John Hope Gateway Royal Botanical Gardens, Edinburgh
Architectural Technology 3.1
Sam Hayes 33241624 Aaron Morris 33250666 Yuen Chak Ngai 33242502 Daniel Whelan 33245349 Brad McArdle 33255523 Jan Harmens 33254426 Christopher Pepper 33250999 Stewart Craven 33259578
intr
od
uct
ion
Building: John Hope Gateway. Client: Royal Botanical Gardens.
Location: Edinburgh, Scotland. Architect: Edward Cullinan Architects.
Contractor: Xircon. Completion: 2009.
Value: £10,700,000.
intr
od
uct
ion
The John Hope Gateway is home to Edinburgh’s botanical gardens.
Building was designed by Edward Cullinan Architects and was completed in 2009. The building is situated to the north of Edinburgh
city centre. The building beautifully fits into its surrounding environment making for a stunning link between nature and
architecture.
A sustainable, low-energy, minimum-waste approach to the building's design became part of the message the Garden wished to convey to its
visitors. The Gateway has many demonstrable environmental solutions, including a biomass boiler, a green roof, rainwater
harvesting, a wind turbine, natural ventilation and passive night-time cooling.
KLH by the nature of its product, is a specialist in sustainable construction. The cross laminated timber is produced from spruce and fir trees. They do not release co2 in production and can be recycled and reused to make other forms of timber panels. Much of the by-product is used to manufacture our own biomass pellets which generate heat / power in the KLH factory, with the excess being sold to local CHP plants.
KLH
cro
ss-l
amin
ated
tim
ber
pan
els
Using KLH timber panels do not just create environmental benefits, but it can also save the cost of the building. -Lighter structure, more economic design of the substructure and foundations (less concrete)
- Reduction on the the thickness of the transfer slab(less concrete) - Prelims can be reduced due to the shortened construction programme
- Programming can be enhanced. E.g. pre-ordering windows, will be delivered to site. K
LH c
ross
-lam
inat
ed t
imb
er p
anel
s
Cross-laminated timber (KLH) is produced from spruce strips that are stacked crosswise on top of each other and glued to each other. Depending on the purpose and static requirement, the plates are available in 3, 5, 7 or more board layers
Exp
lora
tio
n o
f th
e cr
oss
-lam
inat
ed t
imb
er p
anel
s
Compared to conventional timber construction products, cross-laminated timber offers entirely new possibilities when it comes to load transfer. Not only can loads be transferred in one direction but on all sides.
Exp
lora
tio
n o
f th
e cr
oss
-lam
inat
ed t
imb
er p
anel
s
The crossways arrangement of the longitudinal and crosswise lamellas reduces the swelling and shrinkage in the board plane to an insignificant minimum - static strength and shape retention increase considerably.
Exp
lora
tio
n o
f th
e cr
oss
-lam
inat
ed t
imb
er p
anel
s
The KLH Massivholz GmbH factories in Austria, cutting and beaming of KLH solid cross laminated timber boards takes place using state-of- the-art CNC technology.
Exp
lora
tio
n o
f th
e cr
oss
-lam
inat
ed t
imb
er p
anel
s
Because of the cross-lamination timber , the KLH panels are stronger than conventional wood products.
Exp
lora
tio
n o
f th
e cr
oss
-lam
inat
ed t
imb
er p
anel
s
The CO2 is absorbed by the trees, and the carbon is stored and oxygen been released. With 1m³ of KLH panels will have approx 240-250kg of "locked-in" carbon. The John Hope Gateway Biodiversity Centre has used 674m³ of KLH timber, which has locked 161760-168500kg of carbon.
KLH
cro
ss-l
amin
ated
tim
ber
pan
els
Stru
ctu
re in
pla
n
Ground floor plan
Single height columns
Stru
ctu
re in
pla
n
Ground floor plan
Double height columns
Stru
ctu
re in
pla
n
Ground floor plan
Load bearing masonry
Stru
ctu
re in
pla
n
First floor plan
Double storey columns
Stru
ctu
re in
pla
n
First floor plan
Load bearing masonry
Stru
ctu
ral S
yste
m –
Pri
mar
y &
sec
on
dar
y
Longitudinal section A-A
Cross section B-B
1. Concrete pad foundations 2. Concrete/Dolomite Floor 3. Cold rolled mild steel columns 4. First floor KLH beams 5. Diagonal roof bracing
A
A
B
B
Longitudinal section
Cross section
Stru
ctu
ral S
yste
m –
Pri
mar
y &
sec
on
dar
y
1. Concrete pad foundations 2. Concrete/Dolomite Floor 3. Cold rolled mild steel columns 4. First floor KLH beams 5. Diagonal roof bracing
Longitudinal section
Cross section
Stru
ctu
ral S
yste
m –
Pri
mar
y &
sec
on
dar
y
1. Concrete pad foundations 2. Concrete/Dolomite Floor 3. Cold rolled mild steel columns 4. First floor KLH beams 5. Diagonal roof bracing
Longitudinal section
Cross section
Stru
ctu
ral S
yste
m –
Pri
mar
y &
sec
on
dar
y
1. Concrete pad foundations 2. Concrete/Dolomite Floor 3. Cold rolled mild steel columns 4. First floor KLH beams 5. Diagonal roof bracing
Longitudinal section
Cross section
Stru
ctu
ral S
yste
m –
Pri
mar
y &
sec
on
dar
y
1. Concrete pad foundations 2. Concrete/Dolomite Floor 3. Cold rolled mild steel columns 4. First floor KLH beams 5. Diagonal roof bracing
Longitudinal section
Cross section
Stru
ctu
ral S
yste
m –
Pri
mar
y &
sec
on
dar
y
1. Concrete pad foundations 2. Concrete/Dolomite Floor 3. Cold rolled mild steel columns 4. First floor KLH beams 5. Diagonal roof bracing
Stru
ctu
ral S
yste
m –
Fo
un
dat
ion
pla
te
Steel base plate - The steel base plate is set into the concrete pad
- Hessian sacks allow for tolerances needed when the column is introduced later on
Stru
ctu
ral S
yste
m –
Fo
un
dat
ion
pla
te
Shuttering - Ply shuttering is put up around the base plate so the next layers of concrete do not come in contact with steel
Stru
ctu
ral S
yste
m –
Fo
un
dat
ion
pla
te
Floor construction -The floor is built up around the shuttering -The column is not put in place until the top layer of concrete has dried through
Stru
ctu
ral S
yste
m –
Fo
un
dat
ion
pla
te
Column connection -The main column slots over the base plate - The hessian sacks under the base plate allow for slight movement of the column
Stru
ctu
ral S
yste
m –
Fo
un
dat
ion
pla
te
Grout - Grout is applied around the base plate to create a solid connection
Stru
ctu
ral S
yste
m –
Fo
un
dat
ion
pla
te
Concrete back fill - The remaining gap is backfilled with concrete once the column is in the correct position
Stru
ctu
ral S
yste
m –
Co
lum
n b
uild
up
1. Inner supports 2. Main column 3. Top column connection 4. Base connection 5. First floor connection 6. Flitch plate
1. Inner supports 2. Main column 3. Top column connection 4. Base connection 5. First floor connection 6. Flitch plate
Stru
ctu
ral S
yste
m –
Co
lum
n b
uild
up
-The inner supports prevent the column from warping - There are a total of 4 cross sections - The gap in the middle is for the later first floor connection plate
Stru
ctu
ral S
yste
m –
Co
lum
n b
uild
up
1. Inner supports 2. Main column 3. Top column connection 4. Base connection 5. First floor connection 6. Flitch plate
- The outer L plates are welded onto the inner supports - These will be done to a high tolerance to ensure that when they arrive on site they can be put in place quickly
Stru
ctu
ral S
yste
m –
Co
lum
n b
uild
up
1. Inner supports 2. Main column 3. Top column connection 4. Base connection 5. First floor connection 6. Flitch plate
Stru
ctu
ral S
yste
m –
Co
lum
n b
uild
up
1. Inner supports 2. Main column 3. Top column connection 4. Base connection 5. First floor connection 6. Flitch plate
-The top connection plate welds into the column
Stru
ctu
ral S
yste
m –
Co
lum
n b
uild
up
1. Inner supports 2. Main column 3. Top column connection 4. Base connection 5. First floor connection 6. Flitch plate
Stru
ctu
ral S
yste
m –
Co
lum
n b
uild
up
1. Inner supports 2. Main column 3. Top column connection 4. Base connection 5. First floor connection 6. Flitch plate
-The bottom connection is welded onto the column
Stru
ctu
ral S
yste
m –
Co
lum
n b
uild
up
1. Inner supports 2. Main column 3. Top column connection 4. Base connection 5. First floor connection 6. Flitch plate
Stru
ctu
ral S
yste
m –
Co
lum
n b
uild
up
1. Inner supports 2. Main column 3. Top column connection 4. Base connection 5. First floor connection 6. Flitch plate
-The first floor connection plate should just slot through the column and be welded to the existing structure
Stru
ctu
ral S
yste
m –
Co
lum
n b
uild
up
1. Inner supports 2. Main column 3. Top column connection 4. Base connection 5. First floor connection 6. Flitch plate
Stru
ctu
ral S
yste
m –
Co
lum
n b
uild
up
1. Inner supports 2. Main column 3. Top column connection 4. Base connection 5. First floor connection 6. Flitch plate
-The flitch plate slots though the top welded connection -This is again welded to the existing column
Stru
ctu
ral S
yste
m –
Co
lum
n b
uild
up
1. Inner supports 2. Main column 3. Top column connection 4. Base connection 5. First floor connection 6. Flitch plate
Stru
ctu
ral S
yste
m
Pad foundation -The pad foundation is cast with the connection plate inside it - Any required movement in the base plate is accommodated by the hessian sacks
Stru
ctu
ral S
yste
m
Shuttering - Ply shuttering is put up around the base plate so the next layers of concrete do not come in contact with steel
Stru
ctu
ral S
yste
m
Dolomite layer -Dolomite is the first layer to be poured on site - 200mm thick
Stru
ctu
ral S
yste
m
Blinding layer -A thin blinding layer is cast to seal the lower levels
Stru
ctu
ral S
yste
m
Concrete layer - A concrete base is poured for the main floor structure - 150mm thick
Stru
ctu
ral S
yste
m
DPM -The damp proof membrane is laid over the concrete
Stru
ctu
ral S
yste
m
Insulation -Rigid insulation is placed over the DPM layer - 100mm thick
Stru
ctu
ral S
yste
m
Final concrete layer -The top layer of concrete is polished to make it aesthetically pleasing - 100mm thick
Stru
ctu
ral S
yste
m
Main column -The main columns are now introduced on site once the floor build up is complete - These columns can be slightly altered due to hessian sacks in the foundations
Stru
ctu
ral S
yste
m
Concrete backfill -Once the column has been welded in place, concrete is poured to secure the column
Stru
ctu
ral S
yste
m
First floor beams - Paired 210mm x 815mm gluelam beams are lifted between the columns - There are two different sizes in columns
Stru
ctu
ral S
yste
m
First floor beams - Steel bolts are then put through both beams and the central connection plate - Total of 18 bolts hold both beams in place
Stru
ctu
ral S
yste
m
KLH floor panels - The KLH floor panels are now lifted and dropped in place individually - Each panel is 2m x 6m - 226mm thick
Stru
ctu
ral S
yste
m
KLH floor panels - The KLH floor panels are now lifted and dropped in place individually -Each panel is 2m x 6m - 226mm thick
Stru
ctu
ral S
yste
m
KLH floor panels - The KLH floor panels are now lifted and dropped in place individually -Each panel is 2m x 6m - 226mm thick
Stru
ctu
ral S
yste
m
KLH floor panels - The KLH floor panels are now lifted and dropped in place individually -Each panel is 2m x 6m - 226mm thick
Stru
ctu
ral S
yste
m
Top flitch plate - Now that the first floor is in, the top flitch plate can be prepped to receive the roof beams
Stru
ctu
ral S
yste
m
Roof beams - Each beam is exactly the same as tapers from 1035mm to 500mm - A slot is cut from the larger end to receive the flitch plate
Stru
ctu
ral S
yste
m
Roof beams - M24 bolts go through the beams and the connection plate to secure the beams in place - There are 24 bolts in total holding each beam
Stru
ctu
ral S
yste
m
Roof beams - M24 bolts go through the beams and the connection plate to secure the beams in place - There are 24 bolts in total holding each beam
Stru
ctu
ral S
yste
m
Connection plates - Each connection plate, connects four different beams together
Stru
ctu
ral S
yste
m
Connection plates - Each connection plate, connects four different beams together
Stru
ctu
ral S
yste
m
Connection plates - The arrangement of the bolts helps visitors understand the structure; a circular arrangement indicates a rotational force or movement while a vertical arrangement indicates a vertical force or shear.
