At a Glance
The facility is complete and operational.
►FLEXIBLE/MODULAR ►CONCURRENT EXPANDABILITY – 6 to 18MW. ►RAPID DEPLOYMENT ►GRANULAR MONITORING / TIGHT MANAGEMENT ►Low Carbon ►EFFICIENCY: PUE ≤ 1.13.
Year Round 100% Free Cooling.
High Power Density / Close Coupled cooling
Tight Load matching capability.
Best-in-class efficient components.
►ON SITE CLEAN POWER GENERATION
►FLEXIBLE/MODULAR ►CONCURRENT EXPANDABILITY – 6 to 18MW. ►RAPID DEPLOYMENT ►GRANULAR MONITORING / TIGHT MANAGEMENT ►Low Carbon ►EFFICIENCY: PUE ≤ 1.13.
Year Round 100% Free Cooling.
High Power Density / Close Coupled cooling
Tight Load matching capability.
Best-in-class efficient components.
►ON SITE CLEAN POWER GENERATION
EFFICIENCY
end-to-end efficiency
Digital Service Efficiency
Power
IT Facilities on-site generation
PUE
Service
Bloomenergy | solid oxide fuel cells
On-site Power Generation
UPM(s)
Stamp
ES
ES
ES
ES
ES
Fuel Cell
Stack Module
ES
White Space Power/Cooling Path
From Fuel Cells
WS Switch Gear
WS Distribution
400v Busway
Server Load
Cooling
Pumps
System Stacking
First Floor
White Space Level
Piping Level
400v Busway
Cable Tray
Rear Doors
Water Pumps
Water Loop