Asset Optimization Case Example Petronas Samarang Field David Rossi, Scientific Advisor Schlumberger SIS October 2015

Asset Optimization Case Example Petronas Samarang Field

  • Upload
    others

  • View
    4

  • Download
    0

Embed Size (px)

Citation preview

Page 1: Asset Optimization Case Example Petronas Samarang Field

Asset Optimization Case ExamplePetronas Samarang Field

David Rossi, Scientific Advisor

Schlumberger SIS

October 2015

Page 2: Asset Optimization Case Example Petronas Samarang Field

Samarang – Overview & Challenges

Page 3: Asset Optimization Case Example Petronas Samarang Field

Samarang Asset Description

Page 4: Asset Optimization Case Example Petronas Samarang Field

Main Challenges

• Lack of field instrumentation, dispersed data sources

• Poor infrastructure and network, absence of data management tools

• No control systems - need for automation architecture

• Need for improved collaboration

• Lack of streamlined process, long decision cycles

Page 5: Asset Optimization Case Example Petronas Samarang Field

Samarang – IO Solution

Page 6: Asset Optimization Case Example Petronas Samarang Field

Tri-Node Collaborative Working Environment

Page 7: Asset Optimization Case Example Petronas Samarang Field

Samarang IO Project Plan

IO objectives:

• Increase the production and recovery factor through total asset optimization

• Increase operational efficiency through streamlined workflow processes

• Reduce unplanned deferment and downtime

• Create a CWE among multiple disciplines and locations

• Remote tri-node monitoring of offshore facilities

Design & Planning

Surveillance & Monitoring

CWE

PO & Recovery,

TriNode CWE

Hybrid SS and

Transient

2011

Page 8: Asset Optimization Case Example Petronas Samarang Field

Samarang IO FrameworkPeople Process Technology

Page 9: Asset Optimization Case Example Petronas Samarang Field

IO Solution Approach

Meters, gauges, WF, TH

Qgl, headers, trunk line,

Separators; MPFM, DH,

microwave telecomms

Page 10: Asset Optimization Case Example Petronas Samarang Field

Samarang – Workflows

Page 11: Asset Optimization Case Example Petronas Samarang Field

Samarang: 25 Asset Workflows

Page 12: Asset Optimization Case Example Petronas Samarang Field

Workflow DevelopmentDesign, Develop, Deploy, Apply, Improve

Page 13: Asset Optimization Case Example Petronas Samarang Field

Solution Architecture

Page 14: Asset Optimization Case Example Petronas Samarang Field

Samarang Workflow Case ExampleGas Lift Surveillance and Optimization

Automated Well Test Validation (OTC-25035)

Well Integrity Workflow (SPE 167855)

Page 15: Asset Optimization Case Example Petronas Samarang Field

Gas Lift Surveillance and Optimization Workflow

Page 16: Asset Optimization Case Example Petronas Samarang Field

Samarang IO – Value

Page 17: Asset Optimization Case Example Petronas Samarang Field

Fast-Loop: Improved Decision Cycle Time

Page 18: Asset Optimization Case Example Petronas Samarang Field

Medium-Loop: Improved Decision Cycle Time

Page 19: Asset Optimization Case Example Petronas Samarang Field

Production:From 4.7k to 15kpod

Well Uptime:from 60% to 80%

Intra-Field Visits:75% reduction

Gas Lift:20% Improvement

Response time to Field:70% improvement

Well Test Update:from 9 days to 2 hours

Samarang Value

Page 20: Asset Optimization Case Example Petronas Samarang Field

2014

2014

2015

2015

2015

2013

2013

2014

2013 2014

Page 21: Asset Optimization Case Example Petronas Samarang Field

The End