DRAFT - IN PROGRESS I II Full Size Tension Mechanical (Coupon Tension, CVN, Hardness) Chemical Analysis Metallurgical Analysis Galvanization Chemistry IV Stress Corrosion Test (Wet Test) Following "Townsend" Test Protocol Full Size Test III LIST OF TESTS Field Hardness Test (insitu ) Laboratory Test (Hardness, CVN, Chemistry) 05/17/2013 ASTM A354BD BOLTS TESTING PROGRAM Page 1 of 7

ASTM A354 GR BD BOLTS Testing Rev 3 - Californiafiles.mtc.ca.gov/A354_report/A354/Appendix_H_Other... · 2017-09-14 · DRAFT - IN PROGRESS I II Full Size Tension Mechanical (Coupon

  • Upload
    others

  • View
    14

  • Download
    0

Embed Size (px)

Citation preview

Page 1: ASTM A354 GR BD BOLTS Testing Rev 3 - Californiafiles.mtc.ca.gov/A354_report/A354/Appendix_H_Other... · 2017-09-14 · DRAFT - IN PROGRESS I II Full Size Tension Mechanical (Coupon

DRAFT - IN P

ROGRESSI

II

Full Size Tension

Mechanical (Coupon Tension, CVN, Hardness)

Chemical Analysis

Metallurgical Analysis

Galvanization Chemistry

IV Stress Corrosion Test (Wet Test) Following "Townsend" Test Protocol

Full Size TestIII

LIST OF TESTS

Field Hardness  Test (in‐situ )

Laboratory  Test (Hardness, CVN, Chemistry)

05/17/2013

ASTM A354BD BOLTS TESTING PROGRAM Page 1 of 7

Page 2: ASTM A354 GR BD BOLTS Testing Rev 3 - Californiafiles.mtc.ca.gov/A354_report/A354/Appendix_H_Other... · 2017-09-14 · DRAFT - IN PROGRESS I II Full Size Tension Mechanical (Coupon

DRAFT - IN P

ROGRESS

05/17/2013

ASTM A354BD BOLTS TESTING PROGRAM Page 2 of 7

Page 3: ASTM A354 GR BD BOLTS Testing Rev 3 - Californiafiles.mtc.ca.gov/A354_report/A354/Appendix_H_Other... · 2017-09-14 · DRAFT - IN PROGRESS I II Full Size Tension Mechanical (Coupon

DRAFT - IN P

ROGRESS

05/17/2013

ASTM A354BD BOLTS TESTING PROGRAM Page 3 of 7

Page 4: ASTM A354 GR BD BOLTS Testing Rev 3 - Californiafiles.mtc.ca.gov/A354_report/A354/Appendix_H_Other... · 2017-09-14 · DRAFT - IN PROGRESS I II Full Size Tension Mechanical (Coupon

DRAFT - IN P

ROGRESS

05/17/2013

ASTM A354BD BOLTS TESTING PROGRAM Page 4 of 7

Page 5: ASTM A354 GR BD BOLTS Testing Rev 3 - Californiafiles.mtc.ca.gov/A354_report/A354/Appendix_H_Other... · 2017-09-14 · DRAFT - IN PROGRESS I II Full Size Tension Mechanical (Coupon

DRAFT - IN P

ROGRESS%Fu Load per Rod (Kips) Time* (hr)0.30 251  480.40 334  480.50 418  480.55 460  480.60 501  480.65 543  480.70 585  480.75 627  480.80 669  480.85 710  120

05/17/2013

ASTM A354BD BOLTS TESTING PROGRAM Page 5 of 7

Page 6: ASTM A354 GR BD BOLTS Testing Rev 3 - Californiafiles.mtc.ca.gov/A354_report/A354/Appendix_H_Other... · 2017-09-14 · DRAFT - IN PROGRESS I II Full Size Tension Mechanical (Coupon

DRAFT - IN P

ROGRESSID Priority Structural Component Number of BoltsNominal Bolt Diameter [in]

Sustained Bolt Tension

% Fu (UTS)Number of Heats

I(in‐situ  test)

II(lab test)(Note 1)

III(full size)

IV( test)

1 C Shear Key Anchor Bolts‐ Bottom (S1/S2) 96 3 0.70 7 90 20 1 1 (1ft +/‐)

A Shear Key Anchor Bolts‐ Bottom (S3/S4) 96 3 0.70 1* 90 3 2** 2 (22ft +/‐)

A Pier E2 Bearing Bolts‐ Bottom Housing (B1, B2, B3, B4) 96 3 0.70 1* 74 3 2** 3 (22ft +/‐)

