ISRAEL ELECTRIC
CORPORATION LTD.
RFI NO. 535.4.15 - Assessment of IEC's Natural Gas Systems By independent inspection body
Assessment of IEC's
Natural Gas Systems
By independent inspection body
Request for Information
(RFI)
ISRAEL ELECTRIC
CORPORATION LTD.
RFI NO. 535.4.15 - Assessment of IEC's Natural Gas Systems By independent inspection body
Table of Content
1. Definitions.
2. Project description.
3. Scope of Work.
4. Detailed Requirements.
5. Work location and schedule.
6. PFD of NG system (sample).
7. Questionnaire
ISRAEL ELECTRIC
CORPORATION LTD.
RFI NO. 535.4.15 - Assessment of IEC's Natural Gas Systems By independent inspection body
1. Definitions:
Where used in this RFI, each word or phrase listed below have the definition indicated:
1.1 Israel Electric Corp. Ltd.
1.2 NG – Natural Gas.
1.3 NG Power Station – Electrical Power station which consists of: Gas Valve Station,
Gas skid, Gas Burner System, NG Filters and Pre-heaters, Gas Turbine coupled with
a Steam Turbine (Combined Cycle), NG fired steam boiler, NG fired Auxiliary
Boiler.
1.4 NG distribution System.
1.5 HAZOP – Hazard And Operability study.
1.6 PRMS – Pressure Reduction and Metering System.
1.7 INGL – Israel Natural Gas Lines. (Gas Transmission System)
1.8 NGA – Natural Gas Authority (of Israel).
1.9 P&ID – Piping and Instrumentation Diagrams.
1.10 PFD – Piping Flow Diagram.
1.11 NDT – Non Destructive Testing.
1.12 WPS – Welding Procedures Specification.
1.13 PQR – Procedure Qualification Record.
1.14 WQTR – Welder Qualification Test Record.
1.15 ASME – American Society of Mechanical Engineers.
1.16 CE Stamp - indicates the compliance with European Union Legislation of a product.
1.17 UL Stamp - indicates the compliance with American Standards.
1.18 EP – Engineering plan - NG design submitted to the NGA for approval before
construction.
1.19 Gas Consumers – The final gas user such as Gas turbine, Auxiliary boiler or steam
boiler.
ISRAEL ELECTRIC
CORPORATION LTD.
RFI NO. 535.4.15 - Assessment of IEC's Natural Gas Systems By independent inspection body
2. Project Description:
2.1 The IEC is required by the NGA (Natural Gas Authority) to perform a comprehensive
asset integrity and condition assessment of the Natural Gas Distribution System inside
its power station by an Independent Inspection notified Body to be able to demonstrate
continued system operation at the design conditions. These assessments shall be
performed individually per specific NG power station.
2.2 The following power stations are included in the scope of work:
GAS Consumers Power Station
Two (2) gas turbines and two (2)
Auxiliary boilers
Haifa
Six (6) gas turbines and two (2) Auxiliary
boilers
Hagit
One (1) gas turbine and one (1) Auxiliary
boiler
Alon tavor
Two (2) steam boilers Reading
Six (6) gas turbines and two (2) Auxiliary
boilers
Gezer
One (1) gas turbine and one (1) Auxiliary
boiler
Tzafit
Two (2) gas turbines and one (1)
Auxiliary boilers and four (4) steam
boilers
Eshkol
Seven (7) gas turbines and one (1)
Auxiliary boilers
Ramat Hovav
2.3 Main Parameters for Gas Consumers.
2.3.1 Gas Turbine
Design Pressure: 25 to 40 bars
Design Capacity: 65,000 – 85,000 m3/hr
Design Temperature: –10 to 50°C
Gaz Pipes: 10" dia. 200 to 1,000 m long.
2.3.2 Auxiliary Boilers
Design Pressure: 1 bar (approx.)
