ASSESSMENT DEFINITIONS
LIFE
CYC
LE -
YEAR
SLA
ST R
EPLA
CED
% L
IFE
REM
AINI
NGVI
SUAL
EVA
LUAT
ION
WOR
K OR
DER
HIST
ORY
TOTA
L AS
SESS
MEN
T
LIFE CYCLE - YEARS
LAST REPLACED
% LIFE REMAINING
VISUAL EVALUATION
WORK ORDER HISTORY
TOTAL ASSESSMENT
Newly added Assessment items for 2020
This document is for Lewisville ISD use only and is subject to change. All rights reserved. No part of this publication may be reproduced, distributed, or transmitted in any form or by any means, including photocopying, recording, or other electronic or mechanical methods, without the prior written
permission of Lewisville Independent School District.
The score given by Facility Services personnel after visual evaluation of a product, material, or system. The score of each visual evaluation is based on the % Life Remaining. The item is then scored as to how it is performing relative to the expected life cycle.
The Total Assessment Score is based on the average of the % Life Remaining and Visual Evaluation scores, plus the Work Order History benefit or penalty.
Calculated for Total Assessment
The number in this column represents the benefit or penalty the Work Order History has on the % Life Remaining and Visual Evaluation scores.
Lightning Detection SystemShade Structures at Elementary Playgrounds
The length of time measured in years that a product, material, or system is expected to perform under normal usage before needing replacement.
Denotes the year that the product, material, or system was last replaced.
The amount of service life, expressed as a percentage, that a product, material, or system has remaining based on the ratio of an item's age to its expected life cycle.
This score consists of five years of Work Order History which includes labor and materials cost associated with maintaining a system. This data was used to create a median cost per square foot for the five year period.
ASSESSMENT SUMMARYELEMENTARY SCHOOLS
Current Year 2020
BLUE
BONN
ETBR
IDLE
WOO
DCA
MEY
CAST
LE H
ILLS
CENT
RAL
COYO
TE R
IDGE
CREE
KSID
EDE
GAN
DONA
LD
ETHR
IDGE
FLOW
ER M
OUND
FORE
ST V
ISTA
GARD
EN R
IDGE
Year Built 2000 1998 2014 2002 1957 2005 1989 1973 1989 1990 1985 1997 1992
Age 20 22 6 18 63 15 31 47 31 30 35 23 28
Foundation - - - - 0 - - 28 - - 35 - -
HVAC - Original 3 0 83 13 0 22 98 100 39 48 29 0 68
HVAC - Additions 42 0 - - 0 - - 53 8 13 0 -
HVAC - Additions - - - - 0 - - 100 - - - - -
HVAC - Additions - - - - 18 - - - - - - - -
HVAC - Controls 3 0 73 13 0 93 98 100 38 45 28 0 63
Ceiling and Lights - Original 3 0 73 13 0 28 98 100 38 45 28 0 63
Ceiling and Lights - Additions 40 0 - 0 - - 63 10 - 13 0 -
Ceiling and Lights - Additions - - - 0 - - 15 - - - - -
Ceiling and Lights - Additions - - - 28 - - - - - - - -
Roof - Flat - Original 6 0 82 12 - 32 - 44 83 95 36 0 73
Roof - Shingled or Standing Seam - - - - 9 0 26 - 45 - - 73
Roof - Additions 47 45 - - 0 - - 44 8 - 13 0 -
Roof - Additions - - - - 18 - - 11 - - - - -
Electrical Panels - Original 33 29 92 46 51 52 41 100 13 7 55 25 9
Electrical Panels - Addition - - - - 0 - - - - - - - -
Elevator - - 45 - - 46 - - - - - - -
Fire Safety - Fire Alarm 2 0 65 95 23 28 98 100 22 15 28 0 56
Fire Safety - Sprinkler System 68 63 100 58 52 66 45 66 22 88 62 62 48
Fire Safety - Sprinkler System - - - - - - - - - - - - -
Fire Safety - Sprinkler System - - - - - - - - - - - - -
Food Service Boilers - Original 0 0 70 55 23 25 98 100 80 35 3 - 60
Food Service Freezers - Original 3 0 73 13 25 28 50 100 38 45 28 - 63
Lightning Detection 26 26 26 26 26 26 26 26 26 26 26 26 26
Generator - 0 85 - 0 64 98 100 - - - - 80
Lift Stations - - - - - - - - - - - - -
Playground- Shad Structure - Main 40 60 75 90 - - 88 - 40 - 63 40 -
Playground - Main 88 0 73 13 18 25 25 25 40 78 63 98 53
Playground- Shade Structure - Pre-K - - 73 - - - - - - - - - 70
Playground - Pre-K - 50 73 - 20 78 - 78 63 78 60 75 93
Perf Arts - Curtains 3 68 73 15 23 28 98 100 93 50 23 0 98
Perf Arts - Stage Lghtng/panel 20 0 78 29 38 42 98 100 98 94 43 0 72
Flooring - Classrooms - Carpet -17 0 - 0 0 0 97 - - 85 0 -
Flooring - Classrooms - VCT/LVT 3 0 73 0 - 28 98 100 88 88 75 - 63
Flooring - Classrooms - Additions 20 - - - - - - 35 - - - 0 -
Flooring - Corridors-Carpet - - - - - - - - - - - - -
Flooring - Corridors-VCT 3 0 73 13 25 28 98 28 58 88 85 55 63
Flooring - Library -17 0 73 0 0 0 97 100 88 88 83 0 63
Flooring - Offices -17 0 73 0 0 0 97 100 88 51 83 0 63
Flooring - Cafeteria 3 98 73 13 28 28 98 100 88 88 85 0 63
Flooring - Cafeteria - Addition - - - - 28 - - - - - - - -
Flooring - Kitchen 55 53 89 52 67 55 44 18 37 43 33 45 37
Flooring - Kitchen - Addition - - - - 67 - - - - - - - -
Flooring - Gym - Original 3 0 73 13 25 28 98 100 88 88 85 0 63
Flooring - Gym - Addition - - - - 25 - - - - - - - -
Doors 3 0 73 13 23 28 98 100 -23 -20 -28 0 -10
Door Hardware 3 0 73 13 23 28 98 100 -28 -20 15 0 -20
Casework (Built Ins) 3 0 73 13 20 28 98 100 -23 -20 -28 0 -5
Restrooms - Faculty 3 0 73 13 25 30 98 100 93 93 93 0 0
Restrooms - Student 3 0 73 13 28 25 98 100 93 93 63 0 0
Restrooms - Addition 40 40 - - 0 - - 39 93 - 93 0 -
Restrooms - Addition - - - - 0 - - 15 - - - - -
Marquee 34 26 80 79 48 50 6 43 72 75 15 24 8
Paving - Parking Lots 60 58 89 47 67 65 44 7 39 43 35 55 45
Paving - Parking - Asphalt - - - - - - -28 25 - - - - -
Paving - Sidewalks 50 53 87 43 60 64 34 10 24 35 14 46 33
Exterior Lighting - Original 8 88 73 13 25 28 98 78 90 95 97 0 93
Exterior Lighting - Other areas - - - - - - - - - - - - -
Paint - Commons -7 0 68 39 2 80 97 100 93 53 88 0 53
Paint - Cafeteria -7 0 68 59 2 80 97 100 93 53 31 0 56
Paint - Library -7 0 68 59 2 59 97 100 93 68 31 0 53
Paint - Gyms 95 0 73 68 23 85 98 100 95 60 58 0 68
Paint - Exterior 75 0 73 15 23 23 45 100 85 60 38 55 63
Paint - Hallways 10 0 73 8 23 85 98 100 95 65 93 0 63
ELEM SUMMARY8/5/2020
Current Year
Year Built
Age
Foundation
HVAC - Original
HVAC - Additions
HVAC - Additions
HVAC - Additions
HVAC - Controls
Ceiling and Lights - Original
Ceiling and Lights - Additions
Ceiling and Lights - Additions
Ceiling and Lights - Additions
Roof - Flat - Original
Roof - Shingled or Standing Seam
Roof - Additions
Roof - Additions
Electrical Panels - Original
Electrical Panels - Addition
Elevator
Fire Safety - Fire Alarm
Fire Safety - Sprinkler System
Fire Safety - Sprinkler System
Fire Safety - Sprinkler System
Food Service Boilers - Original
Food Service Freezers - Original
Lightning Detection
Generator
Lift Stations
Playground- Shad Structure - Main
Playground - Main
Playground- Shade Structure - Pre-K
Playground - Pre-K
Perf Arts - Curtains
Perf Arts - Stage Lghtng/panel
Flooring - Classrooms - Carpet
Flooring - Classrooms - VCT/LVT
Flooring - Classrooms - Additions
Flooring - Corridors-Carpet
Flooring - Corridors-VCT
Flooring - Library
Flooring - Offices
Flooring - Cafeteria
Flooring - Cafeteria - Addition
Flooring - Kitchen
Flooring - Kitchen - Addition
Flooring - Gym - Original
Flooring - Gym - Addition
Doors
Door Hardware
Casework (Built Ins)
Restrooms - Faculty
Restrooms - Student
Restrooms - Addition
Restrooms - Addition
Marquee
Paving - Parking Lots
Paving - Parking - Asphalt
Paving - Sidewalks
Exterior Lighting - Original
Exterior Lighting - Other areas
Paint - Commons
Paint - Cafeteria
Paint - Library
Paint - Gyms
Paint - Exterior
Paint - Hallways
ASSESSMENT SUMMARY ELEMENTARY SCHOOLS
2020
HEBR
ON V
ALLE
YHE
RITA
GE
HICK
S
HIGH
LAND
VIL
LAGE
HOM
ESTE
ADIN
DEPE
NDEN
CEIN
DIAN
CRE
EKLA
KELA
ND
LEW
ISVI
LLE
LIBE
RTY
LILL
IE J
ACKS
ONM
CAUL
IFFE
MIL
L ST
REET
1989 1993 2004 1981 1999 2008 1985 2008 2010 2002 2005 1987 2019
31 27 16 39 21 12 35 12 10 18 15 33 1- - - - - - 30 - - - - 30 97
41 71 21 95 -2 38 32 39 51 13 27 58 95
17 38 - 95 - - - - - 37 - - -
- - - - - - - - - - - - -
- - - - - - - - - - - - -
40 73 20 83 -3 45 38 43 53 10 93 53 95
43 73 25 83 0 45 38 45 53 10 28 53 95
18 38 - 83 - - - - - 35 - - -
- - - - - - - - - - - - -
- - - - - - - - - - - - -
93 98 - 84 -2 - 41 - - 10 28 98 95
93 95 28 - - 45 - 49 39 - 19 - 96
13 98 - 84 - - 16 - - 36 - - -
- - - - - - - - - - - - -
-2 14 49 97 31 61 61 36 71 44 58 72 96
- - - - - - - - - - - - -
- - 45 - - 53 - 69 69 - - - -
44 0 23 91 -3 53 35 98 52 14 25 41 95
67 37 80 92 62 88 77 58 84 70 65 23 97
- - - - - - - - - - - - -
- - - - - - - - - - - - -
90 70 95 45 40 40 40 35 45 10 20 15 95
43 73 25 83 -3 45 38 43 53 13 28 48 95
- 26 26 26 26 - 26 26 26 26 26 26 26
- - 60 90 - 70 - 73 78 - 64 71 96
- - - - - - - - - - - - -
95 75 - 95 43 45 - - - 45 - - -
80 68 20 28 -3 43 48 45 48 10 - 48 95
- - - - - - - - - 95 25 - -
80 53 20 - - 50 70 - - 93 25 10 95
95 48 23 83 75 43 93 43 50 13 25 20 95
96 94 38 85 16 54 94 54 60 22 40 48 96
0 88 37 - - 25 0 25 37 0 - - -
0 - - 83 68 - 0 40 53 13 28 53 95
- 88 - - - - - - - 14 - - -
- - - - - - 0 - - - - - -
0 88 25 83 53 45 0 43 50 13 28 33 95
0 88 34 83 48 28 0 25 37 0 8 37 94
0 88 28 77 54 28 0 25 37 0 5 53 94
0 88 23 83 53 45 0 43 53 13 28 50 97
- - - - - - - - - - - - -
34 43 69 21 42 76 0 76 80 57 68 35 97
- - - - - - - - - - - - -
0 88 25 83 70 45 0 43 50 13 25 23 95
- - - - - - - - - - - - -
-28 -13 25 88 -3 40 -38 43 55 13 30 -28 95
-28 -13 25 88 -3 40 -38 43 55 13 30 -28 95
-28 -13 25 83 -3 40 -38 43 55 15 30 -30 95
93 93 28 83 -3 45 68 43 53 13 28 53 95
93 93 28 83 -3 45 68 43 53 13 28 53 95
93 35 - - - 10 - - 35 - - -
- - - 83 - - - - - - - - -
64 72 31 48 79 62 76 60 68 38 50 39 -
39 46 64 79 52 78 33 76 81 64 70 35 97
- - - - - - - - - - - - -
31 34 60 11 49 72 16 70 77 55 44 19 96
35 73 25 83 0 43 25 40 50 10 25 13 95
- - - - - - - - - - - 73 -
48 91 22 82 26 80 88 30 88 80 8 37 94
48 91 22 82 72 66 88 30 80 65 8 37 94
48 91 19 82 26 71 65 28 94 65 85 37 94
75 95 30 85 35 40 73 50 58 83 25 50 95
60 95 90 85 0 40 43 43 58 18 95 25 95
60 93 33 85 53 40 90 48 55 73 78 50 95
ELEM SUMMARY8/5/2020
Current Year
Year Built
Age
Foundation
HVAC - Original
HVAC - Additions
HVAC - Additions
HVAC - Additions
HVAC - Controls
Ceiling and Lights - Original
Ceiling and Lights - Additions
Ceiling and Lights - Additions
Ceiling and Lights - Additions
Roof - Flat - Original
Roof - Shingled or Standing Seam
Roof - Additions
Roof - Additions
Electrical Panels - Original
Electrical Panels - Addition
Elevator
Fire Safety - Fire Alarm
Fire Safety - Sprinkler System
Fire Safety - Sprinkler System
Fire Safety - Sprinkler System
Food Service Boilers - Original
Food Service Freezers - Original
Lightning Detection
Generator
Lift Stations
Playground- Shad Structure - Main
Playground - Main
Playground- Shade Structure - Pre-K
Playground - Pre-K
Perf Arts - Curtains
Perf Arts - Stage Lghtng/panel
Flooring - Classrooms - Carpet
Flooring - Classrooms - VCT/LVT
Flooring - Classrooms - Additions
Flooring - Corridors-Carpet
Flooring - Corridors-VCT
Flooring - Library
Flooring - Offices
Flooring - Cafeteria
Flooring - Cafeteria - Addition
Flooring - Kitchen
Flooring - Kitchen - Addition
Flooring - Gym - Original
Flooring - Gym - Addition
Doors
Door Hardware
Casework (Built Ins)
Restrooms - Faculty
Restrooms - Student
Restrooms - Addition
Restrooms - Addition
Marquee
Paving - Parking Lots
Paving - Parking - Asphalt
Paving - Sidewalks
Exterior Lighting - Original
Exterior Lighting - Other areas
Paint - Commons
Paint - Cafeteria
Paint - Library
Paint - Gyms
Paint - Exterior
Paint - Hallways
ASSESSMENT SUMMARY ELEMENTARY SCHOOLS
2020
MOR
NING
SIDE
OLD
SETT
LERS
OWEN
PARK
WAY
PETE
RS C
OLON
YPO
LSER
PRAI
RIE
TRAI
LRO
CKBR
OOK
SOUT
HRID
GEST
EWAR
TS C
REEK
TIMB
ER C
REEK
VALL
EY R
IDGE
VICK
ERY
WEL
LING
TON
1993 1994 1987 1995 2010 1995 1995 2003 1999 1978 1978 1996 2003 1998
27 26 33 25 10 25 25 17 21 42 42 24 17 22- - - - - - - - - 18 - - - -
68 98 59 0 56 93 0 19 -2 18 0 0 16 -2
- 98 - - - - 0 41 - - 63 39 - 29
- - - - - - - - - - - - - -
- - - - - - - - - - - - - -
63 98 53 0 53 93 0 15 -3 93 98 -10 15 -3
63 98 53 0 53 93 0 20 -3 23 0 0 18 -3
- 5 - - - - 0 35 - - 63 38 - 28
- - - - - - - - - - - - - -
- - - - - - - - - - - - - -
67 51 12 0 - 93 0 22 -3 25 24 93 17 -6
67 98 - 65 52 73 64 - - - - 93 - -
- 5 - - - - 40 42 - - 63 93 98 21
- - - - - - - - - - - - - -
14 17 51 15 69 20 16 42 28 -17 0 22 48 27
- - - - - - - - - - - - - -
- - - - 68 - - - - - - - - -
63 98 10 0 52 93 0 19 -3 14 0 0 14 -6
46 44 93 46 80 41 35 77 69 18 0 41 70 58
- - - - - - - - - - - - - -
- - - - - - - - - - - - - -
60 98 85 0 50 45 0 15 65 53 0 43 70 -5
63 98 50 0 53 93 0 18 0 25 78 0 18 -3
26 - 26 26 26 26 26 26 - - 26 26 26 26
80 96 77 - 75 95 - - - - - - 95 -
- 98 - - - - - - - - - - - -
- 60 - 30 - - 25 - - - - 80 - 45
50 88 25 78 48 68 68 15 75 20 60 90 15 -5
- - - - - - - 90 - - - - - -
- 88 70 65 70 68 68 75 75 75 60 93 - 30
60 98 30 0 50 93 0 18 60 53 0 43 18 -5
69 98 60 0 63 94 0 34 16 94 0 0 34 9
- 97 53 0 - - - 9 - - 0 0 -7 5
63 - - 0 53 98 68 20 -3 53 - 0 8 45
- 97 - - - - - 78 - - - - 95 -
- - - - - - - - - - - - - -
63 98 53 0 53 63 0 18 20 25 0 18 18 33
63 97 37 0 42 93 0 -2 -20 7 0 0 -7 -23
63 68 37 0 42 97 68 48 26 53 0 0 -7 43
63 98 50 0 53 58 0 18 -3 28 0 0 65 -5
- - - - - - - - - - - - - -
46 47 40 0 73 48 50 63 52 21 0 51 56 56
- - - - - - - - - - - - - -
63 98 53 0 58 98 68 18 -3 28 0 0 65 -5
- - - - - - - - - - - - - -
-18 98 53 0 58 98 0 20 8 -55 0 0 18 -5
-18 98 53 0 58 98 0 20 8 -55 0 0 18 -5
-18 98 -33 0 53 98 0 18 5 -55 0 0 18 -5
93 98 53 0 55 98 0 18 -3 93 0 0 15 -5
93 98 53 0 55 98 0 15 0 93 0 0 18 -5
5 - - - - 0 35 - - 0 38 98 25
- - - - - - - - - - - - - -
88 12 68 0 66 26 18 39 35 76 2 20 44 28
53 49 40 45 83 53 53 67 59 26 33 53 66 57
- - - - - - - - - - 33 - - -
41 35 24 39 78 49 41 59 49 15 5 42 59 48
60 98 53 0 53 98 0 18 98 98 0 0 78 -5
- - - - - - - - - - - - - -
51 97 39 0 44 97 0 57 53 48 0 0 8 93
51 97 39 0 47 97 0 57 68 80 0 0 8 -13
51 97 39 0 47 97 0 94 -20 71 0 0 74 -16
63 98 55 0 55 98 0 20 60 75 0 0 23 5
63 98 88 0 53 98 0 18 5 25 0 85 25 85
63 98 53 0 53 98 0 18 -3 90 0 0 25 5
ELEM SUMMARY8/5/2020
Year Built / Age 2000 / 20 Assessment Scale: Campus Square Footage 69,593 100 = New or Newly Replaced
Current Year 2020 0 = End of Life Cycle
Bluebonnet ES
LIFE
CYC
LE -
YEAR
SLA
ST R
EPLA
CED
% L
IFE
REM
AINI
NGVI
SUAL
EVA
LUAT
ION
WOR
K OR
DER
HIST
ORY
TOTA
L AS
SESS
MEN
T
Type of Material / Notes - Items highlighted Orange are 2017 Bond
FACILITY AGE RATING 50 2000 60Bluebonnet ES - HVAC - Original 20 2000 0 5 4% 3 RTU
Bluebonnet ES - HVAC - 2008 Addition 20 2008 40 40 4% 42 RTUBluebonnet ES - HVAC Controls 20 2000 0 5 3 2000 & 2008 Controls = I/net
Bluebonnet ES - Ceiling and Lights - Original 20 2000 0 5 3
Bluebonnet ES - Ceiling and Lights - 2008 20 2008 40 40 40
Bluebonnet ES - Roof - Flat 20 2000 0 10 12% 6
Bluebonnet ES - Roof - Flat - 2008 Addition 20 2008 40 45 12% 47
Bluebonnet ES - Electrical Switchgear 30 2000 33 33 0% 33
Bluebonnet ES - Fire Safety - Fire Alarm 20 2000 0 5 -29% 2 FCI - No SupportBluebonnet ES - Fire Safety - Sprinkler System 50 2000 60 60 13% 68 Building shifting - Riser Rm
Bluebonnet ES - Food Service Boilers 20 2000 0 0 0
Bluebonnet ES - Food Service Freezers 20 2000 0 5 3
Bluebonnet ES - Lightning Detection 15 2009 27 25 26 Controls & SirenBluebonnet ES - Generator - -
Bluebonnet ES - Shade Structure - Main 20 2009 45 35 40 Ok shape for the canopy - some patched holes
Bluebonnet ES - Playground - Main 20 2017 85 90 88 Good shapeBluebonnet ES - Shade Structure - Pre-K - - N/A
Bluebonnet ES - Playground - Pre-K - - N/ABluebonnet ES - Perf Arts - Curtains 20 2000 0 5 3
Bluebonnet ES - Perf Arts - Stage Lighting/panel 25 2000 20 20 20
Bluebonnet ES - Flooring - Classroom - Carpet 15 2000 -33 0 -17 CarpetBluebonnet ES - Flooring - Classrooms VCT 20 2000 0 5 3 VCT
Bluebonnet ES - Flooring - Clssrms Carpet-2008 Add 15 2008 20 20 20 CarpetBluebonnet ES - Flooring - Corridors 20 2000 0 5 3 VCT
Bluebonnet ES - Flooring - Library 15 2000 -33 0 -17 CarpetBluebonnet ES - Flooring - Offices 15 2000 -33 0 -17 Carpet and VCT
Bluebonnet ES - Flooring - Cafeteria 20 2000 0 5 3 VCTBluebonnet ES - Flooring - Kitchen 50 2000 60 50 55 Terrazzo is cracking
Bluebonnet ES - Flooring - Gym 20 2000 0 5 3 VCTBluebonnet ES - Doors 20 2000 0 5 3
Bluebonnet ES - Door Hardware 20 2000 0 5 3
Bluebonnet ES - Casework (Built Ins) 20 2000 0 5 3
Bluebonnet ES - Restrooms - Faculty 20 2000 0 5 3 CeramicBluebonnet ES - Restrooms - Student 20 2000 0 5 3 Ceramic
Bluebonnet ES - Restrooms - 2008 Addition 20 2008 40 40 40
Bluebonnet ES - Marquee 30 2000 33 35 34
Bluebonnet ES - Paving - Parking Lots 50 2000 60 60 60
Bluebonnet ES - Paving - Sidewalks 40 2000 50 50 50 Some buckling in front on roadsideBluebonnet ES - Exterior Lighting 20 2000 0 15 8
Bluebonnet ES - Paint - Commons 15 2000 -33 20 -7
Bluebonnet ES - Paint - Cafeteria 15 2000 -33 20 -7
Bluebonnet ES - Paint - Library 15 2000 -33 20 -7
Bluebonnet ES - Paint - Gyms 20 2019 95 95 95 Painted 2019Bluebonnet ES - Paint - Exterior 20 2015 75 75 75 Summer 2018 Exterior block power
washed & sealed
Bluebonnet ES - Paint - Hallways 20 2000 0 20 10 Maintaining
Bluebonnet ES8/5/2020
Year Built / Age 1998 / 22 Assessment Scale:Campus Square Footage 82,993 100 = New or Newly Replaced
Current Year 2020 0 = End of Life Cycle
Bridlewood ES
LIFE
CYC
LE -
YEAR
SLA
ST R
EPLA
CED
% L
IFE
REM
AINI
NGVI
SUAL
EVA
LUAT
ION
WOR
K OR
DER
HIST
ORY
TOTA
L AS
SESS
MEN
T
Type of Material / Notes - Items highlighted Orange are 2017 Bond
FACILITY AGE RATING 50 1998 56Bridlewood ES - HVAC 20 1998 0 RTU; In Progress
Bridlewood ES - HVAC - 2008 Addition 20 2008 0 RTU; In Progress Bridlewood ES - HVAC Controls 20 1998 0 1998 & 2008 Controls = I/Net; In Progress
Bridlewood ES - Ceiling and Lights - Original 20 1998 0 In ProgressBridlewood ES - Ceiling and Lights - 2008 20 2008 0 In Progress
Bridlewood ES - Roof - Flat 20 1998 0 In ProgressBridlewood ES - Roof - Flat - 2008 Addition 20 2008 40 45 6% 45
Bridlewood ES - Electrical Switchgear 30 1998 27 30 2% 29
Bridlewood ES - Fire Safety - Fire Alarm 20 1998 0 Edwards EST 2 - Limited Parts In Progress
Bridlewood ES - Fire Safety - Sprinkler System 50 1998 56 56 13% 63
Bridlewood ES - Food Service Boilers 20 1998 0 In ProgressBridlewood ES - Food Service Freezers 20 1998 0 In Progress
Bridlewood ES - Lightning Detection 15 2009 27 25 26 Controls & SirenBridlewood ES - Generator - 0 In Progress
Bridlewood ES - Shade Structure - Main 20 2013 65 55 60 3 Shade Structures; Largest structure has several holes
Bridlewood ES - Playground - Main 20 1998 0 Rubber coating worn/stairs peeling, Fibar washes over boarder; In Progress
Bridlewood ES - Shade Structure - Pre-K - -N/A
Bridlewood ES - Playground - Pre-K 20 2010 50 50 50
Bridlewood ES - Perf Arts - Curtains 20 2013 65 70 68
Bridlewood ES - Perf Arts - Stage Lghtng/panel 25 1998 0 In ProgressBridlewood ES - Flooring - Classrooms - Carpet 15 2008 0 Carpet; In Progress
Bridlewood ES - Flooring - Classrooms - VCT 20 2009 0 VCT; In ProgressBridlewood ES - Flooring - Corridors 20 1998 0 VCT; In Progress
Bridlewood ES - Flooring - Library 15 1998 0 Carpet; In ProgressBridlewood ES - Flooring - Offices 20 2009 0 VCT; In Progress
Bridlewood ES - Flooring - Cafeteria 20 2019 95 100 98 VCTBridlewood ES - Flooring - Kitchen 50 1998 56 50 53 Terrazzo small cracking
Bridlewood ES - Flooring - Gym 20 1998 0 VCT; In ProgressBridlewood ES - Door Hardware 20 1998 0 In Progress
Bridlewood ES - Doors 20 1998 0 In ProgressBridlewood ES - Casework (Built-Ins) 20 1998 0 In Progress
Bridlewood ES - Restrooms - Faculty 20 1998 0 Plastic partitions, 1"x1" ceramic floor tile, 4"x4" wall tile; In Progress
Bridlewood ES - Restrooms - Student 20 1998 0 Plastic partitions, 1"x1" ceramic floor tile, 4"x4" wall tile; In Progress
Bridlewood ES - Restrooms - 2008 Addition 20 2008 40 40 40
Bridlewood ES - Marquee 30 1998 27 25 26
Bridlewood ES - Paving - Parking Lots 50 1998 56 60 58 ConcreteBridlewood ES - Paving - Sidewalks 40 1998 45 60 53 Concrete
Bridlewood ES - Exterior Lighting 20 2017 85 90 88 replace w/LED well packs as existing burns out
Bridlewood ES - Paint - Commons 15 2016 0 In ProgressBridlewood ES - Paint - Cafeteria 15 2016 0 In Progress
Bridlewood ES - Paint - Library 15 2016 0 In ProgressBridlewood ES - Paint - Gyms 20 2017 0 In Progress
Bridlewood ES - Paint - Exterior 20 2016 0 Need to repair sparrow holes; In Progress
Bridlewood ES - Paint - Hallways 20 2014 0 In Progress
Bridlewood ES8/5/2020
Year Built / Age 2014 / 6 Assessment Scale:Campus Square Footage 110,585 100 = New or Newly Replaced
Current Year 2020 0 = End of Life Cycle
Camey ES
LIFE
CYC
LE -
YEAR
SLA
ST R
EPLA
CED
% L
IFE
REM
AINI
NGVI
SUAL
EVA
LUAT
ION
WOR
K OR
DER
HIST
ORY
TOTA
L AS
SESS
MEN
T
Type of Material / Notes
FACILITY AGE RATING 50 2014 88Camey ES - HVAC 20 2014 70 75 14% 83 RTU
Camey ES - HVAC Controls 20 2014 70 75 73 Controls = AlertonCamey ES - Ceiling and Lights 20 2014 70 75 73
Camey ES - Roof - Flat 20 2014 70 75 13% 82
Camey ES - Electrical Switchgear 30 2014 80 80 15% 92
Camey ES - Elevator 25 2014 76 75 -40% 45 Thyssen KruppCamey ES - Fire Safety - Fire Alarm 20 2014 70 75 -11% 65 Edwards EST 2 - Limited Parts
Camey ES - Fire Safety - Sprinkler System 50 2014 88 90 17% 100
Camey ES - Food Service Boilers 20 2014 70 70 70
Camey ES - Food Service Freezers 20 2014 70 75 73
Camey ES - Lightning Detection 15 2009 27 25 26 Siren; controls @ TCHSCamey ES - Generator 40 2014 85 85 85 Generac - Diesel
Camey ES - Shade Structure - Main 20 2015 75 75 75 Shade sails on main; good condition
Camey ES - Playground - Main 20 2014 70 75 73
Camey ES - Shade Structure - Pre-K 20 2014 70 75 73
Camey ES - Playground - Pre-K 20 2014 70 75 73 Good conditionCamey ES - Perf Arts - Curtains 20 2014 70 75 73
Camey ES - Perf Arts - Stage Lghtng/panel 25 2014 76 80 78
Camey ES - Flooring - Classrooms 20 2014 70 75 73 VCTCamey ES - Flooring - Corridors 20 2014 70 75 73 VCT
Camey ES - Flooring - Library 20 2014 70 75 73 VCTCamey ES - Flooring - Offices 20 2014 70 75 73 VCT
Camey ES - Flooring - Cafeteria 20 2014 70 75 73 VCTCamey ES - Flooring - Kitchen 50 2014 88 90 89 Terrazzo
Camey ES - Flooring - Gym 20 2014 70 75 73 VCTCamey ES Doors 20 2014 70 75 73
Camey ES Door Hardware 20 2014 70 75 73
Camey ES Casework (Built-Ins) 20 2014 70 75 73
Camey ES - Restrooms - Faculty 20 2014 70 75 73
Camey ES - Restrooms - Student 20 2014 70 75 73
Camey ES - Marquee 30 2014 80 80 80
Camey ES - Paving - Parking Lots 50 2014 88 90 89
Camey ES - Paving - Sidewalks 40 2014 85 88 87
Camey ES - Exterior Lighting 20 2014 70 75 73
Camey ES - Paint - Commons 15 2014 60 75 68 Office areas painted 2019Camey ES - Paint - Cafeteria 15 2014 60 75 68
Camey ES - Paint - Library 15 2014 60 75 68
Camey ES - Paint - Gyms 20 2014 70 75 73
Camey ES - Paint - Exterior 20 2014 70 75 73
Camey ES - Paint - Hallways 20 2014 70 75 73 Columns 2018
Camey ES8/5/2020
Year Built / Age 2002 / 18 Assessment Scale:Campus Square Footage 73,557 100 = New or Newly Replaced
Current Year 2020 0 = End of Life Cycle
Castle Hills ES
LIFE
CYC
LE -
YEAR
SLA
ST R
EPLA
CED
% L
IFE
REM
AINI
NGVI
SUAL
EVA
LUAT
ION
WOR
K OR
DER
HIST
ORY
TOTA
L AS
SESS
MEN
T
Type of Material / Notes - Items highlighted Orange are 2017 Bond
FACILITY AGE RATING 50 2002 64Castle Hills ES - HVAC 20 2002 10 15 1% 13 RTU
Castle Hills ES - HVAC Controls 20 2002 10 15 13 Controls = I/netCastle Hills ES - Ceiling and Lights 20 2002 10 15 13
Castle Hills ES - Roof - Flat 20 2002 10 15 -5% 12
Castle Hills ES - Electrical Switchgear 30 2002 40 43 11% 46
Castle Hills ES - Fire Safety - Fire Alarm 20 2019 95 95 95 Edwards IO 6/2019
Castle Hills ES - Fire Safety - Sprinkler System 50 2002 64 64 -9% 58
Castle Hills ES - Food Service Boilers 20 2011 55 55 55
Castle Hills ES - Food Service Freezers 20 2002 10 15 13
Castle Hills ES - Ligtning Detection 15 2009 27 25 26 Siren; controls @ Homestead ESCastle Hills ES - Generator - - N/A
Castle Hills ES - Shade Structure - Main 20 2018 90 90 90 Shade structure - Fabric replaced 2018
Castle Hills ES - Playground - Main 20 2002 10 15 13 Playground good; poor drainage due to slope
Castle Hills ES - Shade Structure - Pre-K - - N/ACastle Hills ES - Playground - Pre-K - - N/ACastle Hills ES - Perf Arts - Curtains 20 2002 10 20 15
Castle Hills ES - Perf Arts - Stage Lghtng/panel 25 2002 28 30 29
Castle Hills ES - Flooring - Classrooms 15 2002 0 Carpet; In ProgressCastle Hills ES - Flooring - Classrooms 20 2002 0 VCT; In Progress
Castle Hills ES - Flooring - Corridors 20 2002 10 15 13 VCTCastle Hills ES - Flooring - Library 15 2002 0 Carpet / LVT; In ProgressCastle Hills ES - Flooring - Offices 15 2002 0 Carpet / VCT; In Progress
Castle Hills ES - Flooring - Cafeteria 20 2002 10 15 13 VCTCastle Hills ES - Flooring - Kitchen 50 2002 64 40 52 Terrazzo
Castle Hills ES - Flooring - Gym 20 2002 10 15 13 VCTCastle Hills ES - Doors 20 2002 10 15 13
Castle Hills ES - Door Hardware 20 2002 10 15 13
Castle Hills ES - Casework (Built-Ins) 20 2002 10 15 13
Castle Hills ES - Restrooms - Faculty 20 2002 10 15 13 Original-ceramic tile, no partitions, cmu drywall
Castle Hills ES - Restrooms - Student 20 2002 10 15 13 Ceramic tile / plastic partitionsCastle Hills ES - Marquee 15 2016 73 85 79 Replaced 2016 LED
Castle Hills ES - Paving - Parking Lots 50 2002 64 30 47 Movement from Poor SoilCastle Hills ES - Paving - Sidewalks 40 2002 55 30 43 Movement from Poor Soil
Castle Hills ES - Exterior Lighting 20 2002 10 15 13
Castle Hills ES - Paint - Commons 15 2010 33 45 39
Castle Hills ES - Paint - Cafeteria 15 2013 53 65 59 Kitchen painted in 2017Castle Hills ES - Paint - Library 15 2013 53 65 59
Castle Hills ES - Paint - Gyms 20 2013 65 70 68 Lower walls last painted 2012Castle Hills ES - Paint - Exterior 20 2002 10 20 15 Original
Castle Hills ES - Paint - Hallways 20 2002 10 5 8 P-Lam; Some Drywall; Some Tack Surface; upper to be scheduled
Non District Covered Castle Hills ES - Track, Teacher Shelter & Basketball Court 2020 Maintained by Castle Hills Foundation and
HOA
Castle Hills ES8/5/2020
Year Built / Age 1957 / 63 Assessment Scale:Campus Square Footage 152,952 100 = New or Newly Replaced
Current Year 2020 0 = End of Life Cycle
Central ES
LIFE
CYC
LE -
YEAR
SLA
ST R
EPLA
CED
% L
IFE
REM
AINI
NGVI
SUAL
EVA
LUAT
ION
WOR
K OR
DER
HIST
ORY
TOTA
L AS
SESS
MEN
T
Type of Material / Notes - Items highlighted Orange are 2017 Bond
FACILITY AGE RATING 50 1957 -26Central ES - Foundation 50 1957 0 Slab-On-Grade, Original section only - In
Progress
Central ES - HVAC - Original 20 1988 0 MIX - In ProgressCentral ES - HVAC - 1978 Addition 20 1978 0 Gym; In ProgressCentral ES - HVAC - 1993 Addition 20 1993 0 In ProgressCentral ES - HVAC - 2000 Addition 20 2000 0 600 Hallway - In ProgressCentral ES - HVAC - 2004 Addition 20 2004 20 25 -19% 18
Central ES - HVAC - Controls 20 1988 0 Controls = I/net (Original and Additions)- In Progress
Central ES - Ceiling and Lights - Original 20 1988 0 MIX - In ProgressCentral ES - Ceiling and Lights - 1978 20 1978 0 In ProgressCentral ES - Ceiling and Lights - 1993 20 1993 0 Small gym, - In ProgressCentral ES - Ceiling and Lights - 2000 20 2000 0 600 Hallway, - In ProgressCentral ES - Ceiling and Lights - 2004 20 2004 20 35 28 T-8
Central ES - Roof - Flat - Original 20 2002 10 10 -8% 9 Partially replaced 2019Central ES - Roof - Metal - 1978 Addition 30 1978 0 In Progress
Central ES - Roof- Flat - 2000 Addition 20 2019 95 24 60 2 ply mod bitCentral ES - Roof - Shingles - 2004 Addition 20 2004 20 20 -8% 18 Shingle, flatCentral ES - Electrical Switchgear - Original 30 2004 47 47 9% 51 Updated 2004
Central ES - Electrical Switchgear - 1988 30 1988 0 In ProgressCentral ES - Fire Safety - Fire Alarm 20 2004 20 25 2% 23 Edwards EST 2 - Limited Parts
Central ES - Fire Safety - Sprinkler System 50 2004 68 68 -24% 52
Central ES - Food Service Boilers 20 2003 15 30 23 Original = 2016; addition = 2003Central ES - Food Service Freezers - Original 20 2004 20 30 25 x 2 (same year, 2nd in 2004 additon)
Central ES - Lightning Detection 15 2009 27 25 26 Siren; controls @ LHSCentral ES - Generator - 0 In Progress
Central ES - Shade Structure - Main - - N/ACentral ES - Playground - Main 20 2003 15 20 18 Heavy community use; color fading on
equipment; good condition
Central ES - Shade Structure - Pre-K - - N/ACentral ES - Playground - Pre-K 20 2004 20 20 20 Heavy community use; color fading on
equipment; good condition
Central ES - Perf Arts - Curtains 20 2004 20 25 23
Central ES - Perf Arts - Stage Lghtng/panel 25 2004 36 40 38
Central ES - Flooring - Classrooms 15 2004 0 Carpet - In ProgressCentral ES - Flooring - Corridors 20 2004 20 30 25 VCT
Central ES - Flooring - Library 15 2004 0 Carpet - In ProgressCentral ES - Flooring - Offices 15 2004 0 Carpet - In Progress
Central ES - Flooring - Cafeteria - Original 20 2004 20 35 28 VCTCentral ES - Flooring - Cafeteria - 2004 Addition 20 2004 20 35 28 VCT
Central ES - Flooring - Kitchen - Original 50 2004 68 65 67 TerrazzoCentral ES - Flooring - Kitchen - 2004 Addition 50 2004 68 65 67 Terrazzo
Central ES - Flooring - Gym - Original 20 2004 20 30 25 VCTCentral ES - Flooring - Gym - 1978 Addition 20 2004 20 30 25 VCT
Central ES8/5/2020
LIFE
CYC
LE -
YEAR
SLA
ST R
EPLA
CED
% L
IFE
REM
AINI
NGVI
SUAL
EVA
LUAT
ION
WOR
K OR
DER
HIST
ORY
TOTA
L AS
SESS
MEN
T
Type of Material / Notes - Items highlighted Orange are 2017 Bond
Central ES - Doors 20 2004 20 25 23
Central ES - Door Hardware 20 2004 20 25 23
Central ES - Casework (Built-Ins) 20 2004 20 20 20
Central ES - Restrooms - Faculty - Original 20 2004 20 30 25 CeramicCentral ES - Restrooms - Student - Original 20 2004 20 35 28 Ceramic
Central ES - Restrooms - 2000 Addition 20 2000 0 Partitions need to be replaced. - In Progress
Central ES - Restrooms - 2004 Addition 20 2004 20 20 0
Central ES - Marquee 30 2004 47 50 48
Central ES - Paving - Parking Lots 50 2004 68 65 67
Central ES - Paving - Sidewalks 40 2004 60 60 60
Central ES - Exterior Lighting 20 2004 20 30 25 Metal HalideCentral ES - Paint - Commons 15 2004 -7 10 2 2018 Office areas paintedCentral ES - Paint - Cafeteria 15 2004 -7 10 2
Central ES - Paint - Library 15 2004 -7 10 2
Central ES - Paint - Gyms 20 2004 20 25 23 Lower walls painted 2019Central ES - Paint - Exterior 20 2004 20 25 23
Central ES - Paint - Hallways 20 2004 20 25 23
Central ES8/5/2020
Year Built / Age 2005 / 15 Assessment Scale:Campus Square Footage 99,939 100 = New or Newly Replaced
Current Year 2020 0 = End of Life Cycle
Coyote Ridge ES
LIFE
CYC
LE -
YEAR
SLA
ST R
EPLA
CED
% L
IFE
REM
AINI
NGVI
SUAL
EVA
LUAT
ION
WOR
K OR
DER
HIST
ORY
TOTA
L AS
SESS
MEN
T
Type of Material / Notes - Items highlighted Orange are 2017 Bond
FACILITY AGE RATING 50 2005 70Coyote Ridge ES - HVAC 20 2005 25 30 -18% 22 Chiller;
Coyote Ridge ES - HVAC - Controls 20 2018 90 95 93 2008 Bond - EnviromaticCoyote Ridge ES - Ceiling and Lights 20 2005 25 30 28
Coyote Ridge ES - Roof - Flat 20 2005 25 30 17% 32 over KitchenCoyote Ridge ES - Roof - Shingled 20 2005 0 In Progress - 6/18 Storm Damage
Coyote Ridge ES - Electrical Switchgear 30 2005 50 50 4% 52
Coyote Ridge ES - Elevator 25 2005 40 45 8% 46 SchindlerCoyote Ridge ES - Fire Safety - Fire Alarm 20 2005 25 25 13% 28 Edwards EST 2 - Limited Parts
Coyote Ridge ES - Fire Safety - Sprinkler System 50 2005 70 72 -7% 66
Coyote Ridge ES - Food Service Boilers 20 2005 25 25 25
Coyote Ridge ES - Food Service Freezers 20 2005 25 30 28
Coyote Ridge ES - Lightning Detection 15 2009 27 25 26 Siren; contols @ Creek Valley MSCoyote Ridge ES - Generator 40 2005 63 65 64 Generac - Diesel
Coyote Ridge ES - Shade Structure - Main - - N/A
Coyote Ridge ES - Playground - Main 20 2005 25 25 25 Faded paint; some minor rubber coating cracking; no shade
Coyote Ridge ES - Shade Structure - Pre-K - - N/ACoyote Ridge ES - Playground - Pre-K 20 2015 75 80 78 Good shapeCoyote Ridge ES - Perf Arts - Curtains 20 2005 25 30 28
Coyote Ridge ES - Perf Arts - Stage Lghtng/panel 25 2005 40 44 42 Terrazzo stairsCoyote Ridge ES - Flooring - Classrooms-Carpet 15 2005 0 In Progress Coyote Ridge ES - Flooring - Classrooms - VCT 20 2005 25 30 28
Coyote Ridge ES - Flooring - Corridors 20 2005 25 30 28 VCT / stairs are TerrazzoCoyote Ridge ES - Flooring - Library 15 2005 0 Carpet; In ProgressCoyote Ridge ES - Flooring - Offices 15 2005 0 VCT / Carpet; In Progress
Coyote Ridge ES - Flooring - Cafeteria 20 2005 25 30 28 VCTCoyote Ridge ES - Flooring - Kitchen 50 2005 70 40 55 Terrazzo - visible cracks
Coyote Ridge ES - Flooring - Gym 20 2005 25 30 28 VCTCoyote Ridge ES - Doors 20 2005 25 30 28
Coyote Ridge ES - Door Hardware 20 2005 25 30 28
Coyote Ridge ES - Casework (Built-Ins) 20 2005 25 30 28
Coyote Ridge ES - Restrooms - Faculty 20 2005 25 35 30 Ceramic tile floor, CT wall to 7', then CMU.
Coyote Ridge ES - Restrooms - Student 20 2005 25 25 25 Terrazzo movement-cracks in all restrooms, ceramic, CMU / tile partitions, classrooms: ceramic floor / wall.
