Asset Management Performance (Structures)
Awtar Jandu
Safe Roads, Reliable Journeys, Informed Travellers
Bridge Owners Forum – Leeds -14 June 2005
The following areas will be covered in this presentation:
Safe Roads, Reliable Journeys, Informed Travellers
• Research during 2004/2005
• New procedures for Research proposals
• Value Management Workshops
• Research proposal for 2005/2006 and beyond
Research Projects 2004/05
• Separation of cyclist and Pedestrians from motor traffic- Report awaited
• User tolerances to vibrations on footbridges- Work completed –Report awaited
• Scoping study Timber Bridges –Work completed- Report awaited
• Waterproofing of decks- Stiffness of membrane/ thin surfacing –Completion 03/06
• Waterproofing of decks – Early application – Completion 03/06
• ATM gantries – High -sided vehicle buffeting effects – Completion 09/05
• Durability of hinge-decks – Draft of BA to be circulated shortly
Research Projects 2004/05
• Fire protection of tunnel assets- Second draft being considered
• Implications of EU Directive on tunnels- Report is finalised
• Fire detection and suppression in road tunnels- Draft final report received
• Innovations in Road Tunnels- Report finalised – Review recommendations.
• Performance Indicators for highway structures – Trial Documents available
• Trial use of recycled aggregates in structural concrete- Seminar held- Draft BA in progress
Research Projects 2004/05
• Crevice corrosion investigation in post-tensioned structures- Research findings being considered by HA
• Footbridge dynamic response properties – Final report in Autumn ’05
• WIM systems and braking forces for abnormal loads- Work completed
• The effectiveness of sub-standard shear reinforcement in bridge decks – Phase 1
• Tests on RC beams strengthened for shear using FRP laminates – Third Report
• Behaviour of RC beams strengthened for flexure - FRP laminates – 4th Report
• Performance assessment of FRP bridge decks: Testing of deck sections under static and dynamic loading – Phase 3 Report
Research Projects 2004/05
• Near surface mounted FRP for bridge strengthening
• Fire detection and suppression in road tunnels
• Acoustic emission for hinge decks
• Fire protection of tunnel assets
• Effective post- incident recovery in highway tunnels
• Primary safety for tunnel users
• Design guidance for non-ferrous rebar
Research Projects 2004/05
• Tunnel emergencies:emergency evacuation
• Expansion joints for integral bridges
• Use of mechanical ventilation in tunnel emergencies
• Effectiveness of washing bridges
Research Value Management Workshops
Value Management Workshops:
Development of the R&D Programme:
• New proposals received (Oct 04)
• Bids collated and evaluated
• Proposed projects prioritised
• Programme matched to available resources
• Draft programme to HA Board (Jan 05)
• Submission to the Minister (Feb 04)
• Approval by the Minister (April 05)
Value Management Workshops:
HA Research Themes:
• Accessibility
• Asset Use
• Driver information
• Improved safety
• Integration
• Reducing congestion
• Sustainability
Value Management Workshops:
The Essential Criteria:
• Benefits must be clearly identified
• Proposals must be feasible/achievable
• Proposals in line with HA objectives
Value Management Workshops:
Criteria used for 2005/06:• Improving safety
• Reducing congestion
• Reducing environmental impact
• Enhancing driver information
• Optimising WLC
• More effective technical governance
• Speeding up delivery
• Developing Traffic Operator role
• Wider benefits
Value Management Workshops:
Scoring:
• Benefits
Score of 0 – None benefits
Score of 10 – Exceptional benefits
• Likelihood – Score (0 - 10)
Research Value Management Workshops
Proposed Research Projects for 2005/06
Proposed New Projects 2005/06
• Early application of waterproofing systems to bridge decks
• Impact of revised HSE Standards on tunnels
• Assessment rule s for web stiffeners in steel bridges
• Half- joint bridge testing
• Temperature effects on integral bridges
• Design and strengthening of bridges for vehicle impact (desk study)
• Assessing defect acceptance in FRP materials
• Steel fibre-reinforced concrete – Concrete Society Report
Thank you
Safe Roads, Reliable Journeys, Informed Travellers