ASSIGHNMENT
SUBJECT:IRREGATION ENGINEERING
SUBMITTED BY:
HAFIZ RIAZ
2008-CIVIL-29
SECTION:A
SUBMITTED TO:
DR. MOHSIN
DEPARTMENT OF CIVIL ENGINEERING
UNIVERSITY OF ENGINEERING AND
TECHNOLOGY LAHORE.
8/3/2019 Assighnment No 1
2/19
2
CONTENTS:
y History
y TRIPPLE CANALPROJECT
y POSTINDEPEndenceERA
y INDUS WATERTRETY
y PHYSICALSYSTEM
y FACTS AND FIGURES
y SALIENTFEATURESOF BARRAGES
y BARRAGESON INDUSRIVER
y BARRAGESON RIVERJHELUM
y BARRAGESON SUTLEJRIVER
y BARRAGESON RIVER CHENAB
8/3/2019 Assighnment No 1
3/19
3
BARRAGES OVER INDUS RIVER:
ThenamesofbarragesoverIndusriveraregiven belowalongwiththeirsalientfeatures.
Thesalientfeaturesaregiven below.
1)TOUNABARRAGE:
Yearofcompletion=1958
Location=`OnriverIndus(20 kmSOUTHEASTFROMTAUNSA SHARIF CITY)
Desighndischarge=750000 CUSECS
Length=4346feet
Numberofbays=53
Numberofundersluices=12
Crestlevel=6
Numberofoff-takingcanals=4
2)TERBELLE DAM:
Yearofcompletion=1976
Location=LOCATED 50Km NORTHWESTOFISLAMABAD ATTERBELLA IN SAWABI
Desighn discharge=THE MAIN SPILLWAY HAS THE CAPACITY= 650000 CUSECS,AND THE AUXILLARY
SPILLWAYHAS DISCHARGING CAPACITY=850000 CUSECS
Length=9000 feet
Numberofbays=
Numberofundersluices=
Crestlevel=
Numberofoff-takingcanals=
3)GHAZIBAROTHABARRAGE:
Yearofcompletion=2004
8/3/2019 Assighnment No 1
4/19
4
Location=OnIndusRiver
Desighndischarge=500000 cusecs
Length=170560 feet
Numberofbays=
Numberofundersluices=
Crestlevel=
Numberofoff-takingcanals=1
4)JINNAHBARRAGE:
Yearofcompletion=1946
Location=Itissituatedat KALABAGHinMIANWALI DISTRICT,ON INDUSRIVER
Desighndischarge=950000 cusecs
Length=3360 feet
Numberofbays=42
Numberofundersluices=
Crestlevel=
Numberofoff-takingcanals=1
5)CHASHMABARRAGE:
Yearofcompletion=1971
Location=
Desighndischarge=
Length=
Numberofbays=
Numberofundersluices=
Crestlevel=
8/3/2019 Assighnment No 1
5/19
5
Numberofoff-takingcanals=
6)GUDDUBARRAGE:
Yearofcompletion=1962
Location=onIN DUSRIVER NEAR KASHMORE
Desighndischarge=1200,000 CUSECS
Length=3840 feet
Numberofbays=64
Numberofundersluices=
Crestlevel=
Numberofoff-takingcanals=5
7)SUKKURBARRAGE:
Yearofcompletion=1932
Location=onINDUSRIVERNEARSUKKAR CITY
Desighndischarge=1500000 CUSECS
Length=4490 feet
Numberofbays=54
Numberofundersluices=12
Crestlevel=
Numberofoff-takingcanals=7
8)KOTRIBARRAGE:
Yearofcompletion=
Location=nearHYDERABAD
Desighndischarge=750000 CUSECS
Length=3000 feet
8/3/2019 Assighnment No 1
6/19
6
Numberofbays=44
Numberofundersluices=
Crestlevel=
Numberofoff-takingcanals=4
9)BARRAGES OVERJHELUMRIVER:
1)Mangla Dam
2)Rasool Barrage
1)MANGLA DAM:
Yearofcompletion=1967
Location=locatedatJHELUMRIVER
Desighndischarge=1.01MILLION CUSECS
Length=10300 feet
Numberofbays=
Numberofundersluices=
Crestlevel=
Numberofoff-takingcanals=1
2)RASOOL BARRAGE:
Yearofcompletion=1968
Location=onJHELUMRIVER,72 KmfromtheMANGLA DAM
Desighndischarge=876000 CUSECS
Length=3209feet
Numberofbays=42
Numberofundersluices=6
Crestlevel=
8/3/2019 Assighnment No 1
7/19
7
Numberofoff-takingcanals=2
BARRAGES OVER SUTLEJRIVER:
1)Sulemanki barrage
2)Islam barrage
3)Malsi Chenab
1)SULEMANKIBARRAGE
Yearofcompletion=1927
Location=ON SUTLEJRIVER
Desighn
discharge=
309
000 CUSE
CS
Length=2220 feet
Numberofbays=24
Numberofundersluices=16