Coyote Ridge ES - Marquee 30 2005 50 50 50
Coyote Ridge ES - Paving - Parking Lots 50 2005 70 60 65 ConcreteCoyote Ridge ES - Paving - Sidewalks 40 2005 63 65 64
Coyote Ridge ES - Exterior Lighting 20 2005 25 30 28
Coyote Ridge ES - Paint - Commons 15 2017 80 80 80
Coyote Ridge ES - Paint - Cafeteria 15 2017 80 80 80
Coyote Ridge ES - Paint - Library 15 2013 53 65 59
Coyote Ridge ES - Paint - Gyms 20 2017 85 85 85 Maintaining lower wallsCoyote Ridge ES - Paint - Exterior 20 2005 25 20 23
Coyote Ridge ES - Paint - Hallways 20 2017 85 85 85 P-Lam, drywall, tackboard
Coyote Ridge ES8/5/2020
Year Built / Age 1989 / 31 Assessment Scale:Campus Square Footage 60,168 100 = New or Newly Replaced
Current Year 2020 0 = End of Life Cycle
Creekside ES
LIFE
CYC
LE -
YEAR
SLA
ST R
EPLA
CED
% L
IFE
REM
AINI
NGVI
SUAL
EVA
LUAT
ION
WOR
K OR
DER
HIST
ORY
TOTA
L AS
SESS
MEN
T
Type of Material / Notes - Items highlighted Orange are 2017 Bond
FACILITY AGE RATING 50 1989 38Creekside ES - HVAC 20 2019 95 100 98 CHILLER; 1 new, 1 original;
Creekside ES - HVAC Controls 20 2019 95 100 98
Creekside ES - Ceiling and Lights 20 2019 95 100 98
Creekside ES - Roof - Shingled 20 2007 35 35 -25% 26
Creekside ES - Electrical Switchgear 30 1989 45 -8% 41 Engineer reviewed system and extended life
Creekside ES - Fire Safety - Fire Alarm 20 2019 95 100 98 EST 3 w/Voice Evac.Creekside ES - Fire Safety - Sprinkler System 50 1989 38 40 15% 45
Creekside ES - Food Service Boilers 20 2019 95 100 98
Creekside ES - Food Service Freezers 20 2010 50 50 50
Creekside ES - Lightning Detection 15 2009 27 25 26 Siren; controls @ Durham MSCreekside ES - Generator 40 2018 95 100 98
Creekside ES - Shade Structure - Main 20 2017 85 90 88 2 bench shade structures; 2017 shade structure over 5-12 play; good shape
Creekside ES - Playground - Main 20 2005 25 25 25Very faded
Creekside ES - Shade Structure - Pre-K - - N/A
Creekside ES - Playground - Pre-K - - Not standard equipment (minimal equip. on Pre-K)
Creekside ES - Perf Arts - Curtains 20 2019 95 100 98
Creekside ES - Perf Arts - Stage Lghtng/panel 25 2019 96 100 98
Creekside ES - Flooring - Classrooms - Carpet 15 2019 93 100 97
Creekside ES - Flooring - Classrooms - VCT 20 2019 95 100 98
Creekside ES - Flooring - Corridors 20 2019 95 100 98
Creekside ES - Flooring - Library 15 2019 93 100 97
Creekside ES - Flooring - Offices 15 2019 93 100 97
Creekside ES - Flooring - Cafeteria 20 2019 95 100 98
Creekside ES - Flooring - Kitchen 50 1989 38 50 44 TerrazzoCreekside ES - Flooring - Gym 20 2019 95 100 98
Creekside ES - Doors 20 2019 95 100 98
Creekside ES - Door Hardware 20 2019 95 100 98
Creekside ES - Casework (Built-Ins) 20 2019 95 100 98
Creekside ES - Restrooms - Faculty 20 2019 95 100 98
Creekside ES - Restrooms - Student 20 2019 95 100 98
Creekside ES - Marquee 30 1989 -3 15 6
Creekside ES - Paving - Parking Lots 50 1989 38 50 44 ConcreteCreekside ES - Paving - Asphalt Parking Lots 20 1989 -55 0 -28 Back Drive is asphalt
Creekside ES - Paving - Sidewalks 40 1989 23 45 34
Creekside ES - Exterior Lighting 20 2019 95 100 98
Creekside ES - Paint - Commons 15 2019 93 100 97
Creekside ES - Paint - Cafeteria 15 2019 93 100 97
Creekside ES - Paint - Library 15 2019 93 100 97
Creekside ES - Paint - Gyms 20 2019 95 100 98
Creekside ES - Paint - Exterior 20 2007 35 55 45
Creekside ES - Paint - Hallways 20 2019 95 100 98
Creekside ES8/5/2020
Year Built / Age 1973 / 47 Assessment Scale:Campus Square Footage 75,764 100 = New or Newly Replaced
Current Year 2020 0 = End of Life Cycle
Degan ES
LIFE
CYC
LE -
YEAR
SLA
ST R
EPLA
CED
% L
IFE
REM
AINI
NGVI
SUAL
EVA
LUAT
ION
WOR
K OR
DER
HIST
ORY
TOTA
L AS
SESS
MEN
T
Type of Material / Notes - Items highlighted Orange are 2017 Bond
FACILITY AGE RATING 50 1973 6Degan ES - Foundation 50 1973 6 50 28 Slab-On-Grade
Degan ES - HVAC - Original 20 2020 100 100 100 RTU; IN PROGRESSDegan ES - HVAC - 1987 Addition 20 2012 60 65 -15% 53
Degan ES - HVAC - 2001 Addition 20 2020 100 100 100 IN PROGRESSDegan ES - HVAC - Controls 20 2020 100 100 100 Controls =Alerton
Degan ES - Ceiling and Lights - Original 20 2020 100 100 100 IN PROGRESSDegan ES - Ceiling and Lights - 1987 20 2012 60 65 63 Lights & Ceiling tiles replaced, not the grid
Degan ES - Ceiling and Lights - 2001 20 2001 5 25 15
Degan ES - Roof - Flat - Original 20 2012 60 60 -26% 44
Degan ES - Roof - Flat - 1987 Addition 20 2012 60 60 -26% 44
Degan ES - Roof - Flat - 2001 Addition 20 2001 5 25 -26% 11
Degan ES - Electrical Switchgear 30 2020 100 100 100 Some replaced in kitchens; IN PROGRESS
Degan ES - Fire Safety - Fire Alarm 20 2020 100 100 100
Degan ES - Fire Safety - Sprinkler System - Original 50 2020 100 100 100
Degan ES - Fire Safety - Sprinkler System - 1987 50 2020 100 100 100
Degan ES - Fire Safety - Sprinkler System - 2001 50 2001 62 60 9% 66
Degan ES - Food Service Boilers 20 2020 100 100 100 IN PROGRESSDegan ES - Food Service Freezers 20 2020 100 100 100 IN PROGRESS
Degan ES - Lightning Detection 15 2009 27 25 26 Siren; controls @ Huffines MSDegan ES - Generator 40 2020 100 100 100 IN PROGRESS
Degan ES - Shade Structure - Main - - N/A
Degan ES - Playground - Main 20 2005 25 25 25 High traffic; Drainage issues partially resolved still holds water; a lot of vandalism
Degan ES - Shade Structrue - Pre-K - - N/ADegan ES - Playground - Pre-K 20 2015 75 80 78 Looks goodDegan ES - Perf Arts - Curtains 20 2020 100 100 100 IN PROGRESS
Degan ES - Perf Arts - Stage Lghtng/panel 25 2020 100 100 100 IN PROGRESSDegan ES - Flooring - Classrooms -Original 20 2020 100 100 100 VCT
Degan ES - Flooring - Classrooms - 1987 Add 20 2004 20 50 35 VCT; Corridor replaced 2020Degan ES - Flooring - Classrooms - 2001 Add 20 2004 20 30 25 VCT
Degan ES - Flooring - Corridors 20 2004 20 35 28 VCT; all but 2001 complete 2020Degan ES - Flooring - Library 15 2020 100 100 100 Carpet; IN PROGRESSDegan ES - Flooring - Offices 15 2020 100 100 100 Carpet; IN PROGRESS
Degan ES - Flooring - Cafeteria 20 2020 100 100 100 VCT; IN PROGRESSDegan ES - Flooring - Kitchen 50 1973 6 30 18 Terrazzo
Degan ES - Flooring - Gym 20 2020 100 100 100 VCT; IN PROGRESSDegan ES - Doors 20 2020 100 100 100 Original areas completed
Degan ES - Door Hardware 20 2020 100 100 100 Original areas completedDegan ES - Casework (Built-Ins) 20 2020 100 100 100 Original and 1987 areas completedDegan ES - Restrooms - Faculty 20 2020 100 100 100 VCT floor, ceramic tile walls
Degan ES - Restrooms - Student 20 2020 100 100 100 Ceramic floor and walls, laminate partitions
Degan ES - Restrooms - 1987 Addition 20 2008 40 38 39
Degan ES - Restrooms - 2001 Addition 20 2001 5 25 15
Degan ES - Marquee 30 2004 47 40 43
Degan ES - Paving - Parking Lots 50 1973 6 8 7
Degan ES - Paving - Asphalt Parking Lots 20 2005 25 25 25
Degan ES - Paving - Sidewalks 40 1973 -18 38 10 Some movement; Repairing as needed
Degan ES - Exterior Lighting 20 2015 75 80 78 LEDDegan ES - Paint - Commons 15 2020 100 100 100 P-Lam, drywallDegan ES - Paint - Cafeteria 15 2020 100 100 100 IN PROGRESS
Degan ES - Paint - Library 15 2020 100 100 100 IN PROGRESSDegan ES - Paint - Gyms 20 2020 100 100 100 P-Lam, drywall; IN PROGRESS
Degan ES - Paint - Exterior 20 2020 100 100 100 IN PROGRESSDegan ES - Paint - Hallways 20 2020 100 100 100 P-Lam, drywall, some tac.; IN PROGRESS
Degan ES8/5/2020
Year Built / Age 1989 / 31 Assessment Scale:Campus Square Footage 80,465 100 = New or Newly Replaced
Current Year 2020 0 = End of Life Cycle
Donald ES
LIFE
CYC
LE -
YEAR
SLA
ST R
EPLA
CED
% L
IFE
REM
AINI
NGVI
SUAL
EVA
LUAT
ION
WOR
K OR
DER
HIST
ORY
TOTA
L AS
SESS
MEN
T
Type of Material / Notes - Items highlighted Orange are 2017 Bond
FACILITY AGE RATING 50 1989 38Donald ES - HVAC - Original 20 2007 35 40 4% 39 RTU
Donald ES - HVAC - 2001 Addition 20 2001 5 10 4% 8 RTU Donald ES - HVAC - Controls 20 2007 35 40 38 Controls = Alerton
Donald ES - Ceiling and Lights - Original 20 2007 35 40 38 Donald ES - Ceiling and Lights - 2001 Addition 20 2001 5 15 10
Donald ES - Roof - Flat - Orginal 20 2016 80 85 83
Donald ES - Roof - Flat - 2001 20 2001 5 10 7% 8
Donald ES - Roof - Shingled 20 2016 80 85 83
Donald ES - Electrical Switchgear 30 1989 -3 25 -24% 13 SiemensDonald ES - Fire Safety - Fire Alarm 20 2001 5 35 12% 22 Edwards EST 2 - Limited Parts
Donald ES - Fire Safety - Sprinkler System 50 1989 38 40 -43% 22
Donald ES - Fire Safety - 2001 Sprinkler System 50 2001 62 62 -43% 35
Donald ES - Food Service Boilers 20 2016 80 80 80
Donald ES - Food Service Freezers 20 2007 35 40 38
Donald ES - Lightning Detection 15 2009 27 25 26 Controls & SirenDonald ES - Generator - - N/A
Donald ES - Shade Structure - Main 20 2008 40 40 40
Donald ES - Playground - Main 20 2012 60 60 60 Little Tykes - slide on topDonald ES - Shade Structure - Pre-K - - N/A
Donald ES - Playground - Pre-K 20 2012 60 65 63
Donald ES - Perf Arts - Curtains 20 2018 90 95 93
Donald ES - Perf Arts - Stage Lghtng/panel 25 2019 96 100 98
Donald ES - Flooring - Classrooms - Carpet -
Donald ES - Flooring - Classrooms - VCT 20 2017 85 90 88
Donald ES - Flooring - Corridors 20 2011 55 60 58 VCTDonald ES - Flooring - Library 20 2017 85 90 88 VCT/Carpet TileDonald ES - Flooring - Offices 20 2017 85 90 88 VCT
Donald ES - Flooring - Cafeteria 20 2017 85 90 88 VCTDonald ES - Flooring - Kitchen 50 1989 38 35 37 Terrazzo
Donald ES - Flooring - Gym 20 2017 85 90 88 LVTDonald ES - Doors 20 1989 -55 10 -23
Donald ES - Door Hardware 20 1989 -55 0 -28 Round knobs; Scheduled Fall 2020Donald ES - Casework (Built-Ins) 20 1989 -55 10 -23
Donald ES - Restrooms - Faculty 20 2018 90 95 93
Donald ES - Restrooms - Student 20 2018 90 95 93
Donald ES - Restrooms - 2001 Addition 20 2018 90 95 93
Donald ES - Marquee 30 2011 70 73 72 New face (STEM)Donald ES - Paving - Parking Lots 50 1989 38 40 39 Concrete
Donald ES - Paving - Sidewalks 40 1989 23 25 24 Heaving in multiple areasDonald ES - Exterior Lighting 20 2018 90 90 90 In house LED 2018
Donald ES - Paint - Commons 15 2018 87 100 93 Stem Update 2018; Admin areas painted 2019
Donald ES - Paint - Cafeteria 15 2018 87 100 93 Stem Update 2018Donald ES - Paint - Library 15 2018 87 100 93 Stem Update 2018Donald ES - Paint - Gyms 20 2018 90 100 95 Stem Update 2018
Donald ES - Paint - Exterior 20 2016 80 90 85
Donald ES - Paint - Hallways 20 2018 90 100 95 Stem Update 2018
Donald ES8/5/2020
Year Built / Age 1990 / 30 Assessment Scale:Campus Square Footage 63,863 100 = New or Newly Replaced
Current Year 2020 0 = End of Life Cycle
Ethridge ES
LIFE
CYC
LE -
YEAR
SLA
ST R
EPLA
CED
% L
IFE
REM
AINI
NGVI
SUAL
EVA
LUAT
ION
WOR
K OR
DER
HIST
ORY
TOTA
L AS
SESS
MEN
T
Type of Material / Notes - Items highlighted Orange are 2017 Bond
FACILITY AGE RATING 50 1990 40Ethridge ES - HVAC 20 2008 40 50 7% 48 RTU;
Ethridge ES - HVAC - Controls 20 2008 40 50 45 Controls = AlertonEthridge ES - Ceiling and Lights 20 2008 40 50 45
Ethridge ES - Roof - Flat 20 2019 95 95 95
Ethridge ES - Roof - Shingled 20 2008 40 50 45
Ethridge ES - Electrical Switchgear 30 1990 0 15 -11% 7
Ethridge ES - Fire Safety - Fire Alarm 20 2002 10 15 17% 15 Edwards EST 2 - Limited Parts Ethridge ES - Fire Safety - Sprinkler System 50 2008 76 78 14% 88
Ethridge ES - Food Service Boilers 20 2007 35 35 35
Ethridge ES - Food Service Freezers 20 2008 40 50 45
Ethridge ES - Lightning Detection 15 2009 27 25 26 Controls & SirenEthridge ES - Generator - - N/A
Ethridge ES - Shade Structure - Main - - N/APlayground - MainEthridge ES - Main 20 2015 75 80 78
Ethridge ES - Shade Structure - Pre-K - - N/AEthridge ES - Playground - Pre-K 20 2015 75 80 78
Ethridge ES - Perf Arts - Curtains 20 2009 45 55 50
Ethridge ES - Perf Arts - Stage Lghtng/panel 25 2018 92 95 94
Ethridge ES - Flooring - Classrooms - VCT 20 2017 85 90 88 VCTEthridge ES - Flooring - Corridors 20 2017 85 90 88 VCT
Ethridge ES - Flooring - Library 20 2017 85 90 88 VCT/Carpet TileEthridge ES - Flooring - Offices 15 2012 47 55 51 VCT, lounge: Carpet / VCT
Ethridge ES - Flooring - Cafeteria 20 2017 85 90 88 VCTEthridge ES - Flooring - Kitchen 50 1990 40 45 43 Terrazzo
Ethridge ES - Flooring - Gym 20 2017 85 90 88 LVTEthridge ES - Doors 20 1990 -50 10 -20
Ethridge ES - Door Hardware 20 1990 -50 10 -20 Knobs
Ethridge ES - Casework (Built-Ins) 20 1990 -50 10 -20
Ethridge ES - Restrooms - Faculty 20 2018 90 95 93
Ethridge ES - Restrooms - Student 20 2018 90 95 93
Ethridge ES - Marquee 30 2012 73 77 75 2012 - DigitalEthridge ES - Paving - Parking Lots 50 1990 40 45 43 Concrete; 22 new saces added in front of
school
Ethridge ES - Paving - Sidewalks 40 1990 25 45 35
Ethridge ES - Exterior Lighting 20 2019 95 95 95 LEDEthridge ES - Paint - Commons 15 2012 47 60 53 A-wing, 1 wall tackboard, 3 walls drywall
Ethridge ES - Paint - Cafeteria 15 2012 47 60 53
Ethridge ES - Paint - Library 15 2015 67 70 68
Ethridge ES - Paint - Gyms 20 2012 60 60 60
Ethridge ES - Paint - Exterior 20 2012 60 60 60 2018 Exterior Doors, rails and posts
Ethridge ES - Paint - Hallways 20 2013 65 65 65 2013-Installed tackboards, P-Lam original / paint
Ethridge ES8/5/2020
Year Built / Age 1985 / 35 Assessment Scale:Campus Square Footage 79,485 100 = New or Newly Replaced
Current Year 2020 0 = End of Life Cycle
Flower Mound ES
LIFE
CYC
LE -
YEAR
SLA
ST R
EPLA
CED
% L
IFE
REM
AINI
NGVI
SUAL
EVA
LUAT
ION
WOR
K OR
DER
HIST
ORY
TOTA
L AS
SESS
MEN
T
Type of Material / Notes - Items highlighted Orange are 2017 Bond
FACILITY AGE RATING 50 1985 30Flower Mound ES - Foundation 50 1985 30 40 35 Slab-On-Grade, Repairs in 2016
Flower Mound ES - HVAC - Original 20 2005 25 30 4% 29 RTU / HW; Flower Mound ES - HVAC - 2001 Addition 20 2001 5 20 4% 13 RTU / HW;
Flower Mound ES - HVAC - Controls 20 2005 25 30 28 Controls = AlertonFlower Mound ES - Ceiling and Lights - Original 20 2005 25 30 28
Flower Mound ES - Ceiling and Lights - 2001 Addition 20 2001 5 20 13
Flower Mound ES - Roof - Original 20 2007 35 35 4% 36
Flower Mound ES - Roof - 2001 Addition 20 2001 5 20 4% 13
Flower Mound ES - Electrical Switchgear 30 2007 57 60 -7% 55 EatonFlower Mound ES - Lift in building 25 2005 40 30 35 Nat'l Wheel-O-Vator - Lift at stage
Flower Mound ES - Fire Safety - Fire Alarm 20 2005 25 30 4% 28 Edwards EST 2Flower Mound ES - Fire Safety - Sprinkler System 50 2005 70 70 -12% 62
Flower Mound ES - Food Service Boilers 20 1994 -30 35 3 Replaced: Tank 1 - 2001; Tank 2 - 2002
Flower Mound ES - Food Service Freezers 20 2005 25 30 28
Flower Mound ES - Lightning Detection 15 2009 27 25 26 Siren; Controls @ FMHSFlower Mound ES - Generator - - N/A
Flower Mound ES - Shade Structure - Main 20 2013 65 60 63
Flower Mound ES - Playground - Main 20 2012 60 65 63 drainage issues; has an additional section; installed 5 new steps & 4 new platforms
Flower Mound ES - Shade Structure - Pre-K - - N/AFlower Mound ES - Playground - Pre-K 20 2012 60 60 60
Flower Mound ES - Perf Arts - Curtains 20 2004 20 25 23
Flower Mound ES - Perf Arts - Stage Lghtng/panel 25 2005 40 45 43 Truck LightingFlower Mound ES - Flooring - Classrooms - VCT 20 2017 85 85 85
Flower Mound ES - Flooring - Classrooms - VCT 20 2015 75 75 75
Flower Mound ES - Flooring - Corridors 20 2017 85 85 85 VCT
Flower Mound ES - Flooring - Library 15 2017 80 85 83 Carpet Tile
Flower Mound ES - Flooring - Offices 15 2017 80 85 83 Carpet Tile
Flower Mound ES - Flooring - Cafeteria 20 2017 85 85 85 VCT
Flower Mound ES - Flooring - Kitchen 50 1985 30 35 33 TerrazzoFlower Mound ES - Flooring - Gym 20 2017 85 85 85 LVT
Flower Mound ES - Doors 20 1985 -75 20 -28
Flower Mound ES - Door Hardware 20 2001 5 25 15
Flower Mound ES - Casework (Built-Ins) 20 1985 -75 20 -28 Light Tan Wood Grain Tops
Flower Mound ES - Restrooms - Faculty 20 2018 90 95 93
Flower Mound ES - Restrooms - Student 20 2012 60 65 63 10x10 ceramic floors / walls, plastic partitions, laminate partitions in 2001 wing.
Flower Mound ES - Restrooms - 2001 Addition 20 2018 90 95 93
Flower Mound ES - Marquee 30 1994 13 17 15
Flower Mound ES - Paving - Parking Lots 50 1985 30 40 35
Flower Mound ES - Paving - Sidewalks 40 1985 13 15 14 Some movementFlower Mound ES - Exterior Lighting 30 2019 97 97 97 LED
Flower Mound ES - Paint - Commons 15 2018 87 90 88 PLAM; Admin. Areas painted 2019Flower Mound ES - Paint - Cafeteria 15 2009 27 35 31 Ceramic tile, CMU
Flower Mound ES - Paint - Library 15 2009 27 35 31
Flower Mound ES - Paint - Gyms 20 2012 60 55 58 CMUFlower Mound ES - Paint - Exterior 20 2007 35 40 38 Front Entry painted 2019
Flower Mound ES - Paint - Hallways 20 2018 90 95 93
Flower Mound ES8/5/2020
Year Built / Age 1997 / 23 Assessment Scale:Campus Square Footage 85,610 100 = New or Newly Replaced
Current Year 2020 0 = End of Life Cycle
Forest Vista ES
LIFE
CYC
LE -
YEAR
SLA
ST R
EPLA
CED
% L
IFE
REM
AINI
NGVI
SUAL
EVA
LUAT
ION
WOR
K OR
DER
HIST
ORY
TOTA
L AS
SESS
MEN
T
Type of Material / Notes - Items highlighted Orange are 2017 Bond
FACILITY AGE RATING 50 1997 54Forest Vista ES - HVAC - Original 20 1997 0 RTU; In Progress
Forest Vista ES - HVAC - 2001 Addition 20 2001 0 RTU; In ProgressForest Vista ES - HVAC - Controls 20 1997 0 1997 & 2001 Controls = I/net; In Progress
Forest Vista ES - Ceiling and Lights - Original 20 1997 0 In ProgressForest Vista ES - Ceiling and Lights - 2001 Addition 20 2001 0 In Progress
Forest Vista ES - Roof - Flat - Original 20 1997 0 In ProgressForest Vista ES - Roof - Flat - 2001 Addition 20 2001 0 In Progress
Forest Vista ES - Electrical Switchgear 30 1997 23 25 2% 25 Cutler Hammer
Forest Vista ES - Fire Safety - Fire Alarm 20 2016 0 New Panel / Original Devices; Edwards EST 3; In Progress
Forest Vista ES - Fire Safety - Sprinkler System 50 1997 54 55 14% 62 Sprinkler heads replaced 2020Forest Vista ES - Fire Safety -Emergency Radio - - Tracking Purposes only - Test Pass - not
needed
Forest Vista ES - Food Service Boilers 20 2011 - Tank - 2011; In ProgressForest Vista ES - Food Service Freezers 20 1997 - In Progress
Forest Vista ES - Lightning Detection 15 2009 27 25 26 Siren; Controls @ Garden Ridge ESForest Vista ES - Generator - - In Progress
Forest Vista ES - Shade Structure -Main 20 2008 40 40 40
Forest Vista ES - Playground -Main 20 2019 95 100 98 In Progress
Forest Vista ES - Shade Structure - Pre-K - - N/AForest Vista ES - Playground - Pre-K 20 2015 75 75 75 Game Time; New Fence 2017; good shape
Forest Vista ES - Perf Arts - Curtains 20 1997 0 In ProgressForest Vista ES - Perf Arts - Stage Lghtng/panel 25 1997 0 In Progress
Forest Vista ES - Flooring - Classrooms - Org 15 1997 0 Carpet; In ProgressForest Vista ES - Flooring - Classrms - 2001 Add 15 2001 0 Carpet; In Progress
Forest Vista ES - Flooring - Corridors 20 2011 55 55 55 VCT in 2011Forest Vista ES - Flooring - Library 15 1997 0 Carpet; In ProgressForest Vista ES - Flooring - Offices 15 1997 0 Carpet; In Progress
Forest Vista ES - Flooring - Cafeteria 20 1997 0 VCT; In ProgressForest Vista ES - Flooring - Kitchen 50 1997 54 35 45 Terrazzo
Forest Vista ES - Flooring - Gym 20 1997 0 VCT; In ProgressForest Vista ES - Doors 20 1997 0 In Progress
Forest Vista ES - Door Hardware 20 1997 0 In ProgressForest Vista ES - Casework (Built-Ins) 20 1997 0 Green; In ProgressForest Vista ES - Restrooms - Faculty 20 1997 0 Ceramic Tile; In ProgressForest Vista ES - Restrooms - Student 20 1997 0 Ceramic Tile, P-Lam partitions; In Progress
Forest Vista ES - Restrooms - 2001 Addition 20 2001 0 In ProgressForest Vista ES - Marquee 30 1997 23 25 24 Needs a new logo
Forest Vista ES - Paving - Parking Lots 50 1997 54 55 55 ConcreteForest Vista ES - Paving - Sidewalks 40 1997 43 50 46 Concrete
Forest Vista ES - Exterior Lighting 20 1997 0 In ProgressForest Vista ES - Paint - Commons 15 1997 0 P-Lam, some tackboard; In ProgressForest Vista ES - Paint - Cafeteria 15 1997 0 In Progress
Forest Vista ES - Paint - Library 15 1997 0 In ProgressForest Vista ES - Paint - Gyms 20 1997 0 In Progress
Forest Vista ES - Paint - Exterior 20 2011 55 55 55
Forest Vista ES - Paint - Hallways 20 1997 0 In Progress
Forest Vista ES8/5/2020
Year Built / Age 1992 / 28 Assessment Scale:Campus Square Footage 63,853 100 = New or Newly Replaced
Current Year 2020 0 = End of Life Cycle
Garden Ridge ES
LIFE
CYC
LE -
YEAR
SLA
ST R
EPLA
CED
% L
IFE
REM
AINI
NGVI
SUAL
EVA
LUAT
ION
WOR
K OR
DER
HIST
ORY
TOTA
L AS
SESS
MEN
T
Type of Material / Notes - Items highlighted Orange are 2017 Bond
FACILITY AGE RATING 50 1992 44Garden Ridge ES - HVAC 20 2012 60 65 8% 68 RTU;
Garden Ridge ES - HVAC - Controls 20 2012 60 65 63 Controls = AlertonGarden Ridge ES - Ceiling and Lights 20 2012 60 65 63
Garden Ridge ES - Roof - Flat 20 2012 60 65 17% 73
Garden Ridge ES - Roof - Shingled 20 2012 60 65 17% 73
Garden Ridge ES - Electrical Switchgear 30 1992 7 10 10% 9 Switch Gear needs updatingGarden Ridge ES - Fire Safety - Fire Alarm 20 2012 60 55 -3% 56 Harrington HS3200
Garden Ridge ES - Fire Safety - Sprinkler System 50 1992 44 44 10% 48
Garden Ridge ES - Food Service Boilers 20 2012 60 60 60
Garden Ridge ES - Food Service Freezers 20 2012 60 65 63
Garden Ridge ES - Lightning Detection 15 2009 27 25 26 Controls & SirenGarden Ridge ES - Generator 40 2012 80 80 80 Generac - Diesel
Garden Ridge ES - Shade Structure - Main 20 - - Shade Structure only on secondaryGarden Ridge ES - Playground - Main 20 2010 50 55 53
Garden Ridge ES - Shade Structure - Pre-K 20 2014 70 70 70
Garden Ridge ES - Playground - Pre-K 20 2018 90 95 93
Garden Ridge ES - Perf Arts - Curtains 20 2019 95 100 98
Garden Ridge ES - Perf Arts - Stage Lghtng/panel 25 2012 68 75 72
Garden Ridge ES - Flooring - Classrooms 20 2012 60 65 63 VCTGarden Ridge ES - Flooring - Corridors 20 2012 60 65 63 VCT with P-Lam
Garden Ridge ES - Flooring - Library 20 2012 60 65 63 VCTGarden Ridge ES - Flooring - Offices 20 2012 60 65 63 VCT
Garden Ridge ES - Flooring - Cafeteria 20 2012 60 65 63 VCTGarden Ridge ES - Flooring - Kitchen 50 1992 44 30 37 Terrazzo
Garden Ridge ES - Flooring - Gym 20 2012 60 65 63 VCT; carpet benchGarden Ridge ES - Doors 20 1992 -40 20 -10 Light Color
Garden Ridge ES - Door Hardware 20 1992 -40 0 -20 Knobs; Scheduled Fall 2020Garden Ridge ES - Casework (Built-Ins) 20 1992 -40 30 -5
Garden Ridge ES - Restrooms - Faculty 20 1992 0 Ceramic; In Progress
Garden Ridge ES - Restrooms - Student 20 1992 0Ceramic, plastic partitions, floor urinals; sinks on boys side new; In Progress
Garden Ridge ES - Marquee 30 1992 7 10 8
Garden Ridge ES - Paving - Parking Lots 50 1992 44 45 45 ConcreteGarden Ridge ES - Paving - Sidewalks 40 1992 30 35 33 Concrete
Garden Ridge ES - Exterior Lighting 20 2018 90 95 93 LED Lamps onlyGarden Ridge ES - Paint - Commons 15 2012 47 60 53
Garden Ridge ES - Paint - Cafeteria 15 2012 47 65 56
Garden Ridge ES - Paint - Library 15 2012 47 60 53
Garden Ridge ES - Paint - Gyms 20 2012 60 75 68
Garden Ridge ES - Paint - Exterior 20 2012 60 65 63
Garden Ridge ES - Paint - Hallways 20 2012 60 65 63
Garden Ridge ES8/5/2020
Year Built / Age 1989 / 31 Assessment Scale:Campus Square Footage 79,195 100 = New or Newly Replaced
Current Year 2020 0 = End of Life Cycle
Hebron Valley ES
LIFE
CYC
LE -
YEAR
SLA
ST R
EPLA
CED
% L
IFE
REM
AINI
NGVI
SUAL
EVA
LUAT
ION
WOR
K OR
DER
HIST
ORY
TOTA
L AS
SESS
MEN
T
Type of Material / Notes - Items highlighted Orange are 2017 Bond
FACILITY AGE RATING 50 1989 38Hebron Valley ES - HVAC - Original 20 2008 40 45 -2% 41 RTU;
Hebron Valley ES - HVAC - 2002 Addition 20 2002 10 25 -2% 17
Hebron Valley ES - HVAC - Controls 20 2008 40 40 40 Controls = AlertonHebron Valley ES - Ceiling and Lights - Original 20 2008 40 45 43
Hebron Valley ES - Ceiling and Lights - 2002 Addition 20 2002 10 25 18
Hebron Valley ES - Roof - Flat - Original 20 2018 90 95 93 2008 BondHebron Valley ES - Roof - Flat - 2002 Addition 20 2002 10 15 2% 13
Hebron Valley ES - Roof - Shingled 20 2018 90 95 93 2008 BondHebron Valley ES - Electrical Switchgear 30 1989 -3 0 -13% -2
Hebron Valley ES - Fire Safety - Fire Alarm 20 2008 40 45 4% 44 Edwards QuickstartHebron Valley ES - Fire Safety - Sprinkler System 50 2008 76 78 -14% 67
Hebron Valley ES - Food Service Boilers 20 2018 90 90 90
Hebron Valley ES - Food Service Freezers 20 2008 40 45 43
Hebron Valley ES - Lightning Detection - - Shared siren w/Creek Valley MSHebron Valley ES - Generator - - Generac
Hebron Valley ES - Shade Structure - Main 20 2019 95 95 95 Campus adding partial shade structure 2019; 2 bench shade covers
Hebron Valley ES - Playground - Main 20 2016 80 80 80
Hebron Valley ES - Shade Structure - Pre-K - - N/A
Hebron Valley ES - Playground - Pre-K 20 2016 80 80 80
Hebron Valley ES - Perf Arts - Curtains 20 2018 90 100 95
Hebron Valley ES - Perf Arts - Stage Lghtng/panel 25 2018 92 100 96 Dimmer cabinet: 2008;Hebron Valley ES - Flooring - Classrooms - Carpet 15 2002 0 Carpet; In Progress
Hebron Valley ES - Flooring - Classrooms - VCT 15 2002 0 Music room: VCT-2014; In ProgressHebron Valley ES - Flooring - Corridors 20 2010 0 VCT; In Progress
Hebron Valley ES - Flooring - Library 15 2002 0 Carpet; In ProgressHebron Valley ES - Flooring - Offices 15 2002 0 Carpet and VCT; In Progress
Hebron Valley ES - Flooring - Cafeteria 20 2010 0 VCT, no ADA to stage; In ProgressHebron Valley ES - Flooring - Kitchen 50 1989 38 30 34 Terrazzo
Hebron Valley ES - Flooring - Gym 20 1989 0 VCT; In ProgressHebron Valley ES - Doors 20 1989 -55 0 -28 Golden Oak
Hebron Valley ES - Door Hardware 20 1989 -55 0 -28 KnobsHebron Valley ES - Casework (Built-Ins) 20 1989 -55 0 -28
Hebron Valley ES - Restrooms - Faculty 20 2018 90 95 93
Hebron Valley ES - Restrooms - Student 20 2018 90 95 93
Hebron Valley ES - Restrooms - 2002 Addition 20 2018 90 95 93
Hebron Valley ES - Marquee 15 2013 53 75 64 LED Hebron Valley ES - Paving - Parking Lots 50 1989 38 40 39 Concrete
Hebron Valley ES - Paving - Sidewalks 40 1989 23 40 31 Heaving repairedHebron Valley ES - Exterior Lighting 20 2008 40 30 35
Hebron Valley ES - Paint - Commons 15 2012 47 50 48 Admin. Areas painted in 2019Hebron Valley ES - Paint - Cafeteria 15 2012 47 50 48
Hebron Valley ES - Paint - Library 15 2012 47 50 48
Hebron Valley ES - Paint - Gyms 20 2015 75 75 75
Hebron Valley ES - Paint - Exterior 20 2012 60 60 60
Hebron Valley ES - Paint - Hallways 20 2012 60 60 60 P-Lam / Tackboard
Hebron Valley ES8/5/2020
Year Built / Age 1993 / 27 Assessment Scale:Campus Square Footage 80,517 100 = New or Newly Replaced
Current Year 2020 0 = End of Life Cycle
Heritage ES
LIFE
CYC
LE -
YEAR
SLA
ST R
EPLA
CED
% L
IFE
REM
AINI
NGVI
SUAL
EVA
LUAT
ION
WOR
K OR
DER
HIST
ORY
TOTA
L AS
SESS
MEN
T
Type of Material / Notes - Items highlighted Orange are 2017 Bond
FACILITY AGE RATING 50 1993 46Heritage ES - HVAC - Original 20 2014 70 80 -5% 71 RTU
Heritage ES - HVAC - 2007 Addition 20 2007 35 45 -5% 38
Heritage ES - HVAC - Controls 20 2014 70 75 73 Controls = AlertonHeritage ES - Ceiling and Lights - Original 20 2014 70 75 73 LED
Heritage ES - Ceiling and Lights - 2007 Addition 20 2007 35 40 38 T-5Heritage ES - Roof - Flat 20 2019 95 100 98
Heritage ES - Roof - 2007 Addition 20 2019 95 100 98
Heritage ES - Roof - Shingled 20 2018 90 100 95 2017 hail damage insurance replacement
Heritage ES - Electrical Switchgear 30 1993 10 15 9% 14 Square DHeritage ES - Fire Safety - Fire Alarm 20 1993 0 Edwards EST 2 - Limited Parts; In Progress
Heritage ES - Fire Safety - Sprinkler System 50 1993 46 46 -18% 37
Heritage ES - Food Service Boilers 20 2013 65 75 70 Tank - 2013Heritage ES - Food Service Freezers 20 2014 70 75 73
Heritage ES - Lightning Detection 15 2009 27 25 26 Siren; Controls @ MHSHeritage ES - Generator - -
Heritage ES - Shade Structure - Main 20 2015 75 75 75 2 main shade structures and 2 sailsHeritage ES - Playground - Main 20 2013 65 70 68
Heritage ES - Shade Structure - Pre-K - - N/A
Heritage ES - Playground - Pre-K 20 2010 50 55 53
Heritage ES - Perf Arts - Curtains 20 2009 45 50 48
Heritage ES - Perf Arts - Stage Lghtng/panel 25 2018 92 95 94
Heritage ES - Flooring - Clssrm - Original 20 2017 85 90 88 VCTHeritage ES - Flooring - Clssrm -2007 Add 20 2017 85 90 88 VCT
Heritage ES - Flooring - Corridors 20 2017 85 90 88 VCTHeritage ES - Flooring - Library 20 2017 85 90 88 VCT & Carpet TilesHeritage ES - Flooring - Offices 20 2017 85 90 88 VCT
Heritage ES - Flooring - Cafeteria 20 2017 85 90 88 VCTHeritage ES - Flooring - Kitchen 50 1993 46 40 43 Terrazzo-cracked
Heritage ES - Flooring - Gym 20 2017 85 90 88 LVTHeritage ES - Doors 20 1993 -35 10 -13 Golden Oack
Heritage ES - Door Hardware 20 1993 -35 10 -13 Levers
Heritage ES - Casework (Built-Ins) 20 1993 -35 10 -13 Original blueHeritage ES - Restrooms - Faculty 20 2018 90 95 93
Heritage ES - Restrooms - Student 20 2018 90 95 93
Heritage ES - Restrooms - 2007 Addition 20 2007 35 35 35
Heritage ES - Marquee 30 2012 73 70 72
Heritage ES - Paving - Parking Lots 50 1993 46 45 46
Heritage ES - Paving - Sidewalks 40 1993 33 35 34
Heritage ES - Exterior Lighting 20 2014 70 75 73 All LEDHeritage ES - Paint - Commons 15 2018 87 95 91 Admin. & Lounge painted 2019
Heritage ES - Paint - Cafeteria 15 2018 87 95 91
Heritage ES - Paint - Library 15 2018 87 95 91 Lower walls have been paintedHeritage ES - Paint - Gyms 20 2019 95 95 95 LOGO Original
Heritage ES - Paint - Exterior 20 2019 95 95 95
Heritage ES - Paint - Hallways 20 2018 90 95 93
Heritage ES8/5/2020
Year Built / Age 2004 / 16 Assessment Scale:Campus Square Footage 100,479 100 = New or Newly Replaced
Current Year 2020 0 = End of Life Cycle
Hicks ES
LIFE
CYC
LE -
YEAR
SLA
ST R
EPLA
CED
% L
IFE
REM
AINI
NGVI
SUAL
EVA
LUAT
ION
WOR
K OR
DER
HIST
ORY
TOTA
L AS
SESS
MEN
T
Type of Material / Notes
FACILITY AGE RATING 50 2004 68Hicks ES - HVAC 20 2004 20 30 -15% 21 CHILLER
Hicks ES - HVAC - Controls 20 2004 20 20 20 Controls = I/netHicks ES - Ceiling and Lights 20 2004 20 30 25
Hicks ES - Roof - Shingled 20 2004 20 30 11% 28
Hicks ES - Electrical Switchgear 30 2004 47 50 2% 49
Hicks ES - Elevator 25 2004 36 40 18% 45 OtisHicks ES - Fire Safety - Fire Alarm 20 2004 20 20 15% 23 Edwards EST 2 - Limited Parts
Hicks ES - Fire Safety - Sprinkler System 50 2004 68 70 15% 80
Hicks ES - Food Service Boilers 20 2019 95 95 95
Hicks ES - Food Service Freezers 20 2004 20 30 25
Hicks ES - Lightning Detection 15 2009 27 25 26 Controls & SirenHicks ES - Generator 40 2004 60 60 60 Generac - Diesel
Hicks ES - Shade Structure - Main - - N/A
Hicks ES - Playground - Main 20 2004 20 20 20 Drainage issues at entry repaired Hicks ES - Shade Structure - Pre-K - - N/A
Hicks ES - Playground - Pre-K 20 2004 20 20 20
Hicks ES - Perf Arts - Curtains 20 2004 20 25 23
Hicks ES - Perf Arts - Stage Lghtng/panel 25 2004 36 40 38
Hicks ES - Flooring - Classrooms 15 2010 33 40 37 Carpet Squares; Art room is VCTHicks ES - Flooring - Corridors 20 2004 20 30 25 Ceramic, VCT. Stairs-Terrazzo
Hicks ES - Flooring - Library 15 2010 33 35 34 Carpet SquaresHicks ES - Flooring - Offices 15 2009 27 30 28 Carpet Replaced 2009-2010
Hicks ES - Flooring - Cafeteria 20 2004 20 25 23 VCTHicks ES - Flooring - Kitchen 50 2004 68 70 69 Terrazzo
Hicks ES - Flooring - Gym 20 2004 20 30 25 VCTHicks ES - Doors 20 2004 20 30 25 Golden Oak
Hicks ES - Door Hardware 20 2004 20 30 25 LeversHicks ES - Casework (Built-Ins) 20 2004 20 30 25
Hicks ES - Restrooms - Faculty 20 2004 20 35 28 Ceramic tile
Hicks ES - Restrooms - Student 20 2004 20 35 28 Gym-VCT, Ceramic tile, plastic partitions
Hicks ES - Marquee 30 2004 47 15 31
Hicks ES - Paving - Parking Lots 50 2004 68 60 64 Concrete, slight crackingHicks ES - Paving - Sidewalks 40 2004 60 60 60
Hicks ES - Exterior Lighting 20 2004 20 30 25
Hicks ES - Paint - Commons 15 2004 -7 50 22 2013 lower areas; Admin. Areas painted
Hicks ES - Paint - Cafeteria 15 2004 -7 50 22 2013 Lower areas maintained, higher-original
Hicks ES - Paint - Library 15 2004 -7 45 19
Hicks ES - Paint - Gyms 20 2004 20 40 30 Lower areas maintained, higher-original
Hicks ES - Paint - Exterior 20 2018 90 90 90 Hand Rails painted 2019Hicks ES - Paint - Hallways 20 2004 20 45 33
Hicks ES8/5/2020
Year Built / Age 1981 / 39 Assessment Scale:Campus Square Footage 63,823 100 = New or Newly Replaced
Current Year 2020 0 = End of Life Cycle
Highland Village ES
LIFE
CYC
LE -
YEAR
SLA
ST R
EPLA
CED
% L
IFE
REM
AINI
NGVI
SUAL
EVA
LUAT
ION
WOR
K OR
DER
HIST
ORY
TOTA
L AS
SESS
MEN
T
Type of Material / Notes
FACILITY AGE RATING 50 1981 22Highland Village ES - Foundation 50 1981 22 24 23 Slab-On-Grade
Highland Village ES - HVAC - Original 20 2016 80 85 15% 95 RTUHighland Village ES - HVAC - 1990 Addition 20 2016 80 85 15% 95 RTU
Highland Village ES - HVAC - Controls 20 2016 80 85 83 Controls = AlertonHighland Village ES - Ceiling and Lights - Original 20 2016 80 85 83
Highland Village ES - Ceiling and Lights - 1990 Addition 20 2016 80 85 83
Highland Village ES - Roof - Flat - Original 20 2016 80 80 5% 84Highland Village ES - Roof - Flat - 1990 Addition 20 2016 80 80 5% 84
Highland Village ES - Electrical Switchgear 30 2016 87 90 10% 97 EatpmHighland Village ES - Fire Safety - Fire Alarm 20 2016 80 85 10% 91 Edwards EST 3
Highland Village ES - Fire Safety - Sprinkler Sys-Orginal 50 2016 92 92 92 100% sprinkledHighland Village ES - Fire Safety - Sprinkler Sys - 1990 Add 50 1990 40 40 -12% 35
Highland Village ES - Food Service Boilers 20 2009 45 45 45
Highland Village ES - Food Service Freezers 20 2016 80 85 83 Boxes Re-UsedHighland Village ES - Lightning Detection 15 2009 27 25 26 Controls & Siren
Highland Village ES - Generator 40 2016 90 90 90 Generac - DieselHighland Village ES - Shade Structure - Main 20 2019 95 95 95
Highland Village ES - Playground - Main 20 2005 25 30 28 Little Tikes; some cracking and fading
Highland Village ES - Shade Structure - Pre-K - - N/A
Highland Village ES - Playground - Pre-K - - N/A
Highland Village ES - Perf Arts - Curtains 20 2016 80 85 83
Highland Village ES - Perf Arts - Stage Lghtng/panel 25 2016 84 85 85
Highland Village ES - Flooring - Classrooms 20 2016 80 85 83 VCTHighland Village ES - Flooring - Corridors 20 2016 80 85 83 VCT
Highland Village ES - Flooring - Library 20 2016 80 85 83 VCTHighland Village ES - Flooring - Offices 15 2016 73 80 77 Carpet
Highland Village ES - Flooring - Cafeteria 20 2016 80 85 83 VCTHighland Village ES - Flooring - Kitchen 50 1981 22 20 21 Ceramic
Highland Village ES - Flooring - Gym 20 2016 80 85 83 VCTHighland Village ES - Doors 20 2017 85 90 88 Dark Standard
Highland Village ES - Door Hardware 20 2017 85 90 88 LeversHighland Village ES - Casework (Built-Ins) 20 2016 80 85 83
Highland Village ES - Restrooms - Faculty 20 2016 80 85 83 Ceramic
Highland Village ES - Restrooms - Student - Orginal 20 2016 80 85 83
Highland Village ES - Restrooms - Student - 1990 Addition 20 2016 80 85 83
Highland Village ES - Marquee 30 2007 57 40 48 Not litHighland Village ES - Paving - Parking Lots 50 2009 78 80 79
Highland Village ES - Paving - Sidewalks 40 1981 3 20 11 Concrete, heaving around buildingHighland Village ES - Exterior Lighting 20 2016 80 85 83 LED
Highland Village ES - Paint - Commons 15 2016 73 90 82
Highland Village ES - Paint - Cafeteria 15 2016 73 90 82
Highland Village ES - Paint - Library 15 2016 73 90 82
Highland Village ES - Paint - Gyms 20 2016 80 90 85
Highland Village ES - Paint - Exterior 20 2016 80 90 85
Highland Village ES - Paint - Hallways 20 2016 80 90 85
Highland Village ES8/5/2020
Year Built / Age 1999 / 21 Assessment Scale:Campus Square Footage 74,375 100 = New or Newly Replaced
Current Year 2020 0 = End of Life Cycle
Homestead ES
LIFE
CYC
LE -
YEAR
SLA
ST R
EPLA
CED
% L
IFE
REM
AINI
NGVI
SUAL
EVA
LUAT
ION
WOR
K OR
DER
HIST
ORY
TOTA
L AS
SESS
MEN
T
Type of Material / Notes - Items highlighted Orange are 2017 Bond
FACILITY AGE RATING 50 1999 58Homestead ES - HVAC 20 1999 -5 0 0% -2 RTU
Homestead ES - HVAC - Controls 20 1999 -5 0 -3 Controls = I/netHomestead ES - Ceiling and Lights 20 1999 -5 5 0
Homestead ES - Roof - Flat 20 1999 -5 0 4% -2
Homestead ES - Electrical Switchgear 30 1999 30 33 -1% 31
Homestead ES - Fire Safety - Fire Alarm 20 1999 -5 0 -22% -3 FCIHomestead ES - Fire Safety - Sprinkler System 50 1999 58 58 6% 62
Homestead ES - Food Service Boilers 20 2008 40 40 40
Homestead ES - Food Service Freezers 20 1999 -5 0 -3 Flat floor transitionHomestead ES - Lightning Detection 15 2009 27 25 26 Controls & Siren
Homestead ES - Generator - -
Homestead ES - Shade Structure - Main 20 2009 45 40 43 1 main shade structure and 1 over sitting area; outdated equip.
Homestead ES - Playground - Main 20 1999 -5 0 -3 small foot print
Homestead ES - Shade Structure - Pre-K - - N/A
Homestead ES - Playground - Pre-K - - N/A
Homestead ES - Perf Arts - Curtains 20 2015 75 75 75
Homestead ES - Perf Arts - Stage Lghtng/panel 25 1999 16 15 16
Homestead ES - Flooring - Classrooms 20 2013 65 70 68 LVT, Music room: VCT 2012Homestead ES - Flooring - Corridors 20 2010 50 55 53 VCT
Homestead ES - Flooring - Library 15 2011 40 55 48 CarpetHomestead ES - Flooring - Offices 15 2013 53 55 54 Carpet, VCT
Homestead ES - Flooring - Cafeteria 20 2010 50 55 53
Homestead ES - Flooring - Kitchen 50 1999 58 25 42 TerrazzoHomestead ES - Flooring - Gym 20 2013 65 75 70 LVT
Homestead ES - Doors 20 1999 -5 0 -3
Homestead ES - Door Hardware 20 1999 -5 0 -3 LeversHomestead ES - Casework (Built-Ins) 20 1999 -5 0 -3
Homestead ES - Restrooms - Faculty 20 1999 -5 0 -3
Homestead ES - Restrooms - Student 20 1999 -5 0 -3
Homestead ES - Marquee 15 2016 73 85 79 Replaced in 2016 with 1/2 LEDHomestead ES - Paving - Parking Lots 50 1999 58 45 52 Concrete
Homestead ES - Paving - Sidewalks 40 1999 48 50 49
Homestead ES - Exterior Lighting 20 1999 0 IN PROGRESSHomestead ES - Paint - Commons 15 2009 27 25 26 Lounge and Office area painted 2019
Homestead ES - Paint - Cafeteria 15 2016 73 70 72
Homestead ES - Paint - Library 15 2009 27 25 26
Homestead ES - Paint - Gyms 20 2009 45 25 35 Lower walls painted 2019Homestead ES - Paint - Exterior 20 1999 -5 5 0
Homestead ES - Paint - Hallways 20 2011 55 50 53 P-LAM; TAC; Drywall
Homestead ES8/5/2020
Year Built / Age 2008 / 12 Assessment Scale:Campus Square Footage 107,000 100 = New or Newly Replaced
Current Year 2020 0 = End of Life Cycle
Independence ES
LIFE
CYC
LE -
YEAR
SLA
ST R
EPLA
CED
% L
IFE
REM
AINI
NGVI
SUAL
EVA
LUAT
ION
WOR
K OR
DER
HIST
ORY
TOTA
L AS
SESS
MEN
T
Type of Material / Notes
FACILITY AGE RATING 50 2008 76Independence ES - HVAC 20 2008 40 50 -15% 38 CHILLER; 2 new boilers 2018
Independence ES - HVAC - Controls 20 2008 40 50 45 Controls = AlertonIndependence ES - Ceiling and Lights 20 2008 40 50 45
Independence ES - Roof - Shingled 20 2008 40 50 0% 45
Independence ES - Electrical Switchgear 30 2008 60 60 2% 61
Independence ES - Elevator 25 2008 52 50 3% 53 SchindlerIndependence ES - Fire Safety - Fire Alarm 20 2008 40 50 17% 53 Edwards Quickstart
Independence ES - Fire Safety - Sprinkler System 50 2008 76 76 16% 88
Independence ES - Food Service Boilers 20 2008 40 40 40
Independence ES - Food Service Freezers 20 2008 40 50 45
Independence ES - Lightning Detection - - Shared with Killian MS next doorIndependence ES - Generator 40 2008 70 70 70 Generac - Diesel
Independence ES - Shade Structure - Main 20 2009 45 45 45 Sail shade structure on main onlyIndependence ES - Playground - Main 20 2008 40 45 43
Independence ES - Shade Structure - Pre-K - - N/A
Independence ES - Playground - Pre-K 20 2010 50 50 50 Peeling/bubbling on Pre-K stairs; slight paint fade.
Independence ES - Perf Arts - Curtains 20 2008 40 45 43
Independence ES - Perf Arts - Stage Lghtng/panel 25 2008 52 55 54
Independence ES - Flooring - Classrooms 15 2008 20 30 25 Carpet SquaresIndependence ES - Flooring - Corridors 20 2008 40 50 45 VCT, steps-terrazzo
Independence ES - Flooring - Library 15 2008 20 35 28 Carpet SquaresIndependence ES - Flooring - Offices 15 2008 20 35 28 Carpet Squares
Independence ES - Flooring - Cafeteria 20 2008 40 50 45 VCTIndependence ES - Flooring - Kitchen 50 2008 76 75 76 Concrete
Independence ES - Flooring - Gym 20 2008 40 50 45 VCTIndependence ES - Doors 20 2008 40 40 40
Independence ES - Door Hardware 20 2008 40 40 40
Independence ES - Casework (Built-Ins) 20 2008 40 40 40
Independence ES - Restrooms - Faculty 20 2008 40 50 45 CeramicIndependence ES - Restrooms - Student 20 2008 40 50 45 Ceramic
Independence ES - Marquee 30 2008 60 63 62
Independence ES - Paving - Parking Lots 50 2008 76 80 78 ConcreteIndependence ES - Paving - Sidewalks 40 2008 70 73 72 Concrete
Independence ES - Exterior Lighting 20 2008 40 45 43
Independence ES - Paint - Commons 15 2017 80 80 80 Admin. Areas painted 2019Independence ES - Paint - Cafeteria 15 2015 67 65 66
Independence ES - Paint - Library 15 2015 67 75 71
Independence ES - Paint - Gyms 20 2008 40 40 40
Independence ES - Paint - Exterior 20 2008 40 40 40
Independence ES - Paint - Hallways 20 2008 40 40 40
Independence ES8/5/2020
Year Built / Age 1985 / 35 Assessment Scale:Campus Square Footage 76,172 100 = New or Newly Replaced
Current Year 2020 0 = End of Life Cycle
Indian Creek ES
LIFE
CYC
LE -
YEAR
SLA
ST R
EPLA
CED
% L
IFE
REM
AINI
NGVI
SUAL
EVA
LUAT
ION
WOR
K OR
DER
HIST
ORY
TOTA
L AS
SESS
MEN
T
Type of Material / Notes - Items highlighted Orange are 2017 Bond
FACILITY AGE RATING 50 1985 30Indian Creek ES - Foundation 50 1985 30 30 30 Slab-On-Grade
Indian Creek ES - HVAC 20 2007 35 40 -15% 32 RTUIndian Creek ES - HVAC - 2002 Addition 20 2002 10 15 -15% 11
Indian Creek ES - HVAC - Controls 20 2007 35 40 38 Controls = AlertonIndian Creek ES - Ceiling and Lights 20 2007 35 40 38
Indian Creek ES - Roof - Flat - Original 20 2007 35 40 8% 41
Indian Creek ES - Roof - Flat - 2002 Addition 20 2002 10 20 8% 16
Indian Creek ES - Electrical Switchgear 30 2007 57 57 7% 61 Original PanelsIndian Creek ES - Fire Safety - Fire Alarm 20 2007 35 25 18% 35 Edwards EST 2 - Limited Parts
Indian Creek ES - Fire Safety - Sprinkler System 50 2007 74 75 4% 77
Indian Creek ES - Food Service Boilers 20 2008 40 40 40
Indian Creek ES - Food Service Freezers 20 2007 35 40 38
Indian Creek ES - Lightning Detection 15 2009 27 25 26 Siren; Controls @ Homestead ESIndian Creek ES - Generator - -
Indian Creek ES - Shade Structure - Main - - N/A
Indian Creek ES - Playground - Main 20 2009 45 50 48 Paint fading; stairs peeling/cracking were replaced
Indian Creek ES - Shade Structure - Pre-K - - N/A
Indian Creek ES - Playground - Pre-K 20 2014 70 70 70 Drainage problem
Indian Creek ES - Perf Arts - Curtains 20 2018 90 95 93
Indian Creek ES - Perf Arts - Stage Lghtng/panel 25 2018 92 95 94
Indian Creek ES - Flooring - Classrooms-Carpet 15 2002 0 Carpet; In ProgressIndian Creek ES - Flooring - Classrooms-VCT 20 2002 0 In ProgressIndian Creek ES - Flooring - Corridors-Carpet 15 2002 0 Carpet; In Progress
Indian Creek ES - Flooring - Corridors-VCT 20 2004 0 VCT; In ProgressIndian Creek ES - Flooring - Library 15 2004 0 Carpet; In Progress
Indian Creek ES - Flooring - Offices - Carpet 15 2013 0 Carpet; In ProgressIndian Creek ES - Flooring - Offices - LVT 20 2013 0 LVT; In Progress
Indian Creek ES - Flooring - Cafeteria 20 1985 0 VCT; In ProgressIndian Creek ES - Flooring - Kitchen 50 1985 0 Terrazzo
Indian Creek ES - Flooring - Gym 20 1985 0 VCTIndian Creek ES - Doors 20 1985 -75 0 -38
Indian Creek ES - Door Hardware 20 1985 -75 0 -38
Indian Creek ES - Casework (Built-Ins) 20 1985 -75 0 -38
Indian Creek ES - Restrooms - Faculty 20 2013 65 70 68 Ceramic TileIndian Creek ES - Restrooms - Student 20 2013 65 70 68 Tile, CMU patitions
Indian Creek ES - Restrooms - 2002 Addition 20 2002 10 10 10
Indian Creek ES - Marquee 30 2013 77 75 76 Replaced 2013Indian Creek ES - Paving - Parking Lots 50 1985 30 35 33
Indian Creek ES - Paving - Sidewalks 40 1985 13 20 16
Indian Creek ES - Exterior Lighting 20 2002 10 40 25
Indian Creek ES - Paint - Commons 15 2018 87 90 88 Ceramic Tile, CMU, sheetrock; New PLAM Panels 2018
Indian Creek ES - Paint - Cafeteria 15 2018 87 90 88 Ceramic Tile painted, cmu paintedIndian Creek ES - Paint - Library 15 2014 60 70 65
Indian Creek ES - Paint - Gyms 20 2014 70 75 73 Carpet on benchIndian Creek ES - Paint - Exterior 20 2007 35 50 43
Indian Creek ES - Paint - Hallways 20 2018 90 90 90 Ceramic Tile, CMU, sheetrock; New PLAM Panels 2018
Indian Creek ES8/5/2020
Year Built / Age 2008 / 12 Assessment Scale:Campus Square Footage 107,000 100 = New or Newly Replaced
Current Year 2020 0 = End of Life Cycle
Lakeland ES
LIFE
CYC
LE -
YEAR
SLA
ST R
EPLA
CED
% L
IFE
REMA
ININ
GVI
SUAL
EVA
LUAT
ION
WOR
K OR
DER
HIST
ORY
TOTA
L AS
SESS
MENT
Type of Material / Notes
FACILITY AGE RATING 50 2008 76Lakeland ES - HVAC 20 2008 40 45 -7% 39 CHILLER; Mcquay Chillers
Lakeland ES - HVAC - Controls 20 2008 40 45 43 Controls = AlertonLakeland ES - Ceiling and Lights 20 2008 40 50 45 T-5
Lakeland ES - Roof - Shingled 20 2008 40 45 15% 49
Lakeland ES - Electrical Switchgear 30 2008 60 60 -40% 36
Lakeland ES - Elevators 25 2010 60 60 16% 69 SchlinderLakeland ES - Fire Safety - Fire Alarm 20 2019 95 100 98 Edwards IO
Lakeland ES - Fire Safety - Sprinkler System 50 2008 76 75 -23% 58
Lakeland ES - Food Service Boilers 20 2007 35 35 35
Lakeland ES - Food Service Freezers 20 2008 40 45 43
Lakeland ES - Lightning Detection 15 2009 27 25 26 Siren; Controls @ LHSLakeland ES - Generator 40 2008 70 75 73 Olympian - Diesel
Lakeland ES - Shade Structure - Main - - N/A
Lakeland ES - Playground - Main 20 2008 40 50 45 Overall good shape; Slight fadingLakeland ES - Shade Structure - Pre-K - - N/A
Lakeland ES - Playground - Pre-K - - N/A
Lakeland ES - Perf Arts - Curtains 20 2008 40 45 43
Lakeland ES - Perf Arts - Stage Lghtng/panel 25 2008 52 55 54
Lakeland ES - Flooring - Classrooms - Carpet 15 2008 20 30 25 Carpet SquaresLakeland ES - Flooring - Classrooms - VCT 20 2008 40 40 40 VCT
Lakeland ES - Flooring - Corridors 20 2008 40 45 43 VCTLakeland ES - Flooring - Library 15 2008 20 30 25 CarpetLakeland ES - Flooring - Offices 15 2008 20 30 25 Carpet
Lakeland ES - Flooring - Cafeteria 20 2008 40 45 43 VCTLakeland ES - Flooring - Kitchen 50 2008 76 75 76 Concrete
Lakeland ES - Flooring - Gym 20 2008 40 45 43 VCTLakeland ES - Doors 20 2008 40 45 43
Lakeland ES - Door Hardware 20 2008 40 45 43
Lakeland ES - Casework (Built-Ins) 20 2008 40 45 43
Lakeland ES - Restrooms - Faculty 20 2008 40 45 43 Ceramic tile floor, walls
Lakeland ES - Restrooms - Student 20 2008 40 45 43 Ceramic tile floor, walls. CMU partitions with ceramic tile, solid wood doors.
Lakeland ES - Marquee 30 2008 60 60 60
Lakeland ES - Paving - Parking Lots 50 2008 76 75 76 ConcreteLakeland ES - Paving - Sidewalks 40 2008 70 70 70 Concrete
Lakeland ES - Exterior Lighting 20 2008 40 40 40
Lakeland ES - Paint - Commons 15 2008 20 40 30 Brick, P-Lam; Office areas painted 2019
Lakeland ES - Paint - Cafeteria 15 2008 20 40 30 maintaining lower walls Lakeland ES - Paint - Library 15 2008 20 35 28
Lakeland ES - Paint - Gyms 20 2008 40 60 50 2016 painted up to 10 ft.Lakeland ES - Paint - Exterior 20 2008 40 45 43
Lakeland ES - Paint - Hallways 20 2008 40 55 48 Brick, P-Lam
Lakeland ES8/5/2020
Year Built / Age 2010 / 10 Assessment Scale:Campus Square Footage 101,110 100 = New or Newly Replaced
Current Year 2020 0 = End of Life Cycle
Lewisville ES
LIFE
CYC
LE -
YEAR
SLA
ST R
EPLA
CED
% L
IFE
REM
AINI
NGVI
SUAL
EVA
LUAT
ION
WOR
K OR
DER
HIST
ORY
TOTA
L AS
SESS
MEN
T
Type of Material / Notes
FACILITY AGE RATING 50 2010 80Lewisville ES - HVAC 20 2010 50 55 -3% 51 CHILLER
Lewisville ES - HVAC - Control 20 2010 50 55 53 Controls = AlertonLewisville ES - Ceiling and Lights 20 2010 50 55 53
Lewisville ES - Roof - Shingled 20 2010 50 55 -25% 39 Kitchen Flat
Lewisville ES - Electrical Switchgear 30 2010 67 72 2% 71
Lewisville ES - Elevators 25 2010 60 60 15% 69 SchlinderLewisville ES - Fire Safety - Fire Alarm 20 2010 50 50 3% 52 Harrington HS3200
Lewisville ES - Fire Safety - Sprinkler System 50 2010 80 80 4% 84
Lewisville ES - Food Service Boilers 20 2009 45 45 45
Lewisville ES - Food Service Freezers 20 2010 50 55 53
Lewisville ES - Lightning Detection 15 2009 27 25 26 Controls & SirenLewisville ES - Generator 40 2010 75 80 78 Cummins - Diesel
Lewisville ES - Shade Structure - Main - - N/A
Lewisville ES - Playground - Main 20 2010 50 45 48 High Traffic; Fencing removed; some fading due to only partial shade from trees
Lewisville ES - Shade Structure - Pre-K - - N/A
Lewisville ES - Playground - Pre-K - - N/A
Lewisville ES - Perf Arts - Curtains 20 2010 50 50 50
Lewisville ES - Perf Arts - Stage Lghtng/panel 25 2010 60 60 60
Lewisville ES - Flooring - Classrooms - Carpet 15 2010 33 40 37 CarpetLewisville ES - Flooring - Classrooms - VCT 20 2010 50 55 53 VCT
Lewisville ES - Flooring - Corridors 20 2010 50 50 50 VCTLewisville ES - Flooring - Library 15 2010 33 40 37 Carpet
Lewisville ES - Flooring - Offices - Carpet 15 2010 33 40 37 Carpet Lewisville ES - Flooring - Offices - VCT 20 2010 50 55 53 VCT
Lewisville ES - Flooring - Cafeteria 20 2010 50 55 53 VCTLewisville ES - Flooring - Kitchen 50 2010 80 80 80 Sealed Concrete
Lewisville ES - Flooring - Gym 20 2010 50 50 50 VCTLewisville ES - Doors 20 2010 50 60 55
Lewisville ES - Door Hardware 20 2010 50 60 55
Lewisville ES - Casework (Built-Ins) 20 2010 50 60 55
Lewisville ES - Restrooms - Faculty 20 2010 50 55 53 Ceramic tile floor, wallsLewisville ES - Restrooms - Student 20 2010 50 55 53 Ceramic tile floor, walls
Lewisville ES - Marquee 30 2010 67 70 68
Lewisville ES - Paving - Parking Lots 50 2010 80 82 81 ConcreteLewisville ES - Paving - Sidewalks 40 2010 75 78 77 Concrete
Lewisville ES - Exterior Lighting 20 2010 50 50 50
Lewisville ES - Paint - Commons 15 2018 87 90 88
Lewisville ES - Paint - Cafeteria 15 2017 80 80 80
Lewisville ES - Paint - Library 15 2019 93 95 94
Lewisville ES - Paint - Gyms 20 2010 50 65 58 2016 painted up to 10 ft.