Design Capacity: 900 – 1000 m3/hr
Design Temperature: –10 to 50°C
Pipes: 4" dia., 200 m to 1,000 m long (about)
ISRAEL ELECTRIC
CORPORATION LTD.
RFI NO. 535.4.15 - Assessment of IEC's Natural Gas Systems By independent inspection body
2.3.3 Steam Boilers
Design Pressure: 5 to 7 bars
Design Capacity: 65,000 m3/hr (approx.)
Design Temperature: –10 to 50°C
Pipes: 16" dia. to 24", about 500 m long.
It is considered best practice that the comprehensive asset integrity and condition assessment is
undertaken every four years. The reports generated shall contain a definitive list of integrity
condition monitoring activities in association with the prescribed intervals between these activities.
3. Scope of Work: 3.1 Main
a. Contractor should perform, in the agreed time schedule, the comprehensive asset
integrity report and condition assessment of the NG piping & systems inside IEC's
Power Stations listed in Para 2.
b. Contractor shall submit an assessment integrity report for each Power Station site.
c. The NG system boundaries are:
- Start point: pipes at PRMS outlet.
- End points: flanges entering the skids of the Gas Consumers (Gas Turbines or
the auxiliary boiler or the steam boiler).
d. The NG boundaries are shown on the PFD attached (Appendix 2).
e. The report shall cover all aspect of the design, construction, maintenance, and
existing state of the NG systems.
f. Contractor shall receive and review the following documents after signing the
contract:
f.1 The NG system "Engineering Plan", approved for construction
by the NGA.
f.2 The following construction documents will be submitted:
Cathodic Protection Reports.
Pipe Book.
ISRAEL ELECTRIC
CORPORATION LTD.
RFI NO. 535.4.15 - Assessment of IEC's Natural Gas Systems By independent inspection body
Pressure and Leak test.
General Layout of the power stations site.
PFD and P&ID.
NDT reports.
WQTR, WPS and PQR reports.
QC documents.
Risk Assessment Reports.
"As made" drawings.
f.3 Operation Documents.
Procedures
Cathodic protection.
Running and Testing procedure.
Emergency Procedure.
System Log Book.
HAZOP reports.
3.2 Options.
Contractor shall give an optional price for:
- First repeated assessment after 4 or 5 years.
- Second repeated assessment 4 to 5 years later.
ISRAEL ELECTRIC
CORPORATION LTD.
RFI NO. 535.4.15 - Assessment of IEC's Natural Gas Systems By independent inspection body
4. Detailed Requirements:
4.1 The Contractor , being a "Notified Body" shall assess the Natural Gas Systems, pipelines
and related equipment and facilities, under the contract, and shall certify that the system
is constructed, tested, cold commissioned and operates in accordance with the plans,
drawings, specification and permits.
4.2 The Contractor will inspect all the supplied documents and facilities and issue the
Company an "Asset integrity and condition assessment report". This will be forwarded
to the NGA for the purpose of NG final approval.
4.3 Pipelines:
The pipelines (buried or exposed) and buried valve stations integrity assessment is to
include the following, but not limited to, as applicable:
Verification of Design, Construction and Testing:
o Design and Pressure Testing Criteria.
o Pipe As-Made Documentation and Weld Quality.
o Depth of Cover.
o Sleeves.
o Additional Impact Protection.
Site State of Development.
Operation and Maintenance:
o Annual MOP Records.
o Fatigue Life.
o Gas Quality History.
o Corrosion Control.
o Ground Movements.
o Nitrogen-Filled Sleeves.
o Valves.
o Records.
Recommendations.
Implementation Plan of The Recommendations Made.
ISRAEL ELECTRIC
CORPORATION LTD.
RFI NO. 535.4.15 - Assessment of IEC's Natural Gas Systems By independent inspection body
4.4 Above Ground Installations (AGI's):
For each specific AGI, the assessment is to include the following, but is not limited to, all
AGI components and equipment e.g. Pipe Spools, Valves, Filters, Meters, PSV's etc.:
Visual Inspection Report by the Independent Inspection Body.