Crestlevel=
Numberofoff-takingcanals=3
2)ISLAMBARRAGE:
Yearofcompletion=1927
Location=ON SUTLEJRIVER
Desighndischarge=300000 cusecs
Length=1650 feet
Numberofbays=29
Numberofundersluices=4
Crestlevel=2
Numberofoff-takingcanals=
3)MALSI SIPHON:
8/3/2019 Assighnment No 1
8/19
8
Yearofcompletion=1965
Location=nearMALSI,ON RIVERSUTLEJ
Desighndischarge=429000 CUSECS
Length=1601feet
Numberofbays=24
Numberofundersluices=
Crestlevel=
Numberofoff-takingcanals=
BARRAGES OVER CHENABRIVER:
1)Maralla Barrage
2)Khanki Barrage
3)Qadirabad Barrage
4)Trimmu Barrage
5)Punjnad Barrage
1)MARRALLABARRAGE:
Yearofcompletion=1968
Location=on CHENAB RIVER NEARSIALKOT CITY
Desighndischarge=1.1MILLION CUSECS
Length=4472 feet
Numberofbays=66
Numberofundersluices=13
Crestlevel=
Numberofoff-takingcanals=2
8/3/2019 Assighnment No 1
9/19
9
2)KHANKIHEADWORKS:
Yearofcompletion=1889
Location=onRIVER CHENAB NEARGUJRAT DISTRICT
Desighndischarge=750000 CUSECS
Length=4000 feet
Numberofbays=48
Numberofundersluices=6
Crestlevel=
Numberofoff-takingcanals=1
3)QADIRABAD BARRAGE:
Yearofcompletion=1967
Location=onRIVER CHENAB
Desighndischarge=900000 CUSECS
Length=3373 feet
Numberofbays=50
Numberofundersluices=5
Crestlevel=
Numberofoff-takingcanals=1
4)TRIMMUBARRAGE:
Yearofcompletion=1939
Location=NEARJHANG
Desighndischarge=645000 CUSECS
Length=3025feet
Numberofbays=37
8/3/2019 Assighnment No 1
10/19
10
Numberofundersluices=
Crestlevel=
Numberofoff-takingcanals=3
5)PUNJNAD BARRAGE:
Yearofcompletion=1929
Location=on CHENAB RIVER
Desighndischarge=700000 CUSECS
Length=2856feet
Numberofbays=47
Numberofundersluices=2
Crestlevel=
Numberofoff-takingcanals=
BARRAGES OVERRIVERRAVI:
1)Balloki Barrage
2)Sindhnai Barrage
1)BALLOKIBARRAGE:
Yearofcompletion=1914
Location=onRIVERRAVI
Desighndischarge=140000 CUSECS
Length=1644feet
Numberofundersluices=
Crestlevel=
Numberofoff-takingcanals=2
2)SINDHNAIBARRAGE:
8/3/2019 Assighnment No 1
11/19
11
Yearofcompletion=1965
Location=onRIVERRAVI
Desighndischarge=167000 CUSECS
Length=712 feet
Numberofbays=15
Numberofundersluices=4
Crestlevel=
Numberofoff-takingcanals=2
SALIENT FEATURES OF OFF-TAKING CANALS FROM THE BARRAGES IN PAKISTAN
S.NoBarrageNames
RiversArea
Irrigatedin Km2
CanalsYear of
Completion
Discharge atHead
(cusecs)
1 Jinnah Indus 26,900 1. Thal Canal 1949 311
2 Chashma Indus 28,317Chashma Jhelum Link
1970614
2. CRBC/Peharpur 142
3 Taunsa Indus 21,237 Taunsa Punjnad Link 1970 340
8/3/2019 Assighnment No 1
12/19
12
Muzaffargarh Canal 1959 235
3. D.G. Khan Canal 1959 249
4 Guddu Indus 25,485
Ghotki Feeder 1962 241
2a. Desert Pat Feeder 1962 365
2b. Pat Feeder Canal 1962 235
3. Begari Feeder 1962 439
5 Sukkur Indus 42,475
Nara Canal 1932 379
Khairpur East Canal 1932 76
Rohri Canal 1932 317
Khairpur West Canal 1932 54
North West Canal 1932 144
6. Rice Canal 1932 289
4 Rice Canal 1932 91
6 Kotri Indus 25,485
Akram Wah (Link
Canal)
1955 116
Fuleli Canal 1955 391
Pinyari Canal 1955 408
4. Kalri Canal 1955 255
7 Rasul Jhelum 24,069
Rasul- Qadirabad Link 1967 538
Lower Jhelum Canal 1901 150
LJC Feeder 154
4. Rasul Power Canal 101
8 Marala Chenab 31,148Marala Ravi Link 1956 623
2. Upper Chenab Canal 1912 467
9 Khanki Chenab 29,732 1. Lower Chenab Canal 1892 326