Stru
ctu
ral S
yste
m
KLH roof panels - The roof panels are also made of KLH panels - 2m x 6m - 226mm thick
Stru
ctu
ral S
yste
m
KLH roof panels - The roof panels are also made of KLH panels - 2m x 6m - 226mm thick
Stru
ctu
ral S
yste
m
KLH roof panels - The roof panels are also made of KLH panels - 2m x 6m - 226mm thick
Stru
ctu
ral S
yste
m
KLH roof panels - The roof panels are also made of KLH panels - 2m x 6m - 226mm thick
Load Paths: A Live Load in the Office Space. The Occupier
Live
Lo
ads
Gravity Exerts a Vertical Load on the First Floor
Live
Lo
ads
Gravity Exerts a Vertical Load on the First Floor Where the Seven Laminations of 42mm Thick KLH Panels form a stable platform
Live
Lo
ads
Gravity Exerts a Vertical Load on the First Floor Where the Seven Laminations of 42mm Thick KLH Panels form a stable platform And Distributes the Load Evenly Across the Panels
Live
Lo
ads
Gravity Exerts a Vertical Load on the First Floor Where the Seven Laminations of 42mm Thick KLH Panels form a stable platform And Distributes the Load Evenly Across the Panels To 855mm Thick Beams
Live
Lo
ads
Gravity Exerts a Vertical Load on the First Floor Where the Seven Laminations of 42mm Thick KLH Panels form a stable platform And Distributes the Load Evenly Across the Panels To 855mm Thick Beams Which Connect to and Transfer the Load to Columns Laid on a 6m by 8m Grid Li
ve L
oad
s
Gravity Exerts a Vertical Load on the First Floor Where the Seven Laminations of 42mm Thick KLH Panels form a stable platform And Distributes the Load Evenly Across the Panels To 855mm Thick Beams Which Connect to and Transfer the Load to Columns Laid on a 6m by 8m Grid And then Delivers the Load to a Composite Pad and Raft Foundation
Live
Lo
ads
Gravity Exerts a Vertical Load on the First Floor Where the Seven Laminations of 42mm Thick KLH Panels form a stable platform And Distributes the Load Evenly Across the Panels To 855mm Thick Beams Which Connect to and Transfer the Load to Columns Laid on a 6m by 8m Grid And then Delivers the Load to a Composite Pad and Raft Foundation Where the Ground Resists With an Equal and Opposite Force
Live
Lo
ads
Load Paths: A Dead Load on the Roof. The Skylight
Dea
d L
oad
s
The Mass of the Skylight Exerts a Force
Dea
d L
oad
s
The Mass of the Skylight Exerts a Force Onto the Diagonal Grid Roof Beams,
Dea
d L
oad
s
The Mass of the Skylight Exerts a Force Onto the Diagonal Grid Roof Beams Which Transfer the Load onto the Flitch Plate of the Columns
Dea
d L
oad
s
The Mass of the Skylight Exerts a Force Onto the Diagonal Grid Roof Beams Which Transfer the Load onto the Flitch Plate of the Columns And Turns the Horizontal force into a Vertical Force
Dea
d L
oad
s
The Mass of the Skylight Exerts a Force Onto the Diagonal Grid Roof Beams Which Transfers the Load onto the Flitch Plate of the Columns And Turns the Horizontal force into a Vertical Force That Then Travels Down the Columns
Dea
d L
oad
s
The Mass of the Skylight Exerts a Force Onto the Diagonal Grid Roof Beams Which Transfer the Load onto the Flitch Plate of the Columns And Turns the Horizontal force into a Vertical Force That Then Travels Down the Columns And Into the Pad and Raft Composite Foundation D
ead
Lo
ads
The Mass of the Skylight Exerts a Force Onto the Diagonal Grid Roof Beams Which Transfer the Load onto the Flitch Plate of the Columns And Turns the Horizontal force into a Vertical Force That Then Travels Down the Columns And Into the Pad and Raft Composite Foundation Where the Ground Exerts an Equal and Opposite Force D
ead
Lo
ads
Co
nst
ruct
ion
bu
ild-u
p
Basement floor -In-situ concrete is cast for the basement floor - 250mm thick
Co
nst
ruct
ion
bu
ild-u
p
Basement floor -In-situ concrete is cast for the basement floor - 250mm thick
Co
nst
ruct
ion
bu
ild-u
p
Basement walls -In-situ concrete walls are cast using plyboard shuttering - 250mm thick
Co
nst
ruct
ion
bu
ild-u
p
Basement ceiling construction - Acroprops are put in place the support the shuttering for the ceiling poor
Co
nst
ruct
ion
bu
ild-u
p
Concrete roof shuttering - Plyboard is layered to create the shuttering
Co
nst
ruct
ion
bu
ild-u
p
Basement roof - 250mm thick pre-cast concrete slabs
Co
nst
ruct
ion
bu
ild-u
p
Site backfill - Once the basement concrete panels have been positioned , the basement excavation is backfilled
Co
nst
ruct
ion
bu
ild-u
p
Pad foundations - As a result of good load bearing underlying strata, pad foundations were the most suitable choice of main foundation - The pad foundations are positioned on a 6m x 8m grid which is shared by the primary structural system -There are two sizes of pad foundations. The larger 1500mm x 1500mm x 800mm pads support the primary structural steel columns whereas the smaller 1200mm x 1200mm x 800mm pads support the wooden cladding facade and atrium area
Co
nst
ruct
ion
bu
ild-u
p
Alternative foundations -Raft foundations were used in areas of load bearing capacity such as the entrance and structural cores - Strip foundations were used for elongated load bearing retaining walls at the rear of the building
Co
nst
ruct
ion
bu
ild-u
p
Shuttering - The foundation perimeter is encased with ply board shuttering
Co
nst
ruct
ion
bu
ild-u
p
Dolomite/hardcore layer -A 200mm thick compacted dolomite is poured around the plyboard shuttering
Co
nst
ruct
ion
bu
ild-u
p
Blinding/screed layer - A 6mm blinding layer is poured to fill and cracks and gaps within the dolomite to prevent water causing a freeze thaw effect which ultimately prevents cracking within the dolomite and concrete foundations
Co
nst
ruct
ion
bu
ild-u
p
Concrete - A concrete layer is poured over reinforced steel re-bar which together act as a composite layer to help distribute uneven loads - The concrete is 150mm thick and completes the structural foundations
Co
nst
ruct
ion
bu
ild-u
p
DPC - The damp proof course is laid over the entire length of the concrete for waterproofing purposes
Co
nst
ruct
ion
bu
ild-u
p
Insulation - 100mm thick Kingspan rockwool insulation is laid
Co
nst
ruct
ion
bu
ild-u
p
Under floor heating - Polybutylene piping is laid out over the insulation in isolation zones to allow different areas of the building to be heated individually
Co
nst
ruct
ion
bu
ild-u
p
Polished concrete -A 100mm thick layer of concrete with marble veneer finish to complete the finished floor level of 600mm
Co
nst
ruct
ion
bu
ild-u
p
Remove shuttering - Now that the floor build up is complete the shuttering can be removed
Co
nst
ruct
ion
bu
ild-u
p
Single storey columns - 12 columns are welded into position, attached to the pad foundations . The steel work will start in one corner and progress across site to add strength during the construction sequence
Co
nst
ruct
ion
bu
ild-u
p
Entrance columns - Full height cold rolled mild steel including flitch plates are erected in the atrium area due to full height uninterrupted nature
Co
nst
ruct
ion
bu
ild-u
p
Load bearing masonry - Along steel work a group of brick layers
will start laying load bearing masonry
Co
nst
ruct
ion
bu
ild-u
p
First floor beams - First floor beams are introduced while steel beams are still being erected to provide lateral strength during the build process to withstand wind loading
Co
nst
ruct
ion
bu
ild-u
p
Continuation of columns and beams - Steel and load bearing masonry progress
Co
nst
ruct
ion
bu
ild-u
p
Continuation of columns, beams and advanced brickwork
Co
nst
ruct
ion
bu
ild-u
p
Continuation of columns and beams - Steel and load bearing masonry progress
Co
nst
ruct
ion
bu
ild-u
p
Completion of columns and beams - Steel and load bearing masonry progress
Co
nst
ruct
ion
bu
ild-u
p
Advanced ramp brickwork and pond concrete - The load bearings areas are completed with cavity and window and door openings - Wet tradesman will then start laying the in-situ concrete retaining walls for the water feature
Co
nst
ruct
ion
bu
ild-u
p
KLH floor panels - 2m x 6m KLH panels are added to provide horizontal support during construction
Co
nst
ruct
ion
bu
ild-u
p
Diagonal roof bracing - The diaconal roof bracing is erected in a similar fashion to the columns by building from a corner and progressing across the building
Co
nst
ruct
ion
bu
ild-u
p
Continuation of diagonal roof bracing - Diagonal roof bracing progress
Co
nst
ruct
ion
bu
ild-u
p
Continuation of diagonal roof bracing - Diagonal roof bracing progress
Co
nst
ruct
ion
bu
ild-u
p
Continuation of diagonal roof bracing - Diagonal roof bracing progress
Co
nst
ruct
ion
bu
ild-u
p
Continuation of diagonal roof bracing - Diagonal roof bracing progress
Co
nst
ruct
ion
bu
ild-u
p
KLH roof panels -Each KLH panel has seven laminate layers totalling 226mm thick and are 2m x 6m - The KLH panels span a total of 100m x 50m
Co
nst
ruct
ion
bu
ild-u
p
Entrance columns - Atrium glazing framework connected to steel base plates which connect to concrete raft foundations
Co
nst
ruct
ion
bu
ild-u
p
Lower cladding - Lower cladding is constructed of 3000mm x 250mm x 50mm stained Scots Pine
Co
nst
ruct
ion
bu
ild-u
p
Intermediate cladding -Intermediate cladding is constructed of 3000mm x 250mm x 50mm dark stained Scots Pine -- Complete with internal window glazing and 1100mm tall vertical louvre system
Co
nst
ruct
ion
bu
ild-u
p
Final cladding -Final cladding is constructed of 3000mm x 250mm x 50mm stained Scots Pine and forms the structural basis of the roof parapett
Co
nst
ruct
ion
bu
ild-u
p
Zinc roof -Zinc flashing completes the wooden cladding by providing a waterproof layer for the parapett roof - A zinc roof is added to toilets complete with aluminium grey water storage sistern
Co
nst
ruct
ion
bu
ild-u
p
DPC
Co
nst
ruct
ion
bu
ild-u
p
Insulation - 100mm thick rigid insulation
Co
nst
ruct
ion
bu
ild-u
p
Concrete tray - A corrugated 12mm thick 100mm riveted concrete in-filled tray is constructed
Co
nst
ruct
ion
bu
ild-u
p
Sedum bedding tray - Several containment trays are formed as part of the Sedum roof
Co
nst
ruct
ion
bu
ild-u
p
Soil - Compacted aerated soil is filled to accommodate Sedum layer
Co
nst
ruct
ion
bu
ild-u
p
Pebbles - A layer of medium to fine course pebbles surround the soil filled containment rays to provide increased drainage
Co
nst
ruct
ion
bu
ild-u
p
Soffit - A finishing layer of wood encases and
waterproofs the roof build up
Co
nst
ruct
ion
bu
ild-u
p
ETFE roof skylights -Steel framework, timber batons, plastic window frames, glazing and ETFE skylight roofing are added along with remaining windows to weather proof the building
Co
nst
ruct
ion
bu
ild-u
p
Glazing - By starting the construction in January the building was weatherproof by the start of next winter, allowing for internal walls and first fix progression while construction is not viable due to weather
Co
nst
ruct
ion
bu
ild-u
p
Sedum roof - The Sedum roof is used as a dual purpose facility, it is a lightweight, cheap and efficient insulation layer. It also collects a larger volume of water for the grey water system
Caf
é ar
ea s
ecti
on
1) Pad foundations and columns
Caf
é ar
ea s
ecti
on
1) Pad foundations and columns 2) Insulation bracket
Caf
é ar
ea s
ecti
on
1) Pad foundations and columns 2) Insulation bracket 3) Below slab insulation
Caf
é ar
ea s
ecti
on
1) Pad foundations and columns 2) Insulation bracket 3) Below slab insulation 4) Ground loadbearing slab
Caf
é ar
ea s
ecti
on
1) Pad foundations and columns 2) Insulation bracket 3) Below slab insulation 4) Ground loadbearing slab 5) Slip membrane
Caf
é ar
ea s
ecti
on
1) Pad foundations and columns 2) Insulation bracket 3) Below slab insulation 4) Ground loadbearing slab 5) Slip membrane 6) Concrete topping
Caf
é ar
ea s
ecti
on
1) Pad foundations and columns 2) Insulation bracket 3) Below slab insulation 4) Ground loadbearing slab 5) Slip membrane 6) Concrete topping 7) Insulation RWP
Caf
é ar
ea s
ecti
on
Caf
é ar
ea s
ecti
on
1) Pad foundations and columns 2) Insulation bracket 3) Below slab insulation 4) Ground loadbearing slab 5) Slip membrane 6) Concrete topping 7) Insulation RWP 8) In situ concrete
Caf
é ar
ea s
ecti
on
1) Pad foundations and columns 2) Insulation bracket 3) Below slab insulation 4) Ground loadbearing slab 5) Slip membrane 6) Concrete topping 7) Insulation RWP 8) In situ concrete 9) Insulation
Caf
é ar
ea s
ecti
on
1) Pad foundations and columns 2) Insulation bracket 3) Below slab insulation 4) Ground loadbearing slab 5) Slip membrane 6) Concrete topping 7) Insulation RWP 8) In situ concrete 9) Insulation 10) Breather membrane
Caf
é ar
ea s
ecti
on
1) Pad foundations and columns 2) Insulation bracket 3) Below slab insulation 4) Ground loadbearing slab 5) Slip membrane 6) Concrete topping 7) Insulation RWP 8) In situ concrete 9) Insulation 10) Breather membrane 11) Engineering blocks
Caf
é ar
ea s
ecti
on
1) Pad foundations and columns 2) Insulation bracket 3) Below slab insulation 4) Ground loadbearing slab 5) Slip membrane 6) Concrete topping 7) Insulation RWP 8) In situ concrete 9) Insulation 10) Breather membrane 11) Engineering blocks 12) Stone wall
Caf
é ar
ea s
ecti
on
1) Pad foundations and columns 2) Insulation bracket 3) Below slab insulation 4) Ground loadbearing slab 5) Slip membrane 6) Concrete topping 7) Insulation RWP 8) In situ concrete 9) Insulation 10) Breather membrane 11) Engineering blocks 12) Stone wall 13) Floor beams
Caf
é ar
ea s
ecti
on
1) Pad foundations and columns 2) Insulation bracket 3) Below slab insulation 4) Ground loadbearing slab 5) Slip membrane 6) Concrete topping 7) Insulation RWP 8) In situ concrete 9) Insulation 10) Breather membrane 11) Engineering blocks 12) Stone wall 13) Floor beams 14) Cross laminated timber panel
Caf
é ar
ea s
ecti
on
1) Pad foundations and columns 2) Insulation bracket 3) Below slab insulation 4) Ground loadbearing slab 5) Slip membrane 6) Concrete topping 7) Insulation RWP 8) In situ concrete 9) Insulation 10) Breather membrane 11) Engineering blocks 12) Stone wall 13) Floor beams 14) Cross laminated timber panel 15) Single poly membrane
Caf
é ar
ea s
ecti
on
1) Pad foundations and columns 2) Insulation bracket 3) Below slab insulation 4) Ground loadbearing slab 5) Slip membrane 6) Concrete topping 7) Insulation RWP 8) In situ concrete 9) Insulation 10) Breather membrane 11) Engineering blocks 12) Stone wall 13) Floor beams 14) Cross laminated timber panel 15) Single poly membrane 16) Beam
Caf
é ar
ea s
ecti
on
1) Pad foundations and columns 2) Insulation bracket 3) Below slab insulation 4) Ground loadbearing slab 5) Slip membrane 6) Concrete topping 7) Insulation RWP 8) In situ concrete 9) Insulation 10) Breather membrane 11) Engineering blocks 12) Stone wall 13) Floor beams 14) Cross laminated timber panel 15) Single poly membrane 16) Beam 17) Beam fixing
Caf
é ar
ea s
ecti
on
1) Pad foundations and columns 2) Insulation bracket 3) Below slab insulation 4) Ground loadbearing slab 5) Slip membrane 6) Concrete topping 7) Insulation RWP 8) In situ concrete 9) Insulation 10) Breather membrane 11) Engineering blocks 12) Stone wall 13) Floor beams 14) Cross laminated timber panel 15) Single poly membrane 16) Beam 17) Beam fixing 18) Beam
Caf
é ar
ea s
ecti
on