Lewisville ES - Paint - Exterior 20 2010 50 65 58
Lewisville ES - Paint - Hallways 20 2010 50 60 55 P-Lam walls, paint / drywall
Lewisville ES8/5/2020
Year Built / Age 2002 / 18 Assessment Scale:Campus Square Footage 86,122 100 = New or Newly Replaced
Current Year 2020 0 = End of Life Cycle
Liberty ES
LIFE
CYC
LE -
YEAR
SLA
ST R
EPLA
CED
% L
IFE
REM
AINI
NGVI
SUAL
EVA
LUAT
ION
WOR
K OR
DER
HIST
ORY
TOTA
L AS
SESS
MEN
T
Type of Material / Notes - Items highlighted Orange are 2017 Bond
FACILITY AGE RATING 50 2002 64Liberty ES - HVAC - Original 20 2002 10 15 5% 13 RTU
Liberty ES - HVAC - 2007 Addition 20 2007 35 35 5% 37 RTULiberty ES - HVAC - Controls 20 2002 10 10 10 2002 & 2007 Controls = I/net
Liberty ES - Ceiling and Lights - Original 20 2002 10 10 10 T-8Liberty ES - Ceiling and Lights - 2007 Addition 20 2007 35 35 35 T-5
Liberty ES - Roof - Flat - Original 20 2002 10 10 4% 10
Liberty ES -Roof - Flat - 2007 Addition 20 2007 35 35 4% 36
Liberty ES - Electrical Switchgear 30 2002 40 40 10% 44 Square DLiberty ES - Fire Safety - Fire Alarm 20 2002 10 15 12% 14 Edwards EST 2 - Limited Parts
Liberty ES - Fire Safety - Sprinkler System 50 2002 64 64 9% 70
Liberty ES - Food Service Boilers 20 2002 10 10 10 Tank 2001Liberty ES - Food Service Freezers 20 2002 10 15 13
Liberty ES - Lightning Detection 15 2009 27 25 26 Siren; Controls @ FMHSLiberty ES - Generator - -
Liberty ES - Shade Structure - Main 20 2009 45 45 45 4 Shade Structures (2003, 2009 main, 2014, 2016)
Liberty ES - Playground - Main 20 2002 10 10 10
Liberty ES - Shade Structure - Pre-K 20 2019 95 95 95
Liberty ES - Playground - Pre-K 20 2018 90 95 93
Liberty ES - Perf Arts - Curtains 20 2002 10 15 13
Liberty ES - Perf Arts - Stage Lghtng/panel 25 2002 28 15 22 No support & limited partsLiberty ES - Flooring - Classrooms-Original 15 2002 0 Carpet; In Progress
Liberty ES - Flooring - Classroom-2007 Add 15 2007 13 15 14 CarpetLiberty ES - Flooring - Classrooms-VCT 20 2002 10 15 13 VCT
Liberty ES - Flooring - Corridors 20 2002 10 15 13 VCTLiberty ES - Flooring - Library 15 2002 0 Carpet; In ProgressLiberty ES - Flooring - Offices 15 2002 0 Carpet; In Progress
Liberty ES - Flooring - Cafeteria 20 2002 10 15 13 VCT Liberty ES - Flooring - Kitchen 50 2002 64 50 57 Terrazzo - cracking
Liberty ES - Flooring - Gym 20 2002 10 15 13 VCT, Carpeted benchLiberty ES - Doors 20 2002 10 15 13 Milkwash
Liberty ES - Door Hardware 20 2002 10 15 13 LeversLiberty ES - Casework (Built-Ins) 20 2002 10 20 15
Liberty ES - Restrooms - Faculty 20 2002 10 15 13 Laminate Partitions, 1"x1" ceramic floor, 4"x4" ceramic wall
Liberty ES - Restrooms - Student 20 2002 10 15 13
Liberty ES - Restrooms - 2007 Addition 20 2007 35 35 35
Liberty ES - Marquee 30 2002 40 35 38 T-12 Liberty ES - Paving - Parking Lots 50 2002 64 64 64 Concrete
Liberty ES - Paving - Sidewalks 40 2002 55 55 55 ConcreteLiberty ES - Exterior Lighting 20 2002 10 10 10
Liberty ES - Paint - Commons 15 2017 80 80 80
Liberty ES - Paint - Cafeteria 15 2014 60 70 65 2017 painted lower wallsLiberty ES - Paint - Library 15 2014 60 70 65
Liberty ES - Paint - Gyms 20 2017 85 80 83
Liberty ES - Paint - Exterior 20 2002 10 25 18 Exterior Doors painted 2019Liberty ES - Paint - Hallways 20 2014 70 75 73
Liberty ES8/5/2020
Year Built / Age 2005 / 15 Assessment Scale:Campus Square Footage 88,290 100 = New or Newly Replaced
Current Year 2020 0 = End of Life Cycle
Lillie J Jackson ECC
LIFE
CYC
LE -
YEAR
SLA
ST R
EPLA
CED
% L
IFE
REM
AINI
NGVI
SUAL
EVA
LUAT
ION
WOR
K OR
DER
HIST
ORY
TOTA
L AS
SESS
MEN
T
Type of Material / Notes
FACILITY AGE RATING 50 2005 70Lillie J Jackson ECC - HVAC 20 2005 25 30 -3% 27 CHILLER
Lillie J Jackson ECC - HVAC - Controls 20 2018 90 95 93 2008 Bond - EnviromaticLillie J Jackson ECC - Ceiling and Lights 20 2005 25 30 28
Lillie J Jackson ECC - Roof - Flat 20 2005 25 30 28
Lillie J Jackson ECC - Roof - Shingled 20 2005 25 25 -25% 19
Lillie J Jackson ECC - Electrical Switchgear 30 2005 50 50 16% 58
Lillie J Jackson ECC - Fire Safety - Fire Alarm 20 2005 25 25 0% 25 Edwards EST 2 - Limited Parts Lillie J Jackson ECC - Fire Safety - Sprinkler System 50 2005 70 72 -8% 65
Lillie J Jackson ECC - Food Service Boilers 20 2004 20 20 20
Lillie J Jackson ECC - Food Service Freezers 20 2005 25 30 28
Lillie J Jackson ECC - Lightning Detection 15 2009 27 25 26 Siren; Controls @ LHSLillie J Jackson ECC - Generator 40 2005 63 65 64 Olympian - Diesel
Lillie J Jackson ECC - Shade Structure - Main - - N/A
Lillie J Jackson ECC - Playground - Main - - N/A
Lillie J Jackson ECC - Shade Structure - Pre-K 20 2005 25 25 25 2 Shade Structures (2005 sandboxes & 2015 garden)
Lillie J Jackson ECC - Playground - Pre-K 20 2005 25 25 25Added turf to surface 2018; Paint fading
Lillie J Jackson ECC - Perf Arts - Curtains 20 2005 25 25 25
Lillie J Jackson ECC - Perf Arts - Stage Lghtng/panel 25 2005 40 40 40
Lillie J Jackson ECC - Flooring - Classrooms 20 2005 25 30 28 Mostly VCT, some carpetLillie J Jackson ECC - Flooring - Corridors 20 2005 25 30 28 VCT, Terrazzo
Lillie J Jackson ECC - Flooring - Library 15 2005 0 15 8 CarpetLillie J Jackson ECC - Flooring - Offices 15 2005 0 10 5 Carpet
Lillie J Jackson ECC - Flooring - Cafeteria 20 2005 25 30 28 VCTLillie J Jackson ECC - Flooring - Kitchen 50 2005 70 65 68 Terrazzo, some cracks
Lillie J Jackson ECC - Flooring - Gym 20 2005 25 25 25 VCTLillie J Jackson ECC - Doors 20 2005 25 35 30
Lillie J Jackson ECC - Door Hardware 20 2005 25 35 30
Lillie J Jackson ECC - Casework (Built-Ins) 20 2005 25 35 30
Lillie J Jackson ECC - Restrooms - Faculty 20 2005 25 30 28 1"x1" ceramic tile floor, wall, including health
Lillie J Jackson ECC - Restrooms - Student 20 2005 25 30 28 Ceramic floor (1x1), wall, plastic partitions
Lillie J Jackson ECC - Marquee 30 2005 50 50 50
Lillie J Jackson ECC - Paving - Parking Lots 50 2005 70 70 70 Concrete
Lillie J Jackson ECC - Paving - Sidewalks 40 2005 63 25 44 Concrete / pavers, some movement; 2016 some pavers replaced
Lillie J Jackson ECC - Exterior Lighting 20 2005 25 25 25
Lillie J Jackson ECC - Paint - Commons 15 2005 0 15 8 P-Lam, paint, tileLillie J Jackson ECC - Paint - Cafeteria 15 2005 0 15 8 CMU
Lillie J Jackson ECC - Paint - Library 15 2017 80 90 85 2017 color changeLillie J Jackson ECC - Paint - Gyms 20 2005 25 25 25
Lillie J Jackson ECC - Paint - Exterior 20 2019 95 95 95
Lillie J Jackson ECC - Paint - Hallways 20 2015 75 80 78 All frames and jams
Lillie Jackson ECC8/5/2020
Year Built / Age 1987 / 33 Assessment Scale:Campus Square Footage 78,776 100 = New or Newly Replaced
Current Year 2020 0 = End of Life Cycle
McAuliffe ES
LIFE
CYC
LE -
YEAR
SLA
ST R
EPLA
CED
% L
IFE
REMA
ININ
GVI
SUAL
EVA
LUAT
ION
WOR
K OR
DER
HIST
ORY
TOTA
L AS
SESS
MENT
Type of Material / Notes - Items highlighted Orange are 2017 Bond
FACILITY AGE RATING 50 1987 34McAuliffe ES - Foundation 50 1987 34 25 30 Slab-On-Grade
McAuliffe ES - HVAC 20 2010 50 55 10% 58 RTUMcAuliffe ES - HVAC - Controls 20 2010 50 55 53 Controls = Alerton
McAuliffe ES - Ceiling and Lights 20 2010 50 55 53 T-5McAuliffe ES - Roof - Flat 20 2019 95 100 98
McAuliffe ES - Electrical Switchgear 30 2010 67 70 6% 72 Square DMcAuliffe ES - Fire Safety - Fire Alarm 20 2009 45 45 -8% 41 Edwards EST 2 - Limited Parts
McAuliffe ES - Fire Safety - Sprinkler System 50 1987 34 35 -32% 23
McAuliffe ES - Food Service Boilers 20 2001 5 25 15 Tank 2001McAuliffe ES - Food Service Freezers 20 2009 45 50 48
McAuliffe ES - Lightning Detection 15 2009 27 25 26 Controls & SirenMcAuliffe ES - Generator 40 2009 73 70 71 Cummins - Diesel
McAuliffe ES - Shade Structure - Main - - N/A
McAuliffe ES - Playground - Main 20 2009 45 50 48 Drainage issues at basketball court; some peeling/cracking of equip.; Little Tikes
McAuliffe ES - Shade Structure - Pre-K - - N/A
McAuliffe ES - Playground - Pre-K 20 2002 10 10 10 Pre-K peeling/bubbling on stairs; Little Tikes; has pour & play fall protection
McAuliffe ES - Perf Arts - Curtains 20 2003 15 25 20
McAuliffe ES - Perf Arts - Stage Lghtng/panel 25 2010 60 35 48 Lehigh - No supportMcAuliffe ES - Flooring - Classrooms 20 2010 50 55 53 VCT
McAuliffe ES - Flooring - Corridors 20 2006 30 35 33 VCT, P-LamMcAuliffe ES - Flooring - Library 15 2010 33 40 37 Carpet/VCTMcAuliffe ES - Flooring - Offices 20 2010 50 55 53 VCT
McAuliffe ES - Flooring - Cafeteria 20 2010 50 50 50 VCT, P-LamMcAuliffe ES - Flooring - Kitchen 50 1987 34 35 35 Terrazzo
McAuliffe ES - Flooring - Gym 20 2004 20 25 23 VCTMcAuliffe ES - Doors 20 1987 -65 10 -28 Wood Laminate Doors
McAuliffe ES - Door Hardware 20 1987 -65 10 -28 LeversMcAuliffe ES - Casework (Built-Ins) 20 1987 -65 5 -30 Grey tops and wood cabinetsMcAuliffe ES - Restrooms - Faculty 20 2010 50 55 53
McAuliffe ES - Restrooms - Student 20 2010 50 55 53
McAuliffe ES - Marquee 15 2010 33 45 39 LEDMcAuliffe ES - Paving - Parking Lots 50 1987 34 35 35
McAuliffe ES - Paving - Sidewalks 40 1987 18 20 19
McAuliffe ES - Exterior Lighting - Original 20 2002 10 15 13
McAuliffe ES - Exterior Lighting - Front Area 20 2014 70 75 73
McAuliffe ES - Paint - Commons 15 2010 33 40 37
McAuliffe ES - Paint - Cafeteria 15 2010 33 40 37 maintaining lower wallsMcAuliffe ES - Paint - Library 15 2010 33 40 37
McAuliffe ES - Paint - Gyms 20 2010 50 50 50 Lower gym walls 2019McAuliffe ES - Paint - Exterior 20 2002 10 40 25 Rails & Ext. Doors replaced 2017
McAuliffe ES - Paint - Hallways 20 2010 50 50 50
McAuliffe ES8/5/2020
Year Built / Age 2019 / 1 Assessment Scale:Campus Square Footage 112,909 100 = New or Newly Replaced
Current Year 2020 0 = End of Life Cycle
Storm Shelter = Gym
Mill Street ES
LIFE
CYC
LE -
YEAR
SLA
ST R
EPLA
CED
% L
IFE
REM
AINI
NGVI
SUAL
EVA
LUAT
ION
WOR
K OR
DER
HIST
ORY
TOTA
L AS
SESS
MEN
T
Type of Material / Notes - Items highlighted Orange are 2017 Bond
FACILITY AGE RATING 50 2019 98Mill Street ES - Foundation 50 2019 98 95 97
Mill Street ES - HVAC - Original 20 2019 95 95 95
Mill Street ES - HVAC - Controls 20 2019 95 95 95 Controls = AlertonMill Street ES - Ceiling and Lights 20 2019 95 95 95 LED
Mill Street ES - Roof - Flat 20 2019 95 95 95 2 ply mod bitMill Street ES - Roof - Standing Seam 30 2019 97 95 96 Metal
Mill Street ES - Electrical Switchgear 30 2019 97 95 96
Mill Street ES - Elevator 25 2019 96 95 96 OtisMill Street ES - Fire Safety - Fire Alarm 20 2019 95 95 95 EST 3
Mill Street ES - Fire Safety - Sprinkler System 50 2019 98 95 97
Mill Street ES - Storm Shelter - Pressurized Water Tank 20 2019 95 95 95
Mill Street ES - Food Service Boilers 20 2019 95 95 95
Mill Street ES - Food Service Freezers 20 2019 95 95 95
Mill Street ES - Lightning Detection 15 2009 27 25 26 Siren; controls @ LHSMill Street ES - Generator 40 2019 98 95 96 Generac
Mill Street ES - Shade Structure - Main - - N/A
Mill Street ES - Playground - Main 20 2019 95 95 95
Mill Street ES - Shade Structure - Pre-K - N/A
Mill Street ES - Playground - Pre-K 20 2019 95 95 95
Mill Street ES - Perf Arts - Curtains 20 2019 95 95 95
Mill Street ES - Perf Arts - Stage Lghtng/panel 25 2019 96 95 96
Mill Street ES - Flooring - Classrooms 20 2019 95 95 95 VCTMill Street ES - Flooring - Corridors 20 2019 95 95 95 Concrete and Carpet
Mill Street ES - Flooring - Library 15 2019 93 95 94 CarpetMill Street ES - Flooring - Offices 15 2019 93 95 94 Concrete, Carpet and VCT
Mill Street ES - Flooring - Cafeteria 50 2019 98 95 97 ConcreteMill Street ES - Flooring - Kitchen 50 2019 98 95 97 Concrete
Mill Street ES - Flooring - Gym 20 2019 95 95 95 LVTMill Street ES - Doors 20 2019 95 95 95 Standard Dark
Mill Street ES - Door Hardware 20 2019 95 95 95 LeversMill Street ES - Casework (Built-Ins) 20 2019 95 95 95
Mill Street ES - Restrooms - Faculty 20 2019 95 95 95
Mill Street ES - Restrooms - Student 20 2019 95 95 95
Mill Street ES - Marquee - - In ProgressMill Street ES - Paving - Parking Lots 50 2019 98 95 97
Mill Street ES - Paving - Sidewalks 40 2019 98 95 96
Mill Street ES - Exterior Lighting 20 2019 95 95 95 LEDMill Street ES - Paint - Commons 15 2019 93 95 94
Mill Street ES - Paint - Cafeteria 15 2019 93 95 94
Mill Street ES - Paint - Library 15 2019 93 95 94
Mill Street ES - Paint - Gyms 20 2019 95 95 95
Mill Street ES - Paint - Exterior 20 2019 95 95 95
Mill Street ES - Paint - Hallways 20 2019 95 95 95
Mill St ES8/5/2020
Year Built / Age 1993 / 27 Assessment Scale:Campus Square Footage 63,853 100 = New or Newly Replaced
Current Year 2020 0 = End of Life Cycle
Morningside ES
LIFE
CYC
LE -
YEAR
SLA
ST R
EPLA
CED
% L
IFE
REM
AINI
NGVI
SUAL
EVA
LUAT
ION
WOR
K OR
DER
HIST
ORY
TOTA
L AS
SESS
MEN
T
Type of Material / Notes - Items highlighted Orange are 2017 Bond
FACILITY AGE RATING 50 1993 46Morningside ES - HVAC 20 2012 60 65 8% 68 RTU
Morningside ES - HVAC - Controls 20 2012 60 65 63 Controls = AlertonMorningside ES - Ceiling and Lights 20 2012 60 65 63
Morningside ES - Roof - Flat 20 2012 60 65 8% 67
Morningside ES - Roof - Shingled 20 2012 60 65 8% 67
Morningside ES - Electrical Switchgear 30 1993 10 15 14% 14
Morningside ES - Fire Safety - Fire Alarm 20 2012 60 55 10% 63 HarringtonMorningside ES - Fire Safety - Sprinkler System 50 1993 46 48 -2% 46
Morningside ES - Food Service Boilers 20 2012 60 60 60
Morningside ES - Food Service Freezers 20 2012 60 65 63
Morningside ES - Lightning Detection 15 2009 27 25 26 Siren; Controls @ Griffin MSMorningside ES - Generator 40 2012 80 80 80 Generac - Diesel
Morningside ES - Shade Structure - Main 20 2006 30 30 - N/A
Morningside ES - Playground - Main 20 2010 50 50 50 Bench coating is peeling; minor rust and fading
Morningside ES - Shade Structure - Pre-K - -N/A
Morningside ES - Playground - Pre-K - - N/A
Morningside ES - Perf Arts - Curtains 20 2012 60 60 60
Morningside ES - Perf Arts - Stage Lghtng/panel 25 2012 68 70 69
Morningside ES - Flooring - Classrooms 20 2012 60 65 63 VCTMorningside ES - Flooring - Corridors 20 2012 60 65 63 VCT
Morningside ES - Flooring - Library 20 2012 60 65 63 VCTMorningside ES - Flooring - Offices 20 2012 60 65 63 VCT
Morningside ES - Flooring - Cafeteria 20 2012 60 65 63 VCTMorningside ES - Flooring - Kitchen 50 1993 46 45 46 Terrazzo
Morningside ES - Flooring - Gym 20 2012 60 65 63 VCT; Bench is carpeted. Morningside ES - Doors 20 1993 -35 0 -18
Morningside ES - Door Hardware 20 1993 -35 0 -18 Round Handles (not ADA)Morningside ES - Casework (Built-Ins) 20 1993 -35 0 -18
Morningside ES - Restrooms - Faculty 20 2018 90 95 93
Morningside ES - Restrooms - Student 20 2018 90 95 93
Morningside ES - Marquee 15 2018 87 90 88 LEDMorningside ES - Paving - Parking Lots 50 1993 46 60 53
Morningside ES - Paving - Sidewalks 40 1993 33 50 41 Some heavingMorningside ES - Exterior Lighting 20 2012 60 60 60 None LED
Morningside ES - Paint - Commons 15 2012 47 55 51
Morningside ES - Paint - Cafeteria 15 2012 47 55 51 Maintaining lower wallsMorningside ES - Paint - Library 15 2012 47 55 51
Morningside ES - Paint - Gyms 20 2012 60 65 63 Maintaining lower wallsMorningside ES - Paint - Exterior 20 2012 60 65 63 Rails & Doors replaced 2017
Morningside ES - Paint - Hallways 20 2012 60 65 63 P-Lam from floor up
Morningside ES8/5/2020
Year Built / Age 1994 / 26 Assessment Scale:Campus Square Footage 83,850 100 = New or Newly Replaced
Current Year 2020 0 = End of Life Cycle
Old Settlers ES
LIFE
CYC
LE -
YEAR
SLA
ST R
EPLA
CED
% L
IFE
REM
AINI
NGVI
SUAL
EVA
LUAT
ION
WOR
K OR
DER
HIST
ORY
TOTA
L AS
SESS
MEN
T
Type of Material / Notes - Items highlighted in orange are 2008 Bond
FACILITY AGE RATING 50 1994 48Old Settlers ES - HVAC - Orginal 20 2019 95 100 98
Old Settlers ES - HVAC - 2001 Addition 20 2019 95 100 98
Old Settlers ES - HVAC - Controls 20 2019 95 100 98 Controls = Enviromatics/Reliable
Old Settlers ES - Ceiling and Lights - Orginal 20 2019 95 100 98
Old Settlers ES - Ceiling and Lights - 2001 Addition 20 2001 5 5 5
Old Settlers ES - Roof - Flat - Original 20 2019 95 6 51 2 ply mod bitOld Settlers ES - Roof - Flat - 2001 Addition 20 2001 5 5 5
Old Settlers ES - Roof - Shingled 20 2019 95 100 98
Old Settlers ES - Electrical Switchgear 30 1994 13 20 2% 17
Old Settlers ES - Fire Safety - Fire Alarm 20 2019 95 100 98 EST 3 w/Voice Evac.Old Settlers ES - Fire Safety - Sprinkler System 50 1994 48 50 -9% 44 Heads Recalled
Old Settlers ES - Food Service Boilers 20 2019 95 100 98 Tank 2004Old Settlers ES - Food Service Freezers 20 2019 95 100 98
Old Settlers ES - Lightning Detection - - Siren @ next door McKamy; Controls @ FMHS
Old Settlers ES - Generator 40 2019 98 95 96 Cummins - DieselOld Settlers ES - Lift Station 20 2019 95 100 98
Old Settlers ES - Shade Structure - Main 20 2012 60 60 60
Old Settlers ES - Playground - Main 20 2017 85 90 88
Old Settlers ES - Shade Structure - Pre-K - - N/A
Old Settlers ES - Playground - Pre-K 20 2017 85 90 88
Old Settlers ES - Perf Arts - Curtains 20 2019 95 100 98
Old Settlers ES - Perf Arts - Stage Lghtng/panel 25 2019 96 100 98
Old Settlers ES - Flooring - Classrooms-Orig 15 2019 93 100 97
Old Settlers ES - Flooring - Classrooms - 2001 Add 15 2019 93 100 97
Old Settlers ES - Flooring - Corridors 20 2019 95 100 98
Old Settlers ES - Flooring - Library 15 2019 93 100 97
Old Settlers ES - Flooring - Offices 15 2015 67 70 68 VCTOld Settlers ES - Flooring - Cafeteria 20 2019 95 100 98
Old Settlers ES - Flooring - Kitchen 50 1994 48 45 47 Terrazzo, some crackingOld Settlers ES - Flooring - Gym 20 2019 95 100 98
Old Settlers ES - Doors 20 2019 95 100 98
Old Settlers ES - Door Hardware 20 2019 95 100 98
Old Settlers ES - Casework (Built-Ins) 20 2019 95 100 98
Old Settlers ES - Restrooms - Faculty 20 2019 95 100 98
Old Settlers ES - Restrooms - Student 20 2019 95 100 98
Old Settlers ES - Restrooms - 2001 Addition 20 2001 5 5 5
Old Settlers ES - Marquee 30 1994 13 10 12
Old Settlers ES - Paving - Parking Lots 50 1994 48 50 49 ConcreteOld Settlers ES - Paving - Sidewalks 40 1994 35 35 35 Concrete
Old Settlers ES - Exterior Lighting 20 2019 95 100 98
Old Settlers ES - Paint - Commons 15 2019 93 100 97
Old Settlers ES - Paint - Cafeteria 15 2019 93 100 97
Old Settlers ES - Paint - Library 15 2019 93 100 97
Old Settlers ES - Paint - Gyms 20 2019 95 100 98
Old Settlers ES - Paint - Exterior 20 2019 95 100 98
Old Settlers ES - Paint - Hallways 20 2019 95 100 98
Old Settlers ES8/5/2020
Year Built / Age 1987 / 33 Assessment Scale:Campus Square Footage 78,776 100 = New or Newly Replaced
Current Year 2020 0 = End of Life Cycle
Owen ES
LIFE
CYC
LE -
YEAR
SLA
ST R
EPLA
CED
% L
IFE
REM
AINI
NGVI
SUAL
EVA
LUAT
ION
WOR
K OR
DER
HIST
ORY
TOTA
L AS
SESS
MEN
T
Type of Material / Notes
FACILITY AGE RATING 50 1987 34Owen ES - HVAC 20 2010 50 55 13% 59 RTU
Owen ES - Controls 20 2010 50 55 53 Controls = AlertonOwen ES - Ceiling and Lights 20 2010 50 55 53
Owen ES - Roof - Flat 20 2002 10 20 -17% 12
Owen ES - Electrical Switchgear 30 1987 -10 30 0% 10 Major repair 2010Owen ES - Lift 25 2008 52 50 51 Nat'l Wheel-O-Vator - Lift at stage
Owen ES - Fire Safety - Fire Alarm 20 2002 10 10 0% 10 Edwards EST 2 - Limited Parts Owen ES - Fire Safety - Sprinkler System 50 2010 80 80 16% 93
Owen ES - Food Service Boilers 20 2017 85 85 85
Owen ES - Food Service Freezers 20 2009 45 55 50
Owen ES - Lightning Detection 15 2009 27 25 26 Siren & ControlsOwen ES - Generator 40 2010 75 78 77 Cummins - Diesel
Owen ES - Shade Structure - Main - - N/A
Owen ES - Playground - Main 20 2005 25 25 25 Paint fading/scratches; steps bubblingOwen ES - Shade Structure - Pre-K - - N/A
Owen ES - Playground - Pre-K 20 2014 70 70 70 Minor rust and coating coming off on Pie steps
Owen ES - Perf Arts - Curtains 20 2005 25 35 30
Owen ES - Perf Arts - Stage Lghtng/panel 25 2010 60 60 60
Owen ES - Flooring - Classrooms 20 2010 50 55 53 VCTOwen ES - Flooring - Corridors 20 2010 50 55 53 VCT
Owen ES - Flooring - Library 15 2010 33 40 37 Carpet Owen ES - Flooring - Offices 15 2010 33 40 37 Carpet / VCT
Owen ES - Flooring - Cafeteria 20 2010 50 50 50 VCTOwen ES - Flooring - Kitchen 50 1987 34 45 40 Terrazzo
Owen ES - Flooring - Gym 20 2010 50 55 53 VCTOwen ES - Doors 20 2010 50 55 53
Owen ES - Door Hardware 20 2010 50 55 53
Owen ES - Casework (Built-Ins) 20 1987 -65 0 -33
Owen ES - Restrooms - Faculty 20 2010 50 55 53
Owen ES - Restrooms - Student 20 2010 50 55 53
Owen ES - Marquee 30 2010 67 70 68 Brick with metal frameOwen ES - Paving - Parking Lots 50 1987 34 45 40 Concrete
Owen ES - Paving - Sidewalks 40 1987 18 30 24
Owen ES - Exterior Lighting 20 2010 50 55 53
Owen ES - Paint - Commons 15 2010 33 45 39
Owen ES - Paint - Cafeteria 15 2010 33 45 39
Owen ES - Paint - Library 15 2010 33 45 39
Owen ES - Paint - Gyms 20 2010 50 60 55 Lower walls painted 2017Owen ES - Paint - Exterior 20 2017 85 90 88 New coping; Front Awning painted 2019
Owen ES - Paint - Hallways 20 2010 50 55 53 1/2 P-Lam/ 1/2 tackable surface
Owen ES8/5/2020
Year Built / Age 1995 / 25 Assessment Scale:Campus Square Footage 75,113 100 = New or Newly Replaced
Current Year 2020 0 = End of Life Cycle
Parkway ES
LIFE
CYC
LE -
YEAR
SLA
ST R
EPLA
CED
% L
IFE
REM
AINI
NGVI
SUAL
EVA
LUAT
ION
WOR
K OR
DER
HIST
ORY
TOTA
L AS
SESS
MEN
T
Type of Material / Notes - Items highlighted Orange are 2017 Bond
FACILITY AGE RATING 50 1995 50Parkway ES - HVAC 20 1995 0 RTU - IN PROGRESS
Parkway ES - HVAC -Controls 20 1995 0 Controls = I/net - IN PROGRESSParkway ES - Ceiling and Lights 20 1995 0 IN PROGRESS
Parkway ES - Roof - Flat 20 1995 0 IN PROGRESSParkway ES - Roof - Shingled 20 2013 65 65 65
Parkway ES - Electrical Switchgear 30 1995 17 20 -19% 15
Parkway ES - Fire Safety - Fire Alarm 20 1995 0 Napco N-1010- IN PROGRESSParkway ES - Fire Safety - Sprinkler System 50 1995 50 50 -8% 46
Parkway ES - Food Service Boilers 20 2002 0 IN PROGRESSParkway ES - Food Service Freezers 20 1995 0 IN PROGRESS
Parkway ES - Lightning Detection 15 2009 27 25 26 Siren; Controls @ HarmonParkway ES - Generator 40 2019 98 98 -
Parkway ES - Shade Structure - Main 20 2006 30 30 30 Some holes in shade structureParkway ES - Playground - Main 20 2015 75 80 78 bench coating is peeling; all steps replaced
through warranty
Parkway ES - Shade Structure - Pre-K - - N/A
Parkway ES - Playground - Pre-K 20 2012 60 70 65
Parkway ES - Perf Arts - Curtains 20 1995 0 IN PROGRESSParkway ES - Perf Arts - Stage Lghtng/panel 25 1995 0 IN PROGRESSParkway ES - Flooring - Classrooms-Carpet 15 1995 0 Carpet - IN PROGRESS
Parkway ES - Flooring - Classrooms-VCT 20 1995 0 VCT - IN PROGRESS
Parkway ES - Flooring - Corridors 20 2006 0 VCT (2017 evident moisture causing glue to come through) - IN PROGRESS
Parkway ES - Flooring - Library 15 1995 0 Carpet - IN PROGRESSParkway ES - Flooring - Offices 20 2014 0 VCT - IN PROGRESS
Parkway ES - Flooring - Cafeteria 20 2009 0 VCT - IN PROGRESSParkway ES - Flooring - Kitchen 50 1995 0 Terrazzo - IN PROGRESS
Parkway ES - Flooring - Gym 20 2012 0 VCT - IN PROGRESSParkway ES - Doors 20 1995 0 IN PROGRESS
Parkway ES - Door Hardware 20 1995 0 IN PROGRESSParkway ES - Casework (Built-Ins) 20 1995 0 Green/Salmon - IN PROGRESSParkway ES - Restrooms - Faculty 20 1995 0 CMU walls, ceramic tile floors - IN
PROGRESS
Parkway ES - Restrooms - Student 20 1995 0 floor urinals, ceramic tile floors, CMU walls, laminate partitions - IN PROGRESS
Parkway ES - Marquee 30 1995 0 Brick w/Stone Cap - IN PROGRESSParkway ES - Paving - Parking Lots 50 1995 50 40 45 Concrete, a lot of movement
Parkway ES - Paving - Sidewalks 40 1995 38 40 39 Concrete, a lot of movementParkway ES - Exterior Lighting 20 1995 0 IN PROGRESS
Parkway ES - Paint - Commons 15 2013 0 P-Lam, paint - IN PROGRESSParkway ES - Paint - Cafeteria 15 2013 0 IN PROGRESS
Parkway ES - Paint - Library 15 2013 0 IN PROGRESSParkway ES - Paint - Gyms 20 2014 0 IN PROGRESS
Parkway ES - Paint - Exterior 20 1995 0 2017 some lower walls - IN PROGRESS
Parkway ES - Paint - Hallways 20 2013 0 P-Lam, drywall paint - IN PROGRESS
Parkway ES8/5/2020
Year Built / Age 2010 / 10 Assessment Scale:Campus Square Footage 108,560 100 = New or Newly Replaced
Current Year 2020 0 = End of Life Cycle
Peters Colony ES
LIFE
CYC
LE -
YEAR
SLA
ST R
EPLA
CED
% L
IFE
REM
AINI
NGVI
SUAL
EVA
LUAT
ION
WOR
K OR
DER
HIST
ORY
TOTA
L AS
SESS
MEN
T
Type of Material / Notes
FACILITY AGE RATING 50 2010 80Peters Colony ES - HVAC 20 2010 50 55 7% 56 CHILLER
Peters Colony ES - HVAC - Controls 20 2010 50 55 53 Controls = Alerton (control)/Automated Logic (hardware)
Peters Colony ES - Ceiling and Lights 20 2010 50 55 53
Peters Colony ES - Roof - Shingled 20 2010 50 55 -1% 52
Peters Colony ES - Electrical Switchgear 30 2010 67 65 5% 69
Peters Colony ES - Elevator 25 2010 60 60 14% 68 SchindlerPeters Colony ES - Fire Safety - Fire Alarm 20 2010 50 40 16% 52 Harrington
Peters Colony ES - Fire Safety - Sprinkler System 50 2010 80 82 -2% 80
Peters Colony ES - Food Service Boilers 20 2010 50 50 50
Peters Colony ES - Food Service Freezers 20 2010 50 55 53
Peters Colony ES - Lightning Detection 15 2009 27 25 26 Siren; Controls @ Griffin MSPeters Colony ES - Generator 40 2010 75 75 75 Generac - Diesel
Peters Colony ES - Shade Structure - Main - - N/A
Peters Colony ES - Playground - Main 20 2010 50 45 48 Steps peeling/cracking on main playground; paint fading; drainage repaired
Peters Colony ES - Shade Structure - Pre-K - -N/A
Peters Colony ES - Playground - Pre-K 20 2014 70 70 70
Peters Colony ES - Perf Arts - Curtains 20 2010 50 50 50
Peters Colony ES - Perf Arts - Stage Lghtng/panel 25 2010 60 65 63
Peters Colony ES - Flooring - Classrooms 20 2010 50 55 53 VCTPeters Colony ES - Flooring - Corridors 20 2010 50 55 53 VCT, Stair Terrazzo: 75%
Peters Colony ES - Flooring - Library 15 2010 33 50 42 CarpetPeters Colony ES - Flooring - Offices 15 2010 33 50 42 Carpet/VCT
Peters Colony ES - Flooring - Cafeteria 20 2010 50 55 53 VCTPeters Colony ES - Flooring - Kitchen 50 2010 80 65 73 Terrazzo
Peters Colony ES - Flooring - Gym 20 2010 50 65 58 VCTPeters Colony ES - Doors 20 2010 50 65 58
Peters Colony ES - Door Hardware 20 2010 50 65 58
Peters Colony ES - Casework (Built-Ins) 20 2010 50 55 53
Peters Colony ES - Restrooms - Faculty 20 2010 50 60 55
Peters Colony ES - Restrooms - Student 20 2010 50 60 55
Peters Colony ES - Marquee 30 2010 67 65 66
Peters Colony ES - Paving - Parking Lots 50 2010 80 85 83
Peters Colony ES - Paving - Sidewalks 40 2010 75 80 78
Peters Colony ES - Exterior Lighting 20 2010 50 55 53 Continued issues with timingPeters Colony ES - Paint - Commons 15 2010 33 55 44
Peters Colony ES - Paint - Cafeteria 15 2010 33 60 47 Kitchen-tile walls,Peters Colony ES - Paint - Library 15 2010 33 60 47
Peters Colony ES - Paint - Gyms 20 2010 50 60 55
Peters Colony ES - Paint - Exterior 20 2010 50 55 53
Peters Colony ES - Paint - Hallways 20 2010 50 55 53 P-Lam, some tackboard
Peters Colony ES8/5/2020
Year Built / Age 1995 / 25 Assessment Scale:Campus Square Footage 73,324 100 = New or Newly Replaced
Current Year 2020 0 = End of Life Cycle
Polser ES
LIFE
CYC
LE -
YEAR
SLA
ST R
EPLA
CED
% L
IFE
REM
AINI
NGVI
SUAL
EVA
LUAT
ION
WOR
K OR
DER
HIST
ORY
TOTA
L AS
SESS
MEN
T
Type of Material / Notes - Items highlighted Orange are 2017 Bond
FACILITY AGE RATING 50 1995 50Polser ES - HVAC 20 2018 90 95 93
Polser ES - HVAC - Controls 20 2018 90 95 93 Controls = AlertonPolser ES - Ceiling and Lights 20 2018 90 95 93
Polser ES - Roof - Flat 20 2018 90 95 93
Polser ES - Roof - Shingled 20 2013 65 70 8% 73
Polser ES - Electrical Switchgear 30 1995 17 20 11% 20
Polser ES - Fire Safety - Fire Alarm 20 2018 90 95 93 Napco N-1010;Polser ES - Fire Safety - Sprinkler System 50 1995 50 52 -20% 41
Polser ES - Food Service Boilers 20 2009 45 45 45
Polser ES - Food Service Freezers 20 2018 90 95 93
Polser ES - Lightning Detection 15 2009 27 25 26 Siren; Controls @ Homestead ESPolser ES - Generator 40 2018 95 95 95 Cummins - Diesel
Polser ES - Shade Structure - Main - - N/A
Polser ES - Playground - Main 20 2013 65 70 68 Big rain slope issuesPolser ES - Shade Structure - Pre-K - - N/A
Polser ES - Playground - Pre-K 20 2013 65 70 68
Polser ES - Perf Arts - Curtains 20 2018 90 95 93
Polser ES - Perf Arts - Stage Lghtng/panel 25 2018 92 95 94
Polser ES - Flooring - Classrooms 20 2019 95 100 98
Polser ES - Flooring - Corridors 20 2012 60 65 63 VCTPolser ES - Flooring - Library 15 2018 87 100 93
Polser ES - Flooring - Offices 15 2019 93 100 97
Polser ES - Flooring - Cafeteria 20 2011 55 60 58 VCTPolser ES - Flooring - Kitchen 50 1995 50 45 48 Terrazzo
Polser ES - Flooring - Gym 20 2019 95 100 98
Polser ES - Doors 20 2019 95 100 98
Polser ES - Door Hardware 20 2019 95 100 98
Polser ES - Casework (Built-Ins) 20 2019 95 100 98
Polser ES - Restrooms - Faculty 20 2019 95 100 98
Polser ES - Restrooms - Student 20 2019 95 100 98
Polser ES - Marquee 30 1995 17 35 26 Updated STEMPolser ES - Paving - Parking Lots 50 1995 50 55 53 Concrete
Polser ES - Paving - Sidewalks 40 1995 38 60 49 ConcretePolser ES - Exterior Lighting 20 2019 95 100 98
Polser ES - Paint - Commons 15 2019 93 100 97
Polser ES - Paint - Cafeteria 15 2019 93 100 97
Polser ES - Paint - Library 15 2019 93 100 97
Polser ES - Paint - Gyms 20 2019 95 100 98
Polser ES - Paint - Exterior 20 2019 95 100 98
Polser ES - Paint - Hallways 20 2019 95 100 98
Polser ES8/5/2020
Year Built / Age 1995 / 25 Assessment Scale:Campus Square Footage 84,221 100 = New or Newly Replaced
Current Year 2020 0 = End of Life Cycle
Prairie Trail ES
LIFE
CYC
LE -
YEAR
SLA
ST R
EPLA
CED
% L
IFE
REM
AINI
NGVI
SUAL
EVA
LUAT
ION
WOR
K OR
DER
HIST
ORY
TOTA
L AS
SESS
MEN
T
Type of Material / Notes - Items highlighted Orange are 2017 Bond
FACILITY AGE RATING 50 1995 50Prairie Trail ES - HVAC-Original 20 1995 0 RTU; In Progress
Prairie Trail ES - HVAC-2007 Addition 20 2007 0 RTU; In ProgressPrairie Trail ES - HVAC- Controls 20 1995 0 Controls = I/net; In Progress
Prairie Trail ES - Ceiling and Lights-Original 20 1995 0 In ProgressPrairie Trail ES - Ceiling and Lights-2007 Addition 20 2007 0 T-5; In Progress
Prairie Trail ES - Roof - Flat-Original 20 1995 0 In ProgressPrairie Trail ES - Roof - Flat-2007 Addition 20 2007 35 50 -5% 40
Prairie Trail ES - Roof - Shingled 20 2013 65 70 -5% 64
Prairie Trail ES - Electrical Switchgear 30 1995 17 25 -24% 16
Prairie Trail ES - Fire Safety - Fire Alarm 20 1995 0 Edwards EST 2 - Limited Parts; In Progress
Prairie Trail ES - Fire Safety - Sprinkler System 50 1995 50 50 -31% 35
Prairie Trail ES - Food Service Boilers 20 1995 0 Tank 2009; In ProgressPrairie Trail ES - Food Service Freezers 20 1995 0 In Progress
Prairie Trail ES - Lightning Detection 15 2009 27 25 26 Siren; Controls @ MHSPrairie Trail ES - Generator - - In Progress
Prairie Trail ES - Shade Structure - Main 20 2005 25 25 25
Prairie Trail ES - Playground - Main 20 2013 65 70 68 MiraclePrairie Trail ES - Shade Structure - Pre-K - - N/A
Prairie Trail ES - Playground - Pre-K 20 2013 65 70 68 MiraclePrairie Trail ES - Perf Arts - Curtains 20 1995 0 In Progress
Prairie Trail ES - Perf Arts - Stage Lghtng/panel 25 1995 0In Progress
Prairie Trail ES - Flooring - Classrooms 20 2013 65 70 68 LVT ; Art Rm floor needs replacement
Prairie Trail ES - Flooring - Corridors 20 2004 0 VCT; In ProgressPrairie Trail ES - Flooring - Library 15 2009 0 Carpet; In ProgressPrairie Trail ES - Flooring - Offices 20 2013 65 70 68 LVT
Prairie Trail ES - Flooring - Cafeteria 20 1995 0 VCT; In ProgressPrairie Trail ES - Flooring - Kitchen 50 1995 50 50 50 Terrazzo
Prairie Trail ES - Flooring - Gym 20 2013 65 70 68 LVT Prairie Trail ES - Doors 20 1995 0 In Progress
Prairie Trail ES - Door Hardware 20 1995 0 In ProgressPrairie Trail ES - Casework (Built-Ins) 20 1995 0 In ProgressPrairie Trail ES - Restrooms - Faculty 20 1995 0 Ceramic; In ProgressPrairie Trail ES - Restrooms - Student 20 1995 0 Ceramic, CMU walls; In Progress
Prairie Trail ES - Restrooms - 2007 Addition 20 2007 0 In ProgressPrairie Trail ES - Marquee 30 1995 17 20 18
Prairie Trail ES - Paving - Parking Lots 50 1995 50 55 53 ConcretePrairie Trail ES - Paving - Sidewalks 40 1995 38 45 41 Concrete
Prairie Trail ES - Exterior Lighting 20 1995 0 IN PROGRESSPrairie Trail ES - Paint - Commons 15 1995 0 Office Areas painted 2017; In Progress
Prairie Trail ES - Paint - Cafeteria 15 1995 0 In ProgressPrairie Trail ES - Paint - Library 15 2018 0 In ProgressPrairie Trail ES - Paint - Gyms 20 2017 0 In Progress
Prairie Trail ES - Paint - Exterior 20 1995 0 In ProgressPrairie Trail ES - Paint - Hallways 20 1995 0 In Progress
Prairie Trail ES8/5/2020
Year Built / Age 2003 / 17 Assessment Scale:Campus Square Footage 86,122 100 = New or Newly Replaced
Current Year 2020 0 = End of Life Cycle
Rockbrook ES
LIFE
CYC
LE -
YEAR
SLA
ST R
EPLA
CED
% L
IFE
REM
AINI
NGVI
SUAL
EVA
LUAT
ION
WOR
K OR
DER
HIST
ORY
TOTA
L AS
SESS
MEN
T
Type of Material / Notes
FACILITY AGE RATING 50 2003 66Rockbrook ES - HVAC - Original 20 2003 15 20 10% 19 RTU
Rockbrook ES - HVAC - 2007 Addition 20 2007 35 40 10% 41 RTURockbrook ES - HVAC - Controls 20 2003 15 15 15 2003 & 2007 Control = I/net
Rockbrook ES - Ceiling and Lights - Original 20 2003 15 25 20
Rockbrook ES - Ceiling and Lights - 2007 Addition 20 2007 35 35 35
Rockbrook ES - Roof - Flat Original 20 2003 15 25 11% 22
Rockbrook ES - Roof - Flat 2007 Addition 20 2007 35 40 11% 42
Rockbrook ES - Electrical Switchgear 30 2003 43 47 -7% 42
Rockbrook ES - Fire Safety - Fire Alarm 20 2003 15 20 6% 19 Edwards EST 2 - Limited Parts Rockbrook ES - Fire Safety - Sprinkler System 50 2003 66 66 17% 77
Rockbrook ES - Food Service Boilers 20 2002 10 20 15
Rockbrook ES - Food Service Freezers 20 2003 15 20 18
Rockbrook ES - Lightning Detection 15 2009 27 25 26 Siren & ControlsRockbrook ES - Generator - -
Rockbrook ES - Shade Structure - Main - - N/A
Rockbrook ES - Playground - Main 20 2003 15 15 15 All stairs bubbled/cracked; some fading; heavy wear
Rockbrook ES - Shade Structure - Pre-K 20 2018 90 90 90
Rockbrook ES - Playground - Pre-K 20 2014 70 80 75
Rockbrook ES - Perf Arts - Curtains 20 2003 15 20 18
Rockbrook ES - Perf Arts - Stage Lghtng/panel 25 2003 32 35 34
Rockbrook ES - Flooring - Classrooms - Carpet 15 2007 13 5 9 Carpet Rockbrook ES - Flooring - Classrooms - VCT 20 2003 15 25 20 VCTRockbrook ES - Flooring - Classrooms - VCT 20 2015 75 80 78 VCT
Rockbrook ES - Flooring - Corridors 20 2003 15 20 18 VCTRockbrook ES - Flooring - Library 15 2003 -13 10 -2 Carpet Rockbrook ES - Flooring - Offices 15 2012 47 50 48 VCT
Rockbrook ES - Flooring - Cafeteria 20 2003 15 20 18 VCTRockbrook ES - Flooring - Kitchen 50 2003 66 60 63 Terrazzo
Rockbrook ES - Flooring - Gym 20 2003 15 20 18 VCTRockbrook ES - Doors 20 2003 15 25 20
Rockbrook ES - Door Hardware 20 2003 15 25 20
Rockbrook ES - Casework (Built-Ins) 20 2003 15 20 18
Rockbrook ES - Restrooms - Faculty 20 2003 15 20 18 Ceramic floor / wall
Rockbrook ES - Restrooms - Student 20 2003 15 15 15
Ceramic floor / wall, laminate partitions, boys: some swelling. 2007 Addition: plastic partitions - 2017 - Restrooms by gym & 2nd grade Hall have new Partitions in 2017
Rockbrook ES - Restrooms - 2007 Addition 20 2007 35 35 35
Rockbrook ES - Marquee 30 2003 43 35 39
Rockbrook ES - Paving - Parking Lots 50 2003 66 68 67 ConcreteRockbrook ES - Paving - Sidewalks 40 2003 58 60 59 Concrete, some swelling
Rockbrook ES - Exterior Lighting 20 2003 15 20 18
Rockbrook ES - Paint - Commons 15 2013 53 60 57 Office areas painted 2019Rockbrook ES - Paint - Cafeteria 15 2013 53 60 57
Rockbrook ES - Paint - Library 15 2019 93 95 94
Rockbrook ES - Paint - Gyms 20 2003 15 25 20 Bench: carpet; Lower walls painted 2019
Rockbrook ES - Paint - Exterior 20 2003 15 20 18
Rockbrook ES - Paint - Hallways 20 2003 15 20 18 P-LAM walls
Rockbrook ES8/5/2020
Year Built / Age 1999 / 21 Assessment Scale:Campus Square Footage 74,375 100 = New or Newly Replaced
Current Year 2020 0 = End of Life Cycle
Southridge ES
LIFE
CYC
LE -
YEAR
SLA
ST R
EPLA
CED
% L
IFE
REM
AINI
NGVI
SUAL
EVA
LUAT
ION
