Upload
others
View
0
Download
0
Embed Size (px)
Citation preview
PROFILEU R B A N P L A N N I N G GOVERNANCEselected
ATELIERCAPPOCHINarchitectureurban planning
Year
2000Role
Consultant for urban production policiesClient
Province of PaduaDescription of the assignment
P.T.C.P. – Consultation on the revision of the settlement systems of the Territorial Coordination Provincial PlanProject information
approved
Year
2001Role
Consultant for urban production policiesClient
Province of PaduaDescription of the assignment
P.T.C.P. – union P.R.G. of the municipalities of the Province of PaduaProject information
approved
Year
2004Role
Consultant for urban production policiesClient
Province of PaduaDescription of the assignment
P.T.C.P. – adaptation of the residential and productive residential system to L.R. 11/04 of which he was a designerProject information
approved
1. Urban Planning Supra-Municipal 1.1 P.T.C.P. (Piano Territoriale di Coordinamento Provinciale_ Territorial Coordination Provincial Plan)
2
G O V E R N A N C E
U R B A NP L A N N I N G
3
1. Urban Planning Supra-Municipal 1.2 P.A.T.I. (Piano Assetto Territoriale Intercomunale_Inter-municipal Urban Development Plan)
Year
2006Role
Lead architectClient
Province of PaduaDescription of the assignment
P.A.T.I. Area of the Metropolitan Community of Padua (n° 17 Municipalities - inhabitants n° 420.000) - Urban Planning of the P.A.T.I.(Municipality of : Abano Terme, Albignasego, Cadoneghe, Casalserugo, Legnaro, Maserà, Mestrino, Noventa Padovana, Padova, Pon-te S. Nicolò, Rubano, Saccolongo, Saonara, Selvazzano Dentro, Vigodarzere, Vigonza, Villafranca Padovana)Identification of the metropolitan-Veneto strategic choices to be implemented in the Metropolitan Community Plan of the Padua Metropolitan CommunityProject information
adopted and approved
Year
2012Role
Lead architectClient
Province of PaduaDescription of the assignment
P.A.T.I. of Camposampierese (n° 11 muni-cipality - inhabitants n° 100.000)(Municipality of: Borgoricco, Campodarsego, Camposampiero, Loreggia, Massanzago, Piombino Dese, San Giorgio delle Pertiche, Santa Giustina in Colle, Trebaseleghe, Villa del Conte e Villanova di Camposampiero)Project information
Adopted before 31.12.2012 by all City Councils
3
G O V E R N A N C E
U R B A NP L A N N I N G
3
2. Urban Planning Municipal 2.1 New P.R.G.(Piano Regolatore Generale_General Controller Plan), general and partial variations
Year
2005Role
lead architectClient
S. Martino di Lupari Municipality (PD)Description of the assignment
Partial variations to the P.R.G. under the 3° subparagraph art. 50 L.R. 11/85with G.I.S. (Geographics Information System)Project information
approved by G.R.V.
Year
2009Role
lead architect of observationsClient
Camisano Vicentino Municipality (VI)Description of the assignment
Variations n° 5 and n°6 to the P.R.G. observations to the proposed amendments of G.R.V. (art. 46 L.R. 61/85)Project information
observations approved by City Council
Year
2004Role
lead architectClient
Teolo Municipality (PD) Description of the assignment
Partial variations to the P.R.G. under the 4° and 9° subparagraph art. 50 L.R. 61/85Project information
4° c. – approved by City Council9° c. – approved by Regional Manager
Year
2004Role
lead architectClient
Saccolongo Municipality (PD)Description of the assignment
Partial variations to the P.R.G. under the 3° subparagraph art. 50 L.R. 61/85Project information
approved by G.R.V.
4
G O V E R N A N C E
U R B A NP L A N N I N G
3
Year
2004Role
lead architectClient
Veggiano Municipality (PD)Description of the assignment
Partial variations to the P.R.G. under the 3° subparagraph art. 50 L.R. 61/85with G.I.S. (Geographics Information System)Project information
approved by G.R.V.