1) Pad foundations and columns 2) Insulation bracket 3) Below slab insulation 4) Ground loadbearing slab 5) Slip membrane 6) Concrete topping 7) Insulation RWP 8) In situ concrete 9) Insulation 10) Breather membrane 11) Engineering blocks 12) Stone wall 13) Floor beams 14) Cross laminated timber panel 15) Single poly membrane 16) Beam 17) Beam fixing 18) Beam 19) Under floor heating
Caf
é ar
ea s
ecti
on
1) Pad foundations and columns 2) Insulation bracket 3) Below slab insulation 4) Ground loadbearing slab 5) Slip membrane 6) Concrete topping 7) Insulation RWP 8) In situ concrete 9) Insulation 10) Breather membrane 11) Engineering blocks 12) Stone wall 13) Floor beams 14) Cross laminated timber panel 15) Single poly membrane 16) Beam 17) Beam fixing 18) Beam 19) Under floor heating
Caf
é ar
ea s
ecti
on
1) Pad foundations and columns 2) Insulation bracket 3) Below slab insulation 4) Ground loadbearing slab 5) Slip membrane 6) Concrete topping 7) Insulation RWP 8) In situ concrete 9) Insulation 10) Breather membrane 11) Engineering blocks 12) Stone wall 13) Floor beams 14) Cross laminated timber panel 15) Single poly membrane 16) Beam 17) Beam fixing 18) Beam 19) Under floor heating 20) Raised timber floor
Caf
é ar
ea s
ecti
on
1) Pad foundations and columns 2) Insulation bracket 3) Below slab insulation 4) Ground loadbearing slab 5) Slip membrane 6) Concrete topping 7) Insulation RWP 8) In situ concrete 9) Insulation 10) Breather membrane 11) Engineering blocks 12) Stone wall 13) Floor beams 14) Cross laminated timber panel 15) Single poly membrane 16) Beam 17) Beam fixing 18) Beam 19) Under floor heating 20) Raised timber floor
Caf
é ar
ea s
ecti
on
1) Pad foundations and columns 2) Insulation bracket 3) Below slab insulation 4) Ground loadbearing slab 5) Slip membrane 6) Concrete topping 7) Insulation RWP 8) In situ concrete 9) Insulation 10) Breather membrane 11) Engineering blocks 12) Stone wall 13) Floor beams 14) Cross laminated timber panel 15) Single poly membrane 16) Beam 17) Beam fixing 18) Beam 19) Under floor heating 20) Raised timber floor 21) Column
Caf
é ar
ea s
ecti
on
1) Pad foundations and columns 2) Insulation bracket 3) Below slab insulation 4) Ground loadbearing slab 5) Slip membrane 6) Concrete topping 7) Insulation RWP 8) In situ concrete 9) Insulation 10) Breather membrane 11) Engineering blocks 12) Stone wall 13) Floor beams 14) Cross laminated timber panel 15) Single poly membrane 16) Beam 17) Beam fixing 18) Beam 19) Under floor heating 20) Raised timber floor 21) Column 22) Timber decking
Caf
é ar
ea s
ecti
on
1) Pad foundations and columns 2) Insulation bracket 3) Below slab insulation 4) Ground loadbearing slab 5) Slip membrane 6) Concrete topping 7) Insulation RWP 8) In situ concrete 9) Insulation 10) Breather membrane 11) Engineering blocks 12) Stone wall 13) Floor beams 14) Cross laminated timber panel 15) Single poly membrane 16) Beam 17) Beam fixing 18) Beam 19) Under floor heating 20) Raised timber floor 21) Column 22) Timber decking 23) Pressed metal insulated panel
Caf
é ar
ea s
ecti
on
1) Pad foundations and columns 2) Insulation bracket 3) Below slab insulation 4) Ground loadbearing slab 5) Slip membrane 6) Concrete topping 7) Insulation RWP 8) In situ concrete 9) Insulation 10) Breather membrane 11) Engineering blocks 12) Stone wall 13) Floor beams 14) Cross laminated timber panel 15) Single poly membrane 16) Beam 17) Beam fixing 18) Beam 19) Under floor heating 20) Raised timber floor 21) Column 22) Timber decking 23) Pressed metal insulated panel
Caf
é ar
ea s
ecti
on
1) Pad foundations and columns 2) Insulation bracket 3) Below slab insulation 4) Ground loadbearing slab 5) Slip membrane 6) Concrete topping 7) Insulation RWP 8) In situ concrete 9) Insulation 10) Breather membrane 11) Engineering blocks 12) Stone wall 13) Floor beams 14) Cross laminated timber panel 15) Single poly membrane 16) Beam 17) Beam fixing 18) Beam 19) Under floor heating 20) Raised timber floor 21) Column 22) Timber decking 23) Pressed metal insulated panel
Caf
é ar
ea s
ecti
on
1) Pad foundations and columns 2) Insulation bracket 3) Below slab insulation 4) Ground loadbearing slab 5) Slip membrane 6) Concrete topping 7) Insulation RWP 8) In situ concrete 9) Insulation 10) Breather membrane 11) Engineering blocks 12) Stone wall 13) Floor beams 14) Cross laminated timber panel 15) Single poly membrane 16) Beam 17) Beam fixing 18) Beam 19) Under floor heating 20) Raised timber floor 21) Column 22) Timber decking 23) Pressed metal insulated panel
Caf
é ar
ea s
ecti
on
1) Pad foundations and columns 2) Insulation bracket 3) Below slab insulation 4) Ground loadbearing slab 5) Slip membrane 6) Concrete topping 7) Insulation RWP 8) In situ concrete 9) Insulation 10) Breather membrane 11) Engineering blocks 12) Stone wall 13) Floor beams 14) Cross laminated timber panel 15) Single poly membrane 16) Beam 17) Beam fixing 18) Beam 19) Under floor heating 20) Raised timber floor 21) Column 22) Timber decking 23) Pressed metal insulated panel 24) Glass
Caf
é ar
ea s
ecti
on
1) Pad foundations and columns 2) Insulation bracket 3) Below slab insulation 4) Ground loadbearing slab 5) Slip membrane 6) Concrete topping 7) Insulation RWP 8) In situ concrete 9) Insulation 10) Breather membrane 11) Engineering blocks 12) Stone wall 13) Floor beams 14) Cross laminated timber panel 15) Single poly membrane 16) Beam 17) Beam fixing 18) Beam 19) Under floor heating 20) Raised timber floor 21) Column 22) Timber decking 23) Pressed metal insulated panel 24) Glass 25) Pressed metal insulation pad
Caf
é ar
ea s
ecti
on
1) Pad foundations and columns 2) Insulation bracket 3) Below slab insulation 4) Ground loadbearing slab 5) Slip membrane 6) Concrete topping 7) Insulation RWP 8) In situ concrete 9) Insulation 10) Breather membrane 11) Engineering blocks 12) Stone wall 13) Floor beams 14) Cross laminated timber panel 15) Single poly membrane 16) Beam 17) Beam fixing 18) Beam 19) Under floor heating 20) Raised timber floor 21) Column 22) Timber decking 23) Pressed metal insulated panel 24) Glass 25) Pressed metal insulation pad 26) RWP
Caf
é ar
ea s
ecti
on
1) Pad foundations and columns 2) Insulation bracket 3) Below slab insulation 4) Ground loadbearing slab 5) Slip membrane 6) Concrete topping 7) Insulation RWP 8) In situ concrete 9) Insulation 10) Breather membrane 11) Engineering blocks 12) Stone wall 13) Floor beams 14) Cross laminated timber panel 15) Single poly membrane 16) Beam 17) Beam fixing 18) Beam 19) Under floor heating 20) Raised timber floor 21) Column 22) Timber decking 23) Pressed metal insulated panel 24) Glass 25) Pressed metal insulation pad 26) RWP 27) Stone block
Caf
é ar
ea s
ecti
on
1) Pad foundations and columns 2) Insulation bracket 3) Below slab insulation 4) Ground loadbearing slab 5) Slip membrane 6) Concrete topping 7) Insulation RWP 8) In situ concrete 9) Insulation 10) Breather membrane 11) Engineering blocks 12) Stone wall 13) Floor beams 14) Cross laminated timber panel 15) Single poly membrane 16) Beam 17) Beam fixing 18) Beam 19) Under floor heating 20) Raised timber floor 21) Column 22) Timber decking 23) Pressed metal insulated panel 24) Glass 25) Pressed metal insulation pad 26) RWP 27) Stone block 28) Dressed coping stone
Caf
é ar
ea s
ecti
on
1) Pad foundations and columns 2) Insulation bracket 3) Below slab insulation 4) Ground loadbearing slab 5) Slip membrane 6) Concrete topping 7) Insulation RWP 8) In situ concrete 9) Insulation 10) Breather membrane 11) Engineering blocks 12) Stone wall 13) Floor beams 14) Cross laminated timber panel 15) Single poly membrane 16) Beam 17) Beam fixing 18) Beam 19) Under floor heating 20) Raised timber floor 21) Column 22) Timber decking 23) Pressed metal insulated panel 24) Glass 25) Pressed metal insulation pad 26) RWP 27) Stone block 28) Dressed coping stone 29) Supports to roof
Caf
é ar
ea s
ecti
on
1) Pad foundations and columns 2) Insulation bracket 3) Below slab insulation 4) Ground loadbearing slab 5) Slip membrane 6) Concrete topping 7) Insulation RWP 8) In situ concrete 9) Insulation 10) Breather membrane 11) Engineering blocks 12) Stone wall 13) Floor beams 14) Cross laminated timber panel 15) Single poly membrane 16) Beam 17) Beam fixing 18) Beam 19) Under floor heating 20) Raised timber floor 21) Column 22) Timber decking 23) Pressed metal insulated panel 24) Glass 25) Pressed metal insulation pad 26) RWP 27) Stone block 28) Dressed coping stone 29) Supports to roof 30) Cross laminated timber panel
Caf
é ar
ea s
ecti
on
1) Pad foundations and columns 2) Insulation bracket 3) Below slab insulation 4) Ground loadbearing slab 5) Slip membrane 6) Concrete topping 7) Insulation RWP 8) In situ concrete 9) Insulation 10) Breather membrane 11) Engineering blocks 12) Stone wall 13) Floor beams 14) Cross laminated timber panel 15) Single poly membrane 16) Beam 17) Beam fixing 18) Beam 19) Under floor heating 20) Raised timber floor 21) Column 22) Timber decking 23) Pressed metal insulated panel 24) Glass 25) Pressed metal insulation pad 26) RWP 27) Stone block 28) Dressed coping stone 29) Supports to roof 30) Cross laminated timber panel 31) Sedum roof
Caf
é ar
ea s
ecti
on
1) Pad foundations and columns 2) Insulation bracket 3) Below slab insulation 4) Ground loadbearing slab 5) Slip membrane 6) Concrete topping 7) Insulation RWP 8) In situ concrete 9) Insulation 10) Breather membrane 11) Engineering blocks 12) Stone wall 13) Floor beams 14) Cross laminated timber panel 15) Single poly membrane 16) Beam 17) Beam fixing 18) Beam 19) Under floor heating 20) Raised timber floor 21) Column 22) Timber decking 23) Pressed metal insulated panel 24) Glass 25) Pressed metal insulation pad 26) RWP 27) Stone block 28) Dressed coping stone 29) Supports to roof 30) Cross laminated timber panel 31) Sedum roof 32) Timber cap
Caf
é ar
ea s
ecti
on
1) Pad foundations and columns 2) Insulation bracket 3) Below slab insulation 4) Ground loadbearing slab 5) Slip membrane 6) Concrete topping 7) Insulation RWP 8) In situ concrete 9) Insulation 10) Breather membrane 11) Engineering blocks 12) Stone wall 13) Floor beams 14) Cross laminated timber panel 15) Single poly membrane 16) Beam 17) Beam fixing 18) Beam 19) Under floor heating 20) Raised timber floor 21) Column 22) Timber decking 23) Pressed metal insulated panel 24) Glass 25) Pressed metal insulation pad 26) RWP 27) Stone block 28) Dressed coping stone 29) Supports to roof 30) Cross laminated timber panel 31) Sedum roof 32) Timber cap 33) Sedum roof build up
Caf
é ar
ea s
ecti
on
1) Pad foundations and columns 2) Insulation bracket 3) Below slab insulation 4) Ground loadbearing slab 5) Slip membrane 6) Concrete topping 7) Insulation RWP 8) In situ concrete 9) Insulation 10) Breather membrane 11) Engineering blocks 12) Stone wall 13) Floor beams 14) Cross laminated timber panel 15) Single poly membrane 16) Beam 17) Beam fixing 18) Beam 19) Under floor heating 20) Raised timber floor 21) Column 22) Timber decking 23) Pressed metal insulated panel 24) Glass 25) Pressed metal insulation pad 26) RWP 27) Stone block 28) Dressed coping stone 29) Supports to roof 30) Cross laminated timber panel 31) Sedum roof 32) Timber cap 33) Sedum roof build up
Caf
é ar
ea s
ecti
on
1) Pad foundations and columns 2) Insulation bracket 3) Below slab insulation 4) Ground loadbearing slab 5) Slip membrane 6) Concrete topping 7) Insulation RWP 8) In situ concrete 9) Insulation 10) Breather membrane 11) Engineering blocks 12) Stone wall 13) Floor beams 14) Cross laminated timber panel 15) Single poly membrane 16) Beam 17) Beam fixing 18) Beam 19) Under floor heating 20) Raised timber floor 21) Column 22) Timber decking 23) Pressed metal insulated panel 24) Glass 25) Pressed metal insulation pad 26) RWP 27) Stone block 28) Dressed coping stone 29) Supports to roof 30) Cross laminated timber panel 31) Sedum roof 32) Timber cap 33) Sedum roof build up 34) Outer flooring
Typ
ical
wal
l sec
tio
n
1) Concrete base
Typ
ical
wal
l sec
tio
n
1) Concrete base 2) Pad foundations
Typ
ical
wal
l sec
tio
n
1) Concrete base 2) Pad foundations 3) Load bearing slab
Typ
ical
wal
l sec
tio
n
1) Concrete base 2) Pad foundations 3) Load bearing slab 4) Engineer blocks
Typ
ical
wal
l sec
tio
n
1) Concrete base 2) Pad foundations 3) Load bearing slab 4) Engineer blocks 5) Foundation casing
Typ
ical
wal
l sec
tio
n
1) Concrete base 2) Pad foundations 3) Load bearing slab 4) Engineer blocks 5) Foundation casing 6) Waterproof membrane
Typ
ical
wal
l sec
tio
n
1) Concrete base 2) Pad foundations 3) Load bearing slab 4) Engineer blocks 5) Foundation casing 6) Waterproof membrane 7) Concrete slab
Typ
ical
wal
l sec
tio
n
1) Concrete base 2) Pad foundations 3) Load bearing slab 4) Engineer blocks 5) Foundation casing 6) Waterproof membrane 7) Concrete slab 8) Slot drain
Typ
ical
wal
l sec
tio
n
1) Concrete base 2) Pad foundations 3) Load bearing slab 4) Engineer blocks 5) Foundation casing 6) Waterproof membrane 7) Concrete slab 8) Slot drain 9) Insulation
Typ
ical
wal
l sec
tio
n
1) Concrete base 2) Pad foundations 3) Load bearing slab 4) Engineer blocks 5) Foundation casing 6) Waterproof membrane 7) Concrete slab 8) Slot drain 9) Insulation 10) Façade fixtures
Typ
ical
wal
l sec
tio
n
1) Concrete base 2) Pad foundations 3) Load bearing slab 4) Engineer blocks 5) Foundation casing 6) Waterproof membrane 7) Concrete slab 8) Slot drain 9) Insulation 10) Façade fixtures 11) Breather membrane
Typ
ical
wal
l sec
tio
n
1) Concrete base 2) Pad foundations 3) Load bearing slab 4) Engineer blocks 5) Foundation casing 6) Waterproof membrane 7) Concrete slab 8) Slot drain 9) Insulation 10) Façade fixtures 11) Breather membrane 12) Laminated timber panel
Typ
ical
wal
l sec
tio
n
1) Concrete base 2) Pad foundations 3) Load bearing slab 4) Engineer blocks 5) Foundation casing 6) Waterproof membrane 7) Concrete slab 8) Slot drain 9) Insulation 10) Façade fixtures 11) Breather membrane 12) Laminated timber panel 13) Horizontal timber element
Typ
ical
wal
l sec
tio
n
1) Concrete base 2) Pad foundations 3) Load bearing slab 4) Engineer blocks 5) Foundation casing 6) Waterproof membrane 7) Concrete slab 8) Slot drain 9) Insulation 10) Façade fixtures 11) Breather membrane 12) Laminated timber panel 13) Horizontal timber element 14) Laminated timber panel
Typ
ical
wal
l sec
tio
n
1) Concrete base 2) Pad foundations 3) Load bearing slab 4) Engineer blocks 5) Foundation casing 6) Waterproof membrane 7) Concrete slab 8) Slot drain 9) Insulation 10) Façade fixtures 11) Breather membrane 12) Laminated timber panel 13) Horizontal timber element 14) Laminated timber panel 15) Cross laminated timber floor
Typ
ical
wal
l sec
tio
n
1) Concrete base 2) Pad foundations 3) Load bearing slab 4) Engineer blocks 5) Foundation casing 6) Waterproof membrane 7) Concrete slab 8) Slot drain 9) Insulation 10) Façade fixtures 11) Breather membrane 12) Laminated timber panel 13) Horizontal timber element 14) Laminated timber panel 15) Cross laminated timber floor 16) Slotted MS cleat
Typ
ical
wal
l sec
tio
n
