Forward Looking Information – Subject to Change Without Notice
Agenda
Introduction ! Challenges
! Process overview Associative eBOM/mBOM practice ! Analyze eBOM ! Restructure into mBOM ! Update and Maintain mBOM ! Ensure mBOM conformity ! Release to production systems
Looking forward : BOM transformation with Windchill MPMLink 10.0
Summary & Q&A
Forward Looking Information – Subject to Change Without Notice
Agenda
Introduction ! Challenges
! Process overview Associative eBOM/mBOM practice ! Analyze eBOM ! Restructure into mBOM ! Update and Maintain mBOM ! Ensure mBOM conformity ! Release to production systems
Looking forward : BOM transformation with Windchill MPMLink 10.0
Summary & Q&A
Forward Looking Information – Subject to Change Without Notice
Introduction - Challenges
Engineering and Manufacturing have different perspectives of the product ! eBOM ≠ mBOM ! eBOM rarely fits mfg constraints
– Different plants, production volume… ! Using mBOM in engineering creates a
significant burden on design teams
Shortened development schedule ! Manufacturing can’t wait until the complete
eBOM is released to create an mBOM, which is critical to start mfg planning
Ensuring conformity ! Continuously evolving engineering designs
have a large impact on multiple manufacturing deliverables
– Non-conform mBOMs generate costly production scrap, rework and delays…
mBOM: Assembly Process Perspective
Stru
ctur
e Pr
opul
sion
El
ectr
ical
H
ydra
ulic
s C
ontr
ol S
yste
ms
…
Parts
Plants
Assembly Stations / Lines
Sub-Assemblies
Raw Materials / …
eBOM: Functional System Perspective
(ENGINEERING) (MANUFACTURING)
© 2009 PTC
Assy 1500
Assy 1500 mBOM
Part 100
Part 200
Assy 1300
Assy 1100
Assy 1200
Part 300
Part 700
eBOM
Part 400
Part 500
Part 100
Part 300
equivalent
equivalent
equivalent
Part 400
Part 500
Assy 1600
Part 800
PLANT 2
Forward Looking Information – Subject to Change Without Notice
Introduction Associative eBOM/mBOM Overview
Objective ! Create mBOMs directly from the eBOM and
manage both BOMs with the same PLM system ! Start the creation of the mBOM before design
release and put the mBOM under formal configuration management
Capabilities: ! Leverage 3D data
– Create mBOM from engineering 3D mockup – Dynamically generate a mBOM 3D mockup
! Flexibility – Mfg equivalent parts – Plant specific BOMs, alternate BOMs
! Traceability – Bidirectional associativity
! Control and manage – Analyze and resolve BOM discrepancies – Change and Configuration Management
[Digital Manufacturing Planning, 2007] © 2009 PTC
mBOM eBOM
Assy 1500
Assy 1500
Part 100
Part 200
Assy 1300
Assy 1100
Assy 1200
Part 300
Part 700
Engineering eBOM (As Designed)
Part 400
Part 500
Part 100
Part 300
equivalent
equivalent
equivalent
Part 400
Part 500
Assy 1600
Part 800
PLANT 2
Manufacturing mBOM (As Planned)
Forward Looking Information – Subject to Change Without Notice
Agenda
Introduction ! Challenges
! Process overview Associative eBOM/mBOM practice ! Analyze eBOM ! Restructure into mBOM ! Update and Maintain mBOM ! Ensure mBOM conformity ! Release to production systems
Looking forward : BOM transformation with Windchill MPMLink 10.0
Summary & Q&A
Forward Looking Information – Subject to Change Without Notice
mBOM eBOM
Associative mBOM – eBOM Practice ► Storyboard Overview
Manufacturing Engineer
Analyze eBOM
Restructure into mBOM
Update and Maintain mBOM
START
END
Ensure BOM conformity
• Visualize multi-level eBOM • Visualize 3D mockup
Use PLM system and directly access evolving engineering design
Release to production systems
• Integral change and configuration management
Stay informed through change process and update mBOM accordingly
• Visual indicators based on traceability BOM links
• Automatic propagation of part attributes and CAD viewables
