Alpharetta

Johns Creek

Mountain Park

Milton

Roswell

Sandy Springs

Methodology: Population EstimateMethodology: Population Estimate

• Demand Forecast– 167 census tracts– 2008 population forecasted– 2.7457% yearly increase in population– Forecast: 1,013,451 residents

April 17, 2008

Atlanta

Union City

Palmetto Hapeville

Fairburn

College Park

East Point

Legend

Population Density (per sq mile)

110 –2,889

2,890 – 5,533

5,534 – 9,980

9,991 – 19,190

19,191 – 51,480Figure 6: Fulton County population density map in GIS

8

Methodology: Service LevelsMethodology: Service Levels

• Arrival Rate– Traffic data

• Service Rate– Average service level = (# loading points) * (service rate)– Service rate = 47 (cars/hour) 1

• Wait Times and Queue Lengths– Simulation

• Fluctuating arrivals from traffic data

April 17, 2008

• Fluctuating arrivals from traffic data• Varying demand levels

1 Determined by USACE

9

Define service rate Mention different percent populations

Methodology: Service LevelsMethodology: Service Levels

1.50

2.00

2.50

3.00

3.50

4.00

Rela

tive

Traf

fic In

tens

ity F

acto

r

Georgia DOT Traffic Flow Factors

April 17, 2008

Figure 7: Atlanta Traffic Factors Georgia Department of Transportation

0.00

0.50

1.00

1.50

6:00 AM

7:00 AM

8:00 AM

9:00 AM

10:00 AM

11:00 AM

12:00 PM

1:00 PM

2:00 PM

3:00 PM

4:00 PM

5:00 PM

6:00 PM

7:00 PM

Rela

tive

Traf

fic In

tens

ity F

acto

r

Time of Day

10

Explain assumption on when we think the population will be visiting (normal commute patterns) Mention how traffic factor is an average over 15 major highway intersections Mention how the assigned population of each POD was used

Methodology: Service LevelsMethodology: Service Levels

3:36

4:48

6:00

7:12

8:24

Wai

t Tim

es (H

ours

:Min

utes

)

Simulated Wait Time Analysis

Average Wait

Max Value Wait

April 17, 2008

0:00

1:12

2:24

3:36

85% 100% 110% 125% 150%

Wai

t Tim

es (H

ours

:Min

utes

)

Utilization of POD

Max Value Wait

11

Figure 8: Arena Simulation

Define service rate

Methodology: Cost of OperationMethodology: Cost of Operation

• Variable Costs– Vary upon utilization

• Fixed Costs– Purchased or rented

• Variable Costs– Vary upon utilization

• Labor• Gasoline• Waste disposal

• Fixed Costs– Purchased or rented

• Tents• Portable toilets• Computers• Traffic cones• Tables

April 17, 2008 12

• Chair• Signage

Speak about fixed costs and variable costs

• Parameters– Location Data

• LSAs, PODs, Census tracts• Capacities, demands

– Cost Parameters• Operating• Lost productivity• Travel

Methodology: POD Placement ModelMethodology: POD Placement Model

m3

m2

Waiting Time Functions

April 17, 2008

• Travel• Constraints

– Demand– Waiting times– Step function variables

• “Fill” limitations• Order of fill

13

Figure 9: Step-function illustration

m1

x1 x2 x3

mi : amount of time added per car per segment

xi : number of cars assigned to POD per segment

Define the axis

Methodology: POD Placement ModelMethodology: POD Placement Model

• Objective– Minimize the cost of a given scenario.

• Decision variables– Determine which PODs to use.– Determine which LSA supplies each POD.

• Output– Determine POD expected daily demand.– Determine which POD an area should serve.

April 17, 2008

– Determine which POD an area should serve.– Determine average waiting time for public.

14

Define service rate

Presentation OutlinePresentation OutlineI. Problem DescriptionII. Client DescriptionIII. MethodologyIV. DeliverablesV. SummaryVI. Questions

I. Problem DescriptionII. Client DescriptionIII. MethodologyIV. Deliverables

i. Scenario Analysisii. Client Toolsiii. POD Handbook

V. Summary

April 17, 2008 15

V. SummaryVI. Questions

Deliverables: AnalysisDeliverables: Analysis

• POD placement with respect to proportion of population needing service.

100% of population served• 39 PODs Operating

80% of population served

• 28 PODs Operating

60% of population served• 18 PODs Operating

Fulton County Map of Locations

April 17, 2008 16

• 39 PODs Operating• 28 PODs Operating• 18 PODs Operating

POD Location

Legend

Figure 4: Fulton County city map using GIS data sectioned by Census tract.