Year
2004Role
lead architectClient
S. Martino di Lupari Municipality (PD) Description of the assignment
Variation to P.R.G. under the 4° subpara-graph art. 50 L.R. 11/85 – (G.I.S.)Project information
approved by City Council
2. Urban Planning Municipal 2.1 New P.R.G.(Piano Regolatore Generale_General Controller Plan), general and partial variations
Year
2004Role
lead architectClient
Rubano Municipality (PD)Description of the assignment
Partial variations to the P.R.G. under the 3° and 4° subparagraph art. 50 L.R. 61/85Project information
4° comma – approved by City Council3° comma – approved by G.R.V.
Year
2004Role
lead architectClient
Montegalda Municipality (VI)Description of the assignment
Partial variations to the P.R.G. under the 9° subparagraph art. 50 L.R. 11/95 Project information
approved by Regional Manager
5
G O V E R N A N C E
U R B A NP L A N N I N G
3
2. Urban Planning Municipal 2.1 New P.R.G.(Piano Regolatore Generale_General Urban Development Plan), general and partial variations
Year
2004Role
lead architectCient
Campodarsego Municipality (PD)Description of the assignment
Partial variations to the P.R.G. under the 3° subparagraph art. 50 L.R. 61/85Project information
approved by G.R.V.
Year
2004Role
lead architectClient
Abano Terme Municipality (PD) under the art. 30 of L.R. 61/85 Description of the assignment
Urban variant at P.R.G.Project information
approved by G.R.V.
6
G O V E R N A N C E
U R B A NP L A N N I N G
3
2. Urban Planning Municipal 2.2 P.A.T. (Piano di Assetto del Territorio_ Territory Plan)
Year
2012Role
Lead architectClient
Treviso Municipality (TV)Description of the assignment
P.A.T. Project information
Adopted and approved
Year
2018Role
Lead architectClient
S. Martino di Lupari Municipality (PD)Description of the assignment
P.A.T.Variant of adapting under art. 13 comma 10 of L.R. 14/2017Project information
Adopted by city council with deliberate n.22 of 22.12.2018 and approved with deliberate n.4 of 16.03.2019
Year
2018Role
Lead architectClient
Piombino Dese Municipality (PD)Description of the assignment
P.A.T.Variant of adapting under art. 13 comma 10 of L.R. 14/2017Project information
adopted
Year
2011Role
Lead architectClient
Albignasego Municipality (PD)Description of the assignment
P.A.T. including Strategic Environmental AssessmentProject information
Adopted
7
G O V E R N A N C E
U R B A NP L A N N I N G
3
2. Urban Planning Municipal 2.2 P.A.T. (Piano di Assetto del Territorio_ Territory Plan)
Year
2007Role
Lead architectClient
Due Carrare Municipality (PD)Description of the assignment
P.A.T. including Strategic Environmental AssessmentProject information
approved
Year
2008Role
Lead architectClient
Saccolongo Municipality (PD)Description of the assignment
P.A.T. including Strategic Environmental AssessmentProject information
approved
Year
2009Role
Lead architectClient
Mestrino Municipality (PD)Description of the assignment
P.A.T. including Strategic Environmental AssessmentProject information
approved
Year
2007Role
Lead architectClient
Cartura Municipality (PD)Description of the assignment
P.A.T. including Strategic Environmental AssessmentProject information
Adopted
8
G O V E R N A N C E
U R B A NP L A N N I N G
3
2. Urban Planning Municipal 2.2 P.A.T. (Piano di Assetto del Territorio_ Territory Plan)
Year
2005Role
Lead architectClient
Campodarsego Municipality (PD)Description of the assignment
P.A.T. including Strategic Environmental AssessmentProject information
approved
Year
2006Role
Lead architectClient
S. Martino di Lupari Municipality (PD)Description of the assignment
P.A.T. including Strategic Environmental AssessmentProject information
approved
Year
2007Role
Lead architectClient
Maserà di Padova Municipality (PD)Description of the assignment
P.A.T. including Strategic Environmental AssessmentProject information
approved
9
G O V E R N A N C E
U R B A NP L A N N I N G
3
Year
2017Role
Lead architectClient
Mestrino Municipality (PD)Description of the assignment
P.I. Intervention PlanEditing of the of the 6° variant under art. 18 of the L.R. 11/04Project information
