Upload
rama-y
View
24
Download
0
Embed Size (px)
Citation preview
Create Document using – CV01N
DRW - type
Upload the document and check in. Click on JPG image
Picutre updated in SAP .
Perfect.
Click on Obkect Links >
Equipment master tab> enter equipment
save
Go to Equipment Master : IE02
Additional data tab
Document “RK” got assigned to Equipment.
PASS.
Added an another image in CV02n
Attached 2 docs
Object Links Tab>
Equipment Master tab > add another equipment : TEX-20
Save
IE02
Aditional data 1 tab
Document : RK is visible. Pass
Select “RK “ doc and click on display Icon.
Two docs attached are visible. PASS
Assigning Document to Task List:
Select the operation and Click on PRT
Click on document button
Enter details
Click ok
Promts an warning message – DRM doc is not a PRT. Fine
IF doc type is PRT we will not sethie warning message. Click ok
Doc ia added to operation 0010. Save
Assigning an PRT to Operation 0020
Click ok
Cat – type “o”
For operation – 0010 , cat type “D” document
Assigning DRF – PRT eng /design drawing as document
Go to tasklist : pump : 0010
Click on PRT
RAMA PRT s displayed. Fine.
Select : environment > documents > display originals
Click on images…