• Multi level BOM compare Ensure all eBOM parts are accounted for
• Standard integration with leading ERPs • Flexible integration framework
© 2009 PTC
• Derive multiple mBOMs from eBOM • Automatically generated mBOM 3D
mockup
Restructure eBOM into mBOMs, with maximum flexibility and detailed traceability links
Part 1
Part 2
Rear Frame
Vehicle mBOM
Part 9
mBOM
Part 1
Part 2
Rear Frame
Vehicle eBOM
Frame Assy
Part 8
Sub-Assy
eBOM
Release to production systems
Forward Looking Information – Subject to Change Without Notice
Associative mBOM – eBOM Practice ► Analyze eBOM
Manufacturing Engineer
Analyze eBOM
Restructure into mBOM
Update and Maintain mBOM
START
END
Ensure BOM conformity
Release to production systems
Open eBOM structure in ProductView for MPMLink
Identify an entire eBOM assembly
Start Step 1
End Step 1
1.4
Visualize and Interact with 3D eBOM mockup
Open multi-level eBOM in MPSE
1.1
1.2
1.3 1.0
2.0
3.0
4.0
5.0
Forward Looking Information – Subject to Change Without Notice
Associative mBOM – eBOM Practice ► Analyze eBOM
Open eBOM structure in ProductView for MPMLink
Identify an entire eBOM assembly
Start Step 1
End Step 1
1.4
Visualize and Interact with 3D eBOM mockup
Open multi-level eBOM in MPSE
1.2
1.3
1.1
Use PLM system and to access to the design part
Open the MPSE to expand the eBOM
Forward Looking Information – Subject to Change Without Notice
Associative mBOM – eBOM Practice ► Analyze eBOM
Open eBOM structure in ProductView for MPMLink
Identify an entire eBOM assembly
Start Step 1
End Step 1
Visualize and Interact with 3D eBOM mockup
Open multi-level eBOM in MPSE
Open Product View to interact with 3D model
1.4
1.2
1.3
1.1
Forward Looking Information – Subject to Change Without Notice
Associative mBOM – eBOM Practice ► Analyze eBOM
Open eBOM structure in ProductView for MPMLink
Identify an entire eBOM assembly
Start Step 1
End Step 1
Visualize and Interact with 3D eBOM mockup
Open multi-level eBOM in MPSE
1.4
1.2
1.3
1.1
Using ProductView features
Forward Looking Information – Subject to Change Without Notice
Associative mBOM – eBOM Practice ► Analyze eBOM
Open eBOM structure in ProductView for MPMLink
Identify an entire eBOM assembly
Start Step 1
End Step 1
Visualize and Interact with 3D eBOM mockup
Open multi-level eBOM in MPSE
Analyze and check the equivalent parts
1.4
1.2
1.3
1.1
Forward Looking Information – Subject to Change Without Notice
Associative mBOM – eBOM Practice ► Restructure into mBOM
Manufacturing Engineer
Analyze eBOM
Restructure into mBOM
Update and Maintain mBOM
START
END
Ensure BOM conformity
Release to production systems
Highlight in ProductView for MPMLink the parts of this assembly
Build Mfg assembly and sub-assemblies
Comparison report for BOM conformity
Start Step 2
End Step 2
2.3
Create equivalent assembly
2.4
2.1
2.2 1.0
2.0
3.0
4.0
5.0
Forward Looking Information – Subject to Change Without Notice
Associative mBOM – eBOM Practice ► Restructure into mBOM
Highlight in ProductView for MPMLink
the parts of this assembly
Build Mfg assembly and sub-assemblies
Comparison report for BOM conformity
Start Step 2
End Step 2
2.3
Create equivalent assembly
2.4
2.2
2.1 Open the assembly in ProductView to visualize all the components
Forward Looking Information – Subject to Change Without Notice
Associative mBOM – eBOM Practice ► Restructure into mBOM
Select New Downstream action to create an equivalent downstream
Manufacturing assembly
Highlight in ProductView for MPMLink
the parts of this assembly
Build Mfg assembly and sub-assemblies
Comparison report for BOM conformity
Start Step 2
End Step 2
Create equivalent assembly
2.3
2.4
2.2
2.1
Forward Looking Information – Subject to Change Without Notice
Associative mBOM – eBOM Practice ► Restructure into mBOM
An equivalent assembly has been created..