Adopted with deliberate of City Council n° 14 of 19.03.2018 and approved with deliberate of City Council n° 29 of 16.07.2018
Year
2018Role
Lead architectClient
S. Martino di Lupari Municipality (PD)Description of the assignment
P.I. Intervention PlanEditing of the of the 17° and 18° variant under art. 17 and 18 of the L.R. 11/04Project information
Adopted with deliberate of City Council n° 16 of 01.10.2018Approved with deliberate of City Council n° 21 of 20.12.2018
2. Urban Planning Municipal 2.3 P.I. (Piano degli Interventi_ Intervention Plan)
Year
2016Role
Lead architectClient
S. Martino di Lupari Municipality (PD)Description of the assignment
P.I. Intervention PlanEditing of the of the 16° variant under art. 17 and 18 of the L.R. 11/04Project information
Adopted with deliberate of City Council n° 32 of 23.11.2016Approved with deliberate of City Council n° 26 of 17.07.2017
10
G O V E R N A N C E
U R B A NP L A N N I N G
3
2. Urban Planning Municipal 2.3 P.I. (Piano degli Interventi_ Intervention Plan)
Year
2015Role
Lead architectClient
S. Martino di Lupari Municipality (PD)Description of the assignment
P.I. Intervention PlanEditing of the of the 12° variant under ex art. 18 of the L.R. 11/2004Project information
Adopted with deliberate of City Council n°11 of 30.04.2015 and approved with deliberate of City Council n° 26 of 30.07.2015
Year
2016Role
Lead architectClient
Treviso Municipality (TV)Description of the assignment
P.I. Intervention PlanEditing of the of the 3° variant under art. 17 and 18 of the L.R. 11/04Project information
P.I. Intervention PlanEditing of the of the general variant under art. 17 e 18 della L.R. 11/04
Year
2015Role
Lead architectClient
Albignasego Municipality (PD)Description of the assignment
P.I. Intervention PlanEditing of the of the 3° variant under art. 17 and 18 of the L.R. 11/04Project information
adopted with deliberate of City Council n° 31/2 of 25.06.2015-Var. n° 2: adopted with deliberate of City Council n° 71 of 04.12.2015 and approved with deliberate of City Council n° 1 of 15.02.2016Var. n° 3: adopted with deliberate of City Council n° 42 of 28.07.2016 and approved with deliberate of City Council n° 55 of 10.11.2016-Var. n° 6: adopted with deliberate of City Council n° 19 4.5.2017 and approved with deliberate of City Council n° 29 of 18.7.2017
11
G O V E R N A N C E
U R B A NP L A N N I N G
3
2. Urban Planning Municipal 2.3 P.I. (Piano degli Interventi_ Intervention Plan)
Year
2014Role
Lead architectClient
Mestrino Municipality (PD)Description of the assignment
P.I. Intervention PlanEditing of the of the 5° variant under art. 18 of the L.R. 11/04Project information
Adopted with deliberate of City Council n° 42 of 15.12.2015 and approved with deliberate of City Council n° 24 of 24.05.2016
Year
2014Role
Lead architectClient
Maserà di Padova Municipality (PD)Description of the assignment
P.I. Intervention PlanEditing of the of the 3° variant under art. 17 of the L.R. 11/04Project information
Adopted with deliberate of City Council of 17.12.2014Approved with deliberate of City Council n° 4 of 04.03.2015
Year
2013Role
Lead architectClient
S. Martino di Lupari Municipality (PD)Description of the assignment
P.I. Intervention PlanEditing of the of the 11° variant ex art. 24 of the L.R. 27/2003 as amended by art. 15 of L.R. 17/2007Project information
Adopted with deliberate of City Council n° 10 of 08.04.2013Approved with deliberate of City Council n° 27 of 08.09.2014
12
G O V E R N A N C E
U R B A NP L A N N I N G
3
2. Urban Planning Municipal 2.3 P.I. (Piano degli Interventi_ Intervention Plan)
Year
2013Role
Lead architectClient
S. Martino di Lupari Municipality (PD)Description of the assignment
P.I. Intervention PlanEditing of the of the 7° variant ex art. 24 of the L.R. 27/2003 as amended by art. 15 of L.R. 17/2007Project information
Adopted with deliberate of City Council n° 12 of 29.04.2013Approved with deliberate of City Council n° 38 of 29.10.2015
Year
2013Role
Lead architectClient
S. Martino di Lupari Municipality (PD)Description of the assignment