WOR
K OR
DER
HIST
ORY
TOTA
L AS
SESS
MEN
T
Type of Material / Notes - Items highlighted Orange are 2017 Bond
FACILITY AGE RATING 50 1999 58Southridge ES - HVAC 20 1999 -5 0 0% -2 RTU
Southridge ES - HVAC - Controls 20 1999 -5 0 -3 Control = I/netSouthridge ES - Ceiling and Lights 20 1999 -5 0 -3
Southridge ES - Roof - Flat 20 1999 -5 0 -28% -3
Southridge ES - Electrical Switchgear 30 1999 30 33 -12% 28
Southridge ES - Fire Safety - Fire Alarm 20 1999 -5 0 -8% -3 FCISouthridge ES - Fire Safety - Sprinkler System 50 1999 58 60 17% 69
Southridge ES - Food Service Boilers 20 2014 70 60 65
Southridge ES - Food Service Freezers 20 1999 -5 5 0 Condenser Replaced 2014Southridge ES - Lightning Detection - - Shared w/Durham MS next door
Southridge ES - Generator - -
Southridge ES - Shade Structure - Main - - N/A
Southridge ES - Playground - Main 20 2015 75 75 75 steps replaced in 2018
Southridge ES - Shade Structure - Pre-K - - N/A
Southridge ES - Playground - Pre-K 20 2015 75 75 75 steps replaced in 2018; some fading
Southridge ES - Perf Arts - Curtains 20 2012 60 60 60
Southridge ES - Perf Arts - Stage Lghtng/panel 25 1999 16 15 16
Southridge ES - Flooring - Classrooms 20 1999 -5 0 -3 VCTSouthridge ES - Flooring - Corridors 20 2004 20 20 20 VCT
Southridge ES - Flooring - Library 15 1999 -40 0 -20 CarpetSouthridge ES - Flooring - Offices 15 2009 27 25 26 Carpet; Principal & AP office LVT 2018
Southridge ES - Flooring - Cafeteria 20 1999 -5 0 -3 VCTSouthridge ES - Flooring - Kitchen 50 1999 58 45 52 Terrazzo
Southridge ES - Flooring - Gym 20 1999 -5 0 -3 VCTSouthridge ES - Doors 20 1999 -5 20 8 Golden Oak
Southridge ES - Door Hardware 20 1999 -5 20 8
Southridge ES - Casework (Built-Ins) 20 1999 -5 15 5 Beige/GreySouthridge ES - Restrooms - Faculty 20 1999 -5 0 -3 Ceramic tile floor/walls
Southridge ES - Restrooms - Student 20 1999 -5 5 0 Ceramic tile floor 2x2, solid plastic partitions, cermaic tile walls to 6'
Southridge ES - Marquee 30 1999 30 40 35 Rebuilt summer 2015Southridge ES - Paving - Parking Lots 50 1999 58 60 59
Southridge ES - Paving - Sidewalks 40 1999 48 50 49
Southridge ES - Exterior Lighting 20 2019 95 100 98 LEDSouthridge ES - Paint - Commons 15 2012 47 60 53
Southridge ES - Paint - Cafeteria 15 2014 60 75 68
Southridge ES - Paint - Gyms 15 1999 -40 0 -20 Scheduled for painting Summer 2020
Southridge ES - Paint - Library 20 2012 60 60 60
Southridge ES - Paint - Exterior 20 1999 -5 15 5
Southridge ES - Paint - Hallways 20 1999 -5 0 -3 need updated colors
Southridge ES8/5/2020
Year Built / Age 1978 / 42 Assessment Scale:Campus Square Footage 67,020 100 = New or Newly Replaced
Current Year 2020 0 = End of Life Cycle
Stewarts Creek ES
LIFE
CYC
LE -
YEAR
SLA
ST R
EPLA
CED
% L
IFE
REM
AINI
NGVI
SUAL
EVA
LUAT
ION
WOR
K OR
DER
HIST
ORY
TOTA
L AS
SESS
MEN
T
Type of Material / Notes - Items highlighted Orange are 2017 Bond
FACILITY AGE RATING 50 1978 16Stewarts Creek ES - Foundation 50 1978 16 20 18 Slab-On-Grade
Stewarts Creek ES - HVAC 20 2004 20 25 -21% 18 RTUStewarts Creek ES - HVAC - Controls 20 2018 90 95 93 2008 Bond - Enviromatic
Stewarts Creek ES - Ceiling and Lights 20 2004 20 25 23
Stewarts Creek ES - Roof - Flat 20 2004 20 25 10% 25
Stewarts Creek ES - Electrical Switchgear 30 1978 -40 0 14% -17
Stewarts Creek ES - Fire Safety - Fire Alarm 20 2002 10 15 9% 14 Edwards EST 2 - Limited Parts Stewarts Creek ES - Fire Safety - Sprinkler System 50 1978 16 16 14% 18
Stewarts Creek ES - Food Service Boilers 20 2011 55 50 53
Stewarts Creek ES - Food Service Freezers 20 2004 20 30 25
Stewarts Creek ES - Lightning Detection - - Shared w/Lakeview MS next door
Stewarts Creek ES - Generator - -
Stewarts Creek ES - Shade Structure - Main - - N/A
Stewarts Creek ES - Playground - Main 20 2004 20 20 20 Stairs bubbling/cracked were replaced 2019; lots of graffiti/vandalism; paint chipping; poor drainage; new ADA ramp installed 2020
Stewarts Creek ES - Shade Structure - Pre-K - -No shade structure but numerous shade trees
Stewarts Creek ES - Playground - Pre-K 20 2015 75 75 75
Stewarts Creek ES - Perf Arts - Curtains 20 2010 50 55 53
Stewarts Creek ES - Perf Arts - Stage Lghtng/panel 25 2018 92 95 94Track lighting
Stewarts Creek ES - Flooring - Classrooms 20 2010 50 55 53 VCT, Music room: carpet 2005Stewarts Creek ES - Flooring - Corridors 20 2004 20 30 25 VCT
Stewarts Creek ES - Flooring - Library 15 2004 -7 20 7 CarpetStewarts Creek ES - Flooring - Offices 15 2012 47 60 53 VCT, Carpet
Stewarts Creek ES - Flooring - Cafeteria 20 2004 20 35 28 VCT, ceramic on stage stairStewarts Creek ES - Flooring - Kitchen 50 1978 16 25 21 Terrazzo
Stewarts Creek ES - Flooring - Gym 20 2005 25 30 28 VCTStewarts Creek ES - Doors 20 1978 -110 0 -55 Dark Brown Laminate
Stewarts Creek ES - Door Hardware 20 1978 -110 0 -55 Dead bolts with pull handles
Stewarts Creek ES - Casework (Built-Ins) 20 1978 -110 0 -55 Cabinets - wood grain w/salmon counters
Stewarts Creek ES - Restrooms - Faculty 20 2018 90 95 93
Stewarts Creek ES - Restrooms - Student 20 2018 90 95 93
Stewarts Creek ES - Marquee 30 2013 77 75 76 Replaced 2013Stewarts Creek ES - Paving - Parking Lots 50 1978 16 35 26 Concrete
Stewarts Creek ES - Paving - Sidewalks 40 1978 -5 35 15 Concrete-slight heavingStewarts Creek ES - Exterior Lighting 20 2019 95 100 98
Stewarts Creek ES - Paint - Commons 15 2011 40 55 48 Office areas painted 2019Stewarts Creek ES - Paint - Cafeteria 15 2017 80 80 80 FRP / CMU
Stewarts Creek ES - Paint - Library 15 2015 67 75 71
Stewarts Creek ES - Paint - Gyms 20 2015 75 75 75 FRP over plywood, CMU paintedStewarts Creek ES - Paint - Exterior 20 2004 20 30 25 Concrete
Stewarts Creek ES - Paint - Hallways 20 2018 90 90 90 FRP from floor, original
Stewarts Creek ES8/5/2020
Year Built / Age 1978 / 42 Assessment Scale:Campus Square Footage 63,532 100 = New or Newly Replaced
Current Year 2020 0 = End of Life Cycle
Timber Creek ES
LIFE
CYC
LE -
YEAR
SLA
ST R
EPLA
CED
% L
IFE
REM
AINI
NGVI
SUAL
EVA
LUAT
ION
WOR
K OR
DER
HIST
ORY
TOTA
L AS
SESS
MEN
T
Type of Material / Notes - Items highlighted Orange are 2017 Bond
FACILITY AGE RATING 50 1978 16Timber Creek ES - HVAC-Original 20 1997 0 RTU; IN PROGRESS
Timber Creek ES - HVAC-1987 Addition 20 2012 60 65 63 RTUTimber Creek ES - HVAC-Controls 20 2019 95 100 98 Control = Reliable
Timber Creek ES - Ceiling and Lights-Original 20 1997 0 T-8; IN PROGRESSTimber Creek ES - Ceiling and Lights-1987 Addition 20 2012 60 65 63 T-8
Timber Creek ES - Roof - Flat Original Bldg 20 2004 20 25 7% 24
Timber Creek ES - Roof - Flat 1987 Addition 20 2012 60 65 63
Timber Creek ES - Electrical Switchgear 30 1978 0 needs replacementTimber Creek ES - Fire Safety - Fire Alarm 20 2012 0 Harrington HS3200 - Unsupported
Timber Creek ES - Fire Safety - Sprinkler System - 0 IN PROGRESSTimber Creek ES - Food Service Boilers 20 2002 0 IN PROGRESS
Timber Creek ES - Food Service Freezers 20 2015 75 80 78
Timber Creek ES - Lightning Detection 15 2009 27 25 26 Controls & SirenTimber Creek ES - Generator 40 2019 98 98 - Cummins - Diesel
Timber Creek ES - Shade Structure - Main - - N/A
Timber Creek ES - Playground - Main 20 2012 60 60 60 Little TikesTimber Creek ES - Shade Structure - Pre-K - - N/A
Timber Creek ES - Playground - Pre-K 20 2012 60 60 60 Little Tikes; ramp added 2018Timber Creek ES - Perf Arts - Curtains 20 2013 0 IN PROGRESS
Timber Creek ES - Perf Arts - Stage Lghtng/panel 25 1978 0 IN PROGRESSTimber Creek ES - Flooring - Classrooms 15 2002 0 Carpet - IN PROGRESS
Timber Creek ES - Flooring - Corridors 20 2002 0 VCT - IN PROGRESSTimber Creek ES - Flooring - Library 15 2002 0 Carpet - IN PROGRESSTimber Creek ES - Flooring - Offices 15 2002 0 Carpet - IN PROGRESS
Timber Creek ES - Flooring - Cafeteria 20 2002 0 VCT - IN PROGRESSTimber Creek ES - Flooring - Kitchen 30 1978 0 Ceramic - IN PROGRESS
Timber Creek ES - Flooring - Gym 20 2002 0 VCT - IN PROGRESSTimber Creek ES - Doors 20 1997 0 IN PROGRESS
Timber Creek ES - Door Hardware 20 1997 0 Round knobs; low - IN PROGRESS
Timber Creek ES - Casework (Built-Ins) 20 1997 0 Dark blue countertops and dark wood - IN PROGRESS
Timber Creek ES - Restrooms - Faculty 20 2002 0 Ceramic - IN PROGRESSTimber Creek ES - Restrooms - Student 20 2002 0 Ceramic - IN PROGRESS
Timber Creek ES - Restrooms - 1987 Addition 20 0 IN PROGRESSTimber Creek ES - Marquee 30 1990 0 3 2
Timber Creek ES - Concrete Paving - Parking Lots 50 1978 16 20 18
Timber Creek ES - Asphalt Paving - Parking Lots 20 2005 25 40 33 South lot
Timber Creek ES - Paving - Sidewalks 40 1978 -5 15 5 ConcreteTimber Creek ES - Exterior Lighting 20 1987 0 50 LED Front only - IN PROGRESS
Timber Creek ES - Paint - Commons 15 2016 0 IN PROGRESSTimber Creek ES - Paint - Cafeteria 15 2002 0 Lower walls painted 2016 - IN PROGRESS
Timber Creek ES - Paint - Library 15 2017 0 Painted 2017 - IN PROGRESSTimber Creek ES - Paint - Gyms 20 2002 0 Lower walls maintaned - IN PROGRESS
Timber Creek ES - Paint - Exterior 20 2015 0 IN PROGRESSTimber Creek ES - Paint - Hallways 20 2002 0 IN PROGRESS
Timber Creek ES8/5/2020
Year Built / Age 1996 / 24 Assessment Scale:Campus Square Footage 83,844 100 = New or Newly Replaced
Current Year 2020 0 = End of Life Cycle
Valley Ridge ES
LIFE
CYC
LE -
YEAR
SLA
ST R
EPLA
CED
% L
IFE
REM
AINI
NGVI
SUAL
EVA
LUAT
ION
WOR
K OR
DER
HIST
ORY
TOTA
L AS
SESS
MEN
T
Type of Material / Notes - Items highlighted Orange are 2017 Bond
FACILITY AGE RATING 50 1996 52Valley Ridge ES - HVAC - Original 20 1996 0 RTU - IN PROGRESS
Valley Ridge ES - HVAC - 2007 Addition 20 2007 35 40 3% 39 RTUValley Ridge ES - HVAC - Controls 20 1996 -20 0 -10 1996 & 2007 Controls = I/net
Valley Ridge ES - Ceiling and Lights - Original 20 1996 0 IN PROGRESSValley Ridge ES - Ceiling and Lights - 2007 Addition 20 2007 35 40 38
Valley Ridge ES - Roof - Flat - Original 20 2018 90 95 93 2016 hail claim insurance replacement
Valley Ridge ES - Roof - Flat - 2007 Addition 20 2018 90 95 93 2016 hail claim insurance replacement
Valley Ridge ES - Roof - Shingled 20 2018 90 95 93 2016 hail claim insurance replacement
Valley Ridge ES - Electrical Switchgear 30 1996 20 20 9% 22
Valley Ridge ES - Fire Safety - Fire Alarm 20 1996 0 Edwards EST 2 - Limited Parts - IN PROGRESS
Valley Ridge ES - Fire Safety - Sprinkler System 50 1996 52 52 -21% 41
Valley Ridge ES - Food Service Boilers 20 2009 45 40 43
Valley Ridge ES - Food Service Freezers 20 1996 0 IN PROGRESSValley Ridge ES - Lightning Detection 15 2009 27 25 26 Siren; Controls @ Huffines MS
Valley Ridge ES - Generator - - IN PROGRESSValley Ridge ES - Shade Structure - Main 20 2016 80 80 80
Valley Ridge ES - Playground - Main 20 2018 90 90 90
Valley Ridge ES - Shade Structure - Pre-K - - N/A
Valley Ridge ES - Playground - Pre-K 20 2018 90 95 93
Valley Ridge ES - Perf Arts - Curtains 20 2008 40 45 43
Valley Ridge ES - Perf Arts - Stage Lghtng/panel 25 1996 0 IN PROGRESSValley Ridge ES - Flooring - Classrooms-Carpet 15 1996 0 Carpet - IN PROGRESS
Valley Ridge ES - Flooring - Classroom - VCT 20 1996 0 VCT - IN PROGRESSValley Ridge ES - Flooring - Classrooms-2007 Add 15 2007 13 20 17 Carpet
Valley Ridge ES - Flooring - Corridors 20 2003 15 20 18 VCTValley Ridge ES - Flooring - Library 15 1996 0 Carpet - IN PROGRESSValley Ridge ES - Flooring - Offices 15 1996 0 VCT / Carpet - IN PROGRESS
Valley Ridge ES - Flooring - Cafeteria 20 1996 0 VCT - IN PROGRESSValley Ridge ES - Flooring - Kitchen 50 1996 52 50 51 Terrazzo
Valley Ridge ES - Flooring - Gym 20 1996 0 VCT - IN PROGRESSValley Ridge ES - Doors 20 1996 0 IN PROGRESS
Valley Ridge ES - Door Hardware 20 1996 0 IN PROGRESSValley Ridge ES - Casework (Built-Ins) 20 1996 0 IN PROGRESSValley Ridge ES - Restrooms - Faculty 20 1996 0 Ceramic floor / walls, drywall to ceiling -
IN PROGRESS
Valley Ridge ES - Restrooms - Student 20 1996 0 Ceramic floor / walls, laminate partitions, floor urinals. IN PROGRESS
Valley Ridge ES - Restrooms - 2007 Addition 20 2007 35 40 38
Valley Ridge ES - Marquee 30 1996 20 20 20
Valley Ridge ES - Paving - Parking Lots 50 1996 52 54 53 ConcreteValley Ridge ES - Paving - Sidewalks 40 1996 40 43 42 Concrete, some movement
Valley Ridge ES - Exterior Lighting 20 1996 0 IN PROGRESSValley Ridge ES - Paint - Commons 15 1996 0 P-Lam, drywall - IN PROGRESSValley Ridge ES - Paint - Cafeteria 15 1996 0 IN PROGRESS
Valley Ridge ES - Paint - Library 15 1996 0 IN PROGRESSValley Ridge ES - Paint - Gyms 20 2013 0 IN PROGRESS
Valley Ridge ES - Paint - Exterior 20 2017 85 85 85 painted 2017Valley Ridge ES - Paint - Hallways 20 1996 0 P-Lam, drywall - IN PROGRESS
Valley Ridge ES8/5/2020
Year Built / Age 2003 / 17 Assessment Scale:Campus Square Footage 74,117 100 = New or Newly Replaced
Current Year 2020 0 = End of Life Cycle
Storm Shelter = 2019 Addition
Vickery ES
LIFE
CYC
LE -
YEAR
SLA
ST R
EPLA
CED
% L
IFE
REM
AINI
NGVI
SUAL
EVA
LUAT
ION
WOR
K OR
DER
HIST
ORY
TOTA
L AS
SESS
MEN
T
Type of Material / Notes - Items highlighted Orange are 2017 Bond
FACILITY AGE RATING 50 2003 66Vickery ES - HVAC 20 2003 15 15 5% 16 RTU
Vickery ES - HVAC - 2019 Addition 20 2019 95 100 98 Controls = AlertonVickery ES - HVAC - Controls 20 2003 15 15 15 Controls = I/net
Vickery ES - Ceiling and Lights 20 2003 15 20 18
Vickery ES - Ceiling and Lights - 2019 Addition 20 2019 95 100 98
Vickery ES - Roof - Flat 20 2003 15 20 -4% 17
Vickery ES - Roof - Flat - 2019 Addition 20 2019 95 100 98
Vickery ES - Electrical Switchgear 30 2003 43 45 9% 48
Vickery ES - Fire Safety - Fire Alarm 20 2003 15 15 -5% 14 Edwards EST 2 - Limited Parts Vickery ES - Fire Safety - Sprinkler System 50 2003 66 65 7% 70
Vickery ES - Food Service Boilers 20 2014 70 70 70
Vickery ES - Food Service Freezers 20 2003 15 20 18
Vickery ES - Lightning Detection 15 2009 27 25 26 Controls & sirenVickery ES - Inverter 2019 Addition 10 2019 90 100 95
Vickery ES - Inverter Batteries 2019 Addition 5 2019 80 100 90
Vickery ES - Shade Structure - Main - - N/A
Vickery ES - Playground - Main 20 2003 15 15 15 Cracks on ladder and walkway, steps replaced
Vickery ES - Shade Structure - Pre-K - - N/A
Vickery ES - Playground - Pre-K - - N/A
Vickery ES - Perf Arts - Curtains 20 2003 15 20 18
Vickery ES - Perf Arts - Stage Lghtng/panel 25 2003 32 35 34
Vickery ES - Flooring - Classrooms - Carpet 15 2003 -13 0 -7 CarpetVickery ES - Flooring - Classrooms - VCT 20 2003 15 0 8 VCT
Vickery ES - Flooring - Classrooms - 2019 Addition - VCT 20 2019 95 95 95VCT
Vickery ES - Flooring - Corridors 20 2003 15 20 18 VCTVickery ES - Flooring - Library 15 2003 -13 0 -7 Carpet: 40%, VCT: 60%Vickery ES - Flooring - Offices 15 2003 -13 0 -7 Carpet / VCT
Vickery ES - Flooring - Cafeteria 20 2013 65 65 65 VCTVickery ES - Flooring - Kitchen 50 2003 66 45 56 Terrazzo
Vickery ES - Flooring - Gym 20 2013 65 65 65 VCTVickery ES - Doors 20 2003 15 20 18 Golden Oak
Vickery ES - Door Hardware 20 2003 15 20 18
Vickery ES - Casework (Built-Ins) 20 2003 15 20 18 light grey/laminateVickery ES - Restrooms - Faculty 20 2003 15 15 15 Ceramic tile floor, walls.Vickery ES - Restrooms - Student 20 2003 15 20 18 Ceramic tile floor, walls. Plastic partitions
Vickery ES - Restrooms - 2019 Addition 20 2019 95 95 95
Vickery ES - Marquee 30 2003 43 45 44
Vickery ES - Paving - Parking Lots 50 2003 66 65 66 ConcreteVickery ES - Paving - Sidewalks 40 2003 58 60 59 Concrete
Vickery ES - Exterior Lighting 20 2015 75 80 78 LEDVickery ES - Paint - Commons 15 2003 -13 30 8 Maintained & Painted as needed 2017
Vickery ES - Paint - Cafeteria 15 2003 -13 30 8 Maintained & Painted as needed 2017
Vickery ES - Paint - Library 15 2016 73 75 74 Maintained & Painted as needed 2017
Vickery ES - Paint - Gyms 20 2003 15 30 23 Painted Lower walls 2017Vickery ES - Paint - Exterior 20 2003 15 35 25
Vickery ES - Paint - Hallways 20 2003 15 35 25 P-LAM, CMU, drywall; Touched up 2017
Vickery ES8/5/2020
Year Built / Age 1998 / 22 Assessment Scale:Campus Square Footage 86,778 100 = New or Newly Replaced
Current Year 2020 0 = End of Life Cycle
Wellington ES
LIFE
CYC
LE -
YEAR
SLA
ST R
EPLA
CED
% L
IFE
REM
AINI
NGVI
SUAL
EVA
LUAT
ION
WOR
K OR
DER
HIST
ORY
TOTA
L AS
SESS
MEN
T
Type of Material / Notes - Items highlighted Orange are 2017 Bond
FACILITY AGE RATING 50 1998 56Wellington ES - HVAC - Original 20 1998 -10 5 5% -2 RTU
Wellington ES - HVAC - 2005 Addition 20 2005 25 30 5% 29 RTUWellington ES - HVAC - Controls 20 1998 -10 5 -3 1998 & 2005 Controls = I/net
Wellington ES - Ceiling and Lights - Original 20 1998 -10 5 -3
Wellington ES - Ceiling and Lights - 2005 Addition 20 2005 25 30 28
Wellington ES - Roof - Flat - Original 20 1998 -10 0 -22% -6
Wellington ES - Roof - Flat - 2005 Addition 20 2005 25 30 -22% 21
Wellington ES - Electrical Switchgear 30 1998 27 30 -4% 27
Wellington ES - Fire Safety - Fire Alarm 20 1998 -10 0 -22% -6 Edwards EST 2 - Limited Parts Wellington ES - Fire Safety - Sprinkler System 50 1998 56 58 2% 58
Wellington ES - Food Service Boilers 20 1998 -10 0 -5 Tank 2001Wellington ES - Food Service Freezers 20 1998 -10 5 -3
Wellington ES - Lightning Detection 15 2009 27 25 26 Siren;Controls @ FMHSWellington ES - Generator - -
Wellington ES - Shade Structure - Main 20 2009 45 45 45
Wellington ES - Playground - Main 20 1998 -10 0 -5 Peeling paint; platforms wearing out; Miracle
Wellington ES - Shade Structure - Pre-K - -N/A
Wellington ES - Playground - Pre-K 20 2006 30 30 30 Little TikesWellington ES - Perf Arts - Curtains 20 1998 -10 0 -5
Wellington ES - Perf Arts - Stage Lghtng/panel 25 1998 12 5 9
Wellington ES - Flooring - Classrooms - Carpet 15 2005 0 10 5 Carpet Wellington ES - Flooring - Classrooms - VCT 20 2009 45 45 45 VCT
Wellington ES - Flooring - Corridors 20 2006 30 35 33 VCTWellington ES - Flooring - Library 15 1998 -47 0 -23 CarpetWellington ES - Flooring - Offices 20 2008 40 45 43 VCT/ a few with Carpet
Wellington ES - Flooring - Cafeteria 20 1998 -10 0 -5 VCTWellington ES - Flooring - Kitchen 50 1998 56 55 56 Terrazzo
Wellington ES - Flooring - Gym 20 1998 -10 0 -5 VCTWellington ES - Doors 20 1998 -10 0 -5
Wellington ES - Door Hardware 20 1998 -10 0 -5
Wellington ES - Casework (Built-Ins) 20 1998 -10 0 -5 GreenWellington ES - Restrooms - Faculty 20 1998 -10 0 -5 Ceramic floorsWellington ES - Restrooms - Student 20 1998 -10 0 -5 Ceramic floors, partitions: 2011
Wellington ES - Restrooms - 2005 Addition 20 2005 25 25 25
Wellington ES - Marquee 30 1998 27 30 28 Needs workWellington ES - Paving - Parking Lots 50 1998 56 58 57 Concrete
Wellington ES - Paving - Sidewalks 40 1998 45 50 48 ConcreteWellington ES - Exterior Lighting 20 1998 -10 0 -5
Wellington ES - Paint - Commons 15 2019 93 93 93
Wellington ES - Paint - Cafeteria 15 1998 -47 20 -13
Wellington ES - Paint - Library 15 1998 -47 15 -16
Wellington ES - Paint - Gyms 20 1998 -10 20 5 Lower walls painted 2019Wellington ES - Paint - Exterior 20 2017 85 85 85
Wellington ES - Paint - Hallways 20 1998 -10 20 5 P-Lam, Drywall, some CMU
Wellington ES8/5/2020
ASSESSMENT SUMMARYMIDDLE SCHOOLS
Current Year 2020
ARBO
R CR
EEK
BRIA
RHIL
L
CREE
K VA
LLEY
DELA
Y
DOW
NING
DURH
AM
FORE
STW
OOD
GRIF
FIN
HEDR
ICK
HUFF
INES
KILL
IAN
LAKE
VIEW
LAM
AR
MCK
AMY
SHAD
OW R
IDGE
YEAR BUILT 1994 1995 2001 1977 2002 2002 1994 2015 2020 1997 2007 1989 1987 1997 2005
Age 26 25 19 43 18 18 26 5 0 23 13 31 33 23 15Foundation - - - - - - - - - - - - - - -
HVAC - Original 60 82 8 62 15 12 62 86 - 86 36 37 49 70 16
HVAC - Additions 38 49 44 - - 42 47 - - - - 41 - 38 -
HVAC - Controls 68 70 8 55 13 13 58 78 - 78 38 38 48 78 93
Roof - Orignial 34 93 0 93 18 11 59 92 - 79 - 35 7 83 22
Roof - Shingled or Standing Seam - 94 - - 43 36 66 - - 86 57 83 - 83 34
Roof - Additions 21 93 0 - 0 37 56 - - - - 38 - 45 -
Roof - Additions 0 0 - - - - 46 - - - - - - - -
Roof - Additions - - - - - - - - - - - - - - -
Roof - Additions - - - - - - - - - - - - - - -
Electrical Panels 13 17 43 74 44 39 77 86 - 25 64 -2 -6 17 52
Elevators 6 11 25 71 33 31 3 95 - 12 52 15 - 12 42
Fire Safety - Fire Alarm 48 21 8 21 14 14 22 84 - 79 42 10 17 38 28
Fire Safety - Sprinkler System 56 37 54 94 58 64 25 100 - 32 86 45 39 57 67
Food Service Boilers 85 20 85 45 0 40 55 78 - 88 38 58 93 45 25
Food Service Freezers 70 73 8 53 13 15 33 78 - 78 38 38 48 78 28
Lightning Detection 26 26 26 26 26 26 26 26 - 26 26 26 26 26 -
Generator 81 89 - - - - 76 89 - 89 69 - 14 89 64
Lift Station - - - 53 - - - - - - - - - 75 -
Flooring - Classroom - Carpet - - 88 - 88 88 - - - - - 98 -3 - -
Flooring - Classroom - VCT / LVT 65 78 10 55 23 18 58 58 - 78 38 - -3 78 28
Flooring - Corridors 65 70 15 55 13 18 58 58 - 50 38 23 58 78 28
Flooring - Library 68 78 88 39 68 88 43 43 - 78 19 98 73 78 5
Flooring - Offices 65 78 88 37 83 65 43 78 - 78 17 100 8 78 5
Flooring - Cafeteria 65 75 8 55 88 18 58 43 - 78 38 68 60 78 28
Flooring - Kitchen 49 45 51 78 65 65 44 90 - 55 75 39 5 45 68
Flooring - Band 68 78 88 37 88 83 40 43 - 78 14 98 63 78 5
Flooring - Fine Art Additions 0 0 - - 0 - 23 - - - - - - - -
Flooring - Choir 68 78 88 55 88 88 43 43 - 78 17 98 63 78 5
Flooring - Orchestra 68 78 88 37 88 88 40 43 - 78 17 98 63 78 0
Doors 68 78 8 55 13 40 -10 -10 - 78 40 -28 -33 78 28
Door Hardware 68 78 8 55 15 15 -8 -8 - 78 40 -28 -33 78 28
Casework (Built Ins) 10 78 8 55 18 - 58 58 - 78 40 -28 -33 75 28
Restrooms - Faculty 68 78 10 53 13 13 58 78 - 78 40 93 45 78 30
Restrooms - Student 68 78 10 53 10 13 50 78 - 78 43 93 45 78 30
Restrooms - Addition - - - - - - 55 - - - - - - - -
Marquee 83 16 23 66 35 35 15 71 - 94 32 88 -5 19 50
Paving - Parking Lots 52 53 64 80 65 65 52 90 - 55 75 54 35 55 65
Paving - Parking - Asphalt Overlay - - - -13 - - - - - - - 20 - - -
Paving - Sidewalks 48 44 41 11 58 57 40 89 - 44 69 26 21 44 54
Exterior Lighting 65 78 10 53 10 13 93 78 - 78 38 40 100 78 28
Paint - Commons 59 71 71 93 92 93 14 71 - 68 22 77 33 71 10
Paint - Cafeteria 62 71 71 93 92 97 43 71 - 68 19 77 33 71 13
Paint - Gyms 70 78 70 53 68 98 53 78 - 78 38 83 18 78 28
Paint - Exterior 70 78 80 53 93 93 93 78 - 78 38 38 15 78 28
Paint - Hallways 68 78 83 60 13 98 55 80 - 78 38 93 80 78 28
Sports and Fine Arts ACMS BMS CVMS DMS DWMS DRMS FWMS GMS HMS HFMS KMS LVMS LMS MMS SRMS
Perf Arts - Curtains - - - 50 - - - 78 - - 38 - 83 - 30
Perf Arts - Cafetorium Lighting 74 78 20 60 24 24 65 83 - 83 49 -7 94 89 45
Asphalt Track 70 25 5 50 13 10 20 78 - 0 35 0 40 0 28
Field Lights - - - - - - - 84 - - - - - 45 53
Bleachers - Exterior - - - - 48 - - 89 - - - - - - 64
Bleachers - Interior 14 21 38 68 43 40 18 84 - 24 58 1 63 24 50
Gym Main - Flooring 38 39 54 50 55 57 35 89 - 93 69 24 19 41 64
Gym Aux - Flooring 95 39 54 50 55 57 49 89 - 44 69 24 19 41 64
Athletic Lockers 38 44 54 75 45 50 79 91 - 46 71 26 21 46 64
Athletic Benches 70 78 3 55 5 5 60 83 - 80 40 -10 -15 78 33
Athletic Partitions 68 78 5 60 5 5 63 80 - 78 43 70 48 80 33
Weight Room Floor 43 45 43 - - 43 48 80 - - - - - 43 -
DETACHED WEIGHT ROOMS ACMS BMS CVMS DMS DWMS DRMS FWMS GMS HMS HFMS KMS LVMS LMS MMS SRMS
HVAC - - - 45 43 - - - - 43 43 43 40 - 43
Roof - Flat - - - 94 60 - - - - 60 63 63 60 - 60
Flooring - - - 43 43 - - - - 43 43 43 43 - 43
MIDDLE SUMMARY8/5/2020
Year Built / Age 1994 / 26 Assessment Scale:Campus Square Footage 121,430 100 = New or Newly Replaced
Current Year 2020 0 = End of Life Cycle
Arbor Creek MS
LIFE
CYC
LE -
YEAR
SLA
ST R
EPLA
CED
% L
IFE
REM
AINI
NGVI
SUAL
EVA
LUAT
ION
WOR
K OR
DER
HIST
ORY
TOTA
L AS
SESS
MEN
T
Type of Material / Notes
FACILITY AGE RATING 50 1994 48Arbor Creek MS - HVAC - Original 20 2013 65 70 -12% 60 RTU
Arbor Creek MS - HVAC - 2008 Addition 20 2008 40 45 -12% 38 RTU (Weight Rm)Arbor Creek MS - HVAC - 2020 Fine Art Addition 20 2020 0 In Progress
Arbor Creek MS - HVAC - Controls 20 2013 65 70 68 Controls = AlertonArbor Creek MS - Ceiling and Lights - Original 20 2013 65 70 68
Arbor Creek MS - Ceiling and Lights - 2008 Addition 20 2008 40 45 43 Weight Rm
Arbor Creek MS - Ceiling and Lights - 2020 Fine Arts Addition 20 2020 0 In ProgressArbor Creek MS - Roof - Flat 20 2013 65 70 -50% 34
Arbor Creek MS - Roof - Flat - 2008 Addition 20 2008 40 45 -50% 21
Arbor Creek MS - Roof - Flat - 2020 Fine Arts Addition 20 2020 0 In ProgressArbor Creek MS - Electrical Switchgear 30 1994 13 15 -8% 13
Arbor Creek MS - Elevator 25 1994 -4 15 -7% 6 DoverArbor Creek MS - Fire Safety - Fire Alarm 20 2013 65 65 -27% 48 Edwards EST 2 - Limited Parts
Arbor Creek MS - Fire Safety - Sprinkler System 50 1994 48 50 14% 56
Arbor Creek MS - Food Service Boilers 20 2017 85 85 85
Arbor Creek MS - Food Service Freezers 20 2013 65 75 70
Arbor Creek MS - Lightning Detection 15 2009 27 25 26 Siren; Controls @ HHSArbor Creek MS - Generator 40 2013 83 80 81 Generac - Diesel
Arbor Creek MS - Flooring - Classroom 20 2013 65 65 65 LVTArbor Creek MS - Flooring - Corridors 20 2013 65 65 65 LVT
Arbor Creek MS - Flooring - Library 20 2013 65 70 68 LVTArbor Creek MS - Flooring - Offices 20 2013 65 65 65 LVT
Arbor Creek MS - Flooring - Cafeteria 20 2013 65 65 65 LVTArbor Creek MS - Flooring - Kitchen 50 1994 48 50 49 Terrazzo - small cracks
Arbor Creek MS - Flooring - Band 20 2013 65 70 68 LVTArbor Creek MS - Flooring - Choir 20 2013 65 70 68 LVT
Arbor Creek MS - Flooring - Orchestra 20 2013 65 70 68 LVTArbor Creek MS - Flooring - 2020 Fine Art Addition 20 2020 In Progress
Arbor Creek MS - Doors 20 2013 65 70 68 Dark MahonganyArbor Creek MS - Door Hardware 20 2013 65 70 68
Arbor Creek MS - Casework (Built-Ins) 20 1994 -30 50 10 Art, Science & Office 2013Arbor Creek MS - Restrooms - Faculty 20 2013 65 70 68
Arbor Creek MS - Restrooms - Student 20 2013 65 70 68 Solid plastic partitionsArbor Creek MS - Marquee 15 2017 80 85 83 LED
Arbor Creek MS - Paving - Parking Lots 50 1994 48 55 52
Arbor Creek MS - Paving - Sidewalks 40 1994 35 60 48
Arbor Creek MS - Exterior Lighting 20 2013 65 65 65
Arbor Creek MS - Paint - Commons 15 2013 53 65 59 Maintained paint - touched up 2018Arbor Creek MS - Paint - Cafeteria 15 2013 53 70 62 Lower walls painted 2018
Arbor Creek MS - Paint - Gyms 20 2013 65 75 70 Lower walls painted 2018Arbor Creek MS - Paint - Exterior 20 2013 65 75 70
Arbor Creek MS - Paint - Hallways 20 2013 65 70 68 Painted as needed 2018
Sports and Fine ArtsArbor Creek MS - Perf Arts - Curtains - -
Arbor Creek MS - Perf Arts - Cafetorium Lighting 25 2013 72 75 74
Arbor Creek MS - Asphalt Track 20 2014 70 70 70 partial replacement on far side of track - still holding up.
Arbor Creek MS - Field Lights - - Arbor Creek MS - Bleachers - Exterior - -
Arbor Creek MS - Bleachers - Interior 30 1994 13 15 14
Arbor Creek MS - Gym Main - Flooring 40 1994 35 40 38
Arbor Creek MS - Gym Aux - Flooring 40 2018 95 95 95
Arbor Creek MS - Athletic Lockers 40 1994 35 40 38
Arbor Creek MS - Athletic Benches 20 2013 65 75 70 ConcreteArbor Creek MS - Athletic Partitions 20 2013 65 70 68 Solid Plastic
Arbor Creek MS - Weight Room Floor 20 2008 40 45 43 Rubber
Arbor Creek MS8/5/2020
Year Built / Age 1995 / 25 Assessment Scale:Campus Square Footage 121,173 100 = New or Newly Replaced
Current Year 2020 0 = End of Life Cycle
Briarhill MS
LIFE
CYC
LE -
YEAR
SLA
ST R
EPLA
CED
% L
IFE
REM
AINI
NGVI
SUAL
EVA
LUAT
ION
WOR
K OR
DER
HIST
ORY
TOTA
L AS
SESS
MEN
T
Type of Material / Notes
FACILITY AGE RATING 50 1995 50Briarhill MS - HVAC- Original 20 2014 70 80 9% 82 RTU & VRF
Briarhill MS - HVAC - 2008 Addition 20 2008 40 50 9% 49 Weight RoomBriarhill MS - HVAC - 2020 Fine Arts Addition 20 2020 0 In Progress
Briarhill MS - HVAC - Controls 20 2014 70 70 70 Controls = AlertonBriarhill MS - Ceiling and Lights - Original 20 2014 70 80 75 LED
Briarhill MS - Ceiling and Lights - 2008 Addition 20 2008 40 50 45 T-5Briarhill MS - Ceiling and Lights - 2020 Fine Arts Addition 20 2020 0 In Progress
Briarhill MS - Roof - Flat 20 2018 90 95 93 2017 hail damage insurance replacement
Briarhill MS - Roof - Standing Seam 30 2018 93 95 94 2017 hail damage insurance replacement
Briarhill MS - Roof - 2008 Addition 20 2018 90 95 93 Weight Room; 2017 hail damage insurance replacement
Briarhill MS - Roof - 2020 Fine Arts Addition 20 2020 0 In ProgressBriarhill MS - Electrical Switchgear 30 1995 17 20 -9% 17
Briarhill MS - Elevator 25 1995 0 20 11% 11 Dover
Briarhill MS - Fire Safety - Fire Alarm 20 2004 20 30 -16% 21 Edwards EST 2 - Limited Parts; New smoke detectors 2014
Briarhill MS - Fire Safety - Sprinkler System 50 1995 50 50 -27% 37
Briarhill MS - Food Service Boilers 20 2004 20 20 20 Tank and Heater 2004Briarhill MS - Food Service Freezers 20 2014 70 75 73
Briarhill MS - Lightning Detection 15 2009 27 25 26 Siren; Controls @ MHSBriarhill MS - Generator 40 2015 88 90 89 Cummins - Diesel
Briarhill MS - Flooring - Classrooms 20 2015 75 80 78 VCTBriarhill MS - Flooring - Corridors 20 2015 75 65 70 VCT
Briarhill MS - Flooring - Library 20 2015 75 80 78 VCTBriarhill MS - Flooring - Offices 20 2015 75 80 78 VCT
Briarhill MS - Flooring - Cafeteria 20 2015 75 75 75 VCTBriarhill MS - Flooring - Kitchen 50 1995 50 40 45 Terrazzo
Briarhill MS - Flooring - Band 20 2015 75 80 78 VCTBriarhill MS - Flooring - Choir 20 2015 75 80 78 VCT
Briarhill MS - Flooring - Orchestra 20 2015 75 80 78 VCTBriarhill MS - Flooring - 2020 Fine Art Addition 20 2020 0 In Progress
Briarhill MS - Doors 20 2015 75 80 78
Briarhill MS - Door Hardware 20 2015 75 80 78 Need to look at replacing exteriorBriarhill MS - Casework (Built-Ins) 20 2015 75 80 78
Briarhill MS - Restrooms - Faculty 20 2015 75 80 78
Briarhill MS - Restrooms - Student 20 2015 75 80 78
Briarhill MS - Marquee 30 1995 17 15 16
Briarhill MS - Paving - Parking Lots 50 1995 50 55 53 Some breakups and cracking.Briarhill MS - Paving - Sidewalks 40 1995 38 50 44 Front entry walkway cracking
Briarhill MS - Exterior Lighting 20 2015 75 80 78 LEDBriarhill MS - Paint - Commons 15 2015 67 75 71 Admin offices painted Summer 2017 - 2018Briarhill MS - Paint - Cafeteria 15 2015 67 75 71 Lower walls painted 2018
Briarhill MS - Paint - Gyms 20 2015 75 80 78 Lower walls painted 2019Briarhill MS - Paint - Exterior 20 2015 75 80 78 Light poles, metal doors & posts painted 2018
Briarhill MS - Paint - Hallways 20 2015 75 80 78
Sports and Fine ArtsBriarhill MS - Perf Arts - Curtains - -
Briarhill MS - Perf Arts - Cafetorium Lighting 25 2014 76 80 78 LED
Briarhill MS - Asphalt Track 20 2005 25 25 25 Cracked edge / underside / east drain:deep hole - sealed in 2019; heavy use
Briarhill MS - Field Lights - -
Briarhill MS - Bleachers - Exterior - -
Briarhill MS - Bleachers - Interior 30 1995 17 25 21
Briarhill MS - Gym Main - Flooring 40 1995 38 40 39
Briarhill MS - Gym Aux - Flooring 40 1995 38 40 39
Briarhill MS - Athletic Lockers 40 1995 38 50 44 Hardware in bad shapeBriarhill MS - Athletic Benches 20 2015 75 80 78
Briarhill MS - Athletic Partitions 20 2015 75 80 78
Briarhill MS - Weight Room Floor 20 2008 40 50 45 Rubber
Briarhill MS8/5/2020
Year Built / Age 2001 / 19 Assessment Scale:Campus Square Footage 125,006 100 = New or Newly Replaced
Current Year 2020 0 = End of Life Cycle
Creek Valley MS
LIFE
CYC
LE -
YEAR
SLA
ST R
EPLA
CED
% L
IFE
REM
AINI
NGVI
SUAL
EVA
LUAT
ION
WOR
K OR
DER
HIST
ORY
TOTA
L AS
SESS
MEN
T
Type of Material / Notes Items highlighted Orange are 2017 Bond
FACILITY AGE RATING 50 2001 62Creek Valley MS - HVAC 20 2001 5 10 3% 8 RTU
Creek Valley MS - HVAC - 2008 Addition 20 2008 40 45 3% 44 Weight RmCreek Valley MS - HVAC - Controls 20 2001 5 10 8 Controls = I/net
Creek Valley MS - Ceiling and Lights 20 2001 5 10 8
Creek Valley MS - Ceiling and Lights - 2008 Addition 20 2008 40 45 43 Weight RmCreek Valley MS - Roof - Flat 20 2001 0 4-Ply Built-up, standing seam; In Progress 6/2018 Storm
Damage
Creek Valley MS - Roof - 2008 Addition 20 2008 0 In Progress 6/2018 Storm DamageCreek Valley MS - Electrical Switchgear 30 2001 37 40 12% 43
Creek Valley MS - Elevator 25 2001 24 30 -7% 25 DoverCreek Valley MS - Fire Safety - Fire Alarm 20 2001 5 10 9% 8 Edwards EST 2 - Limited Parts
Creek Valley MS - Fire Safety - Sprinkler System 50 2001 62 62 -13% 54
Creek Valley MS - Food Service Boilers 20 2017 85 85 85
Creek Valley MS - Food Service Freezers 20 2001 5 10 8
Creek Valley MS - Lightning Detection 15 2009 27 25 26 Siren & ControlsCreek Valley MS - Generator - -
Creek Valley MS - Flooring - Classroom Carpet 20 2017 85 90 88 VCTCreek Valley MS - Flooring - Classroom VCT 20 2001 5 15 10 VCT
Creek Valley MS - Flooring - Corridors 20 2001 5 25 15 VCT - good shapeCreek Valley MS - Flooring - Library 20 2017 85 90 88 LVTCreek Valley MS - Flooring - Offices 20 2017 85 90 88 LVT
Creek Valley MS - Flooring - Cafeteria 20 2001 5 10 8 VCT - joints showingCreek Valley MS - Flooring - Kitchen 50 2001 62 40 51 Terrazzo
Creek Valley MS - Flooring - Band 20 2017 85 90 88 VCTCreek Valley MS - Flooring - Choir 20 2017 85 90 88 VCT
Creek Valley MS - Flooring - Orchestra 20 2017 85 90 88 VCTCreek Valley MS - Doors 20 2001 5 10 8 Golden Oak
Creek Valley MS - Door Hardware 20 2001 5 10 8
Creek Valley MS - Casework (Built-Ins) 20 2001 5 10 8
Creek Valley MS - Restrooms - Faculty 20 2001 5 15 10
Creek Valley MS - Restrooms - Student 20 2001 5 15 10 Ceramic Tile floor, cmu painted walls, P-Lam partitionsCreek Valley MS - Marquee 30 2001 37 10 23 Brick
Creek Valley MS - Paving - Parking Lots 50 2001 62 65 64 Concrete, some cracking @ control jointsCreek Valley MS - Paving - Sidewalks 40 2001 53 30 41 Sinkage of 3-4" at door 5.
Creek Valley MS - Exterior Lighting 20 2001 5 15 10
Creek Valley MS - Paint - Commons 15 2015 67 75 71 2017 All areas & office complexCreek Valley MS - Paint - Cafeteria 15 2015 67 75 71 Lower walls 2017
Creek Valley MS - Paint - Gyms 20 2013 65 75 70 Did not paint ceiling / stripe in 2013; Upper Gym painted Summer 2017
Creek Valley MS - Paint - Exterior 20 2016 80 80 80
Creek Valley MS - Paint - Hallways 20 2016 80 85 83 Athletic Area: 2015
Sports and Fine ArtsCreek Valley MS - Perf Arts - Curtains - -
Creek Valley MS - Perf Arts - Cafetorium Lighting 25 2001 24 15 20
Creek Valley MS - Asphalt Track 20 2001 5 5 5 CracksCreek Valley MS - Field Lights - -
Creek Valley MS - Bleachers - Exterior - -
Creek Valley MS - Bleachers - Interior 30 2001 37 40 38
Creek Valley MS - Gym Main - Flooring 40 2001 53 55 54 Colors not matched; Last sanding was Aug. 2010
Creek Valley MS - Gym Aux - Flooring 40 2001 53 55 54 Need to check last sanding.Creek Valley MS - Athletic Lockers 40 2001 53 55 54
Creek Valley MS - Athletic Benches 20 2001 5 0 3 Varsity:epoxy over wood; Need to plan soonCreek Valley MS - Athletic Partitions 20 2001 5 5 5 P-Lam; Water Damage
Creek Valley MS - Weight Room Floor 20 2008 40 45 43 Rubber
Creek Valley MS8/5/2020
Year Built / Age 1977 / 43 Assessment Scale:Campus Square Footage 179,733 100 = New or Newly Replaced
Current Year 2020 0 = End of Life Cycle
DeLay MS
LIFE
CYC
LE -
YEAR
SLA
ST R
EPLA
CED
% L
IFE
REM
AINI
NGVI
SUAL
EVA
LUAT
ION
WOR
K OR
DER
HIST
ORY
TOTA
L AS
SESS
MEN
T
Type of Material / Notes
FACILITY AGE RATING 50 1977 14DeLay MS - HVAC 20 2010 50 60 13% 62 RTU
DeLay MS - HVAC - Control 20 2010 50 60 55 Controls = Alerton (control)/Automated Logic (hardware)
DeLay MS - Ceiling and Lights 20 2010 50 60 55
DeLay MS - Roof - Flat 20 2018 90 95 93 2017 hail damage insurance replacement
DeLay MS - Electrical Switchgear 30 2010 67 70 8% 74
DeLay MS - Elevator #1 (Front) 25 2010 60 65 13% 71 SchindlerDeLay MS - Elevator #2 (Back) 25 2010 60 65 20% 75 Schindler
DeLay MS - Fire Safety - Fire Alarm 20 2010 50 35 -50% 21 Harrington DeLay MS - Fire Safety - Sprinkler System 50 2010 80 80 18% 94
DeLay MS - Food Service Boilers 20 2009 45 45 45
DeLay MS - Food Service Freezers 20 2010 50 55 53
DeLay MS - Lightning Detection 15 2009 27 25 26 Siren & ControlsDeLay MS - Generator - -
DeLay MS - Lift Station 20 2010 50 55 53
DeLay MS - Flooring - Classroom VCT 20 2010 50 60 55 VCTDeLay MS - Flooring - Corridors 20 2010 50 60 55 VCT - Hallway lockers are showing wear.