..open the assembly in a new MPSE
Highlight in ProductView for MPMLink
the parts of this assembly
Build Mfg assembly and sub-assemblies
Comparison report for BOM conformity
Start Step 2
End Step 2
Create equivalent assembly
2.3
2.4
2.2
2.1
Forward Looking Information – Subject to Change Without Notice
Associative mBOM – eBOM Practice ► Restructure into mBOM
From ProductView select parts and copy to Manufacturing equivalent
assembly..
Highlight in ProductView for MPMLink
the parts of this assembly
Build Mfg assembly and sub-assemblies
Comparison report for BOM conformity
Start Step 2
End Step 2
Create equivalent assembly
2.3
2.4
2.2
2.1
Forward Looking Information – Subject to Change Without Notice
Associative mBOM – eBOM Practice ► Restructure into mBOM
..and paste with associative links Highlight in ProductView for MPMLink
the parts of this assembly
Build Mfg assembly and sub-assemblies
Comparison report for BOM conformity
Start Step 2
End Step 2
Create equivalent assembly
2.3
2.4
2.2
2.1
Forward Looking Information – Subject to Change Without Notice
Associative mBOM – eBOM Practice ► Restructure into mBOM
Highlight in ProductView for MPMLink
the parts of this assembly
Build Mfg assembly and sub-assemblies
Comparison report for BOM conformity
Start Step 2
End Step 2
Create equivalent assembly
2.3
2.4
2.2
2.1
Create a new Manufacturing sub-assembly
Copy and paste parts from the upstream view..
Forward Looking Information – Subject to Change Without Notice
Associative mBOM – eBOM Practice ► Restructure into mBOM
Highlight in ProductView for MPMLink
the parts of this assembly
Build Mfg assembly and sub-assemblies
Comparison report for BOM conformity
Start Step 2
End Step 2
Create equivalent assembly
2.3
2.4
2.2
2.1
Forward Looking Information – Subject to Change Without Notice
Associative mBOM – eBOM Practice ► Restructure into mBOM
Highlight in ProductView for MPMLink
the parts of this assembly
Build Mfg assembly and sub-assemblies
Comparison report for BOM conformity
Start Step 2
End Step 2
Create equivalent assembly
..and select discrepancies
2.3
2.4
2.2
2.1
Forward Looking Information – Subject to Change Without Notice
Associative mBOM – eBOM Practice ► Update and Maintain mBOM
Manufacturing Engineer
Analyze eBOM
Restructure into mBOM
Update and Maintain mBOM
START
END
Ensure BOM conformity
Release to production systems
© 2009 PTC
Launch equivalent compare panel and report
Update equivalent link
Incorporate EBOM changes
Start Step 3
End Step 3
3.4
Analyze discrepancies
3.5
Select a part in the eBOM not updated
3.1
3.2
3.3
1.0
2.0
3.0
4.0
5.0
Forward Looking Information – Subject to Change Without Notice
Associative mBOM – eBOM Practice ► Update and Maintain mBOM
© 2009 PTC
Launch equivalent compare panel and report
Update equivalent link
Incorporate EBOM changes
Start Step 3
End Step 3
Analyze discrepancies
Select a part in the eBOM not updated
Select a part with a clock out of sync indicator on the upstream BOM
3.4
3.5
3.3
3.1
3.2
Forward Looking Information – Subject to Change Without Notice
Associative mBOM – eBOM Practice ► Update and Maintain mBOM
© 2009 PTC
Launch equivalent compare panel and report
Update equivalent link
Incorporate EBOM changes
Start Step 3
End Step 3
3.4
Analyze discrepancies
3.5
Select a part in the eBOM not updated
3.3
3.1
3.2
Corresponding clock out of sync indicator on the downstream BOM
Launch equivalent report
Forward Looking Information – Subject to Change Without Notice
Associative mBOM – eBOM Practice ► Update and Maintain mBOM
© 2009 PTC
Launch equivalent compare panel and report
Update equivalent link
Incorporate EBOM changes
Start Step 3
End Step 3
Analyze discrepancies
Select a part in the eBOM not updated
Added a new part in the upstream view..