P.I. Intervention PlanEditing of the of the 8° variant ex art. 24 of the L.R. 27/2003 as amended by art. 15 of L.R. 17/2007Project information
Adopted with deliberate of City Council n° 8 of 08.04.2014Approved with deliberate of City Council n° 38 of 30.09.2014
Year
2013Role
Lead architectClient
S. Martino di Lupari Municipality (PD)Description of the assignment
P.I. Intervention PlanEditing of the of the 9° variant ex art. 24 of the L.R. 27/2003 as amended by art. 15 of the L.R. 17/2007Project information
Adopted with deliberate of City Council n° 45 of 27.12.2013Approved with deliberate of City Council n° 7 of 08.04.2014
13
G O V E R N A N C E
U R B A NP L A N N I N G
3
2. Urban Planning Municipal 2.3 P.I. (Piano degli Interventi_ Intervention Plan)
Year
2012Role
Lead architectClient
Maserà di Padova Municipality (PD)Description of the assignment
P.I. Intervention PlanEditing of the of the 1° and 2° variant of the P.I. under the art.17 of L.R. 11/04Project information
Var. n° 1: adopted with deliberate of City Council n° 10 of 02.04.2013 and appro-ved with deliberate of City Council n° 35 of 30.09.2013Var. n° 2: adopted with deliberate of City Council n° 21 of 28.07.2014 and approved with deliberate of City Council of 17.12.2014
Year
2013Role
Lead architectClient
S. Martino di Lupari Municipality (PD)Description of the assignment
P.I. Intervention PlanEditing of the of the 6° variant f the P.I. under the art.17 of L.R. 11/04Project information
Adopted with deliberate of City Council n° 33 of 30.09.2013Approved with deliberate of City Council n° 3 of 08.04.2014
Year
2013Role
Lead architectClient
S. Martino di Lupari Municipality (PD)Description of the assignment
P.I. Intervention PlanEditing of the of the 10° variant ex art. 24 of the L.R. 27/2003 as amended by art. 15 of the L.R. 17/2007Project information
Adopted with deliberate of City Council n° 9 of 08.04.2014Approved with deliberate of City Council n° 26 of 08.09.2014
14
G O V E R N A N C E
U R B A NP L A N N I N G
3
2. Urban Planning Municipal 2.3 P.I. (Piano degli Interventi_ Intervention Plan)
Year
2012Role
Lead architectClient
Mestrino Municipality (PD)Description of the assignment
P.I. Intervention PlanEditing of the 2° variant of the P.I. under the art.17 of L.R. 11/04Project information
Adopted with deliberate of City Council n° 50 of 28.12.2012 and approved with deliberate di City Council n° 10 of 11.04.2013
Year
2012Role
Lead architectClient
Campodarsego Municipality (PD)Description of the assignment
P.I. Intervention PlanEditing of the general variant of the P.I. under the art.17 of L.R. 11/04Project information
Adopted con deliberate of City Council n° 34 of 08.10.2012Adopted with deliberate of City Council n° 40 of 29.11.2013Approved with deliberate of City Council n° 18 of 21.05.2014
Year
2012Role
Lead architectClient
Mestrino Municipality (PD)Description of the assignment
P.I. Intervention PlanEditing of the of the 3° variant of the P.I. under the art.17 of L.R. 11/04Project information
Adopted with deliberate of City Council n° 11 of 11.04.2013 and approved with deliberate of City Council n° 51 of 28.11.2013
15
G O V E R N A N C E
U R B A NP L A N N I N G
3
2. Urban Planning Municipal 2.3 P.I. (Piano degli Interventi_ Intervention Plan)
Year
2010Role
Lead architectClient
Due Carrare Municipality (PD)Description of the assignment
P.I. Intervention PlanProject information
approved by City Council
Year
2011Role
Lead architectClient
Mestrino Municipality (PD)Description of the assignment
P.I. Intervention PlanDrafting of the first variant of the Plan of Interventions under the art. 17 of the L.R. 11/04Project information
Approved with deliberate of the City Council
Year
2011Role
Lead architectClient
Camposampiero Municipality (PD)Description of the assignment
P.I. Intervention PlanEditing of the 7° variant of the P.I. under the art.17 of L.R. 11/04Project information
Adopted with deliberate of the City Council n° 15 of 29.06.2012 and approved with deliberate of City Council n° 40 of 31.07.2013
16
G O V E R N A N C E
U R B A NP L A N N I N G
3