A Shear Key Anchor Bolts‐Top (S1/S2) 160 3 0.70 1* 160 3 (spares) 2 (spares) ‐

A Shear Key Anchor Bolts‐Top (S3/S4) 160 3 0.70 1* 160 3 (spares) 2 (spares) ‐

4 A Pier E2 Bearing Bolts‐  Top Housing (B1,B2,B3,B4) 224 2 0.70 1 224 7 (spares) 2 (spares) 1 (spare)

5 ‐ Spherical Bearing Bushing  Assembly Bolts 96 1 0.61 1 ‐ ‐ ‐ ‐

6 ‐ Bearing Retainer Ring Plate Assembly Bolts 336 1 0.40 2 ‐ ‐ ‐ ‐

7 B PWS Strand Anchor Rods (Main Cable) 274 3‐1/2 0.32 17 274 (Note 2) 43 1 (spare) 3

8 C Tower Saddle Tie Rods 25 4 0.68 1 25 (Note 3) 3 (Note 4) 1 (spare) 1 (spare)

D Tower Saddle Turned Rods (@  Splices) 100 3 0.45 2 20 2 (Note 4) ‐ ‐

D Tower Saddle Turned Rods (@  Splices) 8 3 0.10 1 ‐ ‐ ‐ ‐

10 D Tower Saddle Grillage Bolts 90 3 0.10 1 ‐ ‐ ‐ ‐

11 D Tower Outrigger 4 3 0.10 1 ‐ ‐ 1 (spare) ‐

12 C Tower Anchorage Anchor Bolts (75 Dia. Anchor Bolts) 388 3 0.48 2 194 8 (Note 4) 1 1

13 C Tower Anchorage Anchor Bolts (100 Dia. Anchor Bolts) 36 4 0.37 1 36 4 (Note 4) ‐ ‐

14 D East Saddle Anchor Rods 32 2 0.10 1 16 2 (Note 4) 1 (spare) ‐

15 D East Saddle Tie Rods 18 3 0.20 1 9 1 ‐ ‐

16 D Cable Bracket Anchor Rods 24 3 0.16 1 12 1 ‐ ‐

17 D Bikepath Anchor Bolts at Pier W2 43 1‐1/4 0.10 1 9 1 (Note 4) ‐ ‐*Same Heat ** Tests completed

Notes:1. Test at least one sample from each heat for Test II2. Cut‐off drill and tap hole @ end (~6") for access3. Cut off machined hex @ end to get access4. No Charpy tests due to limited available tail

SAS A354BD Bolts & Rods Tests

2

3

9

Testing Plan ‐ Number of samples to test

05/17/2013

ASTM A354BD BOLTS TESTING PROGRAM Page 6 of 7

Page 7: ASTM A354 GR BD BOLTS Testing Rev 3 - Californiafiles.mtc.ca.gov/A354_report/A354/Appendix_H_Other... · 2017-09-14 · DRAFT - IN PROGRESS I II Full Size Tension Mechanical (Coupon

DRAFT - IN P

ROGRESSSAS A354BD Bolts & RodsTesting Program Draft Schedule

Worksho

p*

S M T W T F S S M T W T F S S M T W T F S S M T W T F S S M T W T F S S M T W T F S S M T W T F S S M T W T F S S M T W T F S S M T W T F M T W T F S S M T

Test Task

5/12

/201

35/13

/201

35/14

/201

35/15

/201

35/16

/201

35/17

/201

35/18

/201

35/19

/201

35/20

/201

35/21

/201

35/22

/201

35/23

/201

35/24

/201

35/25

/201

35/26

/201

35/27

/201

35/28

/201

35/29

/201

35/30

/201

35/31

/201

36/1/20

136/2/20

136/3/20

136/4/20

136/5/20

136/6/20

136/7/20

136/8/20

136/9/20

136/10

/201

36/11

/201

36/12

/201

36/13

/201

36/14

/201

36/15

/201

36/16

/201

36/17

/201

36/18

/201

36/19

/201

36/20

/201

36/21

/201

36/22

/201

36/23

/201

36/24

/201

36/25

/201

36/26

/201

36/27

/201

36/28

/201

36/29

/201

36/30

/201

37/1/20

137/2/20

137/3/20

137/4/20

137/5/20

137/6/20

137/7/20

137/8/20

137/9/20

137/10

/201

37/11

/201

37/12

/201

37/13

/201

37/14

/201

37/15

/201

37/16

/201

37/17

/201

37/18

/201

37/19

/201

37/20

/201

37/21

/201

37/22

/201

37/23

/201

37/24

/201

37/25

/201

37/26

/201

37/27

/201

37/28

/201

37/29

/201

37/30

/201

3

Determine Sampling RateTestingData processing/ ReportSelectionAcquire samplesTesting (8 samples per day )Data processing/ ReportSelection

I

II

Acquire SampleTestingData processing/ ReportDesign  (Test Bed)Shop Dwg/FabricationTime dependent Test (23 days)Lab testsReport

* Meeting/Meeting/Workshop with Input from Bolt ConsultantsH. Townsend (CT/ TYLI/M&N JV)

K. Frank (CT/ TYLI/M&N JV)

D. Williams (CT/ TYLI/M&N JV)

R. Aguilar (METS

IV

III

S. Brahimi (ABF JV))

A. Cavendish (BATA)

J. Gorman (BATA)

05/17/2013

ASTM A354BD BOLTS TESTING PROGRAM Page 7 of 7