DeLay MS - Flooring - Library 15 2010 33 45 39 CarpetDeLay MS - Flooring - Offices 15 2010 33 40 37 Carpet
DeLay MS - Flooring - Cafeteria 20 2010 50 60 55 VCT; Campus reports Café is too small, review size in future Bond
DeLay MS - Flooring - Kitchen 50 2010 80 75 78 TerrazzoDeLay MS - Flooring - Band 15 2010 33 40 37 CarpetDeLay MS - Flooring - Choir 20 2010 50 60 55 VCT
DeLay MS - Flooring - Orchestra 15 2010 33 40 37 CarpetDeLay MS - Doors 20 2010 50 60 55 Mahogany
DeLay MS - Door Hardware 20 2010 50 60 55
DeLay MS - Casework (Built-Ins) 20 2010 50 60 55
DeLay MS - Restrooms - Faculty 20 2010 50 55 53
DeLay MS - Restrooms - Student 20 2010 50 55 53 CMU partitions, ceramic tile floorDeLay MS - Marquee 30 2010 67 65 66
DeLay MS - Paving - Parking Lots 50 2010 80 80 80
DeLay MS - Paving - Asphalt Parking Lots 20 1995 -25 0 -13 Partial asphalt - Repairs neededDeLay MS - Paving - Sidewalks 40 1977 -8 30 11 Repairs needed
DeLay MS - Exterior Lighting 20 2010 50 55 53
DeLay MS - Paint - Commons 15 2019 93 93 93
DeLay MS - Paint - Cafeteria 15 2019 93 93 93
DeLay MS - Paint - Gyms 20 2010 50 55 53 Lower walls 2017 & 2018DeLay MS - Paint - Exterior 20 2010 50 55 53
DeLay MS - Paint - Hallways 20 2010 50 70 60 2018 Touch up as needed
Sports and Fine ArtsDeLay MS - Perf Arts - Curtains 20 2010 50 50 50
DeLay MS - Perf Arts - Cafetorium Lighting 25 2010 60 60 60
DeLay MS - Asphalt Track 20 2010 50 50 50 Cracks concrete curb both sides.DeLay MS - Field Lights - -
DeLay MS - Bleachers - Exterior - -
DeLay MS - Bleachers - Interior 30 2010 67 70 68
DeLay MS - Gym Main - Flooring 40 2000 50 50 50
DeLay MS - Gym Aux - Flooring 40 2000 50 50 50
DeLay MS - Athletic Lockers 40 2010 75 75 75
DeLay MS - Athletic Benches 20 2010 50 60 55 ConcreteDeLay MS - Athletic Partitions 20 2010 50 70 60 CMU
WEIGHT ROOM 2010DeLay MS - Weight Room HVAC 20 2008 40 50 45
DeLay MS - Weight Room Roof - Metal 30 2018 93 95 94 2017 hail damage insurance replacementDeLay MS - Weight Room Flooring 20 2008 40 45 43 Rubber; interior painted 2019
DeLay MS8/5/2020
Year Built / Age 2002 / 18 Assessment Scale:Campus Square Footage 125,310 100 = New or Newly Replaced
Current Year 2020 0 = End of Life Cycle
Downing MS
LIFE
CYC
LE -
YEAR
SLA
ST R
EPLA
CED
% L
IFE
REM
AINI
NGVI
SUAL
EVA
LUAT
ION
WOR
K OR
DER
HIST
ORY
TOTA
L AS
SESS
MEN
T
Type of Material / Notes
FACILITY AGE RATING 50 2002 64Downing MS - HVAC 20 2002 10 20 -1% 15 RTU
Downing MS - HVAC - 2020 Fine Art Addition 20 2020 0 In ProgressDowning MS - HVAC - Controls 20 2002 10 15 13 Controls = I/net
Downing MS - Ceiling and Lights 20 2002 10 20 15 T-8Downing MS - Ceiling and Lights - 2020 Fine Art
Addition 20 2020 0In Progress
Downing MS - Roof - Flat 20 2002 10 25 1% 18
Downing MS - Roof - Flat - 2020 Fine Art Addition 21 2020 0 In ProgressDowning MS - Roof - Standing Seam 30 2002 40 45 1% 43
Downing MS - Electrical Switchgear 30 2002 40 43 6% 44 SiemensDowning MS - Elevator 25 2002 28 30 14% 33 Thyssen Krupp
Downing MS - Fire Safety - Fire Alarm 20 2002 10 15 12% 14 Edwards EST 2 - Limited Parts Downing MS - Fire Safety - Sprinkler System 50 2002 64 65 -10% 58
Downing MS - Food Service Boilers 20 1999 -5 5 0 Tank 2005Downing MS - Food Service Freezers 20 2002 10 15 13
Downing MS - Lightning Detection 15 2009 27 25 26 Siren & ControlsDowning MS - Generator - -
Downing MS - Flooring - Classrooms Carpet 20 2017 85 90 88 VCTDowning MS - Flooring - Classrooms VCT 20 2003 15 30 23 VCT
Downing MS - Flooring - Corridors 20 2002 10 15 13 VCTDowning MS - Flooring - Library 20 2013 65 70 68 LVTDowning MS - Flooring - Offices 15 2017 80 85 83 Carpet/VCT front
Downing MS - Flooring - Cafeteria 20 2017 85 90 88 VCTDowning MS - Flooring - Kitchen 50 2002 64 66 65 Terrazzo - Good Shape
Downing MS - Flooring - Band 20 2017 85 90 88 VCTDowning MS - Flooring - Choir 20 2017 85 90 88 VCT
Downing MS - Flooring - Orchestra 20 2017 85 90 88 VCTDowning MS - Flooring - 2020 Fine Art Addition 20 2020 0 In Progress
Downing MS - Doors 20 2002 10 30 20 Medium BrownDowning MS - Door Hardware 20 2002 10 30 20
Downing MS - Casework (Built-Ins) 20 2002 10 30 20 Maroon Base/Tan CounterDowning MS - Restrooms - Faculty 20 2002 10 15 13
Downing MS - Restrooms - Student 20 2002 10 10 10 P-Lam partitionsDowning MS - Marquee 30 2002 40 30 35
Downing MS - Paving - Parking Lots 50 2002 64 66 65 Good - Minimal HeavingDowning MS - Paving - Sidewalks 40 2002 55 60 58
Downing MS - Exterior Lighting 20 2002 10 10 10 Orig lights/white, good shapeDowning MS - Paint - Commons 15 2019 93 90 92
Downing MS - Paint - Cafeteria 15 2019 93 90 92
Downing MS - Paint - Gyms 20 2013 65 70 68
Downing MS - Paint - Exterior 20 2018 90 95 93 Summer 2018 Paint exterior plaster wallsDowning MS - Paint - Hallways 20 2002 10 15 13 Needs updated color
Sports and Fine ArtsDowning MS - Perf Arts - Curtains - -
Downing MS - Perf Arts - Cafetorium Lighting 25 2002 28 20 24 6 Fixtures
Downing MS - Asphalt Track 20 2002 10 15 13 Original, good shape, few cracks; need to seal cracks
Downing MS - Field Lights - -
Downing MS - Bleachers - Exterior 40 2002 55 40 48 1 sets, portable, 3-tier; fair conditionDowning MS - Bleachers - Interior 30 2002 40 45 43 Plastic original
Downing MS - Gym Main - Flooring 40 2002 55 55 55
Downing MS - Gym Aux - Flooring 40 2002 55 55 55
Downing MS - Athletic Lockers 40 2002 55 35 45 Need PaintDowning MS - Athletic Benches 20 2002 10 0 5 Epoxy topsDowning MS - Athletic Partitions 20 2002 10 0 5 P-Lam
WEIGHT ROOM 2008Downing MS - Weight Room HVAC 20 2008 40 45 43
Downing MS - Weight Room Roof - Metal 30 2008 60 60 60
Downing MS - Weight Room Flooring 20 2008 40 45 43 Rubber
Downing MS8/5/2020
Year Built / Age 2002 / 18 Assessment Scale:Campus Square Footage 125,040 100 = New or Newly Replaced
Current Year 2020 0 = End of Life Cycle
Durham MS
LIFE
CYC
LE -
YEAR
SLA
ST R
EPLA
CED
% L
IFE
REM
AINI
NGVI
SUAL
EVA
LUAT
ION
WOR
K OR
DER
HIST
ORY
TOTA
L AS
SESS
MEN
T
Type of Material / Notes Items highlighted Orange are 2017 Bond
FACILITY AGE RATING 50 2002 64Durham MS - HVAC - Original 20 2002 10 15 -1% 12 RTU
Durham MS - HVAC - 2008 Addition 20 2008 40 45 -1% 42
Durham MS - HVAC - Controls 20 2002 10 15 13 Controls = I/net
Durham MS - Ceiling and Lights - Original 20 2002 10 15 13
Durham MS - Ceiling and Lights - 2008 Addition 20 2008 40 45 43
Durham MS - Roof - Flat 20 2002 10 15 -14% 11 4-Ply Built-up
Durham MS - Roof - Standing Seam 30 2002 40 43 -14% 36
Durham MS - Roof - Flat - 2008 Addition 20 2008 40 45 -14% 37
Durham MS - Electrical Switchgear 30 2002 40 43 -7% 39
Durham MS - Elevator 25 2002 28 35 -3% 31 Thyssen Krupp
Durham MS - Fire Safety - Fire Alarm 20 2002 10 15 10% 14 Edwards EST 2 - Limited Parts
Durham MS - Fire Safety - Sprinkler System 50 2002 64 66 -2% 64
Durham MS - Food Service Boilers 20 2008 40 40 40
Durham MS - Food Service Freezers 20 2002 10 20 15
Durham MS - Lightning Detection 15 2009 27 25 26 Siren & Controls
Durham MS - Generator - -
Durham MS - Flooring - Classrooms-Carpet 20 2017 85 90 88 VCT
Durham MS - Flooring - Classrooms-VCT 20 2002 10 25 18 VCT - C-Tile
Durham MS - Flooring - Corridors 20 2002 10 25 18 VCT; wood baseDurham MS - Flooring - Library 20 2017 85 90 88 LVT
Durham MS - Flooring - Offices 15 2014 60 70 65 Carpet - half VCT
Durham MS - Flooring - Cafeteria 20 2002 10 25 18 VCT
Durham MS - Flooring - Kitchen 50 2002 64 66 65 Terrazzo
Durham MS - Flooring - Band 20 2017 85 80 83 VCT
Durham MS - Flooring - Choir 20 2017 85 90 88 VCT
Durham MS - Flooring - Orchestra 20 2017 85 90 88 VCT
Durham MS - Doors 20 2002 10 20 15 Mediium Dark
Durham MS - Door Hardware 20 2002 10 20 15
Durham MS - Casework (Built-Ins) 20 2002 10 20 15 Grey tops and
Durham MS - Restrooms - Faculty 20 2002 10 15 13
Durham MS - Restrooms - Student 20 2002 10 15 13 Ceramic Tile floors/walls, P-Lam partitions
Durham MS - Restrooms - 2008 Addition 20 2008 40 29 35
Durham MS - Marquee 30 2002 40 30 35 Brick
Durham MS - Paving - Parking Lots 50 2002 64 66 65 Concrete
Durham MS - Paving - Sidewalks 40 2002 55 58 57 Concrete, no heaving
Durham MS - Exterior Lighting 20 2002 10 15 13
Durham MS - Paint - Commons 15 2018 87 100 93 2018 - 2019
Durham MS - Paint - Cafeteria 15 2019 93 100 97 2019
Durham MS - Paint - Gyms 20 2019 95 100 98 2019
Durham MS - Paint - Exterior 20 2018 90 95 93 Summer 2018
Durham MS - Paint - Hallways 20 2019 95 100 98 2019
Sports and Fine ArtsDurham MS - Perf Arts - Curtains - -
Durham MS - Perf Arts - Cafetorium Lighting 25 2002 28 20 24
Durham MS - Asphalt Track 20 2002 10 10 10 2008 Patching, some cracking; poor drainage
Durham MS - Field Lights - -
Durham MS - Bleachers - Exterior - -
Durham MS - Bleachers - Interior 30 2002 40 40 40
Durham MS - Gym Main - Flooring 40 2002 55 58 57
Durham MS - Gym Aux - Flooring 40 2002 55 58 57
Durham MS - Athletic Lockers 40 2002 55 45 50
Durham MS - Athletic Benches 20 2002 10 0 5 Epoxy is bad
Durham MS - Athletic Partitions 20 2002 10 0 5 P-Lam
Durham MS - Weight Room Floor 20 2008 40 45 43 Rubber
Durham MS8/5/2020
Year Built / Age 1994 / 26 Assessment Scale:Campus Square Footage 142,965 100 = New or Newly Replaced
Current Year 2020 0 = End of Life Cycle
Forestwood MS
LIFE
CYC
LE -
YEAR
SLA
ST R
EPLA
CED
% L
IFE
REMA
ININ
GVI
SUAL
EVA
LUAT
ION
WOR
K OR
DER
HIST
ORY
TOTA
L AS
SESS
MENT
Type of Material / Notes Items highlighted Orange are 2017 Bond
FACILITY AGE RATING 50 1994 48Forestwood MS - HVAC 20 2011 55 65 4% 62 RTU
Forestwood MS - HVAC - 2001 Addition 20 2011 55 55 4% 57 RTUForestwood MS - HVAC - 2008 Addition 20 2008 40 50 4% 47 Weight Room addition; RTU
Forestwood MS - HVAC - Contols 20 2011 55 60 58 Controls = AlertonForestwood MS - Ceiling and Lights 20 2011 55 60 58
Forestwood MS - Ceiling and Lights - 2008 Addition 20 2008 40 45 43
Forestwood MS - Roof - Flat 20 2011 55 60 2% 59 4 ply built upForestwood MS - Roof - Standing Seam 30 2011 70 60 2% 66
Forestwood MS - Roof - 2001 Addition 20 2011 55 55 2% 56 4 ply built upForestwood MS - Roof - 2008 Addition 20 2008 40 50 2% 46 4 ply built upForestwood MS - Electrical Switchgear 30 2011 70 70 10% 77 Square D
Forestwood MS - Elevator 25 1994 -4 10 13% 3 DoverForestwood MS - Fire Safety - Fire Alarm 20 2004 20 20 9% 22 Edwards EST 2 - Limited Parts
Forestwood MS - Fire Safety - Sprinkler System 50 1994 48 50 -50% 25
Forestwood MS - Food Service Boilers 20 2011 55 55 55 Tank 2010Forestwood MS - Food Service Freezers 20 2006 30 35 33
Forestwood MS - Lightning Detection 15 2009 27 25 26 Siren & ControlsForestwood MS - Generator 40 2011 78 75 76 Cummins - Natural Gas
Forestwood MS - Flooring - Classrooms 20 2011 55 60 58 VCTForestwood MS - Flooring - Corridors 20 2011 55 60 58 VCT
Forestwood MS - Flooring - Library 15 2011 40 45 43 CarpetForestwood MS - Flooring - Offices 15 2011 40 45 43 Carpet
Forestwood MS - Flooring - Cafeteria 20 2011 55 60 58 VCTForestwood MS - Flooring - Kitchen 50 1994 48 40 44 Terrazzo, some cracking
Forestwood MS - Flooring - Band - Original 15 2011 40 40 40 CarpetForestwood MS - Flooring - Band - 2008 15 2008 20 25 23 Carpet
Forestwood MS - Flooring - Choir 15 2011 40 45 43 CarpetForestwood MS - Flooring - Orchestra 15 2011 40 40 40 Carpet
Forestwood MS - Doors 20 1994 -30 10 -10 Gym Doors replaced 2011; Light colorForestwood MS - Door Hardware 20 1994 -30 15 -8
Forestwood MS - Casework (Built-Ins) 20 2011 55 60 58
Forestwood MS - Restrooms - Faculty 20 2011 55 60 58
Forestwood MS - Restrooms - Student 20 2011 55 45 50 Floor urinalsForestwood MS - Restrooms - 2001 Addition 20 2011 55 55 55
Forestwood MS - Marquee 30 1993 10 20 15 Repairs have been madeForestwood MS - Paving - Parking Lots 50 1994 48 55 52 Concrete
Forestwood MS - Paving - Sidewalks 40 1994 35 45 40 Back area movementForestwood MS - Exterior Lighting 20 2018 90 95 93 Wall packs: 2011; Poles LED 2018-2019
Forestwood MS - Paint - Commons 15 2007 13 15 14 Forestwood MS - Paint - Cafeteria 15 2011 40 45 43 Maintaining lower walls; needs color update
Forestwood MS - Paint - Gyms 20 2011 55 50 53
Forestwood MS - Paint - Exterior 20 2018 90 95 93New Rails 2015
Forestwood MS - Paint - Hallways 20 2011 55 55 55 2019 touch-ups
Sports and Fine ArtsForestwood MS - Perf Arts - Curtains - -
Forestwood MS - Perf Arts - Cafetorium Lighting 25 2011 64 65 65
Forestwood MS - Asphalt Track 20 2005 25 15 20 Some cracking; poor shape due trees; different than other MS Tracks
Forestwood MS - Field Lights - -
Forestwood MS - Bleachers - Exterior - -
Forestwood MS - Bleachers - Interior 30 1995 17 20 18
Forestwood MS - Gym Main - Flooring 40 1994 35 35 35
Forestwood MS - Gym Aux - Flooring 40 1999 48 50 49 Sanded 2019Forestwood MS - Athletic Lockers 40 2011 78 80 79
Forestwood MS - Athletic Benches 20 2011 55 65 60 ConcreteForestwood MS - Athletic Partitions 20 2011 55 70 63 Block and solid plastic
Forestwood MS - Weight Room Floor 20 2008 40 55 48 Rubber
Forestwood MS8/5/2020
Year Built / Age 2015 / 5 Assessment Scale:Campus Square Footage 181,298 100 = New or Newly Replaced
Current Year 2020 0 = End of Life Cycle
Griffin MS
LIFE
CYC
LE -
YEAR
SLA
ST R
EPLA
CED
% L
IFE
REM
AINI
NGVI
SUAL
EVA
LUAT
ION
WOR
K OR
DER
HIST
ORY
TOTA
L AS
SESS
MEN
T
Type of Material / Notes
FACILITY AGE RATING 50 2015 90Griffin MS - HVAC 20 2015 75 80 11% 86 RTU
Griffin MS - HVAC - Control 20 2015 75 80 78 Controls = AlertonGriffin MS - Ceiling and Lights 20 2015 75 80 78
Griffin MS - Roof - Flat 20 2015 75 80 19% 92
Griffin MS - Electrical Switchgear 30 2015 83 85 2% 86
Griffin MS - Elevator 25 2015 80 80 19% 95 Thyssen KruppGriffin MS - Fire Safety - Fire Alarm 20 2015 75 75 12% 84 Edwards EST 2 - Limited Parts
Griffin MS - Fire Safety - Sprinkler System 50 2015 90 90 17% 100
Griffin MS - Food Service Boilers 20 2015 75 80 78
Griffin MS - Food Service Freezers 20 2015 75 80 78
Griffin MS - Lightning Detection 15 2009 27 25 26 Siren & ControlsGriffin MS - Generator 40 2015 88 90 89 Kohler - Diesel
Griffin MS - Flooring - Classrooms 20 2015 75 40 58 VCT; 1st floor moisture in slab from original construction - replacement scheduled through warranty
Griffin MS - Flooring - Corridors 20 2015 75 40 58 VCT; 1st floor moisture in slab from original construction - replacement scheduled through warranty
Griffin MS - Flooring - Library 20 2015 75 10 43 VCT; 1st floor moisture in slab from original construction - replacement scheduled through warranty
Griffin MS - Flooring - Offices 20 2015 75 80 78 VCT
Griffin MS - Flooring - Cafeteria 20 2015 75 10 43 VCT; 1st floor moisture in slab from original construction - replacement scheduled through warranty
Griffin MS - Flooring - Kitchen 50 2015 90 90 90 Terrazzo
Griffin MS - Flooring - Band 20 2015 75 10 43 VCT; 1st floor moisture in slab from original construction - replacement scheduled through warranty
Griffin MS - Flooring - Choir 20 2015 75 10 43 VCT; 1st floor moisture in slab from original construction - replacement scheduled through warranty
Griffin MS - Flooring - Orchestra 20 2015 75 10 43 VCT; 1st floor moisture in slab from original construction - replacement scheduled through warranty
Griffin MS - Doors 20 2015 75 80 78 DarkGriffin MS - Door Hardware 20 2015 75 80 78
Griffin MS - Casework (Built-Ins) 20 2015 75 80 78
Griffin MS - Restrooms - Faculty 20 2015 75 80 78
Griffin MS - Restrooms - Student 20 2015 75 80 78
Griffin MS - Marquee 15 2015 67 75 71 LEDGriffin MS - Paving - Parking Lots 50 2015 90 90 90
Griffin MS - Paving - Sidewalks 40 2015 88 90 89
Griffin MS - Exterior Lighting 20 2015 75 80 78 LEDGriffin MS - Paint - Commons 15 2015 67 75 71 Door Jams throughout the building painted in 2018
Griffin MS - Paint - Cafeteria 15 2015 67 75 71
Griffin MS - Paint - Gyms 20 2015 75 80 78
Griffin MS - Paint - Exterior 20 2015 75 80 78
Griffin MS - Paint - Hallways 20 2015 75 85 80
Sports and Fine ArtsGriffin MS - Perf Arts - Curtains 20 2015 75 80 78
Griffin MS - Perf Arts - Cafetorium Lighting 25 2015 80 85 83
Griffin MS - Asphalt Track 20 2015 75 80 78 Lines repainted in 2020Griffin MS - Field Lights 30 2015 83 85 84
Griffin - Stadium Scoreboard 18 2015 72 75 74
Griffin MS - Bleachers - Exterior 40 2015 88 90 89
Griffin MS - Bleachers - Interior 30 2015 83 85 84
Griffin MS - Gym Main - Flooring 40 2015 88 90 89
Griffin MS - Gym Aux - Flooring 40 2015 88 90 89
Griffin MS - Athletic Lockers 40 2015 88 95 91
Griffin MS - Athletic Benches 20 2015 75 90 83 ConcreteGriffin MS - Athletic Partitions 20 2015 75 85 80
Griffin MS - Weight Room Floor 20 2015 75 85 80 Rubber
Griffin MS8/5/2020
Year Built / Age 2020 / 0 Assessment Scale:Campus Square Footage 175,147 100 = New or Newly Replaced
Current Year 2020 0 = End of Life Cycle
Hedrick MS
LIFE
CYC
LE -
YEAR
SLA
ST R
EPLA
CED
% L
IFE
REM
AINI
NGVI
SUAL
EVA
LUAT
ION
WOR
K OR
DER
HIST
ORY
TOTA
L AS
SESS
MEN
T
Type of Material / Notes
FACILITY AGE RATING 50 2020 100Hedrick MS - Foundation
Hedrick MS - HVAC
Hedrick MS - HVAC - Controls
Hedrick MS - Ceiling and Lights
Hedrick MS - Roof - Flat
Hedrick MS - Roof - Standing Seam
Hedrick MS - Electrical Switchgear
Hedrick MS - Fire Safety - Fire Alarm
Hedrick MS - Fire Safety - Sprinkler System
Hedrick MS - Food Service Boilers
Hedrick MS - Food Service Freezers
Hedrick MS - Lightning Detection
Hedrick MS - Generator
Hedrick MS - Flooring - Classrooms
Hedrick MS - Flooring - Corridors
Hedrick MS - Flooring - Library
Hedrick MS - Flooring - Offices
Hedrick MS - Flooring - Cafeteria
Hedrick MS - Flooring - Kitchen
Hedrick MS - Flooring - Band
Hedrick MS - Flooring - Choir
Hedrick MS - Flooring - Orchestra
Hedrick MS - Doors
Hedrick MS - Door Hardware
Hedrick MS - Casework (Built-Ins)
Hedrick MS - Restrooms - Faculty
Hedrick MS - Restrooms - Student
Hedrick MS - Marquee
Hedrick MS - Paving - Parking Lots
Hedrick MS - Paving - Sidewalks
Hedrick MS - Exterior Lighting
Hedrick MS - Paint - Commons
Hedrick MS - Paint - Cafeteria
Hedrick MS - Paint - Gyms
Hedrick MS - Paint - Exterior
Hedrick MS - Paint - Hallways
Sports and Fine ArtsHedrick MS - Perf Arts - Curtains
Hedrick MS - Perf Arts - Cafetorium Lighting
Hedrick MS - Asphalt Track
Hedrick MS - Field Lights
Hedrick MS - Bleachers - Exterior
Hedrick MS - Bleachers - Interior
Hedrick MS - Gym Main - Flooring
Hedrick MS - Gym Aux - Flooring
Hedrick MS - Athletic Lockers
Hedrick MS - Athletic Benches
Hedrick MS - Athletic Partitions
WEIGHT ROOM Hedrick MS - Weight Room HVAC
Hedrick MS - Weight Room Roof - Metal
Hedrick MS - Weight Room Flooring
Hedrick MS8/5/2020
Year Built / Age 1997 / 23 Assessment Scale:Campus Square Footage 122,076 100 = New or Newly Replaced
Current Year 2020 0 = End of Life Cycle
Huffines MS
LIFE
CYC
LE -
YEAR
SLA
ST R
EPLA
CED
% L
IFE
REM
AINI
NGVI
SUAL
EVA
LUAT
ION
WOR
K OR
DER
HIST
ORY
TOTA
L AS
SESS
MEN
T
Type of Material / Notes - Items highlighted Orange are 2017 Bond
FACILITY AGE RATING 50 1997 54Huffines MS - HVAC 20 2015 75 80 10% 86 RTU & VRF
Huffines MS - HVAC - Controls 20 2015 75 80 78 Controls = AlertonHuffines MS - Ceiling and Lights 20 2015 75 80 78
Huffines MS - Roof - Flat 20 2015 75 80 3% 79 Mod BitHuffines MS - Roof - Standing Seam 30 2015 83 85 3% 86
Huffines MS - Electrical Switchgear 30 1997 23 25 5% 25
Huffines MS - Elevator 25 1997 8 15 7% 12 SchindlerHuffines MS - Fire Safety - Fire Alarm 20 2015 75 80 2% 79 EST 3
Huffines MS - Fire Safety - Sprinkler System 50 1997 54 55 -41% 32
Huffines MS - Food Service Boilers 20 2017 85 90 88
Huffines MS - Food Service Freezers 20 2015 75 80 78
Huffines MS - Lightning Detection 15 2009 27 25 26 Siren & ControlsHuffines MS - Generator 40 2015 88 90 89 Cummins - Diesel
Huffines MS - Flooring - Classrooms 20 2015 75 80 78 VCT - water damageHuffines MS - Flooring - Corridors 20 2015 75 25 50 VCT; float loose
Huffines MS - Flooring - Library 20 2015 75 80 78 VCTHuffines MS - Flooring - Offices 20 2015 75 80 78 VCT
Huffines MS - Flooring - Cafeteria 20 2015 75 80 78 VCTHuffines MS - Flooring - Kitchen 50 1997 54 56 55 Terrazzo
Huffines MS - Flooring - Band 20 2015 75 80 78 VCTHuffines MS - Flooring - Choir 20 2015 75 80 78 VCT
Huffines MS - Flooring - Orchestra 20 2015 75 80 78 VCTHuffines MS - Doors 20 2015 75 80 78 Dark
Huffines MS - Door Hardware 20 2015 75 80 78
Huffines MS - Casework (Built-Ins) 20 2015 75 80 78 Wet areas and countertops replaced 2015Huffines MS - Restrooms - Faculty 20 2015 75 80 78
Huffines MS - Restrooms - Student 20 2015 75 80 78
Huffines MS - Marquee 15 2019 93 95 94 DigitalHuffines MS - Paving - Parking Lots 50 1997 54 55 55
Huffines MS - Paving - Sidewalks 40 1997 43 45 44 Pavement drop at door #3Huffines MS - Exterior Lighting 20 2015 75 80 78 LED
Huffines MS - Paint - Commons 15 2015 67 70 68 Handrails throughout 2018Huffines MS - Paint - Cafeteria 15 2015 67 70 68 2018 lower walls
Huffines MS - Paint - Gyms 20 2015 75 80 78 2018 maintain lower wallsHuffines MS - Paint - Exterior 20 2015 75 80 78
Huffines MS - Paint - Hallways 20 2015 75 80 78
Sports and Fine ArtsHuffines MS - Perf Arts - Curtains - -
Huffines MS - Perf Arts - Cafetorium Lighting 25 2015 80 85 83
Huffines MS - Asphalt Track 20 1997 0 In ProgressHuffines MS - Field Lights - -
Huffines MS - Bleachers - Exterior - -
Huffines MS - Bleachers - Interior 30 1997 23 25 24
Huffines MS - Gym Main - Flooring 40 2016 90 95 93 Replaced in 2016Huffines MS - Gym Aux - Flooring 40 1997 43 45 44
Huffines MS - Athletic Lockers 40 1997 43 50 46
Huffines MS - Athletic Benches 20 2015 75 85 80 ConcreteHuffines MS - Athletic Partitions 20 2015 75 80 78 Solid Plastic
WEIGHT ROOM 2008Huffines MS - Weight Room HVAC 20 2008 40 45 43
Huffines MS - Weight Room Roof - Metal 30 2008 60 60 60
Huffines MS - Weight Room Flooring 20 2008 40 45 43 Rubber
Huffines MS8/5/2020
Year Built / Age 2007 / 13 Assessment Scale:Campus Square Footage 179,581 100 = New or Newly ReplacedCurrent Year 2020 0 = End of Life Cycle
Killian MS
LIFE
CYC
LE -
YEAR
SLA
ST R
EPLA
CED
% L
IFE
REM
AINI
NGVI
SUAL
EVA
LUAT
ION
WOR
K OR
DER
HIST
ORY
TOTA
L AS
SESS
MEN
T
Type of Material / Notes
FACILITY AGE RATING 50 2007 74Killian MS - HVAC 20 2007 35 40 -3% 36 CHILLER
Killian MS - HVAC - Controls 20 2007 35 40 38 Controls = AlertonKillian MS - Ceiling and Lights 20 2007 35 45 40
Killian MS - Roof - Standing Seam 30 2007 57 60 -3% 57
Killian MS - Electrical Switchgear 30 2007 57 60 10% 64
Killian MS - Elevator 25 2007 48 50 7% 52 Thyssen KruppKillian MS - Fire Safety - Fire Alarm 20 2007 35 40 13% 42 Edwards EST 3
Killian MS - Fire Safety - Sprinkler System 50 2007 74 75 15% 86
Killian MS - Food Service Boilers 20 2007 35 40 38
Killian MS - Food Service Freezers 20 2007 35 40 38
Killian MS - Lightning Detection 15 2009 27 25 26 Siren & ControlsKillian MS - Generator 40 2007 68 70 69 Olympian - Diesel
Killian MS - Flooring - Classrooms 20 2007 35 40 38 VCTKillian MS - Flooring - Corridors 20 2007 35 40 38 VCT
Killian MS - Flooring - Library 15 2007 13 25 19 CarpetKillian MS - Flooring - Offices 15 2007 13 20 17 Carpet
Killian MS - Flooring - Cafeteria 20 2007 35 40 38 VCTKillian MS - Flooring - Kitchen 50 2007 74 75 75 Terrazzo
Killian MS - Flooring - Band 15 2007 13 15 14 CarpetKillian MS - Flooring - Choir 15 2007 13 20 17 Carpet
Killian MS - Flooring - Orchestra 15 2007 13 20 17 CarpetKillian MS - Doors 20 2007 35 45 40
Killian MS - Door Hardware 20 2007 35 45 40
Killian MS - Casework (Built-Ins) 20 2007 35 45 40
Killian MS - Restrooms - Faculty 20 2007 35 45 40
Killian MS - Restrooms - Student 20 2007 35 50 43 Block wallsKillian MS - Marquee 15 2007 13 50 32 1 Brick; 1 LED (2010)
Killian MS - Paving - Parking Lots 50 2007 74 75 75 Showing signs of some movementKillian MS - Paving - Sidewalks 40 2007 68 70 69 Showing signs of some movement
Killian MS - Exterior Lighting 20 2007 35 40 38
Killian MS - Paint - Commons 15 2007 13 30 22 Boys/Girls athletics all - 2018Killian MS - Paint - Cafeteria 15 2007 13 25 19
Killian MS - Paint - Gyms 20 2007 35 40 38 2016 lower gym wallsKillian MS - Paint - Exterior 20 2007 35 40 38
Killian MS - Paint - Hallways 20 2007 35 40 38
Sports and Fine ArtsKillian MS - Perf Arts - Curtains 20 2007 35 40 38
Killian MS - Perf Arts - Stage Lighting 25 2007 48 50 49
Killian MS - Asphalt Track 20 2007 35 35 35 Concrete curbing, some cracking however in good shape given age. 2 shade structures added next to track 2019.
Killian MS - Field Lights - -
Killian MS - Bleachers - Exterior - -
Killian MS - Bleachers - Interior 30 2007 57 60 58
Killian MS - Gym Main - Flooring 40 2007 68 70 69
Killian MS - Gym Aux - Flooring 40 2007 68 70 69
Killian MS - Athletic Lockers 40 2007 68 75 71
Killian MS - Athletic Benches 20 2007 35 45 40 Plastic Wood LumberKillian MS - Athletic Partitions 20 2007 35 50 43 CMU
WEIGHT ROOM 2008Killian MS - Weight Room HVAC 20 2008 40 45 43
Killian MS - Weight Room Roof - Metal 30 2008 60 65 63
Killian MS - Weight Room Flooring 20 2008 40 45 43 Rubber
Killian MS8/5/2020
Year Built / Age 1989 / 31 Assessment Scale:Campus Square Footage 130,570 100 = New or Newly Replaced
Current Year 2020 0 = End of Life Cycle
Lakeview MS
LIFE
CYC
LE -
YEAR
SLA
ST R
EPLA
CED
% L
IFE
REM
AINI
NGVI
SUAL
EVA
LUAT
ION
WOR
K OR
DER
HIST
ORY
TOTA
L AS
SESS
MEN
T
Type of Material / Notes Items highlighted Orange are 2017 Bond
FACILITY AGE RATING 50 1989 38Lakeview MS - HVAC 20 2007 35 40 -2% 37 RTU
Lakeview MS - HVAC - 2008 Fine Art Addition 20 2008 40 41 0% 41 RTULakeview MS - HVAC - Controls 20 2007 35 40 38 Controls = Alerton
Lakeview MS - Ceiling and Lights 20 2007 35 45 40
Lakeview MS - Roof - Flat 20 2007 35 40 -6% 35 Mod BitLakeview MS - Roof Skylights 25 2015 80 85 83
Lakeview MS - 2008 Fine Art Addition 20 2007 35 40 0% 38 4 ply built upLakeview MS - Electrical Switchgear 30 1989 -3 0 -9% -2
Lakeview MS - Elevator 25 1998 12 15 8% 15 MCE - Installed 1989 & altered in 1998Lakeview MS - Fire Safety - Fire Alarm 20 1999 -5 25 2% 10 New panel 2016 / original devices; Napco MS-52
Lakeview MS - Fire Safety - Sprinkler System 50 1989 38 40 16% 45
Lakeview MS - Food Service Boilers 20 2011 55 60 58
Lakeview MS - Food Service Freezers 20 2007 35 40 38
Lakeview MS - Lightning Detection 15 2009 27 25 26 Siren & ControlsLakeview MS - Generator - -
Lakeview MS - Flooring - Classrooms 20 2019 95 100 98 VCTLakeview MS - Flooring - Corridors 20 2004 20 25 23 VCT
Lakeview MS - Flooring - Library 20 2019 95 100 98 LVTLakeview MS - Flooring - Offices 20 2020 100 100 100 LVT and carpet
Lakeview MS - Flooring - Cafeteria 20 2013 65 70 68 LVTLakeview MS - Flooring - Kitchen 50 1989 38 40 39 Terrazzo
Lakeview MS - Flooring - Band 20 2019 95 100 98 VCTLakeview MS - Flooring - Choir 20 2019 95 100 98 VCT
Lakeview MS - Flooring - Orchestra 20 2019 95 100 98 VCTLakeview MS - Doors 20 1989 -55 0 -28 Laminated white oak
Lakeview MS - Door Hardware 20 1989 -55 0 -28
Lakeview MS - Casework (Built-Ins) 20 1989 -55 0 -28
Lakeview MS - Restrooms - Faculty 20 2018 90 95 93
Lakeview MS - Restrooms - Student 20 2018 90 95 93
Lakeview MS - Marquee 15 2018 87 90 88 LEDLakeview MS - Paving - Parking - Concrete 50 1989 38 70 54
Lakeview MS - Paving - Parking - Asphalt overlay 20 2004 20 20 20
Lakeview MS - Paving - Sidewalks 40 1989 23 30 26
Lakeview MS - Exterior Lighting 20 2007 35 45 40
Lakeview MS - Paint - Commons 15 2016 73 80 77
Lakeview MS - Paint - Cafeteria 15 2016 73 80 77
Lakeview MS - Paint - Gyms 20 2016 80 85 83
Lakeview MS - Paint - Exterior 20 2007 35 40 38 2017 All doors and rails newLakeview MS - Paint - Hallways 20 2018 90 95 93 2017 Bond
Sports and Fine ArtsLakeview MS - Perf Arts - Curtains - -
Lakeview MS - Perf Arts - Cafetorium Lighting 25 1989 -24 10 -7
Lakeview MS - Asphalt Track 20 1999 -5 5 0 Half cracking around edges; bad shapeLakeview MS - Field Lights - -
Lakeview MS - Bleachers - Exterior - -
Lakeview MS - Bleachers - Interior 30 1989 -3 5 1 WoodenLakeview MS - Gym Main - Flooring 40 1989 23 25 24 2018 resurfaced and painted (2nd sanding)Lakeview MS - Gym Aux - Flooring 40 1989 23 25 24 2019 resurfaced and painted (2nd sanding)
Lakeview MS - Athletic Lockers 40 1989 23 30 26 Painted 3-5 years agoLakeview MS - Athletic Benches 20 1989 -55 35 -10 Wood BenchLakeview MS - Athletic Partitions 20 2013 65 75 70
WEIGHT ROOM 2008Lakeview MS - Weight Room HVAC 20 2008 40 45 43
Lakeview MS - Weight Room Roof - Metal 30 2008 60 65 63
Lakeview MS - Weight Room Flooring 20 2008 40 45 43 Rubber
Lakeview MS8/5/2020
Year Built / Age 1987 / 33 Assessment Scale:Campus Square Footage 135,030 100 = New or Newly Replaced
Current Year 2020 0 = End of Life Cycle
Lamar MS
LIFE
CYC
LE -
YEAR
SLA
ST R
EPLA
CED
% L
IFE
REM
AINI
NGVI
SUAL
EVA
LUAT
ION
WOR
K OR
DER
HIST
ORY
TOTA
L AS
SESS
MEN
T
Type of Material / Notes - Items highlighted Orange are 2017 Bond
FACILITY AGE RATING 50 1987 34Lamar MS - HVAC 20 2009 45 50 3% 49 RTU
Lamar MS - HVAC - Controls 20 2009 45 50 48 Controls = AlertonLamar MS - Ceiling and Lights 20 2009 45 50 48 T-5
Lamar MS - Roof - Flat 20 2001 5 10 0% 7
Lamar MS - Electrical Switchgear 30 1987 -10 0 -10% -6
Lamar MS - Fire Safety - Fire Alarm 20 2003 15 15 10% 17 Edwards EST 2 - Limited Parts Lamar MS - Fire Safety - Sprinkler System 50 1987 34 35 13% 39
Lamar MS - Food Service Boilers 20 2018 90 95 93
Lamar MS - Food Service Freezers 20 2009 45 50 48
Lamar MS - Lightning Detection 15 2009 27 25 26 Siren; Controls @ MHSLamar MS - Generator 40 1987 18 10 14 Generac - Natural Gas - Old
Lamar MS - Flooring - Classrooms 15 2004 -7 0 -3 Old VCT and carpetLamar MS - Flooring - Corridors 20 2011 55 60 58 VCT
Lamar MS - Flooring - Library 20 2014 70 75 73 VCTLamar MS - Flooring - Offices 15 2005 0 15 8 VCT and carpet
Lamar MS - Flooring - Cafeteria 20 2011 55 65 60 VCTLamar MS - Flooring - Kitchen 30 1987 -10 20 5 Ceramic tile: 8x8, cmu painted walls
Lamar MS - Flooring - Band 20 2012 60 65 63 VCTLamar MS - Flooring - Choir 20 2012 60 65 63 VCT
Lamar MS - Flooring - Orchestra 20 2012 60 65 63 VCTLamar MS - Doors 20 1987 -65 0 -33 Medium
Lamar MS - Door Hardware 20 1987 -65 0 -33
Lamar MS - Casework (Built-Ins) 20 1987 -65 0 -33
Lamar MS - Restrooms - Faculty 20 2009 45 45 45
Lamar MS - Restrooms - Student 20 2009 45 45 45 Floor tile: 2x2, cmu painted walls, solid plastic partitions, wall mounted urinals.
Lamar MS - Marquee 30 1987 -10 0 -5 Original on postLamar MS - Paving - Parking - Concrete 50 1987 34 35 35 Repairs have been made
Lamar MS - Paving - Sidewalks 40 1987 18 25 21 Spider cracking in front, right.Lamar MS - Exterior Lighting 20 2020 100 100 100
Lamar MS - Paint - Commons 15 2010 33 33 33 Lower Walls as needed; sections painted 2010/2014/2015/2016
Lamar MS - Paint - Cafeteria 15 2010 33 33 33 Lower Walls as needed; sections painted 2010/2014/2015/2016
Lamar MS - Paint - Gyms 20 2001 5 30 18 Lower WallsLamar MS - Paint - Exterior 20 2001 5 25 15 Lower Walls; New exterior doors and rails 2016
Lamar MS - Paint - Hallways 20 2016 80 80 80 P-Lam 7'
Sports and Fine ArtsLamar MS - Perf Arts - Curtains 20 2016 80 85 83
Lamar MS - Perf Arts - Cafetorium Lighting 25 2018 92 95 94
Lamar MS - Asphalt Track 20 2007 35 45 40 Falling on sides; large cracks; 2019 major repairs to cracks & sealed the track & painted new lanes
Lamar MS - Field Lights - -
Lamar MS - Bleachers - Exterior - -
Lamar MS - Bleachers - Interior 30 2008 60 65 63
Lamar MS - Gym Main - Flooring 40 1987 18 20 19
Lamar MS - Gym Aux - Flooring 40 1987 18 20 19
Lamar MS - Athletic Lockers 40 1987 18 25 21
Lamar MS - Athletic Benches 20 1987 -65 35 -15 Painted woodLamar MS - Athletic Partitions 20 2009 45 50 48 Solid plastic
WEIGHT ROOM 2008Lamar MS - Weight Room HVAC 20 2008 40 40 40 1 unit replaced Spring 2020
Lamar MS - Weight Room Roof - Metal 30 2008 60 60 60
Lamar MS - Weight Room Flooring 20 2008 40 45 43 Rubber
Lamar MS8/5/2020
Year Built / Age 1997 / 23 Assessment Scale:Campus Square Footage 127,775 100 = New or Newly Replaced
Current Year 2020 0 = End of Life Cycle
McKamy MS
LIFE
CYC
LE -
YEAR
SLA
ST R
EPLA
CED
% L
IFE
REM
AINI
NGVI
SUAL
EVA
LUAT
ION
WOR
K OR
DER
HIST
ORY
TOTA
L AS
SESS
MEN
T
Type of Material / Notes Items highlighted Orange are 2017 Bond
FACILITY AGE RATING 50 1997 54McKamy MS - HVAC - Original 20 2015 75 80 -10% 70 RTU & VRF
McKamy MS - HVAC - 2008 - Addition 20 2008 40 45 -10% 38 Weight Room; RTU
McKamy MS - HVAC - Controls 20 2015 75 80 78 Controls = Alerton
McKamy MS - Ceiling and Lights - Original 20 2015 75 80 78 LED
McKamy MS - Ceiling and Lights - 2008 - Addition 20 2008 40 45 43 T-5
McKamy MS - Roof - Flat 20 2015 75 80 7% 83 Leak Warranty Repair
McKamy MS - Roof - Standing Seam 20 2015 75 80 7% 83
McKamy MS - Roof - 2008 Addition 20 2008 40 45 7% 45
McKamy MS - Electrical Switchgear 30 1997 23 25 -31% 17 Siemens
McKamy MS - Elevator 25 1997 8 15 7% 12 Schindler
McKamy MS - Fire Safety - Fire Alarm 20 2015 75 75 -49% 38 Edwards EST 3 - Voice activated
McKamy MS - Fire Safety - Sprinkler System 50 1997 54 55 5% 57
McKamy MS - Food Service Boilers 20 2009 45 45 45 Tank 2009
McKamy MS - Food Service Freezers 20 2015 75 80 78
McKamy MS - Lightning Detection 15 2009 27 25 26 Siren; Controls @ FMHS
McKamy MS - Generator 40 2015 88 90 89 Cummins - Diesel
McKamy MS - Lift Station 20 2015 75 75 75
McKamy MS - Flooring - Classrooms 20 2015 75 80 78 VCT
McKamy MS - Flooring - Corridors 20 2015 75 80 78 VCT
McKamy MS - Flooring - Library 20 2015 75 80 78 VCT
McKamy MS - Flooring - Offices 20 2015 75 80 78 VCT
McKamy MS - Flooring - Cafeteria 20 2015 75 80 78 VCT
McKamy MS - Flooring - Kitchen 50 1997 54 35 45 Terrazzo - cracked
McKamy MS - Flooring - Band - Original 20 2015 75 80 78 VCT
McKamy MS - Flooring - Band - 2008 15 2008 20 30 25 Carpet
McKamy MS - Flooring - Choir 20 2015 75 80 78 VCT
McKamy MS - Flooring - Orchestra 20 2015 75 80 78 VCT
McKamy MS - Doors 20 2015 75 80 78 Dark
McKamy MS - Door Hardware 20 2015 75 80 78
McKamy MS - Casework (Built-Ins) 20 2015 75 75 75 2015 Refresh replaced areas needing repair
McKamy MS - Restrooms - Faculty 20 2015 75 80 78
McKamy MS - Restrooms - Student 20 2015 75 80 78
McKamy MS - Marquee 30 1997 23 15 19
McKamy MS - Paving - Parking Lots 50 1997 54 55 55 LIT T-8 or T-12
McKamy MS - Paving - Sidewalks 40 1997 43 45 44
McKamy MS - Exterior Lighting 20 2015 75 80 78 LED
McKamy MS - Paint - Commons 15 2015 67 75 71 good/clean
McKamy MS - Paint - Cafeteria 15 2015 67 75 71 good/clean - maintaing lower walls
McKamy MS - Paint - Gyms 20 2015 75 80 78
McKamy MS - Paint - Exterior 20 2015 75 80 78
McKamy MS - Paint - Hallways 20 2015 75 80 78 good shape - continue to paint as needed.
Sports and Fine ArtsMcKamy MS - Perf Arts - Curtains - -
McKamy MS - Perf Arts - Cafetorium Lighting 25 2017 88 90 89 No support
McKamy MS - Asphalt Track 20 1997 0 cracks; poor shape - In Progress
McKamy MS - Field Lights 30 2003 43 47 45 not used
McKamy MS - Bleachers - Exterior - -
McKamy MS - Bleachers - Interior 30 1997 23 25 24 showing age
McKamy MS - Gym Main - Flooring 40 1997 43 40 41 need to check last sanding
McKamy MS - Gym Aux - Flooring 40 1997 43 40 41 need to check last sanding
McKamy MS - Athletic Lockers 40 1997 43 50 46 2015 outside painted
McKamy MS - Athletic Benches 20 2015 75 80 78 Concrete
McKamy MS - Athletic Partitions 20 2015 75 85 80
McKamy MS - Weight Room Floor 20 2008 40 45 43 Rubber
McKamy MS8/5/2020
Year Built / Age 2005 / 15 Assessment Scale:Campus Square Footage 150,664 100 = New or Newly Replaced
Current Year 2020 0 = End of Life Cycle
Shadow Ridge MS
LIFE
CYC
LE -
YEAR
SLA
ST R
EPLA
CED
% L
IFE
REM
AINI
NGVI
SUAL
EVA
LUAT
ION
WOR
K OR
DER
HIST
ORY
TOTA
L AS
SESS
MEN
T
Type of Material / Notes Items highlighted Orange are 2017 Bond
FACILITY AGE RATING 50 2005 70Shadow Ridge MS - HVAC 20 2005 25 25 -35% 16 CHILLER
Shadow Ridge MS - HVAC - Controls 20 2018 90 95 93 2008 Bond - EnviromaticShadow Ridge MS - Ceiling and Lights 20 2005 25 35 30 Main Hall LED 2017-18
Shadow Ridge MS - Roof - Flat 20 2005 25 35 -25% 22 Over kitchenShadow Ridge MS - Roof - Metal 30 2005 50 40 -25% 34
Shadow Ridge MS - Electrical Switchgear 30 2005 50 50 5% 52 Cuttler HammerShadow Ridge MS - Elevator A (Main) 25 2005 40 45 -1% 42 Schindler
Shadow Ridge MS - Lift (Press Box) - - Removed 7/2019Shadow Ridge MS - Fire Safety - Fire Alarm 20 2005 25 25 12% 28 Edwards EST 2 - Limited Parts
Shadow Ridge MS - Fire Safety - Sprinkler System 50 2005 70 70 -5% 67
Shadow Ridge MS - Food Service Boilers 20 2005 25 25 25 Tank 2005; Anode Rod 2017Shadow Ridge MS - Food Service Freezers 20 2005 25 30 28 Replacing floor 2018
Shadow Ridge MS - Lightning Detection - - Siren and Controls @ Bluebonnet ES next doorShadow Ridge MS - Generator 40 2005 63 65 64 Generac - Diesel
Shadow Ridge MS - Flooring - Classrooms 20 2005 25 30 28 VCTShadow Ridge MS - Flooring - Corridors 20 2005 25 30 28 VCT - floor cracking between Library & Gym
Shadow Ridge MS - Flooring - Library 15 2005 0 10 5 CarpetShadow Ridge MS - Flooring - Offices 15 2005 0 10 5 Carpet
Shadow Ridge MS - Flooring - Cafeteria 20 2005 25 30 28 VCT - floor crackingShadow Ridge MS - Flooring - Kitchen 50 2005 70 65 68 Terrazzo - repaired 2017
Shadow Ridge MS - Flooring - Band 15 2005 0 10 5 CarpetShadow Ridge MS - Flooring - Choir 15 2005 0 10 5 Carpet
Shadow Ridge MS - Flooring - Orchestra 15 2005 0 0 0 CarpetShadow Ridge MS - Doors 20 2005 25 30 28 Light White Oak
Shadow Ridge MS - Door Hardware 20 2005 25 30 28
Shadow Ridge MS - Casework (Built-Ins) 20 2005 25 30 28
Shadow Ridge MS - Restrooms - Faculty 20 2005 25 35 30
Shadow Ridge MS - Restrooms - Student 20 2005 25 35 30 CMU glazed solid doorsShadow Ridge MS - Marquee 30 2005 50 50 50
Shadow Ridge MS - Paving - Parking Lots 50 2005 70 60 65 Spider cracks, Shadow Ridge MS - Paving - Sidewalks 40 2005 63 45 54 Brick pavers heaved, some heaving in back