2. Urban Planning Municipal 2.3 P.I. (Piano degli Interventi_ Intervention Plan)
Year
2009Role
Lead architectClient
S. Martino di Lupari Municipality (PD)Description of the assignment
P.I. Intervention PlanDocument preparationProject information
completed performances
Year
2010Role
Lead architectCient
S. Martino di Lupari Municipality (PD)Description of the assignment
P.I. Intervention PlanCompletion of 1° Plan of Interventions (variants 2, 3, and 4) under the art. 17 of L.R. 11/04Project information
approved by City Council
17
G O V E R N A N C E
U R B A NP L A N N I N G
3
3. Active Urban Instruments3.1 PUBLIC
Year
2005Role
Lead architectClient
Albignasego Municipality (PD)Description of the assignment
Detailed Plan “Quartiere Ferri”Project information
size: m2 69.500project volumes m3 41.436approved
Year
2005Role
Lead architectClient
Conselve Municipality (PD)Description of the assignment
Economic assessment of the adequacy of the Municipal Administration in relation to the benefit of the private proposer, with re-gard to the integrated programme “Aurora”Project information
ended
Year
2007Role
Lead architectClient
Montegalda Municipality (VI)Description of the assignment
Detailed Plan Historical CenterProject information
size m2 100.000project volumes m3 42.000approved
Year
2004Role
Lead architectClient
Campodarsego Municipality (PD)Description of the assignment
Integrated program “Parco urbano di Reschigliano”
Project information
size: m2 34.000project volumes: m3 17.000approved 18
G O V E R N A N C E
U R B A NP L A N N I N G
3
Year
2018Role
Lead architetcClient
Alì immobiliareDescription of the assignment
RESIDENTIALVariant urban planning implementation called “z.t.o. C2b/19 in via Torino” in Muni-cipality of Albignasego (PD)Project information
size: m2 46.227m3 23.113on going
3. Active Urban Instruments3.2 of PRIVATE initiative
Year
2018Role
Lead architectClient
Immobiliari Cameri s.r.l.Description of the assignment
MIX USEdirect intervention, without P.U.A., by demolition, reconstruction and masterplan redesign, with change of use and recovery of the entire volumetry existing, belonging to the Compendium “ex Lonardi”.Project information
on going
Year
2017Role
lead architectClient
WOLT S.p.A.MAIOR S.r.l.Description of the assignment
INDUSTRIAL, RETAILUrban planning implementation and execu-tion of the urbanization works of aReal Estate Compendium within the West Industrial Zone in Limena Citypreliminary architectural design Project information
on going
19
G O V E R N A N C E
U R B A NP L A N N I N G
3
Year
2017Role
Lead architectClient
ALì immobiliareDescription of the assignment
RESIDENTIAL, RETAILpublic-private agreement draftingpursuant to art. 6 of the L.R. 11/04 in variant of P.A.T. and P.I., aimed at extending the scope of intervention of the detailed plan “San Lorenzo” and consequent, reor-ganization of the sameProject information
on going
3. Active Urban Instruments3.2 of PRIVATE initiative
Year
2015Role
Lead architectClient
Aspiag Service srlDescription of the assignment
INDUSTRIALGeneral planning for the design of a new logistic center in the Municipality of Grisi-gnano di Zocco (Vicenza)Project information
size: m2 309.000 ca.ended
Year
2015Role
lead architectClient
“Il Chiostro” di Ludovica e Maddalena Passi & C. S.n.c.Description of the assignment
MIX USEDesign and urban planning consultancy, to be implemented through a program agreement in variant of P.I., pursuant to art. 7 of the L.R. 11/2004, aimed at promoting urbanization of the “La Certosa” complex of Vigodarzere Project information
deliberate of GC. n° 95 of 24.09.2015in progresssize: m2 60.000 ca.
20
G O V E R N A N C E
U R B A NP L A N N I N G
3
Year
2014Role
Lead architectClient
G.C.P. SrlRigon Angela, Cesarato Andrea e NicolaDescription of the assignment
RETAIL, INDUSTRIALLead architect Planning for urbanization of an area in frieze to S.R. n ° 11 “Padana Superiore” in the municipality of Veggiano (Pd) - Urban implementation planProject information
P.U.A. Adopted with deliberate of GC. n° 58 of 15.07.2015size: m2 19.000 ca.total volume: m3 50.000 ca.