Represented by a graph

Deliverables: AnalysisDeliverables: Analysis

30 Day Costs by Category

Customer Travel Cost7%

Shipment Cost1%

Resource Cost7%

April 17, 2008 17

Figure 11: 30 Day cost analysis

Lost Productivity

Cost85%

Time: Pie chart to show the differences between (customer) waiting cost, opening cost, operating cost, truck cost Make one for one month (100%) and 6 month (100%) Speak about how as time goes on the cost impact is from the wait time of the customers

Deliverables: AnalysisDeliverables: Analysis

$600,000,000

$800,000,000

$1,000,000,000

$1,200,000,000

30 Day Cost by Population

April 17, 2008 18

$0

$200,000,000

$400,000,000

$600,000,000

60% 70% 80% 90% 100% 110% 120%

Percent Population

1 Month 3 Months 6 Months

Figure 12: 30 Day cost analysis

Represented by a graph

Deliverables: Client ToolsDeliverables: Client Tools

Thursday April 17, 2008Point of Distribution Location 6

Service Points

LanesHours of

OperationShift Length

Servers per Point

Reserves %

25 5 14 12 1 0.5

Time of Day Managers Team Leaders ServersReserve Servers

Forklift Operators

Pallet Jack Operators

SecurityPublic

Relations

6am 1 5 25 13 5 6 8 8

LABORERS

April 17, 2008 19

6am 1 5 25 13 5 6 8 8

7am 1 5 25 13 5 6 8 88am 1 5 25 13 5 6 8 89am 1 5 25 13 5 6 8 8

10am 1 5 25 13 5 6 8 811am 1 5 25 13 5 6 8 8

12pm 1 5 25 13 5 6 8 8���� ���� ���� ���� ���� ���� ���� ���� ����

���� ���� ���� ���� ���� ���� ���� ���� ����

���� ���� ���� ���� ���� ���� ���� ���� ����

Totals 2 10 50 26 10 13 16 1676

Only show the top half Show the totals A whole new picture! please

Methodology: Water Replenishment ScheduleMethodology: Water Replenishment Schedule

– Assigned demand– Gallons given per resident– Days between orders– Safety Stock

Inputs

Outputs

• Fixed Period Ordering Policy– Single location– Constant demand

– No stock outs

April 17, 2008 20

– Order quantity– Quantity of full load trucks– Quantity of less than load trucks– Travel cost– Scheduled arrival of orders

Create a table for the inputs and outputs

Deliverables: Client ToolsDeliverables: Client Tools

Opening Information

Opening Inventory

Gallons per Person

Day between Orders

Thursday April 17, 2008Point of Distribution Location 6

Gallons to Order

Trucks Required

Partial Trucks

Forecasted Demand Analysis

25,776 Gallons

5 Trucks

1 Truck

22,976 Gallons

1 Gallon

1 Day

April 17, 2008

Demand

Closing Information

Order Received

Ending Inventory

20,000 Gallons

2,809 Gallons

Travel Cost

User Input Demand Analysis

$ 2,146.25

Gallons to Order

Trucks Required

Partial Trucks

Travel Cost

Safety Stock % 10 %

21

26,879 Gallons

6 Trucks

0 Truck

$ 3,740.75

26,879 Gallons

Do what Adam said…

Deliverables: Client ToolsDeliverables: Client ToolsAtlanta-Fulton County

Emergency Management AgencyWater Distribution Plan

12 4 12

Spring 2008

Georgia Institute of TechnologyPoint of Distribution Handbook

AFCEMA Water Distribution Plan

Northeast Regional Library

9560 Spruill Road, Johns Creek 30022

April 17, 2008

Point of Distribution Handbook

22

Resource List QuantityForklifts 1Pallet Jacks 2Flood Lights 3

Labor List 14 Hour 24 HourTeam Leader 4 4Loaders 24 32Fork Lift Oper. 2 3

Redo the words on the handout pic

SummarySummary

• Identified 39 PODs and 2 LSAs.• Mapped out each POD location.• Forecasted 2008 population.• Derived arrival rates from traffic data.• Determined expected wait times.• Calculated opening and operating POD costs.• Optimized POD placement for various scenarios.

April 17, 2008 23

• Developed labor scheduling and water reorder tool.

Arrival rates from DOT traffic rates Wait times from simulation

ConclusionConclusion

• The largest cost to Fulton County will be the economic impact due to loss of productivity.

• Opening all 39 locations will serve 100% of the population.– 225 trucks needed each day– 1,013,450 gallons of water– $3.8 million to open and operate PODs for 30 days– Public awareness campaign

April 17, 2008 24

– Public awareness campaign

Campaign to decrease variation in arrivals to the PODs

QuestionsQuestions

April 17, 2008 25

Define service rate