Shadow Ridge MS - Exterior Lighting 20 2005 25 30 28 Front is LED (2015/16).Shadow Ridge MS - Paint - Commons 15 2005 0 20 10 good/clean - maintaining as neededShadow Ridge MS - Paint - Cafeteria 15 2005 0 25 13 good/clean - maintaining as needed
Shadow Ridge MS - Paint - Gyms 20 2005 25 30 28 Door Frames need painting; back gym halls painted 2017; Gym lower walls painted 2018
Shadow Ridge MS - Paint - Exterior 20 2005 25 30 28 Lower walls 2014Shadow Ridge MS - Paint - Hallways 20 2005 25 30 28 Back stairwells painted May 2017; Lower walls 2014
Sports and Fine ArtsShadow Ridge MS - Perf Arts - Curtains 20 2005 25 35 30
Shadow Ridge MS - Perf Arts - Cafetorium Lighting 25 2005 40 50 45
Shadow Ridge MS - Asphalt Track 20 2005 25 30 28 Some cracking; good overallShadow Ridge MS - Field Lights 30 2005 50 55 53
Shadow Ridge - Stadium Scoreboard 18 2020 100 100 100 Replaced due to past storm damageShadow Ridge MS - Bleachers - Exterior 40 2005 63 65 64
Shadow Ridge MS - Bleachers - Interior 30 2005 50 50 50 Replaced some seatsShadow Ridge MS - Gym Main - Flooring 40 2005 63 65 64
Shadow Ridge MS - Gym Aux - Flooring 40 2005 63 65 64
Shadow Ridge MS - Athletic Lockers 40 2005 63 65 64
Shadow Ridge MS - Athletic Benches 20 2005 25 40 33 Plastic/Wood CompositeShadow Ridge MS - Athletic Partitions 20 2005 25 40 33
WEIGHT ROOM 2008Shadow Ridge MS - Weight Room HVAC 20 2008 40 45 43
Shadow Ridge MS - Weight Room Roof - Metal 30 2008 60 60 60
Shadow Ridge MS - Weight Room Flooring 20 2008 40 45 43 RubberShadow Ridge MS
8/5/2020
ASSESSMENT SUMMARYHIGH SCHOOLS
Current Year 2020
FLOW
ER M
OUND
9TH
HEBR
ON 9
THLH
S HA
RMON
9/10
LHS
KILL
OUGH
9/1
0M
ARCU
S 9T
HFL
OWER
MOU
ND H
SHE
BRON
HS
LEW
ISVI
LLE
HSM
ARCU
S HS
THE
COLO
NY H
S
YEAR BUILT 2014 2010 2011 2005 2014 1999 1999 2012 1981 1986Age 6 10 9 15 6 21 21 8 39 34
HVAC - Original 77 51 58 23 71 0 0 22 27 22
HVAC - Addition - - - - - 13 13 40 5 22
HVAC - Addition - - - - - 44 41 60 41 22
HVAC - Addition - - - - - 75 - 73 70 9
HVAC - Addition - - - - - - - - - 13
HVAC - Controls 73 53 58 28 70 73 0 63 28 43
Roof - Flat - Original 72 60 60 13 0 0 0 2 0 47
Roof - Shingled or Standing Seam - 62 76 13 - - - - - -
Roof - Addition - - - - - 14 8 41 0 5
Roof - Addition - - - - - 52 27 63 0 5
Roof - Addition - - - - - 73 - 73 0 9
Roof - Addition - - - - - - - - 0 14
Roof - Addition - - - - - - - - 0 37
Roof - Addition - - - - - - - - 0 -
Roof - Addition - - - - - - - - 0 -
Roof - Addition - - - - - - - - 0 -
Roof - Addition - - - - - - - - 0 -
Roof - Addition - - - - - - - - 0 -
Electrical Panels - Original 64 72 72 54 74 31 29 60 98 58
Electrical Panels - Additions - - - - - 41 39 49 98 58
Electrical Panels - Additions - - - - - 61 58 60 98 58
Electrical Panels - Additions - - - - - 80 - 65 98 46
Electrical Panels - Additions - - - - - - - - 34 49
Electrical Panels - Additions - - - - - - - - 59 66
Electrical Panels - Additions - - - - - - - - 80 -
Elevator #1 37 74 80 41 37 0 21 75 72 0
Elevator #2 - - - - - 28 40 64 21 3
Elevator #3 - - - - - 94 - 22 93 -
Elevator #4 - - - - - - - 3 66 -
Elevator #5 - - - - - - - 75 - -
Fire Safety - Fire Alarm 56 58 52 98 76 70 0 50 67 3
Fire Safety - Sprinkler System 100 93 68 35 92 49 65 60 34 81
Fire Safety - Sprinkler System - - - - - 54 71 77 52 -
Fire Safety - Sprinkler System - - - - - 63 84 86 61 -
Fire Safety - Sprinkler System - - - - - 89 - 91 66 -
Fire Safety - Sprinkler System - - - - - - - - 78 -
Food Service Boilers 68 50 55 25 73 0 55 55 70 92
Food Service Freezers 73 55 58 28 73 0 0 63 43 40
Food Service Freezer - TCHS Cougar Cafe - - - - - - - - - 50
Lightning Detection - - 26 26 - 26 26 26 26 26
Generator 85 87 79 66 88 - 0 80 - 68
Lift Station
Flooring - Classrooms - Carpet - - - - - 0 0 - 94 -
Flooring - Classrooms - LVT/VCT 75 53 58 30 73 0 0 63 98 0
Flooring - Classrooms - LVT/VCT - - - - - - - 43 48 0
Flooring - Classrooms - LVT/VCT - - - - - - - - - 0
Flooring - Classrooms - LVT/VCT - - - - - - - - - 48
HIGH SUMMARY8/5/2020
FLOW
ER M
OUND
9TH
HEBR
ON 9
THLH
S HA
RMON
9/10
LHS
KILL
OUGH
9/1
0M
ARCU
S 9T
HFL
OWER
MOU
ND H
SHE
BRON
HS
LEW
ISVI
LLE
HSM
ARCU
S HS
THE
COLO
NY H
S
Flooring - Classrooms - LVT/VCT - - - - - - - - - -
Flooring - Corridors - Carpet - - - - - 0 0 - - -
Flooring - Corridors - VCT 75 55 58 30 73 0 0 63 48 0
Flooring - Corridors - Stained Concrete 94 - - - 80 - - - - -
Flooring - Corridors - Terrazzo 82 - - - - - - - - -
Flooring - Library 94 34 45 3 80 65 0 60 48 34
Flooring - Offices 75 34 45 3 70 0 0 63 91 0
Flooring - Cafeteria 94 53 58 30 80 0 0 60 29 63
Flooring - Kitchen 89 83 81 70 89 59 59 85 29 33
Flooring - Band - 29 40 0 - 45 43 48 63 45
Flooring - Choir - 32 43 - - 93 0 48 98 0
Flooring - Orchestra - 32 40 - - 53 0 48 63 15
Doors 73 55 55 28 73 0 0 63 98 0
Door Hardware 73 55 58 28 73 0 0 63 98 0
Casework (Built Ins) 73 55 58 28 73 0 0 63 -45 0
Restrooms - Faculty 73 55 60 28 73 0 0 63 100 68
Restrooms - Student 73 55 60 28 73 0 0 63 65 68
Restrooms - Addition - - - - - 10 10 8 98 63
Restrooms - Addition - - - - - 40 40 40 5 10
Restrooms - Addition - - - - - 73 - 60 40 48
Restrooms - Addition - - - - - - - 70 70 90
Marquee 65 85 70 35 63 85 100 68 96 82
Paving - Parking Lots 89 80 81 70 89 59 59 28 80 33
Paving - Parking Lots - - - - - 88 77 49 86 63
Paving - Parking Lots - - - - - - - 80 88 87
Paving - Sidewalks - - - - - - - - 24 -
Paving - Sidewalks 85 75 79 64 85 49 41 80 84 20
Exterior Lighting 75 53 60 28 70 68 0 63 85 95
Paint - Commons 65 37 50 94 88 0 0 48 97 57
Paint - Cafeteria 65 37 81 94 88 0 0 63 97 57
Paint - Auditorium - - - - - 94 68 51 91 91
Paint - Activity Centers - - - - - 65 - 51 68 -
Paint - Gyms - 50 60 38 - 0 0 60 13 8
Paint - Exterior 73 50 58 33 73 0 0 63 78 50
Paint - Hallways 73 50 60 43 73 0 0 63 63 73
9th /10th SPORTS & FINE ARTS FMHS-9 HHS-9 LHS-H LHS-K MHS-9 FMHS HHS LHS MHS TCHS
Cafetorium - Curtains 73 53 58 30 70 0 0 63 - -
Cafetorium - Lighting 70 53 58 28 70 0 0 69 - -
Track - - 10 -25 - - - - - -
Field Lights - - 73 - - - - - - -
Bleachers - Exterior - - 99 - - - - - - -
Bleachers - Interior - 68 70 45 - - - - - -
HS SPORTS & FINE ARTS FMHS-9 HHS-9 LHS-H LHS-K MHS-9 FMHS HHS LHS MHS TCHS
Auditorium Curtains - - - - - 13 88 70 93 93
Auditorium Stage Lighting - - - - - 29 13 78 94 94
Auditorium Sound - - - - - - - - - -
Auditorium Seating - - - - - 40 38 80 97 94
Auditorium Flooring - - - - - 94 49 60 91 91
Large Gym - Flooring - 75 79 64 - 49 49 80 70 56
Large Gym - Bleachers - 68 70 45 - 33 33 74 64 44
Large Gym - Scoreboard - - - - - 3 13 60 43 -
Middle/Aux Gym - Flooring - 75 79 64 - 80 49 80 44 19
Middle/Aux Gym - Bleachers - - - - - 33 30 - 24 -5
HIGH SUMMARY8/5/2020
FLOW
ER M
OUND
9TH
HEBR
ON 9
THLH
S HA
RMON
9/10
LHS
KILL
OUGH
9/1
0M
ARCU
S 9T
HFL
OWER
MOU
ND H
SHE
BRON
HS
LEW
ISVI
LLE
HSM
ARCU
S HS
THE
COLO
NY H
S
Middle/Aux Gym - Scoreboard - - - - - 3 3 - 83 -
Other Gym - Flooring - - - - - 43 35 - 6 18
Other Gym - Bleachers - - - - - 63 63 - -15 -
Girls Locker Rooms - Flooring - 50 58 30 - 63 38 63 43 60
Girls Locker Rooms - Benches - 80 84 30 - 60 78 85 77 70
Girls Locker Rooms - Partitions - 55 60 30 - 63 43 63 43 65
Boys Locker Rooms - Flooring - 50 58 30 - 93 0 63 43 60
Boys Locker Rooms - Benches - 80 84 30 - 93 78 85 77 70
Boys Locker Rooms - Partitions - 55 60 30 - 93 0 63 43 65
STADIUMS FMHS-9 HHS-9 LHS-H LHS-K MHS-9 FMHS HHS LHS MHS TCHS
Bleachers - - - - - 59 59 19 75 17
Artificial Turf - - - - - 0 0 100 80 10
Synthetic Track - - - - - 18 25 23 83 28
PA System - - - - - - - - - -
Light poles - - - - - 47 80 52 68 67
Scoreboard - - - - - 8 8 8 47 10
Pressbox HVAC - - - - - 20 18 0 53 5
Pressbox Roof - - - - - 20 18 0 53 -13
Pressbox Flooring - - - - - 15 95 0 37 52
Ticket Booths - - - - - - 18 0 53 -10
Ticket or Restroom / Concession - Home - HVAC - - - - - 20 53 - - 20
Ticket or Restroom / Concession - Home - Roof - - - - - 47 20 0 60 20
Ticket or Restroom / Concession - Visitor - HVAC - - - - - - - - - 95
Ticket or Restroom / Concession - Visitor - Roof - - - - - 47 18 0 60 95
Restrooms - Home - - - - - 18 - 0 53 20
Restrooms - Visitor - - - - - 18 18 0 53 23
Restrooms - North End - - - - - - - - - 93
Athletic Warehouse - - - - - - - 0 - -
Band Tower - - - - - 74 79 85 73 81
FIELD HOUSES FMHS-9 HHS-9 LHS-H LHS-K MHS-9 FMHS HHS LHS MHS TCHS
HVAC - - - - - 53 53 50 53 53
Roof - Metal - - - - - 68 68 68 68 53
Electrical Panels - - - - - 68 68 68 68 67
Fire Safety - Alarm System - - - - - 53 53 50 50 55
Fire Safety - Sprinkler System - - - - - 80 80 80 80 81
Flooring - Carpet - - - - - 37 37 37 37 39
Flooring - Epoxy - - - - - 50 50 53 53 53
Flooring - Concrete/Terrazzo - - - - - 80 80 80 80 81
Restrooms - Locker room - - - - - 53 53 53 55 53
Restrooms - Coaches - - - - - 53 53 55 55 53
Lockers - - - - - 75 50 53 55 53
Benches - - - - - 80 80 55 55 53
Paint - - - - - 94 42 83 83 83
Exterior Lighting - - - - - 53 50 50 50 53
Activity Centers / OLD FIELD HOUSES FMHS-9 HHS-9 LHS-H LHS-K MHS-9 FMHS HHS LHS MHS TCHS
Fire Safety - Alarm System - - - - - 73 - 50 67 -
Activity Centers - HVAC - - - - - 73 - 60 70 -
Activity Centers - Roof - Flat - - - - - 73 - 63 0 -
Activity Centers - Electrical Panels - - - - - 80 - 60 80 -
Activity Centers - Fire Safety - Sprinkler System - - - - - 89 - 86 78 -
Activity Centers - Flooring - - - - - 85 - 80 85 -
Activity Centers - Bleachers - - - - - 83 - 74 80 -
Activity Centers - Restrooms - - - - - 73 - 65 73 -
HIGH SUMMARY8/5/2020
FLOW
ER M
OUND
9TH
HEBR
ON 9
THLH
S HA
RMON
9/10
LHS
KILL
OUGH
9/1
0M
ARCU
S 9T
HFL
OWER
MOU
ND H
SHE
BRON
HS
LEW
ISVI
LLE
HSM
ARCU
S HS
THE
COLO
NY H
S
Activity Centers - Scoreboard - - - - - 73 - 63 73 -
Activity Centers - Locker Room Flooring - - - - - 73 - 63 73 -
Activity Centers - Locker Room Benches - - - - - 89 - 85 73 -
Activity Centers - Locker Room Lockers - - - - - 85 - 80 70 -
Field House -HVAC - - - - - 0 18 0 - -
Field House - Roof - Flat - - - - - 0 18 0 - -
Field House - Roof - Flat - - - - - - - 0 - -
Field House - Roof - Metal - - - - - - - - - -
Field House - Electrical Panels - - - - - 30 44 0 - -
Field House - Alarm System - - - - - 18 0 - -
Field House - Fire Safety - Sprinkler System - - - - - 59 66 0 - -
Field House - Flooring - Carpet - - - - - - - 0 - -
Field House - Flooring - Concrete/Terrazzo - - - - - 93 15 - - -
Field House - Flooring - Epoxy - - - - - - - 0 - -
Field House - Flooring - Epoxy - - - - - - - 0 - -
Field House - Locker Room Flooring - - - - - 93 18 - - -
Field House - Locker Room Benches - - - - - 93 73 0 - -
Field House - Locker Room Lockers - - - - - 49 100 0 - -
Paint - - - - - - 74 0 - -
Paint - Exterior - - - - - 0 45 0 - -
INDOOR ATHLETIC CENTERS FMHS-9 HHS-9 LHS-H LHS-K MHS-9 FMHS HHS LHS MHS TCHS
HVAC - - - - - 68 18 -8 68 93
Roof - Metal - - - - - 76 18 20 78 11
Electrical Panels - - - - - 78 44 20 78 16
Fire Safety - Alarm System - - - - - 68 18 - 68 -
Fire Safety - Sprinkler System - - - - - 86 66 - 87 -
Artificial Turf - - - - - 54 - 20 54 33
Flooring - Carpet - - - - - - 15 - - -
Flooring - Concrete/Terrazzo - - - - - - - - - -
Locker Room Flooring - - - - - - 18 - - 93
Locker Room Benches - - - - - - 73 - - -
Locker Room Lockers - - - - - - 100 - - 93
Weight room flooring - - - - - 68 18 68 90 -
Paint - - - - - 68 74 85 95 85
Paint - Exterior - - - - - 68 45 -10 68 20
SPORTS COMPLEXES FMHS-9 HHS-9 LHS-H LHS-K MHS-9 FMHS HHS LHS MHS TCHS
Parking Lots - - - - - 89 - - 85 -
BASEBALL FIELDS FMHS-9 HHS-9 LHS-H LHS-K MHS-9 FMHS HHS LHS MHS TCHS
Bleachers - - - - - 85 49 56 74 28
Backstop Netting - - - - - 60 94 33 27 33
Scoreboard - - - - - 73 83 25 48 75
Pressbox - - - - - 73 18 0 48 0
Paint - Dugout - - - - - 63 88 80 31 70
Light poles - - - - - 83 30 7 64 9
Field Leveling - - - - - 75 85 10 23 88
Batting Cage - - - - - 73 63 63 50 60
Restrooms / Concession - - - - - - - - - -
HVAC - - - - - 73 - - 48 -
Roof - Metal - - - - - 83 - - 64 -
Flooring - - - - - 73 - - 48 -
Lockers - - - - - - - - 48 -
SOFTBALL FIELDS FMHS-9 HHS-9 LHS-H LHS-K MHS-9 FMHS HHS LHS MHS TCHS
HIGH SUMMARY8/5/2020
FLOW
ER M
OUND
9TH
HEBR
ON 9
THLH
S HA
RMON
9/10
LHS
KILL
OUGH
9/1
0M
ARCU
S 9T
HFL
OWER
MOU
ND H
SHE
BRON
HS
LEW
ISVI
LLE
HSM
ARCU
S HS
THE
COLO
NY H
S
Bleachers - - - 64 - 85 49 - 80 96
Restrooms - - - 30 - - - - - 95
Backstop Netting - - - 32 - 55 22 - 38 94
Scoreboard - - - 93 - 73 78 - 63 75
Pressbox - - - 28 - 73 18 - 63 95
Paint - Dugout - - - 100 - 60 55 - 51 95
Light poles - - - 70 - 83 30 - 74 96
Turf - - - - - - - - - 91
Field Leveling - - - 68 - -5 13 - 68 -
Batting Cage - - - 65 - 73 68 - 63 95
Concession - - - 30 - - 33 - 63 95
TENNIS COURTS FMHS-9 HHS-9 LHS-H LHS-K MHS-9 FMHS HHS LHS MHS TCHS
Courts - - 81 - 87 0 82
Resurfaced - - 93 - 40 0 23
Light Poles - - 70 - - 80 98 - 74 -
Shade Structure - - 65 - - 73 98 - 63 65
Northwest Courts - - - - - - - - - 32
Northwest Courts Resurfaced - - - - - - - - - 28
Northwest Courts Light Poles - - - - - - - - - 62
Southwest Courts - - - - - - - - - 48
Southwest Courts Resurfaced - - - - - - - - - 28
WEIGHT ROOM FMHS-9 HHS-9 LHS-H LHS-K MHS-9 FMHS HHS LHS MHS TCHS
HVAC - - - - - - - 18 - 93
Roof - Metal - - - - - - - 44 - 43
Electrical Panels - - - - - - - 44 - 43
Fire Safety - Alarm System - - - - - - - - - -
Fire Safety - Sprinkler System - - - - - - - - - -
Flooring - - - - - - - 18 - 20
Paint - - - - - - - 13 - 88
GIRLS WRESTLING LOCKER/WEIGHT ROOM FMHS-9 HHS-9 LHS-H LHS-K MHS-9 FMHS HHS LHS MHS TCHS
HVAC - - - - - - - 0 - -
Roof - Metal - - - - - - - 0 - -
Electrical Panels - - - - - - - 0 - -
Fire Safety - Alarm System - - - - - - - - - -
Fire Safety - Sprinkler System - - - - - - - - - -
Flooring - Epoxy - - - - - - - 0 - -
Restroom - - - - - - - 0 - -
Lockers - - - - - - - 0 - -
Benches - - - - - - - 0 - -
Paint - - - - - - - 0 - -
AGRICULTURE SHOP FMHS-9 HHS-9 LHS-H LHS-K MHS-9 FMHS HHS LHS MHS TCHS
HVAC - - - - - - - - 33 -
Roof - Metal - - - - - - - - 0 -
Flooring - VCT - - - - - - - - 75 -
HIGH SUMMARY8/5/2020
Year Built / Age 2014 / 6 Assessment Scale:Campus Square Footage 115,261 100 = New or Newly Replaced
Current Year 2020 0 = End of Life Cycle
Flower Mound 9th
LIFE
CYC
LE -
YEAR
SLA
ST R
EPLA
CED
% L
IFE
REM
AINI
NGVI
SUAL
EVA
LUAT
ION
WOR
K OR
DER
HIST
ORY
TOTA
L AS
SESS
MEN
T
Type of Material / Notes
FACILITY AGE RATING 50 2014 88Flower Mound 9th - HVAC 20 2014 70 75 6% 77 RTU
Flower Mound 9th - HVAC - Controls 20 2014 70 75 73 Controls = AlertonFlower Mound 9th - Ceiling and Lights 20 2014 70 75 73
Flower Mound 9th - Roof - Flat 20 2014 70 75 -1% 72 Mod BitFlower Mound 9th - Electrical Switchgear 30 2014 80 80 -20% 64
Flower Mound 9th - Elevator 25 2014 76 70 -49% 37 Thyssen KruppFlower Mound 9th - Fire Safety - Fire Alarm 20 2014 70 75 -22% 56 Edwards EST 3
Flower Mound 9th - Fire Safety - Sprinkler System 50 2014 88 90 13% 100
Flower Mound 9th - Food Service Boilers 20 2014 70 65 68
Flower Mound 9th - Food Service Freezers 20 2014 70 75 73
Flower Mound 9th - Lightning Detection - - Siren and Controls next door @ FMHSFlower Mound 9th - Generator 40 2014 85 85 85 Cummins - Diesel
Flower Mound 9th - Flooring - Classrooms - VCT 20 2014 70 80 75 VCTFlower Mound 9th - Flooring - Corridors - VCT 20 2014 70 80 75 VCT
Flower Mound 9th - Flooring - Corridors - Stained Concrete 30 2018 93 95 94
Stained concreteFlower Mound 9th - Flooring - Library 30 2018 93 95 94 Stained concreteFlower Mound 9th - Flooring - Offices 20 2014 70 80 75 VCT
Flower Mound 9th - Flooring - Cafeteria 30 2018 93 95 94 Stained concreteFlower Mound 9th - Flooring - Connection Corridor 50 2014 88 75 82 Terrazzo some cracking
Flower Mound 9th - Flooring - Kitchen 50 2014 88 90 89 TerrazzoFlower Mound 9th - Doors 20 2014 70 75 73 Dark
Flower Mound 9th - Door Hardware 20 2014 70 75 73
Flower Mound 9th - Casework (Built-Ins) 20 2014 70 75 73
Flower Mound 9th - Restrooms - Faculty 20 2014 70 75 73 Ceramic tileFlower Mound 9th - Restrooms - Student 20 2014 70 75 73 Ceramic tile
Flower Mound 9th - Marquee 15 2014 60 70 65 LEDFlower Mound 9th - Paving - Parking Lots 50 2014 88 90 89
Flower Mound 9th - Paving - Sidewalks 40 2014 85 85 85 Shotblast Front porch 2018Flower Mound 9th - Exterior Lighting 20 2014 70 80 75 LED
Flower Mound 9th - Paint - Commons 15 2014 60 70 65 Office areas repainted 2018 - color changes
Flower Mound 9th - Paint - Cafeteria 15 2014 60 70 65
Flower Mound 9th - Paint - Exterior 20 2014 70 75 73
Flower Mound 9th - Paint - Hallways 20 2014 70 75 73
Sports and Fine Arts
Flower Mound 9th - Cafetorium - Curtains 20 2014 70 75 73
Flower Mound 9th - Cafetorium - Lighting 20 2014 70 70 70
Flower Mound 9th8/5/2020
Year Built / Age 2010 / 10 Assessment Scale:Campus Square Footage 179,248 100 = New or Newly Replaced
Current Year 2020 0 = End of Life Cycle
Hebron 9th
LIFE
CYC
LE -
YEAR
SLA
ST R
EPLA
CED
% L
IFE
REM
AINI
NGVI
SUAL
EVA
LUAT
ION
WOR
K OR
DER
HIST
ORY
TOTA
L AS
SESS
MEN
T
Type of Material / Notes
FACILITY AGE RATING 50 2010 80Hebron 9th - HVAC 20 2010 50 55 -3% 51 CHILLER
Hebron 9th - HVAC - Controls 20 2010 50 55 53 Controls = Alerton (control)/Automated Logic (hardware)
Hebron 9th - Ceiling and Lights 20 2010 50 55 53
Hebron 9th - Roof - Flat 20 2010 50 60 8% 60 4 Ply Built UpHebron 9th - Roof - Standing Seam 20 2010 50 65 8% 62
Hebron 9th - Electrical Switchgear 30 2010 67 65 10% 72
Hebron 9th - Elevator 25 2010 60 65 18% 74 Thyssen KruppHebron 9th - Fire Safety - Fire Alarm 20 2010 50 50 17% 58 FCI Gamewell E3 Series
Hebron 9th - Fire Safety - Sprinkler System 50 2010 80 80 16% 93
Hebron 9th - Food Service Boilers 20 2010 50 50 50
Hebron 9th - Food Service Freezers 20 2010 50 60 55
Hebron 9th - Lightning Detection - - Siren and Controls next door @ HHSHebron 9th - Generator 40 2014 85 88 87 Kohler - Diesel
Hebron 9th - Flooring - Classrooms 20 2010 50 55 53 VCTHebron 9th - Flooring - Corridors 20 2010 50 60 55 VCT
Hebron 9th - Flooring - Library 15 2010 33 35 34 CarpetHebron 9th - Flooring - Offices 15 2010 33 35 34 Carpet
Hebron 9th - Flooring - Cafeteria 20 2010 50 55 53 VCTHebron 9th - Flooring - Kitchen 50 2010 80 85 83 Terrazzo
Hebron 9th - Flooring - Band 15 2010 33 25 29 CarpetHebron 9th - Flooring - Choir 15 2010 33 30 32 Carpet
Hebron 9th - Flooring - Orchestra 15 2010 33 30 32 CarpetHebron 9th - Doors 20 2010 50 60 55 Medium Dark
Hebron 9th - Door Hardware 20 2010 50 60 55
Hebron 9th - Casework (Built-Ins) 20 2010 50 60 55
Hebron 9th - Restrooms - Faculty 20 2010 50 60 55
Hebron 9th - Restrooms - Student 20 2010 50 60 55 CT to ceiling. Block Part. w/solid wood doors
Hebron 9th - Marquee 15 2017 80 90 85 2017 Change to LEDHebron 9th - Paving - Parking Lots 50 2010 80 80 80
Hebron 9th - Paving - Sidewalks 40 2010 75 75 75
Hebron 9th - Exterior Lighting 20 2010 50 55 53
Hebron 9th - Paint - Commons 15 2010 33 40 37
Hebron 9th - Paint - Cafeteria 15 2010 33 40 37
Hebron 9th - Paint - Gyms 20 2010 50 50 50
Hebron 9th - Paint - Exterior 20 2010 50 50 50
Hebron 9th - Paint - Hallways 20 2010 50 50 50 Maintain Traffic Areas
Sports and Fine ArtsHebron 9th - Perf Arts - Curtains 20 2010 50 55 53
Hebron 9th - Perf Arts - Cafetorium Lighting 20 2010 50 55 53
Hebron 9th - Track - -
Hebron 9th - Field Lights - -
Hebron 9th - Bleachers - Exterior - -
Hebron 9th - Bleachers - Interior 30 2010 67 70 68
Hebron 9th - Gym Main - Flooring 40 2010 75 75 75
Hebron 9th - Gym Auxiliary - Flooring 40 2010 75 75 75
Hebron 9th - Gym -Locker Room - Flooring 20 2010 50 50 50 EpoxyHebron 9th - Gym - Lockers 40 2010 75 85 80
Hebron 9th - Gym - Benches 50 2010 80 80 80 ConcreteHebron 9th - Gym - Partitions 20 2010 50 60 55 Block
Hebron 9th8/5/2020
Year Built / Age 2011 / 9 Assessment Scale:Campus Square Footage 212,748 100 = New or Newly Replaced
Current Year 2020 0 = End of Life Cycle
LHS Harmon
LIFE
CYC
LE -
YEAR
SLA
ST R
EPLA
CED
% L
IFE
REM
AINI
NGVI
SUAL
EVA
LUAT
ION
WOR
K OR
DER
HIST
ORY
TOTA
L AS
SESS
MEN
T
Type of Material / Notes - Items highlighted Orange are 2017 Bond
FACILITY AGE RATING 50 2011 82LHS Harmon - HVAC 20 2011 55 60 1% 58 CHILLER
LHS Harmon - HVAC - Controls 20 2011 55 60 58 Controls = AlertonLHS Harmon - Ceiling and Lights 20 2011 55 60 58
LHS Harmon - Roof - Flat 20 2011 55 60 5% 60 4 Ply Built upLHS Harmon - Roof - Standing Seam 30 2011 70 75 5% 76
LHS Harmon - Electrical Switchgear 30 2011 70 75 0% 72
LHS Harmon - Elevator 25 2011 64 70 20% 80 OtisLHS Harmon - Fire Safety - Fire Alarm 20 2011 55 55 -6% 52 Harrington HS 3030
LHS Harmon - Fire Safety - Sprinkler System 50 2011 82 80 -16% 68
LHS Harmon - Food Service Boilers 20 2011 55 55 55
LHS Harmon - Food Service Freezers 20 2011 55 60 58
LHS Harmon - Lightning Detection 15 2009 27 25 26 Siren & ControlsLHS Harmon - Generator 40 2011 78 80 79 Generac - Diesel
LHS Harmon - Flooring - Classrooms 20 2011 55 60 58 VCTLHS Harmon - Flooring - Corridors 20 2011 55 60 58 VCT
LHS Harmon - Flooring - Library 15 2011 40 50 45 CarpetLHS Harmon - Flooring - Offices 15 2011 40 50 45 Carpet
LHS Harmon - Flooring - Cafeteria 20 2011 55 60 58 VCTLHS Harmon - Flooring - Kitchen 50 2011 82 80 81 Terrazzo
LHS Harmon - Flooring - Band 15 2011 40 40 40 CarpetLHS Harmon - Flooring - Choir 15 2011 40 45 43 Carpet
LHS Harmon - Flooring - Orchestra 15 2011 40 40 40 CarpetLHS Harmon - Doors 20 2011 55 55 55 White Oak
LHS Harmon - Door Hardware 20 2011 55 60 58 MedcoLHS Harmon - Casework (Built-Ins) 20 2011 55 60 58
LHS Harmon - Restrooms - Faculty 20 2011 55 65 60
LHS Harmon - Restrooms - Student 20 2011 55 65 60
LHS Harmon - Marquee 30 2011 70 70 70
LHS Harmon - Paving - Parking Lots 50 2011 82 80 81
LHS Harmon - Paving - Sidewalks 40 2011 78 80 79
LHS Harmon - Exterior Lighting 20 2011 55 65 60
LHS Harmon - Paint - Commons 15 2011 40 60 50
LHS Harmon - Paint - Cafeteria 15 2018 87 75 81
LHS Harmon - Paint - Gyms 20 2011 55 65 60 Lower WallsLHS Harmon - Paint - Exterior 20 2011 55 60 58 Metal Doors
LHS Harmon - Paint - Hallways 20 2011 55 65 60 Athletic areas painted 2015
Sports and Fine ArtsLHS Harmon - Perf Arts - Curtains 20 2011 55 60 58
LHS Harmon - Perf Arts - Cafetorium Lighting 20 2011 55 60 58
LHS Harmon - Synthetic Track 10 2011 10 10 10Fair; some chunks missing; long jump run in very poor condition
LHS Harmon - Field Lights 30 2011 70 75 73
LHS Harmon - Stadium Scoreboard 18 2015 72 75 74 Moved from PurnellLHS Harmon - Bleachers - Exterior 40 2019 98 100 99
LHS Harmon - Bleachers - Interior 30 2011 70 70 70
LHS Harmon - Gym Main - Flooring 40 2011 78 80 79
LHS Harmon - Gym Auxiliary - Flooring 40 2011 78 80 79
LHS Harmon - Gym - Locker Room - Flooring 20 2011 55 60 58 EpoxyLHS Harmon - Gym - Lockers 40 2011 78 80 79
LHS Harmon - Gym - Benches 50 2011 82 85 84 ConcreteLHS Harmon - Gym - Partitions 20 2011 55 65 60 CMU
TENNIS COURTS 2011LHS Harmon - Tennis Courts 50 2011 82 80 81 12 Courts; replaced gate & most latches
LHS Harmon - Tennis Courts Resurfaced 10 2019 90 95 93
LHS Harmon - Tennis Courts Light Poles 30 2011 70 70 70
LHS Harmon - Tennis Courts Shade Structure 20 2013 65 65 65
LHS Harmon8/5/2020
Year Built / Age 2005 / 15 Assessment Scale:Campus Square Footage 175,658 100 = New or Newly Replaced
Current Year 2020 0 = End of Life Cycle
LHS Killough
LIFE
CYC
LE -
YEAR
SLA
ST R
EPLA
CED
% L
IFE
REM
AINI
NGVI
SUAL
EVA
LUAT
ION
WOR
K OR
DER
HIST
ORY
TOTA
L AS
SESS
MEN
T
Type of Material / Notes - Items highlighted Orange are 2017 Bond
FACILITY AGE RATING 50 2005 70LHS Killough - HVAC 20 2005 25 30 -16% 23 CHILLER
LHS Killough - HVAC - Control 20 2005 25 30 28 Controls = AlertonLHS Killough - Ceiling and Lights 20 2005 25 30 28 T-8
LHS Killough - Roof - Flat 20 2005 25 25 -50% 13 4 Ply Built upLHS Killough - Roof - Shingled 20 2005 25 25 -50% 13
LHS Killough - Electrical Switchgear 30 2005 50 50 8% 54
LHS Killough - Elevator (Main Campus) 25 2005 40 40 3% 41 Thyssen KruppLHS Killough - Lift (Softball Press Box) - - Removed 7/2019LHS Killough - Fire Safety - Fire Alarm 20 2019 95 100 98 Edwards IO
LHS Killough - Fire Safety - Sprinkler System 50 2005 70 70 -50% 35
LHS Killough - Food Service Boilers 20 2005 25 25 25
LHS Killough - Food Service Freezers 20 2005 25 30 28
LHS Killough - Lightning Detection 15 2009 27 25 26 Siren; Controls @ Huffines MSLHS Killough - Generator 40 2005 63 70 66 Olympian - Diesel
LHS Killough - Flooring - Classrooms 20 2005 25 35 30 VCTLHS Killough - Flooring - Corridors 20 2005 25 35 30 VCT
LHS Killough - Flooring - Library 15 2005 0 5 3 CarpetLHS Killough - Flooring - Offices 15 2005 0 5 3 Carpet
LHS Killough - Flooring - Cafeteria 20 2005 25 35 30 VCTLHS Killough - Flooring - Kitchen 50 2005 70 70 70 Terrazzo
LHS Killough - Flooring - Band 15 2005 0 0 0 CarpetLHS Killough - Doors 20 2005 25 30 28 Golden Oak
LHS Killough - Door Hardware 20 2005 25 30 28 BestLHS Killough - Casework (Built-Ins) 20 2005 25 30 28
LHS Killough - Restrooms - Faculty 20 2005 25 30 28
LHS Killough - Restrooms - Student 20 2005 25 30 28
LHS Killough - Marquee 30 2005 50 20 35 Needs new faceLHS Killough - Paving - Parking Lots 50 2005 70 70 70
LHS Killough - Paving - Sidewalks 40 2005 63 65 64
LHS Killough - Exterior Lighting 20 2005 25 30 28 Partial LED (3 Poles)LHS Killough - Paint - Commons 15 2019 93 95 94
LHS Killough - Paint - Cafeteria 15 2019 93 95 94
LHS Killough - Paint - Gyms 20 2005 25 50 38 Lower walls painted 2018LHS Killough - Paint - Exterior 20 2005 25 40 33
LHS Killough - Paint - Hallways 20 2005 25 60 43 Frames/Base painted 2018
Sports and Fine ArtsLHS Killough - Perf Arts - Curtains 20 2005 25 35 30
LHS Killough - Perf Arts - Cafetorium Lighting 20 2005 25 30 28
LHS Killough - Synthetic Track 10 2005 -50 0 -25 Repairs in 2015; needs additional replacement or removal
LHS Killough - Bleachers - Interior 30 2005 50 40 45
LHS Killough - Gym Main - Flooring 40 2005 63 65 64
LHS Killough - Gym Auxiliary - Flooring 40 2005 63 65 64
LHS Killough - Gym - Locker Room - Flooring 20 2005 25 35 30 EpoxyLHS Killough - Gym - Lockers 40 2005 63 70 66
LHS Killough - Gym - Benches 20 2005 25 35 30 Plastic, woodLHS Killough - Gym - Partitions 20 2005 25 35 30 Solid Plastic
SOFTBALL FIELD 2005LHS Killough - Softball Field Bleachers 40 2005 63 65 64
LHS Killough8/5/2020
LIFE
CYC
LE -
YEAR
SLA
ST R
EPLA
CED
% L
IFE
REM
AINI
NGVI
SUAL
EVA
LUAT
ION
WOR
K OR
DER
HIST
ORY
TOTA
L AS
SESS
MEN
T
Type of Material / Notes - Items highlighted Orange are 2017 Bond
LHS Killough - Softball Field Restrooms 20 2005 25 35 30 2x2 flt CT; 4x4 wall tile to ceiling; solid plastic partitions
LHS Killough - Softball Field Backstop Netting 15 2010 33 30 32 Repaired netting in 2020LHS Killough - Softball Field Scoreboard 20 2018 90 95 93
LHS Killough - Softball Field Pressbox 20 2005 25 30 28
LHS Killough - Softball Field Paint - Dugout 15 2020 100 100 100
LHS Killough - Softball Field Light poles 30 2005 50 90 70
LHS Killough - Softball Field Leveling 5 2018 60 75 68 Added material to help level spots in 2019LHS Killough - Softball Field Bullpens 20 2016 80 85 83 1st and 3rd added 2016
LHS Killough - Softball Field Batting Cage 20 2012 60 70 65 will need new netting in covered cagesLHS Killough - Softball Field Concession 20 2005 25 35 30
LHS Killough8/5/2020
Year Built / Age 2014 / 6 Assessment Scale:Campus Square Footage 109,046 100 = New or Newly Replaced
Current Year 2020 0 = End of Life Cycle
Marcus 9TH
LIFE
CYC
LE -
YEAR
SLA
ST R
EPLA
CED
% L
IFE
REM
AINI
NGVI
SUAL
EVA
LUAT
ION
WOR
K OR
DER
HIST
ORY
TOTA
L AS
SESS
MEN
T
Type of Material / Notes
FACILITY AGE RATING 50 2014 88Marcus 9th - HVAC 20 2014 70 70 2% 71 RTU
Marcus 9th - HVAC - Controls 20 2014 70 70 70 Controls = AlertonMarcus 9th - Ceiling and Lights 20 2014 70 70 70 Mixed
Marcus 9th - Roof - Flat 20 2014 0 2017 hail damage insurance replacement - IN PROGRESS
Marcus 9th - Electrical Switchgear 30 2014 80 80 -7% 74
Marcus 9th - Elevator 25 2014 76 70 -50% 37 Thyssen KruppMarcus 9th - Fire Safety - Fire Alarm 20 2014 70 70 9% 76 Notifier NFS2-3030E
Marcus 9th - Fire Safety - Sprinkler System 50 2014 88 90 4% 92
Marcus 9th - Food Service Boilers 20 2014 70 75 73
Marcus 9th - Food Service Freezers 20 2014 70 75 73
Marcus 9th - Lightning Detection - - Siren and Controls next door @ MHSMarcus 9th - Generator 40 2014 85 90 88 Cummins - Diesel; Supply 9th and MAC
Marcus 9th - Flooring - Classrooms - VCT 20 2014 70 75 73 VCTMarcus 9th - Flooring - Corridors - VCT 20 2014 70 75 73 VCT
Marcus 9th - Flooring - Corridors - Stained Concrete 30 2014 80 80 80
Stained concreteMarcus 9th - Flooring - Library 30 2014 80 80 80 Stained concreteMarcus 9th - Flooring - Offices 20 2014 70 70 70 VCT
Marcus 9th - Flooring - Cafeteria 30 2014 80 80 80 Stained concreteMarcus 9th - Flooring - Kitchen 50 2014 88 90 89 Terrazzo
Marcus 9th - Doors 20 2014 70 75 73 MahoganyMarcus 9th - Door Hardware 20 2014 70 75 73
Marcus 9th - Casework (Built-Ins) 20 2014 70 75 73
Marcus 9th - Restrooms - Faculty 20 2014 70 75 73 Ceramic tileMarcus 9th - Restrooms - Student 20 2014 70 75 73 Ceramic tile; CMU
Marcus 9th - Marquee 15 2014 60 65 63 LEDMarcus 9th - Paving - Parking Lots 50 2014 88 90 89
Marcus 9th - Paving - Sidewalks 40 2014 85 85 85
Marcus 9th - Exterior Lighting 20 2014 70 70 70 LEDMarcus 9th - Paint - Commons 15 2018 87 90 88
Marcus 9th - Paint - Cafeteria 15 2018 87 90 88
Marcus 9th - Paint - Exterior 20 2014 70 75 73
Marcus 9th - Paint - Hallways 20 2014 70 75 73 some areas painted in 2018 - as needed
Sports and Fine ArtsMarcus 9th - Cafetorium - Projector Lift 2019 Technology Item - Tracking purposes only -
replaced Summer of 2019
Marcus 9th - Cafetorium - Curtains 20 2014 70 70 70
Marcus 9th - Cafetorium - Lighting 20 2014 70 70 70 LED
Marcus 9th8/5/2020
Year Built / Age 1999 / 21 Assessment Scale:Campus Square Footage 525,871 100 = New or Newly Replaced
Current Year 2020 0 = End of Life Cycle
Flower Mound HS
LIFE
CYC
LE -
YEAR
SLA
ST R
EPLA
CED
% L
IFE
REM
AINI
NGVI
SUAL
EVA
LUAT
ION
WOR
K OR
DER
HIST
ORY
TOTA
L AS
SESS
MEN
T
Type of Material / Notes - Items highlighted Orange are 2017 Bond
FACILITY AGE RATING 50 1999 58
MAIN CAMPUSFlower Mound HS - HVAC - Original 20 1999 0 RTU - In Progress
Flower Mound HS - HVAC - 2002 Addition 20 2002 10 15 3% 13 Auditorium, RTUFlower Mound HS - HVAC - 2008 Addition 20 2008 40 45 3% 44 Gym, Wrestling, Fine Arts, RTUFlower Mound HS - HVAC - 2014 Addition 20 2014 70 80 75 Blackbox, RTU
Flower Mound HS - HVAC - Controls 20 2014 70 75 73 Controls = AlertonFlower Mound HS - Ceiling and Lights - Original 20 1999 0 In Progress
Flower Mound HS - Ceiling and Lights - 2002 Addition 20 2002 10 15 13 Auditorium House LightingFlower Mound HS - Ceiling and Lights - 2008 Addition 20 2008 40 45 43 Gym, Wrestling, Fine ArtsFlower Mound HS - Ceiling and Lights - 2014 Addition 20 2014 70 75 73 Blackbox
Flower Mound HS - Roof - Original 20 1999 0 In ProgressFlower Mound HS - Roof - 2002 Addition 20 2002 10 15 15% 14 AuditoriumFlower Mound HS - Roof - 2008 Addition 20 2008 40 50 15% 52 Gym, Wrestling, Fine ArtsFlower Mound HS - Roof - 2014 Addition 20 2014 70 75 73 Blackbox
Flower Mound HS - Electrical Switchgear - Orig 30 1999 30 30 2% 31
Flower Mound HS - Electrical Panels - 2002 Add 30 2002 40 40 2% 41 AuditoriumFlower Mound HS - Electrical Panels - 2008 Add 30 2008 60 60 2% 61 Gym, Wrestling, Fine ArtsFlower Mound HS - Electrical Panels - 2014 Add 30 2014 80 80 2% 80 Blackbox
Flower Mound HS - Elevator #1 (main) 25 1999 0 Dover; In ProgressFlower Mound HS - Elevator #2 (Stadium) 25 2003 32 25 -1% 28 Schindler
Flower Mound HS - Elevator #3 (Arena) 25 2014 76 85 17% 94 Thyssen KruppFlower Mound HS - Lift (Auditorium) 25 2002 28 35 32 Nat'l Wheel-O-Vator
Flower Mound HS - Fire Safety - Fire Alarm 20 2014 70 75 -3% 70 New Panel / Original Devices; Edwards EST 3
Flower Mound HS - Fire Safety - Sprinkler Sys-Orig 50 1999 58 60 -17% 49
Flower Mound HS - Fire Safety - Sprinkler Sys-2002 Add 50 2002 64 65 -17% 54Auditorium
Flower Mound HS - Fire Safety - Sprinkler Sys-2008 Add 50 2008 76 75 -17% 63Gym, Wrestling, Fine Arts
Flower Mound HS - Fire Safety - Sprinkler Sys-2014 Add 50 2014 88 90 89Blackbox
Flower Mound HS - Food Service Boilers 20 1999 0 A.O. Smith Burkay Copper Coils; In ProgressFlower Mound HS - Food Service Freezers 20 1999 0 In Progress
Flower Mound HS - Lightning Detection 15 2009 27 25 26 Siren and ControlsFlower Mound HS - Generator - - In Progress
Flower Mound HS - Flooring - Classrooms 15 1999 0 Carpet - In ProgressFlower Mound HS - Flooring - Classrooms 15 2002 0 Carpet- In Progress
Flower Mound HS - Flooring - Classrooms - VCT 20 1999 0 VCT- In ProgressFlower Mound HS - Flooring - Corridors - Carpet 15 1999 0 Carpet- In Progress
Flower Mound HS - Flooring - Corridors - VCT 20 1999 0 VCT- In ProgressFlower Mound HS - Flooring - Library 15 2014 60 70 65 LVTFlower Mound HS - Flooring - Offices 15 1999 0 Carpet- In Progress
Flower Mound HS - Flooring - Cafeteria 20 1999 0 VCT- In ProgressFlower Mound HS - Flooring - Kitchen 50 1999 58 60 59 Terrazzo
Flower Mound HS - Flooring - Band 20 2008 40 50 45 VCTFlower Mound HS - Flooring - Choir 20 2018 90 95 93 VCT
Flower Mound HS - Flooring - Orchestra 20 2010 50 55 53 VCTFlower Mound HS - Doors 20 1999 0 White washed- In Progress
Flower Mound HS - Door Hardware 20 1999 0 In ProgressFlower Mound HS - Casework (Built-Ins) 20 1999 0 Light Green- In ProgressFlower Mound HS - Restrooms - Faculty 20 1999 0 In ProgressFlower Mound HS - Restrooms - Student 20 1999 0 In Progress
Flower Mound HS8/5/2020
LIFE
CYC
LE -
YEAR
SLA
ST R
EPLA
CED
% L
IFE
REM
AINI
NGVI
SUAL
EVA
LUAT
ION
WOR
K OR
DER
HIST
ORY
TOTA
L AS
SESS
MEN
T
Type of Material / Notes - Items highlighted Orange are 2017 Bond
Flower Mound HS - Restrooms - 2002 Addition 20 2002 10 10 10
Flower Mound HS - Restrooms - 2008 Addition 20 2008 40 40 40
Flower Mound HS - Restrooms - 2014 Addition 20 2014 70 75 73 AuditoriumFlower Mound HS - Marquee 20 2017 85 85 85 Monument sign only; not lit
Flower Mound HS - Paving - Parking Lots 50 1999 58 60 59 ConcreteFlower Mound HS - Paving - Parking Lots 50 2013 86 90 88 Concrete, North Lot
Flower Mound HS - Paving - Sidewalks 40 1999 48 50 49 Some sinking in areasFlower Mound HS - Exterior Lighting 20 2013 65 70 68 LED
Flower Mound HS - Paint - Commons 15 2013 0 Some areas painted in 2018 - In ProgressFlower Mound HS - Paint - Cafeteria 15 2012 0 Lower walls painted 2018 - In Progress
Flower Mound HS - Paint - Auditorium 15 2019 93 95 94
Flower Mound HS - Paint - J.A.C. 15 2014 60 70 65
Flower Mound HS - Paint - Gyms 20 2012 0 Lower walls - In ProgressFlower Mound HS - Paint - Exterior 20 2017 0 In Progress
Flower Mound HS - Paint - Hallways 20 2014 0 Some frames painted 2017 - In ProgessFlower Mound HS - Cafetorium - Curtains 20 1999 0 In ProgressFlower Mound HS - Cafetorium - Lighting 25 1999 0 In ProgressFlower Mound HS - Auditorium Curtains 20 2002 10 15 13
Flower Mound HS - Auditorium Stage Lighting 25 2002 28 30 29
Flower Mound HS - Auditorium Sound 2014 - Tracking Replacement Yr only - In Technology Dept. PlansFlower Mound HS - Auditorium Seating 30 2002 40 40 40
Flower Mound HS - Auditorium Flooring 15 2019 93 95 94 Replaced Summer of 2019Flower Mound HS - Large Gym - Flooring 40 1999 48 50 49
Flower Mound HS - Large Gym - Bleachers 30 1999 30 35 33 Repairs made Summer 2019Flower Mound HS - Large Gym - Scoreboard 20 1999 -5 10 3 Nevco
Flower Mound HS - Middle Gym - Flooring 40 2012 80 80 80
Flower Mound HS - Middle Gym - Bleachers 30 1999 30 35 33 Major repairs in 2018Flower Mound HS - Middle Gym - Scoreboard 20 1999 -5 10 3 Fair Play
Flower Mound HS - 2008 Gym - Flooring 20 2008 40 45 43 RubberFlower Mound HS - 2008 Gym - Bleachers 30 2008 60 65 63
Flower Mound HS - Girls Locker Rooms - Flooring 20 2012 60 65 63 EpoxyFlower Mound HS - Girls Locker Rooms - Benches 20 2012 60 60 60 Plastic wood
Flower Mound HS - Girls Locker Rooms - Partitions 20 2012 60 65 63 PLamFlower Mound HS - Boys Locker Rooms - Flooring 20 2018 90 95 93
Flower Mound HS - Boys Locker Rooms - Benches 20 2018 90 95 93
Flower Mound HS - Boys Locker Rooms - Partitions 20 2018 90 95 93
STADIUM 2003Flower Mound HS - Stadium Bleachers 40 2003 58 60 59
Flower Mound HS - Stadium Artificial Turf 8 2012 0 0 0 D-rings and pole vault runway need replacement - Yr 4
Flower Mound HS - Stadium Synthetic Track 10 2012 20 15 18 Major track repair (twice) due to water faucet; repairs needed again
Flower Mound HS - Stadium PA System 2013 - Tracking Replacement Yr only - In Technology Dept. Plans
Flower Mound HS - Stadium Lightpoles 30 2003 43 50 47
Flower Mound HS - Stadium Scoreboard 18 2003 6 10 8
Flower Mound HS - Stadium Pressbox HVAC 20 2003 15 25 20
Flower Mound HS - Stadium Pressbox Roof 20 2003 15 25 20
Flower Mound HS - Stadium Pressbox Flooring 20 2003 15 15 15 Carpet; VCT (in good shape)Flower Mound HS - Stadium Ticket / Concession - Home
(2) - HVAC 20 2004 20 20 20Package unit A/C only on Ticket booth installed by booster
Flower Mound HS - Stadium Ticket / Concession - Home (2) - Roof 30 2003 43 50 47
MetalFlower Mound HS - Stadium Ticket / Concession - Visitor
(2) - Roof 30 2003 43 50 47Metal
Flower Mound HS - Stadium Restrooms - Home 20 2003 15 20 18 Removed old drinking fountains and bricked wall; Painted 2018
Flower Mound HS - Stadium Restrooms - Visitor 20 2003 15 20 18 Painted 2018Flower Mound HS - Stadium Band Tower 50 2006 72 75 74 Painted Summer 2017
FIELD HOUSE - 2010Flower Mound HS
8/5/2020
LIFE
CYC
LE -
YEAR
SLA
ST R
EPLA
CED
% L
IFE
REM
AINI
NGVI
SUAL
EVA
LUAT
ION
WOR
K OR
DER
HIST
ORY
TOTA
L AS
SESS
MEN
T
Type of Material / Notes - Items highlighted Orange are 2017 Bond
Flower Mound HS - Field House HVAC 20 2010 50 55 53
Flower Mound HS - Field House Roof - Metal 30 2010 67 70 68
Flower Mound HS - Field House Electrical Panels 30 2010 67 70 68
Flower Mound HS - Field House Fire Safety - Alarm System 20 2010 50 55 53
EST - 3; Tied to Main bldg. Warning detection devices only.