3. Active Urban Instruments3.2 of PRIVATE initiative
Year
2013Role
Lead architectClient
G.C.P. SrlDescription of the assignment
RETAIL, INDUSTRIALLead architect of Planning for urbanization of an area in frieze to S.R. No. 11 “Padana Superiore” in the municipality of Veggiano (Pd) - Recovery planProject information
P.U.A. adopted with deliberate of GC. n° 57 of 15.07.2015size: m2 13.000 ca.total volume: m3 30.000 ca.
Year
2013Role
lead architectClient
F.lli Lando SpaDescription of the assignment
INDUSTRIALLead architect of Planning for urban rede-velopment of a wharehouse area in Corso Stati Uniti in the Municipality of Padua Project information
work in progresssize: m2 67.000 ca.total volume: m3 100.000 ca.
21
G O V E R N A N C E
U R B A NP L A N N I N G
3
Year
2013Role
Lead architectClient
Mazzucato FaustoDescription of the assignment
RESIDENTIAL, RETAIL, INDUSTRIALLead architect Urban planning and execution of the urbanization works of the program agreement pursuant to art. 6 of the L.R. 11/04 finalized for the urbanization and reconversion (Urban Development Zone D9 / 2 in Commune of Albignasego) Project information
endedsize: m2 37.500 ca.total volume: m3 37.700 ca.
3. Active Urban Instruments3.2 of PRIVATE initiative
Year
2013Role
Lead architectClient
Consorzio “Casa Mia”Description of the assignment
RESIDENTIALurban development plan and updating “Area perequata 1” in the municipality of Legnaro (Pd)Project information
approved on 24.06.2013size: m2 50.500
Year
2012Role
lead architectClient
Immobiliare Cameri S.r.l.Description of the assignment
RESIDENTIALProgram Agreement pursuant to art. 32 of the L.R. 35/2001 of an area in the munici-pality of S. Pietro in Cariano (Verona) Project information
ratified with deliberate of City Council n° 20 on 13.05.2014size: m2 135.000 ca.total volume: m3 135.000 ca.
22
G O V E R N A N C E
U R B A NP L A N N I N G
3
3. Active Urban Instruments3.2 of PRIVATE initiative
Year
2011Role
lead architetcClient
Bastianello Pietro e Gianni CamilloDescription of the assignment
RESIDENTIALlead architect Public-Private Agreement for the regeneration of an area in the municipality di Piazzola sul Brenta (ai sensi dell’art. 6 of L.R. 11/04)Project information
ended
Year
2011Role
Lead architectClient
Ferraro EdoardoDescription of the assignment
lead architect Public-Private Agreement in the municipality of PadovaProject information
size: m2 16.000ended
Year
2010Role
Lead architectClient
R.E.P.O. Real Estate Padova Ovest S.r.l.Description of the assignment
RESIDENTIAL- Design of an urban development plan and updating the relevant convention scheme in the municipality of Rubano- Update of the definitive project of urbani-zation works- Direction Works of urbanization worksProject information
size: m2 43.220total volume: m3 36.730approved and ended
23
G O V E R N A N C E
U R B A NP L A N N I N G
3
Year
2008Role
Lead architectClient
Figura 22 S.r.l.Description of the assignment
RETAIL, INDUSTRIALUrban planning of an area in the Municipa-lity of S. Pietro in Cariano (Verona) through two separate urban plans implemented with commercial-management destination) Project information
approved by Comm. Ed. Integrata on 28.01.2009 and by City Councilsize: m2 130.000total volume: m3 500.000
Year
2009Role
Lead architectClient
Vimatex spaDescription of the assignment
RESIDENTIALlead architect Public-Private Agreement as varied as P.R.G. (Article 6 L.R 11/04) for urban upgrading in the Municipality of CasalserugoProject information
size: m2 14.072total volume: m3 28.000ended
3. Active Urban Instruments3.2 of PRIVATE initiative
Year
2010Role
lead architetcClient
Consorzio “Iniziativa Curva Boston”Description of the assignment
CONSERVATIVElead architect Public-Private Agreement as varied as P.R.G.(art. 6 L.R. 11/04) in the Municipality of PadovaProject information
size: m2 370.000total volume: m3 400.000on going
24
G O V E R N A N C E
U R B A NP L A N N I N G
3
Year
2008Role
Lead architectClient