1) Concrete base 2) Pad foundations 3) Load bearing slab 4) Engineer blocks 5) Foundation casing 6) Waterproof membrane 7) Concrete slab 8) Slot drain 9) Insulation 10) Façade fixtures 11) Breather membrane 12) Laminated timber panel 13) Horizontal timber element 14) Laminated timber panel 15) Cross laminated timber floor 16) Slotted MS cleat
Typ
ical
wal
l sec
tio
n
1) Concrete base 2) Pad foundations 3) Load bearing slab 4) Engineer blocks 5) Foundation casing 6) Waterproof membrane 7) Concrete slab 8) Slot drain 9) Insulation 10) Façade fixtures 11) Breather membrane 12) Laminated timber panel 13) Horizontal timber element 14) Laminated timber panel 15) Cross laminated timber floor 16) Slotted MS cleat 17) Insulation
Typ
ical
wal
l sec
tio
n
1) Concrete base 2) Pad foundations 3) Load bearing slab 4) Engineer blocks 5) Foundation casing 6) Waterproof membrane 7) Concrete slab 8) Slot drain 9) Insulation 10) Façade fixtures 11) Breather membrane 12) Laminated timber panel 13) Horizontal timber element 14) Laminated timber panel 15) Cross laminated timber floor 16) Slotted MS cleat 17) Insulation 18) Laminated timber panel
Typ
ical
wal
l sec
tio
n
1) Concrete base 2) Pad foundations 3) Load bearing slab 4) Engineer blocks 5) Foundation casing 6) Waterproof membrane 7) Concrete slab 8) Slot drain 9) Insulation 10) Façade fixtures 11) Breather membrane 12) Laminated timber panel 13) Horizontal timber element 14) Laminated timber panel 15) Cross laminated timber floor 16) Slotted MS cleat 17) Insulation 18) Laminated timber panel 19) Vertical timber stud
Typ
ical
wal
l sec
tio
n
1) Concrete base 2) Pad foundations 3) Load bearing slab 4) Engineer blocks 5) Foundation casing 6) Waterproof membrane 7) Concrete slab 8) Slot drain 9) Insulation 10) Façade fixtures 11) Breather membrane 12) Laminated timber panel 13) Horizontal timber element 14) Laminated timber panel 15) Cross laminated timber floor 16) Slotted MS cleat 17) Insulation 18) Laminated timber panel 19) Vertical timber stud 20) Cavity
Typ
ical
wal
l sec
tio
n
1) Concrete base 2) Pad foundations 3) Load bearing slab 4) Engineer blocks 5) Foundation casing 6) Waterproof membrane 7) Concrete slab 8) Slot drain 9) Insulation 10) Façade fixtures 11) Breather membrane 12) Laminated timber panel 13) Horizontal timber element 14) Laminated timber panel 15) Cross laminated timber floor 16) Slotted MS cleat 17) Insulation 18) Laminated timber panel 19) Vertical timber stud 20) Cavity 21) Vertical sawn larch cladding
Typ
ical
wal
l sec
tio
n
1) Concrete base 2) Pad foundations 3) Load bearing slab 4) Engineer blocks 5) Foundation casing 6) Waterproof membrane 7) Concrete slab 8) Slot drain 9) Insulation 10) Façade fixtures 11) Breather membrane 12) Laminated timber panel 13) Horizontal timber element 14) Laminated timber panel 15) Cross laminated timber floor 16) Slotted MS cleat 17) Insulation 18) Laminated timber panel 19) Vertical timber stud 20) Cavity 21) Vertical sawn larch cladding 22) 2x plasterboard and vapour barrier
Typ
ical
wal
l sec
tio
n
1) Concrete base 2) Pad foundations 3) Load bearing slab 4) Engineer blocks 5) Foundation casing 6) Waterproof membrane 7) Concrete slab 8) Slot drain 9) Insulation 10) Façade fixtures 11) Breather membrane 12) Laminated timber panel 13) Horizontal timber element 14) Laminated timber panel 15) Cross laminated timber floor 16) Slotted MS cleat 17) Insulation 18) Laminated timber panel 19) Vertical timber stud 20) Cavity 21) Vertical sawn larch cladding 22) 2x plasterboard and vapour barrier 23) Insulation and laminated timber panel
Typ
ical
wal
l sec
tio
n
1) Concrete base 2) Pad foundations 3) Load bearing slab 4) Engineer blocks 5) Foundation casing 6) Waterproof membrane 7) Concrete slab 8) Slot drain 9) Insulation 10) Façade fixtures 11) Breather membrane 12) Laminated timber panel 13) Horizontal timber element 14) Laminated timber panel 15) Cross laminated timber floor 16) Slotted MS cleat 17) Insulation 18) Laminated timber panel 19) Vertical timber stud 20) Cavity 21) Vertical sawn larch cladding 22) 2x plasterboard and vapour barrier 23) Insulation and laminated timber panel 24) Vertical timber stud
Typ
ical
wal
l sec
tio
n
1) Concrete base 2) Pad foundations 3) Load bearing slab 4) Engineer blocks 5) Foundation casing 6) Waterproof membrane 7) Concrete slab 8) Slot drain 9) Insulation 10) Façade fixtures 11) Breather membrane 12) Laminated timber panel 13) Horizontal timber element 14) Laminated timber panel 15) Cross laminated timber floor 16) Slotted MS cleat 17) Insulation 18) Laminated timber panel 19) Vertical timber stud 20) Cavity 21) Vertical sawn larch cladding 22) 2x plasterboard and vapour barrier 23) Insulation and laminated timber panel 24) Vertical timber stud 25) Lower rail on cleats
Typ
ical
wal
l sec
tio
n
1) Concrete base 2) Pad foundations 3) Load bearing slab 4) Engineer blocks 5) Foundation casing 6) Waterproof membrane 7) Concrete slab 8) Slot drain 9) Insulation 10) Façade fixtures 11) Breather membrane 12) Laminated timber panel 13) Horizontal timber element 14) Laminated timber panel 15) Cross laminated timber floor 16) Slotted MS cleat 17) Insulation 18) Laminated timber panel 19) Vertical timber stud 20) Cavity 21) Vertical sawn larch cladding 22) 2x plasterboard and vapour barrier 23) Insulation and laminated timber panel 24) Vertical timber stud 25) Lower rail on cleats 26) Slotted cleat
Typ
ical
wal
l sec
tio
n
1) Concrete base 2) Pad foundations 3) Load bearing slab 4) Engineer blocks 5) Foundation casing 6) Waterproof membrane 7) Concrete slab 8) Slot drain 9) Insulation 10) Façade fixtures 11) Breather membrane 12) Laminated timber panel 13) Horizontal timber element 14) Laminated timber panel 15) Cross laminated timber floor 16) Slotted MS cleat 17) Insulation 18) Laminated timber panel 19) Vertical timber stud 20) Cavity 21) Vertical sawn larch cladding 22) 2x plasterboard and vapour barrier 23) Insulation and laminated timber panel 24) Vertical timber stud 25) Lower rail on cleats 26) Slotted cleat 27) Cross laminated timber floorboard
Typ
ical
wal
l sec
tio
n
1) Concrete base 2) Pad foundations 3) Load bearing slab 4) Engineer blocks 5) Foundation casing 6) Waterproof membrane 7) Concrete slab 8) Slot drain 9) Insulation 10) Façade fixtures 11) Breather membrane 12) Laminated timber panel 13) Horizontal timber element 14) Laminated timber panel 15) Cross laminated timber floor 16) Slotted MS cleat 17) Insulation 18) Laminated timber panel 19) Vertical timber stud 20) Cavity 21) Vertical sawn larch cladding 22) 2x plasterboard and vapour barrier 23) Insulation and laminated timber panel 24) Vertical timber stud 25) Lower rail on cleats 26) Slotted cleat 27) Cross laminated timber floorboard 28) Angles to fix vertical panel to horizontal
Typ
ical
wal
l sec
tio
n
1) Concrete base 2) Pad foundations 3) Load bearing slab 4) Engineer blocks 5) Foundation casing 6) Waterproof membrane 7) Concrete slab 8) Slot drain 9) Insulation 10) Façade fixtures 11) Breather membrane 12) Laminated timber panel 13) Horizontal timber element 14) Laminated timber panel 15) Cross laminated timber floor 16) Slotted MS cleat 17) Insulation 18) Laminated timber panel 19) Vertical timber stud 20) Cavity 21) Vertical sawn larch cladding 22) 2x plasterboard and vapour barrier 23) Insulation and laminated timber panel 24) Vertical timber stud 25) Lower rail on cleats 26) Slotted cleat 27) Cross laminated timber floorboard 28) Angles to fix vertical panel to horizontal 29) Insulation
Typ
ical
wal
l sec
tio
n
1) Concrete base 2) Pad foundations 3) Load bearing slab 4) Engineer blocks 5) Foundation casing 6) Waterproof membrane 7) Concrete slab 8) Slot drain 9) Insulation 10) Façade fixtures 11) Breather membrane 12) Laminated timber panel 13) Horizontal timber element 14) Laminated timber panel 15) Cross laminated timber floor 16) Slotted MS cleat 17) Insulation 18) Laminated timber panel 19) Vertical timber stud 20) Cavity 21) Vertical sawn larch cladding 22) 2x plasterboard and vapour barrier 23) Insulation and laminated timber panel 24) Vertical timber stud 25) Lower rail on cleats 26) Slotted cleat 27) Cross laminated timber floorboard 28) Angles to fix vertical panel to horizontal 29) Insulation 30) Sedum roof
Typ
ical
wal
l sec
tio
n
1) Concrete base 2) Pad foundations 3) Load bearing slab 4) Engineer blocks 5) Foundation casing 6) Waterproof membrane 7) Concrete slab 8) Slot drain 9) Insulation 10) Façade fixtures 11) Breather membrane 12) Laminated timber panel 13) Horizontal timber element 14) Laminated timber panel 15) Cross laminated timber floor 16) Slotted MS cleat 17) Insulation 18) Laminated timber panel 19) Vertical timber stud 20) Cavity 21) Vertical sawn larch cladding 22) 2x plasterboard and vapour barrier 23) Insulation and laminated timber panel 24) Vertical timber stud 25) Lower rail on cleats 26) Slotted cleat 27) Cross laminated timber floorboard 28) Angles to fix vertical panel to horizontal 29) Insulation 30) Sedum roof
Typ
ical
wal
l sec
tio
n
1) Concrete base 2) Pad foundations 3) Load bearing slab 4) Engineer blocks 5) Foundation casing 6) Waterproof membrane 7) Concrete slab 8) Slot drain 9) Insulation 10) Façade fixtures 11) Breather membrane 12) Laminated timber panel 13) Horizontal timber element 14) Laminated timber panel 15) Cross laminated timber floor 16) Slotted MS cleat 17) Insulation 18) Laminated timber panel 19) Vertical timber stud 20) Cavity 21) Vertical sawn larch cladding 22) 2x plasterboard and vapour barrier 23) Insulation and laminated timber panel 24) Vertical timber stud 25) Lower rail on cleats 26) Slotted cleat 27) Cross laminated timber floorboard 28) Angles to fix vertical panel to horizontal 29) Insulation 30) Sedum roof 31) Vertical timber stud
Typ
ical
wal
l sec
tio
n
1) Concrete base 2) Pad foundations 3) Load bearing slab 4) Engineer blocks 5) Foundation casing 6) Waterproof membrane 7) Concrete slab 8) Slot drain 9) Insulation 10) Façade fixtures 11) Breather membrane 12) Laminated timber panel 13) Horizontal timber element 14) Laminated timber panel 15) Cross laminated timber floor 16) Slotted MS cleat 17) Insulation 18) Laminated timber panel 19) Vertical timber stud 20) Cavity 21) Vertical sawn larch cladding 22) 2x plasterboard and vapour barrier 23) Insulation and laminated timber panel 24) Vertical timber stud 25) Lower rail on cleats 26) Slotted cleat 27) Cross laminated timber floorboard 28) Angles to fix vertical panel to horizontal 29) Insulation 30) Sedum roof 31) Vertical timber stud 32) Timber cap
Typ
ical
wal
l sec
tio
n
1) Concrete base 2) Pad foundations 3) Load bearing slab 4) Engineer blocks 5) Foundation casing 6) Waterproof membrane 7) Concrete slab 8) Slot drain 9) Insulation 10) Façade fixtures 11) Breather membrane 12) Laminated timber panel 13) Horizontal timber element 14) Laminated timber panel 15) Cross laminated timber floor 16) Slotted MS cleat 17) Insulation 18) Laminated timber panel 19) Vertical timber stud 20) Cavity 21) Vertical sawn larch cladding 22) 2x plasterboard and vapour barrier 23) Insulation and laminated timber panel 24) Vertical timber stud 25) Lower rail on cleats 26) Slotted cleat 27) Cross laminated timber floorboard 28) Angles to fix vertical panel to horizontal 29) Insulation 30) Sedum roof 31) Vertical timber stud 32) Timber cap
Typ
ical
wal
l sec
tio
n
1) Concrete base 2) Pad foundations 3) Load bearing slab 4) Engineer blocks 5) Foundation casing 6) Waterproof membrane 7) Concrete slab 8) Slot drain 9) Insulation 10) Façade fixtures 11) Breather membrane 12) Laminated timber panel 13) Horizontal timber element 14) Laminated timber panel 15) Cross laminated timber floor 16) Slotted MS cleat 17) Insulation 18) Laminated timber panel 19) Vertical timber stud 20) Cavity 21) Vertical sawn larch cladding 22) 2x plasterboard and vapour barrier 23) Insulation and laminated timber panel 24) Vertical timber stud 25) Lower rail on cleats 26) Slotted cleat 27) Cross laminated timber floorboard 28) Angles to fix vertical panel to horizontal 29) Insulation 30) Sedum roof 31) Vertical timber stud 32) Timber cap 33) Sawn larch cladding
Typ
ical
wal
l sec
tio
n
1) Concrete base 2) Pad foundations 3) Load bearing slab 4) Engineer blocks 5) Foundation casing 6) Waterproof membrane 7) Concrete slab 8) Slot drain 9) Insulation 10) Façade fixtures 11) Breather membrane 12) Laminated timber panel 13) Horizontal timber element 14) Laminated timber panel 15) Cross laminated timber floor 16) Slotted MS cleat 17) Insulation 18) Laminated timber panel 19) Vertical timber stud 20) Cavity 21) Vertical sawn larch cladding 22) 2x plasterboard and vapour barrier 23) Insulation and laminated timber panel 24) Vertical timber stud 25) Lower rail on cleats 26) Slotted cleat 27) Cross laminated timber floorboard 28) Angles to fix vertical panel to horizontal 29) Insulation 30) Sedum roof 31) Vertical timber stud 32) Timber cap 33) Sawn larch cladding 34) Window fixture
Gla
ss e
ntr
ance
sec
tio
n
1) Concrete base
Gla
ss e
ntr
ance
sec
tio
n
1) Concrete base 2) Pebble marble surface
Gla
ss e
ntr
ance
sec
tio
n
1) Concrete base 2) Pebble marble surface 3) Cold rolled mild steel column
Gla
ss e
ntr
ance
sec
tio
n
1) Concrete base 2) Pebble marble surface 3) Cold rolled mild steel column 4) Marble veneered concrete
Gla
ss e
ntr
ance
sec
tio
n
1) Concrete base 2) Pebble marble surface 3) Cold rolled mild steel column 4) Marble veneered concrete 5) Chanel framed single glazed window
Gla
ss e
ntr
ance
sec
tio
n
1) Concrete base 2) Pebble marble surface 3) Cold rolled mild steel column 4) Marble veneered concrete 5) Chanel framed single glazed window 6) Cross laminated timber panels
Gla
ss e
ntr
ance
sec
tio
n
1) Concrete base 2) Pebble marble surface 3) Cold rolled mild steel column 4) Marble veneered concrete 5) Chanel framed single glazed window 6) Cross laminated timber panels 7) Laminated timber panel
Gla
ss e
ntr
ance
sec
tio
n
1) Concrete base 2) Pebble marble surface 3) Cold rolled mild steel column 4) Marble veneered concrete 5) Chanel framed single glazed window 6) Cross laminated timber panels 7) Laminated timber panel 8) Insulation
Gla
ss e
ntr
ance
sec
tio
n
1) Concrete base 2) Pebble marble surface 3) Cold rolled mild steel column 4) Marble veneered concrete 5) Chanel framed single glazed window 6) Cross laminated timber panels 7) Laminated timber panel 8) Insulation 9) Laminated timber panel
Gla
ss e
ntr
ance
sec
tio
n
1) Concrete base 2) Pebble marble surface 3) Cold rolled mild steel column 4) Marble veneered concrete 5) Chanel framed single glazed window 6) Cross laminated timber panels 7) Laminated timber panel 8) Insulation 9) Laminated timber panel
Gla
ss e
ntr
ance
sec
tio
n
1) Concrete base 2) Pebble marble surface 3) Cold rolled mild steel column 4) Marble veneered concrete 5) Chanel framed single glazed window 6) Cross laminated timber panels 7) Laminated timber panel 8) Insulation 9) Laminated timber panel 10) Sedum tray
Gla
ss e
ntr
ance
sec
tio
n
1) Concrete base 2) Pebble marble surface 3) Cold rolled mild steel column 4) Marble veneered concrete 5) Chanel framed single glazed window 6) Cross laminated timber panels 7) Laminated timber panel 8) Insulation 9) Laminated timber panel 10) Sedum tray 11) Automatic opening vent columns