3.4
3.5
3.3
3.1
3.2
Forward Looking Information – Subject to Change Without Notice
Associative mBOM – eBOM Practice ► Update and Maintain mBOM
© 2009 PTC
Launch equivalent compare panel and report
Update equivalent link
Incorporate EBOM changes
Start Step 3
End Step 3
Analyze discrepancies
Select a part in the eBOM not updated
Update the equivalent link..
Downstream equivalent indicator is updated..
3.4
3.5
3.3
3.1
3.2
.. And now you can see the equivalent part
Forward Looking Information – Subject to Change Without Notice
Associative mBOM – eBOM Practice ► Update and Maintain mBOM
© 2009 PTC
Launch equivalent compare panel and report
Update equivalent link
Incorporate EBOM changes
Start Step 3
End Step 3
Analyze discrepancies
Select a part in the eBOM not updated
Change the MBOM…
3.4
3.5
3.3
3.1
3.2
…selecting the new part from EBOM and copy & paste into MBOM
Open in the right pane the upstream view..
Forward Looking Information – Subject to Change Without Notice
Associative mBOM – eBOM Practice ► Ensure BOM Conformity
Manufacturing Engineer
Analyze eBOM
Restructure into mBOM
Update and Maintain mBOM
START
END
Ensure BOM conformity
Release to production systems
Select discrepant parts from EBOM and highlight in the engineering Mock-up
Start Step 4
End Step 4
Copy these parts from ProductView and Paste into the mBOM
4.1
4.2
1.0
2.0
3.0
4.0
5.0
Forward Looking Information – Subject to Change Without Notice
Associative mBOM – eBOM Practice ► Ensure BOM Conformity
Select discrepant parts from EBOM and highlight in the
engineering Mock-up
Start Step 4
End Step 4
Copy these parts from ProductView and Paste into the
mBOM
4.2
4.1
Launch the compare report at the sub-assembly level
Select the differences and go to the MPSE..
Forward Looking Information – Subject to Change Without Notice
Associative mBOM – eBOM Practice ► Ensure BOM Conformity
Select discrepant parts from EBOM and highlight in the
engineering Mock-up
Start Step 4
End Step 4
Copy these parts from ProductView and Paste into the
mBOM
4.2
4.1
Open in ProductView the assembly with differencies..
Forward Looking Information – Subject to Change Without Notice
Associative mBOM – eBOM Practice ► Ensure BOM Conformity
Select discrepant parts from EBOM and highlight in the
engineering Mock-up
Start Step 4
End Step 4
Copy these parts from ProductView and Paste into the
mBOM
4.2
4.1
Forward Looking Information – Subject to Change Without Notice
Associative mBOM – eBOM Practice ► Release to production systems
Manufacturing Engineer
Analyze eBOM
Restructure into mBOM
Update and Maintain mBOM
START
END
Ensure BOM conformity
Release to production systems
Navigate to the details page
Release to ERP (workflow)
Start Step 5
End Step 5
5.4
Change State of the mBOM (top part) to Released
Check in the mBOM
5.1
5.2
5.3
1.0
2.0
3.0
4.0
5.0
Forward Looking Information – Subject to Change Without Notice
Associative mBOM – eBOM Practice ► Release to production systems
Navigate to the details page
Release to ERP (workflow)
Start Step 5
End Step 5
5.4
Change State of the mBOM (top part) to Released
Check in the mBOM
5.2
5.3
5.1
Forward Looking Information – Subject to Change Without Notice
Associative mBOM – eBOM Practice ► Release to production systems
Navigate to the details page
Release to ERP (workflow)
Start Step 5
End Step 5
Change State of the mBOM (top part) to Released
Check in the mBOM
5.4
5.2
5.3
5.1
Forward Looking Information – Subject to Change Without Notice
Associative mBOM – eBOM Practice ► Release to production systems
Navigate to the details page
Release to ERP (workflow)
Start Step 5
End Step 5
Change State of the mBOM (top part) to Released
Check in the mBOM
Use Promote to start the Change State Process
5.4
5.2
5.3
5.1
Can also use Change Request / Change Notice
Forward Looking Information – Subject to Change Without Notice