Istituto Diocesano per il Sostentamento del CleroDescription of the assignment
RESIDENTIAL– Design of an urban development plan (P.U.A. “Area perequata 19a-19b”) private initiative, municipality of Montegrotto Terme (Pd)– design and costruction of the urban part– design and costruction of a buildingProject information
adopted with deliberate of G.C. n° 2 of 27.01.2012 and approved with deliberate of Commissario Straordinariosize: m2 12.000
Year
2007Role
Lead architectClient
La Certosa di Ludovica e Maddalena Passi snc - TrevisoDescription of the assignment
MIX USEPrivate-public planning agreement for the recovery of the Certosa of Vigodarzere (art.6 L.R. 11/04) Project information
size: m2 400.000on going
3. Active Urban Instruments3.2 of PRIVATE initiative
Year
2008Role
Lead architectClient
Pasqualin c.rtiDescription of the assignment
RESIDENTIALPublic-Private Agreement in the Municipality of Teolo (art. 6 L.R. 11/04)Project information
size: m2 26.300total volume: m3 26.300ended
25
G O V E R N A N C E
U R B A NP L A N N I N G
3
Year
2007Role
Lead architectClient
Net Engineering S.p.a.Description of the assignment
RESIDENTIAL, RETAIL, INDUSTRIALDesign of an urban development plan “I Giardini”Municipality PozzonovoProject information
ended – P.U.A.Adopted by G.C.size: m2 71.000total volume: m3 71.000adopted by municipality
Year
2007Role
Lead architectClient
Barzon FrancescoDescription of the assignment
RESIDENTIAL, RETAIL, INDUSTRIALDesign of an urban development plan “Area perequata 1” of Municipality of StraProject information
approval phasesize: m2 47.000Adopted with deliberate of G.C. n° 100 of 04.06.2015 and approved
Year
2007Role
Lead architectClient
Net Engineering S.p.a.Description of the assignment
RETAIL, INDUSTRIALLead architect of Urban planning implemen-tation of the new area of MonseliceProject information
size: m2 350.000P.U.A. approved by City Council
3. Active Urban Instruments3.2 of PRIVATE initiative
26
G O V E R N A N C E
U R B A NP L A N N I N G
3
Year
2005Role
Lead architectClient
PRIMA COM S.r.l. – Polifin S.r.lDescription of the assignment
RESIDENTIALRecovery Plan (Urban Planning Area D9) with Masterplan in the Municipality of AlbignasegoProject information
size: m2 35.800total volume: m3 89.500approved by City Council
Year
2005Role
Lead architectClient
Barison – Zilio – Forese – Canellac/o Alì SupermercatiDescription of the assignment
RESIDENTIAL, RETAILUrban Implementation Plan “San Lorenzo” with masterplan– in the Municipality of AlbignasegoProject information
size: m2 51.000total volume: m3 55.000approved by C.E.
Year
2007Role
Lead architectClient
Istituto Diocesano per il Sostentamento del CleroDescription of the assignment
RESIDENTIALDesign of an urban development plan (P.U.A. “Multipurpose area in Pelosa”) of public-private initiative in the Municipality of PaduaProject information
size: m2 107.435total volume: m3 70.000approved
3. Active Urban Instruments3.2 of PRIVATE initiative
27
G O V E R N A N C E
U R B A NP L A N N I N G
3
3. Active Urban Instruments3.2 of PRIVATE initiative
Year
2004Role
Lead architectClient
F.lli Pegoraro s.n.c.c/o Futura Progetti S.r.l.Description of the assignment
RESIDENTIALIntegrated Program – Montegalda (VI) as varied as P.R.GProject information
size: m2 60.000 mix use, sport, commercialresidential volume: m3 45.000approved by City Council
Year
2004Role
Lead architectClient
C.E.M. S.r.l.R.E.P.O. S.r.l.Description of the assignment
RESIDENTIALMemorandum of Understanding to be implemented through a detailed plan in the municipality of RubanoDetailed plan of via De Gasperi and streets Genova and Strasburgo in the municipality of RubanoProject information
size: m2 32.690school: m3 4.500residential: m3 32.000schematic design approved
Year
2005Role
Lead architectClient
GOLIN C.rtiDescription of the assignment
RESIDENTIALUrban Implementation Plan in Limena, “area Barchesse”Project information
size: m2 16.100residential volume: m3 20.000approved
28
G O V E R N A N C E
U R B A NP L A N N I N G
3