Gla
ss e
ntr
ance
sec
tio
n
1) Concrete base 2) Pebble marble surface 3) Cold rolled mild steel column 4) Marble veneered concrete 5) Chanel framed single glazed window 6) Cross laminated timber panels 7) Laminated timber panel 8) Insulation 9) Laminated timber panel 10) Sedum tray 11) Automatic opening vent columns 12) Insulation
Gla
ss e
ntr
ance
sec
tio
n
1) Concrete base 2) Pebble marble surface 3) Cold rolled mild steel column 4) Marble veneered concrete 5) Chanel framed single glazed window 6) Cross laminated timber panels 7) Laminated timber panel 8) Insulation 9) Laminated timber panel 10) Sedum tray 11) Automatic opening vent columns 12) Insulation
Gla
ss e
ntr
ance
sec
tio
n
1) Concrete base 2) Pebble marble surface 3) Cold rolled mild steel column 4) Marble veneered concrete 5) Chanel framed single glazed window 6) Cross laminated timber panels 7) Laminated timber panel 8) Insulation 9) Laminated timber panel 10) Sedum tray 11) Automatic opening vent columns 12) Insulation 13) Pressed aluminium gutter with down pipes
Gla
ss e
ntr
ance
sec
tio
n
1) Concrete base 2) Pebble marble surface 3) Cold rolled mild steel column 4) Marble veneered concrete 5) Chanel framed single glazed window 6) Cross laminated timber panels 7) Laminated timber panel 8) Insulation 9) Laminated timber panel 10) Sedum tray 11) Automatic opening vent columns 12) Insulation 13) Pressed aluminium gutter with down pipes 14) Automatic opening vents
Gla
ss e
ntr
ance
sec
tio
n
1) Concrete base 2) Pebble marble surface 3) Cold rolled mild steel column 4) Marble veneered concrete 5) Chanel framed single glazed window 6) Cross laminated timber panels 7) Laminated timber panel 8) Insulation 9) Laminated timber panel 10) Sedum tray 11) Automatic opening vent columns 12) Insulation 13) Pressed aluminium gutter with down pipes 14) Automatic opening vents 15) Window 4m span 120x200
Gla
ss e
ntr
ance
sec
tio
n
1) Concrete base 2) Pebble marble surface 3) Cold rolled mild steel column 4) Marble veneered concrete 5) Chanel framed single glazed window 6) Cross laminated timber panels 7) Laminated timber panel 8) Insulation 9) Laminated timber panel 10) Sedum tray 11) Automatic opening vent columns 12) Insulation 13) Pressed aluminium gutter with down pipes 14) Automatic opening vents 15) Window 4m span 120x200 16) Pressed all internal cover by ETFE contractor
Gla
ss e
ntr
ance
sec
tio
n
1) Concrete base 2) Pebble marble surface 3) Cold rolled mild steel column 4) Marble veneered concrete 5) Chanel framed single glazed window 6) Cross laminated timber panels 7) Laminated timber panel 8) Insulation 9) Laminated timber panel 10) Sedum tray 11) Automatic opening vent columns 12) Insulation 13) Pressed aluminium gutter with down pipes 14) Automatic opening vents 15) Window 4m span 120x200 16) Pressed all internal cover by ETFE contractor 17) ETFE pillow fixture
Fire
Str
ateg
y
Ground Floor Plan
Fire
Str
ateg
y
Ground Floor Plan Fire Exits Doors in the fire cores are held open on electro-magnetic devices -these devices had not yet been activated when we visited. Sliding doors in the entrance and back of the building are fall safe automatic doors with a ‘break-out’ facility.
Fire
Str
ateg
y
Ground Floor Plan Other Exits
Fire
Str
ateg
y
Ground Floor Plan Capacity of Each Space
Fire
Str
ateg
y
Ground Floor Plan Fire Cores
Fire
Str
ateg
y
Ground Floor Plan Fire Travel Distances The maximum travelling distance should be 42.5meters as the building is public visitors centre
47m
30m
39m
17m
Fire
Str
ateg
y
Ground Floor Plan Area Outside Fire Travel Distances The space outside the fire travel distance was allowed as a timber downstand beam was put within the ceiling which will form a smoke reservoir. Therefore occupants can escape via a smoke free reservoir.
Fire
Str
ateg
y
Ground Floor Plan Exits to Assembly Points
Fire
Str
ateg
y
Ground Floor Plan Assembly Points
Fire
Str
ateg
y
Ground Floor Plan Fire Zone 1
Fire
Str
ateg
y
Ground Floor Plan Fire Zone 2
Fire
Str
ateg
y
Ground Floor Plan Fire Zone 3
Fire
Str
ateg
y
Ground Floor Plan Fire Zone 4
Fire
Str
ateg
y
Ground Floor Plan Fire Zone 5
Fire
Str
ateg
y
Ground Floor Plan 60 min Protected Zone
Fire
Str
ateg
y
Ground Floor Plan 60 min Protected Walls and Doors
Fire
Str
ateg
y
Ground Floor Plan 30 min Protected Walls and Doors
Fire
Str
ateg
y
Ground Floor Plan Access For Emergency Services
Fire
Str
ateg
y
Ground Floor Plan Emergency Services Turning Circles These must be a minimum of 14m in diameter.
Fire
Str
ateg
y
Ground Floor Plan Smoke Detectors and Sprinklers
Fire
Str
ateg
y
First Floor Plan
Fire
Str
ateg
y
First Floor Plan Fire Exits
Fire
Str
ateg
y
First Floor Plan Other Exits
Fire
Str
ateg
y
First Floor Plan Capacity of Each Space
Fire
Str
ateg
y
First Floor Plan Fire Cores
Fire
Str
ateg
y
First Floor Plan Fire Travel Distances
16m
28m
16m
37m
Fire
Str
ateg
y
First Floor Plan Fire Zone 1
Fire
Str
ateg
y
First Floor Plan Fire Zone 2
Fire
Str
ateg
y
First Floor Plan Fire Zone 3
Fire
Str
ateg
y
First Floor Plan Fire Zone 4
Fire
Str
ateg
y
First Floor Plan Fire Zone 5
Fire
Str
ateg
y
First Floor Plan 60 min Protected Zone
Fire
Str
ateg
y
First Floor Plan 60 min Protected Walls and Doors
Fire
Str
ateg
y
First Floor Plan 30 min Protected Walls and Doors
Fire
Str
ateg
y
First Floor Plan Smoke Detectors and Sprinklers
Fire
Str
ateg
y
First Floor Plan Hazardous Zone The kitchen
Spring: Autumn:
Summer: Winter:
> 480 460 - 480 440 - 460 420 - 440 400 - 420 380 - 400 380 - 380 340 - 360 < 340
> 640 600 - 640 560 - 600 520 - 560 480 - 520 440 - 480 400 - 440 360 - 400 < 360
> 170 160 - 170 150 - 160 140 - 150 130 - 140 120 - 130 110 - 120 100 - 110 < 100
> 320 300 - 320 280 - 300 260 - 280 240 - 260 220 - 240 200 - 220 180 - 200 < 180
Average Values (Hours) Average Values (Hours)
Average Values (Hours) Average Values (Hours)
Sola
r A
nal
ysis
Sunshine Duration Averages:
25
20
15
10
05
0
-05
-10
-15
-20
-25
Average Min and Max Temperature Degrees Celsius: Extreme Min and Max Temperature Degrees Celsius:
Jan Feb Mar Apr May Jun Jul Aug Sept Oct Nov Dec Jan Feb Mar Apr May Jun Jul Aug Sept Oct Nov Dec
25
20
15
10
05
0
-05
-10
-15
-20
-25
Sola
r A
nal
ysis
Temperature Averages:
The general solar analysis shows that the site averages temperatures above 0 degrees Celsius throughout the year Occasional extreme temperatures may occur and the building should factor in these extremes Advantages: The relatively steady temperature should inform accurate predictions for building systems Disadvantages: the occasional extreme temperature could occur and preparations for such days should be factored
9.00, March
There are no man-made structure casting shadow onto the building. The shadowing of the building is only affected by itself and the foliage around it in the garden
Sola
r A
nal
ysis
Shadow Study:
12.00, March
There are no man-made structure casting shadow onto the building. The shadowing of the building is only affected by itself and the foliage around it in the garden
Sola
r A
nal
ysis
Shadow Study:
15.00, March
There are no man-made structure casting shadow onto the building. The shadowing of the building is only affected by itself and the foliage around it in the garden
Sola
r A
nal
ysis
Shadow Study:
18.00, March
There are no man-made structure casting shadow onto the building. The shadowing of the building is only affected by itself and the foliage around it in the garden
Sola
r A
nal
ysis
Shadow Study:
9.00, July
There are no man-made structure casting shadow onto the building. The shadowing of the building is only affected by itself and the foliage around it in the garden
Sola
r A
nal
ysis
Shadow Study:
12.00, July
There are no man-made structure casting shadow onto the building. The shadowing of the building is only affected by itself and the foliage around it in the garden
Sola
r A
nal
ysis
Shadow Study:
15.00, July
There are no man-made structure casting shadow onto the building. The shadowing of the building is only affected by itself and the foliage around it in the garden
Sola
r A
nal
ysis
Shadow Study:
18.00, July
There are no man-made structure casting shadow onto the building. The shadowing of the building is only affected by itself and the foliage around it in the garden
Sola
r A
nal
ysis
Shadow Study:
9.00, September
There are no man-made structure casting shadow onto the building. The shadowing of the building is only affected by itself and the foliage around it in the garden
Sola
r A
nal
ysis
Shadow Study:
12.00, September
There are no man-made structure casting shadow onto the building. The shadowing of the building is only affected by itself and the foliage around it in the garden
Sola
r A
nal
ysis
Shadow Study:
15.00, September
There are no man-made structure casting shadow onto the building. The shadowing of the building is only affected by itself and the foliage around it in the garden
Sola
r A
nal
ysis
Shadow Study:
18.00, September
There are no man-made structure casting shadow onto the building. The shadowing of the building is only affected by itself and the foliage around it in the garden
Sola
r A
nal
ysis
Shadow Study:
9.00, December
There are no man-made structure casting shadow onto the building. The shadowing of the building is only affected by itself and the foliage around it in the garden
Sola
r A
nal
ysis
Shadow Study:
12.00, December
There are no man-made structure casting shadow onto the building. The shadowing of the building is only affected by itself and the foliage around it in the garden
Sola
r A
nal
ysis
Shadow Study:
15.00, December
There are no man-made structure casting shadow onto the building. The shadowing of the building is only affected by itself and the foliage around it in the garden
Sola
r A
nal
ysis
Shadow Study:
18.00, December
There are no man-made structure casting shadow onto the building. The shadowing of the building is only affected by itself and the foliage around it in the garden
Sola
r A
nal
ysis
Shadow Study:
Summer: Winter:
> 25 20 - 25 15 - 20 10 - 15 8 - 10 6 - 8 < 6
Average Values (Knots) > 25 20 - 25 15 - 20 10 - 15 8 - 10 6 - 8 < 6
Average Values (Knots)
Win
d A
nal
ysis
Mean Wind Speed Averages:
The wind analysis shows that the site may experience winds which average 10-25 knots throughout the year Advantages: strong winds can be used by wind turbines to generate power Disadvantages: the shape of the building may cause adverse wind deflections
Jan: May: Sept:
Feb: June: Oct:
Mar: July: Nov:
Apr: Aug: Dec:
Win
d A
nal
ysis
Month By Month:
N
S
E W
Win
d A
nal
ysis
Year Overall:
The wind analysis shows that the site may experience strong winds, predominantly from the north-east and south-west
The large trees around the site can channel the wind into narrow spaces and increase wind forces and speed
Win
d A
nal
ysis
Wind Channels:
Win
d A
nal
ysis
South West:
Strong winds often approach the site from the south-west
Win
d A
nal
ysis
South West:
1. Winds approach from the south-west
Win
d A
nal
ysis
South West:
1. Winds approach from the south-west 2. As wind is forced through channels speeds increase
Win
d A
nal
ysis
South West:
1. Winds approach from the south-west 2. As wind is forced through channels speeds increase
Win
d A
nal
ysis
South West:
1. Winds approach from the south-west 2. As wind is forced through channels speeds increase 3. Wind disperses into more open ground
Win
d A
nal
ysis
South West:
As the wind passes by the large trees areas of negative pressure Positive pressure Negative pressure
Win
d A
nal
ysis
South West:
As the wind passes by the large trees areas of negative pressure Positive pressure Negative pressure
Win
d A
nal
ysis
South West:
As the wind passes by the large trees areas of negative pressure Positive pressure Negative pressure
Win
d A
nal
ysis
South West:
As the wind passes by the large trees areas of negative pressure Positive pressure Negative pressure
Win
d A
nal
ysis
North East:
Strong winds often approach the site from the north-east
Win
d A
nal
ysis
North East:
1. Winds approach from the north-east
Win
d A
nal
ysis
North East:
1. Winds approach from the north-east 2. As wind is forced through channels speeds increase
Win
d A
nal
ysis
North East:
1. Winds approach from the north-east 2. As wind is forced through channels speeds increase
Win
d A
nal
ysis
North East:
1. Winds approach from the north-east 2. As wind is forced through channels speeds increase 3. Wind disperses into more open ground
Win
d A
nal
ysis
North East:
As the wind passes by the large trees areas of negative pressure Positive pressure Negative pressure
Win
d A
nal
ysis
North East:
As the wind passes by the large trees areas of negative pressure Positive pressure Negative pressure
Win
d A
nal
ysis
North East:
As the wind passes by the large trees areas of negative pressure Positive pressure Negative pressure
Win
d A
nal
ysis
North East:
As the wind passes by the large trees areas of negative pressure Positive pressure Negative pressure
Spring: Autumn:
Summer: Winter:
> 800 600 - 800 500 - 600 400 - 500 300 - 400 250 - 300 200 - 250 150 - 200 < 150
> 800 600 - 800 500 - 600 400 - 500 300 - 400 250 - 300 200 - 250 150 - 200 < 150
> 800 600 - 800 500 - 600 400 - 500 300 - 400 250 - 300 200 - 250 150 - 200 < 150
> 800 600 - 800 500 - 600 400 - 500 300 - 400 250 - 300 200 - 250 150 - 200 < 150
Average Values (mm) Average Values (mm)
Average Values (mm) Average Values (mm)
Wat
er A
nal
ysis
Rainfall Averages:
Mean Monthly Rainfall (mm):
Jan Feb Mar Apr May Jun Jul Aug Sept Oct Nov Dec
130
120
110
100
90
80
70
60
50
40
30
20
10
Wat
er A
nal
ysis
Rainfall Averages:
Rainfall analysis shows that the site experiences a large amount of rainfall throughout the year Advantages: rainwater may be harvested for utilities Disadvantages: the building will need to be very weather tight and damp conditions may restrict material choice
Spring: Autumn:
Summer: Winter:
> 40 30 - 40 20 - 30 15 - 20 10 - 15 5 - 10 < 5
< 0.5
> 40 30 - 40 20 - 30 15 - 20 10 - 15 5 - 10 < 5
> 40 30 - 40 20 - 30 15 - 20 10 - 15 5 - 10 < 5
Average Values (mm) Average Values (mm)
Average Values (days) Average Values (mm)
Wat
er A
nal
ysis
Lying Snow Averages:
26
24
22
20
18
16
14
12
10
08
06
04
02
26
24
22
20
18
16
14
12
10
08
06
04
02
Average No. Days Ground Frost: Average No. Days Air Frost:
Jan Feb Mar Apr May Jun Jul Aug Sept Oct Nov Dec Jan Feb Mar Apr May Jun Jul Aug Sept Oct Nov Dec
Wat
er A
nal
ysis
Frost:
Snow and frost analysis shows that the site may experience severe cold spells Advantages: no significant advantages Disadvantages: lying snow will need to be accounted for in room loading, colder conditions may not be suitable for some environmental conditions
Wat
er A
nal
ysis
River Location:
The site is located on raised ground to the north of the Water of Leith
Wat
er A
nal
ysis
Flood Zone:
Flood analysis shows that the site should not experience any significant flooding should the river burst its banks. Please note: localised flooding could occur if drains are not properly maintained and cleared due to the large volume of rainfall the site experiences.