10 Qadirabad Chenab 25,4851. Qadirabad BallokiLink and LCC Feeder
1967 527
11 Trimmu Chenab 18,406Trimmu Sidhnai Link 1965 311
Haveli Canal 1939 183
3. Rangpur Canal 1939 77
12 Balloki Ravi 63,712Balloki Sulemanki Link 1954 524
2. Lower Bari DoabCanal
1913 198
13Sidhnai(New)
Ravi 4,709SidhnaiMailsi Link 1965 286Mailsi Bahawal Link 1965 110
3. Sidhnai Canal 1886 127
14 Sulemanki Sutlej 9,911
Eastern Sadiqia Canal 1927 139
Fodwah Canal 1927 95
3. Upper PakpattanCanal
1927 169
8/3/2019 Assighnment No 1
13/19
13
15 Islam Sutlej 10,987U & L Bahawal Canal 1927 132
2. Qaim Canal 1927 213
16 Punjnad ChenabPunjnad Canal 1335 231
Abbasia Canal 1338
17 GhaziBarrage
Indus 1. Ghazi Bhotha PowerChannel
2002 132
INTROCTION TO INDUS BASIN:
In termsofwaterusageinPAKISTAN,domesticwaterusageaccountsfor 2percentofthetotalwater
usage.MoreorlessisthesamepercentagewaterusageINDUSTRIES.Butwhenwetalk aboutthe
agriculturalusage,itaccountsabout97percentofthetotalwaterusage.Thisfigureisabovetheaverage
ofabout70%.
TheIndus BasinProgramisveryauthorized
intermsofstorageandmanagementinfrastructure.Theschematicdiagramshowingthemajor
canals,damsandotherworksofIndus BasinIrregationsystem.Terbella,Manglaand Chashmaarethe
8/3/2019 Assighnment No 1
14/19
14
majorprimaryreservoirsofthissystem.Terbellaisthefirstregulationdeviceandhasthelargest
storagecapacityofabout10.93 billioncubicmeters.
8/3/2019 Assighnment No 1
15/19
15
WaterfromIndusemptiesontotheplainsthroughregulatorystructure knownas RIM
STRUCTURE.About173 billioncubicmeterpassthroughrimstations,about128 billioncubicmeter
divertedforirrigationandshortfallofabout40% iscoveredfromgroundwaterthroughpumping
system.Theassociatedcanalnetwork systemismessivewith4356 kmofcanals,18884kmofseepageor
stormwater
drains,1
261
2 km
of
tile
drains.Most
of
these
canals
are
in
provinces
Punja
band
sindh.ReservoirsandcanalsformtheIndus BasinIrrigationsystemanditisessentialtoagriculture.
8/3/2019 Assighnment No 1
16/19
16
HISTORY:
Thefirstcanalsystemwereconstructedsomefiveorsixcenturiesagoandextendedunderthe
MUGHALEPPERORS.Theearlycanalswereinundationchannelsanddeliveredwatertothefields
whenthe riversflowunderhighfloodduringthesummerwithnosystemofregulation.
Thenextstage
istheevaluationoftheirrigationSystemwasconstructedofperennialcanalshavingpermanent
headworks.Theseheadworkseitherdidnotextendacrosstheentirestreamorallowedthefloodsto
passovertheircrests.ThefirstevidenceofperennialirrigationonanyonanyoftheIndusRiverdates
back toearly17centurywhena80kmlongcanalwasconstructed bytheMUGHALEMPERORjahangir
(reigned1605to1627)to bringwaterfromtheright bank oftheRAVItotheGardens ofthe
SHEIKHOPURA nearLAHORE.
Theirrigationsystemwhichexisttodaywasstatedinthenineteenth
centuryunderthe Britishadministration.Intheearly19th
century,therewerenumerousinundation
canalsleadingfromtheINDUSRIVERanditstributaries.
Themoreimportantofthesewerethe UPPER
andLLOWERSUTLEJ CANALS,theSHAHPURcanalsthe CHENAB canalsandtheINDUS CANALSinthe
PUNJAB and BAHALPUR.IntheSINDH,wheretheINDUSRIVERflowsmoreorlessonaridge,conditions
wereparticularlyfavourableforinundationcanals.AmongSINDHS19TH
centurycanalswerethe
desert,the BEGARI AND SUKKUR,theFULELI,thePINYARI AND KALRIcanals.