Associative mBOM – eBOM Practice ► Release to production systems
Navigate to the details page
Release to ERP (workflow)
Start Step 5
End Step 5
Change State of the mBOM (top part) to Released
Check in the mBOM
5.4
5.2
5.3
5.1
Forward Looking Information – Subject to Change Without Notice
Associative mBOM – eBOM Practice ► Release to production systems
Navigate to the details page
Release to ERP (workflow)
Start Step 5
End Step 5
Change State of the mBOM (top part) to Released
Check in the mBOM
5.4
5.2
5.3
5.1
Forward Looking Information – Subject to Change Without Notice
mBOM eBOM
• Visualize multi-level eBOM • Visualize 3D mockup
Use PLM system and directly access evolving engineering design
• Integral change & configuration management
Stay informed through change process and update mBOM accordingly
• Visual indicators based on traceability BOM links
• Automatic propagation of part attributes and CAD viewables
• Multi levels BOM compare Ensure all eBOM parts are accounted for
Release to production systems • Standard integration to leading ERPs • Flexible integration framework
© 2009 PTC
• Derive multiple mBOMs from eBOM • Automatically generated mBOM 3D
mockup
Restructure eBOM into mBOMs, with maximum flexibility and detailed traceability links
Part 1
Part 2
Rear Frame
Vehicle mBOM
Part 9
mBOM
Part 1
Part 2
Rear Frame
Vehicle eBOM
Frame Assy
Part 8
Sub-Assy
eBOM
Productivity TIPS: • Re-use eBOM parts as much as possible • Leverage 3D mockup to build the mBOM • When creating the mBOM, open the eBOM in the “Selection” tab for
side-by-side eBOM/mBOM display • Use “consume from upstream BOM” while defining the process plan
in order to automatically derive the mBOM
Associative mBOM – eBOM Practice ► Storyboard Summary
Manufacturing Engineer
Analyze eBOM
Restructure into mBOM
Update and Maintain mBOM
START
END
Ensure BOM conformity
Release to production systems
1.0
2.0
3.0
4.0
5.0
Forward Looking Information – Subject to Change Without Notice
Agenda
Introduction ! Challenges
! Process overview Associative eBOM/mBOM practice ! Analyze eBOM ! Restructure into mBOM ! Update and Maintain mBOM ! Ensure mBOM conformity ! Release to production systems
Looking forward : BOM transformation with Windchill MPMLink 10.0
Summary & Q&A
Forward Looking Information – Subject to Change Without Notice
Looking Forward BOM transformation with Windchill MPMLink 10.0
Streamline BOM transformations process ! Dual structure editor with eBOM & mBOM
side by side ! New “shortcut” actions for must common tasks ! Tranformations directly in mBOM structure
Reconcile and propagate changes from the eBOM to the mBOM
! Compare Action replaced by the new Reconciliation action
© 2009 PTC
Forward Looking Information – Subject to Change Without Notice
Agenda
Introduction ! Challenges
! Process overview Associative eBOM/mBOM practice ! Analyze eBOM ! Restructure into mBOM ! Update and Maintain mBOM ! Ensure mBOM conformity ! Release to production systems
Looking forward : BOM transformation with Windchill MPMLink 10.0
Summary & Q&A
Forward Looking Information – Subject to Change Without Notice
Summary
Associative eBOM to mBOM transformation with Windchill MPMLink facilitates :
! Concurrent development of BOMs ! BOM conformity between engineering &
manufacturing ! Production planning
PTC solutions deliver higher value with Best Practices
Thanks to the PTC cross functional Windchill MPMLink best practices team for their support in developing this presentation
Pezel, Vladimir; De Nittis, Fabrizio; Farmer, Ed; Arisue, Shinya; Cilia, Giuseppe; Clarke, Roy; Cote, Christian; Fretz, Beat; Graeb, Robert; Lamy, Francois; Lerch, Martin; Montangon, Pascal; Nien, Simon; Niyonkuru, Jean-Claude; Rademacher, Klaus; Sambamurthy, Kumarappan; Thibault, Alain; Wetzels, Wolfgang; Yang, Dong; Hedrick, Kevin
© 2009 PTC