Borehole Sample Map: G
eolo
gy A
nal
ysis
Borehole Sample 130m:
0m
5m
10m
Topsoil Soft Silt And Sandy Clay Medium Dense Brown Clay Firm Dark Gray Gravelly Clay Gravel And Sand Sand With Broken Sandstone Fire Clay
Cobble Sets Mudstone Red Clay With Burnt Shale Concrete Compacted Brick Fill Boulders / Broken Rock Paraffin Shale
Medium Sand Mixed With Stone Weak Weathered Mudstone Tarmac Broken Stone Firm Sandstone Black Ash Filling Black Sand
Key:
Geo
logy
An
alys
is
Topsoil Soft Silt And Sandy Clay Medium Dense Brown Clay Firm Dark Gray Gravelly Clay Gravel And Sand Sand With Broken Sandstone Fire Clay
Cobble Sets Mudstone Red Clay With Burnt Shale Concrete Compacted Brick Fill Boulders / Broken Rock Paraffin Shale
Medium Sand Mixed With Stone Weak Weathered Mudstone Tarmac Broken Stone Firm Sandstone Black Ash Filling Black Sand
Key:
0m
5m
10m
15m
Geo
logy
An
alys
is
Borehole Samples:
Topsoil Soft Silt And Sandy Clay Medium Dense Brown Clay Firm Dark Gray Gravelly Clay Gravel And Sand Sand With Broken Sandstone Fire Clay
Cobble Sets Mudstone Red Clay With Burnt Shale Concrete Compacted Brick Fill Boulders / Broken Rock Paraffin Shale
Medium Sand Mixed With Stone Weak Weathered Mudstone Tarmac Broken Stone Firm Sandstone Black Ash Filling Black Sand
Key:
0m
5m
10m
15m
Geo
logy
An
alys
is
Borehole Samples:
Key: 1: Clay and Large Stones 2:Clay 3: Broken Rock and Boulders 4: Coarse Gravel and Boulders 5: Black Sand 6: Sandstone 7: Clay 8: Paraffin Shale 9: Sandstone 10: Clay 11: Sandstone 12: Clay with Boulders and Gravel 13: Sandstone 14: Clay 15: Sandstone 16: Fireclay 17: Sandstone and Quartz
1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 16 17
0 - 9.14m 9.14 - 13.1m 13.1 - 15.24m 15.24 - 22.55m 22.55 - 25.29m 25.29 - 30.17m 30.17 - 30.78m 30.78 - 40.23m 40.23 - 53.64m 53.64 - 54.25m 54.25 - 57.30m 57.30 - 67.05m 67.05 - 86.56m 86.56 – 87.17m 87.17 - 118.87m 118.87 - 122.52m 122.52 - 129.54m
Geo
logy
An
alys
is
Geological Build-Up 130m:
Geological analysis shows that the site sits on approx. 25m of clay and sand. After 25m there are significant deposits of sandstone. Around the site the smaller bore hole samples suggest that a lot of man made spoil could occur. This should not be a problem for the specific site because of the age of the gardens. We would suggest that pad foundations would be suitable for these geological conditions.
Entrance foyer - Natural lighting from the two side glass facade and ETFE roofing - Artificial lighting system is using spot light to shire from the floor up to the roof and from the roof coming down, when the outside is dark - Naturally Ventilated by passive ventilation
Ground Floor Zo
nin
g –
Pri
nci
pal
Sp
aces
Toilet - Although natural light enter the area from the small glazing on the roof, but artificial lighting is still required - Mechanical ventilated space
Ground Floor Zo
nin
g –
Pri
nci
pal
Sp
aces
Open plan space - Natural light enter the space from the glass facade and ETFE roofing - Artificial lighting is also required to increase the luminosity - Passive Ventilated from automatically controlled vents - Mechanical ventilation will be use when its needed - Under floor heating is used
Ground Floor Zo
nin
g –
Pri
nci
pal
Sp
aces
Toilet - Natural and artificial lighting are both used to light up the space - Mechanical ventilated space - Under floor heating is used
Ground Floor Zo
nin
g –
Pri
nci
pal
Sp
aces
Circulation and Storage -Glazing are installed but due to small openings artificial lighting is mostly used - Spaces are mechanical ventilated - Under floor heating is used
Ground Floor Zo
nin
g –
Pri
nci
pal
Sp
aces
Plant room - Artificial lighting is constantly needed due to lack of windows, but with the space being not having a lot of human access, the light will not required to be on for a long period of time - Mechanically ventilated through vents controlled by extractor fans
Ground Floor Zo
nin
g –
Pri
nci
pal
Sp
aces
Open plan spaces - Natural light enter the space from the glass facade and ETFE roofing - Artificial lighting is also required to increase the luminosity - Passive Ventilated from automatically controlled vents - Mechanical ventilation will be use when its needed - Under floor heating is used
First Floor Zo
nin
g –
Pri
nci
pal
Sp
aces
Office - Natural and artificial lighting are both used in this space - On the facade glazing, white light reflectors are installed to reflect all available sunlight into the space to reduce the need for artificial lighting - The top of the internal walls are also made of glass which allows light enter from the roof atrium - Mechanical ventilated space - Under floor heating is used
First Floor Zo
nin
g –
Pri
nci
pal
Sp
aces
Kitchen - Natural and artificial lighting are both used to light up the space - It is assume that it is mechanically ventilated, because of the function of the space and the lack of window - Under floor heating is used
First Floor Zo
nin
g –
Pri
nci
pal
Sp
aces
Toilet - Artificial lighting is used in the enclosed space - Mechanical ventilated space - Under floor heating is used
First Floor Zo
nin
g –
Pri
nci
pal
Sp
aces
Circulation and Storage - The space is mainly artificial lighted. Although there are glazed opening, but the opening is not big enough to have the space totally naturally lighted - Mechanical ventilated space - Under floor heating is used
First Floor Zo
nin
g –
Pri
nci
pal
Sp
aces
Education room - Natural and artificial lighting are both used to light up the space - Natural ventilation is controlled by the automatically controlled vents - Mechanical ventilation will be use when its needed - Under floor heating is used
First Floor Zo
nin
g –
Pri
nci
pal
Sp
aces
First Floor Plan Public Spaces
Zon
ing
– P
rin
cip
al S
pac
es
First Floor Plan Private Spaces
Zon
ing
– P
rin
cip
al S
pac
es
Ground Floor Plan Public Spaces
Zon
ing
– P
rin
cip
al S
pac
es
Ground Floor Plan Private Spaces
Zon
ing
– P
rin
cip
al S
pac
es
Due to the buildings orientation to the sun,
there is very little direct sunlight allowed into the
building one measure implemented to allow sunlight into the office
spaces are these Louvre's. They work by bouncing a
subdued sunlight into the offices
The building internal atriums are lit by roof light
which have a polymer cover on them. This is to give a more uniform and
bright light rather than direct intense sun light. As there is gallery space with
in the atriums this polymer helps to block out
UV rays.
Nat
ura
l Lig
hti
ng Lighting Systems:
Nat
ura
l Lig
hti
ng Lighting Systems:
Due to the buildings orientation to the sun,
there is very little direct sunlight allowed into the
building one measure implemented to allow sunlight into the office
spaces are these Louvre's. They work by bouncing a
subdued sunlight into the offices
The building internal atriums are lit by roof light
which have a polymer cover on them. This is to give a more uniform and
bright light rather than direct intense sun light. As there is gallery space with
in the atriums this polymer helps to block out
UV rays.
Nat
ura
l Lig
hti
ng Lighting Systems:
Due to the buildings orientation to the sun,
there is very little direct sunlight allowed into the
building one measure implemented to allow sunlight into the office
spaces are these Louvre's. They work by bouncing a
subdued sunlight into the offices
The building internal atriums are lit by roof light
which have a polymer cover on them. This is to give a more uniform and
bright light rather than direct intense sun light. As there is gallery space with
in the atriums this polymer helps to block out
UV rays.
Nat
ura
l Lig
hti
ng Lighting Systems:
Due to the buildings orientation to the sun,
there is very little direct sunlight allowed into the
building one measure implemented to allow sunlight into the office
spaces are these Louvre's. They work by bouncing a
subdued sunlight into the offices
The building internal atriums are lit by roof light
which have a polymer cover on them. This is to give a more uniform and
bright light rather than direct intense sun light. As there is gallery space with
in the atriums this polymer helps to block out
UV rays.
Nat
ura
l Lig
hti
ng Lighting Systems:
Due to the buildings orientation to the sun,
there is very little direct sunlight allowed into the
building one measure implemented to allow sunlight into the office
spaces are these Louvre's. They work by bouncing a
subdued sunlight into the offices
The building internal atriums are lit by roof light
which have a polymer cover on them. This is to give a more uniform and
bright light rather than direct intense sun light. As there is gallery space with
in the atriums this polymer helps to block out
UV rays.
Despite the buildings position in relation to the sun, it has been designed to make the most of
the suns natural light throughout the day.
Maximum sun angle 73 degrees
Nat
ura
l Lig
hti
ng Summer 9am:
Summer 12pm
Maximum sun angle 73 degrees
Nat
ura
l Lig
hti
ng Summer 12pm:
Maximum sun angle 73 degrees
Nat
ura
l Lig
hti
ng Summer 5pm:
Minimum sun angle 20 degrees
Nat
ura
l Lig
hti
ng Winter 9am:
Minimum sun angle 20 degrees
Nat
ura
l Lig
hti
ng Winter 12pm:
Minimum sun angle 20 degrees
Nat
ura
l Lig
hti
ng Winter 5pm:
The restaurant light system consists of fluorescent tubes
suspended from the ceiling and integrated into panels that aid
acoustics' and contain heating and ventilation pipes.
Restaurant:
Exhibition Space:
In the exhibition space no lighting could be integrated into the
structural beams or walls this means all the lighting is suspended
within a neat panel system that also contains all of the heat and
ventilation ducts. The lighting in this space
comprises of spot lights that can be moved along tracks to alter the
space depending on what the exhibition requires.
Art
ific
ial L
igh
tin
g Lighting - Space By Space:
The restaurant light system consists of fluorescent tubes
suspended from the ceiling and integrated into panels that aid
acoustics' and contain heating and ventilation pipes.
In the evening the space is
transformed by atmospheric blue LED lighting that is contained
within the same suspended ceiling panels.
Restaurant:
Exhibition Space:
In the exhibition space no lighting could be integrated into the
structural beams or walls this means all the lighting is suspended
within a neat panel system that also contains all of the heat and
ventilation ducts. The lighting in this space
comprises of spot lights that can be moved along tracks to alter the
space depending on what the exhibition requires.
Art
ific
ial L
igh
tin
g Lighting - Space By Space:
The exterior lighting consists of LED units that illuminate up the blue slate wall. This create and
interesting effect of shadows and highlight using the natural form of
the stone work.
Exterior Lighting:
Timber Staircase:
The stairs are one of the most outstanding features within the building. The lighting engineers
worked with architects and manufacturers to integrate an LED
lighting system that would compliment the sculptural form. The LED strips are built into the
treads of the stair and illuminate both the top and bottom of the
staircase.
Art
ific
ial L
igh
tin
g Lighting - Space By Space:
Section to show the use of lighting throughout the building
Art
ific
ial L
igh
tin
g Lighting - Building Overall:
The buildings primary ventilation strategy is the use of windows and vents along side atriums and opening roof lights to create a chimney
stack effect to naturally cool the volume.