Flower Mound HS - Field House Fire Safety - Sprinkler System 50 2010 80 80 80
Flower Mound HS - Field House Flooring - Carpet 15 2010 33 40 37
Flower Mound HS - Field House Flooring - Epoxy 20 2010 50 50 50
Flower Mound HS - Field House Flooring - Concrete/Terrazzo 50 2010 80 80 80
Flower Mound HS - Field House Restrooms - Locker room 20 2010 50 55 53
Flower Mound HS - Field House Restrooms - Coaches 20 2010 50 55 53
Flower Mound HS - Field House Lockers 40 2010 75 75 75
Flower Mound HS - Field House Benches 50 2010 80 80 80 ConcreteFlower Mound HS - Field House Paint 15 2019 93 95 94
Flower Mound HS - Field House Exterior Lighting 20 2010 50 55 53
J.A.C. 2014 / FIELD HOUSE 1999
Flower Mound HS - J.A.C. Fire Safety - Alarm System 20 2014 70 75 73Tied to Main bldg. Warning detection devices only. EST 3
Flower Mound HS - J.A.C. - HVAC 20 2014 70 75 73
Flower Mound HS - J.A.C. - Roof - Flat 20 2014 70 75 73 Mod BitFlower Mound HS - J.A.C. - Electrical Panels 30 2014 80 80 80
Flower Mound HS - J.A.C. - Fire Safety - Sprinkler System 50 2014 88 90 89
Flower Mound HS - J.A.C. - Gym Flooring 40 2014 85 85 85
Flower Mound HS - J.A.C. - Bleachers 30 2014 80 85 83 RetractableFlower Mound HS - J.A.C. - Restrooms 20 2014 70 75 73
Flower Mound HS - J.A.C. - Scoreboard 20 2014 70 75 73
Flower Mound HS - J.A.C. - Locker Room Flooring 20 2014 70 75 73Epoxy
Flower Mound HS - J.A.C. - Locker Room Benches 50 2014 88 90 89Concrete
Flower Mound HS - J.A.C. - Locker Room Lockers 40 2014 85 85 85
Flower Mound HS - Field House 1999 -HVAC 20 1999 0 In Progress
Flower Mound HS - Field House 1999 - Roof - Flat 20 1999 0In Progress
Flower Mound HS - Field House 1999 - Electrical Panels 30 1999 30 30 30
Flower Mound HS - Field House 1999 - Fire Safety - Sprinkler System 50 1999 58 60 59
Flower Mound HS - Field House 1999 - Flooring - VCT 20 2018 90 95 93
Flower Mound HS - Field House 1999 - Locker Room Flooring 20 2018 90 95 93
Flower Mound HS - Field House 1999 - Locker Room Benches 20 2018 90 95 93
LinexFlower Mound HS - Field House 1999 - Locker Room
Lockers 40 1999 48 50 49
Flower Mound HS - Field House 1999 - Paint - Exterior 20 1999 0Metal coping only- In Progress
INDOOR ATHLETIC CENTER 2013
Flower Mound HS - IAC - HVAC 20 2013 65 70 68
Flower Mound HS - IAC - Roof - Metal 30 2013 77 75 76
Flower Mound HS - IAC - Electrical Panels 30 2013 77 80 78
Flower Mound HS - IAC - Fire Safety - Alarm System 20 2013 65 70 68EST 3 - has own account
Flower Mound HS - IAC - Fire Safety - Sprinkler System 50 2013 86 85 86
Flower Mound HS - IAC - Artificial Turf 15 2013 53 55 54 Starting to show some age - still in fair conditionFlower Mound HS - IAC - Weight Room Flooring 20 2013 65 70 68
Flower Mound HS8/5/2020
LIFE
CYC
LE -
YEAR
SLA
ST R
EPLA
CED
% L
IFE
REM
AINI
NGVI
SUAL
EVA
LUAT
ION
WOR
K OR
DER
HIST
ORY
TOTA
L AS
SESS
MEN
T
Type of Material / Notes - Items highlighted Orange are 2017 Bond
Flower Mound HS - IAC - Paint 20 2013 65 70 68 Lower walls 2019Flower Mound HS - IAC - Paint - Exterior 20 2013 65 70 68
SPORTS COMPLEX 2014
Flower Mound HS - Sports Complex -Parking Lots 50 2014 88 90 89
BASEBALL FIELD 2014Flower Mound HS - Baseball Field Bleachers 40 2014 85 85 85
Flower Mound HS - Baseball Field Backstop Netting 15 2014 60 60 60minor repairs in 2019
Flower Mound HS - Baseball Field Scoreboard 20 2014 70 75 73 LED wirelessFlower Mound HS - Baseball Field Pressbox 20 2014 70 75 73
Flower Mound HS - Baseball Field Dugout Paint 15 2014 60 65 63
Flower Mound HS - Baseball Field Light poles 30 2014 80 85 83
Flower Mound HS - Baseball Field Leveling 5 2018 60 90 75 Added material to level infield in 2020Flower Mound HS - Baseball Field Batting Cage 20 2014 70 75 73 Added new lighting in 2017; flooring coming up in spots
Restrooms / Concession
Flower Mound HS - Baseball Field Concession HVAC 20 2014 70 75 73
Flower Mound HS - Baseball Field Concession Roof - Metal 30 2014 80 85 83
Flower Mound HS - Baseball Field Concession Flooring 20 2014 70 75 73Epoxy & concrete
SOFTBALL FIELD 2014Flower Mound HS - Softball Field Bleachers 40 2014 85 85 85
Flower Mound HS - Softball Field Restrooms - - Shared with Baseball
Flower Mound HS - Softball Field Backstop Netting 15 2014 60 50 55Minor repairs 2019
Flower Mound HS - Softball Field Scoreboard 20 2014 70 75 73 LED - WirelessFlower Mound HS - Softball Field Pressbox 20 2014 70 75 73
Flower Mound HS - Softball Field Dugout Paint 15 2014 60 60 60
Flower Mound HS - Softball Field Light poles 30 2014 80 85 83
Flower Mound HS - Softball Field Leveling 5 2014 -20 10 -5 added material to low spots to level infield in 2020; takeout warming track installed grass 2019
Flower Mound HS - Softball Field Batting Cage 20 2014 70 75 73
Flower Mound HS - Softball Field Concession - - Shared with Baseball
TENNIS COURTS 2014Flower Mound HS - Tennis Courts 50 2014 88 85 87 12 Courts; Ionite rock causing chips in surface
Flower Mound HS - Tennis Courts Resurfaced 10 2014 40 40 40 2019 repairs madeFlower Mound HS - Tennis Courts Light Poles 30 2014 80 80 80 18 for all 12 courts
Flower Mound HS - Tennis Courts Shade Structure 20 2014 70 75 73
Flower Mound HS8/5/2020
Year Built / Age 1999 / 21 Assessment Scale:Campus Square Footage 442,827 100 = New or Newly Replaced
Current Year 2020 0 = End of Life Cycle
Hebron HS
LIFE
CYC
LE -
YEAR
SLA
ST R
EPLA
CED
% L
IFE
REM
AINI
NGVI
SUAL
EVA
LUAT
ION
WOR
K OR
DER
HIST
ORY
TOTA
L AS
SESS
MEN
T
Type of Material / Notes Items highlighted Orange are 2017 Bond
FACILITY AGE RATING 50 1999 58
MAIN CAMPUSHebron HS - HVAC - Original 20 1999 0 RTU- In Progress
Hebron HS - HVAC - 2002 Addition 20 2002 10 15 2% 13 Auditorium, classroom wings, RTUHebron HS - HVAC - 2008 Addition 20 2008 40 40 2% 41 Gym, Wrestling, Fine Arts, RTU
Hebron HS - HVAC - Controls 20 1999 0 Controls = I/net; Locker Rms = Reliable; Additions 2002 & 2008 - In Progress
Hebron HS - Ceiling and Lights -Original 20 1999 0 In ProgressHebron HS - Ceiling and Lights - 2002 Addition 20 2002 10 15 13 Auditorium House Lights, Classroom wingsHebron HS - Ceiling and Lights - 2008 Addition 20 2008 40 40 40 Gym, Wrestling, Fine Arts, RTU
Hebron HS - Roof - Flat - Original 20 1999 0 Mod Bit - In ProgressHebron HS - Root - Flat - 2002 Addition 20 2002 10 15 -32% 8 4 ply; Auditorium, classroom wingsHebron HS - Roof - Flat - 2008 Addition 20 2008 40 40 -32% 27 4 ply; Gym, Wrestling, Fine Arts
Hebron HS - Electrical Switchgear - Original 30 1999 30 30 -3% 29
Hebron HS - Electrical Panels - 2002 Addition 30 2002 40 40 -3% 39 Auditorium, classroom wingsHebron HS - Electrical Panels - 2008 Addition 30 2008 60 60 -3% 58 Gym, Wrestling, Fine Arts
Hebron HS - Elevator #1 (main) 25 1999 16 20 16% 21 DoverHebron HS - Elevator #2 (Stadium) 25 2003 32 35 18% 40 Schindler
Hebron HS - Lift (Auditorium) 25 2001 24 30 27 Nat'l Wheel-O-VatorHebron HS - Lift (Softball Press Box) - - Removed 7/2019
Hebron HS - Lift (Baseball Press Box) - - Removed 7/2020Hebron HS - Fire Safety - Fire Alarm 20 1999 0 Edwards EST 3- In Progress
Hebron HS - Fire Safety - Sprinkler System - Original 50 1999 58 60 10% 65
Hebron HS - Fire Safety - Sprinkler System - 2002 Addition 50 2002 64 65 10% 71Auditorium, classroom wings
Hebron HS - Fire Safety - Sprinkler System - 2008 Addition 50 2008 76 76 10% 84Gym, Wrestling, Fine Arts
Hebron HS - Food Service Boilers 20 2011 55 55 55
Hebron HS - Food Service Freezers 20 1999 0 In ProgressHebron HS - Lightning Detection 15 2009 27 25 26 Siren & Controls
Hebron HS - Generator - 0 In ProgressHebron HS - Flooring - Classrooms 15 1999 0 Carpet- In ProgressHebron HS - Flooring - Classrooms 15 2002 0 Carpet- In Progress
Hebron HS - Flooring - Classrooms - VCT 20 1999 0 In ProgressHebron HS - Flooring - Corridors - Carpet 15 1999 0 Carpet- In Progress
Hebron HS - Flooring - Corridors - VCT 20 1999 0 VCT- In ProgressHebron HS - Flooring - Library 15 1999 0 Carpet- In ProgressHebron HS - Flooring - Offices 15 1999 0 Carpet- In Progress
Hebron HS - Flooring - Cafeteria 20 1999 0 VCT- In ProgressHebron HS - Flooring - Kitchen 50 1999 58 60 59 Terrazzo
Hebron HS - Flooring - Band 20 2008 40 45 43 VCTHebron HS - Flooring - Choir 15 1999 0 Carpet- In Progress
Hebron HS - Flooring - Orchestra 15 1999 0 Carpet- In ProgressHebron HS - Flooring - Stairs 20 1999 0 Raised radial rubber- In Progress
Hebron HS - Doors 20 1999 0 In ProgressHebron HS - Door Hardware 20 1999 0 In Progress
Hebron HS - Casework (Built-Ins) 20 1999 0 In ProgressHebron HS - Restrooms - Faculty 20 1999 0 In ProgressHebron HS - Restrooms - Student 20 1999 0 New partitions in cafeteria restrooms: 2013- In Progress
Hebron HS - Restrooms - 2002 Addition 20 2002 10 10 10
Hebron HS - Restrooms - 2008 Addition 20 2008 40 40 40
Hebron HS - Marquee 15 2020 100 100 100 LEDHebron HS - Paving - Parking Lots 50 1999 58 60 59
Hebron HS - Paving - Parking Lots 50 2009 78 75 77
Hebron HS - Paving - Sidewalks 40 1999 48 35 41
Hebron HS8/5/2020
LIFE
CYC
LE -
YEAR
SLA
ST R
EPLA
CED
% L
IFE
REM
AINI
NGVI
SUAL
EVA
LUAT
ION
WOR
K OR
DER
HIST
ORY
TOTA
L AS
SESS
MEN
T
Type of Material / Notes Items highlighted Orange are 2017 Bond
Hebron HS - Exterior Lighting 20 1999 0 In ProgressHebron HS - Paint - Commons 15 2014 0 In ProgressHebron HS - Paint - Cafeteria 15 2014 60 70 0 2018 painted lower walls - In Progress
Hebron HS - Paint - Auditorium 15 2015 67 70 68
Hebron HS - Paint - Gyms 20 2012 0 In ProgressHebron HS - Paint - Exterior 20 2017 0 Exterior doors, posts and railings 2017; In Progress
Hebron HS - Paint - Hallways 20 2015 0 In ProgressHebron HS - Cafetorium - Curtains 20 1999 0 In ProgressHebron HS - Cafetorium - Lighting 25 1999 0 In ProgressHebron HS - Auditorium Curtains 20 2017 85 90 88
Hebron HS - Auditorium Stage Lighting 20 2002 10 15 13
Hebron HS - Auditorium Sound 2014 - Tracking Replacement Yr only - In Technology Dept. Plans
Hebron HS - Auditorium Seating 30 2002 40 35 38
Hebron HS - Auditorium Flooring 15 2017 80 85 83
Hebron HS - Large Gym - Flooring 40 1999 48 50 49 2018 Sanded and painted (2nd sanding)Hebron HS - Large Gym - Bleachers 30 1999 30 35 33 Retractable
Hebron HS - Large Gym - Scoreboard 20 1999 -5 30 13 Original - overhauledHebron HS - Middle Gym - Flooring 40 1999 48 50 49 2018 Sanded and painted (2nd sanding)
Hebron HS - Middle Gym - Bleachers 30 1999 30 30 30
Hebron HS - Middle Gym - Scoreboard 20 1999 -5 10 3
Hebron HS - 2008 Gym - Flooring 20 2008 40 30 35 Rubber (cracking)Hebron HS - 2008 Gym - Bleachers 30 2008 60 65 63
Hebron HS - Girls Locker Rooms - Flooring 20 2008 40 35 38 EpoxyHebron HS - Girls Locker Rooms - Benches 20 2015 75 80 78 LinexHebron HS - Girls Locker Rooms - Partitions 20 2008 40 45 43
Hebron HS - Boys Locker Rooms - Flooring 20 1999 0 Epoxy - In ProgressHebron HS - Boys Locker Rooms - Benches 20 2015 75 80 78 LinexHebron HS - Boys Locker Rooms - Partitions 20 1999 0 In Progress
STADIUM 2003Hebron HS - Stadium Bleachers 40 2003 58 60 59
Hebron HS - Stadium Artificial Turf 8 2012 0 Vistor side drainage problems- In Progress
Hebron HS - Stadium Synthetic Track 10 2013 30 20 25 Repainted/Repaired 2018; drainage problems; some damage from vehicles driving on track
Hebron HS - Stadium PA System 2013 - Tracking Replacement Yr only - In Technology Dept. Plans
Hebron HS - Stadium Light poles 30 2014 80 80 80
Hebron HS - Stadium Scoreboard 18 2003 6 10 8
Hebron HS - Stadium Pressbox HVAC 20 2003 15 20 18
Hebron HS - Stadium Pressbox Roof 20 2003 15 20 18
Hebron HS - Stadium Pressbox Flooring 20 2019 95 95 95 VCT; interior walls painted 2017
Hebron HS - Stadium Ticket Booth(s) 20 2003 15 20 18
Hebron HS - Stadium Restrooms / Concession - Home - HVAC
20 2010 50 55 53Package unit on concessions installed by booster
Hebron HS - Stadium Restrooms / Concession - Home - Roof - Flat
20 2003 15 25 20
Hebron HS - Stadium Restrooms / Concession - Home - Flooring
50 2003 66 66 66Concrete
Hebron HS - Stadium Restrooms / Concession - Visitor - Roof 20 2003 15 20 18Shingled
Hebron HS - Stadium Restrooms - Visitor 20 2003 15 20 18 Painted 2018
Hebron HS - Stadium Band Tower 50 2009 78 80 79 Painted Summer 2017
FIELD HOUSE - 2010Hebron HS - Field House 2010 - HVAC 20 2010 50 55 53
Hebron HS - Field House 2010 - Roof - Metal 30 2010 67 70 68
Hebron HS - Field House 2010 - Electrical Panels 30 2010 67 70 68
Hebron HS - Field House 2010 - Fire Safety - Alarm System 20 2010 50 55 53
Hebron HS - Field House 2010 - Fire Safety - Sprinkler System
50 2010 80 80 80Tied to Main Bldg, Warning detection devices only
Hebron HS - Field House 2010 - Flooring - Carpet 15 2010 33 40 37
Hebron HS - Field House 2010 - Flooring - Epoxy 20 2010 50 50 50
Hebron HS - Field House 2010 - Flooring - Concrete/Terrazzo 50 2010 80 80 80
Hebron HS8/5/2020
LIFE
CYC
LE -
YEAR
SLA
ST R
EPLA
CED
% L
IFE
REM
AINI
NGVI
SUAL
EVA
LUAT
ION
WOR
K OR
DER
HIST
ORY
TOTA
L AS
SESS
MEN
T
Type of Material / Notes Items highlighted Orange are 2017 Bond
Hebron HS - Field House 2010 - Restrooms - Locker room 20 2010 50 55 53CT floors, CT walls
Hebron HS - Field House 2010 - Restrooms - Coaches 20 2010 50 55 53
Hebron HS - Field House 2010 - Lockers 20 2010 50 50 50
Hebron HS - Field House 2010 - Benches 50 2010 80 80 80 Concrete
Hebron HS - Field House 2010 - Paint 15 2010 33 50 42 Hallways & Locker rms painted 2015
Hebron HS - Field House 2010 - Exterior Lighting 20 2010 50 50 50
OLD FIELD HOUSE / WEIGHT ROOM / INDOOR TURF 2003
Hebron HS - IAC/ Weight Room/ Field House 2003 - HVAC 20 2003 15 20 18
Hebron HS - IAC/ Weight Room/ Field House 2003 - Roof - Flat
20 2003 15 20 184 Ply Built Up
Hebron HS - IAC/ Weight Room/ Field House 2003 - Electrical Panels
30 2003 43 45 44
Hebron HS - IAC/ Weight Room/ Field House 2003 - Fire Safety - Alarm System
20 2003 15 20 18In Progress
Hebron HS - IAC/ Weight Room/ Field House 2003 - Fire Safety - Sprinkler System
50 2003 66 65 66
Hebron HS - IAC/ Weight Room/ Field House 2003 - Artificial Turf
15 2003 -New IAC under construction - Bond 2017 project
Hebron HS - IAC/ Weight Room/ Field House 2003 - Flooring - VCT
20 2003 15 15 15VCT
Hebron HS - IAC/ Weight Room/ Field House 2003 - Locker Room Flooring
20 2003 15 20 18Epoxy
Hebron HS - IAC/ Weight Room/ Field House 2003 - Locker Room Benches
20 2014 70 75 73Linex
Hebron HS - IAC/ Weight Room/ Field House 2003 - Locker Room Lockers
20 2020 100 100 100JV -2019; Varsity - 2020
Hebron HS - IAC/ Weight Room/ Field House 2003 - Weight room flooring
20 2003 15 20 18Rubber
Hebron HS - IAC/ Weight Room/ Field House 2003 - Paint 15 2016 73 75 74
Hebron HS - IAC/ Weight Room/ Field House 2003 - Paint - Exterior
20 2003 15 75 45Doors/Post/Rails new 2016
H.A.C. 2020
Hebron HS - H.A.C. - Fire Safety - Alarm System 20 2020 0In Progress
Hebron HS - H.A.C. - HVAC 20 2020 0 In ProgressHebron HS - H.A.C. - Roof - Flat 20 2020 0 In Progress
Hebron HS - H.A.C. - Electrical Panels 30 2020 0 In Progress
Hebron HS - H.A.C. - Fire Safety - Sprinkler System 50 2020 0In Progress
Hebron HS - H.A.C. - Gym Flooring 40 2020 0 In ProgressHebron HS - H.A.C. - Bleachers 30 2020 0 In Progress
Hebron HS - H.A.C. - Restrooms 20 2020 0 In ProgressHebron HS - H.A.C. - Scoreboard 20 2020 0 In Progress
Hebron HS - H.A.C. - Locker Room Flooring 20 2020 0In Progress
Hebron HS - H.A.C. - Locker Room Benches 50 2020 0In Progress
Hebron HS - H.A.C. - Locker Room Lockers 40 2020 0 In ProgressBASEBALL FIELD 1999
Hebron HS - Baseball Field Bleachers 40 1999 48 50 49
Hebron HS - Baseball Field Restrooms - - See stadium visitor restrooms
Hebron HS - Baseball Field Backstop Netting 15 2019 93 95 94 Replaced netting between 2018 and 2019
Hebron HS - Baseball Field Scoreboard 20 2016 80 85 83
Hebron HS - Baseball Field Pressbox 20 2003 15 20 18
Hebron HS - Baseball Field Dugout Paint 15 2018 87 90 88
Hebron HS - Baseball Field Light poles 30 1999 30 30 30
Hebron HS - Baseball Field Leveling 5 2019 80 90 85 Renovated in 2019
Hebron HS - Baseball Field Batting Cage 20 2012 60 65 63
Hebron HS - Baseball Field Concession 20 2006 30 35 33 Shared with softball; new batting cage nets
SOFTBALL FIELD 1999Hebron HS - Softball Field Bleachers 40 1999 48 50 49
Hebron HS8/5/2020
LIFE
CYC
LE -
YEAR
SLA
ST R
EPLA
CED
% L
IFE
REM
AINI
NGVI
SUAL
EVA
LUAT
ION
WOR
K OR
DER
HIST
ORY
TOTA
L AS
SESS
MEN
T
Type of Material / Notes Items highlighted Orange are 2017 Bond
Hebron HS - Softball Field Restrooms - - See stadium visitor restrooms
Hebron HS - Softball Field Backstop Netting 15 2010 33 10 22 Minor repairs to nets in 2019
Hebron HS - Softball Field Scoreboard 20 2015 75 80 78
Hebron HS - Softball Field Pressbox 20 2003 15 20 18
Hebron HS - Softball Field Dugout Paint 15 2014 60 50 55
Hebron HS - Softball Field Light poles 30 1999 30 30 30
Hebron HS - Softball Field Leveling 5 2015 0 25 13 Added material to level infield in 2019
Hebron HS - Softball Field Batting Cage 20 2012 60 75 68 New nets 2019
Hebron HS - Softball Field Concession 20 2006 30 35 33 Shared with baseball
TENNIS COURTS 1999Hebron HS - Tennis Courts 50 2019 98 100 99 12 Courts
Hebron HS - Tennis Courts - Resurfaced 10 2019 90 100 95
Hebron HS - Tennis Courts - Light Poles 30 2019 97 100 98
Hebron HS - Tennis Courts Shade Structure 20 2019 95 100 98
Hebron HS8/5/2020
Year Built / Age 1968 Rebuilt 2012 / 8 Assessment Scale:Campus Square Footage 436,572 100 = New or Newly Replaced
Current Year 2020 0 = End of Life Cycle
Lewisville HS
LIFE
CYC
LE -
YEAR
SLA
ST R
EPLA
CED
% L
IFE
REM
AINI
NGVI
SUAL
EVA
LUAT
ION
WOR
K OR
DER
HIST
ORY
TOTA
L AS
SESS
MEN
T
Type of Material / Notes Items highlighted Orange are 2017 Bond
FACILITY AGE RATING 50 2012 84MAIN CAMPUS
Lewisville HS - HVAC - 1999 Addition 20 2008 40 4 0% 22 Classrooms, Fine Arts, CHILLERLewisville HS - HVAC - 2008 Addition 20 2008 40 40 0% 40 Science Wing, CHILLERLewisville HS - HVAC - 2012 Addition 20 2012 60 60 0% 60 Main Campus, CHILLERLewisville HS - HVAC - 2014 Addition 20 2014 70 75 0% 73 Auditorium, CHILLER
Lewisville HS - HVAC - Controls 20 2012 60 65 63 Controls = AlertonLewisville HS - Ceiling and Lights - 1999 Addition 20 2014 70 75 73 Classrooms, Fine Arts; T-5Lewisville HS - Ceiling and Lights - 2008 Addition 20 2008 40 50 45 Science Wing; T-5Lewisville HS - Ceiling and Lights - 2012 Addition 20 2012 60 65 63 Main Campus; T-5Lewisville HS - Ceiling and Lights - 2014 Addition 20 2014 70 70 70 Auditorium House Lights; T-5
Lewisville HS - Roof - 1999 Addition 20 1999 -5 10 1% 2 Classrooms, Fine Arts; 4 ply Built upLewisville HS - Roof - 2008 Addition 20 2008 40 40 1% 41 Science WingLewisville HS - Roof - 2012 Addition 20 2012 60 65 1% 63 Main CampusLewisville HS - Roof - 2014 Addition 20 2014 70 75 1% 73 Auditorium
Lewisville HS - Elect Switchgear - 1999 Addition 30 2012 73 75 -19% 60 Classrooms, Fine ArtsLewisville HS - Elect Panels - 2008 Addition 30 2008 60 60 -19% 49 Science WingLewisville HS - Elect Panels - 2012 Addition 30 2012 73 75 -19% 60 Main CampusLewisville HS - Elect Panels - 2014 Addition 30 2014 80 80 -19% 65 Auditorium
Lewisville HS - Elevator #1 (Café/Arena) 25 2011 64 65 16% 75 SchindlerLewisville HS - Elevator #2 (D-Wing) 25 2008 52 55 19% 64 Thyssen KruppLewisville HS - Elevator #3 (E- Wing) 25 1999 16 20 20% 22 Dover
Lewisville HS - Elevator #4 (Goldsmith Stadium) 25 1995 0 5 17% 3 OtisLewisville HS - Elevator #5 (FB Field House) 25 2010 60 65 20% 75 Schindler
Lewisville HS - Lift (Rm A205-ROTC) 25 2011 64 65 65 Garaventa Lewisville HS - Fire Safety - Fire Alarm 20 2012 60 60 -17% 50 Harrington
Lewisville HS - Fire Sprinkler Sys - 1999 Add 50 1999 58 60 2% 60 Classrooms, Fine ArtsLewisville HS - Fire Sprinkler Sys - 2008 Add 50 2008 76 75 2% 77 Science WingLewisville HS - Fire Sprinkler Sys - 2012 Add 50 2012 84 85 2% 86 Main CampusLewisville HS - Fire Sprinkler Sys - 2014 Add 50 2014 88 90 2% 91 Auditorium
Lewisville HS - Food Service Boilers 20 2011 55 55 55
Lewisville HS - Food Service Freezers 20 2012 60 65 63
Lewisville HS - Lightning Detection 15 2009 27 25 26 Siren & ControlsLewisville HS - Generator 40 2012 80 80 80 Generac - Diesel
Lewisville HS - Flooring - Classrooms 20 2012 60 65 63 VCTLewisville HS - Flooring - Classrms - 2008 Add 20 2008 40 45 43 VCT
Lewisville HS - Flooring - Corridors 20 2012 60 65 63 VCTLewisville HS - Flooring - Library 20 2012 60 60 60 VCTLewisville HS - Flooring - Offices 20 2012 60 65 63 VCT
Lewisville HS - Flooring - Cafeteria 20 2012 60 60 60 VCTLewisville HS - Flooring - Kitchen 50 2012 84 85 85 Terrazzo
Lewisville HS - Flooring - Band 15 2012 47 50 48 VCTLewisville HS - Flooring - Choir 15 2012 47 50 48 Carpet
Lewisville HS - Flooring - Orchestra 15 2012 47 50 48 VCTLewisville HS - Doors 20 2012 60 65 63
Lewisville HS - Door Hardware 20 2012 60 65 63
Lewisville HS - Casework (Built-Ins) 20 2012 60 65 63
Lewisville HS - Restrooms - Faculty 20 2012 60 65 63 Ceramic tileLewisville HS - Restrooms - Student 20 2012 60 65 63 CMU Partitions, Ceramic tile floors/walls
Lewisville HS - Restrooms - 1999 Addition 20 1999 -5 20 8 Solid plastic Partitions; Partial RenovationsLewisville HS - Restrooms - 2008 Addition 20 2008 40 40 40
Lewisville HS - Restrooms - 2012 Addition 20 2012 60 60 60
Lewisville HS - Restrooms - 2014 Addition 20 2014 70 70 70
Lewisville HS - Marquee 15 2014 60 75 68 Brick, LEDLewisville HS - Paving - Parking Lots 20 2005 25 30 28 Stadium & Band: Asphalt
Lewisville HS8/5/2020
LIFE
CYC
LE -
YEAR
SLA
ST R
EPLA
CED
% L
IFE
REM
AINI
NGVI
SUAL
EVA
LUAT
ION
WOR
K OR
DER
HIST
ORY
TOTA
L AS
SESS
MEN
T
Type of Material / Notes Items highlighted Orange are 2017 Bond
Lewisville HS - Paving - Parking Lots 50 1994 48 50 49 Along / closest to Main Street, ConcreteLewisville HS - Paving - Parking Lots 40 2012 80 80 80 Front of school, Concrete
Lewisville HS - Paving - Sidewalks 40 2012 80 80 80
Lewisville HS - Exterior Lighting 20 2012 60 65 63
Lewisville HS - Paint - Commons 15 2012 47 50 48
Lewisville HS - Paint - Cafeteria 15 2012 60 65 63
Lewisville HS - Paint - Auditorium 15 2012 47 55 51
Lewisville HS - Paint - F.A.C. 15 2012 47 55 51
Lewisville HS - Paint - Gyms 20 2012 60 60 60
Lewisville HS - Paint - Exterior 20 2012 60 65 63
Lewisville HS - Paint - Hallways 20 2012 60 65 63 P-Lam to 7'-0"; CMU not sealedLewisville HS - Cafetorium - Curtains 20 2012 60 65 63
Lewisville HS - Cafetorium - Lighting 25 2012 68 70 69 T-5Lewisville HS - Auditorium Curtains 20 2014 70 70 70
Lewisville HS - Auditorium Stage Lighting 25 2014 76 80 78
Lewisville HS - Auditorium Sound 2017 - Tracking Replacement Yr only - In Technology Dept. Plans
Lewisville HS - Auditorium Seating 30 2014 80 80 80
Lewisville HS - Auditorium Flooring 15 2014 60 60 60 CarpetLewisville HS - F.A.C. - Flooring 40 2012 80 80 80 Wood
Lewisville HS - F.A.C. - Bleachers 30 2012 73 75 74
Lewisville HS - F.A.C. - Restrooms 20 2012 60 70 65
Lewisville HS - F.A.C. - Scoreboard 20 2012 60 65 63
Lewisville HS - Gym 1 - Flooring 40 2012 80 80 80
Lewisville HS - Gym 1- Bleachers 30 2012 73 75 74
Lewisville HS - Gym 1 - Scoreboard 20 2012 60 60 60
Lewisville HS - Gym 2 - Flooring 40 2012 80 80 80
Lewisville HS - Locker Rooms - Flooring 20 2012 60 65 63 EpoxyLewisville HS - Locker Rooms - Benches 50 2012 84 85 85 ConcreteLewisville HS - Locker Rooms - Lockers 40 2012 80 80 80
Lewisville HS - Locker Rooms - Partitions 20 2012 60 65 63 CMU
STADIUMLewisville HS - Stadium Bleachers 50 1971 2 35 19 Homeside underneath/structure painted 2018; Visitor 2019
Lewisville HS - Stadium Bleachers Addition 40 1982 5 25 15
Lewisville HS - Stadium Artificial Turf 8 2020 100 100 100
Lewisville HS - Stadium Synthetic Track 10 2012 20 25 23 Lower Grade Surface on D-Ring Permeable; long jump pit and runway need work
Lewisville HS - Stadium PA System 2003 - Tracking Replacement Yr only - In Technology Dept. Plans
Lewisville HS - Stadium Light poles 30 2009 63 40 52 Poles only, due to storm damageLewisville HS - Stadium Scoreboard 18 2003 6 10 8 Fair Play
Lewisville HS - Stadium Pressbox HVAC 20 1995 0 In ProgressLewisville HS - Stadium Pressbox Roof 30 1995 0 In Progress
Lewisville HS - Stadium Pressbox Flooring 15 2012 0 In ProgressLewisville HS - Stadium Ticket Booth(s) 20 2002 0 In Progress
Lewisville HS - Stadium Concession - Home - HVAC - -In Progress
Lewisville HS - Stadium Concession - Home - Roof 20 2016 0In Progress
Lewisville HS - Stadium Concession - Visitor - HVAC - -In Progress
Lewisville HS - Stadium Concession - Visitor - Roof 20 2016 0In Progress
Lewisville HS - Stadium - 1983 Restrooms - Home 20 2009 0In Progress
Lewisville HS - Stadium - 1987 Restrooms - Visitor 20 1987 0Roof: 2014 - In Progress
Lewisville HS - Stadium Athletic Warehouse 40 1987 0 In ProgressLewisville HS - Stadium Band Tower 50 2012 84 86 85 Painted Summer 2017
FIELD HOUSE - 2010Lewisville HS - Field House 2010 - HVAC 20 2010 50 50 50
Lewisville HS - Field House 2010 - Roof - Metal 30 2010 67 70 68
Lewisville HS - Field House 2010 - Electrical Panels 30 2010 67 70 68
Lewisville HS - Field House 2010 - Fire Safety - Alarm System
20 2010 50 50 50Tied into Main Bldg, Warning detection devices only
Lewisville HS8/5/2020
LIFE
CYC
LE -
YEAR
SLA
ST R
EPLA
CED
% L
IFE
REM
AINI
NGVI
SUAL
EVA
LUAT
ION
WOR
K OR
DER
HIST
ORY
TOTA
L AS
SESS
MEN
T
Type of Material / Notes Items highlighted Orange are 2017 Bond
Lewisville HS - Field House 2010 - Fire Safety - Sprinkler System
50 2010 80 80 80
Lewisville HS - Field House 2010 - Flooring - Carpet 15 2010 33 40 37Offices
Lewisville HS - Field House 2010 - Flooring - Epoxy 20 2010 50 55 53
Lewisville HS - Field House 2010 - Flooring - Concrete/Terrazzo
50 2010 80 80 80
Lewisville HS - Field House 2010 - Restrooms - Locker room 20 2010 50 55 53
CMU partitions, ceramic tileLewisville HS - Field House 2010 - Restrooms -
Coaches20 2010 50 60 55
Ceramic tile
Lewisville HS - Field House 2010 - Lockers 20 2010 50 55 53
Lewisville HS - Field House 2010 - Benches 20 2010 50 60 55Concrete
Lewisville HS - Field House 2010 - Paint 15 2017 80 85 83
Lewisville HS - Field House 2010 - Exterior Lighting 20 2010 50 50 50Wall Packs
FIELD HOUSE - 1972/1996
Lewisville HS - Field House 1972/1999 - HVAC 20 2000 0In Progress
Lewisville HS - Field House 1972/1999 - Roof - Flat 20 2009 0In Progress
Lewisville HS - Field House 1972/1999 - Roof - Flat 20 1996 0In Progress
Lewisville HS - Field House 1972/1999 - Electrical Panels 30 1996 0
In ProgressLewisville HS - Field House 1972/1999 - Fire Safety -
Alarm System20 2012 0 Tied into Main Bldg, Warning detection devices only
- In ProgressLewisville HS - Field House 1972/1999 - Fire Safety -
Sprinkler System 50 2012 0In Progress
Lewisville HS - Field House 1972/1999 - Flooring - Carpet 15 1996 0
In ProgressLewisville HS - Field House 1972/1999 - Flooring -
Epoxy 20 1996 0In Progress
Lewisville HS - Field House 1972/1999 - Flooring - Epoxy 20 2013 0
In ProgressLewisville HS - Field House 1972/1999 - Restrooms -
Baseball 20 1996 0In Progress
Lewisville HS - Field House 1972/1999 - Restrooms - Girls 20 2013 0
In ProgressLewisville HS - Field House 1972/1999 - Benches -
Baseball 20 2008 0Vinyl - In Progress
Lewisville HS - Field House 1972/1999 - Benches - Girls 20 2015 0
Linex - In Progress
Lewisville HS - Field House 1972/1999 - Lockers 20 1996 0In Progress
Lewisville HS - Field House 1972/1999 - Paint 20 2013 0In Progress
Lewisville HS - Field House 1972/1999 - Paint - Exterior 20 2014 0
In Progress
INDOOR ATHLETIC CENTER 1996
Lewisville HS - IAC 1996 - HVAC 20 1996 -20 5 -8 Heaters onlyLewisville HS - IAC 1996 - Roof - Metal 30 1996 20 20 20
Lewisville HS - IAC 1996 - Electrical Panels 30 1996 20 20 20
Lewisville HS - IAC 1996 - Fire Safety - Alarm System - -
Lewisville HS - IAC 1996 - Fire Safety - Sprinkler System
- -
Lewisville HS - IAC 1996 - Turf 15 2008 20 20 20 Wear showing on turf.Lewisville HS - IAC 1996 - Girls Weight Room -
Flooring20 2013 65 70 68
RubberLewisville HS - IAC 1996 - Paint 20 2017 85 85 85 Interior lower walls painted 2018
Lewisville HS - IAC 1996 - Paint - Exterior 20 1996 -20 0 -10
WEIGHT ROOM 2003Lewisville HS - Weight Room 2003 - HVAC 20 2003 15 20 18
Lewisville HS - Weight Room 2003 - Roof - Metal 30 2003 43 45 44
Lewisville HS - Weight Room 2003 - Electrical Panels 30 2003 43 45 44
Lewisville HS - Weight Room 2003 - Fire Safety - Alarm System - -
Lewisville HS - Weight Room 2003 - Fire Safety - Sprinkler System
- -
Lewisville HS - Weight Room 2003 - Flooring - Rubber 20 2003 15 20 18
Lewisville HS - Weight Room 2003 - Paint 15 2003 -13 40 13 Interior lower walls 2016Lewisville HS
8/5/2020
LIFE
CYC
LE -
YEAR
SLA
ST R
EPLA
CED
% L
IFE
REM
AINI
NGVI
SUAL
EVA
LUAT
ION
WOR
K OR
DER
HIST
ORY
TOTA
L AS
SESS
MEN
T
Type of Material / Notes Items highlighted Orange are 2017 Bond
BOYS TRACK 2003Lewisville HS - Boys Track - HVAC 20 2003 15 15 15
Lewisville HS - Boys Track - Roof - Flat 20 2003 15 20 18
Lewisville HS - Boys Track - Electrical Panels 30 2003 43 45 44
Lewisville HS - Boys Track - Fire Safety - Alarm System
- -
Lewisville HS - Boys Track - Fire Safety - Sprinkler System
- -
Lewisville HS - Boys Track - Flooring - Epoxy 20 2003 15 20 18
Lewisville HS - Boys Track - Restroom 20 2003 15 20 18 Solid plastic, ceramic tile floor/wallsLewisville HS - Boys Track - Lockers 40 2003 58 60 59
Lewisville HS - Boys Track - Benches 20 2009 45 5 25 EpoxyLewisville HS - Boys Track - Paint 15 2013 0 In Progress
GIRLS WRESTLING LOCKER/WEIGHT ROOM 1987
Lewisville HS - Girls Wrestling/Weight Room - HVAC 20 2000 0In Progress
Lewisville HS - Girls Wrestling/Weight Room - Roof - Metal
30 1987 0In Progress
Lewisville HS - Girls Wrestling/Weight Room - Electrical Panels
30 1987 0In Progress
Lewisville HS - Girls Wrestling/Weight Room - Fire Safety - Alarm System
- -In Progress
Lewisville HS - Girls Wrestling/Weight Room - Fire Safety - Sprinkler System
- -In Progress
Lewisville HS - Girls Wrestling/Weight Room - Flooring - Epoxy
20 2003 0In Progress
Lewisville HS - Girls Wrestling/Weight Room - Restroom
20 2005 0 Metal partitions, ceramic walls, VCT floor; In Progress
Lewisville HS - Girls Wrestling/Weight Room - Lockers 40 2003 0In Progress
Lewisville HS - Girls Wrestling/Weight Room - Benches
20 2009 0Epoxy; In Progress
Lewisville HS - Girls Wrestling/Weight Room - Paint 20 2008 0In Progress
WRESTLING MAT ROOM 1988Lewisville HS - Wrestling Mat Room - HVAC - - Heaters only - In Progress
Lewisville HS - Wrestling Mat Room - Roof - Metal 30 1988 0 In Progress
Lewisville HS - Wrestling Mat Room - Electrical Panels 30 1988 0In Progress
Fire Safety - Alarm SystemLewisville HS - Wrestling Mat Room -
- -In Progress
Lewisville HS - Wrestling Mat Room - Fire Safety - Sprinkler System
- -In Progress
Lewisville HS - Wrestling Mat Room - Flooring - Concrete 50 1988 0
Concrete - In ProgressLewisville HS - Wrestling Mat Room - Paint 20 1988 0 In Progress
BASEBALL FIELD 1978
Lewisville HS - Baseball Field Bleachers 40 2003 58 55 56
Lewisville HS - Baseball Field Restrooms 20 2008 40 45 43
Lewisville HS - Baseball Field Backstop Netting 15 2010 33 33 33
Lewisville HS - Baseball Field Scoreboard 20 2005 25 25 25Daktronics
Lewisville HS - Baseball Field 1997 Pressbox 20 1997 0In Progress
Lewisville HS - Baseball Field Dugout Paint 15 2017 80 80 80
Lewisville HS - Baseball Field Lightpoles 30 1991 3 10 7
Lewisville HS - Baseball Field Leveling 5 2015 0 20 10 2018 added material to extend life; 2019 material added to level infield.
Lewisville HS - Baseball Field Batting Cages 20 2012 60 65 63
Lewisville HS8/5/2020
Year Built / Age 1981 / 39 Assessment Scale:Campus Square Footage 624,467 100 = New or Newly ReplacedCurrent Year 2020 0 = End of Life Cycle
Marcus HS
LIFE
CYC
LE -
YEAR
SLA
ST R
EPLA
CED
% L
IFE
REM
AINI
NGVI
SUAL
EVA
LUAT
ION
WOR
K OR
DER
HIST
ORY
TOTA
L AS
SESS
MEN
T
Type of Material / Notes - Items highlighted Orange are 2017 Bond
FACILITY AGE RATING 50 1981 22
MAIN CAMPUS Marcus HS - HVAC - Original 20 2005 25 30 -3% 27 MIX
Marcus HS - HVAC - 2000 Addition 20 2000 0 10 -3% 5 W-wing; RTUMarcus HS - HVAC - 2008 Addition 20 2008 40 45 -3% 41 Gym; RTUMarcus HS - HVAC - 2014 Addition 20 2014 70 75 -3% 70 M.A.C.; RTU
Marcus HS - HVAC - Controls 20 2005 25 30 28 Controls = AlertonMarcus HS - Ceiling and Lights - Original 20 2005 25 30 28 MIX
Marcus HS - Ceiling and Lights - 2000 Addition 20 2000 0 10 5 W-wingMarcus HS - Ceiling and Lights - 2008 Addition 20 2008 40 45 43 GymMarcus HS - Ceiling and Lights - 2014 Addition 20 2014 70 75 73 M.A.C.
Marcus HS - Roof - Flat - Original 20 2016 0 2017 Storm damage - IN PROGRESS
Marcus HS - Roof - Flat - 1988 Addition 20 2016 0 S-Wing; 2017 Storm damage - IN PROGRESS
Marcus HS - Roof - Flat - 1989 Addition 20 2016 0 Auditorium; 2017 Storm damage -IN PROGRESSMarcus HS - Roof - Flat - 1993 Replacement 20 2016 0 Original Cafeteria, small gym, band hall; 2017 Storm
damage - IN PROGRESS
Marcus HS - Roof - Flat - 1997 Addition 20 2016 0 Middle gym; 2017 Storm damage - IN PROGRESS
Marcus HS - Roof - Flat - 2000 Addition 20 2000 0 Cafeteria expansion, W-wing; 2017 Storm damage - IN PROGRESS
Marcus HS - Roof - Flat - 2008 Addition 20 2008 0 Fine Arts; 2017 Storm damage - IN PROGRESS
Marcus HS - Roof - Flat - 2008 Replacement 20 2008 0 Library, Front porch, new gym; 2017 Storm damage - IN PROGRESS
Marcus HS - Roof - Flat - 2010 Replacement 20 2010 0 Athletic Area; 2017 Storm damage - IN PROGRESS
Marcus HS - Roof - Flat - 2012 Replacements 20 2012 0 Original building areas; 2017 Storm damage - IN PROGRESS
Marcus HS - Roof - Flat - 2014 Addition 20 2014 0 M.A.C., Black box; 2017 Storm damage - IN PROGRESS
Marcus HS - Electrical Switchgear - Original 30 2019 97 100 98
Marcus HS - Electrical Panels - 1983 Addition 30 2019 97 100 98
Marcus HS - Electrical Panels - 1988 Addition 30 2019 97 100 98
Marcus HS - Electrical Panels - 1989 Addition 30 2019 97 100 98
Marcus HS - Electrical Panels - 2000 Addition 30 2000 33 35 -1% 34 W-wingMarcus HS - Electrical Panels - 2008 Addition 30 2008 60 60 -1% 59 Fine ArtsMarcus HS - Electrical Panels - 2014 Addition 30 2014 80 80 -1% 80 Black box, M.A.C.Marcus HS - Elevator #1 (D Hall/Main Office) 25 2010 60 65 15% 72 Elevator Controls (installed 1970 - Altered in 2010)
Marcus HS - Elevator #2 (West Wing) 25 1999 16 20 16% 21 Montgomery Marcus HS - Elevator #3 (Arena) 25 2014 76 80 20% 93 TKE
Marcus HS - Elevator #4 (Stadium) 25 2010 60 65 6% 66 SchindlerMarcus HS - Lift (Baseball Press Box) - - Removed 7/2019
Marcus HS - Fire Safety - Fire Alarm 20 2014 70 70 -4% 67 NFS2-3030EMarcus HS - Fire Safety - Sprinkler System - Original 50 1989 38 40 -13% 34 Auditorium, 2 underground main line breaks
Marcus HS - Fire Safety - Sprinkler Sys - 2000 Addition 50 2000 60 60 -13% 52 W-wing, 2 underground main line breaks
Marcus HS - Fire Safety - Sprinkler Sys - 2005 Addition 50 2005 70 70 -13% 61 All other areas, 2 underground main line breaks
Marcus HS - Fire Safety - Sprinkler Sys - 2008 Addition 50 2008 76 76 -13% 66 Fine Arts, 2 underground main line breaks
Marcus HS - Fire Safety - Sprinkler Sys - 2014 Addition 50 2014 88 90 -13% 78 Black box, M.A.C.Marcus HS - Food Service Boilers 20 2014 70 70 70 Tank 2014
Marcus HS - Food Service Freezers 20 2008 40 45 43
Marcus HS - Lightning Detection 15 2009 27 25 26 Siren & ControlsMarcus HS - Generator - -
Marcus HS - Flooring - Classrooms - Carpet 15 2019 93 95 94 Carpet
Marcus HS - Flooring - Classrooms - VCT 20 2019 95 100 98 VCT
Marcus HS - Flooring - Classrooms - VCT 20 2009 45 50 48 VCTMarcus HS - Flooring - Corridors 20 2009 45 50 48 VCT
Marcus HS - Flooring - Library 15 2012 47 50 48 Carpet SquaresMarcus HS - Flooring - Principal Offices 15 2018 87 95 91 Carpet
Marcus HS - Flooring - Office 20 2012 60 65 63 VCTMarcus HS - Flooring - Counselor Office 15 2019 93 100 97 Carpet
Marcus HS - Flooring - Cafeteria 50 1984 28 30 29 TerrazzoMarcus HS - Flooring - Kitchen 50 1984 28 30 29 Terrazzo
Marcus HS - Flooring - Band 20 2012 60 65 63 VCTMarcus HS
8/5/2020
LIFE
CYC
LE -
YEAR
SLA
ST R
EPLA
CED
% L
IFE
REM
AINI
NGVI
SUAL
EVA
LUAT
ION
WOR
K OR
DER
HIST
ORY
TOTA
L AS
SESS
MEN
T
Type of Material / Notes - Items highlighted Orange are 2017 Bond
Marcus HS - Flooring - Choir 20 2019 95 100 98 VCTMarcus HS - Flooring - Orchestra 20 2012 60 65 63 VCT
Marcus HS - Doors 20 2019 95 100 98
Marcus HS - Door Hardware 20 2019 95 100 98
Marcus HS - Casework (Built-Ins) 20 1981 -95 5 -45
Marcus HS - Restrooms - Faculty 20 2020 100 100 100
Marcus HS - Restrooms - Student 20 2012 60 70 65
Marcus HS - Restrooms - 1989 Addition 20 2019 95 100 98 Auditorium
Marcus HS - Restrooms - 2000 Addition 20 2000 0 10 5
Marcus HS - Restrooms - 2008 Addition 20 2008 40 40 40
Marcus HS - Restrooms - 2014 Addition 20 2014 70 70 70
Marcus HS - Marquee 30 2019 97 95 96 Monument sign only w/lightingMarcus HS - Paving - Parking Lots 50 2010 80 80 80
Marcus HS - Paving - Parking Lots 50 2013 86 86 86
Marcus HS - Paving - Parking Lots 50 2014 88 88 88 Concrete, NE corner lot and front lot. Area includes 2010 lots.
Marcus HS - Paving - Parking Lots 50 2018 96 96 96
Marcus HS - Paving - Parking Lots 50 2019 98 98 98
Marcus HS - Paving - Sidewalks 40 1989 23 25 24
Marcus HS - Paving - Sidewalks 40 2013 83 85 84
Marcus HS - Exterior Lighting 20 2017 85 85 85 LEDMarcus HS - Exterior Windows - 1981 Original 40 1981 3 10 6 Vinyl Windows
Marcus HS - Paint - Commons 15 2019 93 100 97
Marcus HS - Paint - Cafeteria 15 2019 93 100 97
Marcus HS - Paint - Auditorium 15 2018 87 95 91
Marcus HS - Paint - M.A.C. 15 2014 60 75 68
Marcus HS - Paint - Gyms 20 2002 10 15 13
Marcus HS - Paint - Exterior 20 2015 75 80 78 Washed and Sealed 2018Marcus HS - Paint - Hallways 20 2012 60 65 63 Upper wall only touch ups
Marcus HS - Auditorium Curtains 20 2018 90 95 93 All soft curtains replaced 2018Marcus HS - Auditorium Stage Lighting 25 2018 92 95 94
Marcus HS - Auditorium Sound 2014 - Tracking Replacement Yr only - In Technology Dept. Plans
Marcus HS - Auditorium Seating 30 2018 93 100 97
Marcus HS - Auditorium Flooring 15 2018 87 95 91
Marcus HS - M.A.C. - Flooring 40 2014 85 85 85 WoodMarcus HS - M.A.C. - Bleachers 30 2014 80 80 80 Retractable (only 10%)
Marcus HS - M.A.C. - Restrooms 20 2014 70 75 73
Marcus HS - M.A.C. - Scoreboard 20 2014 70 75 73 Wireless - LEDMarcus HS - M.A.C. - Locker Room Flooring 20 2014 70 75 73 Epoxy
Marcus HS - M.A.C. - Locker Room Benches 20 2014 70 75 73 ConcreteMarcus HS - M.A.C. - Locker Room Lockers 20 2014 70 70 70
Marcus HS - 1981 Gym - Flooring 40 1981 3 10 6 Small gymMarcus HS - 1981 Gym - Bleachers 30 1981 -30 0 -15 Retractable, small gym
Marcus HS - 1981 Gym - Scoreboard - -
Marcus HS - 1997 Middle Gym - Flooring 40 1997 43 45 44
Marcus HS - 1997 Middle Gym - Bleachers 30 1997 23 25 24
Marcus HS - 1997 Middle Gym - Scoreboard 20 2016 80 85 83 Wired LEDMarcus HS - 2008 Large Gym - Flooring 40 2008 70 70 70
Marcus HS - 2008 Large Gym - Bleachers 30 2009 63 65 64
Marcus HS - 2008 Large Gym - Scoreboard 20 2008 40 45 43 Wireless - LEDMarcus HS - Locker Rooms - Flooring 20 2008 40 45 43 Epoxy
Marcus HS - Locker Rooms - Benches 50 2008 76 78 77 ConcreteMarcus HS - Locker Rooms - Partitions 20 2008 40 45 43 Solid plastic
STADIUM 2010Marcus HS - Stadium Bleachers 40 2010 75 75 75
Marcus HS - Stadium Artificial Turf 8 2018 75 85 80
Marcus HS - Stadium Synthetic Track 10 2018 80 85 83
Marcus HS - Stadium PA System 2012 - Tracking Replacement Yr only - In Technology Dept. Plans
Marcus HS - Stadium Light poles 30 2010 67 70 68 Needs refresh
Marcus HS8/5/2020
LIFE
CYC
LE -
YEAR
SLA
ST R
EPLA
CED
% L
IFE
REM
AINI
NGVI
SUAL
EVA
LUAT
ION
WOR
K OR
DER
HIST
ORY
TOTA
L AS
SESS
MEN
T
Type of Material / Notes - Items highlighted Orange are 2017 Bond
Marcus HS - Stadium Scoreboard 18 2010 44 50 47 Wired LED
Marcus HS - Stadium Pressbox HVAC 20 2010 50 55 53
Marcus HS - Stadium Pressbox Roof 20 2010 50 55 53 Mod Bit
Marcus HS - Stadium Pressbox Flooring 15 2010 33 40 37 Carpet; interior painted 2018
Marcus HS - Stadium Ticket Booth(s) 20 2010 50 55 53
Marcus HS - Stadium Concession - Home - HVAC - -
Marcus HS - Stadium Concession - Home - Roof 20 2010 50 70 60 Under Bleachers
Marcus HS - Stadium Concession - Home - Flooring 20 2010 50 55 53 VCT
Marcus HS - Stadium Concession - Visitor - HVAC - -
Marcus HS - Stadium Concession - Visitor - Roof 20 2010 50 70 60 Under Bleachers
Marcus HS - Stadium Concession - Home - Flooring 20 2010 50 55 53 VCT
Marcus HS - Stadium Restrooms - Home 20 2010 50 55 53 Concrete
Marcus HS - Stadium Restrooms - Visitor 20 2010 50 55 53 Concrete
Marcus HS - Stadium Band Tower 50 2005 70 75 73 Painted Summer 2017
FIELD HOUSE - 2010Marcus HS - Field House HVAC 20 2010 50 55 53
Marcus HS - Field House Roof - Metal 30 2010 67 70 68
Marcus HS - Field House Electrical Panels 30 2010 67 70 68
Marcus HS - Field House Fire Safety - Alarm System 20 2010 50 50 50 Tied into Main Bldg, Warning detection devices only. Edwards 10 - has own account.
Marcus HS - Field House Fire Safety - Sprinkler System 50 2010 80 80 80
Marcus HS - Field House Flooring - Carpet 15 2010 33 40 37 Office
Marcus HS - Field House Flooring - Epoxy 20 2010 50 55 53
Marcus HS - Field House Flooring - Concrete/Terrazzo 50 2010 80 80 80
Marcus HS - Field House Restrooms - Locker room 20 2010 50 60 55 Concrete
Marcus HS - Field House Restrooms - Coaches 20 2010 50 60 55
Marcus HS - Field House Lockers 20 2010 50 60 55
Marcus HS - Field House Benches 20 2010 50 60 55 Concrete
Marcus HS - Field House Paint 20 2017 85 80 83
Marcus HS - Field House Exterior Lighting 20 2010 50 50 50
INDOOR ATHLETIC CENTER 2013
Marcus HS - IAC HVAC 20 2013 65 70 68
Marcus HS - IAC Roof - Metal 30 2013 77 80 78
Marcus HS - IAC Electrical Panels 30 2013 77 80 78
Marcus HS - IAC Fire Safety - Alarm System 20 2013 65 70 68 Tied into Main Bldg, Warning detection devices only. Edwards I0 - has own account
Marcus HS - IAC Fire Safety - Sprinkler System 50 2013 86 88 87
Marcus HS - IAC Turf 15 2013 53 55 54 Looks fair.
Marcus HS - IAC Paint 20 2019 95 95 95
Marcus HS - IAC Paint - Exterior 20 2013 65 70 68
Marcus HS - IAC Weight room flooring 20 2018 90 90 90 Purchased by Boosters
AGRICULTURE SHOP 1982Marcus HS - Ag Shop HVAC 20 2007 35 30 33 Need a makeup air & new exhaust fan due to age
Marcus HS - Ag Shop Roof 20 2016 0 4 PLY; Original building areas; IN PROGRESS
Marcus HS - Ag Shop Flooring - VCT 20 2015 75 75 75 VCT; interior painted 2017
SPORTS COMPLEX 2009 DIXON ROADMarcus HS - Sports Complex Parking Lots 50 2012 84 85 85
BASEBALL FIELD 2009Marcus HS - Baseball Field Bleachers 40 2009 73 75 74
Marcus HS - Baseball Field Backstop Netting 15 2009 27 27 27 Minor repairs in 2019
Marcus HS - Baseball Field Scoreboard 20 2009 45 50 48 Wireless - LED
Marcus HS - Baseball Field Pressbox 20 2009 45 50 48
Marcus HS - Baseball Field Dugout Paint 15 2009 27 35 31
Marcus HS - Baseball Field Light poles 30 2009 63 65 64
Marcus HS - Baseball Field Field Leveling 5 2016 20 25 23 Field gets a lot of use out of season.
Marcus HS - Baseball Field Batting Cage 20 2009 45 55 50 New nets covered cage.