Routine Check Records.
Functional Check Records.
Major Overhaul Records.
Records of Replacement of Major Items of Equipment.
Valve Maintenance Records.
Control System Check Records.
Equipment and Component Integrity Examination Records.
Corrosion Control/Maintenance Painting Records.
Recommendations and Plan for Implementation.
ISRAEL ELECTRIC
CORPORATION LTD.
RFI NO. 535.4.15 - Assessment of IEC's Natural Gas Systems By independent inspection body
5. Work Location and Schedule:
5.1 The work will include all the Company's NG Power Stations in Israel per the attached map
showing the site location of each power station (see Ap. 1).
5.2 The Contractor will have about 3 months of work to inspect all the necessary facilities and
equipment and issue the relevant approvals for submission.
ISRAEL ELECTRIC
CORPORATION LTD.
RFI NO. 535.4.15 - Assessment of IEC's Natural Gas Systems By independent inspection body
6. PFD of NG system (sample):
ISRAEL ELECTRIC
CORPORATION LTD.
RFI NO. 535.4.15 - Assessment of IEC's Natural Gas Systems By independent inspection body
7. Questionnaire:
1.1 The following information shall be submitted to IEC
Company Information & contact Details
Company Information Point of contact:
Name: Name:
Address: Position:
City / State / Zip: Telephone #:
Website: Email:
1.2 Capabilities
1.3 Company Notification certificates.
Please attach all required documents showing compliance with the work
requested.
1.4 Company description
Year of incorporation:
Area of expertise:
Employees:
Previous Experience (add reference list):
1.5 Budget prices and time schedule
1.5.1 Please describe your preliminary plans for performing the required
"AUDITING".
7.5.2 What could be the expected time table, for each site, to perform:
ISRAEL ELECTRIC
CORPORATION LTD.
RFI NO. 535.4.15 - Assessment of IEC's Natural Gas Systems By independent inspection body
a. Auditing:
b. First site report, submitted for IEC review, comments, and necessary
repairs.
c. Final site report, submitted for the Natural Gas Authority.
7.5.3 Company Budget price for completing the work required, for all eight (8)
sites.
ISRAEL ELECTRIC
CORPORATION LTD.
RFI NO. 535.4.15 - Assessment of IEC's Natural Gas Systems By independent inspection body
SUBMISSION OF RESPONSES :
The responses shall be submitted to ( moshe shitrit)
via the following e – mail: ([email protected]).
DEADLINE FOR SUBMISSION OF RESPONSES:
The deadline for submission is:
DATE: 12/04/2015
TIME: 14:00 (Israeli Time)
LEGAL STATUS OF THIS RFI:
IEC shall be under no obligation to enter any transaction with any party whomsoever
who responds to or participates in any procedure for the Receipt of Information to be
used for the purposes of acquisition of services/equipment/systems/goods or data which
is the subject of the Request for Information (hereinafter referred to as: "RFI") or for
purposes of their development, application, production or construction. . IEC shall be entitled to use the information obtained by way of the RFI, as well as any
data, solution, process, technique or suggestion contained in any of the responses or
documents/response material submitted to IEC related thereto. Without derogating from
the above, IEC shall keep any information/data received from any person responding to
the RFI in strict confidence and shall not permit the use or use same for any purpose than
for its own needs unless such information must be disclosed subject to a right granted by
law.
A response to an RFI shall not bestow upon any person responding thereto (hereinafter
referred to as the "Respondent") any advantage in any procurement procedure, if such
procedure should be publicized at all, and IEC shall not be obliged to include the
Respondent in the procurement process. Any exceptions, changes or additions to these above instructions (whether contained in
any response to the RFI or otherwise) shall be devoid of validity and legal effect and
shall not obligate IEC.
The IEC wishes to thank you for your anticipated participation and cooperation in the successful
completion of this RFI.
Yours sincerely,
Israel Electric Corporation Ltd.