Nat
ura
l Ven
tila
tio
n
The buildings primary ventilation strategy is the use of windows and vents along side atriums and opening roof lights to create a chimney
stack effect to naturally cool the volume.
Nat
ura
l Ven
tila
tio
n
There is no air conditioning or air pumped within the building, instead the building relies
on allowing air to enter the building through air vents that are automatically controlled by comparing outside temperatures with the
temperatures inside the building
Nat
ura
l Ven
tila
tio
n
This safes energy and has the additional benefit of allowing us to breathe fresh air instead of
recycled ‘second hand’ air.
Nat
ura
l Ven
tila
tio
n
This safes energy and has the additional benefit of allowing us to breathe fresh air instead of
recycled ‘second hand’ air.
Nat
ura
l Ven
tila
tio
n
The services come up the side of the lift shaft located next to the kitchen, above the basement where the plant room is located. In this plant room the utilities enter the building ready to be distributed
throughout the structure. The plant room also services the heating cooling and ventilation systems.
Plant Room Location: Se
rvic
e R
un
s
The services come up the side of the lift shaft located next to the kitchen, above the basement where the plant room is located. In this plant room the utilities enter the building ready to be distributed
throughout the structure. The plant room also services the heating cooling and ventilation systems.
Plant Room Location: Se
rvic
e R
un
s
The services come up the side of the lift shaft located next to the kitchen, above the basement where the plant room is located. In this plant room the utilities enter the building ready to be distributed
throughout the structure. The plant room also services the heating cooling and ventilation systems.
Plant Core Location: Se
rvic
e R
un
s
The services come up the side of the lift shaft located next to the kitchen, above the basement where the plant room is located. In this plant room the utilities enter the building ready to be distributed
throughout the structure. The plant room also services the heating cooling and ventilation systems.
Plant Core Location: Se
rvic
e R
un
s
The services come up the side of the lift shaft located next to the kitchen, above the basement where the plant room is located. In this plant room the utilities enter the building ready to be distributed
throughout the structure. The plant room also services the heating cooling and ventilation systems.
Service Run Locations: Se
rvic
e R
un
s
Serv
ice
Ru
ns Service Run Locations:
The services come up the side of the lift shaft located next to the kitchen, above the basement where the plant room is located. In this plant room the utilities enter the building ready to be distributed
throughout the structure. The plant room also services the heating cooling and ventilation systems.
Serv
ice
Ru
ns Service Run Locations:
The services come up the side of the lift shaft located next to the kitchen, above the basement where the plant room is located. In this plant room the utilities enter the building ready to be distributed
throughout the structure. The plant room also services the heating cooling and ventilation systems.
The services come up the side of the lift shaft located next to the kitchen, above the basement where the plant room is located. In this plant room the utilities enter the building ready to be distributed
throughout the structure. The plant room also services the heating cooling and ventilation systems.
Service Run Locations: Se
rvic
e R
un
s
The services come up the side of the lift shaft located next to the kitchen, above the basement where the plant room is located. In this plant room the utilities enter the building ready to be distributed
throughout the structure. The plant room also services the heating cooling and ventilation systems.
Service Run Locations: Se
rvic
e R
un
s
The services come up the side of the lift shaft located next to the kitchen, above the basement where the plant room is located. In this plant room the utilities enter the building ready to be distributed
throughout the structure. The plant room also services the heating cooling and ventilation systems.
Service Run Locations: Se
rvic
e R
un
s
Serv
ice
Ru
ns
The services come up the side of the lift shaft located next to the kitchen, above the basement where the plant room is located. In this plant room the utilities enter the building ready to be distributed
throughout the structure. The plant room also services the heating cooling and ventilation systems.
Service Run Locations:
Serv
ice
Ru
ns Service Run Locations:
The services come up the side of the lift shaft located next to the kitchen, above the basement where the plant room is located. In this plant room the utilities enter the building ready to be distributed
throughout the structure. The plant room also services the heating cooling and ventilation systems.
The services come up the side of the lift shaft located next to the kitchen, above the basement where the plant room is located. In this plant room the utilities enter the building ready to be distributed
throughout the structure. The plant room also services the heating cooling and ventilation systems.
Service Run Locations: Se
rvic
e R
un
s
The services come up the side of the lift shaft located next to the kitchen, above the basement where the plant room is located. In this plant room the utilities enter the building ready to be distributed
throughout the structure. The plant room also services the heating cooling and ventilation systems.
Service Run Locations: Se
rvic
e R
un
s
The services come up the side of the lift shaft located next to the kitchen, above the basement where the plant room is located. In this plant room the utilities enter the building ready to be distributed
throughout the structure. The plant room also services the heating cooling and ventilation systems.
Service Run Locations: Se
rvic
e R
un
s
Serv
ice
Ru
ns Heating and Cooling System:
The heating and cooling system on the ground floor is a flat line
radiant system manufactured by Zehnder. The system is an efficient
way of maintaining an ambient temperature. It does this by using
convection to move air through the unit which dependent on
requirements can heat or cool the effected space. The system uses
hot or cold water pumped through the system to either heat or cool
the space depending on the requirement of the gallery.
Serv
ice
Ru
ns Heating and Cooling System:
The heating and cooling system on the ground floor is a flat line
radiant system manufactured by Zehnder. The system is an efficient
way of maintaining an ambient temperature. It does this by using
convection to move air through the unit which dependent on
requirements can heat or cool the effected space. The system uses
hot or cold water pumped through the system to either heat or cool
the space depending on the requirement of the gallery.
Serv
ice
Ru
ns Heating and Cooling System:
The heating and cooling system on the ground floor is a flat line
radiant system manufactured by Zehnder. The system is an efficient
way of maintaining an ambient temperature. It does this by using
convection to move air through the unit which dependent on
requirements can heat or cool the effected space. The system uses
hot or cold water pumped through the system to either heat or cool
the space depending on the requirement of the gallery.
Heating and Cooling System:
The heating and cooling system on the ground floor is a flat line
radiant system manufactured by Zehnder. The system is an efficient
way of maintaining an ambient temperature. It does this by using
convection to move air through the unit which dependent on
requirements can heat or cool the effected space. The system uses
hot or cold water pumped through the system to either heat or cool
the space depending on the requirement of the gallery.
Serv
ice
Ru
ns
Nat
ura
l Lig
hti
ng
Sect
ion
4 -
Su
stai
nab
ility
A - Wind Turbine B - Sedum Roof C - Rainwater Harvesting D - Solar Panels E - Bio-mass Boiler
Win
d T
urb
ine Current Wind Turbine System:
Current System: Computer control system (Uses a gust tracking algorithm to detect the behaviour of the wind. This information is then used to gain maximum power from the wind during gusts, to optimize the turbine performance.)
Compact size (Five metres high and three metres in diameter makes it compact and easy to integrate)
One moving part (Limits maintenance and inspection)
Wire safety system (Built in wire tensile system to prevent parts coming away from the turbine in the event of structural failure)
A
Turbine specification: Physical dimensions 5.5m tall, 3.1m diameter Generator Direct drive, mechanically integrated, weather sealed permanent magnet generator Power control Peak power tracking constantly optimises turbine output for all sites and wind speeds Power The projected peak power at 16m/s is: 8.5kW aerodynamic; 7.0kW DC; 6.5kWh at 7m/s Annual energy yield 4197kWh at 5m/s to BWEA standards Up to 12729kWh at 7m/s No reduction in power output at up to 40% turbulence intensity Operating wind speeds Cut in at sustained 5m/s; Cut out sustained 26m/s Design life 25 years (annual inspections recommended) Rotor construction Carbon fibre Power Regulation and shutdown Power regulation above 13.5m/s wind speed, auto shutdown in high wind speeds (above 26m/s) Roof mounting 6m mast Tower mounting 18m mast Remote monitoring Event log can be accessed via PC. Remote monitoring stores operation, average wind speeds and kW hours of electricity generated Warranty Two years on components
Win
d T
urb
ine Current Wind Turbine System - Statistics:
A
Win
d T
urb
ine
The turbine can generate around 4000 to 10000kWh per year, energy enough to supply an office which has 15-20 men.
Current Wind Turbine System: A
Designed as a quiet solution of consuming wind energy. Because of its quietness, it can be installed in urban areas.
Win
d T
urb
ine Current Wind Turbine System:
A
Win
d T
urb
ine Wind Turbine Does Not Work:
The wind turbine is not currently working Possible reasons for turbine failure could be: Too strong / weak wind strength Wind blocked by trees Hardware or software failure A
The Turbine will work at speeds between 5m/s and 26m/s Speeds below 5m/s are shown in Red, The grey areas show up to an optimum speed of approx 16m/s Analysis shows that the site experiences suitable wind speeds for turbine operation
Win
d T
urb
ine Wind Strength?:
Jan: May: Sept:
Feb: June: Oct:
Mar: July: Nov:
Apr: Aug: Dec:
A
= Turbine Location
Win
d T
urb
ine Turbine Positioning?:
The Turbine will work with winds from any direction As shown in the wind analysis the site experiences strong channels of wind around and over the building Analysis indicates the turbine should not be blocked from the wind and have strong channels passing A
Win
d T
urb
ine Computer System?:
The chosen turbine incorporates a sophisticated computer system which: Determines when to spin turbine to start Determines when to brake in high winds Decides when to shut down Production of event logs for analysis Predictive controller learns site wind analysis over time Remote monitoring
Analysis shows under the environmental conditions of the site the turbine should operate. Because conditions are adequate we would suggest that the turbine may have malfunctioned due hardware or software problems.
A
Quietrevolution QR5 Windspire Gyromill Venturi Turbine Ropatec Vertical
Cut in: 5m/s 4m/s 2m/s 1.94m/s
Optimum: 16m/s 5.4m/s 5m/s 13.88m/s
Max: 26m/s 45m/s 40m/s 75m/s
kW/hr: 9600 2000 500 2300
Features: Low Noise Predictive Controller Auto Shut Down Low Vibration
Low Noise Small Scale Self Starting High Strength
Low Noise Almost continuous Low Cost Ideal for Low Speeds
Low Noise Low Maintenance Aerodynamic braking system
Win
d T
urb
ine Correct Turbine Choice?:
Our Suggestion: We believe alternative vertical turbines would be suited to the site. A turbine which does not rely on computer systems would eliminate the chance of software failure.
A
Win
d T
urb
ine Alternative Turbine Choice?:
Our Suggestion: A system using the Ropatec Vertical turbine would be more suited to the site.
Ropatec Vertical Turbine Quietrevolution QR5
Operates at lower speed Requires higher speeds
Able to operate at higher speeds Unable to operate at highest speeds
Optimum speed is higher Optimum speed is lower
Generates less power Generates more power
Aerodynamic braking system Computerised braking system
Although the Quiet revolution produces more power and it optimal at lower speeds, we believe that the Ropatec would be better suited due to its ability to work in lower and higher winds. Also by eliminating a reliance on complex computer systems will minimise failure.
More desirable traits are highlighted in red
A
Win
d T
urb
ine Alternative Turbine Choice?:
Our Suggestion: Using two Ropatec Vertical turbines would give more power generation and produce approx. 2/3 of the power from the Quietrevolution QR5 system
We would suggest utilising both wind channels and putting a second turbine on the south-east corner Although 2 Ropatec turbines only produce 4600kW/hr compared to 9600kW/hr of the Quietrevolution QR5 system we believe the ability to run at lower and higher speeds would make up for some of this loss
= Turbine Location
A
Green roof is a roof that is partially or completely covered with vegetation and a growing medium. Green roof has a longer lifespan than conventional roof, with roofs are under constant ultra-violet light. In it’s first summer the roof was colonised by butterflies, insects and birds
Gre
en
Ro
of Current Roof System:
B
Gre
en
Ro
of Green Roof Section:
Key: 1. Sedum Roof 2. Rock Fill 3. Growing Medium 4. Primary Filter Layer 5. Secondary Filter Layer Drainage Layer 6. Root Barrier 7. Insulation 8. Vapour Control Layer 9. Cross Laminated Timber
1 3 4 6 7 8 9
2 5
B
Green roof provide a sustainable drainage as it reduce the immediate storm-water run off, by trapping the water within the soil and plants.
Gre
en
Ro
of Drainage:
B
Green roof has a longer lifespan than conventional roof, with roofs are under constant ultra-violet light.
Gre
en
Ro
of Life Span:
B
Gre
en
Ro
of
During the summer, solar energy is utilised by plants for evapotranspiration, reducing the temperature of the green roof and the surrounding microclimate.
Summer Winter
During the winter months, a green roof can add to the insulating qualities of the roof. Water has a negative effect on thermal conductance. So in damp winter climate, such as the UK, a green roof will add little to the overall thermal performance of the roof.
Thermal Properties: B
Gre
en
Ro
of
Sedums herbs Sedums herbs perennials Perennials grasses shrubs Grasses shrubs trees 76 – 102 mm 127 – 178 mm 203 -279 mm 305 + mm
The roof currently has a thinner growing medium which is only suitable to plants such as sedum, we believe that the roof could benefit biodiversity by having different plant species.
Green Roof Depth Analysis:
The thickness of the growing medium will be depends on the vegetation. The taller and bigger the vegetation , the thicker the growing medium. This is because of the taller and bigger the plants, the more and longer the roots they will have to keep them stable.
B
Gre
en
Ro
of Potential Biodiversity Promotion :
Our Suggestion: The botanical gardens could help bio-diversity by having a green roof incorporating plants which help endangered insect species. However, as discussed on the previous page this would increase the loading on the roof if a thicker growing medium was needed. We suggest a tiered system to enable more diverse planting. This would minimise growing medium thickness and maintain a reduced loading on the structure
B
Large Heath Butterfly (Coenonympha tullia)
Habitat: Bog moss Hare’s-tail Cottongrass Cross-leaved Heath
Northern Brown Argus (Aricia artaxerxes)
Habitat: Drained and unimproved grasslands Rock-rose Sheltered scrub Patches of bare ground
Gre
en
Ro
of Potential Biodiversity Promotion - Priority Species in UK Biodiversity Action Plan:
The roof has already been colonised by some common butterflies and insects. However the area around the site is home to the following endangered butterflies which we feel can benefit from different roof planting
B
Small Pearl-bordered Fritillary (Boloria selene)
Habitat: Bracken Pteridium aquilinum Damp grassland Flushes and moorland Open wood-pasture
Dark Green Fritillary (Argynnis aglaja)
Habitat: Flower-rich grassland Patches of scrub Bracken Pteridium aquilinum
Gre
en
Ro
of Potential Biodiversity Promotion - Priority Species in UK Biodiversity Action Plan:
The roof has already been colonised by some common butterflies and insects. However the area around the site is home to the following endangered butterflies which we feel can benefit from different roof planting
B
Current System: 2x 7000 litre tanks (5000 litre per tank dedicated to rainwater)
Simple filter system (Because the rainwater is only being use as toilet water, large and complex filter system can be avoid, Gravity treatment cyclonic filters are used to the north)
Part gravity fed (Harvesting to the north toilet drum is gravity fed)
Part pumped (Harvesting to the south end of the building is pumped with the booster set to allow all WC’s in building to be served)
Low maintenance Low running cost
Rai
nw
ater
Har
vest
ing Current Rainwater Harvesting From Roof Area:
C
On this building, the rainwater is collected from the roof and used for flushing the toilets.