Locker Rooms / Restrooms / Concession
Marcus HS - Baseball Field Locker/Restroom/Concession HVAC 20 2009 45 50 48
Controls = Alerton
Marcus HS8/5/2020
LIFE
CYC
LE -
YEAR
SLA
ST R
EPLA
CED
% L
IFE
REM
AINI
NGVI
SUAL
EVA
LUAT
ION
WOR
K OR
DER
HIST
ORY
TOTA
L AS
SESS
MEN
T
Type of Material / Notes - Items highlighted Orange are 2017 Bond
Marcus HS - Baseball Field Locker/Restroom/Concession Roof - Metal
30 2009 63 65 64
Marcus HS - Baseball Field Locker/Restroom/Concession Flooring 20 2009 45 50 48
Epoxy
Marcus HS - Baseball Field Lockers 20 2009 45 50 48
SOFTBALL FIELD 2012Marcus HS - Softball Field Bleachers 40 2012 80 80 80
Marcus HS - Softball Field Backstop Netting 15 2012 47 30 38 Minor repairs in 2020
Marcus HS - Softball Field Scoreboard 20 2012 60 65 63
Marcus HS - Softball Field Pressbox 20 2012 60 65 63
Marcus HS - Softball Field Dugout Paint 15 2012 47 55 51 Boosters have maintained
Marcus HS - Softball Field Light poles 30 2012 73 75 74
Marcus HS - Softball Field Leveling 5 2018 60 75 68
Marcus HS - Softball Field Batting Cage 20 2012 60 65 63
Marcus HS - Softball Field Concession 20 2012 60 65 63
Locker Rooms / Restrooms / Concession Marcus HS - Softball Field Locker/Restroom/Concession
HVAC20 2012 60 65 63
Marcus HS - Softball Field Locker/Restroom/Concession Roof - Metal
30 2012 73 75 74
Marcus HS - Softball Field Locker/Restroom/Concession Flooring
20 2012 60 65 63Epoxy
Marcus HS - Softball Field Locker/Restroom/Concession Flooring
20 2012 60 65 63VCT
Marcus HS - Softball Field Locker/Restroom/Concession Lockers
20 2012 60 65 63
TENNIS COURTS 2014Marcus HS - Tennis Courts 50 2012 84 80 82 12 courts; some concrete cracking and chipping on side
walls
Marcus HS - Tennis Courts Resurfaced 10 2012 20 25 23 Showing wear
Marcus HS - Tennis Courts Light Poles 30 2012 73 75 74 12 Light poles - MuscoMarcus HS - Tennis Courts Shade Structure 20 2012 60 65 63
Marcus HS8/5/2020
Year Built / Age 1986 / 34 Assessment Scale:Campus Square Footage 473,311 100 = New or Newly ReplacedCurrent Year 2020 0 = End of Life Cycle
The Colony HS
LIFE
CYC
LE -
YEAR
S
LAST
REP
LACE
D%
LIF
E RE
MAI
NING
VISU
AL E
VALU
ATIO
NW
ORK
ORDE
R HI
STOR
YTO
TAL
ASSE
SSM
ENT
Type of Material / Notes - Items highlighted Orange are 2017 Bond
FACILITY AGE RATING 50 1986 32
MAIN CAMPUSThe Colony HS - HVAC - Original 20 2005 25 25 -10% 22 MIX; 2019 2 New Boilers installed
The Colony HS - HVAC - 1987 Addition 20 2005 25 25 -10% 22 H Hall; Big Gym; Ag; Old Football Locker RmThe Colony HS - HVAC - 1989 Addition 20 2005 25 25 -10% 22 J Hall; AuditoriumThe Colony HS - HVAC - 2002 Addition 20 2002 10 10 -10% 9 K-wing, 2002 PercussionThe Colony HS - HVAC - 2003 Addition 20 2003 15 15 -10% 13 Varsity Gym and locker roomsThe Colony HS - HVAC - 2008 Addition 20 2009 45 50 -10% 43 2009 Band partial
The Colony HS - HVAC - Controls 20 2005 25 25 25 Controls = AlertonThe Colony HS - Ceiling and Lights - Original 20 2005 25 25 25 MIX
The Colony HS - Ceiling and Lights - 1987 Addition 20 2005 25 25 25
The Colony HS - Ceiling and Lights - 1989 Addition 20 2005 25 25 25
The Colony HS - Ceiling and Lights - 2002 Addition 20 2002 10 10 10 K-wing, 2002 BandThe Colony HS - Ceiling and Lights - 2003 Addition 20 2003 15 15 15 Varsity Gym and locker roomsThe Colony HS - Ceiling and Lights - 2008 Addition 20 2009 45 50 48 2009 Band
The Colony HS - Roof - Flat - Original 20 2010 50 50 -7% 47 Small Gym replaced 2015The Colony HS - Roof - Flat - 1987 Addition 20 2001 5 5 -7% 5 Big Gym replaced 2015The Colony HS - Roof - Flat - 1989 Addition 20 2001 5 5 -7% 5 Auditorium replaced 2015The Colony HS - Roof - Flat - 2002 Addition 20 2002 10 10 -7% 9 K Wing & PercussionThe Colony HS - Roof - Flat - 2003 Addition 20 2003 15 15 -7% 14 Competition GymThe Colony HS - Roof - Flat - 2008 Addition 20 2008 40 40 -7% 37 Band
The Colony HS - Electrical Switchgear - Original 30 2009 63 45 8% 58 Main Switch Gear 2009; Original PanelsThe Colony HS - Electrical Panels - 1987 Addition 30 2009 63 45 8% 58 Main Switch Gear 2009; Original PanelsThe Colony HS - Electrical Panels - 1989 Addition 30 2009 63 45 8% 58 Main Switch Gear 2009; Original PanelsThe Colony HS - Electrical Panels - 2002 Addition 30 2002 40 45 8% 46
The Colony HS - Electrical Panels - 2003 Addition 30 2003 43 47 8% 49
The Colony HS - Electrical Panels - 2008 Addition 30 2008 60 63 8% 66
The Colony HS - Elevator #1 (Main) 25 1986 0 Elevator Controls (installed 1993 - altered 2007) - IN PROGRESS
The Colony HS - Elevator #2 (Stadium) 25 1995 0 5 18% 3 OtisThe Colony HS - Lift (Baseball Press Box) - - Removed 7/2019
The Colony HS - Fire Safety - Fire Alarm 20 2000 0 5 12% 3 Edwards EST 3The Colony HS - Fire Safety - Sprinkler System 50 2005 70 72 14% 81
The Colony HS - Food Service Boilers 20 2018 90 93 92
The Colony HS - Food Service Freezers 20 2008 40 40 40
The Colony HS - Food Service Freezers - Cougar Cafe 20 2009 45 55 50
The Colony HS - Lightning Detection 15 2009 27 25 26 Siren & ControlsThe Colony HS - Generator 40 2007 68 68 68 Generac - Natural Gas
The Colony HS - Flooring - Classrooms - VCT 20 1986 0 VCT; In ProgressThe Colony HS - Flooring - Classrooms - VCT 20 1987 0 VCT; In ProgressThe Colony HS - Flooring - Classrooms - VCT 20 1989 0 VCT; In ProgressThe Colony HS - Flooring - Classrooms - VCT 20 2009 45 50 48 VCT
The Colony HS - Flooring - Corridors 20 1986 0 VCT; Has Logo Front Entry; In ProgressThe Colony HS - Flooring - Library 15 2010 33 35 34 Carpet; LeesThe Colony HS - Flooring - Offices 15 2007 0 Carpet; In Progress
The Colony HS - Flooring - Cafeteria / Commons 20 2013 65 60 63 LVTThe Colony HS - Flooring - Kitchen 50 1986 32 34 33 CT
The Colony HS - Flooring - Band 20 2009 45 45 45 VCTThe Colony HS - Flooring - Choir 15 2003 0 Carpet; In Progress
The Colony HS - Flooring - Orchestra 20 2003 15 15 15 VCTThe Colony HS - Doors 20 1986 0 IN PROGRESS
The Colony HS - Door Hardware 20 1986 0 IN PROGRESSThe Colony HS - Casework (Built-Ins) 20 1986 0 IN PROGRESSThe Colony HS - Restrooms - Faculty 20 2013 65 70 68
The Colony HS - Restrooms - Student 20 2013 65 70 68 CMU partitionsThe Colony HS - Restrooms - 1987 Addition 20 2013 65 60 63 Old Football Locker roomThe Colony HS - Restrooms - 2002 Addition 20 2002 10 10 10 K WingThe Colony HS - Restrooms - 2003 Addition 20 2003 15 80 48 Varsity Gym Locker Rooms
The Colony HS - Restrooms - Auditorium 20 2018 90 90 90
The Colony HS - Marquee 15 2016 73 90 82 2016 Replaced LEDThe Colony HS - Paving - Parking Lots 50 1986 32 34 33 ConcreteThe Colony HS - Paving - Parking Lots 20 2012 60 65 63 Asphalt
The Colony HS8/5/2020
LIFE
CYC
LE -
YEAR
S
LAST
REP
LACE
D%
LIF
E RE
MAI
NING
VISU
AL E
VALU
ATIO
NW
ORK
ORDE
R HI
STOR
YTO
TAL
ASSE
SSM
ENT
Type of Material / Notes - Items highlighted Orange are 2017 Bond
The Colony HS - Paving - Parking Lots 50 2013 86 88 87 ConcreteThe Colony HS - Paving - Sidewalks 40 1986 15 25 20 Concrete
The Colony HS - Exterior Lighting 20 2019 95 95 95
The Colony HS - Exterior Windows - 1986 Original 40 1986 15 15 15 VinylThe Colony HS - Paint - Commons 15 2013 53 60 57 PLAM to 7 ft; maintained paint 2019The Colony HS - Paint - Cafeteria 15 2013 53 60 57
The Colony HS - Paint - Auditorium 15 2018 87 95 91
The Colony HS - Paint - Gyms 15 2005 0 15 8 Small and medium gymThe Colony HS - Paint - Gyms 20 2010 50 50 50 Varsity gym
The Colony HS - Paint - Exterior 20 2010 50 50 50 New doors & Rails 2017The Colony HS - Paint - Hallways 20 2014 70 75 73
The Colony HS - Auditorium Curtains 20 2018 90 95 93 2008 BondThe Colony HS - Auditorium Stage Lighting 25 2018 92 95 94 2008 Bond
The Colony HS - Auditorium Sound 2015 - Tracking Replacement Yr only - In Technology Dept. PlansThe Colony HS - Auditorium Seating 30 2018 93 95 94 2008 BondThe Colony HS - Auditorium Flooring 15 2018 87 95 91 2008 Bond
The Colony HS - 1986 North Gym - Flooring 40 1986 15 20 18 WoodThe Colony HS - 1987 South Gym - Flooring 40 1987 18 20 19
The Colony HS - 1987 South Gym - Bleachers 30 1987 -10 0 -5
The Colony HS - 2003 Varsity Gym - Flooring 40 2003 58 55 56 Varsity; Sanded and Painted 2016 (2nd sanding)The Colony HS - 2003 Varsity Gym - Bleachers 30 2003 43 45 44
The Colony HS - Locker Rooms - Flooring 20 2012 60 60 60 EpoxyThe Colony HS - Locker Rooms - Benches 20 2013 65 75 70 LinexThe Colony HS - Locker Rooms - Partitions 20 2012 60 70 65 Solid plastic
STADIUM 1986The Colony HS - Stadium Bleachers 40 1986 15 18 17
The Colony HS - Stadium Artificial Turf 8 2012 0 20 10 Summer of 2012The Colony HS - Stadium Synthetic Track 10 2012 20 35 28 Repainted 2018; Good shape
The Colony HS - Stadium PA System 2013 - Tracking Replacement Yr only - In Technology Dept. PlansThe Colony HS - Stadium Light poles 30 2010 67 67 67
The Colony HS - Stadium Scoreboard 18 2003 6 15 10
The Colony HS - Stadium Pressbox HVAC 20 1995 -25 35 5 New Unit - 2017The Colony HS - Stadium Pressbox Roof 20 1995 -25 0 -13 Modified Bitumen
The Colony HS - Stadium Pressbox Flooring 15 2013 53 50 52 CarpetThe Colony HS - Stadium Ticket Booth(s) 20 1995 -25 5 -10
The Colony HS - Stadium Concession - Home - HVAC 20 2004 20 20 20Portable
The Colony HS - Stadium Concession - Home - Roof 20 2004 20 20 20Portable
The Colony HS - Stadium Concession - Home - Flooring 20 2004 20 20 20
The Colony HS - Stadium Concession / Locker Room - Visitor - HVAC 20 2019 95 95 95
The Colony HS - Stadium Concession / Locker Room - Visitor - Roof 20 2019 95 95 95
The Colony HS - Stadium Restrooms - Home 20 2004 20 20 20 Painted 2017The Colony HS - Stadium Restrooms - Visitor 20 2004 20 25 23 Painted 2017
The Colony HS - Stadium Restrooms - North End 20 2018 90 95 93
The Colony HS - Stadium Band Tower 50 2013 86 75 81 Paint okFIELD HOUSE - 2010
The Colony HS - Field House HVAC 20 2010 50 55 53
The Colony HS - Field House Roof - Metal 20 2010 50 55 53
The Colony HS - Field House Electrical Panels 30 2010 67 67 67
The Colony HS - Field House Fire Safety - Alarm System 20 2010 50 60 55Tied into Main Bldg, Warning detection devices only
The Colony HS - Field House Fire Safety - Sprinkler System 50 2010 80 82 81
The Colony HS - Field House Flooring - Carpet 15 2010 33 45 39
The Colony HS - Field House Flooring - Epoxy 20 2010 50 55 53
The Colony HS - Field House Flooring - Concrete/Terrazzo 50 2010 80 82 81
The Colony HS - Field House Restrooms - Locker room 20 2010 50 55 53
The Colony HS - Field House Restrooms - Coaches 20 2010 50 55 53
The Colony HS - Field House Lockers 20 2010 50 55 53
The Colony HS - Field House Benches 20 2010 50 55 53 ConcreteThe Colony HS - Field House Paint 15 2017 80 85 83
The Colony HS - Field House Exterior Lighting 20 2010 50 55 53 Concrete
The Colony HS8/5/2020
LIFE
CYC
LE -
YEAR
S
LAST
REP
LACE
D%
LIF
E RE
MAI
NING
VISU
AL E
VALU
ATIO
NW
ORK
ORDE
R HI
STOR
YTO
TAL
ASSE
SSM
ENT
Type of Material / Notes - Items highlighted Orange are 2017 Bond
INDOOR ATHLETIC CENTER 1995
The Colony HS - IAC HVAC 20 2018 90 95 93 HeatThe Colony HS - IAC Roof - Metal 30 1995 17 5 11
The Colony HS - IAC Electrical Panels 30 1995 17 15 16
The Colony HS - IAC Fire Safety - Alarm System - -
The Colony HS - IAC Fire Safety - Sprinkler System - -
The Colony HS - IAC Artificial Turf 15 2010 33 33 33 Fair conditionThe Colony HS - IAC Flooring - Girls Soccer 20 2018 90 95 93
The Colony HS - IAC Lockers - Girls Soccer 20 2018 90 95 93
The Colony HS - IAC Paint 20 2017 85 85 85
The Colony HS - IAC Paint - Exterior 20 1995 -25 65 20
WEIGHT ROOM 2003The Colony HS - Weight Room HVAC 20 2018 90 95 93
The Colony HS - Weight Room Roof - Metal 30 2003 43 43 43
The Colony HS - Weight Room Electrical Panels 30 2003 43 43 43
The Colony HS - Weight Room Fire Safety - Alarm System - -
The Colony HS - Weight Room Fire Safety - Sprinkler System - -
The Colony HS - Weight Room Flooring - Rubber 20 2003 15 25 20
The Colony HS - Weight Room Paint 20 2018 90 85 88
BASEBALL FIELD 1987The Colony HS - Baseball Field Bleachers 40 1991 28 28 28
The Colony HS - Baseball Field Restrooms - - See Stadium Concession/Locker Room Visitor 1988The Colony HS - Baseball Field Backstop Netting 15 2010 33 33 33 Considerable repairs in 2017; Minor repairs in 2019
The Colony HS - Baseball Field Scoreboard 20 2015 75 75 75
The Colony HS - Baseball Field Pressbox 20 1997 0 IN PROGRESSThe Colony HS - Baseball Field Dugout Paint 20 2015 75 65 70
The Colony HS - Baseball Field Light poles 30 1991 3 15 9
The Colony HS - Baseball Field Field Leveling 5 2019 80 95 88 Renovated Fall 2019The Colony HS - Baseball Field Batting Cages 20 2012 60 60 60
SOFTBALL FIELD 2019The Colony HS - Softball Field Bleachers 40 2019 98 95 96
The Colony HS - Softball Field Restrooms 20 2019 95 95 95
The Colony HS - Softball Field Backstop Netting 15 2019 93 95 94
The Colony HS - Softball Field Scoreboard 20 2015 75 75 75
The Colony HS - Softball Field Pressbox 20 2019 95 95 95
The Colony HS - Softball Field Dugout Paint 20 2019 95 95 95
The Colony HS - Softball Field Light poles 30 2019 97 95 96
The Colony HS - Softball Artificial Turf 8 2019 88 95 91
The Colony HS - Softball Field Batting Cages 20 2019 95 95 95
The Colony HS - Softball Field Locker Room 20 2019 95 95 95
TENNIS COURTS 1986The Colony HS - Tennis Courts - West 50 1986 32 32 32 4 Courts
The Colony HS - Tennis Courts - West Resurfaced 10 2013 30 25 28 Showing some wear.The Colony HS - Tennis Courts - West Light Poles 30 2010 67 57 62 9 poles for 4 courts; some dark spots
The Colony HS - Tennis Courts - East 50 1994 48 48 48 4 Courts
The Colony HS - Tennis Courts - East Resurfaced 10 2013 30 25 28 Showing some wear.The Colony HS - Tennis Courts - Shade Structure 20 2013 65 65 65
The Colony HS8/5/2020
ASSESSMENT SUMMARYEXTRA-CURRICULAR
Current Year 2020
AG B
ARN
AQUA
TIC
CENT
ER E
AST
AQUA
TIC
CENT
ER W
EST
DEAP
/Tea
ms (
form
erly
Colle
ge S
treet
)TE
CC -
EAST
TECC
- W
EST
LEW
ISVI
LLE
LEAR
NING
CENT
ER
Year Built 2010 2006 2014 1960 2010 2020 2001Age 10 14 6 60 10 0 19
Foundation - - - 0 - - -
HVAC - Original 63 18 47 0 56 - 9
HVAC - Addition 70 - - 0 - - 57
HVAC - Controls - 30 70 0 50 - 13
Roof - Flat - 40 - 40 - - 10
Roof - Flat Addition - - - - - - 46
Roof - Shingled - - - - - - -
Roof - Metal 79 - 85 - - - -
Roof - Standing Seam - - - 0 78 - -
Electrical Panels - Original 57 60 91 0 77 - 34
Electrical Panels - Addition 82 - - - - - 62
Elevator #1 - - 79 - 64 - 47
Elevator #2 - - - - - - 37
Fire Safety - Fire Alarm 26 32 95 0 55 - 8
Fire Safety - Sprinkler System - 37 70 0 79 - 69
Food Service Boilers - - - 0 - - -
Food Service Freezers - - - 0 - - -
Lightning Detection - - - 26 - - 26
Generator - - 86 - 75 - -
Flooring - Classrooms - 30 88 63 81 - 10
Flooring - Classrooms - Additions - - - - - - 48
Flooring - Corridors - 72 88 45 81 - 10
Flooring - Library - - - - - - -
Flooring - Office - 30 70 41 37 - 23
Flooring - Cafeteria - - - 38 - - 10
Flooring - Kitchen - - - 0 - - 63
Flooring - Gym - - - 0 - - -
Flooring - Band - - - - - - -
Flooring - Choir - - - - - - -
Flooring - Weight Room - 30 - - - - -
Flooring - Concrete 75 - - - - - -
Doors 58 30 73 0 50 - 13
Door Hardware 53 30 68 0 50 - 18
Casework (Built Ins) - 30 73 0 50 - 23
Restrooms - Faculty - - - 0 - - -
Restrooms - Student - - - 0 - - -
Restrooms - Men's 50 30 70 - 53 - 10
Restrooms - Women's 50 30 70 - 53 - 10
Marquee - - - 16 68 - 70
Paving - Parking Lots 81 71 88 0 81 - 63
Paving - Sidewalks 75 67 85 0 77 - 54
Exterior Lighting 50 33 70 0 53 - 98
Paint - Commons 37 46 87 0 54 - 89
Paint - Gym - - - 0 - - 78
Paint - Exterior 53 33 75 0 55 - 78
Extra-Curricular Summary8/5/2020
AG B
ARN
AQUA
TIC
CENT
ER E
AST
AQUA
TIC
CENT
ER W
EST
DEAP
/Tea
ms (
form
erly
Colle
ge S
treet
)TE
CC -
EAST
TECC
- W
EST
LEW
ISVI
LLE
LEAR
NING
CENT
ER
Paint - Hallways - - - 0 58 - 78
Dust Collector - - - - - - -
Sports and Fine Arts - - - - - - -
Perf Arts - Curtains - - - - - - -
Perf Arts - PA System - - - - - - -
Perf Arts - Cafetorium Lighting - - - - - - -
Track - - - - - - -
Field Lights - - - - - - -
Bleachers - Exterior - - - - - - -
Bleachers - Interior - 72 89 - - - -
Gym Main - Flooring - - - - - - -
Gym Auxiliary - Flooring - - - - - - -
Boys Locker Rooms - Flooring - 72 70 - - - -
Girls Locker Rooms - Flooring - 72 70 - - - -
Boys Locker Rooms - Lockers - 65 63 - - - -
Girls Locker Rooms - Lockers - 65 63 - - - -
Boys Locker Rooms - Benches - 72 87 - - - -
Girls Locker Rooms - Benches - 72 87 - - - -
Gym - Partitions - - - - - - -
Pool Plaster - 68 60 - - - -
Scoreboard - 8 65 - - - -
Extra-Curricular Summary8/5/2020
Year Built / Age 2010 / 10 Assessment Scale:Campus Square Footage 17,445 100 = New or Newly ReplacedCurrent Year 2020 0 = End of Life Cycle
Agriculture Barn
LIFE
CYC
LE -
YEAR
SLA
ST R
EPLA
CED
% L
IFE
REM
AINI
NGVI
SUAL
EVA
LUAT
ION
WOR
K OR
DER
HIST
ORY
TOTA
L AS
SESS
MEN
T
Type of Material / Notes
FACILITY AGE RATING 50 2010 80Agriculture Barn - HVAC - Original 20 2010 50 55 20% 63 RTU; Contols = n/a
Agriculture Barn - HVAC - 2014 Addition 20 2014 70 70 70 Pig Barn: heaters onlyAgriculture Barn - HVAC - 2020 Addition 20 2020 In Progress
Agriculture Barn - Ceiling and Lights - Original 20 2010 50 50 50
Agriculture Barn - Roof - Metal 30 2010 67 65 20% 79
Agriculture Barn - Roof - Metal - 2020 Addition 30 2020 In ProgressAgriculture Barn - Electrical Switchgear - Original 30 2010 67 67 -15% 57
Agriculture Barn - Electrical Panels - 2014 Addition 30 2014 80 83 82 Pig BarnAgriculture Barn - Electrical Panels - 2020 Addition 30 2020 In Progress
Agriculture Barn - Fire Safety - Fire Alarm 20 2010 50 55 -51% 26 Edwards EST IO64Agriculture Barn - Fire Safety - Sprinkler System - - N/A
Agriculture Barn - Lightning Detection - - Siren and Controls @ LISDOLA next door
Agriculture Barn - Generator - -
Agriculture Barn - Flooring - Concrete 50 2010 80 70 75 ConcreteAgriculture Barn - Doors 20 2010 50 65 58
Agriculture Barn - Door Hardware 20 2010 50 55 53
Agriculture Barn - Restrooms - Men 20 2010 50 50 50 ConcreteAgriculture Barn - Restrooms - Women 20 2010 50 50 50 Concrete
Agriculture Barn - Marquee - -
Agriculture Barn - Paving - Parking Lots 50 2010 80 82 81
Agriculture Barn - Paving - Sidewalks 40 2010 75 75 75
Agriculture Barn - Exterior Lighting 20 2010 50 50 50
Agriculture Barn - Paint - Commons areas 15 2010 33 40 37
Agriculture Barn - Paint - Exterior 20 2010 50 55 53
Ag Barn8/5/2020
Year Built / Age 2006 / 14 Assessment Scale:Campus Square Footage 38,871 100 = New or Newly Replaced
Current Year 2020 0 = End of Life Cycle
Aquatic Center East
LIFE
CYC
LE -
YEAR
SLA
ST R
EPLA
CED
% L
IFE
REM
AINI
NGVI
SUAL
EVA
LUAT
ION
WOR
K OR
DER
HIST
ORY
TOTA
L AS
SESS
MEN
T
Type of Material / Notes
FACILITY AGE RATING 50 2006 72Aquatic Cntr East - HVAC 20 2006 30 25 -35% 18 DECTRON UNITS
Aquatic Cntr East - HVAC - Controls 20 2006 30 30 30 Controls = AlertonAquatic Cntr East - Ceiling and Lights 20 2006 30 25 28
Aquatic Cntr East -LED Lights over Pool 20 2019 95 95 95
Aquatic Cntr East - Roof - Flat 20 2006 30 40 15% 40 Modified BitumenAquatic Cntr East - Electrical Switchgear 30 2006 53 57 9% 60
Aquatic Cntr East - Fire Safety - Fire Alarm 20 2006 30 30 7% 32 Edwards EST 3Aquatic Cntr East - Fire Safety - Sprinkler System 50 2006 72 74 -50% 37
Aquatic Cntr East - Lightning Detection - -
Aquatic Cntr East - Generator - -
Aquatic Cntr East - Flooring - Classrooms 20 2006 30 30 30 VCTAquatic Cntr East - Flooring - Corridors 50 2006 72 72 72 Concrete
Aquatic Cntr East - Flooring - Office 20 2006 30 30 30 VCTAquatic Cntr East - Flooring - Weight Room 20 2006 30 30 30 Rubber
Aquatic Cntr East - Doors 20 2006 30 30 30
Aquatic Cntr East - Door Hardware 20 2006 30 30 30
Aquatic Cntr East - Casework (Built-Ins) 20 2006 30 30 30
Aquatic Cntr East - Restrooms - Men's 20 2006 30 30 30 CTAquatic Cntr East - Restrooms - Women's 20 2006 30 30 30 CT
Aquatic Cntr East - Marquee - -
Aquatic Cntr East - Paving - Parking Lots 50 2006 72 70 71
Aquatic Cntr East - Paving - Sidewalks 40 2006 65 68 67
Aquatic Cntr East - Exterior Lighting 20 2006 30 35 33 46 light poles LEDAquatic Cntr East - Paint - Commons 15 2015 67 25 46 Lower areas painted in 2019
Aquatic Cntr East - Paint - Exterior 20 2006 30 35 33 MaintainingAquatic Cntr East - Bleachers - Interior 50 2006 72 72 72 Concrete / Aluminum
Aquatic Cntr East - Boys Locker Rooms - Flooring 50 2006 72 72 72Ceramic tile 12x12
Aquatic Cntr East - Girls Locker Rooms - Flooring 50 2006 72 72 72Ceramic tile 12x12
Aquatic Cntr East - Boys Locker Rooms - Lockers 40 2006 65 65 65Phenolic
Aquatic Cntr East - Girls Locker Rooms - Lockers 40 2006 65 65 65Phenolic
Aquatic Cntr East - Boys Locker Rooms - Benches 50 2006 72 72 72Concrete
Aquatic Cntr East - Girls Locker Rooms - Benches 50 2006 72 72 72Concrete
Aquatic Cntr East - Pool Plaster 10 2016 60 75 68 Replaced 2016Aquatic Cntr East - Scoreboard 15 2006 7 10 8
Aquatic Center East8/5/2020
Year Built / Age 2014 / 6 Assessment Scale:Campus Square Footage 59,000 100 = New or Newly Replaced
Current Year 2020 0 = End of Life Cycle
Aquatic Center West
LIFE
CYC
LE -
YEAR
SLA
ST R
EPLA
CED
% L
IFE
REM
AINI
NGVI
SUAL
EVA
LUAT
ION
WOR
K OR
DER
HIST
ORY
TOTA
L AS
SESS
MEN
T
Type of Material / Notes
FACILITY AGE RATING 50 2014 88Aquatic Cntr West - HVAC 20 2014 70 70 -33% 47 DECTRON UNITS
Aquatic Cntr West - HVAC - Controls 20 2014 70 70 70 Controls = AlertonAquatic Cntr West - Ceiling and Lights 20 2014 70 70 70
Aquatic Cntr West -LED Lights over Pool 20 2016 80 85 83
Aquatic Cntr West - Roof - Metal 30 2014 80 83 5% 85
Aquatic Cntr West - Electrical Switchgear 30 2014 80 83 12% 91
Aquatic Cntr West - Elevator 25 2014 76 70 8% 79Thyssen Krupp
Aquatic Cntr West - Fire Safety - Fire Alarm 20 2019 95 95 95 Honeywell Farenhyt IFP-300Aquatic Cntr West - Fire Safety - Sprinkler System 50 2014 88 90 -21% 70
Aquatic Cntr West - Lightning Detection - - Siren and Controls @ LHS Harmon next door
Aquatic Cntr West - Generator 40 2014 85 86 86 Cummins - DieselAquatic Cntr West - Flooring - Corridors 50 2014 88 88 88 Concrete
Aquatic Cntr West - Flooring - Offices 50 2014 88 88 88 ConcreteAquatic Cntr West - Flooring - Weight Room 20 2014 70 70 70 Rubber
Aquatic Cntr West - Doors 20 2014 70 75 73
Aquatic Cntr West - Door Hardware 20 2014 70 65 68 Minor RustingAquatic Cntr West - Casework (Built-Ins) 20 2014 70 75 73
Aquatic Cntr West - Restrooms - Men's 20 2014 70 70 70
Aquatic Cntr West - Restrooms - Women's 20 2014 70 70 70
Aquatic Cntr West - Marquee - - shared with Harmon and TECC WAquatic Cntr West - Paving - Parking Lots 50 2014 88 88 88
Aquatic Cntr West - Paving - Sidewalks 40 2014 85 85 85
Aquatic Cntr West - Exterior Lighting 20 2014 70 70 70
Aquatic Cntr West - Paint - Commons 15 2018 87 87 87 Lower areas in 2019Aquatic Cntr West - Paint - Exterior 20 2014 70 80 75
Aquatic Cntr West - Bleachers - Interior 50 2014 88 90 89 Concrete / Aluminum
Aquatic Cntr West - Boys Locker Rooms - Flooring 20 2014 70 70 70Epoxy
Aquatic Cntr West - Girls Locker Rooms - Flooring 20 2014 70 70 70Epoxy; walls painted 2018
Aquatic Cntr West - Boys Locker Rooms - Lockers 15 2014 60 65 63walls painted 2018
Aquatic Cntr West - Girls Locker Rooms - Lockers 15 2014 60 65 63
Aquatic Cntr West - Boys Locker Rooms - Benches 50 2014 88 86 87
concrete
Aquatic Cntr West - Girls Locker Rooms - Benches 50 2014 88 86 87concrete
Aquatic Cntr West - Pool Liners 15 2014 60 60 60 FadedAquatic Cntr West - Scoreboard 15 2014 60 70 65
Aquatic Center West8/5/2020
Year Built / Age 1960 / 60 Assessment Scale:Campus Square Footage 35,601 100 = New or Newly Replaced
Current Year 2020 0 = End of Life Cycle
DEAP/TEAMS (Formerly College Street)
LIFE
CYC
LE -
YEAR
SLA
ST R
EPLA
CED
% L
IFE
REM
AINI
NGVI
SUAL
EVA
LUAT
ION
WOR
K OR
DER
HIST
ORY
TOTA
L AS
SESS
MEN
T
Type of Material / Notes - Items highlighted Orange are 2017 Bond
FACILITY AGE RATING 50 1960 -20College Street ES - Foundation 50 1960 0 Slab-On-Grade - In Progress
College Street ES - HVAC - Original 20 1996 0 RTU - In ProgressCollege Street ES - HVAC - 1989 Addition 20 1989 0 RTU - In Progress
College Street ES - HVAC - Controls 20 2014 0 Controls = EnTouch; In ProgressCollege Street ES - Ceiling and Lights - Original 20 1996 0 In Progress
College Street ES - Ceiling and Lights - 1989 20 1989 0 In ProgressCollege Street ES - Roof - Flat 20 2008 40 45 -5% 40
College Street ES - Roof - Standing Seam 30 1989 0 In ProgressCollege Street ES - Electrical Switchgear 30 1973 0 In Progress
College Street ES - Fire Safety - Fire Alarm 20 2000 0 Edwards EST 2 - Limited Parts - In Progress
College Street ES - Fire Safety - Sprinkler System - 0 In ProgressCollege Street ES - Food Service Boilers 20 2001 0 In Progress
College Street ES - Food Service Freezers 20 1999 0 Reach-in cooler only - In ProgressCollege Street ES - Lightning Protection 15 2009 27 25 26 Siren; Controls @ LHS
College Street ES - Generator - - In ProgressCollege Street ES - Shade Structure - Main 20 2011 55 55 55
College Street ES - Playground - Main 20 2005 25 30 28 Shade structure, goodCollege Street ES - Shade Structure - Pre-K 20 2015 75 75 75
College Street ES - Playground - Pre-K - -
College Street ES - Perf Arts - Curtains 20 2007 0 In ProgressCollege Street ES - Perf Arts - Stage Lghtng/panel 25 1996 0 In Progress
College Street ES - Flooring - Classrooms 20 2012 60 65 63 VCTCollege Street ES - Flooring - Corridors 20 2008 40 50 45 VCT
College Street ES - Flooring - Offices 15 2012 47 35 41 VCT; sinking issuesCollege Street ES - Flooring - Cafeteria 20 2008 40 35 38 VCT
College Street ES - Flooring - Kitchen 50 1960 0 VCT - Original - In ProgressCollege Street ES - Flooring - Gym 20 1990 0 VCT - In Progress
College Street ES - Doors 20 1960 0 In ProgressCollege Street ES - Door Hardware 20 1960 0 knobs - In Progress
College Street ES - Casework (Built-Ins) 20 1960 0 In ProgressCollege Street ES - Restrooms - Faculty 20 1989 0 Ceramic tile, cmv wall; In Progress
College Street ES - Restrooms - Student-Orgininal 20 1989 0 FRP, ceramic floor, metal partitions, No ADA; In Progress
College Street ES - Restrooms - 1989 Addition 20 1989 0 New wing-laminate, floor urinals, In Progress
College Street ES - Marquee 30 1989 -3 35 16
College Street ES - Paving - Parking Lots 20 1960 0 Asphalt; In ProgressCollege Street ES - Paving - Sidewalks 40 1960 0 Heaving & Sagging; In Progress
College Street ES - Exterior Lighting 20 1989 0 In ProgressCollege Street ES - Paint - Commons 15 2014 0 In ProgressCollege Street ES - Paint - Cafeteria 15 2014 0 In Progress
College Street ES - Paint - Library 15 2014 0 In ProgressCollege Street ES - Paint - Gyms 20 2014 0 CMU with FRP - no pads; In Progress
College Street ES - Paint - Exterior 20 2008 0 In Progress
College Street ES - Paint - Hallways 20 2014 0 Original wing painted brick - new wing P-Lam, tack strips. In Progress
DEAP-Teams8/5/2020
Year Built / Age 2001 / 19 Assessment Scale:Campus Square Footage 61,203 100 = New or Newly Replaced
Current Year 2020 0 = End of Life Cycle
Lewisville Learning Center
LIFE
CYC
LE -
YEAR
SLA
ST R
EPLA
CED
% L
IFE
REM
AINI
NGVI
SUAL
EVA
LUAT
ION
WOR
K OR
DER
HIST
ORY
TOTA
L AS
SESS
MEN
T
Type of Material / Notes
FACILITY AGE RATING 50 2001 62Lewisville Learning Cntr - HVAC - Original 20 2001 5 10 14% 9 RTU
Lewisville Learning Cntr - HVAC - 2009 Addition 20 2009 45 55 14% 57 RTULewisville Learning Cntr - HVAC - Controls 20 2001 5 10 8 Controls = I/net
Lewisville Learning Cntr - Ceiling and Lights - Original 20 2001 5 15 10
Lewisville LC - Ceiling and Lights - 2009 Addition 20 2009 45 55 50
Lewisville Learning Cntr - Roof - Flat - Original 20 2001 5 15 -3% 10
Lewisville Learning Cntr - Roof - Flat - 2009 Addition 20 2009 45 50 -3% 46
Lewisville Learning Cntr - Electrical Switchgear - Original 30 2001 37 35 -4% 34
Lewisville Learning Cntr - Electrical Panels - 2009 Addition 30 2009 63 67 -4% 62
Lewisville Learning Cntr - Elevator #1 25 2001 24 30 4% 28Thyssen Krupp
Lewisville Learning Cntr - Elevator #2 (2009 addition) 25 2009 56 65 8% 65Dover
Lewisville Learning Cntr - Fire Safety - Fire Alarm 20 2001 5 10 9% 8 Edwards EST 2 - Limited Parts
Lewisville Learning Cntr - Fire Safety - Sprinkler System 50 2001 62 64 10% 69
Lewisville Learning Cntr - Food Service Boilers - -
Lewisville Learning Cntr - Food Service Freezers - - 2 small reach-insLewisville Learning Cntr - Lightning Detection 15 2009 27 25 26 Siren; Controls at LHS
Lewisville Learning Cntr - Generator - -
Lewisville Learning Cntr - Flooring - Classrooms - VCT 20 2001 5 15 10 VCTLewisville Learning Cntr - Flooring - Classrooms - VCT
Addition 20 2009 45 50 48VCT
Lewisville Learning Cntr - Flooring - Corridors 20 2001 5 15 10 VCTLewisville Learning Cntr - Flooring - Offices 15 2008 20 25 23 Carpet
Lewisville Learning Cntr - Flooring - Cafeteria 20 2001 5 15 10 VCTLewisville Learning Cntr - Flooring - Kitchen 50 2001 62 64 63 Terrazzo
Lewisville Learning Cntr - Doors 20 2002 10 15 13 LightLewisville Learning Cntr - Door Hardware 20 2003 15 20 18
Lewisville Learning Cntr - Casework (Built-Ins) 20 2004 20 25 23
Lewisville Learning Cntr - Restrooms - Faculty 20 2001 5 15 10 Ceramic TileLewisville Learning Cntr - Restrooms - Student 20 2001 5 15 10 Ceramic Tile
Lewisville Learning Cntr - Restrooms - 2009 Additions 20 2009 45 55 50
Lewisville Learning Cntr - Marquee 30 2011 70 70 70
Lewisville Learning Cntr - Paving - Parking Lots 50 2001 62 64 63
Lewisville Learning Cntr - Paving - Sidewalks 40 2001 53 55 54
Lewisville Learning Cntr - Exterior Lighting 30 2020 100 95 98 LEDLewisville Learning Cntr - Paint - Commons 15 2019 93 85 89
Lewisville Learning Cntr - Paint - Gyms 20 2016 80 75 78
Lewisville Learning Cntr - Paint - Exterior 20 2016 80 75 78
Lewisville Learning Cntr - Paint - Hallways 20 2016 80 75 78
Learning Center8/5/2020
Year Built / Age 2010 / 10 Assessment Scale:Campus Square Footage 95,168 100 = New or Newly Replaced
Current Year 2020 0 = End of Life Cycle
Technology, Exploration and Career Center - East
LIFE
CYC
LE -
YEAR
SLA
ST R
EPLA
CED
% L
IFE
REM
AINI
NGVI
SUAL
EVA
LUAT
ION
WOR
K OR
DER
HIST
ORY
TOTA
L AS
SESS
MEN
T
Type of Material / Notes
FACILITY AGE RATING 50 2010 80Career Cntr East - HVAC 20 2010 50 50 12% 56 CHILLER
Career Cntr East - HVAC - Controls 20 2010 50 50 50 Controls = Alerton (control)/Automated Logic (hardware)
Career Cntr East - Ceiling and Lights 20 2010 50 50 50
Career Cntr East - Roof - Standing Seam 30 2010 67 65 18% 78
Career Cntr East - Electrical Switchgear 30 2010 67 70 12% 77
Career Cntr East - Elevator 25 2010 60 60 7% 64 SchindlerCareer Cntr East - Fire Safety - Fire Alarm 20 2010 50 55 5% 55 Edwards Quickstart
Career Cntr East - Fire Safety - Sprinkler System 50 2010 80 82 -3% 79
Career Cntr East - Lightning Detection - - Siren and brains @ Killian MS next door
Career Cntr East - Generator 40 2010 75 75 75 MTV Onsite Energy - DieselCareer Cntr East - Flooring - Classrooms 50 2010 80 82 81 Stained Concrete
Career Cntr East - Flooring - Corridors 50 2010 80 82 81 Stained ConcreteCareer Cntr East - Flooring - Offices 15 2010 33 40 37 Carpet; Front office - VCT (2018)
Career Cntr East - Doors 20 2010 50 50 50
Career Cntr East - Door Hardware 20 2010 50 50 50
Career Cntr East - Casework (Built-Ins) 20 2010 50 50 50
Career Cntr East - Restrooms - Faculty 20 2010 50 55 53 Ceramic TileCareer Cntr East - Restrooms - Student 20 2010 50 55 53 Ceramic Tile
Career Cntr East - Marquee 30 2010 67 70 68
Career Cntr East - Paving - Parking Lots 50 2010 80 82 81
Career Cntr East - Paving - Sidewalks 40 2010 75 78 77
Career Cntr East - Exterior Lighting 20 2010 50 55 53 Well Packs LED 2018Career Cntr East - Paint - Commons 15 2013 53 55 54 Painted sections in 2019
Career Cntr East - Paint - Exterior 20 2010 50 60 55
Career Cntr East - Paint - Hallways 20 2010 50 65 58 2018 painted where needed
TECC-E8/5/2020
Year Built / Age 2020 / 0 Assessment Scale:Campus Square Footage 132,971 100 = New or Newly Replaced
Current Year 2020 0 = End of Life Cycle
Technology, Exploration and Career Center - West
LIFE
CYC
LE -
YEAR
SLA
ST R
EPLA
CED
% L
IFE
REM
AINI
NGVI
SUAL
EVA
LUAT
ION
WOR
K OR
DER
HIST
ORY
TOTA
L AS
SESS
MEN
T
Type of Material / Notes
FACILITY AGE RATING 50 2020 100Career Cntr East - HVAC
Career Cntr East - HVAC - ControlsCareer Cntr East - Ceiling and Lights
Career Cntr East - Roof - Standing Seam
Career Cntr East - Electrical Switchgear
Career Cntr East - Elevator
Career Cntr East - Fire Safety - Fire Alarm
Career Cntr East - Fire Safety - Sprinkler System
Career Cntr East - Lightning Detection
Career Cntr East - Generator
Career Cntr East - Flooring - Classrooms
Career Cntr East - Flooring - Corridors
Career Cntr East - Flooring - Offices
Career Cntr East - Doors
Career Cntr East - Door Hardware
Career Cntr East - Casework (Built-Ins)
Career Cntr East - Restrooms - Faculty
Career Cntr East - Restrooms - Student
Career Cntr East - Marquee
Career Cntr East - Paving - Parking Lots
Career Cntr East - Paving - Sidewalks
Career Cntr East - Exterior Lighting
Career Cntr East - Paint - Commons
Career Cntr East - Paint - Exterior
Career Cntr East - Paint - Hallways
TECC-W8/5/2020
ASSESSMENT SUMMARYAdministration
Current Year 2020
Adm
inist
ratio
n Ce
nter
(LIS
DAC)
Asse
ssm
ent-T
extb
ook
Cam
pus S
uppo
rtDi
strib
utio
n Ce
nter
Futu
re F
acili
ties/
Cons
truct
ion
(For
mer
ly D
ALE
JACK
SON
CC)
Facil
ity S
ervi
ces
The C
olon
y Bu
s Ba
rn
Year Built 2005 2009 1965 1979 1985 1961 2006Age 15 11 55 41 35 59 14
HVAC 26 49 -8 -20 0 2 38
HVAC Additions 96 - - - 29 - -
HVAC - Controls 25 45 65 -20 - 63 0
HVAC - Controls Additions 93 - - - 28 - -
Roof - Flat 25 - -11 - 24 - -
Roof - Flat - - -3 - - - -
Roof - Metal - 58 - 91 - -40 61
Roof - Shingled - - - - 0 - -
Electrical Panels 53 66 -3 -20 - -20 27
Elevators 28 - - - 77 - -
Fire Safety - Fire Alarm 83 47 - 72 - - 30
Fire Safety - Sprinkler System 34 38 - 0 - - 0
Food Service Boilers - - - - - - -
Food Service Freezer - - - 80 70 - -
Food Service Freezer - - - 80 0 - -
Generator 84 - - - - - -
Und. Storage Tanks - Fuel - - - -7 - - -
Abv. Storage Tanks - Fuel - - - - - 46 72
Flooring - Offices 5 28 37 95 - 25 33
Flooring - Offices - West - - - - 0 - -
Flooring - Board Room 83 - - - - - -
Flooring - Meeting Room 5 - - - 0 - -
Flooring - Corridors 28 48 37 95 - 95 -
Flooring - Corridors-West - - - - 32 - -
Flooring - Work Rooms 28 77 53 - - 95 -
Flooring - Break Rooms 28 48 -8 - - 95 33
Flooring - Commons 80 - - - - - -
Flooring - Stairs 91 - - - - - -
Flooring - Warehouse - - - 24 - - -
Board Room Seating 5 - - - - - -
Doors 28 48 10 -8 0 -5 33
Door Hardware 28 48 10 -8 0 -5 33
Casework (Built-Ins) 38 45 10 -8 0 -50 33
Restrooms - Men's 28 45 -8 -38 - 5 33
Restrooms - Women's 28 45 -8 -38 - 5 33
Restrooms - Other Areas - - - 95 68 -13 -
Restrooms - Other Areas - - - 95 68 -13 -
Marquee / Signage - - - - 70 -43 -
Paving - Parking Lots 30 -5 33 17 86 -43 71
Paving - Sidewalks 61 34 20 1 14 2 65
Exterior Lighting 90 62 -3 -8 98 38 54
Paint - Commons 88 31 37 86 0 40 100
Paint - Commons - Additions 91 - - - - - -
Paint - Exterior 93 43 55 -38 25 63 33
NETWORK OPERATION CENTER - - - - 0 - -
Liebert A/C 75 - - - 95 - -
Uninterrupted Power Supply Battery Replacement
0 - - - - - -
Administration Summary8/5/2020
Year Built / Age 2005 / 15 Assessment Scale:Campus Square Footage 149,305 100 = New or Newly Replaced
Current Year 2020 0 = End of Life Cycle
Administration - LISD Administrative Center
LIFE
CYC
LE -
YEAR
SLA
ST R
EPLA
CED
% L
IFE
REM
AINI
NGVI
SUAL
EVA
LUAT
ION
WOR
K OR
DER
HIST
ORY
TOTA
L AS
SESS
MEN
T
Type of Material / Notes
FACILITY AGE RATING 50 2005 70 Admin LISDAC - HVAC 20 2005 25 25 4% 26 CHILLER 4 RTU
Admin LISDAC - HVAC - Controls 20 2005 25 25 25 Controls = Alerton Admin LISDAC - Ceiling and Lights 20 2005 25 25 25
Admin LISDAC - Roof - Flat 20 2010 50 55 0% 53
Admin LISDAC - Electrical Switchgear 30 2005 50 55 1% 53
Admin LISDAC - Elevator #1 25 2005 40 25 -50% 16 SchindlerAdmin LISDAC - Lift (behind stage) 25 2005 40 40 40 W.L. Electric Screw Drive
Admin LISDAC - Fire Safety - Fire Alarm 20 2018 90 95 -11% 83 Edwards EST 3 Admin LISDAC - Fire Safety - Sprinkler System 50 2005 70 65 -50% 34 50 HP Pump
Admin LISDAC - Generator 40 2013 83 85 84 Cummins - Diesel Admin LISDAC - Flooring - Offices 15 2005 0 10 5 Carpet & Carpet Tiles; several offices replaced in
2019
Admin LISDAC - Flooring - Offices 15 2017 80 85 83 Carpet Tiles Admin LISDAC - Flooring - Board Room 15 2017 80 85 83 Carpet
Admin LISDAC - Flooring - Room D 15 2005 0 10 5 Carpet Admin LISDAC - Flooring - Corridors 20 2005 25 30 28 VCT
Admin LISDAC - Flooring - Work Rooms 20 2005 25 30 28 VCT Admin LISDAC - Flooring -Break Rooms 20 2005 25 30 28 VCT
Admin LISDAC - Flooring - Commons 50 2005 70 70 70 Ceramic Tile Admin LISDAC - Flooring - Stairs 50 2005 70 70 70 Terrazzo
Admin LISDAC - Board Room Seating 15 2005 0 10 5 reworked counterAdmin LISDAC - Doors 20 2005 25 30 28
Admin LISDAC - Door Hardware 20 2005 25 30 28
Admin LISDAC - Casework (Built-Ins) 20 2005 25 50 38 reworked built-ins Admin LISDAC - Restrooms - Men's (4) 20 2005 25 30 28 Ceramic tile floor/walls to 4'. Solid plastic
partition. Some areas repaired
Admin LISDAC - Restrooms - Women's (4) 20 2005 25 30 28 Ceramic tile floor/walls to 4'. Solid plastic partition.
Admin LISDAC - Marquee / Signage - -
Admin LISDAC - Paving - Parking Lots 50 1985 30 30 30 Concrete Admin LISDAC - Paving - Sidewalks 40 2005 63 60 61
Admin LISDAC - Exterior Lighting 30 2017 90 90 90 Wall packs; LED parking lot lights Admin LISDAC - Paint - Commons Areas 15 2018 87 90 88
Admin LISDAC - Paint - Exterior 20 2018 90 95 93
NETWORK OPERATION CENTER
Admin LISDAC - Liebert A/C 20 2015 75 75 75
Admin LISDAC - Uninterrupted Power Supply Battery Replacement 5 2018 Technology item - Tracking purposes
only
Welcome Center 2018 Admin LISDAC - WC - HVAC 20 2018 90 95 4% 96 CHILLER 4 RTU
Admin LISDAC - WC - HVAC - Controls 20 2018 90 95 93 Controls = Alerton Admin LISDAC - WC - Ceiling and Lights 20 2018 90 95 93
Admin LISDAC - WC - Roof - Flat 20 2005 25 25 25
Admin LISDAC - WC - Fire Safety - Sprinkler System 50 2018 96 96 0% 96 50 HP Pum Admin LISDAC - WC - Flooring - Commons 20 2018 90 70 80 LVT
Admin LISDAC - WC - Flooring 15 2018 87 95 91 Carpet TilesAdmin LISDAC - WC - Doors 20 2018 90 90 90
Admin LISDAC - WC - Door Hardware 20 2018 90 90 90
Admin LISDAC - WC - Casework (Built-Ins) 20 2018 90 90 90
Admin LISDAC - WC - Restrooms 20 2018 90 85 88
Admin-LISDAC8/5/2020
LIFE
CYC
LE -
YEAR
SLA
ST R
EPLA
CED
% L
IFE
REM
AINI
NGVI
SUAL
EVA
LUAT
ION
WOR
K OR
DER
HIST
ORY
TOTA
L AS
SESS
MEN
T
Type of Material / Notes
Admin LISDAC - Paint - Commons Areas 15 2018 87 95 91
Bolin/Prof. Learning Center 2020 Admin LISDAC - Bolin - HVAC 20 2020
Admin LISDAC - Bolin - HVAC - Controls 20 2020
Admin LISDAC - Bolin - Ceiling and Lights 20 2020
Admin LISDAC - Bolin - Roof - Flat 20 2020
Admin LISDAC - Bolin - Fire Safety - Sprinkler System 50 2020
Admin LISDAC - Bolin - Flooring - Commons 20 2020
Admin LISDAC - Bolin - Flooring 15 2020
Admin LISDAC - Bolin - Doors 20 2020
Admin LISDAC - Bolin - Door Hardware 20 2020
Admin LISDAC - Bolin - Casework (Built-Ins) 20 2020
Admin LISDAC - Bolin - Restrooms 20 2020
Admin LISDAC - Bolin - Paint - Commons Areas 15 2020
Admin-LISDAC8/5/2020
Year Built / Age Unknown, Purchased 2009 / 11 Assessment Scale:Campus Square Footage 36,955 100 = New or Newly Replaced
Current Year 2020 0 = End of Life Cycle
Assessment / Textbook Warehouse
LIFE
CYC
LE -
YEAR
SLA
ST R
EPLA
CED
% L
IFE
REM
AINI
NGVI
SUAL
EVA
LUAT
ION
WOR
K OR
DER
HIST
ORY
TOTA
L AS
SESS
MEN
T
Type of Material / Notes
FACILITY AGE RATING 50 2009 78Assessment / Txtbk Whse - HVAC 20 2009 45 45 9% 49 RTU
Assessment / Txtbk Whse - Ceiling and Lights 20 2009 45 45 45
Assessment / Txtbk Whse - Roof - Metal 30 2009 63 65 -10% 58
Assessment / Txtbk Whse - Electrical Switchgear 30 2009 63 65 4% 66
Assessment / Txtbk Whse - Fire Safety - Fire Alarm 20 2009 45 45 5% 47Edwards Quickstart
Assessment / Txtbk Whse - Fire Safety - Sprinkler System 50 2009 78 75 -50% 38
Assessment / Txtbk Whse - Generator - -
Assessment / Txtbk Whse - Flooring - Offices 15 2009 27 30 28 CarpetAssessment / Txtbk Whse - Flooring - Corridors 20 2009 45 50 48 VCT
Assessment / Txtbk Whse - Flooring - Work Rooms 50 2009 78 75 77Stained concrete
Assessment / Txtbk Whse - Flooring -Break Rooms 20 2009 45 50 48 VCT
Assessment / Txtbk Whse - Doors 20 2009 45 50 48
Assessment / Txtbk Whse - Door Hardware 20 2009 45 50 48
Assessment / Txtbk Whse - Casework (Built-Ins) 20 2009 45 45 45
Assessment / Txtbk Whse - Restrooms - Men 20 2009 45 45 45 Ceramic tile 2x2, 6x6 wall, plastic partitions
Assessment / Txtbk Whse - Restrooms - Women 20 2009 45 45 45 Ceramic tile 2x2, 6x6 wall, plastic partitions; Additional restroom added 2017
Assessment / Txtbk Whse - Marquee / Signage - - Gate entrance litAssessment / Txtbk Whse - Paving - Parking Lots 20 1995 -25 15 -5 Asphalt; poor condition - needs repair
Assessment / Txtbk Whse - Paving - Sidewalks 40 1995 38 30 34
Assessment / Txtbk Whse - Exterior Lighting 30 2009 63 60 62
Assessment / Txtbk Whse - Paint - Commons Areas 15 2009 27 35 31 Hallways 2015Assessment / Txtbk Whse - Paint - Exterior 20 2009 45 40 43
Assessmnt-Textbk Whse8/5/2020
Year Built / Age 1965 / 55 Assessment Scale:Campus Square Footage 8,045 100 = New or Newly Replaced
Current Year 2020 0 = End of Life Cycle
Campus Support Center
LIFE
CYC
LE -
YEAR
SLA
ST R
EPLA
CED
% L
IFE
REM
AINI
NGVI
SUAL
EVA
LUAT
ION
WOR
K OR
DER
HIST
ORY
TOTA
L AS
SESS
MEN
T
Type of Material / Notes - Items highlighted Orange are 2017 Bond
FACILITY AGE RATING 50 1965 -10Campus Support - HVAC 20 1997 -15 0 -12% -8 RTU; South side unit replaced 2019 (Lennox)
Campus Support - HVAC - Controls 20 2013 65 65 65 Controls = EntouchCampus Support - Ceiling and Lights 20 1997 -15 0 -8
Campus Support - Roof - Flat 20 1997 -15 0 -46% -11 Major repairs 2013Campus Support - Electrical Switchgear 30 1988 -7 0 9% -3
Campus Support - Fire Safety - Fire Alarm - -
Campus Support - Fire Safety - Sprinkler System - -
Campus Support - Food Service Freezers - -
Campus Support - Generator - -
Campus Support - Flooring - Offices 15 2010 33 40 37 CarpetCampus Support - Flooring - Corridors 15 2010 33 40 37 Carpet
Campus Support - Flooring - Work Rooms 20 2010 50 55 53 VCTCampus Support - Flooring -Break Rooms 20 1997 -15 0 -8 VCT
Campus Support - Doors 20 1997 -15 0 -8
Campus Support - Door Hardware 20 1997 -15 0 -8
Campus Support - Casework (Built-Ins) 20 1997 -15 0 -8
Campus Support - Restrooms - Men 20 1997 -15 0 -8
Campus Support - Restrooms - Women 20 1997 -15 0 -8
Campus Support - Marquee / Signage - -
Campus Support - Paving - Parking Lots 50 1988 36 30 33 ConcreteCampus Support - Paving - Sidewalks 40 1988 20 20 20
Campus Support - Exterior Lighting 30 1988 -7 0 -3
Campus Support - Paint - Commons Areas 15 2010 33 40 37 2012 touch up throughout buildingCampus Support - Paint - Exterior 20 2010 50 60 55
Campus Support8/5/2020
Year Built / Age Unknown, Purchased 1979 / 41 Assessment Scale:Campus Square Footage 35,220 100 = New or Newly Replaced
Current Year 2020 0 = End of Life Cycle
Distribution Center
LIFE
CYC
LE -
YEAR
SLA
ST R
EPLA
CED
% L
IFE
REM
AINI
NGVI
SUAL
EVA
LUAT
ION
WOR
K OR
DER
HIST
ORY
TOTA
L AS
SESS
MEN
T
Type of Material / Notes - Items highlighted Orange are 2017 Bond
FACILITY AGE RATING 50 1979 18Distribution Cntr - HVAC 20 1990 -50 10 -20 Split System
Distribution Cntr - HVAC - Controls 20 1990 -50 10 -20 Controls = AlertonDistribution Cntr - Ceiling and Lights 20 1990 -50 15 -18
Distribution Cntr - Roof - Metal 30 2012 73 82 17% 91
Distribution Cntr - Electrical Switchgear 30 1979 -37 0 -7% -20
Distribution Cntr - Fire Safety - Fire Alarm 20 2012 60 65 16% 72 Tied Security Alarm SystemDistribution Cntr - Fire Safety - Sprinkler System - 0
Distribution Cntr - Food Service Freezer 20 2016 80 80 80 Backup FreezerDistribution Cntr - Food Service Freezer 1990 20 2016 80 80 80
Distribution Cntr - Generator - -
Distribution Cntr - Und. Storage Tanks - Fuel 30 1986 -13 0 -7 New Controls - 2018; 2 tanks 12,000 gallons each, both deisel
Distribution Cntr - Flooring - Offices 20 2019 95 95 95 VCTDistribution Cntr - Flooring - Corridors 20 2019 95 95 95 VCT
Distribution Cntr - Flooring - Warehouse 50 1979 18 30 24 ConcreteDistribution Cntr - Doors 20 1996 -20 5 -8
Distribution Cntr - Door Hardware 20 1996 -20 5 -8
Distribution Cntr - Casework (Built-Ins) 20 1996 -20 5 -8
Distribution Cntr - Restrooms - Men 20 1985 -75 0 -38 Bus BarnDistribution Cntr - Restrooms - Women 20 1985 -75 0 -38 Bus Barn
Distribution Cntr - Restrooms - Men 20 2019 95 95 95 Distribution Center - flooring and vanitiesDistribution Cntr - Restrooms - Women 20 2019 95 95 95 Distribution Center - flooring and vanities
Distribution Cntr - Marquee / Signage - -
Distribution Cntr - Paving - Parking Lots 50 1979 18 15 17 Concrete; Gravel added and leveled in Spring of 2019
Distribution Cntr - Paving - Sidewalks 40 1979 -3 5 1
Distribution Cntr - Exterior Lighting 30 1985 -17 0 -8
Distribution Cntr - Paint - Commons Areas 15 2018 87 85 86 First Student Complex painted all areas in 2017
Distribution Cntr - Paint - Exterior 20 1985 -75 0 -38 Prefinish panels
Distribution Center8/5/2020
Year Built / Age 1985 / 35 Assessment Scale:Campus Square Footage 55,331 100 = New or Newly Replaced
Current Year 2020 0 = End of Life Cycle
Future Facilities/Construction (Formerly Dale Jackson Career Center)
LIFE
CYC
LE -
YEAR
SLA
ST R
EPLA
CED
% L
IFE
REM
AINI
NGVI
SUAL
EVA
LUAT
ION
WOR
K OR
DER
HIST
ORY
TOTA
L AS
SESS
MEN
T
Type of Material / Notes - Items highlighted Orange are 2017 Bond
FACILITY AGE RATING 50 1985 30Dale Jackson CC - Foundation 50 1985 0 In Progress
Dale Jackson CC - HVAC 20 2005 25 30 4% 29 RTUDale Jackson CC - HVAC - Controls 20 2005 25 30 28 Controls = I/net
Dale Jackson CC - Ceiling and Lights 20 2005 25 30 28
Dale Jackson CC - Roof - Flat 20 2005 25 35 -21% 24
Dale Jackson CC - Roof - Metal 30 1985 0 Shops; In ProgressDale Jackson CC - Electrical Switchgear 30 2013 77 80 -1% 77
Dale Jackson CC - Fire Safety - Fire Alarm 20 2014 70 70 70 Notifier 500Dale Jackson CC - Fire Safety - Sprinkler System 50 1985 0 Over Wood Shop & Spray Booth; In Progress
Dale Jackson CC - Lightning Detection - - Siren next door @ LLCDale Jackson CC - Generator - - In Progress
Dale Jackson CC - Flooring - Classrooms 20 1985 0 VCT; In ProgressDale Jackson CC - Flooring - Corridors 20 1985 0 VCT; In Progress
Dale Jackson CC - Flooring - Offices 15 2010 33 30 32 CarpetDale Jackson CC - Doors 20 1985 0 In Progress
Dale Jackson CC - Door Hardware 20 1985 0 In ProgressDale Jackson CC - Casework (Built-Ins) 20 1985 0 In ProgressDale Jackson CC - Restrooms - Faculty 20 2013 65 70 68 Ceramic TileDale Jackson CC - Restrooms - Student 20 2013 65 70 68 Ceramic Tile
Dale Jackson CC - Marquee 30 2011 70 70 70 Need to change outDale Jackson CC - Paving - Parking Lots 50 2013 86 85 86
Dale Jackson CC - Paving - Sidewalks 40 1985 13 15 14
Dale Jackson CC - Exterior Lighting 20 2020 100 95 98 LEDDale Jackson CC - Paint - Commons 15 2013 0 In Progress
Dale Jackson CC - Paint - Exterior 20 2005 25 25 25
Dale Jackson CC - Paint - Hallways 20 2013 0 In ProgressDale Jackson CC - Dust Collector 20 2019 95 95 95 Wood Shop; Replaced 1/24/19
Dale Jackson FS8/5/2020
Year Built / Age 1961 / 59 Assessment Scale:Campus Square Footage 18,288 100 = New or Newly Replaced
Current Year 2020 0 = End of Life Cycle
Facility Services
LIFE
CYC
LE -
YEAR
SLA
ST R
EPLA
CED
% L
IFE
REM
AINI
NGVI
SUAL
EVA
LUAT
ION
WOR
K OR
DER
HIST
ORY
TOTA
L AS
SESS
MEN
T
Type of Material / Notes - Items highlighted Orange are 2017 Bond
FACILITY AGE RATING 50 1961 -18Facility Services - HVAC 20 2000 0 5 -30% 2 RTU; one unit replaced 2018
Facility Services - HVAC - Controls 20 2012 60 65 63 Controls = Entouch/AlertonFacility Services - Ceiling and Lights 20 2000 0 0 0
Facility Services - Roof - Metal 30 1961 -97 0 18% -40 Roof Coated in 2010Facility Services - Electrical Switchgear 30 1980 -33 0 -17% -20
Facility Services - Fire Safety - Fire Alarm - -
Facility Services - Fire Safety - Sprinkler System - -
Facility Services - Generator - -
Facility Services - Abv. Storage Tanks - Fuel 50 1993 46 46 46
Facility Services - Flooring - Offices 15 2008 20 30 25 CarpetFacility Services - Flooring - Corridors 20 2019 95 95 95 VCT
Facility Services - Flooring - Work Rooms 20 2019 95 95 95 VCTFacility Services - Flooring -Break Rooms 20 2019 95 95 95 VCT
Facility Services - Doors 20 1998 -10 0 -5
Facility Services - Door Hardware 20 1998 -10 0 -5
Facility Services - Casework (Built-Ins) 20 1980 -100 0 -50
Facility Services - Restrooms - Men's 20 2001 5 5 5 New flooring 2019Facility Services - Restrooms - Women's 20 2001 5 5 5 New flooring 2020
Facility Services - Restrooms - Grounds 20 1995 -25 0 -13
Facility Services - Restrooms - Grounds 20 1995 -25 0 -13
Facility Services - Paving - Parking Lots 20 1980 -100 15 -43 AsphaltFacility Services - Paving - Sidewalks 40 1980 0 3 2 Concrete
Facility Services - Exterior Lighting 30 2004 47 30 38
Facility Services - Paint - Commons Areas 15 2011 40 40 40 painting as needed; some areas painted 2020 due to required abatement
Facility Services - Paint - Exterior 20 2019 95 30 63 painted due to peeling and cracking
Facility Services8/5/2020
Year Built / Age 2006 / 14 Assessment Scale:Campus Square Footage 21,600 100 = New or Newly Replaced
Current Year 2020 0 = End of Life Cycle
The Colony Bus Barn
LIFE
CYC
LE -
YEAR
SLA
ST R
EPLA
CED
% L
IFE
REM
AINI
NGVI
SUAL
EVA
LUAT
ION
WOR
K OR
DER
HIST
ORY
TOTA
L AS
SESS
MEN
T
Type of Material / Notes
FACILITY AGE RATING 50 2006 72The Colony Bus Barn - HVAC 20 2006 30 35 17% 38 RTU
The Colony Bus Barn - HVAC - Controls - - Controls = The Colony Bus Barn - Ceiling and Lights 20 2006 30 35 33
The Colony Bus Barn - Roof - Metal 30 2006 53 55 13% 61
The Colony Bus Barn - Electrical Switchgear 30 2006 53 55 -50% 27
The Colony Bus Barn - Fire Safety - Fire Alarm 20 2006 30 25 7% 30 Edwards EST 2 - Limited Parts The Colony Bus Barn - Fire Safety - Sprinkler System - 0
The Colony Bus Barn - Generator - -
The Colony Bus Barn - Abv. Storage Tanks - Fuel 50 2006 72 72 72
The Colony Bus Barn - Flooring - Offices 20 2006 30 35 33 VCTThe Colony Bus Barn - Flooring -Break Rooms 20 2006 30 35 33 Carpet and VCT
The Colony Bus Barn - Doors 20 2006 30 35 33
The Colony Bus Barn - Door Hardware 20 2006 30 35 33
The Colony Bus Barn - Casework (Built-Ins) 20 2006 30 35 33
The Colony Bus Barn - Restrooms - Men 20 2006 30 35 33 Ceramic tile 2x2 floor, 4x4 wall, solid plastic partitions
The Colony Bus Barn - Restrooms - Women 20 2006 30 35 33 Ceramic tile 2x2 floor, 4x4 wall, solid plastic partitions
The Colony Bus Barn - Marquee / Signage - -
The Colony Bus Barn - Paving - Parking Lots 50 2006 72 70 71 ConcreteThe Colony Bus Barn - Paving - Sidewalks 40 2006 65 65 65
The Colony Bus Barn - Exterior Lighting 30 2006 53 55 54 9 Spun aluminum The Colony Bus Barn - Paint - Commons Areas 15 2020 100 100 100
The Colony Bus Barn - Paint - Exterior 20 2006 30 35 33
The Colony Bus Barn8/5/2020