Thefirstpermanent
headworksconstructedin1887wastheMARALLA BARRAGEwhichsupplyingwaterto UPPER CHENAB
CANALin1915.In1889,theprojectwaspreparedfortheirrigationofpartofRACHNA DOAB.Theproject
envisagedthediversionofCHENAB water bymeansofweirsat KHANKI.Thelower CHENAB CANALwas
openedin1892.
A similarschemewassanctionedfortheirrigationofthearea betweenthe CHENAB
andtheJHELUM(CHAJ DOAB)fromaweiratRASOOLontheJHELUMRIVER. Constructionwasstarted
in1897andtheJHELUM CANAL,nowcalledtheLOWERJHELUM CANALwasopenedin1901.
Afterthe
firstworldwar,theSUKKUR BARRAGEPROJECT,thefirst barrageconstructedontheINDUSRIVERwas
startedin1923 andwascommissionedtoirrigationin1932.During1921theSUTLEJVALLYPROJECT
wassanctionedforthedevelopmentofthePUNJAB,Bikaner(now presentinINDIA)and BAHAWALPUR
statesareas.Theprojectconsistedon4weirsontheSUTLEJRIVERatFEROZPUR,SULEMANKI,ISLAM
AND PUNJNAD and11canalswerecompleted by1933.
8/3/2019 Assighnment No 1
17/19
17
TheTRIMMU BARAGE,located betweenthe
junctionoftheJHELUMandthe CHENAB RIVERwasstartedin1837andcompletedin1939,wasthelast
barragecompletedpriortothe WORLD WAR-2.Atthetimeofindependencethe KALABAGH BARRAGE
(JINNAH BARRAGE),KOTRI BARRAGEontheINDUSRIVERandthe BHAKRA DAMinINDIA ontheSUTLEJ
RIVERwere
under
construction.
TRIPLE CANAL PROJECT:
TheTRIPLE CANALPROJECTwassanctionedin1905and becomethefirst
projectintransferwaterfromonerivertoanother.Theprojectinvolvedthediversionofavailable
waterintheJHELUMRIVERacrossthe CHAJandRAChNA DOAB.Theprojectconsistedofafeedercanal
fromtheJHELUMRIVERatMANGLA to the CHENAB RIVERabove KHANKI(UPPERJHELUM CANAL),a
feedercanalfromMARALA onthe CHENAB RIVER toRIVERRAVIabpve BALLOKI(UPPER CHENAB
CANAL)andconstructionofa barrage(levelcroosing)ontheRIVERRAVIat BALLOKItodivertthe
transformedwaterintothenewLOWER BARI DOAB CANAL(LBDC).
THE INDUS WATER TREATY:
Theproposalhasthreemainfeatures:
1)Thewaterofthewesternriversi.etheINDUS,theJHELUMandthe CHENAB,were to beallocatedto
PAKISTAN,andthewatersofthewatersofthethreeEASTERN RIVERSS(BEAS,RAVI andSUTLEJ)to
INDIA.
2)INDIA wouldmakeacontributiontothecostofreplacementworks.
3)Duringtheconstructionphase,INDIA wouldlimitherwithdrawnfromtheeasternriversinproperties
tomatchPAKistanScapacitytoreplace.Ittook about8yearsto beforeanagreementwasreachedand
aTREATYsighnedon19september1960.
TocompensatePAKISTAN forthelossofwateroftheEASTERN RIVERS,sixfriendlycountriesofthe
World Bank togetherwithPakistanandIndiaagreedtoprovidefundstoenableasystem,a
replacementworksto beconstructedwhichwouldtransferwaterfromthewesternriverstotheareas
thatweredependentonsuppliesfromtheeasternrivers.
PHYSICAL SYSTEM:
Pakistanhastheuniqueirrigationsystemwhichcomprisesoffivemainrivers.i.ethe
INDUS,theJHELUM,theRAVI,theSUTLEJ,the BEAS.Thenetwork oftheINDUS BASIN SYSTEMconsiston
thedams,Barrages,Headworks,Canalsandinterlinkscanals.ThesystemincludesLink CANAL,thatwere
builtaconcepttotransferwaterfromthe WesternRIVERSi.eINDUS,Jhelumand CHENAB tothe
8/3/2019 Assighnment No 1
18/19
18
EasternRIVERS,i.eRaviandSUTLEJaftertheInduswatertreatyof1960.Whereasthefeedercanals
takenoutfromthedifferentheadworksaremeantmainlytoirrigatetheagriculturallands
throughout.ThewateroftheINDUS BASIN RIVERSarediveredthroughreservoirsor barragesintothe
canals,classifiedastheMAIN CANALS.Thesemaincanalsthendistributetheirrigationwaterintotheir
commandareas
through
a
networ
kof
branch
canals.
8/3/2019 Assighnment No 1
19/19
19