12
Assembly instructi ons Part 1 PPE & Tools 19 January 2014 Sunrider II

Assembly instructions Part 1 PPE & Tools 19 January 2014 Sunrider II

Embed Size (px)

Citation preview

Assembly instructions

Part 1PPE & Tools

19 January 2014

Sunrider II

Contents part 1Section Subjest Slidepart 1 – 1 HSE 4part 1 – 2 Tools 5

1.Persoonlijke beschermings-middelen (PBM)

Use appropriate Personal Protective Equipment (PPE):

• Work gloves.• Disposable gloves.• Hearing protection.• Dusk mask.• Safety goggles.

2.Tools.

Hole saw.

‘Cats-tail’ file.

Multi saw.

(battery) drill.

Power file.

Blind rivet pliers.

Locking pliers.

Rivet insert nut plier.

ScaleMixing cups, large, small.Stir wood.

Grain 150 sandpaper.Sanding block.

Vice.

Benzene.

Clamps, jaw length ~ 90 mm and 140 mm.

Sharp knife.

Mastic gun.

Ballast, minimum 25 kg (2x).