Rai
nw
ater
Har
vest
ing Current Rainwater Harvesting From Roof Area:
C
Rai
nw
ater
Har
vest
ing Current Rainwater Harvesting From Roof Area:
Some of the rainwater being store away, the large drainage system for the rainwater will not be required, as another solution on reducing the cost on the construction of the building.
C
Rai
nw
ater
Har
vest
ing Current Rainwater Harvesting From Roof Area:
This system reduces the amount of water needed to flush the toilet by at least 36% a year.
36%
C
Rai
nw
ater
Har
vest
ing Potential Rainwater Harvesting From Roof Area:
Our Suggestion: We believe that the rainwater harvesting system can be more efficient than 36% Surface area of roof =1630.099817m2 Based of the following criteria: Adequate drainage can be used to collect 100% of the water The green roof does not consume a large quantity of the water C
Rai
nw
ater
Har
vest
ing
Jan = 195,610 Feb = 138,560 Mar = 163,010 Apr = 130,410 May = 154,860 Jun = 179,310
Jul = 187,460 Aug = 171,160 Sept = 203,760 Oct = 220,060 Nov = 187,460 Dec = 203,760
Potential Rainwater Harvesting From Roof Area:
Jan Feb Mar Apr May Jun Jul Aug Sept Oct Nov Dec
22,000
20,000
18,000
16,000
14,000
12,000
10,000
8,000
6,000
4,000
2,000
Key: = 2000 Litres Collected
We believe the surface area of the roof and average rainfall for Edinburgh can provide 100% of the water for the building
C
Rai
nw
ater
Har
vest
ing
No. Visitors 2010 = 707,244 visitors Public Buildings require = 3-10 litres per person 100% rainwater harvesting system requires = 2,121,732 litres Summer total (April to September) = 1,273,039.2 litres Winter total (October – March) = 848,692.8 litres Summer month = 212,173.2 litres Winter month = 141,448.8 litres
22,000
20,000
18,000
16,000
14,000
12,000
10,000
8,000
6,000
4,000
2,000
Jan Feb Mar Apr May Jun Jul Aug Sept Oct Nov Dec
(We will allow 3 litres per visitor because not all visitors to the park will use the facilities) (As there are more visitors in summer 60% of the total will be required and 40% in winter)
Required Rainwater for 100% Rainwater Usage:
Key: = Required
C
Rai
nw
ater
Har
vest
ing
22,000
20,000
18,000
16,000
14,000
12,000
10,000
8,000
6,000
4,000
2,000
Key: = Harvested = Stored = Shortage
Jan Feb Mar Apr May Jun Jul Aug Sept Oct Nov Dec
Jan = +54,161.2 Feb = -2888.8 Mar = +21561.2 Apr = -81763.2 May = -57313.2 Jun = -32863.2
Jul = -24713.2 Aug = -41013.2 Sept = -8413.2 Oct = +78611.2 Nov = +46011.2 Dec = +62311.2
Yearly shortage = -19,465.6 Rainwater harvesting from roof Yearly capacity = 99.08%
Collected Water Vs Required Water: C
The roof falls just short of providing 100% water for the building. Our Suggestion: Harvesting water from the car park to provide any extra water Supplying the missing 0.92% Provide in times of low rain Allow extra water for the green roof
(Car park would be only suitable for flushing toilets due to potential contamination from cars)
Rai
nw
ater
Har
vest
ing How to Achieve 100% Rainwater Harvesting:
Surface area of car park area = 407.374491m2 C
Utilising rainwater from both the roof and car park should supply a large surplus which can be utilised in other ways
Our Suggestion: If car park water is used as first choice for toilets, the large surplus of water collected from the roof could use a UV sterilisation system to produce safe drinking water.
Advantages: No chemicals added to the water Low running costs Simple maintenance Safe and environmentally friendly
Rai
nw
ater
Har
vest
ing
Rain water harvested from roof
Secondary filtration with a minimum of 5 micron filter to remove any remaining sediment
Pre-filtration 10 micron filter to remove larger sediment
UV sterilisation systems to kill bacteria and viruses making the water suitable for drinking
Safe dinking water produced
Making Rainwater Safe to Drink: C
Photovoltaic and solar hot water heating panels are installed on the south side of the roof.
Sola
r Po
wer
Current Solar Power System:
D
Sola
r Po
wer
Photovoltaic Panel Charge Controller
Charge Controller
Electric Meter
Battery Electrical Device
National Grid
Solar Power System: D
Key: 1.) N-type silicon 2.) Junction 3.) P-type silicon
4.) Photons 5.) Electron flow 6.) ‘Hole’ flow
Sola
r Po
wer
Solar Power System - Panel Build-Up:
1 2 3
4 5
6
Photons in sunlight strike PV and may be absorbed by atom Energy of the photon transferred to the electron of the atom that receives that energy. Cell materials (semiconductors) N-type, – charge (lot of nearly free electrons) P-type, + charge (lot of "Holes“ - when an electron has left its place) When an electron is free to move and has a negative charge it will try to catch a positive charge Although the charges are attracted it is impossible for electrons to pass the junction The only way to find a Hole is by going out from the solar cell, through an electrical device and toward the P-Type semiconductor. Thus creating electricity. D
When a visible light strike a solar cell, three things would happen: 1) Pass straight through 2) Be reflected 3) Be absorbed
Sola
r Po
wer
1) 2) 3)
Solar Power System: D
11sqm of photovoltaic panel on the roof Generate 1400 kWh per year, which is equal saving 600kg of carbon dioxide per year
Sola
r Po
wer
Solar Power System:
D
Sola
r Po
wer
Evacuated tube solar thermal panels
Water pump
Hot water
Boiler
Solar Heating System: D
Key: 1.) Evacuated Tube 2.) Copper Heat Pipe 3.) Non-toxic Liquid So
lar
He
atin
g Solar Heating System - Panel Build-Up:
Infra-red radiation from the sun is absorbed by this sealed heat pipe which contains an anti-freeze liquid. As heat rises, hot vapours from the antifreeze rise up to the top of the heat pipe where its copper tip connects with a header pipe through which more antifreeze flows This hot antifreeze is pumped through pipes inside the hot water tank with the end result that the water gets hotter and the antifreeze cooler
1
3
2
Hot vapour rises to heat pipe tip
Cold vapour liquefies and returns to bottom
D
15sqm of solar hot water panels can generate 12 kV of warm water, which will provide enough hot water for 100000 hand wash or 1500 showers per year
Sola
r H
eat
ing Solar Heating System:
D
The photovoltaic and the solar hot water heating panels both do not work. During us visit to the building, the panels were protected We suggest an alternative method of heating could be more appropriate
Sola
r H
eat
ing Solar Heating System:
D
He
atin
g A
lter
nat
ive
Alternative Heating Method:
Ground Source Heat Pump: 1.) Energy absorbed from the ground 2.) Transferred to the refrigerant 3.) Refrigerant turns to gaseous state 4.) Refrigerant compressed, reducing its volume causes temperature rise
5.) Heat exchanger extracts heat from refrigerant to heat water 6.) After loss of heat energy refrigerant turns back to liquid 7.) Cycle begins again
1
2
3
4
5
6
D
Our Suggestion: Ground source heat pumps require a large space to lay pipes, to minimise damaging the site gardens we suggest the use of a bore hole heat pump.
He
atin
g A
lter
nat
ive
Alternative Heating Method:
The geology study shows it is relatively easy to drill a borehole to a depth of approx. 25m. Which will be sufficient for the ground source heat pump.
25m
D
He
atin
g A
lter
nat
ive
Alternative Heating Method - Heat Pump Efficiency:
Standard Gas Boiler:
Ground Source Heat Pump:
The ratio of output energy compared to input energy is called co-efficiency of performance (COP). Most standard boilers have a COP of 1 (i.e. 1kW energy is turned into 1kW heat energy). Ground source heat pumps often achieve a COP of 4. At temperature of 35-45 degrees Celsius COP 5 can be achieved.
D
Co
olin
g A
lter
nat
ive Alternative Heating Method – Combined Passive Cooling System
Our Suggestion: The bore hole can also be utilised in combination with the water tank to provide passive cooling
Summer Cooling: 1.) Rainwater collected 2.) Rainwater transferred to storage tank 3.) Cold energy absorbed from the water tank 4.) Cold transferred via distribution system
Winter Heating: 5.) Heat energy absorbed 6.) Transferred to the refrigerant 7.) Refrigerant turns to gaseous state 8.) Refrigerant compressed 9.) Heat exchanger extracts heat from refrigerant to heat water 10.) After loss of heat energy refrigerant turns back to liquid 11.) Cycle begins again
1
2 3
4
5
6
7
8
9
10
11
h Summer (Cold used for cooling)
Winter h (Heat used for compressor)
D
Bio
mas
s B
oile
r
The Biomass Boiler is used to heat water and the building . The waste ash is then mixed into the soil and acts as fertilizer. The Botanical Garden uses a closed loop system of burning trees and waste from the garden and then replanting any trees used.
E Utilising Waste From The Biomass Boiler:
Bio
mas
s B
oile
r
Advantages -Biomass is a sustainable fuel source if managed correctly, i.e. trees need to be planted to replace those used. -It is virtually carbon neutral. -If they are well maintained and run they will produce very little smoke. -Biomass is a good way of using up waste wood. It is used by the Royal Botanical Gardens for a large proportion of their garden waste. Disadvantage -The main disadvantage of using biomass boilers is the need for a regular supply of wood however this is over come by the building being a Botanical garden Centre. Fact -12 cubic metres of wood chips can produce similar levels of heat to 1000 litres of heating oil. For your information, 4.8 cubic metres (approx 4.8 tonnes) of raw wood makes 12 cubic metres of chips.
E Advantages and Disadvantages of Biomass Boilers:
The Use of KLH Panels
Co
ncl
usi
on
Structure: KLH panels are manufactured to specific sizes and thicknesses which means bulk producing is easy In the event of a fire, the laminations of the panels make it difficult for the fire to spread throughout the building The panels are easily assembled and connected on site, reducing labour costs and construction time Compared to other structural systems, they are very small/thin which means thin load bearing walls are possible They are manufactured from a sustainable wood source and are a storage of carbon
Structure: During the construction of the building there were relatively few problems with the build up. This was due to the standardised KLH panelling system. The first floor, roof and beams were all built offsite and simply delivered to be bolted onto the columns. This consequently meant that the building could be constructed extremely quickly and with relatively low skilled labourers. This not only made it cheaper to build but it also meant that there were a limited number of human errors during construction. Although the building is now structurally complete, the main contractor Xircon went into liquidation towards the end of the build. This has consequently meant that many small finishing bits on the building are either yet to be done or a later contractor had to finish.
Wind Turbine: The current wind turbine is not working due to a technical fault. From our analysis we believe the malfunction could be due to the complex computer system that controls the turbine. We suggest an alternative vertical turbine would be more suited to the site because a turbine which does not rely on computer systems would eliminate the chance of software failure. After analysing several vertical turbines we would suggest a system using the Ropatec Vertical turbine would be more suited to the site. The Ropatec would work under both lower and higher wind speeds. The wind analysis shows that the site could experience high wind due to channelling. The downside to the Ropatec turbine is that is produces less power. To make up for this loss we suggest using two Ropatec Vertical turbines would produce approx. 2/3 of the power from the Quietrevolution QR5 system. The wind analysis shows that the site could be suited to a second turbine to the south of the building, we would suggest locating the second Ropatec turbine here.
Sustainability Conclusion:
Sedum Roof: One of the key objectives of the botanical gardens is to promote biodiversity. We feel that the roof of this building has missed an opportunity to help struggling species of insects and birds. We suggest a green roof which incorporates plants which help endangered insect species would be more suited. New species of plants on the roof may require deeper growing medium which would in turn increase the loading on the building. In order to have both deeper growing medium yet maintain a lower loading force we suggest a tiered system could be suitable and enable more diverse planting. The roof has already been colonised by some common butterflies and insects. Our research showed that there are several species of endangered butterfly which are a priority for government biodiversity targets. We suggest selective planting could create a suitable habitat for these endangered butterflies.
We suggest that the following changes and additions could greatly increase the sustainability of the building:
Co
ncl
usi
on
Rainwater Harvesting: Currently the rainwater harvesting system provides 36% of the toilet water. We believe that the rainwater harvesting system can be utilised better and become more efficient than 36%. Our aim is to increase the amount of water harvested to provide 100% of the water for the building. Based on our calculations with the size of the roof, the amount of average rain on the site and the average consumption of water per visitor it is possible to harvest almost 100% of the water for the building. Because rain amounts fluctuate we also suggest harvesting water from the car park would provide extra water to supply the 0.92% shortfall from the roof, provide in times of low rain and also provide water to feed the green roof. If the building had a system which could utilise rainwater from both the roof and the car park our research shows that 100% of the needed water would be achieved. This can be achieved by increasing the size of the storage tanks and the area of water harvesting.
Car park water would be used as first choice for toilets. We suggest installing a UV filtration system so that the large surplus of water collected from the roof could be sterilised to produce safe drinking water. This filtration and sterilisation system would also be more suited than the current filtration system which leaves the water yellow and has resulted in complaints from the visitors.
Solar panels: The current solar panel system is not working due to a technical fault. The specific fault is unknown, but we suggest that by using several systems together will provide a back-up to cover such times. Based on our geological research we suggest that the site is suitable for a ground source heat pump. Commonly ground source heat pumps require a large space to lay pipes, we suggest that to minimise damaging the site gardens the use of a bore hole heat pump would be more suitable. The geological research shows that a bore hole of 25m should be easy to drill before reaching sandstone. By combining the suggested ground source heat pump with both the bio mass boiler and the solar heating (when it becomes active) the building would be more covered for all eventualities. Ground source heat pumps are also one of the most efficient ways to heat the building and has significant environmental advantages over traditional heating systems. The bore hole system can also be used in reverse to provide additional cooling in the summer. By using the borehole in combination with the water tank the building should be able to cool the passing liquid enough to provide passive cooling to the building
We suggest that the following changes and additions could greatly increase the sustainability of the building:
Sustainability Conclusion: C
on
clu
sio
n
http://www.edwardcullinanarchitects.com/ http://www.rbge.org.uk/ http://www.journal-online.co.uk/article/7493-visitor-numbers-for-botanics-on-the-rise http://www.metoffice.gov.uk/climate/uk/es/print.html http://www.solaruk.net/lazer2_solar_thermal_collectors.asp?gclid=CL3njZ7X7KwCFSFItAod_2CLHQ http://www.coste53.net/downloads/Edinburgh/Edinburgh-Presentation/78.pdf http://www.architecture.com/SustainabilityHub/Casestudies/5-RoyalBotanicGardenEdinburgh.aspx http://www.petervaldivia.com/technology/energy/solar-power.php http://www.energ.co.uk/gshp-technology http://www.britishbutterflies.co.uk/protected.asp http://www.windfinder.com/windstats/windstatistic_edinburgh.htm http://www.quietrevolution.com/index.htm?gclid=CJOGmdvh76wCFdEhtAodPmZfPw http://peswiki.com/index.php/Directory:Vertical_Axis_Wind_Turbines http://www.zae-bayern.de/english/division-2/projects/archive/regenerative-cooling-system.html www.speirsandmajor.com www.zehnder.co.uk www.edwardcullinanarchitects.co.uk www.rbge.org.uk